W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 013 HVAC System Lima.pdf

PDF 2 MB Posted

Attached to
Operation and Maintenance of US Navy Medical Research Unit Six (NAMRU-6) in Peru
Solicitation number
W9127822R0005
Issued by

About this file

This federal contract solicitation seeks operation and maintenance services for US Navy Medical Research Unit Six facilities in Peru. Requirements include preventive, predictive, demand, and emergency maintenance of architectural, mechanical, electrical, and instrumentation systems at specified medical research laboratory and support facilities in Lima and other dispersed locations, as well as limited grounds keeping. A firm-fixed-price contract will be awarded for a base year and four option years. Offerors must meet an average annual gross revenue size standard of $41.5 million for the past three years under NAICS code 561210. The solicitation will be issued only as a direct download from the SAM.gov website, where any changes will also be posted.

View the file

Other files

File Type Posted
W9127822R0005 Solicitation-Amend 0006.pdf PDF
W9127822R0005 Second Site Visit Attendance List.pdf PDF
W9127822R0005 Solicitation-Amend 0004.pdf PDF
W9127822R0005 Solicitation-Amend 0003.pdf PDF
W9127822R0005 Pre-Proposal Conference Attendance List.pdf PDF
W9127822R0005 Pre-proposal Conference Slide Presentation.pdf PDF
W9127822R0005 Solicitation-Amend 0002.pdf PDF
W9127822R0005 Solicitation-Amend 0001.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 008 Boiler & Cage Washer.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.3 Site Plan Puerto Maldonado.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.13 Bid Schedule.xlsx XLSX spreadsheet
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 017 Landscape Maintenance.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 006 Grounding & Lightning Protection System.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 014 Building Automation System.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 016 HVAC System Puerto Maldonado.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 021 Sterilizer.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 018 Water Treatment Systems.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 015 HVAC System Iquitos.pdf PDF
W9127822R0005 Section J - List of Exhibits.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.11 Form W-14.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.5 US & Host Nation Holidays.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 012 Fire Protection System.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 010 X-Ray Security Scanner.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.9 RSO Personnel Screening Requirements.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.3 Site Plan Iquitos.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 011 Fire Alarm System.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 003 Generator.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.4 Unscheduled Maintenance Service Calls 2020 & 2021.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 007 UPS.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.7 Known Asbestos, Lead & Other Hazard Materials.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.3 Site Plan Lima .pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 002 Above Ground Diesel Tanks & Components.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 001 Access Control CCTV & Public Address System.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 020 Exterior & Interior Building Maintenance.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 004 Auto Lighting System Animal Facilities.pdf PDF
W9127822R0005 Solicitation.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.1 Requirements List.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.8 NAMRU-6 Safety & Security Requirements.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.12 Instructions for Form W-14.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.10 List of Acronyms.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 019 Pest Control Disinfection of Areas.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 009 Elevators.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.4 NAMRU-6 Standard Service Calls.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 005 Electrical Substation & Main Panelboards.pdf PDF
W9127822R0005 Section J - Exhibit 11.2.6 US Navy OEBGD.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD OPERATING PROCEDURE (SOP) – BIMONTHLY PREVENTIVE

MAINTENANCE ACTIVITIES FOR HVAC SYSTEM IN LIMA SITE

General Requirements for Lima:

NAMRU-6 at Lima has the following air conditioning equipment per building:

One (01) Chiller brand York, Model: YCAV0157PA28VAC & Capacity: 157 TN

Five (05) Air Handling Units (AHUs). Two units brand York and three units brand SEMCO.

Nine (09) Variable Speed Drives (VSDs), located in the AHUs, Chiller and HVAC Boiler, as shown in table below:

VSD LOCATION QTY BRAND MODEL SERIAL POWER

CHILLER 02 Telemecanique ATV71HU75M3 SW0851000

051/52 7.5kw-10HP 240v

BOILER 02 Telemecanique ATV71HU15M3 No visible 1.5kw-2 HP240v

AHU101 01 DANFOSS VLT 2800 No visible 15HP240v

AHU102 01 YASKAWA CIMR-E7U2011 No visible 30HP240v

AHU103 01 YORK AYK550-UH-

017A- 2+K465

2083903526 15HP240v

AHU202 01 YASKAWA CIMR-E7U2011 No visible 15HP240v

AHU201 01 ABB ASC550-01-

046A-2

1063305036 15HP240v

(04) Chiller and Boiler Pumps, as described below:

Chiller pumps:

Brand: Bell & Gossett.

Capacity: 10 HP Serial: CO74527-02L80.

Size: 1531.

RPM: 1800.

Quantity: two (2)

HVAC Boiler pumps:

Brand: Bell & Gossett.

Section J - Exhibit 11.2.2 SOP-FAC 013

Capacity: 5 HP Serial: CO74526-01L80.

Size: 1531.

RPM: 1800

Quantity: two (2)

One (01) HVAC Boiler, as described below:

Brand: BRYAN.

Model: AB120-W-FDGO.

Date of fabrication: 2008.

Bryan #96048.

National Board Number: 55441.

