This is a set of Process & Instrumentation Diagrams (P&IDs) for a boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings detail the feedwater, steam, and combustion air systems for three 400 HP firetube boilers and associated equipment including reverse osmosis units, surge tanks, deaerator, chemical feed systems, and steam distribution.
The P&IDs show detailed piping configurations, instrumentation, control systems, and safety devices for the entire boiler plant. Key specifications include steam pressure of 200 PSI, NOx emissions level of 30 PPM, and blower motor power of 25 HP per boiler. The drawings include sequence of operations detailing automatic controls for water level, steam pressure, combustion air, and safety systems. Each boiler has dedicated feedwater pumps, chemical injection, stack dampers, and oxygen trim control. The control system monitors multiple parameters including steam flow, water levels, pressures, temperatures, and emissions, with various alarms and safety interlocks specified throughout the system.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLD WATER
FROM BUILDING 2
PG
31007
PG
31002
WATER SOFTENER
CONTROL VALVE
RESIN TANK 1 RESIN TANK 2BRINE TANK
3" CW
V-31004 V-31005 CKV-31008
WATER SOFTENER
2-119-TK-004
FACTORY OUTLET
CONNECTION
FACTORY INLET
CONNECTION
V-31001
SOFT WATER FROM
BUILDING 1 V-31015CKV-31014 V-31020
PRE-FILTER
CKV-31025 REVERSE
OSMOSIS
UNIT
NC
V-
DR
V-31026
NC
V-
RO STORAGE
TANK
2-100-TK-005
DR
M
V-
V-
V-
KIC
31053
PI
31021
V-
PI
31024
V-
KIC
31022
V-
V-31044
CKV-31051
LSH
31048
LSL
31049
V-31042
SODIUM HYDROXIDE
55 GAL DRUM
CKV-31031
PG
31029
LSL
31031
LBL
31031
CP-5
M
SIC
31030
SI
31030
SC
31030
YI
31030
HS
31030
CP-5
YA
31030
YIR
31030
V-31033PCV-31032 V-31034 V-31035
REDUCED PRESSURE ZONE
(BACKFLOW PREVENTER)
MIXING
VALVE 77°F
CIP
CONNECTION
V-31028
KIC
31037
CIP
CONNECTION
CIP
CONNECTION
FQI
31009
FQI
31052
NC
V-
DR
V-
PCV-31046
V-
PI
31036 FIT
31039
FIT
31040
AIC
31036
RO
PACKAGE
UNIT
REDUCED PRESSURE ZONE
(BACKFLOW PREVENTER)
NC
NC
V-
2-128-CF-204
2-119-PMP-008
2-119-RO-001
CKV-31016 V-31017
SOFT WATER TO
DOMESTIC SYSTEM
CKV-31010 V-31011
V-
NC
V-
NC
V-
OVERFLOW
V-
V-
D-632 1 B
SOFT WATER TO
SURGE TANK
D-645 1 C
SOFT WATER TO HX
D-632 1 D
RO TO SURGE TANK
D-645 10 A
HOT WATER FROM HX
YY
31054
YA
31054
LIH
31048
LAH
31048
SET POINT: 50 PSIG
SET POINT: 50 PSIG
LS
31055
2" CW
V-31056
2" CW
2" S
W 1-
1/2 " S
W
CKV-31010 V-31011
3/4" HW
2" SW
2 x 1-1/2"
1-1/2" SW
1" SW
1/2" CF
1" SW
1" RO
1" RO
1" RO
3/4" SW
2" SW
1-1/2" SW
D-642 1 E
TO BLOWDOWN
SEPARATOR
D-634 1 F
DEAERATOR SAMPLE
COOLER
D-642 1 B
CBD SAMPLE COOLER
3/4" CW
3/4" CW
2" CW
BFP-31056
BFP-31018
PCV-31019
PI
31036
LIL
31049
LAL
31049
4 EMERGENCY BOILER
CONNECTION
1-1/2" SW
V-
NC
V31057
NC
SET POINT: 600 GAL
SET POINT: 2400 GAL
LOW POINT DRAIN
BEH TJD
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
2.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE EXCEPTION
OF DOMESTIC WATER SERVICES.
KEYED NOTES
1 TEMPORARY CONNECTIONS WILL BE REQUIRED UNTIL DE-COMMISSIONING OF LEGACY
BOILER SYSTEM. REFER TO PHASING DRAWINGS FOR MORE INFORMATION.
2 TIE LOW POINT DRAIN FROM PUMP INTO DRAIN LINE.
3 REFER TO PP121 FOR LOCATION OF CONNECTIONS TO DOMESTIC WATER SUPPLY.
4 SEE MP122 FOR LOCATION OF EMERGENCY BOILER CONNECTION.
2-119-PMP-008
PUMP
FLOWRATE: 10GPM
POWER: 1 1/2HP
PRESSURE: 50 PSIG
REV 0 - 100% BID SET 2024-02-23
2-119-TK-005
RO STORAGE TANK
TANK CAPACITY: 2,500 GALLONS
2-119-RO-001
REVERSE OSMOSIS UNIT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FEEDWATER -
BALANCE OF PLANT
100% BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-631
585-21-115
PCV-31032
PRESSURE REDUCING VALVE
SET POINT: 50 PSI
PCV-31019
PRESSURE REDUCING VALVE
SET POINT: 50 PSIG
SHEET 1512/22/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
1-1/2" SW
NCNC
V-
V-
NC
FE
32016
FIT
32016
V-32014 V-32017
V-32018
M
PG
32013
NC
V-32019 V-32022
V-32023
FE
32008
FIT
32008
M
PG
32006
M
V-32011
V-32012
V-32005
M
FI
32016
FQI
32016 HS
32021
ZIC
32021
YI
32021
ZC
32021
ZI
32021
FI
32008
FQI
32008
HS
32010
ZIC
32010
YI
32010
ZI
32010
ZC
32010
CP-6
CP-6
CP-6
F-32015 F-32020
F-32007 F-32009
LCV-32021
LCV-32010
1" ROINCLUDED WITH SURGE TANK SHIPPED LOOSE
V-
V-
CP-6
D-631 10 B
SOFT WATER
D-631 10 F
RO STORAGE TANK
D-634 1 B
SW TO DEAERATOR
D-633 1 A
LIT-33032
D-633 1 B
MAKEUP WATER TO
SURGE TANK
D-633 1 E
TRANSFER PUMP
PACKAGE
1-1/2" SW
1" S
W
1" SW
1" RO 1" RO
1" RO
BEH TJD
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
2.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES.
KEYED NOTES
1 TEMPORARY CONNECTIONS WILL BE REQUIRED UNTIL DE-COMMISSIONING OF
LEGACY BOILER SYSTEM. REFER TO PHASING DRAWINGS FOR MORE INFORMATION.
