S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf
PDF 3 MB Posted
- Solicitation number
- 36C25225R0004
About this file
This is a mechanical engineering drawing set showing HVAC and piping plans for a boiler plant replacement project at the Oscar G. Johnson VA Medical Center. The drawings include detailed mechanical plans for steam piping, hydronic piping, and fuel piping systems across basement, ground floor and mezzanine levels. The plans show equipment layouts, piping routes, control diagrams and schematics for various systems including steam-to-hot water heat exchangers, makeup air units, unit heaters, and ventilation systems.
The drawing set contains specific technical details such as pipe sizes, equipment specifications, control sequences, spring hanger schedules, and key notes for installation requirements. Notable elements include steam and condensate piping modifications, new boiler installations with associated fuel systems (natural gas and propane), hot water heating distribution, and various HVAC control systems. The plans provide both overall layouts and enlarged detail views of critical areas, along with schematic diagrams showing control strategies and operational sequences for the major mechanical systems.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1' 2'
A'
B'
G'
F'
D'
C'
2.8'
E'
1 2 3
A
B
D
F
H
6" EXHAUST FROM
GENERATOR TO ROOF
3'
2-R-EF-001 2-R-EF-002
2-R-EF-004
EXHAUST THIMBLE TO BE PROVIDED AT EVERY
PENETRATION THROUGH FLOOR OR ROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MH161
MECHANICAL HVAC PLAN - ROOF
LEVEL 2
DJU KRL
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 MECHANICAL HVAC PLAN - ROOF LEVEL
KEYPLAN
N AREA OF WORK
12 16
N
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 SEE AE503 FOR ROOF PENETRATION DETAILS
Revisions: Date:
SHEET 1842/22/2024
2'
MEZZANINE
12' - 0"
2-200-HEX-001
2-200-HEX-002
2-200-MAU-002
2-200-MAU-001
3"ø HWS
3"ø HWR
3"ø HWS
2-200-PMP-002
2-200-PMP-001
3"ø LPS
2 1/2"ø HWS
1" ø
HW
S
2"ø HWS
2"ø HWR
2"ø HWR 1"ø HWR
2-200-XPT-001
2-200-AS-001
/1 MH141
FROM DEARATOR
PRV STATION
3"ø HPS
STEAM TRAP
GROUND FLOOR
0' - 0"
G' F'
MEZZANINE
12' - 0"
72"x 66"
3/4"ø HWR
/1 MH121
2-120B-480-GEN-011
6" EXHAUST VENT FROM GENERATOR TO ROOF
INTAKE LOUVER
AUTOMATIC CONTROL DAMPER
2'
- 0
" A
FF
1-1/2"x1-1/2"x1/4" ANGLE SUPPORT TO FLOOR
26"x 37"
DUCT MUFFLER
2-102B-UH-004
P1
42"x37"
THIMBLE
2-202-HEX-001
4"ø LPS
CONDENSATE PUMP RECIEVER
STEAM TRAP
/1 MH141
1"ø CT
2"ø NG
1 1/2"ø HWR
1 1/2"ø HWS
1 1/2"ø LPS
1 1 /2" ø
HW
R
1 1/2"ø HWS
1 1/2"ø HWR
PRV
CIRCULATING PUMP
EXPANSION TANK
AIR SEPARATOR
3"ø HWS
4"ø LPS
TO SURGE TANK
PRV
STEAM CONTROL VALVE
PRESSURE REGULATING
VALVE
EXISTING 2ND FLOOR
15' - 6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MH201
MECHANICAL HVAC ELEVATIONS
DJU KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
SCALE: 1/2" = 1'-0"1 MECHANICAL MEZZANINE HEX ELEVATION
SCALE: 1/2" = 1'-0"2 MECHANICAL GENERATOR ROOM ELEVATION
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 1/2" = 1'-0"3 MECHANICAL BUILDING 1 MEZZANINE HEX ELEVATION
Revisions: Date: SHEET 1852/22/2024
12"x12"
SA
100 CFM 12"x12"
EA
50 CFM
12"x12"
EA
50 CFM
12"x12"
EA
50 CFM
12"x12"
EA
50 CFM
12"x12"
EA
50 CFM
12"x12"
SA
100 CFM
2-125-CH-001
2-124-ITU-003
12"x12"
EA
50 CFM
2-119-HRV-002
8" DIA
8" D
IA
6" D
IA
8" DIA
6"
D
IA
6" D
IA
BREAK ROOM
124-2
JANITOR
121-2
TOILET
122-2
TOILET
123-2
SHOWER AREA
126-2
LOCKER ROOM
125-2
CHANGING AREA
127-2
1" HWS FROM
ABOVE
3/4 "ø
H W
S
PIPE RISER TO MEZZANINE
1" ø
HW
R
3/4 "ø
H W
R
3/4"ø HWS 1"ø HWS
3/4 "ø
H W
S 3/4
"ø H
W S
3/4"ø HWS
3/4 "ø
H W
R
3/4"ø HWR1"ø HWR
2-125-ITU-004
3/4"ø HWR
8" SUPPLY FROM ABOVE.
MUST BE AT LEADT 10'-0"
ABOVE EXHAUST LOUVER
M
/1 MH131
BOOSTER COIL
12"x12"
EA
50 CFM
12"x12"
SA
75 CFM
4" DIA
6" D
IA
12"x12"
EA
50 CFM
12"x12"
SA
75 CFM
8" DIA
6" D
IA
12"x12"
EA
50 CFM
6" DIA
2-130-ITU-002
3/4"ø HWS
3/4"ø HWR
3/4"ø HWR
CONTROL ROOM
130-2
SUPERVISOR
129-2
CHEM FEED
128-2
EXHAUST UP TO
MEZZANINE LEVEL
SUPPLY UP TO
MEZZANINE LEVEL
8" DIA
6" D
IA
8" D
IA
/1 MH131
2-129-ITU-001
BOOSTER COIL 2-200-HRV-001
VD
VD
8" EXHAUST AIR FROM
GROUND FLOOR CEILING
8" SUPPLY AIR TO
GROUND FLOOR CEILING
8" D
IA
8" DIA
3/4"ø HWS 3/4"ø HWR
/1 MH141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MH401
MECHANIAL ENLARGED PLANS
DJU KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
SCALE: 3/8" = 1'-0"1 MECHANICAL HVAC ENLARGED RCP PLAN - BREAK ROOM/LOCKER ROOM AREA
SCALE: 3/8" = 1'-0"2 MECHANICAL HVAC ENLARGED RCP PLAN - CONTROL ROOM AREA
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/8" = 1'-0"3 MECHANICAL HVAC ENLARGED FLOOR PLAN - MEZZANINE LEVEL ABOVE CHEM FEED ROOM
Revisions: Date: SHEET 1862/22/2024
W
W1
30°MAX
30°
MAX
15°MAX
15°
MAX
MAX
MA
X
WATER RETURN
WATER SUPPLY
SHUT OFF VALVE
REDUCER, IF REQUIRED
MODULATION CONTROL VALVE
DRAIN WITH HOSE
CONNECTION
UNION CONNECTIONS, TYP
TEST PLUG, TYP
MANUAL AIR VENT
BALANCE VALVE
COIL
MV
TYPICAL CONNECTIONS TO VERTICAL HOT WATER UNIT HEATER
TYPICAL CONNECTIONS TO HORIZONTAL HOT WATER UNIT HEATER
HOT WATER
SUPPLY
HOT WATER
RETURN
HOT WATER
SUPPLY
HOT WATER
RETURN
MV
MV
NOTE:
UNIT MOUNTED THERMOSTAT
SHALL MAINTAIN SPACE
TEMPERATURE BY CYCLING
UNIT HEATER
CONTROL VALVE
AIR VENT
TEST
PLUG, TYP
UNIT HEATER
WYE STRAINER,
TYP
SHUTOFF BALL
VALVE, TYP
CONTROL VALVE
M
M
BALANCE VALVE
BALANCE VALVE
NOTES:
1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY
SMACNA.
2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE
REGARDLESS OF W DIMENSION.
3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1 1/2" MAXIMUM SPACE
BETWEEN VANES AND A 3/4" TRAILING EDGE.
4. WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" VANES SHALL BE DOUBLE VANE
TYPE.
NOTE:
UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.
TYPICAL DUCTWORK TRANSITION
WITH EQUIPMENT MOUNTED IN DUCT
PLAN OR SIDE VIEW
TYPICAL DUCTWORK TRANSITION
PLAN OR SIDE VIEW
AIR
FLOW
AIR
FLOW
EQ
UI
PM
EN
T
PLAN VIEW
BRANCH DUCT
AIR
FLOW AIR
FLOW
MAIN EXHAUST OR RETURN
VD 1/4W OR 4" MIN
WOOD NAILING STRIP
PREFABRICATED
ROOF CURB
SEE NOTE 2
GRAVITY BACKDRAFT
DAMPER
DUCT (WHEN SHOWN)
FACTORY ASSEMBLED
HINGED HOOD WITH
LATCH AND BIRD SCREEN
SEE NOTE 1
CURB CAP
ROOF
SEE NOTE 2
TRANSITION DUCT TO
FULL SIZE OF DAMPER
SUPPLIED WITH HOOD
NOTES:
1. SECURE HOOD TO WOOD NAILING STRIP WITH 3/8" CADMIUM PLATED LAG BOLTS NOT
OVER 12" ON CENTER.
2. SECURE ROOF CURB, DUCTWORK AND DAMPER TO ROOF WITH EXPANSION BOLTS
(CONCRETE ROOF) OR RUST RESISTANT BOLTS (METAL DECK & BAR JOIST ROOF).
NOTES:
1. SECURE CURB CAP TO WOOD NAILING STRIP WITH 3/8" CADMIUM PLATED LAG BOLTS
NOT OVER 12" ON CENTER.
2. SECURE ROOF CURB, DUCTWORK AND DAMPER TO ROOF WITH EXPANSION BOLTS
(CONCRETE ROOF) OR RUST RESISTANT BOLTS (METAL DECK AND BAR JOIST ROOF).
3. RUN ELECTRICAL LINES THROUGH CLEARANCE HOLE PROVIDED IN GRAVITY DAMPER,
THEN THROUGH VENTINLATOR ELECTRICAL CONDUIT GUIDE.
ROOF
DUCT
TRANSITION DUCT TO FULL
SIZE OF DAMPER SUPPLIED
WITH ROOF VENTILATOR
SEE NOTE 2
SEE NOTE 1
CURB CAP
MOTOR HOUSING
PREFABRICATED
ROOF CURB
SEE NOTE 2
GRAVITY BACKDRAFT
DAMPER
WOOD NAILING STRIP
RIGID CONDUIT TO
ACCOMODATE
ELECTRICAL WIRES
DESIGNER'S NOTES:
1. THE SUPPLY REGISTER TAKE-OFF MAY BE USED FOR UP UP TO 25% OF THE MAIN DUCT
CFM. THE BRANCH DUCT TAKE-OFF MAY BE USED FOR UP TO 15% OF THE MAIN DUCT
CFM ANYTIME AND UP TO 40% WHEN THE MAIN DUCT VELOCITY IS 1000 FPM OR LESS.