Fuel: Diesel

Filters to be replace in an annual basis, based on the table below:

ITEM DESCRIPTION TYPE EFICIENCY DIMENTIONS

(Hor,Vert,Depth) QUANTITY

1 Filters Bag 90-95% MERV 14 20x24x22 12 2 Pre-filters (carbon) Pleated 30% MERV 8 20x24x2 12 3 Return filters Pleated 30/30 MERV 8 24x24x4 42 4 Return filters Pleated 30/30 MERV 8 12x24x4 36 5 Pre-filters Pleated 30/30 MERV 8 20x20x4 6 6 Pre-filters Pleated 30/30 MERV 8 20x24x4 12

7 Filters Pleated RIGA-FLO

MERV 14 95% 20X24X12 7

8 Filters Pleated RIGA-FLO

MERV 14 95% 20X20X12 21

9 Filters Bag 90-95% MERV 14 24X24X22 12

10 Filters Pleated RIGA-FLO MERV 14 95% 24x24x12 10

11 Filters Pleated RIGA-FLO MERV 14 95% 12x24x12 08

12 Filters HEPA 99.99% 24x24x12 11 13 Filters Pleated 30/30 MERV 8 19x40x2 24 14 Return filters Bag 90-95% MERV 14 12X24X15 12 15 Filters Pleated 30/30 MERV 8 20X25X2 132 16 Filters Pleated 30/30 MERV 8 15x24x2 12 17 Filters Pleated 30/30 MERV 8 16X30X2 12 18 Filters Pleated 30/30 MERV 8 20x24x2 24 19 Filters Pleated 30/30 MERV 8 12x24x2 24

Four (04) Exhaust fans as described below:

- VEKTOR VK-MD-15

- VEKTOR VK-MD-18

- VEKTOR VK-MD-20

- VEKTOR VK-MD-22

Three (03) split duct air conditioning units brand McQuay, Capacity 5 TON (2000CFM), 6.5 TON (2600CFM) and 3 TON (1200CFM) respectively. All of them installed at Building 10 or security building.

Two (02) split duct air conditioning units brand McQuay, Capacity 4 TON (1600CFM) and 6 TON (2400CFM) respectively. Installed at Building 11 or procurement building.

One (01) Roof Top Unit (RTU) brand AAON, model RN-015-8-0-EB0A-142. Capacity: 176 MBH, 4000 CFM. Three (03) Variable Air Volume terminals: VAV-SH-101, VAV-SH-102, VAV-SH-103.

All of them installed at Building 11 or Conference Building.

One (01) precision air conditioning unit, Capacity: 60,000 BTU/HR. Installed at Data Server Room in Building 1 or Main Building.

Contractor shall provide the names and certification of the technicians performing preventive maintenance tasks. Only qualified technicians shall perform preventive and corrective maintenance tasks. Contractor must demonstrate that they have official representative of the brands of the equipment: GREENHECK, YORK, AAON, MCQUAY or technicians trained/certified to perform work to this equipment.

Contractor shall perform quarterly and annual preventive maintenance activities to all of the air conditioning units specified in this document. It is the responsibility of the contractor to perform a full inspection of the systems and collect all required information to provide a quality preventive maintenance. In addition, contractor shall review operation manuals for the equipment of the systems under this contract and include any recommended preventive maintenance activities by the manufacturer not mentioned in this document.

Contractor shall elaborate, review and update the drawings in AUTOCAD of the HVAC system in Lima site on an annual basis.

Contractor shall include all materials, tools and personal protective equipment necessary to perform preventive and corrective maintenance work. Contractor must use the necessary and appropriate equipment to delimit the work area and not allow the pedestrian traffic. The contractor’s staff shall use the appropriate PPE for the activity to perform. NAMRU-6 will not provide any materials, tools nor PPE to the contractor to perform their work.

The contractor shall provide a weekly progress report to the NAMRU-6 facilities department, as well as a completion report when completing the maintenance work to include: activities performed with pictures, recommendations, conclusion and future needed corrective maintenance tasks. When a corrective maintenance work is required, the contractor shall submit a report detailing the problem encountered, with a quotation of the solution.

The preventive maintenance work will be coordinated between NAMRU-6 facilities staff and the staff assigned by the contractor.

Contractor shall perform operational testing of the systems at the completion of each preventive maintenance work. NAMRU-6 facilities department will assign a staff to participate in the operational testing and contractor shall prepare an operational testing form (checklist) to be signed by the facilities staff once testing is perform and accepted.

It is the responsibility of the contractor to dispose properly out of NAMRU-6 facilities all consumable materials and garbage generated by the contractor during the performance of the maintenance activities.

Applicable codes:

The following are applicable codes for the elaboration of the preventive maintenance plan, reports and activities mentioned in this document:

NACE

ASHRAE

IMC-International Mechanical Code BMBL 6th edition (Biosafety in Microbiological & Biomedical Laboratories) OEBGD (Overseas Environmental Baseline Guidance Document) DoD UFC (Unified Facilities Criteria)

NFPA 77

NFPA 70

NEC (National Electrical Code) Local (Host Country) regulations RNE (Peruvian National Building Code) IBC (International Building Code)

NACE

AWWA

IPC (International Plumbing Code)

Description of work required in Lima

HVAC systems in Lima

The contractor shall perform the following preventive maintenance activities:

HVAC system – LIMA Item Sub-system Task Frequency

1 Mechanical system of HVAC units

Cleaning of evaporator coils and condenser coils, internal and external, with pressurized liquid.

Quarterly

2 Mechanical system of

Cleaning of condensate tray (tray), to avoid plugging the condensation water discharge.

Quarterly

3 Mechanical system of

Cleaning of motor blades, grids, condensers and turbines.

Quarterly

4 Mechanical system of

Adjustment of charge and refrigerant gas

R-22, according to equipment design.

(Alternatively, ecological refrigerant as applicable).

Quarterly

5 Mechanical system of

Change of insulating sleeve (armaflex) in copper pipe, if necessary Quarterly

6 Mechanical system of

Cleaning of air filters and/or replace if necessary Quarterly

7 Mechanical system of

Verification of temperature of the conditioned areas. Temperature sensor ohm value reading.

Quarterly

8 Mechanical system of HVAC units

Verification and, where appropriate, correction to the compressor duty cycle. Quarterly

9 Mechanical system of HVAC units

Verification and, where appropriate, correction of leaks. Quarterly

10 Mechanical system of HVAC units

Cleaning of thermostat, verifying that it works correctly, in its stop, start and automatic cut by temperature.