REV 0 - 100% BID SET 2024-02-23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FEEDWATER -
BALANCE OF PLANT
100% BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-632
585-21-115
SHEET 1522/22/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SURGE TANK
PUMP CONDENSATE
RETURN
NC
TE
33017
M
NC
2-119-TK-002
2-119-PMP-002
3" C
T
GAUGE GLASS
LSH
33026
LSL
33027
LIT
33032
HIGH LEVEL
ALARM SWITCH
(PROBE)
LOW LEVEL
ALARM SWITCH
(FLOAT)
LAH
33026
LAL
33027
LWACT
HWACT
PLUGGED CROSS
PROBE
COLUMNNC
VENT
LPR
HPR
NC
NC
FIRE HOSE CONNECTION
V-33011
V-
V-33030
V-33028
V-
V-
1 V-33032
TE
33034
V-33002
V-
V-
V-33019
V-33021
V-33022
V-33025
LC
33032
LI
33032
ROOF
TIT
33034
TI
33034
TIT
33017
TI
33017
PG
33003
LAH
33026
LAL
33027
LG
33023
CP-6
CP-6
CP-6
CP-6
V-
PG
33050
V-33047
SIC
33051
SC
33051
SI
33051
F-33048
CKV-33054 V-33056
V-33055
YA
33051
YIR
33051
CKV-33012
NC
V-33036 CKV-33035
CONDENSATE TRANSFER PUMP PACKAGE
INTERIOR EXTERIOR
V-
LOCKABLE
(LOCK OPEN)
LOCKABLE
(LOCK OPEN)
LOCKABLE
(LOCK OPEN)
1" CF
1/2" CF
NC
V-
V-
V-
INCLUDED WITH SURGE TANK
V-
V-
PG
33052
V-33037
F-33038
M
2-112-PMP-001
V-
PG
33040
SIC
33041
SC
33041
SI
33041
CKV-33044 V-33046
YA
33041
YIR
33041
V-
PG
33042
LOCKABLE
(LOCK OPEN)
NC NC NC
V-
V-
D-632 10 D
LCV-33010
LCV-32021
D-632 10 B
MAKEUP WATER
D-632 10 E
MAKEUP WATER BYPASS
D-636 10 A
SULFITE OXYGEN
SCAVENGER
D-634 1 B
TO DEAERATOR
D-634 1 D
HPR TO DEAERATOR
V-33053
NC
V-33045
V-33043
NC
CP-6
CP-6
CP-6
1" RO
1-1/2" CT
4" CT
1-1/2" CT
3" CT
4" x 3"
3" C
T
CK
V-
2" x
1- 1/2
1- 1/2
" C T
2" C
T 3"
C T
1" CT
1" RO
1" RO
3/4" CT
3/4" CT
3/4 " C
T 3/4
" C T
1" C
T 1"
C T
2-1/2" CT
1-1/2" CT
3" CW
PG
33003
V-
V-33059
33059
PG
TP
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
2-119-TK-002
SURGE TANK
TANK CAPACITY: 900 GAL
OPERATING PRESSURE: ATMOSPHERIC VENTED
BASIS OF DESIGN: CLEAVER-BROOKS SRG-900
2-119-PMP-001
CONDENSATE TRANSFER PUMP
FLOWRATE: 83 GPM
POWER: 5 HP
PRESSURE: 32 PSIG
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
2.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES.
KEYED NOTES
1 SEE MP122 FOR LOCATION OF FIRE HOSE CONNECTION.
2 SEE MP102 FOR TIE-IN TO PUMPED CONDENSATE FROM BUILDING 1.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FEEDWATER -
BALANCE OF PLANT
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-633
585-21-115
2-119-PMP-002
CONDENSATE TRANSFER PUMP
FLOWRATE: 83 GPM
POWER: 5 HP
PRESSURE: 32 PSIG
SHEET 1534/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DEAERATOR
NC
PG
34010
2-119-TK-001
2-1/2" CT
S
PG
34019
NCNC
LSHH
34047
LSH
34048
LSL
34050
LIT
34040
OFL CONTROL
SWITCH
HIGH LEVEL
ALARM SWITCH
(PROBE)
LOW LEVEL ALARM
SWITCH
VALVE LOCKED
OPEN
GAUGE GLASS
LAH
34048
LAL
34050
LWADT
HWADT
DAODS
DAODS
1/4" SAMPLE
OUTLET
ANTI-SYPHON
VACUUM
BREAKER
MOUNT FWS COOLER 2'
± ABOVE MEZZANINE
FLOOR AT DEAERATOR
DR
TG
34030
ROOF
1" CF
INCLUDED WITH
DEAERATOR
2" D
R
NC
M
V-34011 LCV-34013 CKV-34014
V-34015
CKV-34016
NC
M
V-34003 LCV-34005 CKV-34006
V-34007
CKV-34008
V-
V-
TG
34023
TE
34034
V-
5 V-34046
V-34049
V-34051
V-34039 V-34042
V-34041
V-
V-
V-
V-
V-
LCV-34026 V-34025
V-34031
V-34029
V-34033
V-
V-
ZIC
34005
ZC
34005
ZI
34005
ZIC
34013
ZC
34013
ZI
34013
LI
34040
LC
34040
PIT
34001
V-
PI
34001
PIT
34009
V-
PI
34009
V-
PIT
34020
V-
PI
34020
TE
34022
TT
34022
TI
34022
TT
34034
TI
34034
TG
34035
LAL
34050
LAH
34048
LAHH
34047
LG
34058
YIC
34026
HS
34026
YI
34026
3/4"
CP-6A
CP-6A
CP-6A
CP-6A
CP-6A
CP-6A
CP-6A
CP-6A
CP-6A
CP-6A
CP-6A
CP-6A
F-34004
F-34012
INCLUDED WITH DEAERATOR
SHIPPED LOOSE
V-
V-
DASV
SET POINT: 10 PSIG
LOCKABLE
(LOCK OPEN)
LOCKABLE
(LOCK OPEN)
LOCKABLE
(LOCK OPEN)
LOCKABLE
(LOCK OPEN)
VACUUM BREAKER
PIT
34002
V-
V-
NCNCNC
D-632 10 B
SOFT WATER
D-633 10 E
FROM CONDENSATE
TRANSFER PUMPS
D-645 10 D
FROM DEAERATOR
PRS
D-633 10 B
FROM HPR
D-631 10 B
COLD WATER
D-635 10 B
FEEDWATER PUMP
RECIRCULATION
D-635 1 B
FEEDWATER PUMP
1/2" CFD-636
10 A
SULFITE OXYGEN
SCAVENGER
V-
CK
V-
V-
V-34027
V-34001A
1-1/2" SW
6" LPS (5 PSIG)
1-1/2" CT
3/4" CW
3/4" CT
CKV-34060
1-1/2" x 2"
2- 1/2
" C T
3" FW
V-34001B
V-
NC
D-642 1 D
TO BLOWDOWN
SEPERATOR
3" DR
3" DR
PG
34062
V-34062
TP
V-
BEH TJD
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
2.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED
FOR STEAM SERVICE SHALL BE FORGED STEEL.