THE AIR SPLIT DUCT TAKE-OFF SHALL BE USED IN ALL OTHER CASES AND MAY BE
USED AT ANYTIME.
2. SHOW ALL VOLUME DAMPERS ON FLOOR PLANS.
BRANCH DUCT TAKE-OFF
PLAN VIEW
AIR SPLIT TAKE-OFF
PLAN VIEW
SUPPLY REGISTER TAKE-OFF
PLAN VIEW
TURNING VANES
SEE FLOOR PLAN
FOR SPLIT
DIMENSION
AIR
FLOW
AIR
FLOW
AI
R
FL
OW
AIR
FLOW
AIR
FLOW
AIR
FLOW
AI
R
FL
OW
W
MAIN SUPPLY
DUCT
VOLUME EXTRACTOR;
ADJUSTABLE FROM FULLY
CLOSED POSITION TO CFM
NOTED ON FLOOR PLANS
ADJUSTABLE
METAL ROD
OR LINKAGE
TOP REGISTERMAIN SUPPLY
DUCTPROVIDE
VOLUME
DAMPER
SUPPLY REGISTER OR
BRANCH DUCT
1/4 W OR
4" MIN
MAIN SUPPLY
PROVIDE
VOLUME
DAMPER
NOTE:
ALL DUCTWORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THROUGH ATTIC FLOORS AND
FAN ROOM FLOORS SHALL BE PROVIDED WITH A 3" HIGH CONCRETE CURB AROUND OPENING
FOR DUCT.
1/2 INCH WG TO 4 INCHES WG DUCT RISER SUPPORT
2"X2"X1/4" ANGLE INSTALL ON
BOTH LONG DIMENSION
SIDES OF DUCT
ARRANGE RISER SO
REINFORCER
TRANSVERSE JOINT IS AT
RISER SUPPORT POINT
DUCT RISER
HOLE IN STRUCTURAL FLOOR
1-1/2"X1-1/2"X1/8" ANGLE INSTALL ON
BOTH LONG DIMENSION SIDES OF
DUCT. FOR DUCTS OVER 60" USE
2"X2"X1/8" ANGLE.
SHEET METAL SCREWS 4" ON
CENTER
FLOOR
SEAL HOLE WITH
FIREPROOFING MATERIAL
AFTER DUCT INSTALLATION
DUCT RISER - SEE FLOOR
PLANS FOR DETAILS
EXTEND ANGLE 3" BEYOND DUCT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MH501
MECHANICAL HVAC DETAILS
DJU KRL
PARTIALLY SPRINKLERED
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
NTS1 DUCTWORK SQUARE VANE ELBOWS
NTS2 DUCTWORK TRANSITION WITH EQUIPMENT IN DUCT
NTS3 TYPICAL BRANCH DUCTWORK
NTS4 LOW-SILHOUETTE EXHAUST
NTS5 POWER ROOF VENTILATOR
NTS6 SUPPLY DUCTWORK TAKE-OFFS
NTS7 DUCT RISER SUPPORTS
SCALE: 12" = 1'-0"9 BOOSTER COIL DETAIL
SCALE: 1" = 1'-0"8 UNIT HEATERS (HOT WATER) - PIPING CONNECTIONS
Revisions: Date: SHEET 1872/22/2024
HANGER RODS,
TYP
FROM SYSTEM
RUN DRAIN LINE TO
GLYCOL TANK
BUTTERFLY
OR BALL
ISOLATION
VALVE
AIR SEPARATOR
CONNECTOR PIPE
AUTO AIR VENT TO DRAINREDUCED PRESSURE
BACKFLOW PREVENTER
RUN DRAIN LINE
TO NEAREST FD
COLD WATER FILL LINE
AIR CHARGING
SHRAEDER
VALVE
6" HOUSEKEEPING PAD
FLOOR MOUNTING BASE RING WITH
DRAIN ACCESS OPENING SHOWN.
ANGLE IRON LEGS MAY BE USED AS AN
OPTION
D
DRAIN
DRAIN
TO
PUMP
SUCTION
NCD
MV
PI
BLADDER
EXPANSION
TANK
NOTES:
1. SEE EXPANSION TANK SYSTEM SCHEDULE
FOR COMPONENT SIZES.
2. SET PRESSURE REDUCING VALVE SO
PRESSURE AT HIGHEST POINT IN SYSTEM
HAS A MINIMUM OF 4 PSIG.
PLUMBING HVAC
STRAINER
1/2"
PRESSURE GAGE
FLEXIBLE
CONNECTION
BALL OR
BUTTERFLY, TYP
BALANCING DEVICE
PIPE HANGERS - PROVIDE DOUBLE
DEFLECTION NEOPRENE (TYPE
HN) FOR FIRST TWO ON EACH
SIDE OF PUMP (SEE NOTE 1)
NOTES:
1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM MOTOR.
FLOOR
3" THICK CONCRETE PAD
55 GALLON
GLYCOL-WATER
STORAGE TANK
BACK PRESSURE REGULATING VALVE
SEE NOTE 2
FROM OTHER GLYCOL-WATER
RELIEF VALVES
AIR SEPARATOR
LOW WATER
LEVEL ALARM
SEE NOTE 1
GLYCOL-WATER
MAKE-UP PUMP
5 GPM @ 30 PSIG
3/4"
WALL MOUNTED
"ON-OFF" MOTOR
CONTROL-SEE
NOTE 4
3/4"
TANK FILL
D
TO EXPANSION
TANK
PUMP
SUCTION
PLUMBING HVAC
NOTES:
1. PROVIDE LOW WATER LEVEL ALARM. PROVIDE A LOW WATER LEVEL AT ECC.
RELIEF VALVE DRAIN SHALL RETURN TO TANK AS SHOWN ON THIS DETAIL.
2. SET REGULATING VALVE TO MAINTAIN MAKE-UP PRESSURE AT 15 PSIG ABOVE
HIGHEST SYSTEM PRV SETTING.
3. MAKE-UP PIPING SYSTEM DOES NOT REQUIRE INSULATION.
4. OPERATE PUMP MANUALLY AS REQUIRED TO FILL.
AVHOT WATER RETURNS
OA
CO
IL
HOT WATER
SUPPLY
BYPASS DAMPER
FACE DAMPER
MODULATING CONTROL VALVE
STRAINER
DRAIN
44"x48" EXHAUST DUCT
ROOF SUPPORT STEEL
ROOF
12" ROOF CURB
DAMPER ACCESS DOOR
EXHAUST FAN HOOD
45"x50" ROOF OPENING
1"
DRIP TRAY FOR EF-001, 002
NOTE:
DUCT SIZE FOR EF-001 IS 40"x48", ROOF OPENING IS 41"x48"
31"x36"x4" INTAKE
LOUVER
12"x12" ACCESS DOOR
WELD ANGLE TO
4"x4" WALLPLATE
MOTORIZED
4" DAMPER WELD ANGLE TO 6"x6"
FLOOR PLATE
1-1/2"x1-1/2"x1/4"
ANGLE, TYP
3" HSS SUPPORT
UIB ISOLATOR
SUPPORT
29"x29" 20 GAUGE SHEET METAL CONNECTION
M
MAU
ELEVATION VIEW END VIEW
4'-2"
"x
"x
3"
54"x60"x4" LOUVER
WINDOW
2 1/2" WINDOW
MULLION
TRANSITION
56"X56" TO 60"X54"
MOTORIZED BACK
DRAFT DAMPER
FAN WALL HOUSING
3"X3"X1/4" CROSS SUPPORT
W/ 3"X3"X1/4" LEG TO
FLOOR EACH SIDE
3"X3"X1/4"∠ 5'8" LONG
ATTACH TO WALL ON EITHER
SIDE OF WALL OPENING
M
5/
2'-9 1/2"
2'-8 1/16"
MAX WIDTH OF ARMS
2'-1"
42"
MAX LENGTH
MA
X
HE
IG
HT
20"
MAX DEPTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MH502
MECHANICAL HVAC DETAILS
DJU IJS
PARTIALLY SPRINKLERED
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
NTS1 FLOOR MOUNTED EXPANSION TANK - PIPING CONNECTIONS
NTS2 IN-LINE PUMPS - CONNECTIONS
NTS3 INDIRECT GLYCOL MAKE-UP SYSTEM (PIPING AND CONTROLS)
NTS4 MAKEUP AIR UNIT - PIPING CONNECTIONS
NTS5 EXHAUST FAN DETAIL - TYP FOR EF-001, 002, 004
NTS6 MAKEUP AIR HEATER INSTALLATION DETAIL
NTS7 SUPPLY FAN DETAIL
SCALE: 1 1/2" = 1'-0"8 A/C CONDENSING UNIT WALL BRACKET SYSTEMS
Revisions: Date: SHEET 1882/22/2024
DIFFUSER, REGISTER, AND GRILLE SCHEDULE
UNIT TYPE BASIS OF
DESIGN PANEL SIZE FEATURES
SD SUPPLY DIFFUSER PRICE 24"X24" COLLAR SIZE TO MATCH CONNECTING DUCT SIZE
RG RETURN GRILLES PRICE 24"X24" COLLAR SIZE TO MATCH CONNECTING DUCT SIZE
ER EXHAUST REGISTERS PRICE 12"X12" COLLAR SIZE TO MATCH CONNECTING DUCT SIZE
CONDENSING UNIT (CU) SCHEDULE
UNIT COOLING
BTU/HR (1)
HEATING
BTU/HR
INDOOR ELECTRICAL
MCA MOCP
BASIS OF
NOTES
UNITS (ITU) # V/P/HZ R.L.A. L.R.A. DESIGN (TRANE)
2-EXT-CU-001 18,000 NA 001,002 208/1/60 17.2 20 10.7 15.5 NTXMMX20A122A 1,2,3
2-EXT-CU-002 18,000 NA 003,004 208/1/60 17.2 20 10.7 15.5 NTXMMX20A122A 1,2,3
2-EXT-CU-003 48,000 NA 005,006, 007 208/1/60 37 52 19 22 NTXMMX48A182A 1,2,3,4
NOTES:
1. COOLING RATED @ OA 95/75 DEG.F. DB/WB; IA 80/67 DEG.F. DB/WB
2. ELECTRICAL POWER, 24 V CONTROL WIRING FROM OUTDOOR UNIT
3. PROVIDE WITH BACnet INTERFACE
4. UNIT REQUIRES BRANCH BOX FOR OPERATION
5. PROVIDE WITH LOW AMBIENT KIT
CEILING FAN SCHEDULE
UNIT LOCATION TYPE DRIVE MAX SPEED
(RPM)
DIAMETER
(IN)
ELECTRICAL *
BASIS OF DESIGN
WATTS V/P/HZ
2-119-CF-001 BOILER ROOM SUSPENDED PROPELLER DIRECT 140 72 41.6 115/1/60 BIG ASS FANS MK-161-06 2-119-CF-002 BOILER ROOM SUSPENDED PROPELLER DIRECT 140 72 41.6 115/1/60 BIG ASS FANS MK-161-06
* FURNISH WITH VARIABLE SPEED DRIVE, WIRED WALL CONTROLLER
SUPPLY FAN SCHEDULE
UNIT LOCATION TYPE CFM SP (IN. WG) FAN RPM DRIVE DIAMETER
(IN)
ELECTRICAL *
BASIS OF DESIGN
HP V/P/HZ
2-200-SF-001 BOILER ROOM SIDEWALL PROPELLER 18699 0.3 860 DIRECT 48 2 460/3/60 GREENHECK MODEL S2-48-410-C20 2-200-SF-002 BOILER ROOM SIDEWALL PROPELLER 18699 0.3 860 DIRECT 48 2 460/3/60 GREENHECK MODEL S2-48-410-C20
* FURNISH WITH VARIABLE SPEED DRIVE
GLYCOL MAKEUP UNIT SCHEDULE (GMU)
UNIT LOCATION SERVICE TANK PUMP ELECTRICAL BASIS OF DESIGNGAL FLOW (GPM) HEAD (FT) POWER (HP) CONTROL
2-200- GMU-001 MEZZANINE HOT WATER LOOP 55 10 70 0.5 PRESSURE SWITCH BELL & GOSSETT GMU-30P
NOTES:
1. FURNISH WITH PRESSURE SWITCH/STARTER, LOW WATER CUT OFF AND PRESSUE GAUGE.
FINNED TUBE RADIATION SCHEDULE
UNIT # FIN LENGTH
(FT) FIN SIZE (IN) FINS/INCH TUBE DIAMETER COVER
ROOM BTUH (2) GPM
2-124- FTR-001 BREAK ROOM 1560 1 3 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP
2-126- FTR-002 SHOWER AREA 1560 1 3 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP
2-127- FTR-003 CHANGING AREA 1040 0.5 2 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP
2-123- FTR-004 TOILET 123-2 2080 1.5 4 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP
2-128- FTR-005 CHEM FEED 1560 1 3 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP
2-129- FTR-006 SUPERVISOR 1560 1 3 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP
2-130- FTR-007 CONTROL RM 1560 1 3 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP
2-131- FTR-008 PROPANE (1) 1560 1 3 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP
2-201- FTR-009 CONTROL IT RM 1560 1 3 5 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP
NOTES:
1. FURNISH WITH SELF-CONTAINED NON ELECTRIC CONTROL VALVE
2. RATED AT: 170 DEG.F AWT, 65 DEG. F EAT. SYSTEM FLUID IS 35% PROPYLENE GLYCOL
3. BASIS OF DESIGN: MODINE MODEL SP SLOPE TOP TRIMFIN, 35% GLYCOL
MAKE-UP AIR HEATER SCHEDULE
UNIT LOCATION CFM LEAVING AIR
TEMP (F) (2) MBH (1) GPM (4)
MOTOR
WEIGHT (LBS) BASIS OF DESIGN (3)
HP V/P/HZ
2-200-MAU-001 MEZZANINE 3700 44.6 268.1 24 1/2 460/3/60 258 LJ WING MODEL: FASC-B2-24
2-200-MAU-002 MEZZANINE 3700 44.6 268.1 24 1/2 460/3/60 258 LJ WING MODEL: FASC-B2-24
NOTES:
1. BASED ON: EWT = 200 DEG. F, EAT = -20 DEG.F SYSTEM FLUID IS 35% PROPYLENE GLYCOL.
2. AUX HEATING OF 141.7 MBH @ -20 EAT PROVIDED BY UNIT HEATERS AND BOILER, PIPING LOSSES
3. FURNISH WITH VARIABLE SPEED DRIVE, LEAVING AIR TEMPERATURE CONTROL (SET FOR 65 DEG. F)
4. 35% GLYCOL
INDOOR TERMINAL UNIT (ITU) SCHEDULE
UNIT
LOCATION COOLING
BTU/HR (1)
HEATING
BTU/HR
AIRFLOW ELECTRICAL OUTDOOR
BASIS OF DESIGN NOTES
CFM (4) V/P/HZ UNIT (CU)
2-129-ITU-001 SUPERVISOR'S OFC. 6000 NA 364 208/1/60 CU-001 TRANE NTXWST06A112A 1,2
2-130-ITU-002 CONTROL ROOM 9000 NA 270 208/1/60 CU-001 TRANE NTXCKS09A112A 1,2,3
2-124-ITU-003 BREAK ROOM 9000 NA 270 208/1/60 CU-002 TRANE NTXCKS09A112A 1,2,3
2-125-ITU-004 LOCKER ROOM 6000 NA 364 208/1/60 CU-002 TRANE NTXWST06A112A 1,2
2-120A-ITU-005 ELECTRICAL ROOM 22400 NA 661 208/1/60 CU-003 TRANE NTXWST24A112A 1,2 2-120B-ITU-006 GENERATOR ROOM 9000 NA 270 208/1/60 CU-003 TRANE NTXCKS09A112A 1,2,3 2-201-ITU-007 CONTROL IT ROOM 14000 NA 498 208/1/60 CU-003 TRANE NTXWST15A112A 1,2
NOTES:
1. COOLING RATED @ OA 95/75 DEG.F. DB/WB; IA 80/67 DEG.F. DB/WB
2. ELECTRICAL POWER, 24 V CONTROL WIRING FROM OUTDOOR UNIT
3. 4-WAY CEILING CASSETT UNIT
4. CFM @ RATED CONDITIONS
AIR SEPARATOR SCHEDULE
UNIT SYSTEM CONNECTION SIZE (IN) MAX GPM BASIS OF DESIGN
2-200-AS-001 HW HEATING LOOP 3" 70 BELL & GOSSETT R-3F
2-200-AS-002 HW HEATING LOOP (1) 2" 13.5 BELL & GOSSETT R-2F
NOTES
1. OLD BOILER PLANT SYSTEM
HEAT RECOVERY VENTILATOR (HRV) SCHEDULE
UNIT
SERVICE
LOCATION AIRFLOW (CFM) RATED/DESIGN
EXHAUST SUPPLY
SENSIBLE
EFFECTIVENESS
FANS
( AMPS) DRIVE WEIGHT (LB)
ELECTRICAL
BASIS OF DESIGN
AMPS V/P/HZ
2-128-HRV-001 SUPERVISOR, ETC. MEZZANINE 450/150 450/150 0.56 1.96 DIRECT 146 3.92 115/1/60 FANTECH SHR 450 (1) 2-124-HRV-002 BREAK ROOM, ETC. MEZZANINE 450/300 450/200 0.56 1.96 DIRECT 146 3.92 115/1/60 FANTECH SHR 450 (1)
NOTES
1. FURNISH WITH BOOSTER COIL, 8.5 MBH, 200 CFM @ .04 " SP, 2.0 GPM, 8" H x 12" W. SYSTEM FLUID IS 35% PROPYLENE GLYCOL.
WATER CIRCULATION PUMP SCHEDULE
UNIT LOCATION SERVICE CIRCULATING FLUID (1) ELECTRICAL BASIS OF DESIGNFLOW (GPM) HEAD (FT) POWER (HP) SPEED CONTROL
2-200-PMP-001 MEZZANINE HOT WATER LOOP 77 35 2 YES BELL & GOSSETT ECOCIRC XL 70-145
2-200-PMP-002 MEZZANINE HOT WATER LOOP 77 35 2 YES BELL & GOSSETT ECOCIRC XL 70-145
2-202-PMP-003 MEZZANINE HOT WATER LOOP 13.5 35 0.5 YES BELL & GOSSETT ECOCIRC XL 55-45
2-202-PMP-004 MEZZANINE HOT WATER LOOP 13.5 35 0.5 YES BELL & GOSSETT ECOCIRC XL 55-45
NOTES:
1. FLUID FOR P-001 & 002 IS 35% GLYCOL
STEAM TO HOT WATER HEAT EXCHANGER SCHEDULE
2-200-HEX-001, 002 SHELL SIDE TUBE SIDE
DIAMETER (IN) 6.5 NO. TUBES 24
FLUID LPS LENGTH (IN) 60
OPERATING PRESSURE/DESIGN (PSI) 15/150 FLUID 35% GLYCOL
TEMPERATURE IN/OUT (F) 249.1 / 249.1 TEMPERATURE IN/OUT (F) 180/200
FLOW (LB/HR) 698.7 FLOW (GPM) 77
HEAT LOAD (MBH) 663.3
EFFECTIVE AREA (SF) 22.6 PRESSURE DROP (PSI) 1.26
LMTD (F) 58.5
INLET/OUTLET (IN) 2"/0.75" INLET/OUTLET (IN) 2" / 2" NPT
BASIS OF DESIGN: BELL AND GOSSETT QSU-65-2
STEAM TO HOT WATER HEAT EXCHANGER SCHEDULE
2-202-HEX-001 SHELL SIDE TUBE SIDE
DIAMETER (IN) 4.5 NO. TUBES 12
FLUID LPS LENGTH (IN) 24
OPERATING PRESSURE/DESIGN (PSI) 15/150 FLUID WATER
TEMPERATURE IN/OUT (F) 249.1 / 249.1 TEMPERATURE IN/OUT (F) 160 / 180
FLOW (LB/HR) 138.9 FLOW (GPM) 13.5
HEAT LOAD (MBH) 131.8
EFFECTIVE AREA (SF) 4.2 PRESSURE DROP (PSI) 0.13
LMTD (F) 78.64
INLET/OUTLET (IN) 2" / 1" NPT INLET/OUTLET (IN) 1.5" / 1.5" NPT
BASIS OF DESIGN: BELL AND GOSSETT SU-42-2
EXHAUST FAN SCHEDULE
UNIT
SERVICE
LOCATION TYPE CFM SP (IN. WG) FAN RPM DRIVE DIAMETER
(IN)
ELECTRICAL
BASIS OF DESIGN
HP V/P/HZ
2-R-EF-001 BOILER ROOM ROOF PROPELLER - ROOF 18930 0.15 860 DIRECT 48 2 460/3/60 GREENHECK MODEL RE2-48-409-C20 (1,2) 2-R-EF-002 BOILER ROOM ROOF PROPELLER - ROOF 18930 0.15 860 DIRECT 48 2 460/3/60 GREENHECK MODEL RE2-48-409-C20 (1,2) 2-R-EF-003 PROPANE STORAGE ROOF CENTRIFUGAL - ROOF 53 0.15 1050 DIRECT 8 4 WATTS 115/1/60 GREENHECK MODEL G-060E (2) 2-R-EF-004 GENERATOR ROOM ROOF PROPELLER - ROOF 18066 1 742 BELT 48 5 460/3/60 GREENHECK MODEL RBE-3H48-50 (1,2)
NOTES:
1. FURNISH WITH VARIABLE SPEED DRIVE. PROVIDE HIGH BASE OPTION, WITH INTERNAL MOTORIZED BACKDRAFT DAMPER WITH ACCESS DOOR.
