This federal contract solicitation seeks operation and maintenance services for US Navy Medical Research Unit Six facilities in Peru. Requirements include preventive, predictive, demand, and emergency maintenance of architectural, mechanical, electrical, and instrumentation systems at specified medical research laboratory and support facilities in Lima and other dispersed locations, as well as limited grounds keeping. A firm-fixed-price contract will be awarded for a base year and four option years. Offerors must meet an average annual gross revenue size standard of $41.5 million for the past three years under NAICS code 561210. The solicitation will be issued only as a direct download from the SAM.gov website, where any changes will also be posted.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD OPERATING PROCEDURE (SOP) – BIMONTHLY PREVENTIVE
MAINTENANCE ACTIVITIES FOR HVAC SYSTEM IN LIMA SITE
General Requirements for Lima:
NAMRU-6 at Lima has the following air conditioning equipment per building:
One (01) Chiller brand York, Model: YCAV0157PA28VAC & Capacity: 157 TN
Five (05) Air Handling Units (AHUs). Two units brand York and three units brand SEMCO.
Nine (09) Variable Speed Drives (VSDs), located in the AHUs, Chiller and HVAC Boiler, as shown in table below:
VSD LOCATION QTY BRAND MODEL SERIAL POWER
CHILLER 02 Telemecanique ATV71HU75M3 SW0851000
051/52 7.5kw-10HP 240v
BOILER 02 Telemecanique ATV71HU15M3 No visible 1.5kw-2 HP240v
AHU101 01 DANFOSS VLT 2800 No visible 15HP240v
AHU102 01 YASKAWA CIMR-E7U2011 No visible 30HP240v
AHU103 01 YORK AYK550-UH-
017A- 2+K465
2083903526 15HP240v
AHU202 01 YASKAWA CIMR-E7U2011 No visible 15HP240v
AHU201 01 ABB ASC550-01-
046A-2
1063305036 15HP240v
(04) Chiller and Boiler Pumps, as described below:
Chiller pumps:
Brand: Bell & Gossett.
Capacity: 10 HP Serial: CO74527-02L80.
Size: 1531.
RPM: 1800.
Quantity: two (2)
HVAC Boiler pumps:
Brand: Bell & Gossett.
Section J - Exhibit 11.2.2 SOP-FAC 013
Capacity: 5 HP Serial: CO74526-01L80.
Size: 1531.
RPM: 1800
Quantity: two (2)
One (01) HVAC Boiler, as described below:
Brand: BRYAN.
Model: AB120-W-FDGO.
Date of fabrication: 2008.
Bryan #96048.
National Board Number: 55441.
Fuel: Diesel
Filters to be replace in an annual basis, based on the table below:
ITEM DESCRIPTION TYPE EFICIENCY DIMENTIONS
(Hor,Vert,Depth) QUANTITY
1 Filters Bag 90-95% MERV 14 20x24x22 12 2 Pre-filters (carbon) Pleated 30% MERV 8 20x24x2 12 3 Return filters Pleated 30/30 MERV 8 24x24x4 42 4 Return filters Pleated 30/30 MERV 8 12x24x4 36 5 Pre-filters Pleated 30/30 MERV 8 20x20x4 6 6 Pre-filters Pleated 30/30 MERV 8 20x24x4 12
7 Filters Pleated RIGA-FLO
MERV 14 95% 20X24X12 7
8 Filters Pleated RIGA-FLO
MERV 14 95% 20X20X12 21
9 Filters Bag 90-95% MERV 14 24X24X22 12
10 Filters Pleated RIGA-FLO MERV 14 95% 24x24x12 10
11 Filters Pleated RIGA-FLO MERV 14 95% 12x24x12 08
12 Filters HEPA 99.99% 24x24x12 11 13 Filters Pleated 30/30 MERV 8 19x40x2 24 14 Return filters Bag 90-95% MERV 14 12X24X15 12 15 Filters Pleated 30/30 MERV 8 20X25X2 132 16 Filters Pleated 30/30 MERV 8 15x24x2 12 17 Filters Pleated 30/30 MERV 8 16X30X2 12 18 Filters Pleated 30/30 MERV 8 20x24x2 24 19 Filters Pleated 30/30 MERV 8 12x24x2 24
Four (04) Exhaust fans as described below:
- VEKTOR VK-MD-15
- VEKTOR VK-MD-18
- VEKTOR VK-MD-20
- VEKTOR VK-MD-22
Three (03) split duct air conditioning units brand McQuay, Capacity 5 TON (2000CFM), 6.5 TON (2600CFM) and 3 TON (1200CFM) respectively. All of them installed at Building 10 or security building.
Two (02) split duct air conditioning units brand McQuay, Capacity 4 TON (1600CFM) and 6 TON (2400CFM) respectively. Installed at Building 11 or procurement building.
One (01) Roof Top Unit (RTU) brand AAON, model RN-015-8-0-EB0A-142. Capacity: 176 MBH, 4000 CFM. Three (03) Variable Air Volume terminals: VAV-SH-101, VAV-SH-102, VAV-SH-103.
All of them installed at Building 11 or Conference Building.
One (01) precision air conditioning unit, Capacity: 60,000 BTU/HR. Installed at Data Server Room in Building 1 or Main Building.
Contractor shall provide the names and certification of the technicians performing preventive maintenance tasks. Only qualified technicians shall perform preventive and corrective maintenance tasks. Contractor must demonstrate that they have official representative of the brands of the equipment: GREENHECK, YORK, AAON, MCQUAY or technicians trained/certified to perform work to this equipment.
