S02 Sol 0004 AttJ.4d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf

PDF 3 MB Posted

Attached to
Y1NB--Project 585-21-115 Replace Boiler Plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI -- NAICS 236220 General Construction
Solicitation number
36C25225R0004
Issued by

About this file

This is a set of Process & Instrumentation Diagrams (P&IDs) for a boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings detail the feedwater, steam, and combustion air systems for three 400 HP firetube boilers and associated equipment including reverse osmosis units, surge tanks, deaerator, chemical feed systems, and steam distribution.

The P&IDs show detailed piping configurations, instrumentation, control systems, and safety devices for the entire boiler plant. Key specifications include steam pressure of 200 PSI, NOx emissions level of 30 PPM, and blower motor power of 25 HP per boiler. The drawings include sequence of operations detailing automatic controls for water level, steam pressure, combustion air, and safety systems. Each boiler has dedicated feedwater pumps, chemical injection, stack dampers, and oxygen trim control. The control system monitors multiple parameters including steam flow, water levels, pressures, temperatures, and emissions, with various alarms and safety interlocks specified throughout the system.

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_Updated Dwgs_partial_24JAN25.pdf PDF
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
36C25225R0004 0007.docx DOCX document
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.1_P03 Single Source Justification MEDECO.e.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.6c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLD WATER

FROM BUILDING 2

PG

31007

PG

31002

WATER SOFTENER

CONTROL VALVE

RESIN TANK 1 RESIN TANK 2BRINE TANK

3" CW

V-31004 V-31005 CKV-31008

WATER SOFTENER

2-119-TK-004

FACTORY OUTLET

CONNECTION

FACTORY INLET

CONNECTION

V-31001

SOFT WATER FROM

BUILDING 1 V-31015CKV-31014 V-31020

PRE-FILTER

CKV-31025 REVERSE

OSMOSIS

UNIT

NC

V-

DR

V-31026

NC

V-

RO STORAGE

TANK

2-100-TK-005

DR

M

V-

V-

V-

KIC

31053

PI

31021

V-

PI

31024

V-

KIC

31022

V-

V-31044

CKV-31051

LSH

31048

LSL

31049

V-31042

SODIUM HYDROXIDE

55 GAL DRUM

CKV-31031

PG

31029

LSL

31031

LBL

31031

CP-5

M

SIC

31030

SI

31030

SC

31030

YI

31030

HS

31030

CP-5

YA

31030

YIR

31030

V-31033PCV-31032 V-31034 V-31035

REDUCED PRESSURE ZONE

(BACKFLOW PREVENTER)

MIXING

VALVE 77°F

CIP

CONNECTION

V-31028

KIC

31037

CIP

CONNECTION

CIP

CONNECTION

FQI

31009

FQI

31052

NC

V-

DR

V-

PCV-31046

V-

PI

31036 FIT

31039

FIT

31040

AIC

31036

RO

PACKAGE

UNIT

REDUCED PRESSURE ZONE

(BACKFLOW PREVENTER)

NC

NC

V-

2-128-CF-204

2-119-PMP-008

2-119-RO-001

CKV-31016 V-31017

SOFT WATER TO

DOMESTIC SYSTEM

CKV-31010 V-31011

V-

NC

V-

NC

V-

OVERFLOW

V-

V-

D-632 1 B

SOFT WATER TO

SURGE TANK

D-645 1 C

SOFT WATER TO HX

D-632 1 D

RO TO SURGE TANK

D-645 10 A

HOT WATER FROM HX

YY

31054

YA

31054

LIH

31048

LAH

31048

SET POINT: 50 PSIG

SET POINT: 50 PSIG

LS

31055

2" CW

V-31056

2" CW

2" S

W 1-

1/2 " S

W

CKV-31010 V-31011

3/4" HW

2" SW

2 x 1-1/2"

1-1/2" SW

1" SW

1/2" CF

1" SW

1" RO

1" RO

1" RO

3/4" SW

2" SW

1-1/2" SW

D-642 1 E

TO BLOWDOWN

SEPARATOR

D-634 1 F

DEAERATOR SAMPLE

COOLER

D-642 1 B

CBD SAMPLE COOLER

3/4" CW

3/4" CW

2" CW

BFP-31056

BFP-31018

PCV-31019

PI

31036

LIL

31049

LAL

31049

4 EMERGENCY BOILER

CONNECTION

1-1/2" SW

V-

NC

V31057

NC

SET POINT: 600 GAL

SET POINT: 2400 GAL

LOW POINT DRAIN

BEH TJD

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

2.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE EXCEPTION

OF DOMESTIC WATER SERVICES.

KEYED NOTES

1 TEMPORARY CONNECTIONS WILL BE REQUIRED UNTIL DE-COMMISSIONING OF LEGACY

BOILER SYSTEM. REFER TO PHASING DRAWINGS FOR MORE INFORMATION.

2 TIE LOW POINT DRAIN FROM PUMP INTO DRAIN LINE.

3 REFER TO PP121 FOR LOCATION OF CONNECTIONS TO DOMESTIC WATER SUPPLY.

4 SEE MP122 FOR LOCATION OF EMERGENCY BOILER CONNECTION.

2-119-PMP-008

PUMP

FLOWRATE: 10GPM

POWER: 1 1/2HP

PRESSURE: 50 PSIG

REV 0 - 100% BID SET 2024-02-23

2-119-TK-005

RO STORAGE TANK

TANK CAPACITY: 2,500 GALLONS

2-119-RO-001

REVERSE OSMOSIS UNIT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID FEEDWATER -

BALANCE OF PLANT

100% BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-631

585-21-115

PCV-31032

PRESSURE REDUCING VALVE

SET POINT: 50 PSI

PCV-31019

PRESSURE REDUCING VALVE

SET POINT: 50 PSIG

SHEET 1512/22/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

1-1/2" SW

NCNC

V-

V-

NC

FE

32016

FIT

32016

V-32014 V-32017

V-32018

M

PG

32013

NC

V-32019 V-32022

V-32023

FE

32008

FIT

32008

M

PG

32006

M

V-32011

V-32012

V-32005

M

FI

32016

FQI

32016 HS

32021

ZIC

32021

YI

32021

ZC

32021

ZI

32021

FI

32008

FQI

32008

HS

32010

ZIC

32010

YI

32010

ZI

32010

ZC

32010

CP-6

CP-6

CP-6

F-32015 F-32020

F-32007 F-32009

LCV-32021

LCV-32010

1" ROINCLUDED WITH SURGE TANK SHIPPED LOOSE

V-

V-

CP-6

D-631 10 B

SOFT WATER

D-631 10 F

RO STORAGE TANK

D-634 1 B

SW TO DEAERATOR

D-633 1 A

LIT-33032

D-633 1 B

MAKEUP WATER TO

SURGE TANK

D-633 1 E

TRANSFER PUMP

PACKAGE

1-1/2" SW

1" S

W

1" SW

1" RO 1" RO

1" RO

BEH TJD

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

2.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE

EXCEPTION OF DOMESTIC WATER SERVICES.

KEYED NOTES

1 TEMPORARY CONNECTIONS WILL BE REQUIRED UNTIL DE-COMMISSIONING OF

LEGACY BOILER SYSTEM. REFER TO PHASING DRAWINGS FOR MORE INFORMATION.