2. FURNISH WITH ROOF CURB, MOTORIZED BACKDRAFT DAMPER
EXPANSION TANK SCHEDULE
UNIT SERVICE REQUIRED (GAL) TANK VOLUME
ACTUAL (GAL)
REQUIRED
ACCEPTANCE (GAL)
ACTUAL ACCEPTANCE
(GAL) FILL PRESSURE (PSI) TYPE BASIS OF DESIGN
2-200 -TK-001 HEATING LOOP - NEW BOILER PLANT 32.98 34 4.75 34 15 BLADDER, VERTICAL BELL&GOSSETT B130
2-200 -TK-002 HEATING LOOP - OLD BOILER PLANT 7.78 10 1.12 10 15 BLADDER, VERTICAL BELL&GOSSETT B35
UNIT HEATER SCHEDULE
UNIT LOCATION TYPE CFM HEATING
BTU/HR (1) GPM
MOTOR MAXIMUM MOUNTING
HEIGHT (FT) WEIGHT (LBS) BASIS OF DESIGN NOTES
HP V/P/HZ
2-200-UH-001 BOILER PLANT VERTICAL HOT WATER 1740 43,600 4.5 1/15 115/1/60 26 46 MODINE V78L 1,2,4 2-200-UH-002 BOILER PLANT VERTICAL HOT WATER 1740 43,600 4.5 1/15 115/1/60 26 46 MODINE V78L 1,2,4 2-200-UH-003 BOILER PLANT VERTICAL HOT WATER 1740 43,600 4.5 1/15 115/1/60 26 46 MODINE V78L 1,2,4 2-202-UH-001 OLD BOILER PLNT VERTICAL HOT WATER 1740 43,600 4.5 1/15 115/1/60 26 46 MODINE V78L 1,2,4
2-202-UH-002 OLD BOILER PLNT VERTICAL HOT WATER 1740 43,600 4.5 1/15 115/1/60 26 46 MODINE V78L 1,2,4
2-202-UH-003 OLD BOILER PLNT VERTICAL HOT WATER 1740 43,600 4.5 1/15 115/1/60 26 46 MODINE V78L 1,2,4
2-120B-UH-004 GENERATOR RM HOROZ. HOT WATER 630 21,700 2.3 1/25 115/1/60 11 34 MODINE HSB/HC 33 1,2,4
2-125- CH-001 LOCKER RM CABINET HEATER 200 11,041 1.3. 1/15 115/1/60 NA 85 MODINE WCC 3,4
NOTES:
1. RATED @ 200 DEG.F EWT, 160 DEG. F LWT, 65 DEG.F EAT. SYSTEM FLUID IS 35% GLYCOL
2. L- LOW OUTLET TEMPERATURE MODEL, EQUIPPED WITH CONE-JET AIR OUTLET ACCESSORY.
3. CEILING, RECESSED MOUNTING
4. 35% GLYCOL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MH601
MECHANICAL HVAC SCHEDULES
DJU KRL
PARTIALLY SPRINKLERED
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
Revisions: Date: SHEET 1892/22/2024
T
CS
M
DDC
CONTROLLER
SA
HWCHWS HWR
V-1
T-1
BMS
CS-1
R-1
T M
INDOOR
UNIT
OUTDOOR
UNIT
REFRIGERANT PIPING
BACNET
INTERFACE
BMS
T-1FTRHWS
V-1
T
T
CS CS M
M
DDC
CONTROLLER
SF
EF
FILTERFILTERT-2
BMS
T-1
HRV UNIT
CONTROLLER
CS-1 CS-2
R-1
M
D-2
D-1
M D-3
Q.A.
EA
HWS
HWR
EA
SA
V-1
JOB: 22367
BUILDING: 2 BOILER PLANT
POINT LEGEND
SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL
PAGE:
BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION
SYSTEM:
UNIT HEATER
SYSTEM COMPONENT:
PO
IN
T
ID
AB
BR
EV
IA
TI
ON
PR
IO
RI
TY
/A
DD
-A
LT
ER
NA
TE
N
O.
-- EL
EC
TR
IC
D
EV
IC
E
ST
AR
T/
ST
OP
OP
EN
/C
LO
SE
-- SP
EE
D
CO
MM
AN
D
VA
LV
E
PO
SI
TI
ON
DA
MP
ER
P
OS
IT
IO
N
ST
AT
US
AL
AR
M
PR
ES
SU
RE
HI
GH
H
UM
ID
IT
Y
HI
GH
S
TA
TI
C
PR
ES
SU
RE
LO
W
T
EM
PE
RA
TU
RE
-- TE
MP
ER
AT
UR
E
(T I)
PR
ES
SU
RE
PO
SI
TI
ON
F
EE
DB
AC
K
FL
OW
ST
AT
IC
P
RE
SS
UR
E
CA
RB
ON
M
ON
OX
ID
E
HU
MI
DI
TY
VA
CU
UM
LO
CA
L A
LA
RM
P
AN
EL
AR
EA
A
LA
RM
P
AN
EL
MA
ST
ER
A
LA
RM
P
AN
EL
HI
GH
LI
MI
T
LO
W
LI
MI
T
-- -- SC
HE
DU
LE
S
TA
RT
/S
TO
P
FU
NC
TI
ON
DU
TY
C
YC
LE
TE
MP
ER
AT
UR
E
EC
ON
OM
IZ
ER
EN
TH
AL
PY
E
CO
NO
MI
ZE
R
TE
MP
ER
AT
UR
E
RE
SE
T
DE
MA
ND
LI
MI
TI
NG
TE
MP
ER
AT
UR
E
OV
ER
RI
DE
ST
AT
IC
P
RE
SS
UR
E
RE
SE
T
SN
OW
M
EL
T
SY
ST
EM
-- PR
ES
SU
RE
/V
OL
UM
E
CO
NT
RO
L
FA
ILU
RE
M
OD
E
SP
AC
E
TE
MP
. C
ON
TR
OL
FU
LL
C
OM
MU
NI
TC
AT
IO
N
TR
EN
DI
NG
REMARKS
SPACE TEMPERATURE T-1 X X X X X
FAN R-1 X X X X X
FAN MOTOR CURRENT SENSOR CS-1 X
HOT WATER COIL VALVE V-1 X X X
JOB: 22367
BUILDING: 2 BOILER PLANT
POINT LEGEND
SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL
PAGE:
BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION
SYSTEM:
HRV UNIT
SYSTEM COMPONENT:
PO
IN
T
ID
AB
BR
EV
IA
TI
ON
PR
IO
RI
TY
/A
DD
-A
LT
ER
NA
TE
N
O.
-- EL
EC
TR
IC
D
EV
IC
E
ST
AR
T/
ST
OP
OP
EN
/C
LO
SE
-- SP
EE
D
CO
MM
AN
D
VA
LV
E
PO
SI
TI
ON
DA
MP
ER
P
OS
IT
IO
N
ST
AT
US
AL
AR
M
PR
ES
SU
RE
DA
MP
ER
P
OS
IT
IO
N
HI
GH
S
TA
TI
C
PR
ES
SU
RE
LO
W T
EM
PE
RA
TU
RE
-- TE
MP
ER
AT
UR
E (T
I)
PR
ES
SU
RE
PO
SI
TI
ON
F
EE
DB
AC
K
FL
OW
PE
RC
EN
T
ST
AT
IC
P
RE
SS
UR
E
CA
RB
ON
M
ON
OX
ID
E
HU
MI
DI
TY
VA
CU
UM
LO
CA
L A
LA
RM
P
AN
EL
AR
EA
A
LA
RM
P
ER
A
LA
RM
P
AN
EL
HI
GH
LI
MI
T
LO
W
LI
MI
T
-- -- SC
HE
DU
LE
S
TA
RT
/S
TO
P
FU
NC
TI
ON
DE
FR
OS
T
SE
QU
EN
CE
TE
MP
ER
AT
UR
E
EC
ON
OM
IZ
ER
EN
TH
AL
PY
E
CO
NO
MI
ZE
R
TE
MP
ER
AT
UR
E
RE
SE
T
DE
MA
ND
LI
MI
ER
AT
UR
E
OV
ER
RI
DE
ST
AT
IC
P
RE
SS
UR
E
RE
SE
T
FA
N
IN
B
YP
AS
S
SP
AC
E
VE
NT
ILA
TI
ON
PR
ES
SU
RE
/V
OL
UM
E
CO
NT
RO
L
FA
ILU
RE
M
OD
E
SP
AC
E
TE
MP
. C
ON
TR
OL
FU
LL
C
OM
MU
NI
TC
AT
IO
N
TR
EN
DI
NG
REMARKS
SUPPLY AIR TEMPERATURE T-1 X
OUTSIDE AIR TEMPERATURE T-2 X X X X
HVR REMOTE START/STOP R-1 X X
SUPPLY FAN CURRENT SENSOR CS-1 X X X X
EXHAUST FAN CURRENT SENSOR CS-2 X X X X
EXHAUST AIR DAMPER D-1 X X
OUTSIDE AIR DAMPER D-2 X X
BYPASS DAMPER D-3 X X X
BOOSTER COIL VALVE V-1 X X
JOB: 22367
BUILDING: 2 BOILER PLANT
POINT LEGEND
SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL
PAGE:
BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION
SYSTEM:
DUCTLESS SPLIT SYSTEM COOLING
UNITS
SYSTEM COMPONENT:
PO
IN
T
ID
AB
BR
EV
IA
TI
ON
PR
IO
RI
TY
/A
DD
-A
LT
ER
NA
TE
N
O.
-- EL
EC
TR
IC
D
EV
IC
E
ST
AR
T/
ST
OP
OP
EN
/C
LO
SE
-- SP
EE
D
CO
MM
AN
D
VA
LV
E
PO
SI
TI
ON
DA
MP
ER
P
OS
IT
IO
N
ST
AT
US
AL
AR
M
PR
ES
SU
RE
HI
GH
H
UM
ID
IT
Y
HI
GH
S
TA
TI
C
PR
ES
SU
RE
LO
W
T
EM
PE
RA
TU
RE
-- TE
MP
ER
AT
UR
E
(T I)
PR
ES
SU
RE
PO
SI
TI
ON
F
EE
DB
AC
K
FL
OW
PE
RC
EN
T
ST
AT
IC
P
RE
SS
UR
E
CA
RB
ON
M
ON
OX
ID
E
HU
MI
DI
TY
VA
CU
UM
LO
CA
L A
LA
RM
P
AN
EL
AR
EA
A
LA
RM
P
ER
A
LA
RM
P
AN
EL
HI
GH
LI
MI
T
LO
W
LI
MI
T
-- -- SC
HE
DU
LE
S
TA
RT
/S
TO
P
FU
NC
TI
ON
DU
TY
C
YC
LE
TE
MP
ER
AT
UR
E
EC
ON
OM
IZ
ER
EN
TH
AL
PY
E
CO
NO
MI
ZE
R
TE
MP
ER
AT
UR
E
RE
SE
T
DE
MA
ND
LI
MI
ER
AT
UR
E
OV
ER
RI
DE
ST
AT
IC
P
RE
SS
UR
E
RE
SE
T
SN
OW
M
EL
T
SY
ST
EM
-- PR
ES
SU
RE
/V
OL
UM
E
CO
NT
RO
L
FA
ILU
RE
M
OD
E
SP
AC
E
TE
MP
. C
ON
TR
OL
FU
LL
C
OM
MU
NI
TC
AT
IO
N
TR
EN
DI
NG
REMARKS
SPACE TEMPERATURE T-1 X X X X X
UNIT OFF/ON SETUP BO0 X X X
UNIT OFF/ON STATE BI1 X
FAN SPEED SETUP MS05 X
MODE SETUP MS03 X X
FAULT CODE AI11 X X X
HOT WATER VALVE V-1 X X X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MI601
MECHANICAL HVAC CONTROLS
DIAGRAMS 2
DJU KRL
PARTIALLY SPRINKLERED
UNIT HEATER SEQUENCE OF OPERATION:
OCCUPANCY: UNIT HEATERS SHALL BE STARTED BY BMS.
