W9127822R0005 Section J - Exhibit 11.2.2 SOP-FAC 015 HVAC System Iquitos.pdf
PDF 19 MB Posted
- Solicitation number
- W9127822R0005
About this file
This document outlines a federal contract opportunity for operation and maintenance services. The U.S. Army Corps of Engineers, Mobile District is seeking to award a firm-fixed-price contract with a one-year base period and four one-year options to furnish all personnel, services, materials, and transportation necessary for the operation and maintenance of the U.S. Navy Medical Research Unit Six facilities in Lima, Peru and other satellite locations. Requirements include preventative, predictive, demand, and emergency maintenance for architectural, mechanical, electrical, and instrumentation systems. Limited groundskeeping services are also required. The contractor will be required to minimize interference with daily laboratory operations and comply with regulatory bodies such as AAALAC. Facilities include BSL-2 and BSL-3 research laboratories, vivariums, administrative spaces, parking areas, and supporting utilities. The size standard for this procurement is annual average gross revenue of $41.5 million or less for the past three years under NAICS code 561210. The solicitation will be posted at SAM.gov and no paper solicitation will be issued.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD OPERATING PROCEDURE (SOP) – QUARTERLY PREVENTIVE
MAINTENANCE ACTIVITIES FOR HVAC SYSTEM IN IQUITOS SITE
General Requirements for Iquitos
NAMRU-6 at Iquitos has the following air conditioning equipment per building:
Administrative Building IQ1:
Two (2) air-conditioning units brand AAON; Package Type, R-410A, Capacity: 13 TR.
Laboratory Building IQ1 – Parasitology Laboratory:
One (1) air-conditioning unit brand Carrier; Split Duct Type, R-22, and Capacity: 36.000 BTU
Air injector, motor brand, type SA-10-6N050208004 VOL. 2000 CFM 2 HP.
Air extractor, Model: TD 2000.
Laboratory Building IQ1 – Sterilization Room:
One (1) air-conditioning unit brand Carrier; Split Duct Type, R-22, Capacity: 36.000 BTU
Air injector, motors Brand, type SA-10-6N050208004 VOL. 2000 CFM 2 HP.
Air extractor, Model: TD 2000.
Laboratory Building IQ1 – Bacteriology Laboratory:
One (1) air-conditioning brand York; Split Duct Type, R-410A, Capacity: 60.000 BTU
Air injector, motors Brand, type SA-10-6N050208004 VOL. 2000 CFM 2 HP
Air extractor, Model: TD 2000
Laboratory Building IQ1 – Virology Laboratory:
One (1) air-conditioning brand AAON; Package Type, R-22, Capacity: 120.000 BTU
Air injector, motors Brand Type SA-10-6N050208004 VOL. 2000 CFM 2 HP
Section J - Exhibit 11.2.2 SOP-FAC 015
Guard Shack/Security Room:
One (1) air-conditioning brand LG; Window Type; Capacity: 12.000 BTU
UPS Room IQ1:
Two (2) air-conditioning units brand York, Capacity 36.000 BTU.
Main Electrical Room IQ1:
One (1) air-conditioning brand York; Split Type; R-410A, Capacity: 12.000 BTU.
Freezer Room IQ3:
One (1) air-conditioning brand Mitsubishi Electric, Capacity: 96.000 BTU.
Entomology Building – IQ2:
One (1) Vektor VK-H-10-M15-X, brand Greenheck
One (1) Vektor VK-H-10-A7-X, brand Greenheck
One (1) Roof Top Unit (RTU) RVE-50-36P-30H-20, brand Greenheck
Fifteen (15) Electric Duct Heaters: EDH-1.1; EDH-1.2; EDH-1.3; EDH-1.4; EDH-1.5; EDH-1.6;
EDH-1.7; EDH-1.8; EDH-1.9; EDH-1.10; EDH-2.1; EDH-2.2; EDH-2.3; EDH-2.4; EDH-2.5
Four (4) dehumidifiers, brand Notec, model: RS010/220-240/1
One (1) air-conditioning, 24000 BTU, ductless mini split type, Data room.
Contractor shall provide the names and certification of the technicians performing preventive maintenance tasks. Only qualified technicians shall perform preventive and corrective maintenance tasks. Contractor must demonstrate that they have official representative of GREENHECK factory or technicians trained/certified to perform work to Greenheck equipment.
Contractor shall perform quarterly and annual preventive maintenance activities to all of the air conditioning units specified in this document. It is the responsibility of the contractor to perform a full inspection of the systems and collect all required information to provide a quality preventive maintenance. In addition, contractor shall review operation manuals for the equipment of the systems under this contract and include any recommended preventive maintenance activities by the manufacturer not mentioned in this document.
Contractor shall elaborate, review and update the drawings in AUTOCAD of the HVAC system in Iquitos site on an annual basis.
Contractor shall include all materials, tools and personal protective equipment necessary to perform preventive and corrective maintenance work. Contractor must use the necessary and appropriate equipment to delimit the work area and not allow the pedestrian traffic. The contractor’s staff shall use the appropriate PPE for the activity to perform. NAMRU-6 will not provide any materials, tools nor PPE to the contractor to perform their work.
The contractor shall provide a weekly progress report to the NAMRU-6 facilities department, as well as a completion report when completing the maintenance work to include: activities performed with pictures, recommendations, conclusion and future needed corrective maintenance tasks. When a corrective maintenance work is required, the contractor shall submit a report detailing the problem encountered, with a quotation of the solution.
The preventive maintenance work will be coordinated between NAMRU-6 facilities staff and the staff assigned by the contractor.
Contractor shall perform operational testing of the systems at the completion of each preventive maintenance work. NAMRU-6 facilities department will assign a staff to participate in the operational testing and contractor shall prepare an operational testing form (checklist) to be signed by the facilities staff once testing is perform and accepted.
It is the responsibility of the contractor to dispose properly out of NAMRU-6 facilities all consumable materials and garbage generated by the contractor during the performance of the maintenance activities.
Applicable codes:
The following are applicable codes for the elaboration of the preventive maintenance plan, reports and activities mentioned in this document:
NACE
ASHRAE
IMC-International Mechanical Code BMBL 6th edition (Biosafety in Microbiological & Biomedical Laboratories) OEBGD (Overseas Environmental Baseline Guidance Document) DoD UFC (Unified Facilities Criteria)
NFPA 77
NFPA 70
NEC (National Electrical Code) Local (Host Country) regulations RNE (Peruvian National Building Code) IBC (International Building Code)
NACE
AWWA
IPC (International Plumbing Code)
Description of work required in Iquitos
HVAC systems in Iquitos
The contractor shall perform the following preventive maintenance activities:
HVAC system – IQUITOS Item Sub-system Task Frequency
1 Mechanical system of HVAC units
Cleaning of evaporator coils and condenser coils, internal and external, with pressurized liquid.