2-119-TK-001
DEAERATOR
TYPE: VERTICAL TRAY
TANK CAPACITY: 900 GAL
OPERATING PRESSURE: 5 PPSI
BASIS OF DESIGN: CLEAVER-BROOKS TRAYMASTER TMV-030 / 900
REV 0 - 100% BID SET 2024-02-23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FEEDWATER -
BALANCE OF PLANT
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-634
585-21-115
REV 1 - FINAL BID SET 2024-04-05
SHEET 1544/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
3" F
W
2 1/2" FW
2 1/2" FW
FEEDWATER PUMP PACKAGE
NO
V-35029
NO
V-35012
PG
35039
SIC
35038
2-119-PMP-005
2 1/2" FW
2 1/2" FW
2 1/2" FW
NO
FE
35043
M
FIT
35043
V-35034 V-35040 V-35042 V-35044
V-35043
V-35045
V-35044
PG
35037
V-
V-
SI
35038
SC
35038
YIR
35038
FQI
35043
FI
35043
TG
35041
ZI
35044
ZI
35044
ZI
35045
ZI
35045
CP-6
CP-6
CP-6
CP-6
F-35035
YA
35038
FO-35042
M
3" FW
PG
35023
SIC
35022
2-119-PMP-004
2 1/2" FW
2 1/2" FW
2 1/2" FW
FE
35027
M
FIT
35027
V-35018 V-35024 V-35026 V-35028
V-35031
V-35033
V-35032
PG
35021
V-
V-
SI
35022
SC
35022
YIR
35022
FQI
35027
FI
35027
TG
35025
ZI
35032
ZI
35032
ZI
35033
ZI
35033
CP-6
CP-6
CP-6
CP-6
F-35019
YA
35022
FO-35030
M
PG
35006
SIC
35005
2-119-PMP-003
2 1/2" FW
2 1/2" FW
2 1/2" FW
FE
35010
M
FIT
35010
V-35001 V-35007 V-35009 V-35011
V-35014
V-35017
V-35016
PG
35004
V-
V-
SI
35005
SC
35005
YIR
35005
FQI
35010
FI
35010
TG
35008
ZI
35016
ZI
35016
ZI
35017
ZI
35017
CP-6
CP-6
CP-6
CP-6
F-35002
YA
35005
FO-35013
M
PIT
35015
V-
PI
35015
CP-6
D-634 10 F
DEAERATOR
D-634 1 F
FEEDWATER PUMP
RECIRCULATION
D-637 1 B
FEEDWATER
HEADER 1
D-637 1 C
FEEDWATER
HEADER 2
V-35003
V-35020
V-35036
V-35036
3/4" FW
3/4" FW
NC
NC
NC
3/4" FW
3/4" FW
3/4" FW
3/4" FW
3/4" FW
BEH TJD
REV 0 - 100% BID SET 2024-02-23
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
2.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED
FOR STEAM SERVICE SHALL BE FORGED STEEL.
2-119-PMP-004
FEEDWATER PUMP
FLOWRATE: 42 GPM
POWER: 10 HP
PRESSURE: 159 PSI
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FEEDWATER -
BALANCE OF PLANT
100% BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-635
585-21-115
2-119-PMP-003
FEEDWATER PUMP
FLOWRATE: 42 GPM
POWER: 10 HP
PRESSURE: 159 PSI
2-119-PMP-005
FEEDWATER PUMP
FLOWRATE: 42 GPM
POWER: 10 HP
PRESSURE: 159 PSI
SHEET 1552/22/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE INHIBITOR
55 GAL DRUM
2-128-CF-202A
SI
36005
SC
36005
YI
36005
CP-5
YA
36005
YIR
36005
CKV-36034
PG
36033
V-
M
CKV-36003
SIC
36005
HS
36005
1/2" CF
1/2" CF
1/2" CF
M
M
M
SIC
36026
SI
36026
SC
36026
YI
36026
HS
36026
CP-5
YA
36026
YIR
36026
SIC
36029
SI
36029
SC
36029
YI
36029
HS
36029
CP-5
YA
36029
YIR
36029
SIC
36032
SI
36032
SC
36032
YI
36032
HS
36032
CP-5
YA
36032
YIR
36032
CKV-36031
PG
36030
CKV-36028
PG
36027
1/2" CF
1/2" CF
1/2" CF
SULFITE OXYGEN SCAVENGER
55 GAL DRUM
CKV-36006
LSL
36006
LBL
36006
CP-5
2-128-CF-203B CKV-36009
PG
36008
1/2" CF
1/2" CF
1/2" CF
M
SIC
36007
SI
36007
SC
36007
YI
36007
HS
36007
CP-5
YA
36007
YIR
36007
CKV-36013
CKV-36011
CKV-36015
PG
36004
2-128-CF-203A
2-128-CF-202C
2-128-CF-202B
V-
V-
V-
V-
AMINE
55 GAL DRUM
2-128-CF-201A
CKV-36024
PG
36023
V-
M
M
M
SIC
36016
SI
36016
SC
36016
YI
36016
HS
36016
CP-5
YA
36016
YIR
36016
SIC
36019
SI
36019
SC
36019
YI
36019
HS
36019
CP-5
YA
36019
YIR
36019
SIC
36022
SI
36022
SC
36022
YI
36022
HS
36022
CP-5
YA
36022
YIR
36022
CKV-36021
PG
36020
CKV-36018
PG
36017
2-128-CF-201C
2-128-CF-201B
V-
V-
CKV-36025
LSL
36025
LBL
36025
CP-5
CKV-36035
LSL
36035
LBL
36035
CP-5
V-36014
V-36012
V-36010
V-36001
V-36002
D-637 1 D
BOILER BLR-001
D-638 1 D
BOILER BLR-002
D-639 1 D
BOILER BLR-003
D-637 1 C
BOILER BLR-001
D-638 1 C
BOILER BLR-002
D-639 1 C
BOILER BLR-003
D-637 1 C
BOILER BLR-001
D-638 1 C
BOILER BLR-002
D-639 1 D
BOILER BLR-003
D-634 1 C
DEAERATOR
D-633 1 D
SURGE TANK
1/2" CF
1/2" CF
BEH TJD
REV 0 - 100% BID SET 2024-02-23
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
2.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED
FOR STEAM SERVICE SHALL BE FORGED STEEL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FEEDWATER -
CHEM PUMPS
100% BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-636