SET-POINTS: UPON START UP UNIT SHALL MODULATE CONTROL VALVE V-1 TO OPEN POSITION. FAN SHALL START AND RUN CONTINOUSLY. UNIT HEATER SHALL MODULATE CONTROL VALVE V-1 TO MAINTAIN SPACE
TEMPERATURE OF 70°F (ADJ.)
ALARMS: FAN MOTOR CURRENT SENSOR SHALL DETECT FAN FAILURE AND REPORT ALARM TO BMS SYSTEM.
UNIT HEATER SHALL BE SET IN ALARM IF SPACE TEMPERATURES REACH AND STAY IN HIGH AND LOW
TEMPERATURE LIMITS FOR 10 MIN. (ADJ.)
HEAT RECOVERY VENTILATION (HRV) UNIT SEQUENCE OF OPERATION
OCCUPANCY: HVR SYSTEM SHALL BE ENABLED BY BMS OCCUPIED SCHEDULE AND SET TO VENTILATION MODE.
FAN: POWER OUTDOOR AIR AND EXHAUST AIR DAMPER (D-2, D-1) TO OPEN POSITION. ONCE DAMPERS OPEN POSITION IS PROVEN SUPPLY AND EXHAUST FAN SHALL START AND RUN CONTINUOUSLY. MONITOR FANS STATUS AND GENERATE ALARM WHEN THE FAN FAILS TO RUN AFTER 2 MIN. (ADJ.). FAN SPEED SHALL BE
MANUALLY SET BY TEST AND BALANCE.
SUPPLY AIR TEMPERATURE CONTROL: MODULATE OPEN HWS VALVE FOR BOOSTER COIL TO MAINTAIN S.A.
TEMPERATURE OF 70°F. (ADJ.).
DEFROST MODE: THE SYSTEM SHALL MONITOR OUTDOOR AIR TEMPERATURE (T-2) TO PERFORM DEFROST SEQUENCE. SYSTEM SHALL ACTIVATE DEFROST CONTROL SEQUENCE WHEN OUTDOOR AIR TEMPERATURE HAS REACHED OR IS BELOW 23°F (ADJ.). OUTDOOR AIR DAMPER (D-2) SHALL TURN TO CLOSE POSITION AND BYPASS DAMPER (D-3) SHALL OPEN FOR 10 MIN. (ADJ.) OR UNTIL NORMAL OPERATION IS RESTORED. AFTER DEFROST, THE UNIT SHALL RETURN TO VENTILATION MODE.
ALARMS: SYSTEM SHALL SEND ALARM IN THE EVENT OF ANY FAN OR DAMPER FAILURE.
DUCTLESS SPLIT SYSTEM AIR CONDITIONING UNITS - SEQUENCE OF OPERATION
OCCUPANCY: SPLIT SYSTEM SHALL START BASED ON BMS OCCUPIED SCHEDULE. DURING UNOCCUPIED PERIOD SPLIT
SYSTEM SHALL REMAIN OFF.
SPLIT SYSTEM CONTROL: DURING OCCUPIED COOLING MODE SYSTEM SHALL START TO MAINTAIN A SPACE TEMPERATURE OF 75°F (ADJ.). DURING OCCUPIED HEATING MODE, SYSTEM SHALL ACTIVATE ROOM FINNED TUBE
RADIATION TO MAINTAIN SPACE TEMPERATURE OF 70°F (ADJ.).
ALARMS: IF SPACE TEMPERATURE IS OUTSIDE HIGH AND LOW LIMITS REPORT ALARM TO BMS.REPORT BACNET
MODULE FAULT CODES THROUGH BMS.
NTS2 UNIT HEATER SCHEMATIC
NTS6 DUCTLESS SYSTEM SCHEMATIC
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
UNIT HEATER CONTROLS DIAGRAMS1
SCALE: 12" = 1'-0"4 HRV UNIT SCHEMATIC
HRV UNIT CONTROLS DIAGRAM (HRV-001,HRV-002)3
Revisions: Date:
DUCTLESS SPLIT SYSTEM COOLING5
SHEET 1902/22/2024
M M
CS T
M
T
PDS
HW
C
VFD
M
HWS
HWR
OA
DDC
CONTROLLER
BMS
CS-1
T-1
SA
D-1D-2
V-1
T-2
BOILER
CONTROLS
SC-2
R-2
R-1
SC-1
PDS-1
M
T
DP
CS
CS
HS
VFD
VFD
M
M
M
SF-001,0002
DDC
CONTROLLER
ROOF
VENT
BOILER ROOM
EF-001,0002
T-1
CS-2
R-2
BMS
CS-1
R-1
HS-1
DP-1D-2
D-1
CS
T
M
DDC
CONTROLLER
BMS
CS-1
T-1
R-1
JOB: 22367
BUILDING: 2 BOILER PLANT
POINT LEGEND
SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL
PAGE:
BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION
SYSTEM:
BOILER ROOM VENTILATION: EXHAUST
FAN
SYSTEM COMPONENT:
PO
IN
T
ID
AB
BR
EV
IA
TI
ON
PR
IO
RI
TY
/A
DD
-A
LT
ER
NA
TE
N
O.
-- EL
EC
TR
IC
D
EV
IC
E
ST
AR
T/
ST
OP
OP
EN
/C
LO
SE
-- SP
EE
D
CO
MM
AN
D
VA
LV
E
PO
SI
TI
ON
DA
MP
ER
P
OS
IT
IO
N
ST
AT
US
AL
AR
M
PR
ES
SU
RE
HI
GH
H
UM
ID
IT
Y
HI
GH
S
TA
TI
C
PR
ES
SU
RE
LO
W
T
EM
PE
RA
TU
RE
-- TE
MP
ER
AT
UR
E
(T I)
PR
ES
SU
RE
PO
SI
TI
ON
FL
OW
PE
RC
EN
T
ST
AT
IC
P
RE
SS
UR
E
CA
RB
ON
M
ON
OX
ID
E
HU
MI
DI
TY
VA
CU
UM
LO
CA
L A
LA
RM
P
AN
EL
AR
EA
A
LA
RM
P
ER
A
LA
RM
P
AN
EL
HI
GH
LI
MI
T
LO
W
LI
MI
T
-- -- SC
HE
DU
LE
S
TA
RT
/S
TO
P
FU
NC
TI
ON
DU
TY
C
YC
LE
TE
MP
ER
AT
UR
E
EC
ON
OM
IZ
ER
EN
TH
AL
PY
E
CO
NO
MI
ZE
R
TE
MP
ER
AT
UR
E
RE
SE
T
DE
MA
ND
LI
MI
ER
AT
UR
E
OV
ER
RI
DE
ST
AT
IC
P
RE
SS
UR
E
RE
SE
T
SN
OW
M
EL
T
SY
ST
EM
-- PR
ES
SU
RE
/V
OL
UM
E
CO
NT
RO
L
FA
ILU
RE
M
OD
E
SP
AC
E
TE
MP
. C
ON
TR
OL
FU
LL
C
OM
MU
NI
TC
AT
IO
N
TR
EN
DI
NG
REMARKS
CIRCULATING FAN R-1 X
FAN MOTOR CURRENT SWITCH CS-1 X X
JOB: 22367
BUILDING: 2 BOILER PLANT
POINT
LEGEND
SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL
PAGE:
BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION
SYSTEM:
MAKEUP AIR UNIT
SYSTEM COMPONENT:
PO
IN
T
ID
PR
IO
RI
TY
-- EL
EC
TR
IC
D
EV
IC
E
ST
AR
T/
ST
OP
OP
EN
/C
LO
SE
-- SP
EE
D
CO
MM
AN
D
VA
LV
E
PO
SI
TI
ON
DA
MP
ER
P
OS
IT
IO
N
ST
AT
US
AL
AR
M
PR
ES
SU
RE
HI
GH
H
UM
ID
IT
Y
HI
GH
S
TA
TI
C
PR
ES
SU
RE
LO
W T
EM
PE
RA
TU
RE
AI
RF
LO
W
TE
MP
ER
AT
UR
E (T
I)
PR
ES
SU
RE
PO
SI
TI
ON
FL
OW
PE
RC
EN
T
ST
AT
IC
P
RE
SS
UR
E
CA
RB
ON
M
ON
OX
ID
E
HU
MI
DI
TY
VA
CU
UM
LO
CA
L A
LA
RM
P
AN
EL
AR
EA
A
LA
RM
P
ER
A
LA
RM
P
AN
EL
HI
GH
LI
MI
T
LO
W
LI
MI
T
BO
ILE
R
CO
NT
RO
LS
-- BO
ILE
R
CO
NT
RO
LS
SC
HE
DU
LE
S
TA
RT
/S
TO
P
FU
NC
TI
ON
DU
TY
C
YC
LE
TE
MP
ER
AT
UR
E
EC
ON
OM
IZ
ER
EN
TH
AL
PY
E
CO
NO
MI
ZE
R
TE
MP
ER
AT
UR
E
RE
SE
T
DE
MA
ND
LI
MI
ER
AT
UR
E
CO
NT
RO
L
ST
AT
IC
P
RE
SS
UR
E
RE
SE
T
SN
OW
M
EL
T
SY
ST
EM
-- PR
ES
SU
RE
/V
OL
UM
E
CO
NT
RO
L
FA
ILU
RE
M
OD
E
SP
AC
E
TE
MP
. C
ON
TR
OL
FU
LL
C
OM
MU
NI
TC
AT
IO
N
TR
EN
DI
NG
REMARKS
OUTSIDE AIR TEMPERATURE T-2 X X X
BOILER CONTROL COMBUSTION AIR INTAKE DAMPER D-2 X X X X X X
SUPPLY FAN VFD RUN R-1 X X X
SUPPLY FAN VFD SPEED CONTROL SC-1 X
BOILER CONTROL REQUEST TO START R-2 X X X
BOILER CONTROL FIRING RATE SC-2 X X X X
FAN MOTOR CURRENT SENSOR CS-1 X X
AIR FLOW SWITCH PDS-1 X X X
HOT WATER VALVE V-1 X X
FACE AND BYPASS DAMPER D-1 X X X X
SUPPLY AIR TEMPERATURE T-1 X X X X X X
JOB: 22367
BUILDING: 2 BOILER PLANT
POINT LEGEND
SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL
PAGE:
BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION
SYSTEM:
BOILER ROOM VENTILATION: SUPPLY
AND EXHAUST FANS
SYSTEM COMPONENT:
PO
IN
T
ID
AB
BR
EV
IA
TI
ON
PR
IO
RI
TY
/A
DD
-A
LT
ER
NA
TE
N
O.