Quarterly
2 Mechanical system of HVAC units
Cleaning of condensate tray (tray), to avoid plugging the condensation water discharge.
Quarterly
3 Mechanical system of HVAC units Cleaning of motor blades, grids, condensers and turbines.
Quarterly
4 Mechanical system of HVAC units
Adjustment of charge and refrigerant gas R-22, according to equipment design.
(Alternatively, ecological refrigerant as applicable).
Quarterly
5 Mechanical system of HVAC units Change of insulating sleeve (armaflex) in copper pipe, if necessary Quarterly
6 Mechanical system of HVAC units Cleaning of air filters and/or replace. Quarterly
7 Mechanical system of HVAC units
Verification of temperature of the conditioned areas. Temperature sensor ohm value reading.
Quarterly
8 Mechanical system of HVAC units
Verification and, where appropriate, correction to the compressor duty cycle. Quarterly
9 Mechanical system of HVAC units
Verification and, where appropriate, correction of leaks. Quarterly
10 Mechanical system of HVAC units
Cleaning of thermostat, verifying that it works correctly, in its stop, start and automatic cut by temperature.
Quarterly
11 Mechanical system of HVAC units
Verification of the conditions and trajectory of the ducts of the air conditioning system. Quarterly
12 Mechanical system of HVAC units Repair of leaks in external ducts (foil). Quarterly
13 Mechanical system of HVAC units
Verification of belts, pulleys and bearings;
adjustment, cleaning, lubrication and leveling.
Quarterly
14 Mechanical system of HVAC units
Guarantee that the equipment works 24 hours. Quarterly
15 Mechanical system of HVAC units
Change of service valve, o-wheels, seals, according to their condition. Quarterly
16 Mechanical system of HVAC units
Check working parameters, voltage, temperature, etc. Perform testing to demonstrate equipment is working in good conditions.
17 Electrical system of HVAC units
Review of the electrical supply from the panel to the unit, tightening the terminals forthe driver's arrival and the output of the thermal pad, before and after providingpreventive maintenance service to the unit.
Quarterly
18 Electrical system of HVAC units
Review of arrival of electrical power to the terminals of the equipment, before andafter providing preventive maintenance service to the unit.
Quarterly
19 Electrical system of HVAC units Measurement of current consumption at start-up and work, normal voltage Quarterly
20 Electrical system of HVAC units
Verify the incoming voltage to the control board, which is the design of the unit,before and after providing preventive maintenance service to the unit.
Quarterly
21 Electrical system of HVAC units
Verify consumption amperage, before and after giving preventive maintenance serviceto the unit.
Quarterly
22 Electrical system of HVAC units Cleaning contactors and control panel relays with dielectric liquid.
Quarterly
23 Electrical system of HVAC units
Cleaning, washing and drying (dielectric spray, moisture displacer) of the main controlelectronic card.
Quarterly
24 Electrical system of HVAC units Lubrication and engine cleaning. Quarterly
25 Electrical Panelboards of HVAC units Inspection and cleaning of exterior panel Quarterly
26 Electrical Panelboards of HVAC units Inspection and cleaning of interior panel Quarterly
27 Electrical Panelboards of HVAC units
Inspection and cleaning of interior devices using appropriate dielectric solvent Quarterly
28 Electrical Panelboards of HVAC units
Check operation of each contactor and breaker Quarterly
29 Electrical Panelboards of HVAC units
Inspection and tighten of all electrical connections inside the panel Quarterly
30 Electrical Panelboards of HVAC units
Check and install missing labels of wires and breakers Quarterly
31 Electrical Panelboards of HVAC units
Provide and replace new signs and labels mounted in the panels Quarterly
Electrical Panelboards of
HVAC units Check and provide missing electrical drawings and/or circuit’s description card in the panels
Quarterly
33 Maintenance to Vektor vk-h- 10-m15-x
Removal of guards
34 Maintenance to Vektor vk-h-
Disassembly of belt
35 Maintenance to Vektor vk-h-
Removal of pulley
36 Maintenance to Vektor vk-h-
Removing engine covers
37 Maintenance to Vektor vk-h-
Motor/rotor disassembly
38 Maintenance to Vektor vk-h-
Cleaning of engine coils
39 Maintenance to Vektor vk-h-
Removing bearings
40 Maintenance to Vektor vk-h-
Test insulation resistenace of motors
41 Maintenance to Vektor vk-h-
Cleaning of parts
42 Maintenance to Vektor vk-h-
Mounting new bearings
43 Maintenance to Vektor vk-h-
Mounting rotor
44 Maintenance to Vektor vk-h-
Mounting engine covers
45 Maintenance to Vektor vk-h-
Pulley assembly
46 Maintenance to Vektor vk-h-
Fitting assembly
47 Maintenance to Vektor vk-h-
Alignment and temperature of strip
48 Maintenance to Vektor vk-h-
Assembly of lids and guards
49 Maintenance to Vektor vk-h-
Electrical board cleaning
50 Maintenance to Vektor vk-h-
Electrical component locking reset
51 Maintenance to Vektor vk-h-
Check status of components
52 Maintenance to Vektor vk-h-
Verify condition of cabinet
53 Maintenance to Vektor vk-h- 10-m15-x Check tabler hermeticity Quarterly
54 Maintenance to Vektor vk-h-
Disassembly of air-taking case
55 Maintenance to Vektor vk-h-
Cleaning the area
56 Maintenance to Vektor vk-h-
Air-taking box mounting
57 Maintenance to Vektor vk-h-
Panelboard sealing
58 Maintenance to Vektor vk-h-
Disassembly of damper
59 Maintenance to Vektor vk-h-
Cleaning and lubricating mobile parts
60 Maintenance to Vektor vk-h-
Sanding and painting of damper
61 Maintenance to Vektor vk-h-
Assembly of damper
62 Maintenance to Vektor vk-h-
Starting equipment