585-21-115
SHEET 1562/22/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
2 1/2" FW
BOILER
2-119-BLR-001
F-37005
V-37035
1/2" CF
1" CF NC
V-37034
1/2" CF
V-37033
1/2" CF
1" CF
1" CF
TIT
37007
TE
37007
2 1/2" FW
LSH
37118
LSL
37119
LSLL
37120
LSLL
37108
LT
37107
PSHH
37116
PSH
37115
PIT
37114
PG
37112
SIGHT GLASS
WITH ROTOR
2-119-BLR-001
GAUGE GLASS
BALL VALVES
PROHIBITED (TYP)
LWCO SHUNT SWITCH
(LOCATE WITHIN 3'-0" OF LWCO
& GAUGE GLASS DRAIN VALVE)
ALWCO
LWA
HWAB
PROBE COLUMN
PLUGGED CROSS (TYP)
NRBSPLS RBSPLS
LWCO
FLOAT-TYPE
LEVEL SENSOR
PIT
37006
V-
NC
V-
1V-37020 FCV-37022 V-37024
V-37025
CKV-37030
FE
37028
FIT
37028
M V-37027 V-37029
V-37003
V-37004
ZI
37003
ZI
37004
M
ZIC
37022
NC
V-37112
NC
V-37114
NC
NC
LG
37106
FG
37103
V-
3/4" BD
CKV-37101V-37102
V-
CP-1
CP-1
ZI
37003
PI
37006
TI
37007
TDI
37007
ZI
37022
ZC
37022
FI
37028
FQI
37028
LAH
37118
LAL
37119
LALL
37120
ZI
37004
PAHH
37116
PAH
37115
PI
37114
LALL
37108
LI
37107
ALWCO SHUNT SWITCH
(LOCATE WITHIN 3'-0"
OF ALWCO DRAIN VALVE)
HS
37120
YI
37120
HS
37108
YI
37108
LWCO SHUNT
SWITCH
FACTORY FEEDWATER
INLET CONNECTION (TYP)
NC
V-
NC
V-
NC
V-
V-
V-
SIGHT GLASS
WITH ROTOR
FG
37122
3/4" BD
CKV-37124V-37123
V-
V-
V-
BOILER
(END VIEW)
V-
V-
EMERGENCY BOILER
CONNECTION
TO OUTSIDE OF BUILDING
D-635 10 B
FEEDWATER
HEADER 1
D-635 10 C
FEEDWATER
HEADER 2
D-636 10 B
CHEMICAL FEED
SULFITE OXYGEN
SCAVENGER
D-636 10 C
CHEMICAL FEED
AMINE
D-636 10 E
CHEMICAL FEED
SCALE INHIBITOR
D-638 1 B
FEEDWATER
HEADER 1
D-638 1 C
FEEDWATER
HEADER 2
D-639 1 B
FEEDWATER
HEADER 1
D-639 1 C
FEEDWATER
HEADER 2
D-642 1 D
TO BLOWDOWN
SEPARATOR
D-642 1 D
TO BLOWDOWN
SEPARATOR
LSHH
37117
LAHH
37117
CP-1
CP-1
CP-1
CP-1
CP-1
CP-1
CP-1
CP-1
CP-1
CP-1 CP-1 CP-1
CP-1 CP-1 CP-1
2-1/2" FW
2-1/2" FW
2-1/2" FW
2-1/2" FW
3/4" BD
3/4" BD
LOW POINT DRAIN
V-37032
PG
37036
TP
V-
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
2-119-BLR-001
FIRETUBE BOILER
RATING: 400 HP
FUEL: NATURAL GAS, NO 2 FUEL OIL
DESIGN PRESSURE: 200 PSI
NOx EMMISIONS LEVEL: 30 PPM
BLOWER MOTOR POWER: 25 HP
BASIS OF DESIGN: CLEAVER-BROOKS CBLE-4W-200-400-200ST
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
2.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES.
KEYED NOTES
1 SEE MP122 FOR LOCATION OF EMERGENCY BOILER CONNECTION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FEEDWATER -
BOILER #1
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-637
585-21-115
SHEET 1574/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BOILER
2-119-BLR-002
F-38003
V-38033
1/2" CF
1" CF NC
V-38032
1/2" CF
V-38031
1/2" CF
1" CF
1" CF
TIT
38005
TE
38005
2 1/2" FW
LSLL
38108
LT
38107
PSHH
38116
PSH
38115
PIT
38114
PG
38112
SIGHT GLASS
WITH ROTOR
2-100-BLR-002
GAUGE GLASS
BALL VALVES
PROHIBITED (TYP)
LWCO SHUNT SWITCH
(LOCATE WITHIN 3'-0" OF LWCO
& GAUGE GLASS DRAIN VALVE)
PLUGGED CROSS (TYP)
NRBSPLS RBSPLS
LWCO
FLOAT-TYPE
LEVEL SENSOR
PIT
38004
V-
NC
V-
9V-38018 FCV-38020 V-38022
V-38023
CKV-38028
FE
38026
FIT
38026
M V-38025 V-38027 V-38030
M
ZIC
38020
NC
V-38112
NC
V-38114
NC
NC
LG
38106
FG
38103
V-
3/4" BD
CKV-38101V-38102
V-
CP-2
CP-2
CP-2
CP-2
CP-2CP-2
CP-2CP-2CP-2
PI
38004
TI
38005
TDI
38005
ZI
38020
ZC
38020
FI
38026
FQI
38026
PAHH
38116
PAH
38115
PI
38114
LALL
38108
LI
38107
ALWCO SHUNT SWITCH
(LOCATE WITHIN 3'-0"
OF ALWCO DRAIN VALVE)
HS
38120
YI
38120
CP-2
HS
38108
YI
38108
CP-2
LWCO SHUNT
SWITCH
FACTORY FEEDWATER
INLET CONNECTION (TYP)
NC
V-
NC
V-
NC
V-
V-
V-
SIGHT GLASS
WITH ROTOR
FG
38122
3/4" BD
CKV-38124V-38123
V-
V-
V-
V-38001
V-38002
ZI
38001
ZI
38002
CP-2
CP-2
ZI
38001
ZI
38002
BOILER
(END VIEW)
D-642 1 C
TO BLOWDOWN
SEPARATOR
D-642 1 C
TO BLOWDOWN
SEPARATOR
D-637 10 D
FEEDWATER
HEADER 1
D-637 10 D
FEEDWATER
HEADER 2
D-636 10 B
CHEMICAL FEED
SULFITE OXYGEN
SCAVENGER
D-636 10 C
CHEMICAL FEED
AMINE
D-636 10 E
CHEMICAL FEED
SCALE INHIBITOR
LSH
38118
LSL
38119
LSLL
38120
ALWCO
LWA
HWAB
PROBE COLUMN
LAH
38118
LAL
38119
LALL
38120
CP-2
CP-2
CP-2
LSHH
38117
LAHH
38117
CP-2
3/4" BD
3/4" BD
PG
38034
TP
V-
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
2.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES.
2-100-BLR-002
FIRETUBE BOILER
RATING: 400 HP
FUEL: NATURAL GAS, NO 2 FUEL OIL
DESIGN PRESSURE: 200 PSI
NOx EMMISIONS LEVEL: 30 PPM
BLOWER MOTOR POWER: 25 HP
BASIS OF DESIGN: CLEAVER-BROOKS CBLE-4W-200-400-200ST
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FEEDWATER -
BOILER #2
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-638
585-21-115
SHEET 1584/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TIT
39005
TE
39005
BOILER
2-119-BLR-003
2 1/2" FW
BOILER
(END VIEW)
LSLL
39108
LT
39107
PSHH
39116
PSH
39115
PIT
39114
PG
39112
SIGHT GLASS
WITH ROTOR
2-119-BLR-003
GAUGE GLASS
BALL VALVES
PROHIBITED (TYP)
LWCO SHUNT SWITCH
(LOCATE WITHIN 3'-0" OF LWCO
& GAUGE GLASS DRAIN VALVE)
PLUGGED CROSS (TYP)
NRBSPLS RBSPLS
LWCO
FLOAT-TYPE
LEVEL SENSOR
PIT
39004
V-
NC
V-
0V-39019 FCV-39021 V-39023
V-39024
CKV-39029
FE
39027
FIT
39027
M V-39026 V-39028 V-39031
V-39001
V-39002
ZI
39001
ZI
39002
M
ZIC
39021
NC
V-39112
NC
V-39114
NC
NC
LG
39106
FG
39103
V-
3/4" BD
CKV-39101V-39102
V-
CP-3
CP-3
CP-3
CP-3
CP-3
CP-3
CP-3CP-3
CP-3CP-3CP-3
ZI
39001
PI
39004
TI
39005
TDI
39005
ZI
39021
ZC
39021
FI
39027
FQI
39027
ZI
39002
PAHH
39116
PAH
39115
PI
39114
LALL
39108
LI
39107
F-39003
ALWCO SHUNT SWITCH
(LOCATE WITHIN 3'-0"
OF ALWCO DRAIN VALVE)
HS
39120
YI
39120
CP-3
HS
39108
YI
39108
CP-3
LWCO SHUNT
SWITCH
FACTORY FEEDWATER
INLET CONNECTION (TYP)
V-39034
1/2" CF
1" CF NC
V-39033
1/2" CF
V-39032
1/2" CF
1" CF
1" CF
NC
V-
NC
V-
NC
V-
V-
V-
SIGHT GLASS
WITH ROTOR
FG
39122
3/4" BD
CKV-39124V-39123
V-
V-
V-
D-642 1 F
TO BLOWDOWN
SEPARATOR
D-642 1 F
TO BLOWDOWN
SEPARATOR
D-637 10 D
FEEDWATER
HEADER 1
D-637 10 E
FEEDWATER
HEADER 2
D-636 10 B
CHEMICAL FEED
SULFITE OXYGEN
SCAVENGER
D-636 10 D
CHEMICAL FEED
AMINE
D-636 10 F
CHEMICAL FEED
SCALE INHIBITOR
LSH
39118
LSL
39119
LSLL
39120
ALWCO
LWA
HWAB
PROBE COLUMN
LAH
39118
LAL
39119
LALL
39120
CP-3
CP-3
CP-3
LSHH
39117
LAHH
39117
CP-3
3/4" BD
3/4" BD
PG
39035
TP
V-
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
2-119-BLR-003
FIRETUBE BOILER
RATING: 400 HP
FUEL: NATURAL GAS, NO 2 FUEL OIL
DESIGN PRESSURE: 200 PSI
NOx EMMISIONS LEVEL: 30 PPM
BLOWER MOTOR POWER: 25 HP
BASIS OF DESIGN: CLEAVER-BROOKS CBLE-4W-200-400-200ST
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FEEDWATER -
BOILER #3
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-639
585-21-115
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
2.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES.
SHEET 1594/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
6" HPS (100 PSIG)
2" BBD
V-
V-41015
V-41016
V-
V-41012
CK
V-
FE
41011
FIT
41011PIT
41009
PI
41009
PG
41008
FI
41011
FQI
41011
NC
V-
CP-1
CP-1
V-
V-
BOILER
2-119-BLR-001
ROOF
ZAO
41001
ZSO
41001
CP-1
V-41001
SVB
SET POINT:
130 PSIG
V-
ZAO
41002
ZSO
41002
CP-1
V-41002
SVB
SET POINT:
135 PSIG
D-644 1 C
STEAM HEADER
D-642 1 C
SURFACE BLOWDOWN
D-642 1 C
BOTTOM BLOWDOWN
V-41004
V-41005
NC
NC
NON-RETURN
STOP-CHECK
V-
V-
1-1/2" CBD
2" BBD
2" BBD
1-1/2" CBD
PSH
41118
PSH
41119
PAH
41118
PAHH
41119
PAH
41118
PAHH
41119
HSPLS HHPLS
V-41120
BEH TJD
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
2.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED
FOR STEAM SERVICE SHALL BE FORGED STEEL.
3. ALL BOTTOM BLOWDOWN PIPING SHALL USE SHORT RADIUS 45 DEGREE ELBOWS OR
LONG RADIUS 90 DEGREE ELBOWS.
4. WYE-TYPE TEE FITTINGS SHALL BE USED FOR ALL BOTTOM BLOWDOWN PIPING. 90
DEGREE TEES ARE PROHIBITED.
5. BOTTOM BLOWDOWN VALVES SHALL HAVE CLEAR, UNOBSTRUCTED ACCESS, AND NO
PART OF THE VALVE SHALL BE LOCATED UNDER ANY PART OF THE BOILERS.
KEYED NOTES
1 3/4" THREADED HALF-COUPLING FOR CALORIMETER CONNECTION. LOCATE TO
ALLOW SPACE FOR PROVIDED PLUG.
REV 0 - 100% BID SET 2024-02-23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID STEAM - BOILER #1 FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-641
585-21-115
REV 1 - FINAL BID SET 2024-04-05
SHEET 1604/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TG
42104
TE
42103
BLOWDOWN
SEPARATOR
2-119-TK-003
ROOF
6" HPS (100 PSIG)
2" CW
NC
DEAD BOILER
DRAIN
TIT
42103
ZI
42103
ZIC
42103
CP-2
S
ZC
42103
TAH
42103
TI
42103
CKV-42101 ST-42102
V-42105
BOILER
NC
FE
42011
FIT
42011
2-119-BLR-002
2" BBD
PIT
42009
PI
42009
PG
42008
FI
42011
FQI
42011
V-42015
NC
V-
CP-2
CP-2
CP-5 CP-5
V-42016
CK
V-
CKV-42119
3/4" BD
3/4" BD
1/4" SAMPLE
OUTLET
3/4"
ANTI-SYPHON
VACUUM BREAKER
MOUNT CBD SAMPLE
COOLER 4' ± ABOVE
FINISHED FLOOR ON
WALL OR COLUMN
DR
TG
42118
V-42117
V-42118
V-
V-42109
V-42111
V-42113
V-
V-42012
CK
V-
V-
V-
V-42017
V-
V-
V-
V-
3/4" BD
3/4" BD
2" BBD
ROOF
ZAO
42001
ZSO
42001
CP-2
V-42001
SVB
SET POINT:
130 PSIG
V-
ZAO
42002
ZSO
42002
CP-2
V-42002
SVB
SET POINT:
135 PSIG
V-42106
3/4" BD
3/4" BD
CK
V-
D-644 1 C
STEAM HEADER
D-631
10 A
COLD WATER
D-643 10 C
SURFACE BLOWDOWN
D-637 10 F
WATER COLUMN
BLOWDOWN
D-631 10 B
COLD WATER
D-643 10 F
BOTTOM BLOWDOWN
D-639 10 F
WATER COLUMN
BLOWDOWN
D-639 10 F
WATER COLUMN
BLOWDOWN
D-637 10 F
WATER COLUMN
BLOWDOWN
D-641 10 E
BOTTOM BLOWDOWN
D-638 10 F
WATER COLUMN
BLOWDOWN
D-638 10 F
WATER COLUMN
BLOWDOWN
D-641 10 D
SURFACE BLOWDOWN
V-42004
V-42005
NC
NC
NON-RETURN
STOP-CHECK
V-
V-
1-1/2" CBD
1-1/2" CBD
3/4" CW
2" BBD
5" V
5" B
D
2" BD
2" B
D
2" B
D
2" BBD
2" BBD
1-1/2" CBD
3" DRD-634
10 C
DEAERATOR
OVERFLOW
PSH
42118
PSH
42119
PAH
42118
PAHH
42119
PAH
42118
PAHH
42119
HSPLS HHPLS
V-42120
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
2-100-TK-003
BLOWDOWN SEPARATOR
OPERATING PRESSURE: 100 PSI
BASIS OF DESIGN: CLEAVER-BROOKS BDS-A34B / A16DS
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
2.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED
FOR STEAM SERVICE SHALL BE FORGED STEEL.
3. ALL BOTTOM BLOWDOWN PIPING SHALL USE SHORT RADIUS 45 DEGREE ELBOWS OR
LONG RADIUS 90 DEGREE ELBOWS.
4. WYE-TYPE TEE FITTINGS SHALL BE USED FOR ALL BOTTOM BLOWDOWN PIPING. 90
DEGREE TEES ARE PROHIBITED.
5. BOTTOM BLOWDOWN VALVES SHALL HAVE CLEAR, UNOBSTRUCTED ACCESS, AND NO
PART OF THE VALVE SHALL BE LOCATED UNDER ANY PART OF THE BOILERS.
KEYED NOTES
1 3/4" THREADED HALF-COUPLING FOR CALORIMETER CONNECTION. LOCATE TO
ALLOW SPACE FOR PROVIDED PLUG.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID STEAM - BOILER #2 FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-642
585-21-115
SHEET 1614/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
2" BBD
6" HPS (100 PSIG)
V-43015
V-43016
V-
V-43012
CK
V-
FE
43011
FIT
43011
ROOF
ZAO
43001
ZSO
43001
PIT
43009
PI
43009
PG
43008
FI
43011
FQI
43011
NC
V-
CP-3
CP-3
CP-3
V-
V-
V-43001
SVB
SET POINT:
130 PSIG
V-
BOILER
2-119-BLR-003
ZAO
43002
ZSO
43002
CP-3
V-43002
SVB
SET POINT:
135 PSIG
NC
V-
D-644 1 C
STEAM HEADER
D-642 1 B
SURFACE BLOWDOWN
D-642 1 F
BOTTOM BLOWDOWN
V-43004
V-43005
NC
NC
NON-RETURN
STOP-CHECK
V-
V-
PSH
43018
PSH
43019
PAH
43018
PAHH
43019
PAH
43018
PAHH
43019
HSPLS HHPLS
V-43020
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
2.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED
FOR STEAM SERVICE SHALL BE FORGED STEEL.
3. ALL BOTTOM BLOWDOWN PIPING SHALL USE SHORT RADIUS 45 DEGREE ELBOWS OR
LONG RADIUS 90 DEGREE ELBOWS.
4. WYE-TYPE TEE FITTINGS SHALL BE USED FOR ALL BOTTOM BLOWDOWN PIPING. 90
DEGREE TEES ARE PROHIBITED.
5. BOTTOM BLOWDOWN VALVES SHALL HAVE CLEAR, UNOBSTRUCTED ACCESS, AND NO
PART OF THE VALVE SHALL BE LOCATED UNDER ANY PART OF THE BOILERS.
KEYED NOTES
1 3/4" THREADED HALF-COUPLING FOR CALORIMETER CONNECTION. LOCATE TO
ALLOW SPACE FOR PROVIDED PLUG.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID STEAM - BOILER #3 FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-643
585-21-115
1-1/2" CBD
2" BBD
2" BBD
1-1/2" CBD
SHEET 1624/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
STEAM
SILENCER
NC
ROOF
PIT
44030
6" HPS
6" HPS
6" HPS
6" HPS
10" HPS
ZT
44026
PI
44030
ZI
44027
ZT
44027
ZT
44028
V-
V-
V-
V-
3/4" DR3/4" DR
TRP-44031
STS-440
NC
FE
44004
FIT
44004
V-44003 V-44005
V-44006
FI
44004
FQI
44004
6" HPS
TO BUILDING 1
(100 PSIG HPS)
6" HPS
6"
6" HPS
3" HPS
TO BUILDING 1
(100 PSIG HPS)
3" HPS
NC
V-
NC
V-
NC
V-
NC
V-
V-
NC
V-
NC
V-
V-44014 V-44016
NC
FE
44019
FIT
44019
V-44018 V-44020
V-44021
FI
44019
FQI
44019
3"
3" HPS
3" HPS
ZI
44028
ZI
44026
ZT
44025
ZI
44025
V-
V-
V-
V-
V-
V-
V-
V-
PIT
44001
V-
HPR1"
PI
44001
EMERGENCY BOILER
CONNECTION
TRP-44032
D-641 10 B
2-119-BLR-001
D-642 10 B
2-119-BLR-002
D-643 10 B
2-119-BLR-003
D-645 1 D
3" HPS
CP-5
CP-5
CP-5
CP-5
CP-5
CP-5
CP-5
CP-5
LOW POINT DRAIN
BEH TJD
KEYED NOTES
1 3/4" THREADED HALF-COUPLING FOR CALORIMETER CONNECTION. LOCATE TO
ALLOW SPACE FOR THREADED PLUG.
2 SEE MP141 FOR LOCATION OF EMERGENCY BOILER CONNECTION.
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
3.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED
FOR STEAM SERVICE SHALL BE FORGED STEEL.
2. ALL INSTRUMENTATION TO CONNECT VIA CP-5A, UNLESS OTHERWISE INDICATED.
REV 0 - 100% BID SET 2024-02-23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID STEAM - BALANCE
OF PLANT
100% BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-644
585-21-115
SHEET 1632/22/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
3" HPS 6" LPS (5 PSIG)
V-45024
V-45027 V-45029 V-45031
V-45028
V-45042
FE
45006
FIT
45006
NC
V-45005 V-45007
V-45008
NC
V-45015
V-45014
V-45015
V-45016 V-45018
BUILDING HEATING
AND MAKEUP AIR
4" LPS (15 PSIG)
V-45026
FI
45006
FQI
45006
2" 2" 2"2"
1" 1/2" 2 1/2"1/2"
1 1/4" 3/4" 4"3/4"
V-
TRP-45041
TRP-45039
V-45033 V-45035 V-45037
V-45034
V-45012
VENT THROUGH ROOF
SVFPRV
SET POINT: 20 PSI
ZAO
45011
ZSO
45011
VENT THROUGH ROOF
SVFPRV
SET POINT: 15 PSI ZSO
45025
V-45040
2" HPS
3" HPS
3" HPS
6"
HPR3/4" HPR
LPR3/4" LPR
HPR3/4" HPR
LPR3/4" LPR
2" HPS
V-45023
TRP-45022
TRP-45020
V-45021
ECC
FOB
ECC
FOB
ECC
FOB
ECC
FOB
ECC
FOB
PG
45019
V-
PG
45013
V-
PG
45038
V-
PG
45032
V-
V-
V-
ZAO
45025
V-
V-
V-
TE
45002
LPR
V-45002 V-45003
VB
45004
PG
45001
V-
HEAT
EXCHANGER
2-119-HEX-001
D-631 10 B
SOFT WATER
D-644 10 C
3" HPS
D-631 1 C
HOT WATER TO RO
D-634 1 D
TO DEAERATOR
CP-5
CP-5
CP-5
TRP-45044
2"
LP
S (1
5 P
SI
G)
3/4" SW
1/2" LPR
2"
LP
S (1
5 P
SI
G)
3/4" LPR
3/4" HW
2" LPS (15 PSIG) D-612
1 A
TO FUEL OIL HX
GARAGE HEATING
V-45045
V-45046
V-45047 V-45048
2" 2" 2"2"ECC
FOB
V-
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
KEYED NOTES
1 SLOPE PILOT CONTROL LINE FROM PRESSURE REDUCING VALVE TO DOWNSTREAM
PIPING. MINIMUM SLOPE SHALL BE 1"/12".
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
3.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED
FOR STEAM SERVICE SHALL BE FORGED STEEL.
2. ALL INSTRUMENTATION TO CONNECT VIA CP-5A, UNLESS OTHERWISE INDICATED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID STEAM - BALANCE
OF PLANT
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-645
585-21-115
2-119-HEX-001
STEAM/HOT WATER HEAT EXCHANGER
SUFPRV-45011
SAFETY VALVE FOLLOWING PRESSURE REDUCING VALVE
SET POINT: 20 PSIG
CAPACITY: 2973 LB/HR
ORIFICE AREA: 1.968 IN²
SUFPRV-45025
SAFETY VALVE FOLLOWING PRESSURE REDUCING VALVE
SET POINT: 15 PSIG
CAPACITY: 929 LB/HR
ORIFICE AREA: 0.841 IN²
SHEET 1644/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FLUE GAS TO
ATMOSPHERE
TE
51022
TIT
51022
STACK
DAMPER
M
COMBUSTION AIR
INLET
PDS
51007
M
BURNER
PDS
51013
ROTARY AIR
DAMPER
LOCKABLE
(LOCK OPEN)
LOCKABLE
(LOCK OPEN)
CAPS
PAPS
M
BE
51015
INCLUDED WITH BOILER #1
BOILER
2-119-BLR-001
AE
51023
AIT
51023
AI
51023
AI
51023
AAL
51023
AAL
51023
0₂ ANALYZER
LFGOLI
TI
51022
TI
51022
TE
51019
TIT
51019
TI
51019
TI
51019
TDI
51019
TDI
51019
ZSO
51021
ZIO
51021
ZIO
51021
OSDPI
ZIC
51020
ZI
51020
ZC
51020
ZI
51020
PDAL
51013
ZIC
51009
ZI
51009
ZC
51009
ZI
51009
BJ
51016
BI
51016
BI
51016
PDAL
51007
IE
51002
IIT
51003
II
51003
II
51003
ISL
51003
IAL
51003
IAL
51003
FDMIS
SC
51001
SI
51001
SI
51001
SIC
51001
ZSO
51010
ZIO
51010
ZAC
51010
51013
PDAL
51007
PDAL
51016
BJA
51010
ZAC
FDDWOPS
V-51008
V-
V-51006
V-51004
V-
V-51012
V-51014
SILENCER
TP
TPTP
TP
TP
PSH
51017
FPI
PAH
51017
PAH
51017
TP
V-51017
LOCKABLE
(LOCK OPEN)
V-51018
CP-1
CP-1
CP-1
CP-1CP-1
CP-1
CP-1
CP-1
CP-1CP-1CP-1
CP-1
CP-1
CP-1
AE
51024
AIT
51024
NOX ANALYZER AE
51025
AIT
51025
CO ANALYZER AE
51026
AIT
51026
CO₂ ANALYZER
AI
51024
AI
51025
AI
51026
LAH
51024
LAH
51025
LAH
51026
BEH TJD
GENERAL NOTES
1 SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
KEYED NOTES
1 LOW-FIRE PROVING SWITCH REQUIRED ON CONTROL DAMPER, REFER TO
BASPDTM
REV 0 - 100% BID SET 2024-02-23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID COMBUSTION AIR -
BOILER #1
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-651
585-21-115
REV 1 - FINAL BID SET 2024-04-05
SHEET 1654/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TE
52022
TIT
52022
STACK
DAMPER
M
COMBUSTION AIR
INLET
PDS
52007
M
BURNER
PDS
52013
ROTARY AIR
DAMPER
LOCKABLE
(LOCK OPEN)
LOCKABLE
(LOCK OPEN)
CAPS
PAPS
M
BE
52015
INCLUDED WITH BOILER #2
BOILER
2-119-BLR-002
AE
52023
AIT
52023
AI
52023
AI
52023
AAL
52023
AAL
52023
0₂ ANALYZER
LFGOLI
TI
52022
TI
52022
TE
52019
TIT
52019
TI
52019
TI
52019
TDI
52019
TDI
52019
ZSO
52021
ZIO
52021
ZIO
52021
OSDPI
ZIC
52020
ZI
52020
ZC
52020
ZI
52020
PDAL
52013
ZIC
52009
ZI
52009
ZC
52009
ZI
52009
BJ
52016
BI
52016
BI
52016
PDAL
52007
IE
52002
IIT
52002
II
52002
II
52002
ISL
52003
IAL
52003
IAL
52003
FDMIS
SC
52001
SI
52001
SI
52001
SIC
52001
ZSO
52010
ZIO
52010
ZAC
52010
52013
PDAL
52007
PDAL
52016
BJA
52010
ZAC
FDDWOPS
V-52008
V-
V-52006
V-52004
V-
V-52012
V-52014
SILENCER
TP
TPTP
TP
TP
PSH
52017
FPI
PAH
52017
PAH
52017
TP
LOCKABLE
(LOCK OPEN)
V-52017 V-52018
AE
52024
AIT
52024
NOX ANALYZER AE
52025
AIT
52025
CO ANALYZER AE
52026
AIT
52026
CO₂ ANALYZER
CP-2
CP-2
CP-2CP-2
CP-2
CP-2
CP-2
CP-2
CP-2
CP-2CP-2CP-2
CP-2
CP-2
AI
52024
LAH
52024
AI
52025
LAH
52025
AI
52026
LAH
52026
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID COMBUSTION AIR -
BOILER #2
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-652
585-21-115
KEYED NOTES
1 LOW-FIRE PROVING SWITCH REQUIRED ON CONTROL DAMPER, REFER TO BASPDTM
SHEET 1664/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TE
53022
TIT
53022
STACK
DAMPER
M
COMBUSTION
AIR INLET
PDS
53007
M
BURNER
PDS
53013
ROTARY AIR
DAMPER
LOCKABLE
(LOCK OPEN)
LOCKABLE
(LOCK OPEN)
CAPS
PAPS
M
BE
53015
INCLUDED WITH BOILER #3
BOILER
2-119-BLR-003
AE
53023
AIT
53023
AI
53023
AI
53023
AAL
53023
AAL
53023
0₂ ANALYZER
LFGOLI
TI
53022
TI
53022
TE
53019
TIT
53019
TI
53019
TI
53019
TDI
53019
TDI
53019
ZSO
53021
ZIO
53021
ZIO
53021
OSDPI
ZIC
53020
ZI
53020
ZC
53020
ZI
53020
PDAL
53013
ZIC
53009
ZI
53009
ZC
53009
ZI
53009
BJ
53016
BI
53016
BI
53016
PDAL
53007
IE
53002
IIT
53002
II
53002
II
53002
ISL
53003
IAL
53003
IAL
53003
FDMIS
SC
53001
SI
53001
SI
53001
SIC
53001
ZSO
53010
ZIO
53010
ZAC
53010
53013
PDAL
53007
PDAL
53016
BJA
53010
ZAC
FDDWOPS
V-53008
V-
V-53006
V-53004
V-
V-53012
V-53014
SILENCER
TP
TPTP
TP
TP
PSH
53017
FPI
PAH
53017
PAH
53017
TP
V-53017 V-53018
LOCKABLE
(LOCK OPEN)
CP-3
CP-3 CP-3
CP-3
CP-3
CP-3
CP-3 CP-3 CP-3
CP-3
CP-3
CP-3
CP-3
CP-3
AE
53024
AIT
53024
NOX ANALYZER AE
53025
AIT
53025
CO ANALYZER AE
53026
AIT
53026
CO₂ ANALYZER
AI
53024
LAH
53024
AI
53025
LAH
53025
AI
53026
LAH
53026
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
KEYED NOTES
1 LOW-FIRE PROVING SWITCH REQUIRED ON CONTROL DAMPER, REFER TO BAPSDTM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID COMBUSTION AIR -
BOILER #3
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-653
585-21-115
SHEET 1674/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
SEQUENCE OF OPERATION FINAL BID SET
PARTIALLY
SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
DI601
585-21-115
IAR IJS
REV 0 - 100% BID SET 2024-02-23
SEQUENCE OF OPERATION:
BOILER PLANT CONTROL:
THE MASTER PANEL SHALL NOT START/STOP INDIVIDUAL BOILERS. SYSTEM SHALL MODULATE BURNER FIRING RATES ON ALL BOILERS TO MAINTAIN STEAM-HEADER PRESSURE SET POINT. THE VA BOILER PLANTS DO NOT ALLOW FOR ANY BOILER TO BE AUTOMATICALLY OR REMOTELY STARTED, AND LEAD LAG CONTROL SYSTEMS ARE NOT ALLOWED WITHIN VA BOILER PLANTS, REGARDLESS OF THE SIZE OR TYPE OF BOILER. THE BOILER SHALL BE STARTED BY AN OPERATOR STANDING AT THE BOILER. SYSTEM SHALL INTERFACE WITH BURNER MANAGEMENT SYSTEM FOR AUTOMATIC POSITIONING OF FORCED DRAFT FAN DAMPER, FORCE DRAFT FAN SPEED, AND FUEL FLOW CONTROL VALVES DURING PRE-PURGE, IGNITION, SHUT DOWN, AND POST-PURGE. PROVIDE FEEDBACK FROM FORCED DRAFT FAN DAMPER, FORCED DRAFT FAN SPEED, BOILER OUTLET DAMPER, AND FUEL FLOW CONTROL VALVES FOR IGNITION AND RUNNING CYCLES. IN CASE OF AN EMERGENCY OR IF ANY OF THE REMOTE EMERGENCY (PANIC BUTTONS) SWITCH ARE ACTIVE ALL AUTOMATIC FUEL SHUTOFF VALVES SHALL CLOSE. PROVIDE CAPABILITY TO OPERATE CONTROLLERS LOCALLY AT THE CONTROL AND INDICATING STATIONS AND REMOTELY AT THE COMPUTER WORK STATION. FOR SAFETY, IT SHALL BE POSSIBLE TO DEFEAT THE REMOTE CONTROL FROM THE FRONT PANEL OF EACH INDIVIDUAL CONTROLLER, PREVENTING ANY STATUS CHANGES FROM BEING INITIATED AT THE COMPUTER WORKSTATION. ALL INACTIVE BOILERS AND ACILLARY EQUIPMENT SHALL BE CONSECUTIVELY ROTATED BACK INTO SERVICE MONTHLY (ADJ.). AFTER PERSONNEL SELECT THE FUEL TO BE BURNED AND OPERATE THE BURNER START SWITCH, THE CONTROL SYSTEM SHALL AUTOMATICALLY PERFORM THE FOLLOWING OPERATIONS. BOILERS SHALL BE EQUIPED WITH
BACNET GATEWAY TO PROVIDE READ ONLY POINTS TO THE CAMPUS BMS:
1. PROVE PROPER OPERATION OF ALL INTERLOCKS EXCEPT PURGING INTERLOCKS OR PREVENT FURTHER PROGRESS.
2. OPEN ALL AIR DAMPERS FULLY. THIS INCLUDES ALL DAMPERS IN THE BOILER OUTLET BREECHING AND STACK SYSTEM.
3. POSITION FGR DAMPER AS REQUIRED BY BURNER MANUFACTURER TO PURGE FLUE GAS FROM RECIRCULATION DUCT.
4. PROVE 80 PERCENT OF MAXIMUM AIR FLOW THROUGH THE BOILER AND PROVE ALL AIR DAMPERS OPEN WIDE AND FGR DAMPER IN PROPER POSITION.
5. PRE-PURGE FOUR AIR CHANGES FOR FIRE TUBE BOILERS.
6. RETURN FORCED DRAFT FAN DAMPERS AND FUEL FLOW CONTROL VALVES TO LOW FIRE POSITION.
7. RETAIN OUTLET DAMPER WIDE OPEN. AUTOMATICALLY POSITION THE OUTLET DAMPER TO AN ACCEPTABLE POSITION FOR BURNER IGNITION.
8. PROVE LOW FIRE START POSITION.
9. SENSING OF FLAME PRIOR TO THIS SHALL CAUSE SHUTDOWN.
10. ENERGIZE IGNITER AND OPEN IGNITER FUEL AUTOMATIC SAFETY SHUT-OFF VALVES. PROVE IGNITER FLAME IN TEN SECONDS OR PROVIDE SHUTDOWN.
11. TERMINATE IGNITION SPARK FIVE SECONDS BEFORE MAIN FUEL VALVES OPEN.
12. OPEN MAIN FUEL SAFETY SHUT-OFF VALVES FOR FUEL SELECTED.