Contractor shall perform quarterly and annual preventive maintenance activities to all of the air conditioning units specified in this document. It is the responsibility of the contractor to perform a full inspection of the systems and collect all required information to provide a quality preventive maintenance. In addition, contractor shall review operation manuals for the equipment of the systems under this contract and include any recommended preventive maintenance activities by the manufacturer not mentioned in this document.
Contractor shall elaborate, review and update the drawings in AUTOCAD of the HVAC system in Lima site on an annual basis.
Contractor shall include all materials, tools and personal protective equipment necessary to perform preventive and corrective maintenance work. Contractor must use the necessary and appropriate equipment to delimit the work area and not allow the pedestrian traffic. The contractor’s staff shall use the appropriate PPE for the activity to perform. NAMRU-6 will not provide any materials, tools nor PPE to the contractor to perform their work.
The contractor shall provide a weekly progress report to the NAMRU-6 facilities department, as well as a completion report when completing the maintenance work to include: activities performed with pictures, recommendations, conclusion and future needed corrective maintenance tasks. When a corrective maintenance work is required, the contractor shall submit a report detailing the problem encountered, with a quotation of the solution.
The preventive maintenance work will be coordinated between NAMRU-6 facilities staff and the staff assigned by the contractor.
Contractor shall perform operational testing of the systems at the completion of each preventive maintenance work. NAMRU-6 facilities department will assign a staff to participate in the operational testing and contractor shall prepare an operational testing form (checklist) to be signed by the facilities staff once testing is perform and accepted.
It is the responsibility of the contractor to dispose properly out of NAMRU-6 facilities all consumable materials and garbage generated by the contractor during the performance of the maintenance activities.
Applicable codes:
The following are applicable codes for the elaboration of the preventive maintenance plan, reports and activities mentioned in this document:
NACE
ASHRAE
IMC-International Mechanical Code BMBL 6th edition (Biosafety in Microbiological & Biomedical Laboratories) OEBGD (Overseas Environmental Baseline Guidance Document) DoD UFC (Unified Facilities Criteria)
NFPA 77
NFPA 70
NEC (National Electrical Code) Local (Host Country) regulations RNE (Peruvian National Building Code) IBC (International Building Code)
NACE
AWWA
IPC (International Plumbing Code)
Description of work required in Lima
HVAC systems in Lima
The contractor shall perform the following preventive maintenance activities:
HVAC system – LIMA Item Sub-system Task Frequency
1 Mechanical system of HVAC units
Cleaning of evaporator coils and condenser coils, internal and external, with pressurized liquid.
Quarterly
2 Mechanical system of
Cleaning of condensate tray (tray), to avoid plugging the condensation water discharge.
Quarterly
3 Mechanical system of
Cleaning of motor blades, grids, condensers and turbines.
Quarterly
4 Mechanical system of
Adjustment of charge and refrigerant gas
R-22, according to equipment design.
(Alternatively, ecological refrigerant as applicable).
Quarterly
5 Mechanical system of
Change of insulating sleeve (armaflex) in copper pipe, if necessary Quarterly
6 Mechanical system of
Cleaning of air filters and/or replace if necessary Quarterly
7 Mechanical system of
Verification of temperature of the conditioned areas. Temperature sensor ohm value reading.
Quarterly
8 Mechanical system of HVAC units
Verification and, where appropriate, correction to the compressor duty cycle. Quarterly
9 Mechanical system of HVAC units
Verification and, where appropriate, correction of leaks. Quarterly
10 Mechanical system of HVAC units
Cleaning of thermostat, verifying that it works correctly, in its stop, start and automatic cut by temperature.
Quarterly
11 Mechanical system of HVAC units
Verification of the conditions and trajectory of the ducts of the air conditioning system. Quarterly
12 Mechanical system of HVAC units Repair of leaks in external ducts (foil). Quarterly
13 Mechanical system of HVAC units
Verification of belts, pulleys and bearings;
adjustment, cleaning, lubrication and leveling.
Quarterly
14 Mechanical system of HVAC units
Guarantee that the equipment works 24 hours. Quarterly
15 Mechanical system of HVAC units
Change of service valve, o-wheels, seals, according to their condition. Quarterly
16 Mechanical system of HVAC units
Check working parameters, voltage, temperature, etc. Perform testing to demonstrate equipment is working in good conditions.
17 Electrical system of HVAC units
Review of the electrical supply from the panel to the unit, tightening the terminals forthe driver's arrival and the output of the thermal pad, before and after providingpreventive maintenance service to the unit.
Quarterly
18 Electrical system of HVAC
Review of arrival of electrical power to the terminals of the equipment, before andafter providing preventive maintenance service to the unit.
19 Electrical system of HVAC
Measurement of current consumption at start-up and work, normal voltage Quarterly
20 Electrical system of HVAC
Verify the incoming voltage to the control board, which is the design of the unit,before and after providing preventive maintenance service to the unit.
Quarterly
21 Electrical system of HVAC
Verify consumption amperage, before and after giving preventive maintenance serviceto the unit.
Quarterly
22 Electrical system of HVAC
Cleaning contactors and control panel relays with dielectric liquid.
Quarterly
23 Electrical system of HVAC
Cleaning, washing and drying (dielectric spray, moisture displacer) of the main controlelectronic card.