Quarterly

11 Mechanical system of HVAC units

Verification of the conditions and trajectory of the ducts of the air conditioning system. Quarterly

12 Mechanical system of HVAC units Repair of leaks in external ducts (foil). Quarterly

13 Mechanical system of HVAC units

Verification of belts, pulleys and bearings;

adjustment, cleaning, lubrication and leveling.

Quarterly

14 Mechanical system of HVAC units

Guarantee that the equipment works 24 hours. Quarterly

15 Mechanical system of HVAC units

Change of service valve, o-wheels, seals, according to their condition. Quarterly

16 Mechanical system of HVAC units

Check working parameters, voltage, temperature, etc. Perform testing to demonstrate equipment is working in good conditions.

17 Electrical system of HVAC units

Review of the electrical supply from the panel to the unit, tightening the terminals forthe driver's arrival and the output of the thermal pad, before and after providingpreventive maintenance service to the unit.

Quarterly

18 Electrical system of HVAC

Review of arrival of electrical power to the terminals of the equipment, before andafter providing preventive maintenance service to the unit.

19 Electrical system of HVAC

Measurement of current consumption at start-up and work, normal voltage Quarterly

20 Electrical system of HVAC

Verify the incoming voltage to the control board, which is the design of the unit,before and after providing preventive maintenance service to the unit.

Quarterly

21 Electrical system of HVAC

Verify consumption amperage, before and after giving preventive maintenance serviceto the unit.

Quarterly

22 Electrical system of HVAC

Cleaning contactors and control panel relays with dielectric liquid.

Quarterly

23 Electrical system of HVAC

Cleaning, washing and drying (dielectric spray, moisture displacer) of the main controlelectronic card.

Quarterly

24 Electrical system of HVAC

Lubrication and engine cleaning. Quarterly

25 Electrical Panelboards of HVAC units Inspection and cleaning of exterior panel Quarterly

26 Electrical Panelboards of HVAC units Inspection and cleaning of interior panel Quarterly

27 Electrical Panelboards of HVAC units

Inspection and cleaning of interior devices using appropriate dielectric solvent Quarterly

28 Electrical Panelboards of HVAC units

Check operation of each contactor and breaker Quarterly

29 Electrical Panelboards of HVAC units

Inspection and tighten of all electrical connections inside the panel Quarterly

30 Electrical Panelboards of HVAC units

Check and install missing labels of wires and breakers Quarterly

31 Electrical Panelboards of HVAC units

Provide and replace new signs and labels mounted in the panels Quarterly

Electrical Panelboards of

HVAC units Check and provide missing electrical drawings and/or circuit’s description card in the panels

Quarterly

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

MD-20 & VK-MD-22

Removal of guards

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Disassembly of belt

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Removal of pulley

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Removing engine covers

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Motor/rotor disassembly

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Cleaning of engine coils

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Removing bearings

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Test insulation resistenace of motors

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Cleaning of parts

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Mounting new bearings

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Mounting rotor

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Mounting engine covers

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Pulley assembly

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Fitting assembly

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Alignment and temperature of strip

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Assembly of lids and guards

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Electrical board cleaning

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Electrical component locking reset

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Check status of components

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Verify condition of cabinet

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

MD-20 & VK-MD-22

Check tabler hermeticity Quarterly

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Disassembly of air-taking case

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Cleaning the area

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Air-taking box mounting

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Panelboard sealing

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Disassembly of damper

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Cleaning and lubricating mobile parts

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Sanding and painting of damper

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Assembly of damper

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Starting equipment

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Painting

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Testing

Maintenance to Vektors

VK-MD-15, VK-MD-18, VK-

Check parameters

66 Maintenance of roof top units (RTU) Disassembly of equipment lids Quarterly

67 Maintenance of roof top units (RTU)

Check belt status

68 Maintenance of roof top

Check pulley status

69 Maintenance of roof top

Check alignment and temperature of strip

70 Maintenance of roof top

Check engine status

71 Maintenance of roof top

Engine cleaning

72 Maintenance of roof top

Check bearing status

73 Maintenance of roof top

Change bearings if required

74 Maintenance of roof top

Cleaning of parts, covers and guards

75 Maintenance of roof top

Cleaning of fixed bearings

76 Maintenance of roof top

Lubricacion de fixed bearings

77 Maintenance of roof top

Wheel cleaning

78 Maintenance of roof top

Check condenser fan

79 Maintenance of roof top

Check evaporator fan

80 Maintenance of roof top

Check compressors

81 Maintenance of roof top

Check refrigeration pressures

82 Maintenance of roof top

Cleaning the condenser

83 Maintenance of roof top

Cleaning the evaporator

Maintenance of roof top units (RTU) Power and control electrical panelboard cleaning

85 Maintenance of roof top

Sealing of air tank duct joints

86 Maintenance of roof top

Check control operation

87 Maintenance of roof top

Check sensors

88 Maintenance of roof top

Check control operation

89 Maintenance of roof top

Check operation of actuators

90 Maintenance of roof top

Starting equipment

91 Maintenance of roof top

Painting

92 Maintenance of roof top

Testing

93 Maintenance of roof top

Check parameters

94 Chiller Verify the level of humidity / Humidity indicator

Bimonthly

95 Chiller Verify operation parameters (electrical, pressure and temperature)

Bimonthly

96 Chiller Verify correct set-points of operation and security.

Bimonthly

97 Chiller Inspect the condition of the condenser grills (cleaning is required)

Bimonthly

98 Chiller Visual inspection of oil leaks Bimonthly

99 Chiller Inspect the motors and fans of the condensers

Bimonthly

100 Chiller Inspect the correct rotation of the ventilator

Bimonthly

101 Chiller Inspect any abnormal or excessive noise Bimonthly 102 Chiller Inspect the interrupter of water flow Bimonthly