REV 0 - 100% BID SET 2024-02-23

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID FEEDWATER -

BALANCE OF PLANT

100% BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-632

585-21-115

SHEET 1522/22/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SURGE TANK

PUMP CONDENSATE

RETURN

NC

TE

33017

M

NC

2-119-TK-002

2-119-PMP-002

3" C

T

GAUGE GLASS

LSH

33026

LSL

33027

LIT

33032

HIGH LEVEL

ALARM SWITCH

(PROBE)

LOW LEVEL

ALARM SWITCH

(FLOAT)

LAH

33026

LAL

33027

LWACT

HWACT

PLUGGED CROSS

PROBE

COLUMNNC

VENT

LPR

HPR

NC

NC

FIRE HOSE CONNECTION

V-33011

V-

V-33030

V-33028

V-

V-

1 V-33032

TE

33034

V-33002

V-

V-

V-33019

V-33021

V-33022

V-33025

LC

33032

LI

33032

ROOF

TIT

33034

TI

33034

TIT

33017

TI

33017

PG

33003

LAH

33026

LAL

33027

LG

33023

CP-6

CP-6

CP-6

CP-6

V-

PG

33050

V-33047

SIC

33051

SC

33051

SI

33051

F-33048

CKV-33054 V-33056

V-33055

YA

33051

YIR

33051

CKV-33012

NC

V-33036 CKV-33035

CONDENSATE TRANSFER PUMP PACKAGE

INTERIOR EXTERIOR

V-

LOCKABLE

(LOCK OPEN)

LOCKABLE

(LOCK OPEN)

LOCKABLE

(LOCK OPEN)

1" CF

1/2" CF

NC

V-

V-

V-

INCLUDED WITH SURGE TANK

V-

V-

PG

33052

V-33037

F-33038

M

2-112-PMP-001

V-

PG

33040

SIC

33041

SC

33041

SI

33041

CKV-33044 V-33046

YA

33041

YIR

33041

V-

PG

33042

LOCKABLE

(LOCK OPEN)

NC NC NC

V-

V-

D-632 10 D

LCV-33010

LCV-32021

D-632 10 B

MAKEUP WATER

D-632 10 E

MAKEUP WATER BYPASS

D-636 10 A

SULFITE OXYGEN

SCAVENGER

D-634 1 B

TO DEAERATOR

D-634 1 D

HPR TO DEAERATOR

V-33053

NC

V-33045

V-33043

NC

CP-6

CP-6

CP-6

1" RO

1-1/2" CT

4" CT

1-1/2" CT

3" CT

4" x 3"

3" C

T

CK

V-

2" x

1- 1/2

1- 1/2

" C T

2" C

T 3"

C T

1" CT

1" RO

1" RO

3/4" CT

3/4" CT

3/4 " C

T 3/4

" C T

1" C

T 1"

C T

2-1/2" CT

1-1/2" CT

3" CW

PG

33003

V-

V-33059

33059

PG

TP

BEH TJD

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

2-119-TK-002

SURGE TANK

TANK CAPACITY: 900 GAL

OPERATING PRESSURE: ATMOSPHERIC VENTED

BASIS OF DESIGN: CLEAVER-BROOKS SRG-900

2-119-PMP-001

CONDENSATE TRANSFER PUMP

FLOWRATE: 83 GPM

POWER: 5 HP

PRESSURE: 32 PSIG

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

2.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE

EXCEPTION OF DOMESTIC WATER SERVICES.

KEYED NOTES

1 SEE MP122 FOR LOCATION OF FIRE HOSE CONNECTION.

2 SEE MP102 FOR TIE-IN TO PUMPED CONDENSATE FROM BUILDING 1.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID FEEDWATER -

BALANCE OF PLANT

FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-633

585-21-115

2-119-PMP-002

CONDENSATE TRANSFER PUMP

FLOWRATE: 83 GPM

POWER: 5 HP

PRESSURE: 32 PSIG

SHEET 1534/5/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DEAERATOR

NC

PG

34010

2-119-TK-001

2-1/2" CT

S

PG

34019

NCNC

LSHH

34047

LSH

34048

LSL

34050

LIT

34040

OFL CONTROL

SWITCH

HIGH LEVEL

ALARM SWITCH

(PROBE)

LOW LEVEL ALARM

SWITCH

VALVE LOCKED

OPEN

GAUGE GLASS

LAH

34048

LAL

34050

LWADT

HWADT

DAODS

DAODS

1/4" SAMPLE

OUTLET

ANTI-SYPHON

VACUUM

BREAKER

MOUNT FWS COOLER 2'

± ABOVE MEZZANINE

FLOOR AT DEAERATOR

DR

TG

34030

ROOF

1" CF

INCLUDED WITH

DEAERATOR

2" D

R

NC

M

V-34011 LCV-34013 CKV-34014

V-34015

CKV-34016

NC

M

V-34003 LCV-34005 CKV-34006

V-34007

CKV-34008

V-

V-

TG

34023

TE

34034

V-

5 V-34046

V-34049

V-34051

V-34039 V-34042

V-34041

V-

V-

V-

V-

V-

LCV-34026 V-34025

V-34031

V-34029

V-34033

V-

V-

ZIC

34005

ZC

34005

ZI

34005

ZIC

34013

ZC

34013

ZI

34013

LI

34040

LC

34040

PIT

34001

V-

PI

34001

PIT

34009

V-

PI

34009

V-

PIT

34020

V-

PI

34020

TE

34022

TT

34022

TI

34022

TT

34034

TI

34034

TG

34035

LAL

34050

LAH

34048

LAHH

34047

LG

34058

YIC

34026

HS

34026

YI

34026

3/4"

CP-6A

CP-6A

CP-6A

CP-6A

CP-6A

CP-6A

CP-6A

CP-6A

CP-6A

CP-6A

CP-6A

CP-6A

F-34004

F-34012

INCLUDED WITH DEAERATOR

SHIPPED LOOSE

V-

V-

DASV

SET POINT: 10 PSIG

LOCKABLE

(LOCK OPEN)

LOCKABLE

(LOCK OPEN)

LOCKABLE

(LOCK OPEN)

LOCKABLE

(LOCK OPEN)

VACUUM BREAKER

PIT

34002

V-

V-

NCNCNC

D-632 10 B

SOFT WATER

D-633 10 E

FROM CONDENSATE

TRANSFER PUMPS

D-645 10 D

FROM DEAERATOR

PRS

D-633 10 B

FROM HPR

D-631 10 B

COLD WATER

D-635 10 B

FEEDWATER PUMP

RECIRCULATION

D-635 1 B

FEEDWATER PUMP

1/2" CFD-636

10 A

SULFITE OXYGEN

SCAVENGER

V-

CK

V-

V-

V-34027

V-34001A

1-1/2" SW

6" LPS (5 PSIG)

1-1/2" CT

3/4" CW

3/4" CT

CKV-34060

1-1/2" x 2"

2- 1/2

" C T

3" FW

V-34001B

V-

NC

D-642 1 D

TO BLOWDOWN

SEPERATOR

3" DR

3" DR

PG

34062

V-34062

TP

V-

BEH TJD

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

2.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE

EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED

FOR STEAM SERVICE SHALL BE FORGED STEEL.