63 Maintenance to Vektor vk-h-
Painting
64 Maintenance to Vektor vk-h-
Testing
65 Maintenance to Vektor vk-h-
Check parameters
66 Maintenance of Vektor vk-h-
Removal of guards
67 Maintenance of Vektor vk-h-
Disassembly of belt
68 Maintenance of Vektor vk-h-
Removal of pulley
69 Maintenance of Vektor vk-h-
Removing engine covers
70 Maintenance of Vektor vk-h-
Motor/rotor disassembly
71 Maintenance of Vektor vk-h-
Cleaning of engine coils
72 Maintenance of Vektor vk-h-
Removing bearings
73 Maintenance of Vektor vk-h-
Test insulation resistenace of motors
74 Maintenance of Vektor vk-h-
Cleaning of parts
75 Maintenance of Vektor vk-h-
Mounting new bearings
76 Maintenance of Vektor vk-h-
Mounting rotor
77 Maintenance of Vektor vk-h-
Mounting engine covers
78 Maintenance of Vektor vk-h-
Pulley assembly
79 Maintenance of Vektor vk-h-
Fitting assembly
80 Maintenance of Vektor vk-h-
Alignment and temperature of strip
81 Maintenance of Vektor vk-h-
Assembly of lids and guards
82 Maintenance of Vektor vk-h-
Electrical board cleaning
83 Maintenance of Vektor vk-h-
Electrical component locking reset
84 Maintenance of Vektor vk-h-
Check status of components
85 Maintenance of Vektor vk-h-
Verify condition of cabinet
86 Maintenance of Vektor vk-h-
Check tabler hermeticity
87 Maintenance of Vektor vk-h-
Disassembly of air-taking case
88 Maintenance of Vektor vk-h-
Cleaning the area
89 Maintenance of Vektor vk-h-
Air-taking box mounting
90 Maintenance of Vektor vk-h-
Panelboard sealing
91 Maintenance of Vektor vk-h-
Disassembly of damper
92 Maintenance of Vektor vk-h-
Cleaning and lubricating mobile parts
93 Maintenance of Vektor vk-h-
Sanding and painting of damper
94 Maintenance of Vektor vk-h-
Assembly of damper
95 Maintenance of Vektor vk-h-
96 Maintenance of Vektor vk-h-
97 Maintenance of Vektor vk-h-
Testing
98 Maintenance of Vektor vk-h-
Check parameters
99 Maintenance of roof top unit
(RTU) rve-50-36p-30h-20 Disassembly of equipment lids
100 Maintenance of roof top unit
Check belt status
101 Maintenance of roof top unit
Check pulley status
102 Maintenance of roof top unit
Check alignment and temperature of strip
103 Maintenance of roof top unit
Check engine status
104 Maintenance of roof top unit
Engine cleaning
105 Maintenance of roof top unit
Check bearing status
106 Maintenance of roof top unit
Change bearings if required
107 Maintenance of roof top unit
Cleaning of parts, covers and guards
108 Maintenance of roof top unit
Cleaning of fixed bearings
109 Maintenance of roof top unit
Lubricacion de fixed bearings
110 Maintenance of roof top unit
Wheel cleaning
111 Maintenance of roof top unit
(RTU) rve-50-36p-30h-2 Check condenser fan
112 Maintenance of roof top unit
Check evaporator fan
113 Maintenance of roof top unit
Check compressors
114 Maintenance of roof top unit
Check refrigeration pressures
115 Maintenance of roof top unit
Cleaning the condenser
116 Maintenance of roof top unit
Cleaning the evaporator
117 Maintenance of roof top unit
(RTU) rve-50-36p-30h-20
Power and control electrical panelboard cleaning
118 Maintenance of roof top unit
Sealing of air tank duct joints
119 Maintenance of roof top unit
Check control operation
120 Maintenance of roof top unit
Check sensors
121 Maintenance of roof top unit
Check control operation
122 Maintenance of roof top unit
Check operation of actuators
123 Maintenance of roof top unit
124 Maintenance of roof top unit
125 Maintenance of roof top unit
(RTU) rve-50-36p-30h-20 Testing
Quarterly
126 Maintenance of roof top unit
(RTU) rve-50-36p-30h-20 Check parameters
Quarterly
127 Electric Duct Heaters
(EDH)
Check operation of electrical resistance Quarterly
128 Electric Duct Heaters
(EDH)
Check operation of thermostats Quarterly
129 Electric Duct Heaters
(EDH)
Cleaning of parts Quarterly
130 Electric Duct Heaters
(EDH)
Starting equipment Quarterly
131 Electric Duct Heaters
(EDH)
Testing Quarterly
132 Electric Duct Heaters
(EDH)
Check parameters Quarterly
Dehumidifiers, brand
Nortec, model:
RS010/220-240/1
Perform all maintenance activities as per indicated in the operation manual of the manufacturer.
Quarterly
134 General Update CAD drawings of HVAC systems Annual
Contractor will also include requirements per O&M manuals and any additional requirements not mentioned in this document but required or recommended by manufacturer as preventive maintenance activities to perform quarterly or annually.
SPECIAL REQUIREMENTS:
Contractor shall provide, store at their off-site warehouse the following minimum spare parts (contractor shall immediately procure new spares if the ones listed are used in order to keep a minimum level of spare parts:
One (1) Spare for each one of the Electric Duct Heaters. See annex 4 for the specific data of heaters.
One (1) humidifier
Air filters for replacement of all air conditioners in a quarterly basis. HEPA filters replacement on an annual basis.
ADDITIONAL INFORMATION
ANNEX 1: 2019 PREVENTIVE MAINTENANCE TO HVAC IN ENTOMOLOGY, IQUITOS
ANNEX 2: 2019 INSPECTION REPORTS TO HVAC IN ENTOMOLOGY, IQUITOS
ANNEX 3: 2019 PREVENTIVE MAINTENANCE TO HVAC IN ADMINISTRATIVE,
LABORATORY AND OTHER BUILDINGS, IQUITOS
ANNEX 4: ELECTRIC DUCT HEATERS IN ENTOMOLOGY BUILDING, IQUITOS
ANNEX 1
INFORME DE
MANTENIMIENTO
NAMRU – CLINICA
NAVAL IQUITOS
DESCRIPCIÓN BREVE
Informe de mantenimiento de equipos HVAC y resistencias correspondiente a los trabajos realizados en el mes de Septiembre del 2019
División de Mantenimiento
SAEG PERU S.A
Nº CONTRATO.
N4485219P0235
1. ALCANCE Y OBJETIVO
El presente informe de mantenimiento tiene como alcance presentar un informe detallado al cliente sobre el estado actual de sus equipos de aire acondicionado y ventilación.
Los objetivos a cumplir se basarán principalmente en:
Indicar las condiciones encontradas en los equipos durante el mantenimiento preventivo y correctivo de los equipos HVAC y así lograr el buen funcionamiento del sistema
Verificar las condiciones de cada componente , y adoptar medidas correctivas de ser necesario
Cumplir con las normas aplicadas al tema de seguridad, medio ambiente y salud en el trabajo
Cumplir con los trabajos planificados
Garantizar la operatividad de los equipos
2. DEFINICIONES
SAEG PERU S.A.
Entidad encargada de dar Mantenimiento a los equipos HVAC requeridos
Cliente Entidad que accede un servicio prestado por una contrata.
Equipo HVAC Equipo cuya función está destinada al acondicionamiento y ventilación.
Mantenimiento
Preventivo
Revisión del estado general del equipo para garantizar su funcionamiento y fiabilidad.
Mantenimiento
Correctivo
Localización de averías y cambio inmediato de repuestos para poner operativo el equipo.
3. DESCRIPCIONES DE ACTIVIDADES
3.1 Mantenimiento de extractores
Verificar el estado del rodete.
Verificar el estado de las chumaceras.
Verificar el estado de las fajas.
Verificar el estado de la bobina del motor eléctrico.
Verificar el estado de los rodamientos del motor eléctrico.
Verificar el estado de las poleas del rodete y motor eléctrico.
Verificar el estado de las cajas porta filtros.
Verificar el estado de las empaquetaduras de las puertas.
Verificar el funcionamiento de las electroválvulas.
Limpieza de la malla de la caja porta filtros.
Limpieza de rodete.
Limpieza de filtros de malla.
Lubricación de rodamientos y chumaceras.
Lubricación de las bisagras de las puertas de la caja porta filtro.
Alineamiento de poleas.
Limpieza de bobina del motor eléctrico.
Verificación del traslape del rodete.
4. INFORME DE EQUIPO
CODIGO
Tip. Eq. Ubicación Marca Modelo Fecha Tip. Serv. Diagnostico Conclusión Estado del equipo
0001 AIRE ACONDICIONADO AZOTEA B.ENTO GREENHECK
RVE-50-36P-30H-
20.0 2019-09-25
PREVENTIVO Se encontró equipo y filtros saturados de polvo
Se realizó cambio de contactor de los ventiladores
Se realizó cambio de los filtros de cartón
Se recomienda cambio de rodamientos de los motores eléctricos
Compresor 1: 24.6/24.3/23.1 amp Compresor 2: 22.6/22.3/21.3 amp
Ventilador 1: 3.6/3.7/3.8 amp Ventilador 2: 3.9/3.8/3.9 amp
Blower 1: 7.37.27.3 amp Blower 2: 4.8/4.7 amp Presión 1: 130 - 250 psi Presión 2: 130 - 250 psi Operativo
0002 RESISTENCIA
109 LEAVE
REARING WARREN
CBK 1.00 - 6.00 X
6.00 2019-09-24
PREVENTIVO Se encontró resistencia con polvo
Se verifico resistencia y quedo operativa
Resistencia: 5.7/5.7 amp Operativo
0003 RESISTENCIA
108 LAB. ISH
ADUT WARREN
CBK 1.00 - 6.00 X
6.00 2019-09-24 PREVENTIVO
Se encontró resistencia con polvo
Se verifico resistencia quedando operativa
Resistencia: 3.6/3.6 amp Operativo
0004 RESISTENCIA
111 INFECTIOUS
LAB WARREN
CBK 1.00 - 6.00 X
6.00 2019-09-24 PREVENTIVO
Se encontró resistencia con polvo
Se verifico resistencia y quedo operativa
Resistencia: 3.7/3.7 amp Operativo
RESISTENCIA 112 INFECTIOUS
FEEDING WARREN CBK 2019-09-24
PREVENTIVO Se encontró resistencia con polvo
Se verifico resistencia y queda operativa
Resistencia: 3.6/3.6 amp Operativo
0006 RESISTENCIA
110 INFECTOUS
CORRIDOR WARREN
CBK 1.50-
8.00X8.00 2019-09-24 PREVENTIVO
Se encontró resistencia con polvo
Se verifico resistencia encontrando abierta - inoperativa Fuera de Servicio
0007 EXTRACTOR B.ENTO. AZOTEA F GREENHECK VK-H-10-A7-X 2019-09-26 PREVENTIVO
Se encontró con las chumaceras con grasa negra Se encontró con suciedad en las poleas
Se realizó cambio de grasa y limpieza de toda la estructura
Se recomienda para el próximo mantenimiento cambio de chumaceras Extractor: 3.1/3.1/3.2 amp Operativo
0008 RESISTENCIA 207 - BIO ASSAY WARREN
CBK 3.50 -
10.00 X 10.00 2019-09-26 PREVENTIVO
Se encontró resistencia con polución
Se realizó la verificación de la resistencia
Resistencia: 5.99/5.93/7.14 amp Operativo
0009 RESISTENCIA
205 MOLECULAR
LAB WARREN
CBK 1.00-8.00
X 6.00 2019-09-26 PREVENTIVO
Se encontró resistencia con polución
Se realizó limpieza y inspección de resistencia, encontrando resistencia abierta Fuera de Servicio
RESISTENCIA
103 LG ISM ADULT WARREN
CBK 1.00 - 6.00
X 6.00 2019-09-23
PREVENTIVO Se encontró resistencia con polvo
Se verifico resistencia y queda todo operativo
Resistencia: 3.5/3.5 amp Operativo
0011 RESISTENCIA
105 LARVE REARING
1 PISO WARREN
CBK 1.00-
6.00X6.00 2019-09-23 PREVENTIVO
Se encontró resistencia con polvo Se verifico resistencia abierta Fuera de Servicio
0012 RESISTENCIA PASADIZO 1 PISO WARREN
CBK 1.00-
8.00X6.00 2019-09-23 PREVENTIVO
Se encontró resistencia con polvo
Se verifico resistencia y quedo operativa
Resistencia: 3.4/3.4 amp Operativo
0013 RESISTENCIA OPEN LAB - 204 WARREN
CBK 7.00-
12.00X10.00 2019-09-26 PREVENTIVO
Se encontró resistencia con bastante polución Se hizo limpieza y verificación de la resistencia Operativo
0014 RESISTENCIA
206 CLEAN PCR 1
PISO WARREN
CBK 1.00-
8.00X6.00 2019-09-26 PREVENTIVO
Se encontró resistencia con polución
Se verifico resistencia y se diagnosticó que la resistencia está abierta Fuera de Servicio
0015 RESISTENCIA
ADMINISTRACCION 1
PISO WARREN
CBK 1.50-
8.00X6.00 2019-09-26 PREVENTIVO
Se encontró resistencia con bastante polución
Se realizó limpieza e inspección de resistencia Operativo
EXTRACTOR B. ENTO FUM E-
HOOD GREENHECK
VK-H-10-M15-
X 2019-09-26
PREVENTIVO
Se encontró chumaceras con la grasa negra
Se encontró suciedad en las poleas
Se realizó cambio de grasa y limpieza a toda la estructura
Se recomienda para el próximo mantenimiento cambio de chumaceras Extractor: 2.5/2.6/2.5 amp Operativo
0017 HUMIDIFICADOR 106 NARVE READING NORTEC
R50101220-
240-1 2019-09-23 PREVENTIVO
Se encontró contactor dañado
Se encontró resistencia del humidificador con suciedad penetrada Se encontró bandeja de sensor dañada Se encontró válvula de ingreso de agua con pequeño goteo
Se encontró con el cintillo del tanque de agua dañado
Se realizó cambio de contactor Se realizó cambio de bandeja de sensor Se requiere cintillo de tanque de agua Se recomienda seguir con el plan de mantenimiento Humidificador: 13.0/12.9 amp Operativo
0018 HUMIDIFICADOR 109 LARVE REARING NORTEC
R50101220-
240-1 2019-09-24 PREVENTIVO
Se encontró empaquetadura de la tapa dañada
Se encontró resistencia del humidificador con suciedad penetrada Se encontró tarjeta de la bandeja dañada Se encontró abrazadera de tanque dañada
Se recomienda cambiar empaquetadura de la tapa
Se cambió tarjeta de bandeja, abrazadera de tanque y válvula de ingreso de agua Se recomienda cambiar el cable de conexión de la tarjeta de bandeja a la tarjeta principal, ya que están dañados los cables de conexión Se recomienda continuar con el plan de mantenimiento Humidificador: 12.4/12.9 amp Operativo
0019 HUMIDIFICADOR 103 LG / SM ADULT NORTEC
RS 010/220-
240-1 2019-09-23 PREVENTIVO
Se encontró resistencia del humidificador con suciedad penetrada Se encontró contactor dañado
Se realizó cambio de contactor Se recomienda continuar con el plan de mantenimiento Humidificador: 12.8/12.5 amp Operativo
HUMIDIFICADOR
108 LG / SM ADULT NORTEC
RS 010/220-
240-1 2019-09-24
PREVENTIVO
Se encontró resistencia del humidificador con suciedad penetrada Se encontró bandeja de aguada dañada
Se realizó cambio de bandeja de agua dañada
Se recomienda continuar con el plan de mantenimiento
Humidificador: 12.0/13.1 amp Operativo
0021 RESISTENCIA
PASADIZO NOW –
INFECTIOUS 102 WARREN
CBK 3.00-
10.00X6.00 2019-09-23 PREVENTIVO
Se encontró resistencia con polvo
Se verifico resistencia y quedo operativo
Resistencia: 3.6/3.6 amp Operativo
AIRE
ACONDICIONADO SALA DE SERVIDORES LENNOX
LXGIMCMDO2
415P4 2019-09-26 PREVENTIVO
Se encontró tarjeta de la unidad condensadora con corrosión
Se recomienda tener unidad condensadora en stock por precaución Compresor: 6.3/6.4 amp Ventilador: 0.3/0.3 amp
Blower: 0.8/0.8 amp Operativo
0023 RESISTENCIA
104 NON INFECTIOUS
LAB - RESISTENCIA
1ER PISO WARREN
CBK 8.00-
8.00X8.00 2019-09-23 PREVENTIVO
Se encontró resistencia con polvo
Se encontró termostato dañado Resistencia operativa
Se hizo prueba con termostato de arriba
Resistencia: 3.8/3.8 amp Operativo
5. INDICADORES
EQUIPOS INTERVENIDOS
INTERVENIDOS EQUIPOS SIN OBSERVACION EQUIPO CON OBSERVACION FUERA DE SERVICIO
23 19 0 4
INTERVENIDOS EQUIPOS SIN
OBSERVACION
EQUIPO CON
OBSERVACION
FUERA DE SERVICIO
Equipos Ejecutados
CAMBIO DE
TERMOSATO
CAMBIO DE
UNIDAD
CONDENSADORA
INSTALACION DE
RESISTENCIA
CAMBIO DE
CHUMACERA
CAMBIO DE
RODAMIENTOS
N° EQUIPOS QUE
REQUIEREN
1 1 4 2 1
0023 0022 0006 0007 0001
0009 0016
6. EVIDENCIAS FOTOGRAFICAS ANTES DEL MANTENIMIENTO
EQUIPO AIRE RTU - ANTES DEL MANTENIMIENTO
RESISTENCIA 206 CLEAN PCR
* Se encontró con la resistencia Abierta
EQUIPO MINI SPLIT - ANTES DEL MANTENIMIENTO
EQUIPO VEKTOR - ANTES DEL MANTENIMIENTO
HUMIDIFICADOR - ANTES DEL SERVICIO
7. EVIDENCIAS FOTOGRAFICAS DESPUES DEL MANTENIMIENTO
EQUIPO AIRE RTU - DESPUES DEL MANTENIMIENTO
EQUIPO VEKTOR - DESPUES DEL MANTENIMIENTO
HUMIDIFICADOR - DESPUES DEL MANTENIMIENTO
EQUIPO MINI SPLIT - DESPUES DEL MANTENIMIENTO
8. CONCLUSIONES Y RECOMENDACIONES
EQUIPOS DE AIRE ACONDICIONADO
106 LARVE REARING – HUMIDIFICADOR
* Se hizo cambio del contactor
* Se hizo cambio de la bandeja de nivel
* Se colocó teflón a la rosca de la válvula de ingreso de agua
* Se recomienda cambiar el cintillo de sujeción del tanque de agua
* Se recomienda hacer el cambio de la válvula de ingreso de agua.
* Se recomienda hacer el cambio de la conexión de agua
109 LARVE REARING – HUMIDIFICADOR
* Se hizo el cambió la tarjeta de bandeja de nivel
* Se hizo el cambio de la válvula de ingreso de agua
* Se recomienda cambiar la empaquetadura del tanque del humidificador
* Se recomienda cambiar el cintillo de sujeción del tanque de agua
* Se recomienda hacer el cambio de la conexión de agua
* Se recomienda hacer el cambio de la válvula de ingreso de agua.
103 LG SM ADULT– HUMIDIFICADOR
* Se hizo el cambio del contactor
* Se recomienda hacer el cambio de la válvula de ingreso de agua
108 LG SM ADULT – HUMIDIFICADOR
* Se hizo el cambio del contactor
* Se hizo el cambió de la bandeja de nivel de agua
* Se recomienda hacer el cambio de la válvula de ingreso de agua.
PAQUETE RTV
* Se hizo cambio de los 3 contactores de los ventiladores y el contactor del compresor
* Se hizo lavado de la rueda Entálpica
* Se hizo cambio de los filtros de cartón
* Se recomienda hacer el cambio de la rueda Entálpica
* Se recomienda hacer un cambio mensual de los filtros de cartón que están en el ingreso de aire y los filtros de malla de aluminio, los filtros que están después de la rueda se recomienda el cambio según se encuentren sucios.
* Se recomienda tener motor eléctrico del condensador y del Blower para hacer el reemplazo cuando se necesite cambiar los rodamientos de los motores que están trabajando debido a que el tiempo de intervención es muy corto.
* Se recomienda tener el compresor de etapas en stock para atender cualquier problema que se genere
SALA DE SERVIDORES
* Se recomienda hacer el cambio de la unidad condensadora debido a que la tarjeta del condensador actual no es muy comercial y por las condiciones climáticas siempre se dañarían por eso se sugiere un equipo ON-OFF
B. ENTO AZOTEA – VEKTOR GENERAL
* Se recomienda hacer el cambio de las chumaceras para el próximo mantenimiento
B. ENTO FUM E. HOOD – VEKTOR
* Se recomienda hacer el cambio de las chumaceras para el próximo mantenimiento
RESISTENCIA 104 NON -INFECCTIOUS LAB
* Se recomienda hacer el cambio del termostato.
RESISTENCIA 105 NON INFECTIOS FEEDING
* Se recomienda hacer el cambio de la resistencia
RESISTENCIA 205 MOLECULAR LAB
RESISTENCIA 206 CLEAN PCR
OTRAS RECOMENDACIONES
Se recomienda seguir con el plan de mantenimiento cada 3 meses.
Se recomienda Tener en stock resistencias de cada capacidad para atender una emergencia inmediatamente.
Se recomienda tener repuestos de los humidificadores como resistencias eléctricas, tarjetas principales, tarjetas secundarias, válvulas de agua, sensor de bandeja de llenado, bandeja de agua.
Se recomienda tener la presión constante del suministro de agua de los humidificadores.
Se recomienda tener termostatos digitales y análogos en stock.
Se recomienda tener en stock un control de humedad.
ANNEX 2
ANNEX 3
1 | P a g e
INFORME N°033 /CAM SRL-2020
DE : CORPORACIÓN ALVES MILHO SRL
PARA : Embajada Americana (NAMRU6).
Departamentos de compras
ASUNTO : Tercer y último servicio de mantenimiento preventivo a A/Cs NAMRU6 Iquitos.
REFERENCIA : Orden de Compra#: 19PE5019P1310
FECHA : 27 de Julio del 2019
I. GENERALIDADES
A solicitud de la Embajada de los Estados Unidos – NAMRU6, se ha realizado el trabajo del Tercer y último servicio de mantenimiento preventivo a unidades de aire acondicionado con la finalidad de mantener operativos los equipos de NAMRU6 ubicados en la Clínica Naval y Casa Callao de la ciudad de Iquitos, región Loreto.
II. DIAGNÓSTICO
Se realizó una inspección visual de reconocimiento en todas las áreas donde están instaladas los equipos de aires acondicionados, extractores e inyectores, para evaluar la hora y el momento de realizar los trabajos de mantenimiento, por lo que el personal administrativo se encontraba laborando en todas las oficinas. (Se coordinó la hora de trabajo con personal de la oficina encargado de operaciones).
Se empezó con la inspección visual a todo el sistema de conexión de los equipos evaporadores y condensadores que recibirán un mantenimiento preventivo, como:
Sistema de drenaje.
Sistema de conexión eléctrica (líneas de alimentación, llaves de protección)
Mangas de protección.
Conectores y Tubos de cobre de alta y baja presión.
Estado del gas Refrigerante.
Acondicionamientos de componentes en general.
Mantenimiento preventivo a los componentes.
III. EQUIPOS E INSUMOS EMPLEADOS
Se contará con las Herramientas Apropiadas para el Trabajo:
Manifold completo con 02 manómetros y 03 mangueras de servicio
Pinza Amperimétrica digital.
Hidro Lavadora Portatil, Kit de Soplete para soldar
Llave ratchet, escalera telescópica.
Línea de seguridad, arnés y cinta de seguridad.
Multímetro, mego metro, extensión eléctrica
Juego de llaves Mixtas, juego de llaves hexagonales, llaves Francesas, juego de destornilladores, alicate universal.
Otros
2 | P a g e
IV. TRABAJOS REALIZADOS
Se procedió con el desmontaje de las unidades compresoras y las unidades evaporadoras del tipo Split y también ventana, para luego proceder con el mantenimiento preventivo a los
AA.
Se procedió con la limpieza y lavado general de las unidades evaporadoras y condensadoras usando química (Alkifoam) con agua a presión de la hidrolavadora. Limpieza serpentines
(condensador - evaporador), limpieza de filtros (ALTA EFICIENCIA), limpieza de gabinete, limpieza de contactores, Limpieza de Sistema de Drenaje (bandeja, tina, tuberías, etc.).
Lubricación de rodamientos.
Uso de cinta de aluminio, cinta foam.
Ajuste de pernos, ajuste de fajas, ajuste de bornes.
Chequeo del sistema de carga de refrigerante. Se procedió con la recarga de Gas R-22 y A-
410 al equipo compresor, dejando con la medición en apropiada.
Chequeo de voltaje y amperaje para ver en qué estado se encontraban el motor compresor y sus dispositivos eléctricos como también revisión del estado de la tarjeta de control y sus conexiones.
Antes de arranque las unidades, se procedió con la revisión de los conexiones y mediciones eléctricas respectivas.
A. MANTENIMIENTO PREVENTIVO AA CLINICA NAVAL (7 AA), 4 INYECTORES Y 3
EXTRACTORES
ITEM DESCRIPCION ACCIONES TOMADAS Y OBSERVACIONES
LABORATORIO DE PARASITOLOGÍA
- EQUIPO CARRIER DUCTO 36.000
BTU/H
- Inyector de Aire, motores Brand, type
SA-10-6N050208004 VOL. 2000 CFM 2
HP.
- Extractor de Aire, Model: TD 2000.
- El motor del condensador necesita mantenimiento correctivo para cambiar rodajes y barnizar la bobina. Se requiere cambiar el filtro secador de 3/8 de línea de alta por el tiempo de funcionamiento y mejorar el sistema de refrigeración.
- Los rodajes necesitan ser cambiados por su tiempo de uso y desgaste, se debe cambiar las fajas de las poleas por tener desgaste.
- Se requiere cambiar rodajes debido a desgaste y el continuo trabajo.
LABORATORIO DE ESTERELIZACIÓN
- EQUIPO CARRIER SPLIT DUCTO 36.000
- Serpentín necesita cambiarse debido a que se encuentra dañado y existe probabilidad de que afecte más adelante.
Se requiere cambiar el filtro secador de 3/8 de línea de alta por el tiempo de funcionamiento y mejorar el sistema de refrigeración.
- Se debe cambiar los rodajes del motor de ambos lados, cambiar también las fajas de los inyectores.
3 | P a g e
- Extractor de Aire, Model: TD 2000. - Se debe cambiar el rodaje de la chumacera del extractor.
LABORATORIO BACTERIOLOGÍA
EQUIPO YORK, SPLIT DUCTO 60.000
BTU/H
- Inyector de Aire, motores Brand, type
SA-10-6N050208004 VOL. 2000 CFM 2
- Extractor de Aire, Model: TD 2000.
- Sin novedad, en buen funcionamiento.
- Desgaste de rodajes donde necesitan ser cambiados con urgencia ya que esfuerza al motor y se pueda quemar la bobina. También requerimos el cambio de las fajas.
- Rodajes están haciendo desgaste y es necesario que sean cambiados.
LABORATORIO DE VIROLOGÍA
EQUIPO AAON PAQUETE 120.000 BTU/H
- Se ha encontrado que la lona de fibra de vidrio que cubre toda el área de succión se encuentra averiado y se necesita realizar cambio pronto.
- Es necesario cambiar las fajas y los rodajes del inyector para mejorar su buen funcionamiento.
CUARTO DE VIGILANCIA
EQUIPO COLDPOINT VENTANA 12.000
- Se sugiere generar un cambio de AA 9k btu por Split techo.
CUARTO DE UPS
EQUIPO CARRIER SPLIT DECORATIVO
60.000 BTU/H
- Cambio de rodaje y barnizado de la bobina del motor evaporador y condensador. Se cambió filtro secador de 3/8 porque se encontró obstruido y se hizo el sistema de vacío y se recargo gas. Equipo quedo operativo.
CUARTO DE TABLERO ELECTRICO
EQUIPO COLD POINT SPLIT 12.000
- Se encontró con fuga de gas el equipo y quedando operativo.
B. MANTENIMIENTO PREVENTIVO AA CASA CALLAO (17 AA)
ITEM DESCRIPCION ACCIONES TOMADAS Y OBSERVACIONES
OFICINA DE MÉDICOS
- EQUIPO COLD POINT SPLIT
DECORATIVO 24.000 BTU
- EQUIPO DAIKIN SPLIT DECORATIVO
24.000 BTU
- Se encontró el motor ventilador de la unidad condensadora con problemas de rodaje; se requiere cambiar para mejorar el funcionamiento.
- Sin novedad. Equipo nuevo.
OFICINA ADMINISTRATIVA/CAJA CHICA
EQUIPO DAIKIN SPLIT DECORATICO
- Sin novedad, equipo nuevo.
4 | P a g e
12.000 BTU
- EQUIPO DAIKIN SPLIT DECORATICO
12.000 BTU
SALA DE CONFERENCIA
- EQUIPO YORK SPLIT DECORATIVO
24.000 BTU/H.
- EQUIPO YORK SPLIT DECORATIVO
24.000 BTU/H.
- EQUIPO YORK SPLIT DECORATIVO
24.000 BTU/H.
- Sin novedad, equipo regular.
- Sin novedad, equipo regular.
ESTACIÓN ENTOMOLÓGICA
- EQUIPO CARRIER SPLIT DECORATIVO
24.000 BTU/H
- Se observa sistema de rodamientos desgastado, se requiere cambios.
OF. IT
- EQUIPO YORK SPLIT DECORATIVO
12.000 BTU/H
- EQUIPO COLD POINT SPLIT 24,000 BTU
- Se observa equipo deficiente, por presentar motor eléctrico del evaporador, NO TIENE FUERZA EL MOTOR Y
EL CONTROL NO SIRVE.
TIME KEEPER OFFICE
-EQUIPO DAIKIN SPLIT 12.000 BTU.
- Sin novedad.
OFICINA SALUD OCUPACIONAL
- EQUIPO COLD POINT VENTANA 12.000
- EQUIPO CIAC SPLIT 12.000 BTU/H
- Se observa equipo deficiente, por presentar motor eléctrico del evaporador deficiente.
GARITA DE VIGILANCIA
-EQUIPO DAINKIN SPLIT DECOR 12.000
BTU/H (GARITA DE VIGILANCIA).
SALA DE INGRESO
- EQUIPO DAINKIN SPLIT DECOR 12.000
OFICINA AMY MORRISON
-EQUIPO DAINKIN SPLIT DECOR 12.000
BTU/H (OF. DRA. AMY MORRISON)
OFICINA CENTRO DE DATOS
-EQUIPO YORK SPLIT DECORATIVO
60.000 BTU/H
- Se encontró filtro deshumedecedor inoperativo, se recomienda realizar cambio.
OFICINA PARASITOLOGÍA
EQUIPO LG T/VENTANA 24.000 BTU/H
- Se observa sistema de rodamientos desgastados y deficiencia del capacitor, se requiere cambios.
ALMACEN DE VIROLOGÍA
EQUIPO DAIKIN SPLIT 12.000 BTU/H
5 | P a g e
V. NORMAS TÉCNICAS APLICADAS
Código Nacional de Electricidad Suministro 2001
Código Nacional de Electricidad Utilización 2006
Norma Técnica Peruana 370.056.1999
VI. MÉTODO DE TRABAJO
Capacitación de seguridad.
Planeamiento de trabajo.
Ubicación física de las áreas de trabajo.
Protocolo de pruebas.
VII. SUGERENCIAS Y ACCIONES CORRECTIVAS
• Los equipos EXTRACTORES E INYECTORES – Clínica Naval, necesitaban cambio de rodajes y fajas urgentes. Algunos AA requieren también cambios de rodajes y capacitores.
• Algunos equipos de Casa Callao necesitan mantenimientos correctivos.
Atentamente, José A. Barrios Alvesmilho Gerente General-CAM SRL
6 | P a g e
ANEXOS
A. MANTENIMIENTO PREVENTIVO EQUIPOS EN CLÍNICA NAVAL
7 | P a g e
8 | P a g e
B. MANTENIMIENTO PREVENTIVO DE EQUIPOS AA – CASA CALLAO
9 | P a g e
10 | P a g e
ANNEX 4
RESISTENCIAS
RESISTENCIA SEGUNDO NIVEL - EDH-2-4 RESISTENCIA SEGUNDO NIVEL - EDH-2-1 RESISTENCIA SEGUNDO NIVEL - EDH-2-2 RESISTENCIA SEGUNDO NIVEL - EDH-2-3 RESISTENCIA SEGUNDO NIVEL - EDH-2-5
UBICACIÓN CLEAN PCR 206 MOLECULAR LAB 205 BIOASSAY 207 OPEN LAB 204 ADMINISTRATION 203
TAG EDH-2-4 EDH-2-1 EDH-2-2 EDH-2-3 EDH-2-5
VOLTAJE 220V, 1PH, 60HZ 220V, 1PH, 60HZ 220, 3PH, 60HZ 220V, 3PH, 60HZ 220V, 1PH, 60HZ
AMP 4.17 4.17 8.42 16.84 6.25
TEMPERATURA Heat 25 C Heat 25 C Heat 23.5 C Heat 24 C
MIN. VEL. 380 Ft./ min. 380 Ft./ min. 510 Ft./ min. 710 Ft./ min. 470 Ft./ min.
ETAPA 1 1 2 3 1
MODELO CBK 1.00-8.00X6.00 CBK 1.00-8.00X6.00 CBK 3.50-10.00X10.00 CBK 7.00-12.00X10.00 CBK 1.50-8.00X6.00
SERIE 248690 - 002 248690 - 002 248690 - 006 248690 - 007 248690 - 003
CONSUMO 3.5 - 3.5 3.5 - 3.5 14.8 - 14.4 - 14.3 5.1 - 5.1
CONDICION OK OK Inoperativo por termostato dañado OPERATIVO OPERATIVO
OBSERVACION
Se realizo cambio de termostato del 1er piso para dejar operativo.
Se cambio Bobina de Relay
RESISTENCIAS
RESISTENCIA PRIMER NIVEL - EDH-1-9 RESISTENCIA PRIMER NIVEL - EDH-1-6 RESISTENCIA PRIMER NIVEL - EDH-1-8 RESISTENCIA PRIMER NIVEL - EDH-1-10 RESISTENCIA PRIMER NIVEL - EDH-1-4
UBICACIÓN NON-INFECTIOUS LAB 104 NON-INFECTIOUS ANTE RM 102 LG/ SM ADULT 103 NON-INFECTIOUS FEEDING 105 LG/ SM ADULT 108
TAG EDH-1-9 EDH-1-6 EDH-1-8 EDH-1-10 EDH-1-4
VOLTAJE 220V, 1PH, 60HZ 220V, 1PH, 60HZ 220V, 1PH, 60HZ 220V, 1PH, 60HZ 220V, 1PH, 60HZ
AMP 8.33 12.5 4.17 4.17 4.17
TEMPERATURA Heat 24.5 C Heat 28 C Heat 25 C Heat 24 C Heat 24 C
MIN. VEL. 470 Ft./ min. 640 Ft./ min. 440 Ft./ min. 440 Ft./ min. 440 Ft./ min.
ETAPA 2 1 1 1 1
MODELO CBK 2.00-8.00X8.00 CBK 3.00-10.00X6.00 CBK 1.00-6.00X6.00 CBK 1.00-6.00X6.00 CBK 1.00-6.00X6.00
SERIE 248690 - 005 248690 - 004 248690 - 001 248690 - 001 248690 - 001
CONSUMO 3.8 - 3.8 10.9 - 10.9 3.5 - 3.5 3.5 - 3.5 3.6 - 3.6
CONDICION OPERATIVO OPERATIVO OPERATIVO OPERATIVO OPERATIVO
OBSERVACION
Se dejo INOPERATIVO porque se le retiro el termostato para el ambiente 207
FECHA
RESISTENCIA PRIMER NIVEL - EDH-1-2 RESISTENCIA PRIMER NIVEL - EDH-1-3 RESISTENCIA PRIMER NIVEL - EDH-1-5 RESISTENCIA PRIMER NIVEL - EDH-1-1 RESISTENCIA PRIMER NIVEL - EDH-1-7
UBICACIÓN INFECTIOUS FEEDING 112 LARVE REARING 109 INFECTIOUS CORRIDOR 110 INFECTIOUS LAB 111 LARVE REARING 106
TAG EDH-1-2 EDH-1-3 EDH-1-5 EDH-1-1 EDH-1-7
VOLTAJE 220V, 1PH, 60HZ 220V, 1PH, 60HZ 220V, 1PH, 60HZ 220V, 1PH, 60HZ 220V, 1PH, 60HZ
AMP 4.17 6.25 6.25 4.17 4.17
TEMPERATURA Heat 23.5 C - Cool 25 C Heat 27 C Heat 25 C Cool 25 C Heat 25 C
MIN. VEL. 440 Ft./ min. 470 Ft./ min. 470 Ft./ min. 440 Ft./ min. 380 Ft./ min.
ETAPA 1 1 1 1 1
MODELO CBK 1.00-6.00X6.00 CBK 1.50-8.00X6.00 CBK 1.50-8.00X6.00 CBK 1.00-6.00X6.00 CBK 1.00-8.00X6.00
SERIE 248690 - 001 248690 - 003 248690 - 003 248690 - 001 248690 - 002
CONSUMO 3.6 - 3.6 5.6 - 5.6 3.7 - 3.7 3.4 - 3.4
CONDICION OPERATIVO INOPERATIVO OPERATIVO OPERATIVO OPERATIVO
OBSERVACION
Resistencia abierta - se dejo OPERATIVO porque se puso la resistencia del ambiente 110
Se dejo INOPERATIVO porque se retiro la resistencia para ambiente 109
Relay de la resistencia abierto / se cambio bobina de relay