Quarterly
24 Electrical system of HVAC
Lubrication and engine cleaning. Quarterly
25 Electrical Panelboards of HVAC units Inspection and cleaning of exterior panel Quarterly
26 Electrical Panelboards of HVAC units Inspection and cleaning of interior panel Quarterly
27 Electrical Panelboards of HVAC units
Inspection and cleaning of interior devices using appropriate dielectric solvent Quarterly
28 Electrical Panelboards of HVAC units
Check operation of each contactor and breaker Quarterly
29 Electrical Panelboards of HVAC units
Inspection and tighten of all electrical connections inside the panel Quarterly
30 Electrical Panelboards of HVAC units
Check and install missing labels of wires and breakers Quarterly
31 Electrical Panelboards of HVAC units
Provide and replace new signs and labels mounted in the panels Quarterly
Electrical Panelboards of
HVAC units Check and provide missing electrical drawings and/or circuit’s description card in the panels
Quarterly
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
MD-20 & VK-MD-22
Removal of guards
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Disassembly of belt
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Removal of pulley
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Removing engine covers
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Motor/rotor disassembly
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Cleaning of engine coils
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Removing bearings
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Test insulation resistenace of motors
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Cleaning of parts
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Mounting new bearings
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Mounting rotor
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Mounting engine covers
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Pulley assembly
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Fitting assembly
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Alignment and temperature of strip
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Assembly of lids and guards
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Electrical board cleaning
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Electrical component locking reset
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Check status of components
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Verify condition of cabinet
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
MD-20 & VK-MD-22
Check tabler hermeticity Quarterly
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Disassembly of air-taking case
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Cleaning the area
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Air-taking box mounting
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Panelboard sealing
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Disassembly of damper
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Cleaning and lubricating mobile parts
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Sanding and painting of damper
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Assembly of damper
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Starting equipment
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Painting
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Testing
Maintenance to Vektors
VK-MD-15, VK-MD-18, VK-
Check parameters
66 Maintenance of roof top units (RTU) Disassembly of equipment lids Quarterly
67 Maintenance of roof top units (RTU)
Check belt status
68 Maintenance of roof top
Check pulley status
69 Maintenance of roof top
Check alignment and temperature of strip
70 Maintenance of roof top
Check engine status
71 Maintenance of roof top
Engine cleaning
72 Maintenance of roof top
Check bearing status
73 Maintenance of roof top
Change bearings if required
74 Maintenance of roof top
Cleaning of parts, covers and guards
75 Maintenance of roof top
Cleaning of fixed bearings
76 Maintenance of roof top
Lubricacion de fixed bearings
77 Maintenance of roof top
Wheel cleaning
78 Maintenance of roof top
Check condenser fan
79 Maintenance of roof top
Check evaporator fan
80 Maintenance of roof top
Check compressors
81 Maintenance of roof top
Check refrigeration pressures
82 Maintenance of roof top
Cleaning the condenser
83 Maintenance of roof top
Cleaning the evaporator
Maintenance of roof top units (RTU) Power and control electrical panelboard cleaning
85 Maintenance of roof top
Sealing of air tank duct joints
86 Maintenance of roof top
Check control operation
87 Maintenance of roof top
Check sensors
88 Maintenance of roof top
Check control operation
89 Maintenance of roof top
Check operation of actuators
90 Maintenance of roof top
Starting equipment
91 Maintenance of roof top
Painting
92 Maintenance of roof top
Testing
93 Maintenance of roof top
Check parameters
94 Chiller Verify the level of humidity / Humidity indicator
Bimonthly
95 Chiller Verify operation parameters (electrical, pressure and temperature)
Bimonthly
96 Chiller Verify correct set-points of operation and security.
Bimonthly
97 Chiller Inspect the condition of the condenser grills (cleaning is required)
Bimonthly
98 Chiller Visual inspection of oil leaks Bimonthly
99 Chiller Inspect the motors and fans of the condensers
Bimonthly
100 Chiller Inspect the correct rotation of the ventilator
Bimonthly
101 Chiller Inspect any abnormal or excessive noise Bimonthly 102 Chiller Inspect the interrupter of water flow Bimonthly