2-119-TK-001

DEAERATOR

TYPE: VERTICAL TRAY

TANK CAPACITY: 900 GAL

OPERATING PRESSURE: 5 PPSI

BASIS OF DESIGN: CLEAVER-BROOKS TRAYMASTER TMV-030 / 900

REV 0 - 100% BID SET 2024-02-23

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID FEEDWATER -

BALANCE OF PLANT

FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-634

585-21-115

REV 1 - FINAL BID SET 2024-04-05

SHEET 1544/5/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

3" F

W

2 1/2" FW

2 1/2" FW

FEEDWATER PUMP PACKAGE

NO

V-35029

NO

V-35012

PG

35039

SIC

35038

2-119-PMP-005

2 1/2" FW

2 1/2" FW

2 1/2" FW

NO

FE

35043

M

FIT

35043

V-35034 V-35040 V-35042 V-35044

V-35043

V-35045

V-35044

PG

35037

V-

V-

SI

35038

SC

35038

YIR

35038

FQI

35043

FI

35043

TG

35041

ZI

35044

ZI

35044

ZI

35045

ZI

35045

CP-6

CP-6

CP-6

CP-6

F-35035

YA

35038

FO-35042

M

3" FW

PG

35023

SIC

35022

2-119-PMP-004

2 1/2" FW

2 1/2" FW

2 1/2" FW

FE

35027

M

FIT

35027

V-35018 V-35024 V-35026 V-35028

V-35031

V-35033

V-35032

PG

35021

V-

V-

SI

35022

SC

35022

YIR

35022

FQI

35027

FI

35027

TG

35025

ZI

35032

ZI

35032

ZI

35033

ZI

35033

CP-6

CP-6

CP-6

CP-6

F-35019

YA

35022

FO-35030

M

PG

35006

SIC

35005

2-119-PMP-003

2 1/2" FW

2 1/2" FW

2 1/2" FW

FE

35010

M

FIT

35010

V-35001 V-35007 V-35009 V-35011

V-35014

V-35017

V-35016

PG

35004

V-

V-

SI

35005

SC

35005

YIR

35005

FQI

35010

FI

35010

TG

35008

ZI

35016

ZI

35016

ZI

35017

ZI

35017

CP-6

CP-6

CP-6

CP-6

F-35002

YA

35005

FO-35013

M

PIT

35015

V-

PI

35015

CP-6

D-634 10 F

DEAERATOR

D-634 1 F

FEEDWATER PUMP

RECIRCULATION

D-637 1 B

FEEDWATER

HEADER 1

D-637 1 C

FEEDWATER

HEADER 2

V-35003

V-35020

V-35036

V-35036

3/4" FW

3/4" FW

NC

NC

NC

3/4" FW

3/4" FW

3/4" FW

3/4" FW

3/4" FW

BEH TJD

REV 0 - 100% BID SET 2024-02-23

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

2.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE

EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED

FOR STEAM SERVICE SHALL BE FORGED STEEL.

2-119-PMP-004

FEEDWATER PUMP

FLOWRATE: 42 GPM

POWER: 10 HP

PRESSURE: 159 PSI

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID FEEDWATER -

BALANCE OF PLANT

100% BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-635

585-21-115

2-119-PMP-003

FEEDWATER PUMP

FLOWRATE: 42 GPM

POWER: 10 HP

PRESSURE: 159 PSI

2-119-PMP-005

FEEDWATER PUMP

FLOWRATE: 42 GPM

POWER: 10 HP

PRESSURE: 159 PSI

SHEET 1552/22/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE INHIBITOR

55 GAL DRUM

2-128-CF-202A

SI

36005

SC

36005

YI

36005

CP-5

YA

36005

YIR

36005

CKV-36034

PG

36033

V-

M

CKV-36003

SIC

36005

HS

36005

1/2" CF

1/2" CF

1/2" CF

M

M

M

SIC

36026

SI

36026

SC

36026

YI

36026

HS

36026

CP-5

YA

36026

YIR

36026

SIC

36029

SI

36029

SC

36029

YI

36029

HS

36029

CP-5

YA

36029

YIR

36029

SIC

36032

SI

36032

SC

36032

YI

36032

HS

36032

CP-5

YA

36032

YIR

36032

CKV-36031

PG

36030

CKV-36028

PG

36027

1/2" CF

1/2" CF

1/2" CF

SULFITE OXYGEN SCAVENGER

55 GAL DRUM

CKV-36006

LSL

36006

LBL

36006

CP-5

2-128-CF-203B CKV-36009

PG

36008

1/2" CF

1/2" CF

1/2" CF

M

SIC

36007

SI

36007

SC

36007

YI

36007

HS

36007

CP-5

YA

36007

YIR

36007

CKV-36013

CKV-36011

CKV-36015

PG

36004

2-128-CF-203A

2-128-CF-202C

2-128-CF-202B

V-

V-

V-

V-

AMINE

55 GAL DRUM

2-128-CF-201A

CKV-36024

PG

36023

V-

M

M

M

SIC

36016

SI

36016

SC

36016

YI

36016

HS

36016

CP-5

YA

36016

YIR

36016

SIC

36019

SI

36019

SC

36019

YI

36019

HS

36019

CP-5

YA

36019

YIR

36019

SIC

36022

SI

36022

SC

36022

YI

36022

HS

36022

CP-5

YA

36022

YIR

36022

CKV-36021

PG

36020

CKV-36018

PG

36017

2-128-CF-201C

2-128-CF-201B

V-

V-

CKV-36025

LSL

36025

LBL

36025

CP-5

CKV-36035

LSL

36035

LBL

36035

CP-5

V-36014

V-36012

V-36010

V-36001

V-36002

D-637 1 D

BOILER BLR-001

D-638 1 D

BOILER BLR-002

D-639 1 D

BOILER BLR-003

D-637 1 C

BOILER BLR-001

D-638 1 C

BOILER BLR-002

D-639 1 C

BOILER BLR-003

D-637 1 C

BOILER BLR-001

D-638 1 C

BOILER BLR-002

D-639 1 D

BOILER BLR-003

D-634 1 C

DEAERATOR

D-633 1 D

SURGE TANK

1/2" CF

1/2" CF

BEH TJD

REV 0 - 100% BID SET 2024-02-23

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

2.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE

EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED

FOR STEAM SERVICE SHALL BE FORGED STEEL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID FEEDWATER -

CHEM PUMPS

100% BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-636

585-21-115

SHEET 1562/22/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

2 1/2" FW

BOILER

2-119-BLR-001

F-37005

V-37035

1/2" CF

1" CF NC

V-37034

1/2" CF

V-37033

1/2" CF

1" CF

1" CF

TIT

37007

TE

37007

2 1/2" FW

LSH

37118

LSL

37119

LSLL

37120

LSLL

37108

LT

37107

PSHH

37116

PSH

37115

PIT

37114

PG

37112

SIGHT GLASS

WITH ROTOR

2-119-BLR-001

GAUGE GLASS

BALL VALVES

PROHIBITED (TYP)

LWCO SHUNT SWITCH

(LOCATE WITHIN 3'-0" OF LWCO

& GAUGE GLASS DRAIN VALVE)

ALWCO

LWA

HWAB

PROBE COLUMN

PLUGGED CROSS (TYP)

NRBSPLS RBSPLS

LWCO

FLOAT-TYPE

LEVEL SENSOR

PIT

37006

V-

NC

V-

1V-37020 FCV-37022 V-37024

V-37025

CKV-37030

FE

37028

FIT

37028

M V-37027 V-37029

V-37003

V-37004

ZI

37003

ZI

37004

M

ZIC

37022

NC

V-37112

NC

V-37114

NC

NC

LG

37106

FG

37103

V-

3/4" BD

CKV-37101V-37102

V-

CP-1

CP-1

ZI

37003

PI

37006

TI

37007

TDI

37007

ZI

37022

ZC

37022

FI

37028

FQI

37028

LAH

37118

LAL

37119

LALL

37120

ZI

37004

PAHH

37116

PAH

37115

PI

37114

LALL

37108

LI

37107

ALWCO SHUNT SWITCH

(LOCATE WITHIN 3'-0"

OF ALWCO DRAIN VALVE)

HS

37120

YI

37120

HS

37108

YI

37108

LWCO SHUNT

SWITCH

FACTORY FEEDWATER

INLET CONNECTION (TYP)

NC

V-

NC

V-

NC

V-

V-

V-

SIGHT GLASS

WITH ROTOR

FG

37122

3/4" BD

CKV-37124V-37123

V-

V-

V-

BOILER

(END VIEW)

V-

V-

EMERGENCY BOILER

CONNECTION

TO OUTSIDE OF BUILDING

D-635 10 B

FEEDWATER

HEADER 1

D-635 10 C

FEEDWATER

HEADER 2

D-636 10 B

CHEMICAL FEED

SULFITE OXYGEN

SCAVENGER

D-636 10 C

CHEMICAL FEED

AMINE

D-636 10 E

CHEMICAL FEED

SCALE INHIBITOR

D-638 1 B

FEEDWATER

HEADER 1

D-638 1 C

FEEDWATER

HEADER 2

D-639 1 B

FEEDWATER

HEADER 1

D-639 1 C

FEEDWATER

HEADER 2

D-642 1 D

TO BLOWDOWN

SEPARATOR

D-642 1 D

TO BLOWDOWN

SEPARATOR

LSHH

37117

LAHH

37117

CP-1

CP-1

CP-1

CP-1

CP-1

CP-1

CP-1

CP-1

CP-1

CP-1 CP-1 CP-1

CP-1 CP-1 CP-1

2-1/2" FW

2-1/2" FW

2-1/2" FW

2-1/2" FW

3/4" BD

3/4" BD

LOW POINT DRAIN

V-37032

PG

37036

TP

V-

BEH TJD

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

2-119-BLR-001

FIRETUBE BOILER

RATING: 400 HP

FUEL: NATURAL GAS, NO 2 FUEL OIL

DESIGN PRESSURE: 200 PSI

NOx EMMISIONS LEVEL: 30 PPM

BLOWER MOTOR POWER: 25 HP

BASIS OF DESIGN: CLEAVER-BROOKS CBLE-4W-200-400-200ST

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

2.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE

EXCEPTION OF DOMESTIC WATER SERVICES.

KEYED NOTES

1 SEE MP122 FOR LOCATION OF EMERGENCY BOILER CONNECTION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID FEEDWATER -

BOILER #1

FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-637

585-21-115

SHEET 1574/5/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BOILER

2-119-BLR-002

F-38003

V-38033

1/2" CF

1" CF NC

V-38032

1/2" CF

V-38031

1/2" CF

1" CF

1" CF

TIT

38005

TE

38005

2 1/2" FW

LSLL

38108

LT

38107

PSHH

38116

PSH

38115

PIT

38114

PG

38112

SIGHT GLASS

WITH ROTOR

2-100-BLR-002

GAUGE GLASS

BALL VALVES

PROHIBITED (TYP)

LWCO SHUNT SWITCH

(LOCATE WITHIN 3'-0" OF LWCO

& GAUGE GLASS DRAIN VALVE)

PLUGGED CROSS (TYP)

NRBSPLS RBSPLS

LWCO

FLOAT-TYPE

LEVEL SENSOR

PIT

38004

V-

NC

V-

9V-38018 FCV-38020 V-38022

V-38023

CKV-38028

FE

38026

FIT

38026

M V-38025 V-38027 V-38030

M

ZIC

38020

NC

V-38112

NC

V-38114

NC

NC

LG

38106

FG

38103

V-

3/4" BD

CKV-38101V-38102

V-

CP-2

CP-2

CP-2

CP-2

CP-2CP-2

CP-2CP-2CP-2

PI

38004

TI

38005

TDI

38005

ZI

38020

ZC

38020

FI

38026

FQI

38026

PAHH

38116

PAH

38115

PI

38114

LALL

38108

LI

38107

ALWCO SHUNT SWITCH

(LOCATE WITHIN 3'-0"

OF ALWCO DRAIN VALVE)

HS

38120

YI

38120

CP-2

HS

38108

YI

38108

CP-2

LWCO SHUNT

SWITCH

FACTORY FEEDWATER

INLET CONNECTION (TYP)

NC

V-

NC

V-

NC

V-

V-

V-

SIGHT GLASS

WITH ROTOR

FG

38122

3/4" BD

CKV-38124V-38123

V-

V-

V-

V-38001

V-38002

ZI

38001

ZI

38002

CP-2

CP-2

ZI

38001

ZI

38002

BOILER

(END VIEW)

D-642 1 C

TO BLOWDOWN

SEPARATOR

D-642 1 C

TO BLOWDOWN

SEPARATOR

D-637 10 D

FEEDWATER

HEADER 1

D-637 10 D

FEEDWATER

HEADER 2

D-636 10 B

CHEMICAL FEED

SULFITE OXYGEN

SCAVENGER

D-636 10 C

CHEMICAL FEED

AMINE

D-636 10 E

CHEMICAL FEED

SCALE INHIBITOR

LSH

38118

LSL

38119

LSLL

38120

ALWCO

LWA

HWAB

PROBE COLUMN

LAH

38118

LAL

38119

LALL

38120

CP-2

CP-2

CP-2

LSHH

38117

LAHH

38117

CP-2

3/4" BD

3/4" BD

PG

38034

TP

V-

BEH TJD

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

2.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE

EXCEPTION OF DOMESTIC WATER SERVICES.

2-100-BLR-002

FIRETUBE BOILER

RATING: 400 HP

FUEL: NATURAL GAS, NO 2 FUEL OIL

DESIGN PRESSURE: 200 PSI

NOx EMMISIONS LEVEL: 30 PPM

BLOWER MOTOR POWER: 25 HP

BASIS OF DESIGN: CLEAVER-BROOKS CBLE-4W-200-400-200ST

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID FEEDWATER -

BOILER #2

FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-638

585-21-115

SHEET 1584/5/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TIT

39005

TE

39005

BOILER

2-119-BLR-003

2 1/2" FW

BOILER

(END VIEW)

LSLL

39108

LT

39107

PSHH

39116

PSH

39115

PIT

39114

PG

39112

SIGHT GLASS

WITH ROTOR

2-119-BLR-003

GAUGE GLASS

BALL VALVES

PROHIBITED (TYP)

LWCO SHUNT SWITCH

(LOCATE WITHIN 3'-0" OF LWCO

& GAUGE GLASS DRAIN VALVE)

PLUGGED CROSS (TYP)

NRBSPLS RBSPLS

LWCO

FLOAT-TYPE

LEVEL SENSOR

PIT

39004

V-

NC

V-

0V-39019 FCV-39021 V-39023

V-39024

CKV-39029

FE

39027

FIT

39027

M V-39026 V-39028 V-39031

V-39001

V-39002

ZI

39001

ZI

39002

M

ZIC

39021

NC

V-39112

NC

V-39114

NC

NC

LG

39106

FG

39103

V-

3/4" BD

CKV-39101V-39102

V-

CP-3

CP-3

CP-3

CP-3

CP-3

CP-3

CP-3CP-3

CP-3CP-3CP-3

ZI

39001

PI

39004

TI

39005

TDI

39005

ZI

39021

ZC

39021

FI

39027

FQI

39027

ZI

39002

PAHH

39116

PAH

39115

PI

39114

LALL

39108

LI

39107

F-39003

ALWCO SHUNT SWITCH

(LOCATE WITHIN 3'-0"

OF ALWCO DRAIN VALVE)

HS

39120

YI

39120

CP-3

HS

39108

YI

39108

CP-3

LWCO SHUNT

SWITCH

FACTORY FEEDWATER

INLET CONNECTION (TYP)

V-39034

1/2" CF

1" CF NC

V-39033

1/2" CF

V-39032

1/2" CF

1" CF

1" CF

NC

V-

NC

V-

NC

V-

V-

V-

SIGHT GLASS

WITH ROTOR

FG

39122

3/4" BD

CKV-39124V-39123

V-

V-

V-

D-642 1 F

TO BLOWDOWN

SEPARATOR

D-642 1 F

TO BLOWDOWN

SEPARATOR

D-637 10 D

FEEDWATER

HEADER 1

D-637 10 E

FEEDWATER

HEADER 2

D-636 10 B

CHEMICAL FEED

SULFITE OXYGEN

SCAVENGER

D-636 10 D

CHEMICAL FEED

AMINE

D-636 10 F

CHEMICAL FEED

SCALE INHIBITOR

LSH

39118

LSL

39119

LSLL

39120

ALWCO

LWA

HWAB

PROBE COLUMN

LAH

39118

LAL

39119

LALL

39120

CP-3

CP-3

CP-3

LSHH

39117

LAHH

39117

CP-3

3/4" BD

3/4" BD

PG

39035

TP

V-

BEH TJD

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

2-119-BLR-003

FIRETUBE BOILER

RATING: 400 HP

FUEL: NATURAL GAS, NO 2 FUEL OIL

DESIGN PRESSURE: 200 PSI

NOx EMMISIONS LEVEL: 30 PPM

BLOWER MOTOR POWER: 25 HP

BASIS OF DESIGN: CLEAVER-BROOKS CBLE-4W-200-400-200ST

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID FEEDWATER -

BOILER #3

FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-639

585-21-115

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

2.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE

EXCEPTION OF DOMESTIC WATER SERVICES.

SHEET 1594/5/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

6" HPS (100 PSIG)

2" BBD

V-

V-41015

V-41016

V-

V-41012

CK

V-

FE

41011

FIT

41011PIT

41009

PI

41009

PG

41008

FI

41011

FQI

41011

NC

V-

CP-1

CP-1

V-

V-

BOILER

2-119-BLR-001

ROOF

ZAO

41001

ZSO

41001

CP-1

V-41001

SVB

SET POINT:

130 PSIG

V-

ZAO

41002

ZSO

41002

CP-1

V-41002

SVB

SET POINT:

135 PSIG

D-644 1 C

STEAM HEADER

D-642 1 C

SURFACE BLOWDOWN

D-642 1 C

BOTTOM BLOWDOWN

V-41004

V-41005

NC

NC

NON-RETURN

STOP-CHECK

V-

V-

1-1/2" CBD

2" BBD

2" BBD

1-1/2" CBD

PSH

41118

PSH

41119

PAH

41118

PAHH

41119

PAH

41118

PAHH

41119

HSPLS HHPLS

V-41120

BEH TJD

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

2.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE

EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED

FOR STEAM SERVICE SHALL BE FORGED STEEL.

3. ALL BOTTOM BLOWDOWN PIPING SHALL USE SHORT RADIUS 45 DEGREE ELBOWS OR

LONG RADIUS 90 DEGREE ELBOWS.

4. WYE-TYPE TEE FITTINGS SHALL BE USED FOR ALL BOTTOM BLOWDOWN PIPING. 90

DEGREE TEES ARE PROHIBITED.

5. BOTTOM BLOWDOWN VALVES SHALL HAVE CLEAR, UNOBSTRUCTED ACCESS, AND NO

PART OF THE VALVE SHALL BE LOCATED UNDER ANY PART OF THE BOILERS.

KEYED NOTES

1 3/4" THREADED HALF-COUPLING FOR CALORIMETER CONNECTION. LOCATE TO

ALLOW SPACE FOR PROVIDED PLUG.

REV 0 - 100% BID SET 2024-02-23

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID STEAM - BOILER #1 FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-641

585-21-115

REV 1 - FINAL BID SET 2024-04-05

SHEET 1604/5/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TG

42104

TE

42103

BLOWDOWN

SEPARATOR

2-119-TK-003

ROOF

6" HPS (100 PSIG)

2" CW

NC

DEAD BOILER

DRAIN

TIT

42103

ZI

42103

ZIC

42103

CP-2

S

ZC

42103

TAH

42103

TI

42103

CKV-42101 ST-42102

V-42105

BOILER

NC

FE

42011

FIT

42011

2-119-BLR-002

2" BBD

PIT

42009

PI

42009

PG

42008

FI

42011

FQI

42011

V-42015

NC

V-

CP-2

CP-2

CP-5 CP-5

V-42016

CK

V-

CKV-42119

3/4" BD

3/4" BD

1/4" SAMPLE

OUTLET

3/4"

ANTI-SYPHON

VACUUM BREAKER

MOUNT CBD SAMPLE

COOLER 4' ± ABOVE

FINISHED FLOOR ON

WALL OR COLUMN

DR

TG

42118

V-42117

V-42118

V-

V-42109

V-42111

V-42113

V-

V-42012

CK

V-

V-

V-

V-42017

V-

V-

V-

V-

3/4" BD

3/4" BD

2" BBD

ROOF

ZAO

42001

ZSO

42001

CP-2

V-42001

SVB

SET POINT:

130 PSIG

V-

ZAO

42002

ZSO

42002

CP-2

V-42002

SVB

SET POINT:

135 PSIG

V-42106

3/4" BD

3/4" BD

CK

V-

D-644 1 C

STEAM HEADER

D-631

10 A

COLD WATER

D-643 10 C

SURFACE BLOWDOWN

D-637 10 F

WATER COLUMN

BLOWDOWN

D-631 10 B

COLD WATER

D-643 10 F

BOTTOM BLOWDOWN

D-639 10 F

WATER COLUMN

BLOWDOWN

D-639 10 F

WATER COLUMN

BLOWDOWN

D-637 10 F

WATER COLUMN

BLOWDOWN

D-641 10 E

BOTTOM BLOWDOWN

D-638 10 F

WATER COLUMN

BLOWDOWN

D-638 10 F

WATER COLUMN

BLOWDOWN

D-641 10 D

SURFACE BLOWDOWN

V-42004

V-42005

NC

NC

NON-RETURN

STOP-CHECK

V-

V-

1-1/2" CBD

1-1/2" CBD

3/4" CW

2" BBD

5" V

5" B

D

2" BD

2" B

D

2" B

D

2" BBD

2" BBD

1-1/2" CBD

3" DRD-634

10 C

DEAERATOR

OVERFLOW

PSH

42118

PSH

42119

PAH

42118

PAHH

42119

PAH

42118

PAHH

42119

HSPLS HHPLS

V-42120

BEH TJD

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

2-100-TK-003

BLOWDOWN SEPARATOR

OPERATING PRESSURE: 100 PSI

BASIS OF DESIGN: CLEAVER-BROOKS BDS-A34B / A16DS

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

2.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE

EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED

FOR STEAM SERVICE SHALL BE FORGED STEEL.

3. ALL BOTTOM BLOWDOWN PIPING SHALL USE SHORT RADIUS 45 DEGREE ELBOWS OR

LONG RADIUS 90 DEGREE ELBOWS.

4. WYE-TYPE TEE FITTINGS SHALL BE USED FOR ALL BOTTOM BLOWDOWN PIPING. 90

DEGREE TEES ARE PROHIBITED.

5. BOTTOM BLOWDOWN VALVES SHALL HAVE CLEAR, UNOBSTRUCTED ACCESS, AND NO

PART OF THE VALVE SHALL BE LOCATED UNDER ANY PART OF THE BOILERS.

KEYED NOTES

1 3/4" THREADED HALF-COUPLING FOR CALORIMETER CONNECTION. LOCATE TO

ALLOW SPACE FOR PROVIDED PLUG.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID STEAM - BOILER #2 FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-642

585-21-115

SHEET 1614/5/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

2" BBD

6" HPS (100 PSIG)

V-43015

V-43016

V-

V-43012

CK

V-

FE

43011

FIT

43011

ROOF

ZAO

43001

ZSO

43001

PIT

43009

PI

43009

PG

43008

FI

43011

FQI

43011

NC

V-

CP-3

CP-3

CP-3

V-

V-

V-43001

SVB

SET POINT:

130 PSIG

V-

BOILER

2-119-BLR-003

ZAO

43002

ZSO

43002

CP-3

V-43002

SVB

SET POINT:

135 PSIG

NC

V-

D-644 1 C

STEAM HEADER

D-642 1 B

SURFACE BLOWDOWN

D-642 1 F

BOTTOM BLOWDOWN

V-43004

V-43005

NC

NC

NON-RETURN

STOP-CHECK

V-

V-

PSH

43018

PSH

43019

PAH

43018

PAHH

43019

PAH

43018

PAHH

43019

HSPLS HHPLS

V-43020

BEH TJD

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

2.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE

EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED

FOR STEAM SERVICE SHALL BE FORGED STEEL.

3. ALL BOTTOM BLOWDOWN PIPING SHALL USE SHORT RADIUS 45 DEGREE ELBOWS OR

LONG RADIUS 90 DEGREE ELBOWS.

4. WYE-TYPE TEE FITTINGS SHALL BE USED FOR ALL BOTTOM BLOWDOWN PIPING. 90

DEGREE TEES ARE PROHIBITED.

5. BOTTOM BLOWDOWN VALVES SHALL HAVE CLEAR, UNOBSTRUCTED ACCESS, AND NO

PART OF THE VALVE SHALL BE LOCATED UNDER ANY PART OF THE BOILERS.

KEYED NOTES

1 3/4" THREADED HALF-COUPLING FOR CALORIMETER CONNECTION. LOCATE TO

ALLOW SPACE FOR PROVIDED PLUG.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID STEAM - BOILER #3 FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-643

585-21-115

1-1/2" CBD

2" BBD

2" BBD

1-1/2" CBD

SHEET 1624/5/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

STEAM

SILENCER

NC

ROOF

PIT

44030

6" HPS

6" HPS

6" HPS

6" HPS

10" HPS

ZT

44026

PI

44030

ZI

44027

ZT

44027

ZT

44028

V-

V-

V-

V-

3/4" DR3/4" DR

TRP-44031

STS-440

NC

FE

44004

FIT

44004

V-44003 V-44005

V-44006

FI

44004

FQI

44004

6" HPS

TO BUILDING 1

(100 PSIG HPS)

6" HPS

6"

6" HPS

3" HPS

TO BUILDING 1

(100 PSIG HPS)

3" HPS

NC

V-

NC

V-

NC

V-

NC

V-

V-

NC

V-

NC

V-

V-44014 V-44016

NC

FE

44019

FIT

44019

V-44018 V-44020

V-44021

FI

44019

FQI

44019

3"

3" HPS

3" HPS

ZI

44028

ZI

44026

ZT

44025

ZI

44025

V-

V-

V-

V-

V-

V-

V-

V-

PIT

44001

V-

HPR1"

PI

44001

EMERGENCY BOILER

CONNECTION

TRP-44032

D-641 10 B

2-119-BLR-001

D-642 10 B

2-119-BLR-002

D-643 10 B

2-119-BLR-003

D-645 1 D

3" HPS

CP-5

CP-5

CP-5

CP-5

CP-5

CP-5

CP-5

CP-5

LOW POINT DRAIN

BEH TJD

KEYED NOTES

1 3/4" THREADED HALF-COUPLING FOR CALORIMETER CONNECTION. LOCATE TO

ALLOW SPACE FOR THREADED PLUG.

2 SEE MP141 FOR LOCATION OF EMERGENCY BOILER CONNECTION.

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

3.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE

EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED

FOR STEAM SERVICE SHALL BE FORGED STEEL.