103 Chiller Inspect the temperature sensors and transducers

Bimonthly

104 Chiller Verify the general conditions of the equipment

Bimonthly

105 Chiller Verify the contactors from the ventilators Bimonthly

106 Chiller Verify the insulation of the heat exchangers

Bimonthly

107 Chiller Verify and adjust the electrical connections

Bimonthly

108 Chiller Verify the compressors resistance Bimonthly 109 Chiller Inspect leaks of refrigerant Bimonthly

110 Chiller Verify the value of the super-heater in the evaporator.

Bimonthly

111 Chiller Verify the economizer valve at the entrance or the compressor

Bimonthly

112 Chiller Verify the sub-cooling value at the condenser

Bimonthly

113 Chiller Analyze oil and the refrigerant Bimonthly 114 Chiller Vibration analysis Bimonthly 115 Chiller Change oil filters Bimonthly

116 Chiller Inspect the liquid lines, parallel to the change of filters

Bimonthly

117 Chiller Check the resistance’s ohms of the compressor and ventilators

Bimonthly

118 Chiller Register the operation conditions and collect the data

Bimonthly

119 Chiller Operation test Bimonthly 120 Chiller Cleaning around the working area Bimonthly

121 Air Handling Units Start the engines check for operational deficiencies

Quarterly

122 Air Handling Units Verify general conditions of the equipment Quarterly 123 Air Handling Units Verify parameters (electrical/mechanical) Quarterly 124 Air Handling Units Revision of contactors and/or start buttons Quarterly 125 Air Handling Units Revision of water valve Quarterly

126 Air Handling Units Inspection of the resistance (in case they have on)

127 Air Handling Units General revision of the coils Quarterly 128 Air Handling Units Inspect the V-belts Quarterly 129 Air Handling Units Lubricate the shafts and bearings Quarterly 130 Air Handling Units Cleaning de collecting tray Quarterly 131 Air Handling Units Clean the air filters Quarterly

132 Air Handling Units Inspect, cleaning and disinfecting the drainage

Quarterly

133 Air Handling Units Inspect the condition of the coil’s motor fan

Quarterly

134 Air Handling Units Inspect noises and abnormal vibrations Quarterly 135 Air Handling Units Verify and adjust electrical connection. Quarterly

136 Air Handling Units Verify painting of the dampers and lubrication

Quarterly

137 Air Handling Units Verify the calibration of the filters (pressure differential)

Quarterly

138 Air Handling Units Verify refrigerant (in case of direct expansion) or water leaks

Quarterly

139 Air Handling Units Lubrication of bearings Quarterly

140 Air Handling Units Electrical mega roll (electrical ventilator and compressor)

Quarterly

141 Air Handling Units Cleaning of the cabinets Quarterly 142 Air Handling Units Pressurized cleaning of the coil Quarterly

Air Handling Units Register the parameters (electrical, temperature and pressure) and the conditions of operation

Quarterly

Air Handling Units Cleaning and grease the doors of the air handlers Operation test

Quarterly

145 Variable Speed Drives External cleaning of the variable speed Quarterly 146 Variable Speed Drives Disassemble the heat dissipater Quarterly 147 Variable Speed Drives Cleaning the internal parts with dielectric Quarterly

148 Variable Speed Drives Assembly and test for operation

149 Chiller & Boiler Pumps Disassemble the motors y pumps Semiannual 150 Chiller & Boiler Pumps Disassemble the rotor Semiannual

151 Chiller & Boiler Pumps Replacement of the bearings

Semiannual

152 Chiller & Boiler Pumps Cleaning of the coil with dielectric solvent Semiannual 153 Chiller & Boiler Pumps Apply dehumidifier solvent Semiannual 154 Chiller & Boiler Pumps Heat treatment de the coil Semiannual 155 Chiller & Boiler Pumps Coil’s meg Semiannual

156 Chiller & Boiler Pumps Apply varnish, then to the oven and at last paint de motor

Semiannual

157 Chiller & Boiler Pumps Revision of pump seals and replace gaskets

158 Chiller & Boiler Pumps Operation test

159 Mechanical System of HVAC Boiler

Opening of the front a rear doors

160 Mechanical System of

Cleaning of the chimney

161 Mechanical System of

Sweeping the internal pipes

162 Mechanical System of HVAC Boiler

Cleaning the front and rear plate of the combustion chamber.

Quarterly

Mechanical System of HVAC Boiler

Opening of the man holes and check for any indication of corrosion, bite or scales and eventually to eliminate sludge and sediments with pressurized water.

Quarterly

164 Mechanical System of HVAC Boiler

Complete gaskets change of in every door and man hole.

Quarterly

165 Mechanical System of HVAC Boiler

Airtight seal of all doors and every inspection doors.

Quarterly

166 Mechanical System of HVAC Boiler

Cleaning of the containers, outdoor and indoor.

Quarterly

167 Mechanical System of HVAC Boiler

Painting of the external side of the container.

Quarterly

168 Mechanical System of HVAC Boiler

Painting of the internal side of the container with epoxy paint.

Quarterly

169 Mechanical System of HVAC Boiler

Replace or clean the pump filters depending on use.

Quarterly

170 Valves and Piping

Procedure of a general maintenance is as follows: Maximum security and purge always. The maintenance is done rectifying seats with abrasive material, including the change of gaskets. If you find out deteriorated the seats of the machine, previously quote the service.

Quarterly

171 Valves and Piping Mechanical cleaning of the entrance of the level of water to eliminate the scales. Quarterly

172 Valves and Piping Verify the gaskets and unions to comply that they are working correctly. Quarterly

173 Valves and Piping Correct the water and diesel leaks. Quarterly

Combustion Chamber and Burner System of HVAC

Boiler

Disassemble the burner and cleaning the aux. elements: electrodes, nozzle, filters, solenoid valves etc.

Quarterly

Combustion Chamber and Burner System of HVAC

Boiler Cleaning and regulate the ignition.

Quarterly

Combustion Chamber and Burner System of HVAC

Boiler

Verify the pump pressure and calibrate when necessary

Quarterly

Combustion Chamber and Burner System of HVAC

Boiler

Disassemble and cleaning of the ventilator, verify if it’s working and balanced.

Quarterly

Combustion Chamber and Burner System of HVAC

Boiler Change the air and diesel filters

Combustion Chamber and Burner System of HVAC

Boiler Assemble all the parts of the burner

Quarterly

Combustion Chamber and Burner System of HVAC

Boiler

Verify the heat resistance in the combustion chamber

Quarterly

181 Electrical System of HVAC Boiler

Maintenance and cleaning of all the command elements and the control panel with the dielectric solvent SS-25:

- Contactors and relay

- Adjust loose bolts to prevent false contact

- Check interconnection all the cables to see they are connected to the logical programmer

- Verify the primary and secondary levels of the transformer to see if they are correctly installed.

Quarterly

182 Electrical Motors

General maintenance of the fan motor:

- Disassemble and cleaning of the winding

- Measure the level of the isolation

- Change of bearings

- Assemble and mounting of the motor

- Verify the coupling and its alignment

- Measure the power consumption and compare it with the plate data.

Quarterly

183 Control Combustion System

General maintenance of the control systems which includes:

- Pressure control

- Modulation (PISTON) control

- Air input control

- Atomization control

- Switch end of career

- Electronic program

Quarterly

Tune-Up Of The

Combustion Chamber System

- Tune-up of the combustion chamber through a digital gas analyzer. The parameters must be according to the protection of the environment.

Quarterly

Tune-Up Of The

Combustion Chamber System

- Setting for the regulations: CO2, CO, O2, Excess of air, Efficiency, Chimney gas temperature, etc.

Quarterly

Tune-Up Of The

Combustion Chamber System

- Turn on the heater/boiler Quarterly

187 General Update CAD drawings of HVAC systems Annual

Contractor will also include requirements per O&M manuals and any additional requirements not mentioned in this document but required or recommended by manufacturer as preventive maintenance activities to perform quarterly or annually.

SPECIAL REQUIREMENTS:

Contractor shall provide, store at their off-site warehouse the following minimum spare parts (contractor shall immediately procure new spares if the ones listed are used in order to keep a minimum level of spare parts:

Spares for the Chiller as per recommended by manufacturer.

Procure and install all filters specified in this contract on an annual basis.

Boiler spare parts:

- Two (02) Danfus brand nozzles of 5GPHx60 ° Angle or similar.

- Two (02) foam filter element for fuel 2.

- Two (02) ignition electrodes earthenware material of 6 "length x9 1/16" diameter.

- Two (02) cables for ignition electrodes and connectors.

- Two (02) bearings number 6302 brand SKF or similar.

- One (01) filter for diesel 2 with basket element.

- One (01) display module, model 57800A1167, Honeywell brand or similar.

- One (01) diesel fuel 2 pump, model B2TA 8260, brand Sumtec (USA) or similar.

- Two (02) three-way solenoid valves ¼ ”NPT connection, coil 110 Volt, Jefferson brand (USA) or similar

- One (01) coupling kit diésel 2 engine and pump

- One (01) metal support set for gas train.

- One (01) pressure gauge.

- One (01) ball valve ½” for diesel 2.

- One (01) manufacture of interior thermal insulation for Bryan heater.

- One (01) refractory patch inside combustion chamber.

- One (01) manufacture of a linear meter of 2 ½ ”Ø SCH 80 diesel feet and return pipe and connection accessories.

ADDITIONAL INFORMATION

ANNEX 1: 2019 PREVENTIVE MAINTENANCE TO CHILLER, AHU, VSD AND PUMPS IN

LIMA

ANNEX 2: 2021 PREVENTIVE MAINTENANCE TO HVAC BOILER IN LIMA

ANNEX 3: 2019 PREVENTIVE MAINTENANCE TO EXHAUST EQUIPMENT IN LIMA

ANNEX 4: 2019 HVAC PREVENTIVE MAINTENANCE SCHEDULE IN LIMA

ANNEX 1

BITACORA DE CHILLER YORK NOVIEMBRE 2019

COMPONENTE TIPO MODELO Nº DE SERIE REFRIGERANTE TÉCNICO

TRABAJOS DE SERVICIO

Parametros de Funcionamiento de Equipo

Fecha

Hora

Temp.Salida de Agua

Temp.Retorno de Agua

Temp. Ambiente

Temp. Setpoint

Pres. Succ.

Pres. Desc.

Pres. Oil

Temp Suc.

Temp Desc.

Temp. Oil

Temp.Saturación Suc.

Temp.Sobcal Suc.

Temp.Saturación Desc.

Temp.Sobcal Desc.

Temp. Motor L1

Temp. Motor L2

Temp. Motor L3

Comp.Speed %

Economisador

Flash Tank Nivel %

Valve Feed %

Valve Drean %

Cond. Fans

Compresor heat

VSD Frecuencia

% Amp.

Voltaje VSD, Bus

Temp.VSD Interna

Cooling system

Temp. VSD (IGBT)

VSD Precaucion Senal

Horas de Funcionamiento

Numero de Arranques

OBSERVACIONES:

44 °F

34 PSI

47 °F

11:00 am

55 °F

90 °F

ON

100%

ON

16%

45%

52%

OFF

200 HZ

11:30 am

47 °F

Sistema No. 1 Sistema No. 2

18/11/19

88 °F

150 PSI

136 PSI

46 °F

135 °F

104 °F

7 °F

112 °F

25 °F

103 °F

96 °F

38 °F

102 °F

127 Amp. (67% FLA)

607 VDC

24 °F

55 °F

71 °F

34 PSI

143 PSI

131 PSI

45 °F

130 °F

101 °F

37 °F

7,4 °F

108 °F

200 HZ

127 Amp. (67% FLA)

113 °F

98 °F

90 °F

100%

ON

2%

CLIENTE: NAMRU

71 °F

44 °F

18/11/19

605 VDC

90 °F

ON

102 °F

56%

51%

OFF

CHILLER YORK R 134 a Wildor BarrientosYCAV0157PA28VA RMTM024165

JCI Location. Calle y No de edificio Código:

Ciudad, Codigo de area Fecha de elaboración:

Tel: +1 234 567 8900 Fecha de emisión:

Fax: +1 234 567 8900 NO Visita:

2. Tipo de visita

Nombre: X Mantenimiento Programado (PSA) NO Contrato:

NO Cliente: Retrofit y/o Reparación (L&M) NO SRO:

Dirección: Arranque Equipo Aplicado (HVAC & Ref)

Ciudad: País: Garantía Equipo Aplicado (HVAC & Ref) Emergencia

Contacto: Área: Garantía Proyecto de Sistemas (Ctrs) Inspección

Teléfono E-mail: Otro, detailles:

3. Descripción del equipo 4. Partes usadas

Marca:

Modelo:

NO Serie:

Arrancador:

Aceite:

Compresor:

Refrigerant:

Hrs de Operación:

NO Arranques:

Fluido:

Compr. Serial NO:

5. Estado del servicio 7. Repuestos sugeridos para el próximo servicio

Si X

No

6. Propiedad de Cliente

X

8. Trabajos realizados

Sensor de Temperatura de Succión

Mantenimiento

MANTENIMIENTO PREVENTIVO CHILLER YORK

Se realizó lavado de serpentín de condensador y de estructura exterior del Chiller

Se limpiaron y revisaron conectores de sensores de temperatura y transductores de descarga

Se limpió, se ajustaron terminales eléctricos y revisó tablero de control y fuerza del Chiller.

Se revisaron y limpiaron bornes de los compresores.

Se revisó funcionamiento correcto de válvulas electrónicas, de bomba enfriadora de gabinete eléctrico, de válvulas solenoides, de ventiladores. OK

Se mide amperaje de los ocho ventiladores, todos están en 3 Amp (Placa:5.6 Amp)

Se revisó calefactores de carter de los dos compresores OK

Se revisó funcionamiento de Interruptor de flujo OK, Se realizó búsqueda de fuga de gas refrigerante en los dos sistemas, no se encontró fugas

Se revisó programación en el Display del Chiller

Se revisó nivel de aceite OK

Se revisó nivel de Coolant , esta dentro del rango.

En este mantenimiento se cambiaron El Interruptor de flujo de Agua por estar oxidado internamente y el sensor de temperatura de Succión del Sistema N° 2.

Luis Ugarte

996720185

NAMRU

Descripción

Interruptor de Flujo de Agua tipo paleta

1. Datos del Cliente

Lima Perú

CantidadYORK

YCAV0157PA28VA

RMTM024165

VSD

York L

Tornillo MTS

No Parte

1 024-39397-000

1 025-47673-000

R 134a

Cantidad No Parte Descripción

18/11/2019

18/11/2019

REPORTE DE SERVICIO

Condicion fisica del sitio del trabajo Buen estado

Mal estado

Se completaron todas las actividades contratadas?

9. Mano de Obra

Fecha Hora Hora Horas Horas Horas

(DD/MM/AA) Entrada Salida Extras Aliment. de Viaje

16/11/2019 08:30 a.m. 06:00 p.m.

18/11/2019 08:30 a.m. 06:00 p.m.

10. Observaciones / Recomendaciones del Técnico 11. Comentarios del Cliente

12. Firma Técnico 13. Firma Cliente

Fecha: Fecha:

Nombre: Nombre Completo:

Cargo: Cargo:

Tel/Cel: Tel/Cel: DNI:

Firma: Firma:

Técnico HVAC

Nombre del Técnico Horas

Wildor

Antes de realizar el mantenimiento se observó que el sistema N° 2 estaba alarmado y bloqueado por esta alarma desde el 5 de Noviembre, esta alrma era de BAJO SOBRECALENTAMIENTO DE DESCARGA, se revisó en le mantenimiento y se observó que el sensor de temperatura de succión estaba descalibrado, se cambió y se deja operativo el sistema N° 2.

Se observa que los serpentines condensadores se siguen deteriorando paulatinamente a pesar de eso los parámetros de funcionamiento aun están dentro de rangos normales., tener en cuenta que el equipo viene operando 10 años continuamente las 24 horas del día y sin interrupción

18-Nov-1918-Nov-19

Wildor Barrientos

995711437

Horas

Totales Normales CommentariosID

Wildor / Victor

Técnico de Servicios

Luis Ugarte

996720185

ANNEX 2

Lima, 30 de diciembre del 2021

INFORME N° 00005-21 NAMRU-6

Señores :

EMBAJADA AMERICANA NANRU-6

REFERENCIA : ORDEN DE COMPRA N4485221P0091

Por la presente, nos es grato saludarlo y a la vez hacerle llegar nuestro informe técnico referente al mantenimiento integral de la caldera.

MANTENIMIENTO INTEGRAL DE CALDERA BRYAN BOILER

MANTENIMIENTO MECANICO

DESHOLLINADO DE LOS TUBOS EN SU TOTALIDAD

Pedro.Davila Highlight

Pedro.Davila Highlight

SISTEMA DE COMBUSTIÓN Y QUEMADOR

FABRICACION DE AISLAMIENTO TERMICO DE TAPAS LADO FUEGO

MANTENIMIENTO DE TANQUE DIARIO DE DIESEL 2

VERIFICACION Y REAJUSTE DE BORNERAS DEL SISTEMA ELECTRICO

ANALISIS DE GASES DE COMBUSTION

MANTENIMIENTO ELECTRICO

Mantenimiento y limpieza de todos los elementos de mando y control del tablero y accesorios por medio de solvente dieléctrico SS-25.

• Contactores y relé del tablero

• Ajuste general de los pernos de sujeción de los cables para evitar falsos contactos

• Revisión del cableado de interconexión de todos los controles hacia el programador electrónico

• Verificación de los niveles primario y secundario del transformador de alimentación a los controles

MOTOR ELÉCTRICO VENTILADOR

Mantenimiento general del motor eléctrico del ventilador.

• Desmontaje y limpieza general del bobinado

• Medición del nivel del aislamiento

• Cambio de los rodamientos

• Ensamble y montaje de los motores

• Verificación del alineamiento y del acoplamiento,

• Medición del consumo de energía eléctrica y comparación con los datos de placa

REGULACIÓN DEL SISTEMA DE COMBUSTIÓN

• Presión de combustible

• Ingreso de aire pleno

• Aire primario -Análisis de combustión.

-Informe técnico.

AFINAMIENTO DEL SISTEMA DE COMBUSTIÓN

• Arranque del caldero y afinamiento del sistema de combustión por medio de un analizador de gases digital marca TESTO mod. 327-1. Los parámetros a ajustar estarán de acuerdo a las normas establecidas para la Protección del medio ambiente y lo establecido por el fabricante.

Parámetros de regulación:

CO2, CO, O2, Exceso de Aire, Eficiencia, Temperatura de Gases de Chimenea, etc.

• Puesta en servicio del caldero

PARAMETROS OPTIMOS PARA UNA BUENA COMBUSTION

CO2 MAX 15.7 %

O2 MAX. 8. 0% Y MIN. 2.5 %

CO MAX 400 ppm y optimo 0 ppm

EXCESO DE AIRE MAX. 25 % Y MIN. 15 %

EFICIENCI A DE COMBUSTION MAX. 88 % Y MIN. 70 %

MANTENIMIENTO MECANICO:

Desmontaje integral de las líneas de combustible diésel 2 del calentador al tanque diario de alimentación.

Limpieza de líneas de combustible encontrándose en proceso de deterioro requiere cambio.

PINTURA

• Lavado del contenedor con agua a presión

• Lijado y esmerilado de toda la superficie que presentaba formación de oxido

• Desengrasado del contenedor en su totalidad para mejor agarre de la pintura EPOXICA de la mejor calidad

• Pintado integral del contenedor

• Pintado del piso del interior del contenedor con pintura epoxica de mejor calidad

AGREGADOS:

INSTALACION DE CODILLO PROCEDENCIA USAPARA RESET DEL PROGRAMADOR MARCA HONEYWELL

REPARACION E INSTALACION DE KIT DE CHEVRONES DE, PISTON HIDRAULICO PARA CIERRE DE DAMPER PARA

ENCENCIDO DE PILOTO DEL QUEMADOR.

SUMINISTRO DE REPUESTOS:

-02 toberas marca Danfoss de 5 gphx60° de Angulo o similar.

-02 elemento de filtro material espuma para Diesel 2.

-02 electrodos de ignición material loza de 6" longitud x91/16" diámetro.

-02 cables para electrodos de ignición y conectores.

-02 rodamientos numero 6302 marca SKF o similar.

-01 filtro para Diesel 2 con elemento de canastilla.

-01 módulo de pantalla, modelo 57800A1167, marca Honeywell o similar.

-01 bomba de combustible diésel 2, modelo. B2TA 8260, marca Sumtec (USA) -02 válvulas solenoides de tres vías conexión 1⁄4” NPT bobina 110 Voltios, marca ASCO (USA) o similar -01 juego de acoplamiento motor y bomba diésel 2.

-01 juego de soporte metal para tren de gas.

-01 manómetro de presión.

-01 válvula de bola 1⁄2” para diésel 2.

-01 fabricación de aislamiento térmico interior para calentador Bryan.

-01 fabricación de línea de tubería de alimentación y retorno diésel 2 de 1⁄2” Ø SCH 80 y accesorios de conexión.

RECOMENDACIONES

Se realizar purgas frecuentes al tanque diario de Diesel 2 para la eliminación de borra que se filtra hacia la bomba del quemador.

Usar el reset del tablero eléctrico para armar el calentador cuanto este pare por alguna falla (mover hacia abajo por dos segundos)

Emitimos este documento para los fines que estime conveniente y sin otro particular para servirlos gustosamente, Muy atentamente

Víctor Pérez Limo Gerente Técnico

GRUTERPESA

Pedro.Davila Stamp

Pedro.Davila Highlight

ANNEX 3

INFORME DE

MANTENIMIENTO

NAMRU - LIMA

DESCRIPCIÓN BREVE

Informe de mantenimiento de equipos HVAC correspondiente a los trabajos realizados en el mes de Febrero del 2019

División de Mantenimiento SAEG Engineering Group

1. ALCANCE Y OBJETIVO

El presente informe de mantenimiento tiene como alcance presentar un informe detallado al cliente sobre el estado actual de sus equipos de aire acondicionado y ventilación.

Los objetivos a cumplir se basarán principalmente en:

Indicar las condiciones encontradas en los equipos durante el mantenimiento preventivo y correctivo de los equipos HVAC y así lograr el buen funcionamiento del sistema

Verificar las condiciones de cada componente , y adoptar medidas correctivas de ser necesario

Cumplir con las normas aplicadas al tema de seguridad, medio ambiente y salud en el trabajo

Cumplir con los trabajos planificados

Garantizar la operatividad de los equipos

2. DEFINICIONES

SAEG PERU S.A.

Entidad encargada de dar Mantenimiento a los equipos HVAC requeridos

Cliente Entidad que accede un servicio prestado por una contrata.

Equipo HVAC Equipo cuya función está destinada al acondicionamiento y ventilación.

Mantenimiento

Preventivo

Revisión del estado general del equipo para garantizar su funcionamiento y fiabilidad.

Mantenimiento

Correctivo

Localización de averías y cambio inmediato de repuestos para poner operativo el equipo.

3. DESCRIPCIONES DE ACTIVIDADES

3.1 Mantenimiento de extractores

Verificar el estado del rodete.