103 Chiller Inspect the temperature sensors and transducers
Bimonthly
104 Chiller Verify the general conditions of the equipment
Bimonthly
105 Chiller Verify the contactors from the ventilators Bimonthly
106 Chiller Verify the insulation of the heat exchangers
Bimonthly
107 Chiller Verify and adjust the electrical connections
Bimonthly
108 Chiller Verify the compressors resistance Bimonthly 109 Chiller Inspect leaks of refrigerant Bimonthly
110 Chiller Verify the value of the super-heater in the evaporator.
Bimonthly
111 Chiller Verify the economizer valve at the entrance or the compressor
Bimonthly
112 Chiller Verify the sub-cooling value at the condenser
Bimonthly
113 Chiller Analyze oil and the refrigerant Bimonthly 114 Chiller Vibration analysis Bimonthly 115 Chiller Change oil filters Bimonthly
116 Chiller Inspect the liquid lines, parallel to the change of filters
Bimonthly
117 Chiller Check the resistance’s ohms of the compressor and ventilators
Bimonthly
118 Chiller Register the operation conditions and collect the data
Bimonthly
119 Chiller Operation test Bimonthly 120 Chiller Cleaning around the working area Bimonthly
121 Air Handling Units Start the engines check for operational deficiencies
Quarterly
122 Air Handling Units Verify general conditions of the equipment Quarterly 123 Air Handling Units Verify parameters (electrical/mechanical) Quarterly 124 Air Handling Units Revision of contactors and/or start buttons Quarterly 125 Air Handling Units Revision of water valve Quarterly
126 Air Handling Units Inspection of the resistance (in case they have on)
127 Air Handling Units General revision of the coils Quarterly 128 Air Handling Units Inspect the V-belts Quarterly 129 Air Handling Units Lubricate the shafts and bearings Quarterly 130 Air Handling Units Cleaning de collecting tray Quarterly 131 Air Handling Units Clean the air filters Quarterly
132 Air Handling Units Inspect, cleaning and disinfecting the drainage
Quarterly
133 Air Handling Units Inspect the condition of the coil’s motor fan
Quarterly
134 Air Handling Units Inspect noises and abnormal vibrations Quarterly 135 Air Handling Units Verify and adjust electrical connection. Quarterly
136 Air Handling Units Verify painting of the dampers and lubrication
Quarterly
137 Air Handling Units Verify the calibration of the filters (pressure differential)
Quarterly
138 Air Handling Units Verify refrigerant (in case of direct expansion) or water leaks
Quarterly
139 Air Handling Units Lubrication of bearings Quarterly
140 Air Handling Units Electrical mega roll (electrical ventilator and compressor)
Quarterly
141 Air Handling Units Cleaning of the cabinets Quarterly 142 Air Handling Units Pressurized cleaning of the coil Quarterly
Air Handling Units Register the parameters (electrical, temperature and pressure) and the conditions of operation
Quarterly
Air Handling Units Cleaning and grease the doors of the air handlers Operation test
Quarterly
145 Variable Speed Drives External cleaning of the variable speed Quarterly 146 Variable Speed Drives Disassemble the heat dissipater Quarterly 147 Variable Speed Drives Cleaning the internal parts with dielectric Quarterly
148 Variable Speed Drives Assembly and test for operation
149 Chiller & Boiler Pumps Disassemble the motors y pumps Semiannual 150 Chiller & Boiler Pumps Disassemble the rotor Semiannual
151 Chiller & Boiler Pumps Replacement of the bearings
Semiannual
152 Chiller & Boiler Pumps Cleaning of the coil with dielectric solvent Semiannual 153 Chiller & Boiler Pumps Apply dehumidifier solvent Semiannual 154 Chiller & Boiler Pumps Heat treatment de the coil Semiannual 155 Chiller & Boiler Pumps Coil’s meg Semiannual
156 Chiller & Boiler Pumps Apply varnish, then to the oven and at last paint de motor
Semiannual
157 Chiller & Boiler Pumps Revision of pump seals and replace gaskets
158 Chiller & Boiler Pumps Operation test
159 Mechanical System of HVAC Boiler
Opening of the front a rear doors
160 Mechanical System of
Cleaning of the chimney
161 Mechanical System of
Sweeping the internal pipes
162 Mechanical System of HVAC Boiler
Cleaning the front and rear plate of the combustion chamber.
Quarterly
Mechanical System of HVAC Boiler
Opening of the man holes and check for any indication of corrosion, bite or scales and eventually to eliminate sludge and sediments with pressurized water.
Quarterly
164 Mechanical System of HVAC Boiler
Complete gaskets change of in every door and man hole.
Quarterly
165 Mechanical System of HVAC Boiler
Airtight seal of all doors and every inspection doors.
Quarterly
166 Mechanical System of HVAC Boiler
Cleaning of the containers, outdoor and indoor.
Quarterly
167 Mechanical System of HVAC Boiler
Painting of the external side of the container.
Quarterly
168 Mechanical System of HVAC Boiler
Painting of the internal side of the container with epoxy paint.
Quarterly
169 Mechanical System of HVAC Boiler
Replace or clean the pump filters depending on use.
Quarterly
170 Valves and Piping
Procedure of a general maintenance is as follows: Maximum security and purge always. The maintenance is done rectifying seats with abrasive material, including the change of gaskets. If you find out deteriorated the seats of the machine, previously quote the service.
Quarterly
171 Valves and Piping Mechanical cleaning of the entrance of the level of water to eliminate the scales. Quarterly
172 Valves and Piping Verify the gaskets and unions to comply that they are working correctly. Quarterly
173 Valves and Piping Correct the water and diesel leaks. Quarterly
Combustion Chamber and Burner System of HVAC
Boiler
Disassemble the burner and cleaning the aux. elements: electrodes, nozzle, filters, solenoid valves etc.
Quarterly
Combustion Chamber and Burner System of HVAC
Boiler Cleaning and regulate the ignition.
Quarterly
Combustion Chamber and Burner System of HVAC
Boiler
Verify the pump pressure and calibrate when necessary
Quarterly
Combustion Chamber and Burner System of HVAC
Boiler
Disassemble and cleaning of the ventilator, verify if it’s working and balanced.
Quarterly
Combustion Chamber and Burner System of HVAC
Boiler Change the air and diesel filters
Combustion Chamber and Burner System of HVAC
Boiler Assemble all the parts of the burner
Quarterly
Combustion Chamber and Burner System of HVAC
Boiler
Verify the heat resistance in the combustion chamber
Quarterly
181 Electrical System of HVAC Boiler
Maintenance and cleaning of all the command elements and the control panel with the dielectric solvent SS-25:
- Contactors and relay
- Adjust loose bolts to prevent false contact
- Check interconnection all the cables to see they are connected to the logical programmer
- Verify the primary and secondary levels of the transformer to see if they are correctly installed.
Quarterly
182 Electrical Motors
General maintenance of the fan motor:
- Disassemble and cleaning of the winding
- Measure the level of the isolation
- Change of bearings
- Assemble and mounting of the motor
- Verify the coupling and its alignment
- Measure the power consumption and compare it with the plate data.
Quarterly
183 Control Combustion System
General maintenance of the control systems which includes:
- Pressure control
- Modulation (PISTON) control
- Air input control
- Atomization control
- Switch end of career
- Electronic program
Quarterly
Tune-Up Of The
Combustion Chamber System
- Tune-up of the combustion chamber through a digital gas analyzer. The parameters must be according to the protection of the environment.
Quarterly
Tune-Up Of The
Combustion Chamber System
- Setting for the regulations: CO2, CO, O2, Excess of air, Efficiency, Chimney gas temperature, etc.
Quarterly
Tune-Up Of The
Combustion Chamber System
- Turn on the heater/boiler Quarterly
187 General Update CAD drawings of HVAC systems Annual
Contractor will also include requirements per O&M manuals and any additional requirements not mentioned in this document but required or recommended by manufacturer as preventive maintenance activities to perform quarterly or annually.
SPECIAL REQUIREMENTS:
Contractor shall provide, store at their off-site warehouse the following minimum spare parts (contractor shall immediately procure new spares if the ones listed are used in order to keep a minimum level of spare parts:
Spares for the Chiller as per recommended by manufacturer.
Procure and install all filters specified in this contract on an annual basis.
Boiler spare parts:
- Two (02) Danfus brand nozzles of 5GPHx60 ° Angle or similar.
- Two (02) foam filter element for fuel 2.
- Two (02) ignition electrodes earthenware material of 6 "length x9 1/16" diameter.
- Two (02) cables for ignition electrodes and connectors.
- Two (02) bearings number 6302 brand SKF or similar.
- One (01) filter for diesel 2 with basket element.
- One (01) display module, model 57800A1167, Honeywell brand or similar.
- One (01) diesel fuel 2 pump, model B2TA 8260, brand Sumtec (USA) or similar.
- Two (02) three-way solenoid valves ¼ ”NPT connection, coil 110 Volt, Jefferson brand (USA) or similar
- One (01) coupling kit diésel 2 engine and pump
- One (01) metal support set for gas train.
- One (01) pressure gauge.
- One (01) ball valve ½” for diesel 2.
- One (01) manufacture of interior thermal insulation for Bryan heater.
- One (01) refractory patch inside combustion chamber.
- One (01) manufacture of a linear meter of 2 ½ ”Ø SCH 80 diesel feet and return pipe and connection accessories.
ADDITIONAL INFORMATION
ANNEX 1: 2019 PREVENTIVE MAINTENANCE TO CHILLER, AHU, VSD AND PUMPS IN
LIMA
ANNEX 2: 2021 PREVENTIVE MAINTENANCE TO HVAC BOILER IN LIMA
ANNEX 3: 2019 PREVENTIVE MAINTENANCE TO EXHAUST EQUIPMENT IN LIMA
ANNEX 4: 2019 HVAC PREVENTIVE MAINTENANCE SCHEDULE IN LIMA
ANNEX 1
BITACORA DE CHILLER YORK NOVIEMBRE 2019
COMPONENTE TIPO MODELO Nº DE SERIE REFRIGERANTE TÉCNICO
TRABAJOS DE SERVICIO
Parametros de Funcionamiento de Equipo
Fecha
Hora
Temp.Salida de Agua
Temp.Retorno de Agua
Temp. Ambiente
Temp. Setpoint
Pres. Succ.
Pres. Desc.
Pres. Oil
Temp Suc.
Temp Desc.
Temp. Oil
Temp.Saturación Suc.
Temp.Sobcal Suc.
Temp.Saturación Desc.
Temp.Sobcal Desc.
Temp. Motor L1
Temp. Motor L2
Temp. Motor L3
Comp.Speed %
Economisador
Flash Tank Nivel %
Valve Feed %
Valve Drean %
Cond. Fans
Compresor heat
VSD Frecuencia
% Amp.
Voltaje VSD, Bus
Temp.VSD Interna
Cooling system
Temp. VSD (IGBT)
VSD Precaucion Senal
Horas de Funcionamiento
Numero de Arranques
OBSERVACIONES:
44 °F
34 PSI
47 °F
11:00 am
55 °F
90 °F
ON
100%
ON
16%
45%
52%
OFF
200 HZ
11:30 am
47 °F
Sistema No. 1 Sistema No. 2
18/11/19
88 °F
150 PSI
136 PSI
46 °F
135 °F
104 °F
7 °F
112 °F
25 °F
103 °F
96 °F
38 °F
102 °F
127 Amp. (67% FLA)
607 VDC
24 °F
55 °F
71 °F
34 PSI
143 PSI
131 PSI
45 °F
130 °F
101 °F
37 °F
7,4 °F
108 °F
200 HZ
127 Amp. (67% FLA)
113 °F
98 °F
90 °F
100%
ON
2%
CLIENTE: NAMRU
71 °F
44 °F
18/11/19
605 VDC
90 °F
ON
102 °F
56%
51%
OFF
CHILLER YORK R 134 a Wildor BarrientosYCAV0157PA28VA RMTM024165
JCI Location. Calle y No de edificio Código:
Ciudad, Codigo de area Fecha de elaboración:
Tel: +1 234 567 8900 Fecha de emisión:
Fax: +1 234 567 8900 NO Visita:
2. Tipo de visita
Nombre: X Mantenimiento Programado (PSA) NO Contrato:
NO Cliente: Retrofit y/o Reparación (L&M) NO SRO:
Dirección: Arranque Equipo Aplicado (HVAC & Ref)
Ciudad: País: Garantía Equipo Aplicado (HVAC & Ref) Emergencia
Contacto: Área: Garantía Proyecto de Sistemas (Ctrs) Inspección
Teléfono E-mail: Otro, detailles:
3. Descripción del equipo 4. Partes usadas
Marca:
Modelo:
NO Serie:
Arrancador:
Aceite:
Compresor:
Refrigerant:
Hrs de Operación:
NO Arranques:
Fluido:
Compr. Serial NO:
5. Estado del servicio 7. Repuestos sugeridos para el próximo servicio
Si X
No
6. Propiedad de Cliente
X
8. Trabajos realizados
Sensor de Temperatura de Succión
Mantenimiento
MANTENIMIENTO PREVENTIVO CHILLER YORK
Se realizó lavado de serpentín de condensador y de estructura exterior del Chiller
Se limpiaron y revisaron conectores de sensores de temperatura y transductores de descarga
Se limpió, se ajustaron terminales eléctricos y revisó tablero de control y fuerza del Chiller.
Se revisaron y limpiaron bornes de los compresores.
Se revisó funcionamiento correcto de válvulas electrónicas, de bomba enfriadora de gabinete eléctrico, de válvulas solenoides, de ventiladores. OK
Se mide amperaje de los ocho ventiladores, todos están en 3 Amp (Placa:5.6 Amp)
Se revisó calefactores de carter de los dos compresores OK
Se revisó funcionamiento de Interruptor de flujo OK, Se realizó búsqueda de fuga de gas refrigerante en los dos sistemas, no se encontró fugas
Se revisó programación en el Display del Chiller
Se revisó nivel de aceite OK
Se revisó nivel de Coolant , esta dentro del rango.
En este mantenimiento se cambiaron El Interruptor de flujo de Agua por estar oxidado internamente y el sensor de temperatura de Succión del Sistema N° 2.
Luis Ugarte
996720185
NAMRU
Descripción
Interruptor de Flujo de Agua tipo paleta
1. Datos del Cliente
Lima Perú
CantidadYORK
YCAV0157PA28VA
RMTM024165
VSD
York L
Tornillo MTS
No Parte
1 024-39397-000
1 025-47673-000
R 134a
Cantidad No Parte Descripción
18/11/2019
18/11/2019
REPORTE DE SERVICIO
Condicion fisica del sitio del trabajo Buen estado
Mal estado
Se completaron todas las actividades contratadas?
9. Mano de Obra
Fecha Hora Hora Horas Horas Horas
(DD/MM/AA) Entrada Salida Extras Aliment. de Viaje
16/11/2019 08:30 a.m. 06:00 p.m.
18/11/2019 08:30 a.m. 06:00 p.m.
10. Observaciones / Recomendaciones del Técnico 11. Comentarios del Cliente
12. Firma Técnico 13. Firma Cliente
Fecha: Fecha:
Nombre: Nombre Completo:
Cargo: Cargo:
Tel/Cel: Tel/Cel: DNI:
Firma: Firma:
Técnico HVAC
Nombre del Técnico Horas
Wildor
Antes de realizar el mantenimiento se observó que el sistema N° 2 estaba alarmado y bloqueado por esta alarma desde el 5 de Noviembre, esta alrma era de BAJO SOBRECALENTAMIENTO DE DESCARGA, se revisó en le mantenimiento y se observó que el sensor de temperatura de succión estaba descalibrado, se cambió y se deja operativo el sistema N° 2.
Se observa que los serpentines condensadores se siguen deteriorando paulatinamente a pesar de eso los parámetros de funcionamiento aun están dentro de rangos normales., tener en cuenta que el equipo viene operando 10 años continuamente las 24 horas del día y sin interrupción
18-Nov-1918-Nov-19
Wildor Barrientos
995711437
Horas
Totales Normales CommentariosID
Wildor / Victor
Técnico de Servicios
Luis Ugarte
996720185
ANNEX 2
Lima, 30 de diciembre del 2021
INFORME N° 00005-21 NAMRU-6
Señores :
EMBAJADA AMERICANA NANRU-6
REFERENCIA : ORDEN DE COMPRA N4485221P0091
Por la presente, nos es grato saludarlo y a la vez hacerle llegar nuestro informe técnico referente al mantenimiento integral de la caldera.
MANTENIMIENTO INTEGRAL DE CALDERA BRYAN BOILER
MANTENIMIENTO MECANICO
DESHOLLINADO DE LOS TUBOS EN SU TOTALIDAD
Pedro.Davila Highlight
Pedro.Davila Highlight
SISTEMA DE COMBUSTIÓN Y QUEMADOR
FABRICACION DE AISLAMIENTO TERMICO DE TAPAS LADO FUEGO
MANTENIMIENTO DE TANQUE DIARIO DE DIESEL 2
VERIFICACION Y REAJUSTE DE BORNERAS DEL SISTEMA ELECTRICO
ANALISIS DE GASES DE COMBUSTION
MANTENIMIENTO ELECTRICO
Mantenimiento y limpieza de todos los elementos de mando y control del tablero y accesorios por medio de solvente dieléctrico SS-25.
• Contactores y relé del tablero
• Ajuste general de los pernos de sujeción de los cables para evitar falsos contactos
• Revisión del cableado de interconexión de todos los controles hacia el programador electrónico
• Verificación de los niveles primario y secundario del transformador de alimentación a los controles
MOTOR ELÉCTRICO VENTILADOR
Mantenimiento general del motor eléctrico del ventilador.
• Desmontaje y limpieza general del bobinado
• Medición del nivel del aislamiento
• Cambio de los rodamientos
• Ensamble y montaje de los motores
• Verificación del alineamiento y del acoplamiento,
• Medición del consumo de energía eléctrica y comparación con los datos de placa
REGULACIÓN DEL SISTEMA DE COMBUSTIÓN
• Presión de combustible
• Ingreso de aire pleno
• Aire primario -Análisis de combustión.
-Informe técnico.
AFINAMIENTO DEL SISTEMA DE COMBUSTIÓN
• Arranque del caldero y afinamiento del sistema de combustión por medio de un analizador de gases digital marca TESTO mod. 327-1. Los parámetros a ajustar estarán de acuerdo a las normas establecidas para la Protección del medio ambiente y lo establecido por el fabricante.
Parámetros de regulación:
CO2, CO, O2, Exceso de Aire, Eficiencia, Temperatura de Gases de Chimenea, etc.
• Puesta en servicio del caldero
PARAMETROS OPTIMOS PARA UNA BUENA COMBUSTION
CO2 MAX 15.7 %
O2 MAX. 8. 0% Y MIN. 2.5 %
CO MAX 400 ppm y optimo 0 ppm
EXCESO DE AIRE MAX. 25 % Y MIN. 15 %
EFICIENCI A DE COMBUSTION MAX. 88 % Y MIN. 70 %
MANTENIMIENTO MECANICO:
Desmontaje integral de las líneas de combustible diésel 2 del calentador al tanque diario de alimentación.
Limpieza de líneas de combustible encontrándose en proceso de deterioro requiere cambio.
PINTURA
• Lavado del contenedor con agua a presión
• Lijado y esmerilado de toda la superficie que presentaba formación de oxido
• Desengrasado del contenedor en su totalidad para mejor agarre de la pintura EPOXICA de la mejor calidad
• Pintado integral del contenedor
• Pintado del piso del interior del contenedor con pintura epoxica de mejor calidad
AGREGADOS:
INSTALACION DE CODILLO PROCEDENCIA USAPARA RESET DEL PROGRAMADOR MARCA HONEYWELL
REPARACION E INSTALACION DE KIT DE CHEVRONES DE, PISTON HIDRAULICO PARA CIERRE DE DAMPER PARA
ENCENCIDO DE PILOTO DEL QUEMADOR.
SUMINISTRO DE REPUESTOS:
-02 toberas marca Danfoss de 5 gphx60° de Angulo o similar.
-02 elemento de filtro material espuma para Diesel 2.
-02 electrodos de ignición material loza de 6" longitud x91/16" diámetro.
-02 cables para electrodos de ignición y conectores.
-02 rodamientos numero 6302 marca SKF o similar.
-01 filtro para Diesel 2 con elemento de canastilla.
-01 módulo de pantalla, modelo 57800A1167, marca Honeywell o similar.
-01 bomba de combustible diésel 2, modelo. B2TA 8260, marca Sumtec (USA) -02 válvulas solenoides de tres vías conexión 1⁄4” NPT bobina 110 Voltios, marca ASCO (USA) o similar -01 juego de acoplamiento motor y bomba diésel 2.
-01 juego de soporte metal para tren de gas.
-01 manómetro de presión.
-01 válvula de bola 1⁄2” para diésel 2.
-01 fabricación de aislamiento térmico interior para calentador Bryan.
-01 fabricación de línea de tubería de alimentación y retorno diésel 2 de 1⁄2” Ø SCH 80 y accesorios de conexión.
RECOMENDACIONES
Se realizar purgas frecuentes al tanque diario de Diesel 2 para la eliminación de borra que se filtra hacia la bomba del quemador.
Usar el reset del tablero eléctrico para armar el calentador cuanto este pare por alguna falla (mover hacia abajo por dos segundos)
Emitimos este documento para los fines que estime conveniente y sin otro particular para servirlos gustosamente, Muy atentamente
Víctor Pérez Limo Gerente Técnico
GRUTERPESA
Pedro.Davila Stamp
Pedro.Davila Highlight
ANNEX 3
INFORME DE
MANTENIMIENTO
NAMRU - LIMA
DESCRIPCIÓN BREVE
Informe de mantenimiento de equipos HVAC correspondiente a los trabajos realizados en el mes de Febrero del 2019
División de Mantenimiento SAEG Engineering Group
1. ALCANCE Y OBJETIVO
El presente informe de mantenimiento tiene como alcance presentar un informe detallado al cliente sobre el estado actual de sus equipos de aire acondicionado y ventilación.
Los objetivos a cumplir se basarán principalmente en:
Indicar las condiciones encontradas en los equipos durante el mantenimiento preventivo y correctivo de los equipos HVAC y así lograr el buen funcionamiento del sistema
Verificar las condiciones de cada componente , y adoptar medidas correctivas de ser necesario
Cumplir con las normas aplicadas al tema de seguridad, medio ambiente y salud en el trabajo
Cumplir con los trabajos planificados
Garantizar la operatividad de los equipos
2. DEFINICIONES
SAEG PERU S.A.
Entidad encargada de dar Mantenimiento a los equipos HVAC requeridos
Cliente Entidad que accede un servicio prestado por una contrata.
Equipo HVAC Equipo cuya función está destinada al acondicionamiento y ventilación.
Mantenimiento
Preventivo
Revisión del estado general del equipo para garantizar su funcionamiento y fiabilidad.
Mantenimiento
Correctivo
Localización de averías y cambio inmediato de repuestos para poner operativo el equipo.
3. DESCRIPCIONES DE ACTIVIDADES
3.1 Mantenimiento de extractores
Verificar el estado del rodete.
Verificar el estado de las chumaceras.
Verificar el estado de las fajas.
Verificar el estado de la bobina del motor eléctrico.
Verificar el estado de los rodamientos del motor eléctrico.
Verificar el estado de las poleas del rodete y motor eléctrico.
Verificar el estado de las cajas porta filtros.
Verificar el estado de las empaquetaduras de las puertas.
Verificar el funcionamiento de las electroválvulas.
Limpieza de la malla de la caja porta filtros.
Limpieza de rodete.
Limpieza de filtros de malla.
Lubricación de rodamientos y chumaceras.
Lubricación de las bisagras de las puertas de la caja porta filtro.
Alineamiento de poleas.
Limpieza de bobina del motor eléctrico.
Verificación del traslape del rodete.
4. INFORME DE EQUIPO
CODIGO
Tip. Eq. Ubicación Marca Modelo Fecha Tip. Serv. Diagnostico Conclusión Estado del equipo
0001 EXTRACTOR EF-203 VEKTOR VECTOR-MD-15 2019-01-26
PREVENTIVO Se encontró equipo con polución
Se realizó el cambio de chumaceras , cambio de rodamientos de motor eléctrico (6205 - 6206-27) Se cambió fajas AX-55 (02 UND)
Se recomienda cambiar la caja de toma de aire
Se recomienda cambio de dámper, se recomienda pintado general del equipo Extractor: 10.4/11.1/11.1 amp / FLA:
13.2 amp Operativo
EXTRACTOR EF-202 VEKTOR
VK-MD-20-9-LLL-
A75-X 2019-02-09
PREVENTIVO Equipo se encuentra con polución
Se realizó cambo de chumaceras, cambio de rodamientos de motor eléctrico 6309-2 Se realizó cambio de faja BX-69 (03
UND)
Se recomienda cambiar la caja de toma de aire Se recomienda cambio de dámper, también pintado general del equipo Extractor: 21.1/21.2/22.4 amp / FLA:
36.2 amp Operativo
CODIGO
Tipo. E. Ubicación Marca Modelo Fecha Tipo. Ser. Diagnostico Conclusión Estado del equipo
0003 PRESURIZADOR VECTOR 102 VECTOR
VECTOR 22BA9-
1X1 2019-02-02
PREVENTIVO Se encontró equipo con polución
Se realizó el cambio de rodamientos 6309-6208-2Z
Se realizó cambio de faja BX-84 (03
UND)
Se recomienda cambio de caja de toma de aire
Se recomienda pintado general de todo el equipo, cambio de dámper
Extractor: 33.6/31.9/35.3 amp / FLA:
48.0 amp Operativo
EXTRACTOR VEKTOR - 103 VECTOR
VECTOR-18-BAP-
1X1 2019-02-23
PREVENTIVO Se encontró equipo con polución
Se recomienda el cambio de la tapa del motor eléctrico (dañado con hueco)
Se recomienda cambio de dámper de la toma de aire fresco
Se recomienda pintado del equipo en general
Se realizó cambio de chumaceras , rodamientos 6206-2Z y cambio de fajas BX-66 Se recomienda cambio de chapa del tablero Extractor: 24.8/22.6/24.9 amp Operativo
5. INDICADORES
EQUIPOS INTERVENIDOS
INTERVENIDOS EQUIPOS SIN OBSERVACION EQUIPO CON OBSERVACION FUERA DE SERVICIO
4 4 0 0
4 4
0 0
INTERVENIDOS EQUIPOS SIN
OBSERVACION
EQUIPO CON
OBSERVACION
FUERA DE SERVICIO
Equipos Realizados
6. MATERIAL FOTOGRAFICO.
Equipo VEKTOR 102
Equipo VEKTOR 103
Equipo VEKTOR EF – 202
Equipo VEKTOR EF – 203
7. REPUESTOS RECOMENDADOS
CANTIDAD DESCRIPCIÓN
0 CHUMACERAS
0 FAJAS
0 TARJETA ELECTRONICA
0 RESISTENCIA
0 RODAMIENTOS
0 CAJA PORTA FILTRO
0 FILTRO SECADOR
4 CAJA DE TOMA DE AIRE
4 DAMPER
8. CONCLUSIONES Y RECOMENDACIONES
Se realizó mantenimiento preventivo a los 4 equipos HVAC
Se recomienda cambio de dámper VEKTOR EF-203
Se recomienda pintado general del equipo VEKTOR EF-203
Se recomienda cambio de caja de toma de aire VEKTOR EF-203
Se recomienda cambio de tapa del motor eléctrico VEKTOR-103
Se recomienda cambio de dámper de la toma de aire fresco VEKTOR – 103
Se recomienda cambio de caja de toma de aire VEKTOR – 103
Se recomienda pintado general del equipo VEKTOR – 103
Se recomienda cambiar chapa del tablero del equipo VEKTOR – 103
Se recomienda cambio de caja de toma de aire VEKTOR - 102
Se recomienda pintado general de todo el equipo VEKTOR – 102
Se recomienda cambio de dámper VEKTOR – 102
Se recomienda cambio de caja de toma de aire VEKTOR EF-202
Se recomienda cambio de dámper VEKTOR EF-202
Se recomienda pintado general de todo el equipo VEKTOR EF -202
ANNEX 4
EQUIPOS nov-19 dic-19 ene-20 feb-20 mar-20 abr-20 may-20 jun-20 jul-20 ago-20
Analisis de Aceite SERV SERV
Analisis Vibracional SERV
Cambio Filtros SERV
Variadores de Velocidad SERV
UMAS SERV
Bombas SERV
CRONOGRAMA DE MANTENIMIENTO 2019 - 2020 EMBAJADA DE USA
Chiller YCAV0157PA28VAC
Toma de Parametros SERV SERV SERV SERV
| Chiller pumps: |
| HVAC Boiler pumps: |