2. ALL INSTRUMENTATION TO CONNECT VIA CP-5A, UNLESS OTHERWISE INDICATED.

REV 0 - 100% BID SET 2024-02-23

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID STEAM - BALANCE

OF PLANT

100% BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-644

585-21-115

SHEET 1632/22/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

3" HPS 6" LPS (5 PSIG)

V-45024

V-45027 V-45029 V-45031

V-45028

V-45042

FE

45006

FIT

45006

NC

V-45005 V-45007

V-45008

NC

V-45015

V-45014

V-45015

V-45016 V-45018

BUILDING HEATING

AND MAKEUP AIR

4" LPS (15 PSIG)

V-45026

FI

45006

FQI

45006

2" 2" 2"2"

1" 1/2" 2 1/2"1/2"

1 1/4" 3/4" 4"3/4"

V-

TRP-45041

TRP-45039

V-45033 V-45035 V-45037

V-45034

V-45012

VENT THROUGH ROOF

SVFPRV

SET POINT: 20 PSI

ZAO

45011

ZSO

45011

VENT THROUGH ROOF

SVFPRV

SET POINT: 15 PSI ZSO

45025

V-45040

2" HPS

3" HPS

3" HPS

6"

HPR3/4" HPR

LPR3/4" LPR

HPR3/4" HPR

LPR3/4" LPR

2" HPS

V-45023

TRP-45022

TRP-45020

V-45021

ECC

FOB

ECC

FOB

ECC

FOB

ECC

FOB

ECC

FOB

PG

45019

V-

PG

45013

V-

PG

45038

V-

PG

45032

V-

V-

V-

ZAO

45025

V-

V-

V-

TE

45002

LPR

V-45002 V-45003

VB

45004

PG

45001

V-

HEAT

EXCHANGER

2-119-HEX-001

D-631 10 B

SOFT WATER

D-644 10 C

3" HPS

D-631 1 C

HOT WATER TO RO

D-634 1 D

TO DEAERATOR

CP-5

CP-5

CP-5

TRP-45044

2"

LP

S (1

5 P

SI

G)

3/4" SW

1/2" LPR

2"

LP

S (1

5 P

SI

G)

3/4" LPR

3/4" HW

2" LPS (15 PSIG) D-612

1 A

TO FUEL OIL HX

GARAGE HEATING

V-45045

V-45046

V-45047 V-45048

2" 2" 2"2"ECC

FOB

V-

BEH TJD

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

KEYED NOTES

1 SLOPE PILOT CONTROL LINE FROM PRESSURE REDUCING VALVE TO DOWNSTREAM

PIPING. MINIMUM SLOPE SHALL BE 1"/12".

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

3.

ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED

STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE

EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED

FOR STEAM SERVICE SHALL BE FORGED STEEL.

2. ALL INSTRUMENTATION TO CONNECT VIA CP-5A, UNLESS OTHERWISE INDICATED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID STEAM - BALANCE

OF PLANT

FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-645

585-21-115

2-119-HEX-001

STEAM/HOT WATER HEAT EXCHANGER

SUFPRV-45011

SAFETY VALVE FOLLOWING PRESSURE REDUCING VALVE

SET POINT: 20 PSIG

CAPACITY: 2973 LB/HR

ORIFICE AREA: 1.968 IN²

SUFPRV-45025

SAFETY VALVE FOLLOWING PRESSURE REDUCING VALVE

SET POINT: 15 PSIG

CAPACITY: 929 LB/HR

ORIFICE AREA: 0.841 IN²

SHEET 1644/5/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FLUE GAS TO

ATMOSPHERE

TE

51022

TIT

51022

STACK

DAMPER

M

COMBUSTION AIR

INLET

PDS

51007

M

BURNER

PDS

51013

ROTARY AIR

DAMPER

LOCKABLE

(LOCK OPEN)

LOCKABLE

(LOCK OPEN)

CAPS

PAPS

M

BE

51015

INCLUDED WITH BOILER #1

BOILER

2-119-BLR-001

AE

51023

AIT

51023

AI

51023

AI

51023

AAL

51023

AAL

51023

0₂ ANALYZER

LFGOLI

TI

51022

TI

51022

TE

51019

TIT

51019

TI

51019

TI

51019

TDI

51019

TDI

51019

ZSO

51021

ZIO

51021

ZIO

51021

OSDPI

ZIC

51020

ZI

51020

ZC

51020

ZI

51020

PDAL

51013

ZIC

51009

ZI

51009

ZC

51009

ZI

51009

BJ

51016

BI

51016

BI

51016

PDAL

51007

IE

51002

IIT

51003

II

51003

II

51003

ISL

51003

IAL

51003

IAL

51003

FDMIS

SC

51001

SI

51001

SI

51001

SIC

51001

ZSO

51010

ZIO

51010

ZAC

51010

51013

PDAL

51007

PDAL

51016

BJA

51010

ZAC

FDDWOPS

V-51008

V-

V-51006

V-51004

V-

V-51012

V-51014

SILENCER

TP

TPTP

TP

TP

PSH

51017

FPI

PAH

51017

PAH

51017

TP

V-51017

LOCKABLE

(LOCK OPEN)

V-51018

CP-1

CP-1

CP-1

CP-1CP-1

CP-1

CP-1

CP-1

CP-1CP-1CP-1

CP-1

CP-1

CP-1

AE

51024

AIT

51024

NOX ANALYZER AE

51025

AIT

51025

CO ANALYZER AE

51026

AIT

51026

CO₂ ANALYZER

AI

51024

AI

51025

AI

51026

LAH

51024

LAH

51025

LAH

51026

BEH TJD

GENERAL NOTES

1 SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

KEYED NOTES

1 LOW-FIRE PROVING SWITCH REQUIRED ON CONTROL DAMPER, REFER TO

BASPDTM

REV 0 - 100% BID SET 2024-02-23

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID COMBUSTION AIR -

BOILER #1

FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-651

585-21-115

REV 1 - FINAL BID SET 2024-04-05

SHEET 1654/5/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TE

52022

TIT

52022

STACK

DAMPER

M

COMBUSTION AIR

INLET

PDS

52007

M

BURNER

PDS

52013

ROTARY AIR

DAMPER

LOCKABLE

(LOCK OPEN)

LOCKABLE

(LOCK OPEN)

CAPS

PAPS

M

BE

52015

INCLUDED WITH BOILER #2

BOILER

2-119-BLR-002

AE

52023

AIT

52023

AI

52023

AI

52023

AAL

52023

AAL

52023

0₂ ANALYZER

LFGOLI

TI

52022

TI

52022

TE

52019

TIT

52019

TI

52019

TI

52019

TDI

52019

TDI

52019

ZSO

52021

ZIO

52021

ZIO

52021

OSDPI

ZIC

52020

ZI

52020

ZC

52020

ZI

52020

PDAL

52013

ZIC

52009

ZI

52009

ZC

52009

ZI

52009

BJ

52016

BI

52016

BI

52016

PDAL

52007

IE

52002

IIT

52002

II

52002

II

52002

ISL

52003

IAL

52003

IAL

52003

FDMIS

SC

52001

SI

52001

SI

52001

SIC

52001

ZSO

52010

ZIO

52010

ZAC

52010

52013

PDAL

52007

PDAL

52016

BJA

52010

ZAC

FDDWOPS

V-52008

V-

V-52006

V-52004

V-

V-52012

V-52014

SILENCER

TP

TPTP

TP

TP

PSH

52017

FPI

PAH

52017

PAH

52017

TP

LOCKABLE

(LOCK OPEN)

V-52017 V-52018

AE

52024

AIT

52024

NOX ANALYZER AE

52025

AIT

52025

CO ANALYZER AE

52026

AIT

52026

CO₂ ANALYZER

CP-2

CP-2

CP-2CP-2

CP-2

CP-2

CP-2

CP-2

CP-2

CP-2CP-2CP-2

CP-2

CP-2

AI

52024

LAH

52024

AI

52025

LAH

52025

AI

52026

LAH

52026

BEH TJD

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID COMBUSTION AIR -

BOILER #2

FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-652

585-21-115

KEYED NOTES

1 LOW-FIRE PROVING SWITCH REQUIRED ON CONTROL DAMPER, REFER TO BASPDTM

SHEET 1664/5/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TE

53022

TIT

53022

STACK

DAMPER

M

COMBUSTION

AIR INLET

PDS

53007

M

BURNER

PDS

53013

ROTARY AIR

DAMPER

LOCKABLE

(LOCK OPEN)

LOCKABLE

(LOCK OPEN)

CAPS

PAPS

M

BE

53015

INCLUDED WITH BOILER #3

BOILER

2-119-BLR-003

AE

53023

AIT

53023

AI

53023

AI

53023

AAL

53023

AAL

53023

0₂ ANALYZER

LFGOLI

TI

53022

TI

53022

TE

53019

TIT

53019

TI

53019

TI

53019

TDI

53019

TDI

53019

ZSO

53021

ZIO

53021

ZIO

53021

OSDPI

ZIC

53020

ZI

53020

ZC

53020

ZI

53020

PDAL

53013

ZIC

53009

ZI

53009

ZC

53009

ZI

53009

BJ

53016

BI

53016

BI

53016

PDAL

53007

IE

53002

IIT

53002

II

53002

II

53002

ISL

53003

IAL

53003

IAL

53003

FDMIS

SC

53001

SI

53001

SI

53001

SIC

53001

ZSO

53010

ZIO

53010

ZAC

53010

53013

PDAL

53007

PDAL

53016

BJA

53010

ZAC

FDDWOPS

V-53008

V-

V-53006

V-53004

V-

V-53012

V-53014

SILENCER

TP

TPTP

TP

TP

PSH

53017

FPI

PAH

53017

PAH

53017

TP

V-53017 V-53018

LOCKABLE

(LOCK OPEN)

CP-3

CP-3 CP-3

CP-3

CP-3

CP-3

CP-3 CP-3 CP-3

CP-3

CP-3

CP-3

CP-3

CP-3

AE

53024

AIT

53024

NOX ANALYZER AE

53025

AIT

53025

CO ANALYZER AE

53026

AIT

53026

CO₂ ANALYZER

AI

53024

LAH

53024

AI

53025

LAH

53025

AI

53026

LAH

53026

BEH TJD

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

GENERAL NOTES

1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.

KEYED NOTES

1 LOW-FIRE PROVING SWITCH REQUIRED ON CONTROL DAMPER, REFER TO BAPSDTM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PROCESS - P&ID COMBUSTION AIR -

BOILER #3

FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 D-653

585-21-115

SHEET 1674/5/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

SEQUENCE OF OPERATION FINAL BID SET

PARTIALLY

SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

DI601

585-21-115

IAR IJS

REV 0 - 100% BID SET 2024-02-23

SEQUENCE OF OPERATION:

BOILER PLANT CONTROL:

THE MASTER PANEL SHALL NOT START/STOP INDIVIDUAL BOILERS. SYSTEM SHALL MODULATE BURNER FIRING RATES ON ALL BOILERS TO MAINTAIN STEAM-HEADER PRESSURE SET POINT. THE VA BOILER PLANTS DO NOT ALLOW FOR ANY BOILER TO BE AUTOMATICALLY OR REMOTELY STARTED, AND LEAD LAG CONTROL SYSTEMS ARE NOT ALLOWED WITHIN VA BOILER PLANTS, REGARDLESS OF THE SIZE OR TYPE OF BOILER. THE BOILER SHALL BE STARTED BY AN OPERATOR STANDING AT THE BOILER. SYSTEM SHALL INTERFACE WITH BURNER MANAGEMENT SYSTEM FOR AUTOMATIC POSITIONING OF FORCED DRAFT FAN DAMPER, FORCE DRAFT FAN SPEED, AND FUEL FLOW CONTROL VALVES DURING PRE-PURGE, IGNITION, SHUT DOWN, AND POST-PURGE. PROVIDE FEEDBACK FROM FORCED DRAFT FAN DAMPER, FORCED DRAFT FAN SPEED, BOILER OUTLET DAMPER, AND FUEL FLOW CONTROL VALVES FOR IGNITION AND RUNNING CYCLES. IN CASE OF AN EMERGENCY OR IF ANY OF THE REMOTE EMERGENCY (PANIC BUTTONS) SWITCH ARE ACTIVE ALL AUTOMATIC FUEL SHUTOFF VALVES SHALL CLOSE. PROVIDE CAPABILITY TO OPERATE CONTROLLERS LOCALLY AT THE CONTROL AND INDICATING STATIONS AND REMOTELY AT THE COMPUTER WORK STATION. FOR SAFETY, IT SHALL BE POSSIBLE TO DEFEAT THE REMOTE CONTROL FROM THE FRONT PANEL OF EACH INDIVIDUAL CONTROLLER, PREVENTING ANY STATUS CHANGES FROM BEING INITIATED AT THE COMPUTER WORKSTATION. ALL INACTIVE BOILERS AND ACILLARY EQUIPMENT SHALL BE CONSECUTIVELY ROTATED BACK INTO SERVICE MONTHLY (ADJ.). AFTER PERSONNEL SELECT THE FUEL TO BE BURNED AND OPERATE THE BURNER START SWITCH, THE CONTROL SYSTEM SHALL AUTOMATICALLY PERFORM THE FOLLOWING OPERATIONS. BOILERS SHALL BE EQUIPED WITH

BACNET GATEWAY TO PROVIDE READ ONLY POINTS TO THE CAMPUS BMS:

1. PROVE PROPER OPERATION OF ALL INTERLOCKS EXCEPT PURGING INTERLOCKS OR PREVENT FURTHER PROGRESS.

2. OPEN ALL AIR DAMPERS FULLY. THIS INCLUDES ALL DAMPERS IN THE BOILER OUTLET BREECHING AND STACK SYSTEM.

3. POSITION FGR DAMPER AS REQUIRED BY BURNER MANUFACTURER TO PURGE FLUE GAS FROM RECIRCULATION DUCT.

4. PROVE 80 PERCENT OF MAXIMUM AIR FLOW THROUGH THE BOILER AND PROVE ALL AIR DAMPERS OPEN WIDE AND FGR DAMPER IN PROPER POSITION.

5. PRE-PURGE FOUR AIR CHANGES FOR FIRE TUBE BOILERS.

6. RETURN FORCED DRAFT FAN DAMPERS AND FUEL FLOW CONTROL VALVES TO LOW FIRE POSITION.

7. RETAIN OUTLET DAMPER WIDE OPEN. AUTOMATICALLY POSITION THE OUTLET DAMPER TO AN ACCEPTABLE POSITION FOR BURNER IGNITION.

8. PROVE LOW FIRE START POSITION.

9. SENSING OF FLAME PRIOR TO THIS SHALL CAUSE SHUTDOWN.

10. ENERGIZE IGNITER AND OPEN IGNITER FUEL AUTOMATIC SAFETY SHUT-OFF VALVES. PROVE IGNITER FLAME IN TEN SECONDS OR PROVIDE SHUTDOWN.

11. TERMINATE IGNITION SPARK FIVE SECONDS BEFORE MAIN FUEL VALVES OPEN.

12. OPEN MAIN FUEL SAFETY SHUT-OFF VALVES FOR FUEL SELECTED.