-- EL
EC
TR
IC
D
EV
IC
E
ST
AR
T/
ST
OP
OP
EN
/C
LO
SE
-- SP
EE
D
CO
MM
AN
D
VA
LV
E
PO
SI
TI
ON
DA
MP
ER
P
OS
IT
IO
N
ST
AT
US
AL
AR
M
PR
ES
SU
RE
HI
GH
H
UM
ID
IT
Y
HI
GH
S
TA
TI
C
PR
ES
SU
RE
LO
W
T
EM
PE
RA
TU
RE
-- TE
MP
ER
AT
UR
E
(T I)
PR
ES
SU
RE
PO
SI
TI
ON
FL
OW
PE
RC
EN
T
ST
AT
IC
P
RE
SS
UR
E
CA
RB
ON
M
ON
OX
ID
E
HU
MI
DI
TY
VA
CU
UM
LO
CA
L A
LA
RM
P
AN
EL
AR
EA
A
LA
RM
P
ER
A
LA
RM
P
AN
EL
HI
GH
LI
MI
T
LO
W
LI
MI
T
-- -- SC
HE
DU
LE
S
TA
RT
/S
TO
P
FU
NC
TI
ON
DU
TY
C
YC
LE
TE
MP
ER
AT
UR
E
EC
ON
OM
IZ
ER
EN
TH
AL
PY
E
CO
NO
MI
ZE
R
TE
MP
ER
AT
UR
E
RE
SE
T
DE
MA
ND
LI
MI
ER
AT
UR
E
OV
ER
RI
DE
ST
AT
IC
P
RE
SS
UR
E
RE
SE
T
SN
OW
M
EL
T
SY
ST
EM
MA
NU
AL
O
VE
RR
ID
E
PR
ES
SU
RE
/V
OL
UM
E
CO
NT
RO
L
FA
ILU
RE
M
OD
E
SP
AC
E
TE
MP
. C
ON
TR
OL
FU
LL
C
OM
MU
NI
TC
AT
IO
N
TR
EN
DI
NG
REMARKS
SPACE TEMPERATURE 1 T-1 X X X X X
SUPPLY AIR FAN H.O.A. SWITCH HS-1 X
SUPPLY AIR FAN R-1 X X X X
SA FAN CURRENT SWITCH CS-1 X
EXHAUST AIR FAN R-2 X X X
EA FAN CURRENT SWITCH CS-2 X
SUPPLY AIR DAMPER D-2 X
EXHAUST AIR DAMPER D-1 X
BOILER ROOM PRESSURE DP-1 X X X X X X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MI602
MECHANICAL HVAC CONTROLS
DIAGRAMS 2
DJU KRL
PARTIALLY SPRINKLERED
CIRCULATING FAN CONTROL DIAGRAM (EF-001,002)5
NTS2 MAKEUP AIR UNIT SCHEMATIC
NTS4 BOILER ROOM VENTILATION SCHEMATIC
MAKE UP AIR UNIT SEQUENCE OF OPERATION:
GENERAL: MAKE-UP AIR UNIT PROVIDES COMBUSTION AIR FOR THE BOILERS.
SYSTEM CONTROL: ON A CALL FOR COMBUSTION AIR FROM THE BOILER CONTROL SYSTEM, COMBUSTION AIR DAMPER (D-2) SHALL OPEN AND PROVE OPEN POSITION WITH ACTUATOR END SWITCH. PROVIDE SEPARATE PROVING (AUXILARY) DEVICES AND CONNECTIONS DEDICATED ON DAMPERS AND FAN FOR BOILER SYSTEM INTERLOCKS SEPARATE FROM HVAC (BMS) CONTROLS.
THE MAKE UP AIR UNIT FAN SHALL START AND CONFIRM OPERATION BEFORE LEAD BOILER IS ENABLED TO START. ON A CALL FROM THE BOILER CONTROL INTERLOCK TO COMMAND THE SECOND MAKE UP AIR UNIT, THE UNIT SHALL START AND CONFIRM OPERATION BEFORE ENABLING THE BOILER. UPON COMMAND, THE MAKE UP AIR UNIT SHALL START THE SUPPLY FAN.
WHEN OUTSIDE TEMPERATURE IS BELOW SUPPLY AIR TEMPERATURE SETPOINT THE HOT WATER COIL VALVE (V-1) SHALL BE OPEN AND FACE AND BYPASS DAMPER (D-1) SHALL BE MODULATED TO MAINTAIN A MINIMUM SUPPLY AIR TEMPERATURE (T-1) OF
65°F (ADJ.). THE SETPONT SHALL BE ADJUSTABLE FROM THE BMS.
BOILER CONTROL SYSTEM SHALL PROVIDE MODULATING SUPPLY FAN VFD SPEED SIGNAL TO MAKE-UP AIR UNIT CONTROLLER TO MATCH BOILER FIRING RATE. SUPPLY FAN VFD SHALL PROVIDE MOTOR SPEED (RPM) AND ORIENTATION TO THE BOILER CONTROL
SYSTEM.
ALARMS: COMBUSTION AIR INTAKE DAMPER END SWITCH SHALL CONFIRM DAMPER OPEN OPPOSITION AND GENERATE ALARM THROUGH BMS AND BOILER CONTROSL IF OPEN POSITION HAS NOT BEEN REACH AFTER 45 SEC. (ADJ) AFTER REQUEST. FAN MOTOR CURRENT SENSOR SHALL DETECT FAN FAILURE AND REPORT ALARM TO BMS AND BOILER CONTROL SYSTEM. MAKE UP AIR UNIT SHALL BE SET IN ALARM IF SUPPLY AIR TEMPERATURE DROPS BELOW SETPOINT FOR 8 MIN. (ADJ.). AIRFLOW SWITCH SHALL GENERATE ALARM THRUGH BMS IF NO AIRFLOW IS PROVEN 45 SEC. (ADJ.) AFTER REQUEST.
BOILER ROOM VENTILATION SEQUENCE OF OPERATIONS
1. SUPPLY AND EXHAUST FANS SHALL BE CONTROLLED TO PROVIDE COOLING VENTILATION FOR THE BOILER ROOM. A FLOOR LEVEL, SPACE TEMPERATURE WILL BE PROVIDED AND USED TO CONTROL THE VENTILATION SYSTEM.
2. A BUILDING DIFFERENTIAL PRESSURE CONTROLLER WILL BE PROVIDED, AND WILL CONTROL SUPPLY AND EXHAUST FAN SPEEDS THROUGH THE FAN VFD ’S TO BALANCE SUPPLY AND EXHAUST AIRFLOWS. THE PURPOSE IS TO MAINTAIN A SLIGHT POSITIVE BUILDING PRESSURE WHEN IN OPERATION, ESPECIALLY WHEN THE EMERGENCY
GENERATOR IS IN OPERATION.
3. VENTILATION SYSTEM TEMPERATURE CONTROL SHALL BE AS FOLLOWS:
A. WHEN SPACE TEMPERATURE SENSOR REACHES SETPOINT (80 DEG. F – ADJ). – BOTH SUPPLY FAN
DAMPERS, AND EXHAUST FAN DAMPERS SHALL OPEN FOR NATURAL CONVECTION.
B. IF SPACE TEMPERATURE RISES TO 85 DEG. F, ONE SUPPLY FAN, AND ONE EXHAUST FAN SHALL START
WITH THE FAN VARIABLE SPEED DRIVE ON LOW SPEED. FAN SPEED SHALL RAMP UP AS SPACE
TEMPERTURE RISES OVER 85 DEG.F.
C. AT A SPACE TEMPERATURE READING OF 90 DEG. F, BOTH SUPPLY FANS, AND BOTH EXHAUST FANS SHALL RUN ON LOW SPEED. FAN SPEED SHALL INCREASE UNTIL FANS ARE AT FULL SPEED WHEN
SPACE TEMPERATURE IS 95 DEG.F (ADJ).
D. SUPPLY AND EXHAUST FAN SPEEDS SHALL BE CONTROLLED SEPERATELY TO MAINTAIN A FLOW
DIFFERENTIAL FOR MAINTAINING A POSITIVE BUILDING PRESSURE DIFFERENTIAL.
E. THE LEAD SUPPLY, EXHAUST FAN PAIR SHALL ALTERNATE WITH EACH CYCLE OF OPERATION.
F. FAN FAILURE SHALL ALARM BMS.
4. VENTILATION SYSTEM PRESSUE CONTROL SHALL BE AS FOLLOWS.
A. WHEN THE BOILER ROOM SUPPLY AN EXHAUST FANS ARE RUNNING – THE FANS SPEEDS SHALL BE BALANCED SO AS TO PROVIDE THE POSITIVE BUILDING PRESSURE DIFFERENTIAL OF 0.10" S.P. (ADJ).
CIRCULATING FAN SEQUENCE OF OPERATION:
FAN CONTROL: FAN SHALL RUN CONTINOUSLY TO CIRCULATE BOILER ROOM AIR. FAN SHALL STOP BY MANUAL OVERRIDE.
ALARMS: IF BMS IS COMMANDED CEILING FAN BUT NO STATUS HAS BEEN RECEIVE BY FAN CURRENT SENSOR (CS-1) AFTER 3
MIN.(ADJ.) REPORT ALARM TO BMS SYSTEM.
NTS6 CIRCULATING FAN SCHEMATIC
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
MAKE UP AIR UNIT CONTROL DIAGRAM (MAU-001, 002)1
BOILER ROOM VENTILATION DIAGRAM (EF-001, 002 SF-001, 002)3
Revisions: Date: SHEET 1912/22/2024
M
M
M
M
VFD1 VFD2
STEAM TRAP
STEAM TO HOT WATER
HEAT EXCHANGER
STRAINER PRV
P
HPS LPS
HWR
HW
S
AIR VENT
T-1
V-1
EXPANSION
TANK
HWR
V-2
M-1
M-2
HEX-001
HEX-002
CONDENSATE RETURN
CONDENSATE RETURN
HIGH PRESSURE STEAM
AIR
SEPARATOR
RETURNBUILDING
HEATING
LOOP
R-1
CS-1
P-1
DDC
CONTROLLER
OUTSIDE AIR
TEMPERATURE
SENSOR T-2
DP-1
R-2
CS-2
P-2
B1-1 A0-1
B1-2 A0-2
BMS
CHEMICAL FEED ADD
(2-202-HEX-001 ONLY)
T
M
DDC
CONTROLLER
FTRHWS HWR
V-1
T-1
BMS
T
M
M
GENERATOR
OA
DDC
CONTROLLER BMS
D-1
T-1
R-1
VFD
ROOF
EA
D-2
CS-1
SC-1
R-2
EXHAUST FAN EF-004
JOB: 22367
BUILDING: 2 NEW BOILER PLANT
POINT LEGEND
SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL
BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION
SYSTEM:
STEAM TO HOT WATER EXCHANGER
SYSTEM COMPONENT:
PO
IN
T
ID
AB
BR
EV
IA
TI
ON
PR
IO
RI
TY
/A
DD
-A
LT
ER
NA
TE
N
O.