Verificar el estado de las chumaceras.

Verificar el estado de las fajas.

Verificar el estado de la bobina del motor eléctrico.

Verificar el estado de los rodamientos del motor eléctrico.

Verificar el estado de las poleas del rodete y motor eléctrico.

Verificar el estado de las cajas porta filtros.

Verificar el estado de las empaquetaduras de las puertas.

Verificar el funcionamiento de las electroválvulas.

Limpieza de la malla de la caja porta filtros.

Limpieza de rodete.

Limpieza de filtros de malla.

Lubricación de rodamientos y chumaceras.

Lubricación de las bisagras de las puertas de la caja porta filtro.

Alineamiento de poleas.

Limpieza de bobina del motor eléctrico.

Verificación del traslape del rodete.

4. INFORME DE EQUIPO

CODIGO

Tip. Eq. Ubicación Marca Modelo Fecha Tip. Serv. Diagnostico Conclusión Estado del equipo

0001 EXTRACTOR EF-203 VEKTOR VECTOR-MD-15 2019-01-26

PREVENTIVO Se encontró equipo con polución

Se realizó el cambio de chumaceras , cambio de rodamientos de motor eléctrico (6205 - 6206-27) Se cambió fajas AX-55 (02 UND)

Se recomienda cambiar la caja de toma de aire

Se recomienda cambio de dámper, se recomienda pintado general del equipo Extractor: 10.4/11.1/11.1 amp / FLA:

13.2 amp Operativo

EXTRACTOR EF-202 VEKTOR

VK-MD-20-9-LLL-

A75-X 2019-02-09

PREVENTIVO Equipo se encuentra con polución

Se realizó cambo de chumaceras, cambio de rodamientos de motor eléctrico 6309-2 Se realizó cambio de faja BX-69 (03

UND)

Se recomienda cambiar la caja de toma de aire Se recomienda cambio de dámper, también pintado general del equipo Extractor: 21.1/21.2/22.4 amp / FLA:

36.2 amp Operativo

CODIGO

Tipo. E. Ubicación Marca Modelo Fecha Tipo. Ser. Diagnostico Conclusión Estado del equipo

0003 PRESURIZADOR VECTOR 102 VECTOR

VECTOR 22BA9-

1X1 2019-02-02

PREVENTIVO Se encontró equipo con polución

Se realizó el cambio de rodamientos 6309-6208-2Z

Se realizó cambio de faja BX-84 (03

UND)

Se recomienda cambio de caja de toma de aire

Se recomienda pintado general de todo el equipo, cambio de dámper

Extractor: 33.6/31.9/35.3 amp / FLA:

48.0 amp Operativo

EXTRACTOR VEKTOR - 103 VECTOR

VECTOR-18-BAP-

1X1 2019-02-23

PREVENTIVO Se encontró equipo con polución

Se recomienda el cambio de la tapa del motor eléctrico (dañado con hueco)

Se recomienda cambio de dámper de la toma de aire fresco

Se recomienda pintado del equipo en general

Se realizó cambio de chumaceras , rodamientos 6206-2Z y cambio de fajas BX-66 Se recomienda cambio de chapa del tablero Extractor: 24.8/22.6/24.9 amp Operativo

5. INDICADORES

EQUIPOS INTERVENIDOS

INTERVENIDOS EQUIPOS SIN OBSERVACION EQUIPO CON OBSERVACION FUERA DE SERVICIO

4 4 0 0

4 4

0 0

INTERVENIDOS EQUIPOS SIN

OBSERVACION

EQUIPO CON

OBSERVACION

FUERA DE SERVICIO

Equipos Realizados

6. MATERIAL FOTOGRAFICO.

Equipo VEKTOR 102

Equipo VEKTOR 103

Equipo VEKTOR EF – 202

Equipo VEKTOR EF – 203

7. REPUESTOS RECOMENDADOS

CANTIDAD DESCRIPCIÓN

0 CHUMACERAS

0 FAJAS

0 TARJETA ELECTRONICA

0 RESISTENCIA

0 RODAMIENTOS

0 CAJA PORTA FILTRO

0 FILTRO SECADOR

4 CAJA DE TOMA DE AIRE

4 DAMPER

8. CONCLUSIONES Y RECOMENDACIONES

Se realizó mantenimiento preventivo a los 4 equipos HVAC

Se recomienda cambio de dámper VEKTOR EF-203

Se recomienda pintado general del equipo VEKTOR EF-203

Se recomienda cambio de caja de toma de aire VEKTOR EF-203

Se recomienda cambio de tapa del motor eléctrico VEKTOR-103

Se recomienda cambio de dámper de la toma de aire fresco VEKTOR – 103

Se recomienda cambio de caja de toma de aire VEKTOR – 103

Se recomienda pintado general del equipo VEKTOR – 103

Se recomienda cambiar chapa del tablero del equipo VEKTOR – 103

Se recomienda cambio de caja de toma de aire VEKTOR - 102

Se recomienda pintado general de todo el equipo VEKTOR – 102

Se recomienda cambio de dámper VEKTOR – 102

Se recomienda cambio de caja de toma de aire VEKTOR EF-202

Se recomienda cambio de dámper VEKTOR EF-202

Se recomienda pintado general de todo el equipo VEKTOR EF -202

ANNEX 4

EQUIPOS nov-19 dic-19 ene-20 feb-20 mar-20 abr-20 may-20 jun-20 jul-20 ago-20

Analisis de Aceite SERV SERV

Analisis Vibracional SERV

Cambio Filtros SERV

Variadores de Velocidad SERV

UMAS SERV

Bombas SERV

CRONOGRAMA DE MANTENIMIENTO 2019 - 2020 EMBAJADA DE USA

Chiller YCAV0157PA28VAC

Toma de Parametros SERV SERV SERV SERV

Chiller pumps:
HVAC Boiler pumps:

File details come from the government source that posted it. Updated .