-- EL
EC
TR
IC
D
EV
IC
E
ST
AR
T/
ST
OP
OP
EN
/C
LO
SE
-- SP
EE
D
CO
MM
AN
D
VA
LV
E
PO
SI
TI
ON
DA
MP
ER
P
OS
IT
IO
N
ST
AT
US
AL
AR
M
PR
ES
SU
RE
HI
GH
H
UM
ID
IT
Y
HI
GH
S
TA
TI
C
PR
ES
SU
RE
LO
W
T
EM
PE
RA
TU
RE
PO
SI
TI
ON
TE
MP
ER
AT
UR
E
PR
ES
SU
RE
PO
SI
TI
ON
F
EE
DB
AC
K
FL
OW
PE
RC
EN
T
ST
AT
IC
P
RE
SS
UR
E
CA
RB
ON
M
ON
OX
ID
E
HU
MI
DI
TY
-- LO
CA
L A
LA
RM
P
AN
EL
AR
EA
A
LA
RM
P
ER
A
LA
RM
P
AN
EL
HI
GH
LI
MI
T
LO
W
LI
MI
T
-- -- SC
HE
DU
LE
S
TA
RT
/S
TO
P
FU
NC
TI
ON
DU
TY
C
YC
LE
TE
MP
ER
AT
UR
E
CO
NT
RO
L
EN
TH
AL
PY
E
CO
NO
MI
ZE
R
TE
MP
ER
AT
UR
E
RE
SE
T
DE
MA
ND
LI
MI
ER
AT
UR
E
OV
ER
RI
DE
ST
AT
IC
P
RE
SS
UR
E
RE
SE
T
SN
OW
M
EL
T
SY
ST
EM
-- PR
ES
SU
RE
/V
OL
UM
E
CO
NT
RO
L
FA
ILU
RE
M
OD
E
SP
AC
E
TE
MP
. C
ON
TR
OL
FU
LL
C
OM
MU
NI
TC
AT
IO
N
TR
EN
DI
NG
REMARKS
VFD 1 STATUS BI-1 X X X X
VFD 1 SPEED SIGNAL AO-1 X X
PUMP 1 RELAY R-1 X X
PUMP 1 CURRENT SENSOR CS-1 X X X X
SYSTEM DIFFERENTIAL PRESSURE SENSOR DP-1 X X X
VFD 2 STATUS BI-2 X X X X
VFD 2 SPEED SIGNAL AO-2 X X
PUMP 2 RELAY R-2 X X
PUMP 2 CURRENT SENSOR CS-2 X X X X X
HEATING HOT WATER LOOP TEMPERATURE T-1 X X X X
HX-1 STEAM CONTROL VALVE V-1 X X X X
HX-2 STEAM CONTROL VALVE V-2 X X
OUTSIDE AIR TEMPERATURE T-2 X X
HEX-1 HOT WATER CONTROL VALVE M-1 X X
HEX-2 HOT WATER CONTROL VALVE M-2 X X
JOB: 22367
BUILDING: 2 BOILER PLANT
POINT LEGEND
SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL
PAGE:
BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION
SYSTEM:
GENERATOR ROOM VENTILATION
SYSTEM COMPONENT:
PO
IN
T
ID
AB
BR
EV
IA
TI
ON
PR
IO
RI
TY
/A
DD
-A
LT
ER
NA
TE
N
O.
-- EL
EC
TR
IC
D
EV
IC
E
ST
AR
T/
ST
OP
OP
EN
/C
LO
SE
-- SP
EE
D
CO
MM
AN
D
VA
LV
E
PO
SI
TI
ON
DA
MP
ER
P
OS
IT
IO
N
ST
AT
US
AL
AR
M
PR
ES
SU
RE
HI
GH
H
UM
ID
IT
Y
HI
GH
S
TA
TI
C
PR
ES
SU
RE
LO
W
T
EM
PE
RA
TU
RE
OP
EN
/C
LO
SE
D
PO
SI
TI
ON
TE
MP
ER
AT
UR
E
(T I)
PR
ES
SU
RE
PO
SI
TI
ON
F
EE
DB
AC
K
FL
OW
PE
RC
EN
T
ST
AT
IC
P
RE
SS
UR
E
CA
RB
ON
M
ON
OX
ID
E
HU
MI
DI
TY
VA
CU
UM
LO
CA
L A
LA
RM
P
AN
EL
AR
EA
A
LA
RM
P
ER
A
LA
RM
P
AN
EL
HI
GH
LI
MI
T
LO
W
LI
MI
T
-- -- SC
HE
DU
LE
S
TA
RT
/S
TO
P
FU
NC
TI
ON
DU
TY
C
YC
LE
TE
MP
ER
AT
UR
E
EC
ON
OM
IZ
ER
EN
TH
AL
PY
E
CO
NO
MI
ZE
R
TE
MP
ER
AT
UR
E
RE
SE
T
DE
MA
ND
LI
MI
ER
AT
UR
E
OV
ER
RI
DE
ST
AT
IC
P
RE
SS
UR
E
RE
SE
T
VE
NT
ILA
TI
ON
C
ON
TR
OL
-- PR
ES
SU
RE
/V
OL
UM
E
CO
NT
RO
L
FA
ILU
RE
M
OD
E
SP
AC
E
TE
MP
. C
ON
TR
OL
FU
LL
C
OM
MU
NI
TC
AT
IO
N
TR
EN
DI
NG
REMARKS
SPACE TEMPERATURE T-1 X X X X X
GENERATOR VENTILATION REQUEST R-1 X X
OUTSIDE AIR DAMPER D-1 X X X X X
EXHAUST AIR DAMPER D-2 X X X X X
EXHAUST FAN VFD R-2 X
EXHAUST FAN SPEED CONTROL SC-1 X
EXHAUST FAN STATUS CS-1 X X
JOB: 22367
BUILDING: 2 BOILER PLANT
POINT LEGEND
SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL
PAGE:
BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION
SYSTEM:
FIN TUBE RADIATOR
SYSTEM COMPONENT:
PO
IN
T
ID
AB
BR
EV
IA
TI
ON
PR
IO
RI
TY
/A
DD
-A
LT
ER
NA
TE
N
O.
-- EL
EC
TR
IC
D
EV
IC
E
ST
AR
T/
ST
OP
OP
EN
/C
LO
SE
-- SP
EE
D
CO
MM
AN
D
VA
LV
E
PO
SI
TI
ON
DA
MP
ER
P
OS
IT
IO
N
ST
AT
US
AL
AR
M
PR
ES
SU
RE
HI
GH
H
UM
ID
IT
Y
HI
GH
S
TA
TI
C
PR
ES
SU
RE
LO
W
T
EM
PE
RA
TU
RE
-- TE
MP
ER
AT
UR
E
(T I)
PR
ES
SU
RE
PO
SI
TI
ON
F
EE
DB
AC
K
FL
OW
PE
RC
EN
T
ST
AT
IC
P
RE
SS
UR
E
CA
RB
ON
M
ON
OX
ID
E
HU
MI
DI
TY
VA
CU
UM
LO
CA
L A
LA
RM
P
AN
EL
AR
EA
A
LA
RM
P
ER
A
LA
RM
P
AN
EL
HI
GH
LI
MI
T
LO
W
LI
MI
T
-- -- SC
HE
DU
LE
S
TA
RT
/S
TO
P
FU
NC
TI
ON
DU
TY
C
YC
LE
TE
MP
ER
AT
UR
E
EC
ON
OM
IZ
ER
EN
TH
AL
PY
E
CO
NO
MI
ZE
R
TE
MP
ER
AT
UR
E
RE
SE
T
DE
MA
ND
LI
MI
ER
AT
UR
E
OV
ER
RI
DE
ST
AT
IC
P
RE
SS
UR
E
RE
SE
T
SN
OW
M
EL
T
SY
ST
EM
-- PR
ES
SU
RE
/V
OL
UM
E
CO
NT
RO
L
FA
ILU
RE
M
OD
E
SP
AC
E
TE
MP
. C
ON
TR
OL
FU
LL
C
OM
MU
NI
TC
AT
IO
N
TR
EN
DI
NG
REMARKS
SPACE TEMPERATURE T-1 X X X X X
HOT WATER COIL VALVE V-1 X X X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MI603
MECHANICAL HVAC CONTROLS
DIAGRAMS 2
DJU KRL
PARTIALLY SPRINKLERED
NTS4 STEAM TO HOT WATER SYSTEM SCHEMATIC
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
FIN TUBE RADIATOR SEQUENCE OF OPERATION:
OCCUPANCY: FIN TUBE RADIATOR SHALL BE ENABLED BY BMS OCCUPIED SCHEDULE. DURING UNOCCUPIED PERIOD
UNIT SHALL REMAIN DISABLE.
SYSTEM CONTROL: DURING OCCUPIED HEATING MODE UNIT SHALL MODULATE HOT WATER VALVE (V-1) TO MAINTAIN
SPACE TEMPERATURE (T-1) OF 70°F (ADJ.)
ALARMS: FIN TUBE RADIATOR SHALL BE SET IN ALARM IF SPACE TEMPERATURES REACH AND STAY IN HIGH AND LOW
TEMPERATURE LIMITS FOR 10 MIN. (ADJ.)
NTS2 FIN TUBE RADIATOR SCHEMATIC
KEYED NOTES
1 BACK - UP HEAT EXCHANGER FOR 2-200-HEX-001 ONLY. HEAT EXCHANGER
2-202-HEX-001 DOES NOT CONTAIN BACK - UP.
STEAM TO HOT WATER SYSTEM CONTROL DIAGRAM3
STEAM TO HOT WATER HEAT EXCHANGER SEQUENCE OF OPERATION:
(TYPICAL FOR 2-200-HEX-001, 2-200-HEX-002 & 2-202-HEX-001)
START: BMS SHALL ENABLE STEAM TO HEATING HOT WATER SYSTEM WHEN HEATING IS REQUIRED. BMS
SHALL ROTATE LEAD/LAG PUMPS DESIGNATION EVERY 7 DAYS.
START: UPON START UP THE STEAM CONTROL VALVE (V-1) SHALL MODULATE OPEN AND MAINTAIN HEATING HOT WATER LOOP SET POINT AND HOT WATER ISOLATION VALVE (M-1) SHALL OPEN. AFTER HOT WATER ISOLATION VALVE (M-1) HAVE BEEN CONFIRMED OPEN LEAD CIRCULATING PUMP VFD SHALL START BY ENABLING RELAY (R-1) AND SHALL MODULATE SPEED TO MAITAIN HEATING HOT WATER LOOP DIFFERENTIAL PRESSURE (DP-1) AT SET POINT WHILE MEETING BUILDING HEATING DEMAND. IF LEAD PUMP STATUS IS NOT DETECTED 30 SEC. (ADJ.) AFTER VFD HAS BEEN ENABLED, THE LAG PUMP SHALL START AND AN ALARM SHALL BE REPORTED TRHOUGH THE BMS. IF FAILURE IS REPORTED WITH LEAD HEAT
EXCHANGER, REDUNDANT BACKUP HEAT EXCHANGER SHALL TAKE OVER OPERATION.
OPERATION: HEAING HOT WATER SUPPLY WATER TEMPERATURE (T-1) TO THE BUILDING HEATING LOOP SHALL BE RESET BASED ON OUTSIDE AIR TEMPERATERUE (T-2) BY MODULATING STEAM VALVE (V-1).
MODULATE STEAM VALVE TO SUPPLY WATER AT A MAX TEMPERATURE OF 180°F (ADJ.) WHEN OUTSIDE AIR TEMPERATURE IS 30.0 °F (ADJ.) OR BELOW. AND MODULATE STEAM VALVE TO SUPPLY MAX TEMPERATURE OF 140°F (ADJ) WHEN OUTSIDE AIR TEMPERATURE IS 70°F(ADJ) OR HIGHER. FOR OUTSIDE AIR TEMPERATURE READINGS BETWEEN 30-70°F MODULATE HOT WATER LOOP TEMPERATURE SETPOINT BY SCALING SET POINT LINEARLY BETWEEN 140-180°F FOR RESPECTIVE OUTDOOR AIR TEMPEARATURE. THE MAXIMUM PRESSURE LIMIT IS THE PRESSURE REQUIRED TO PROVIDE FULL FLOW TO ALL HEATING CONTROL VALVES SIMULTANEOUSLY (PER TAB). THE MINIMUM PRESSURE LIMIT IS THE PRESSURE CORRELATING TO THE LOWEST SPEED THE PUMP MOTOR IS ALLOWED TO BE OPERATED AT (PER TAB).
ALARMS: ALL PUMPS SHALL BE MONITORED, AND PUMP OR VFD FAILURE SHALL BE REPORTED THROUGH THE BMS. HEATING HOT WATER TEMPERATURE SHALL BE MONITORED, HIGH AND LOW LIMITS ALRMS SHALL BE REPORTED THROUGH THE BMS. LOW AND HIGH HEATING HOT WATER DIFFERENTIAL PRESSURE
ALARM SHALL BE REPORTED TO THE BMS.
TYPICAL FOR 2-200-HEX-001, 2-200-HEX-002 AND 2-202-HEX-001
GENERATOR ROOM VENTILATION CONTROL DIAGRAM5
GENERATOR ROOM VENTILATION CONTROL SEQUENCE OF OPERATION:
CONTROL: IN THE EVENT OF A GENERATOR VENTILATION REQUEST (R-1). SYSTEM SHALL OPEN OUTSIDE AIR DAMPER (D-1) AND EXHAUST AIR DAMPER (D-2) AND CONFIRM DAMPERS OPEN POSITION. IF OPEN POSITION IS NOT CONFIRMED AFTER 1 MIN. (ADJ) GENERATE ALARM. AFTER DAMPER POSITION HAS BEEN CONFIRM SYSTEM SHALL REQUEST EXHAUST FAN (R-2) AND MAINTAIN GENERATOR ROOM TEMPERATURE (T-1) SETPOINT OF 75°F (ADJ.) BY MODULATING FAN (SC-1). ONCE GENERATOR VENTILATION REQUEST (R-1) HAS STOP, ALL DAMPERS SHALL RETURN TO THE ORIGINAL POSITION ONCE TEMPERATURE SETPOINT HAS BEEN REACHED. DURING COLD WAETHER SEASON MODULATE EXHAUST FAN (SC-1) AND OUTSIDE AIR DAMPER (D-1) TO MAINTAIN ROOM TEMPERATURE SETPOINT, GENERATOR ROOM UNIT HEATER (2-120B-UH-004) SHALL BE DISABLED UPON
GENERATOR VENTILATION REQUEST (R-1).
ALARMS: SHALL GENERATE ALARM IF OUTSIDE AIR AND EXHAUST AIR DAMPERS REMAIN CLOSE FOR MORE THAN 1 MIN. (ADJ.) AFTER VENTILATION REQUEST (R-1). SHALL GENERATE ALARM IF GENERATOR ROOM
TEMPERATURE (T-1) EXCEEDS 100°F (ADJ.).
NTS6 GENERATOR ROOM VENTILATION SCHEMATIC
FIN TUBE RADIATOR UNIT CONTROL DIAGRAM2
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
REV 1 PRE-BID UPDATES 2024-08-01
8/1/2024 SHEET 192
CS
DDC
CONTROLLER
PROPANE
GAS
MONITORBMS
ROOF
EA
R-Z
M
CS-1
BACKDRAFT DAMPER
BMS
S
PDT
COMPRESSED
AIR TANK
PDT
DDC
CONTROLERBMS
V-1
BUILDING 1 CA
SUPPLY
JOB: 22367
BUILDING: 2 BOILER PLANT
POINT LEGEND
SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL
PAGE:
BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION
SYSTEM:
PROPANE GAS ROOM PURGE
SYSTEM COMPONENT:
PO
IN
T
ID
AB
BR
EV
IA
TI
ON
PR
IO
RI
TY
/A
DD
-A
LT
ER
NA
TE
N
O.
-- EL
EC
TR
IC
D
EV
IC
E
ST
AR
T/
ST
OP
OP
EN
/C
LO
SE
-- SP
EE
D
CO
MM
AN
D
VA
LV
E
PO
SI
TI
ON
DA
MP
ER
P
OS
IT
IO
N
ST
AT
US
AL
AR
M
PR
ES
SU
RE
HI
GH
H
UM
ID
IT
Y
HI
GH
S
TA
TI
C
PR
ES
SU
RE
LO
W
T
EM
PE
RA
TU
RE
FA
N
IN
B
YP
AS
TE
MP
ER
AT
UR
E
(T I)
PR
ES
SU
RE
PO
SI
TI
ON
FL
OW
PE
RC
EN
T
ST
AT
IC
P
RE
SS
UR
E
CA
RB
ON
M
ON
OX
ID
E
HU
MI
DI
TY
VA
CU
UM
LO
CA
L A
LA
RM
P
AN
EL
AR
EA
A
LA
RM
P
ER
A
LA
RM
P
AN
EL
HI
GH
LI
MI
T
LO
W
LI
MI
T
-- -- SC
HE
DU
LE
S
TA
RT
/S
TO
P
FU
NC
TI
ON
DU
TY
C
YC
LE
TE
MP
ER
AT
UR
E
EC
ON
OM
IZ
ER
EN
TH
AL
PY
E
CO
NO
MI
ZE
R
TE
MP
ER
AT
UR
E
RE
SE
T
DE
MA
ND
LI
MI
ER
AT
UR
E
OV
ER
RI
DE
ST
AT
IC
P
RE
SS
UR
E
RE
SE
T
VE
NT
ILA
TO
N
CO
NT
RO
L
-- PR
ES
SU
RE
/V
OL
UM
E
CO
NT
RO
L
FA
ILU
RE
M
OD
E
SP
AC
E
TE
MP
. C
ON
TR
OL
FU
LL
C
OM
MU
NI
TC
AT
IO
N
TR
EN
DI
NG
REMARKS
PROPANE GAS MONITOR REQUEST R-1 X X
FAN MOTOR COMMAND R-2 X X
FAN MOTOR CURRENT SENSOR CS-1 X X X X
JOB: 22367
BUILDING: 2 BOILER PLANT
POINT LEGEND
SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL
PAGE:
BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION
SYSTEM:
GENERAL SERVICE COMPRESSED AIR
SYSTEM COMPONENT:
PO
IN
T
ID
AB
BR
EV
IA
TI
ON
PR
IO
RI
TY
/A
DD
-A
LT
ER
NA
TE
N
O.
-- EL
EC
TR
IC
D
EV
IC
E
ST
AR
T/
ST
OP
OP
EN
/C
LO
SE
-- SP
EE
D
CO
MM
AN
D
VA
LV
E
PO
SI
TI
ON
DA
MP
ER
P
OS
IT
IO
N
ST
AT
US
AL
AR
M
PR
ES
SU
RE
HI
GH
H
UM
ID
IT
Y
HI
GH
S
TA
TI
C
PR
ES
SU
RE
LO
W
T
EM
PE
RA
TU
RE
-- TE
MP
ER
AT
UR
E
(T I)
PR
ES
SU
RE
PO
SI
TI
ON
FL
OW
PE
RC
EN
T
ST
AT
IC
P
RE
SS
UR
E
CA
RB
ON
M
ON
OX
ID
E
HU
MI
DI
TY
VA
CU
UM
LO
CA
L A
LA
RM
P
AN
EL
AR
EA
A
LA
RM
P
ER
A
LA
RM
P
AN
EL
HI
GH
LI
MI
T
LO
W
LI
MI
T
-- -- SC
HE
DU
LE
S
TA
RT
/S
TO
P
FU
NC
TI
ON
DU
TY
C
YC
LE
TE
MP
ER
AT
UR
E
EC
ON
OM
IZ
ER
EN
TH
AL
PY
E
CO
NO
MI
ZE
R
TE
MP
ER
AT
UR
E
RE
SE
T
DE
MA
ND
LI
MI
ER
AT
UR
E
OV
ER
RI
DE
ST
AT
IC
P
RE
SS
UR
E
RE
SE
T
CO
MP
RE
SS
ED
A
IR
C
ON
TR
OL
MA
NU
AL
O
VE
RR
ID
E
PR
ES
SU
RE
/V
OL
UM
E
CO
NT
RO
L
FA
ILU
RE
M
OD
E
SP
AC
E
TE
MP
. C
ON
TR
OL
FU
LL
C
OM
MU
NI
TC
AT
IO
N
TR
EN
DI
NG
REMARKS
RECEIVER PRESSURE SENSOR PDT-1 X X X X X
BUILDING 1 CA SUPPLY SOLENOID VALVE V-1 X X X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MI604
MECHANICAL HVAC CONTROLS
DIAGRAMS 2
IAR IJS
PARTIALLY SPRINKLERED
PROPANE GAS ROOM PURGE SEQUENCE OF OPERATION:
OCCUPANCY: PROPANE GAS ROOM MONITOR SHALL START EXHAUST FAN IN THE EVENT OF MONITOR DETECTING PROPANE GAS. ONCE PROPANE GAS MONITOR REQUEST (R-1) IS DETECTED BY BMS, DDC CONTROLLER SHALL RUN EXHAUST FAN (R-2) CONTINOUSLY UNITL PROPANE GAS MONITOR REQUEST (R-1) STOPS. FAN MOTOR CURRENT
SENSOR (CS-1) SHALL PROVIDE FAN STATUS.
ALARM: IF THERE IS A FAN REQUEST (R-2) BUT NO STATUS HAS BEEN PROVED BY FAN MOTOR CURRENT SENSOR
(…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .