S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf

PDF 3 MB Posted

Attached to
Y1NB--Project 585-21-115 Replace Boiler Plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI -- NAICS 236220 General Construction
Solicitation number
36C25225R0004
Issued by

About this file

This is a mechanical engineering drawing set showing HVAC and piping plans for a boiler plant replacement project at the Oscar G. Johnson VA Medical Center. The drawings include detailed mechanical plans for steam piping, hydronic piping, and fuel piping systems across basement, ground floor and mezzanine levels. The plans show equipment layouts, piping routes, control diagrams and schematics for various systems including steam-to-hot water heat exchangers, makeup air units, unit heaters, and ventilation systems.

The drawing set contains specific technical details such as pipe sizes, equipment specifications, control sequences, spring hanger schedules, and key notes for installation requirements. Notable elements include steam and condensate piping modifications, new boiler installations with associated fuel systems (natural gas and propane), hot water heating distribution, and various HVAC control systems. The plans provide both overall layouts and enlarged detail views of critical areas, along with schematic diagrams showing control strategies and operational sequences for the major mechanical systems.

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_Updated Dwgs_partial_24JAN25.pdf PDF
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
36C25225R0004 0007.docx DOCX document
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.1_P03 Single Source Justification MEDECO.e.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.6c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

1 2 3

A

B

D

F

H

6" EXHAUST FROM

GENERATOR TO ROOF

3'

2-R-EF-001 2-R-EF-002

2-R-EF-004

EXHAUST THIMBLE TO BE PROVIDED AT EVERY

PENETRATION THROUGH FLOOR OR ROOF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MH161

MECHANICAL HVAC PLAN - ROOF

LEVEL 2

DJU KRL

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 MECHANICAL HVAC PLAN - ROOF LEVEL

KEYPLAN

N AREA OF WORK

12 16

N

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 SEE AE503 FOR ROOF PENETRATION DETAILS

Revisions: Date:

SHEET 1842/22/2024

2'

MEZZANINE

12' - 0"

2-200-HEX-001

2-200-HEX-002

2-200-MAU-002

2-200-MAU-001

3"ø HWS

3"ø HWR

3"ø HWS

2-200-PMP-002

2-200-PMP-001

3"ø LPS

2 1/2"ø HWS

1" ø

HW

S

2"ø HWS

2"ø HWR

2"ø HWR 1"ø HWR

2-200-XPT-001

2-200-AS-001

/1 MH141

FROM DEARATOR

PRV STATION

3"ø HPS

STEAM TRAP

GROUND FLOOR

0' - 0"

G' F'

MEZZANINE

12' - 0"

72"x 66"

3/4"ø HWR

/1 MH121

2-120B-480-GEN-011

6" EXHAUST VENT FROM GENERATOR TO ROOF

INTAKE LOUVER

AUTOMATIC CONTROL DAMPER

2'

- 0

" A

FF

1-1/2"x1-1/2"x1/4" ANGLE SUPPORT TO FLOOR

26"x 37"

DUCT MUFFLER

2-102B-UH-004

P1

42"x37"

THIMBLE

2-202-HEX-001

4"ø LPS

CONDENSATE PUMP RECIEVER

STEAM TRAP

/1 MH141

1"ø CT

2"ø NG

1 1/2"ø HWR

1 1/2"ø HWS

1 1/2"ø LPS

1 1 /2" ø

HW

R

1 1/2"ø HWS

1 1/2"ø HWR

PRV

CIRCULATING PUMP

EXPANSION TANK

AIR SEPARATOR

3"ø HWS

4"ø LPS

TO SURGE TANK

PRV

STEAM CONTROL VALVE

PRESSURE REGULATING

VALVE

EXISTING 2ND FLOOR

15' - 6"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MH201

MECHANICAL HVAC ELEVATIONS

DJU KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

SCALE: 1/2" = 1'-0"1 MECHANICAL MEZZANINE HEX ELEVATION

SCALE: 1/2" = 1'-0"2 MECHANICAL GENERATOR ROOM ELEVATION

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 1/2" = 1'-0"3 MECHANICAL BUILDING 1 MEZZANINE HEX ELEVATION

Revisions: Date: SHEET 1852/22/2024

12"x12"

SA

100 CFM 12"x12"

EA

50 CFM

12"x12"

EA

50 CFM

12"x12"

EA

50 CFM

12"x12"

EA

50 CFM

12"x12"

EA

50 CFM

12"x12"

SA

100 CFM

2-125-CH-001

2-124-ITU-003

12"x12"

EA

50 CFM

2-119-HRV-002

8" DIA

8" D

IA

6" D

IA

8" DIA

6"

D

IA

6" D

IA

BREAK ROOM

124-2

JANITOR

121-2

TOILET

122-2

TOILET

123-2

SHOWER AREA

126-2

LOCKER ROOM

125-2

CHANGING AREA

127-2

1" HWS FROM

ABOVE

3/4 "ø

H W

S

PIPE RISER TO MEZZANINE

1" ø

HW

R

3/4 "ø

H W

R

3/4"ø HWS 1"ø HWS

3/4 "ø

H W

S 3/4

"ø H

W S

3/4"ø HWS

3/4 "ø

H W

R

3/4"ø HWR1"ø HWR

2-125-ITU-004

3/4"ø HWR

8" SUPPLY FROM ABOVE.

MUST BE AT LEADT 10'-0"

ABOVE EXHAUST LOUVER

M

/1 MH131

BOOSTER COIL

12"x12"

EA

50 CFM

12"x12"

SA

75 CFM

4" DIA

6" D

IA

12"x12"

EA

50 CFM

12"x12"

SA

75 CFM

8" DIA

6" D

IA

12"x12"

EA

50 CFM

6" DIA

2-130-ITU-002

3/4"ø HWS

3/4"ø HWR

3/4"ø HWR

CONTROL ROOM

130-2

SUPERVISOR

129-2

CHEM FEED

128-2

EXHAUST UP TO

MEZZANINE LEVEL

SUPPLY UP TO

MEZZANINE LEVEL

8" DIA

6" D

IA

8" D

IA

/1 MH131

2-129-ITU-001

BOOSTER COIL 2-200-HRV-001

VD

VD

8" EXHAUST AIR FROM

GROUND FLOOR CEILING

8" SUPPLY AIR TO

GROUND FLOOR CEILING

8" D

IA

8" DIA

3/4"ø HWS 3/4"ø HWR

/1 MH141

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MH401

MECHANIAL ENLARGED PLANS

DJU KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

SCALE: 3/8" = 1'-0"1 MECHANICAL HVAC ENLARGED RCP PLAN - BREAK ROOM/LOCKER ROOM AREA

SCALE: 3/8" = 1'-0"2 MECHANICAL HVAC ENLARGED RCP PLAN - CONTROL ROOM AREA

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"3 MECHANICAL HVAC ENLARGED FLOOR PLAN - MEZZANINE LEVEL ABOVE CHEM FEED ROOM

Revisions: Date: SHEET 1862/22/2024

W

W1

30°MAX

30°

MAX

15°MAX

15°

MAX

MAX

MA

X

WATER RETURN

WATER SUPPLY

SHUT OFF VALVE

REDUCER, IF REQUIRED

MODULATION CONTROL VALVE

DRAIN WITH HOSE

CONNECTION

UNION CONNECTIONS, TYP

TEST PLUG, TYP

MANUAL AIR VENT

BALANCE VALVE

COIL

MV

TYPICAL CONNECTIONS TO VERTICAL HOT WATER UNIT HEATER

TYPICAL CONNECTIONS TO HORIZONTAL HOT WATER UNIT HEATER

HOT WATER

SUPPLY

HOT WATER

RETURN

HOT WATER

SUPPLY

HOT WATER

RETURN

MV

MV

NOTE:

UNIT MOUNTED THERMOSTAT

SHALL MAINTAIN SPACE

TEMPERATURE BY CYCLING

UNIT HEATER

CONTROL VALVE

AIR VENT

TEST

PLUG, TYP

UNIT HEATER

WYE STRAINER,

TYP

SHUTOFF BALL

VALVE, TYP

CONTROL VALVE

M

M

BALANCE VALVE

BALANCE VALVE

NOTES:

1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY

SMACNA.

2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE

REGARDLESS OF W DIMENSION.

3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1 1/2" MAXIMUM SPACE

BETWEEN VANES AND A 3/4" TRAILING EDGE.

4. WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" VANES SHALL BE DOUBLE VANE

TYPE.

NOTE:

UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.

TYPICAL DUCTWORK TRANSITION

WITH EQUIPMENT MOUNTED IN DUCT

PLAN OR SIDE VIEW

TYPICAL DUCTWORK TRANSITION

PLAN OR SIDE VIEW

AIR

FLOW

AIR

FLOW

EQ

UI

PM

EN

T

PLAN VIEW

BRANCH DUCT

AIR

FLOW AIR

FLOW

MAIN EXHAUST OR RETURN

VD 1/4W OR 4" MIN

WOOD NAILING STRIP

PREFABRICATED

ROOF CURB

SEE NOTE 2

GRAVITY BACKDRAFT

DAMPER

DUCT (WHEN SHOWN)

FACTORY ASSEMBLED

HINGED HOOD WITH

LATCH AND BIRD SCREEN

SEE NOTE 1

CURB CAP

ROOF

SEE NOTE 2

TRANSITION DUCT TO

FULL SIZE OF DAMPER

SUPPLIED WITH HOOD

NOTES:

1. SECURE HOOD TO WOOD NAILING STRIP WITH 3/8" CADMIUM PLATED LAG BOLTS NOT

OVER 12" ON CENTER.

2. SECURE ROOF CURB, DUCTWORK AND DAMPER TO ROOF WITH EXPANSION BOLTS

(CONCRETE ROOF) OR RUST RESISTANT BOLTS (METAL DECK & BAR JOIST ROOF).

NOTES:

1. SECURE CURB CAP TO WOOD NAILING STRIP WITH 3/8" CADMIUM PLATED LAG BOLTS

NOT OVER 12" ON CENTER.

2. SECURE ROOF CURB, DUCTWORK AND DAMPER TO ROOF WITH EXPANSION BOLTS

(CONCRETE ROOF) OR RUST RESISTANT BOLTS (METAL DECK AND BAR JOIST ROOF).

3. RUN ELECTRICAL LINES THROUGH CLEARANCE HOLE PROVIDED IN GRAVITY DAMPER,

THEN THROUGH VENTINLATOR ELECTRICAL CONDUIT GUIDE.

ROOF

DUCT

TRANSITION DUCT TO FULL

SIZE OF DAMPER SUPPLIED

WITH ROOF VENTILATOR

SEE NOTE 2

SEE NOTE 1

CURB CAP

MOTOR HOUSING

PREFABRICATED

ROOF CURB

SEE NOTE 2

GRAVITY BACKDRAFT

DAMPER

WOOD NAILING STRIP

RIGID CONDUIT TO

ACCOMODATE

ELECTRICAL WIRES

DESIGNER'S NOTES:

1. THE SUPPLY REGISTER TAKE-OFF MAY BE USED FOR UP UP TO 25% OF THE MAIN DUCT

CFM. THE BRANCH DUCT TAKE-OFF MAY BE USED FOR UP TO 15% OF THE MAIN DUCT

CFM ANYTIME AND UP TO 40% WHEN THE MAIN DUCT VELOCITY IS 1000 FPM OR LESS.

THE AIR SPLIT DUCT TAKE-OFF SHALL BE USED IN ALL OTHER CASES AND MAY BE

USED AT ANYTIME.

2. SHOW ALL VOLUME DAMPERS ON FLOOR PLANS.

BRANCH DUCT TAKE-OFF

PLAN VIEW

AIR SPLIT TAKE-OFF

PLAN VIEW

SUPPLY REGISTER TAKE-OFF

PLAN VIEW

TURNING VANES

SEE FLOOR PLAN

FOR SPLIT

DIMENSION

AIR

FLOW

AIR

FLOW

AI

R

FL

OW

AIR

FLOW

AIR

FLOW

AIR

FLOW

AI

R

FL

OW

W

MAIN SUPPLY

DUCT

VOLUME EXTRACTOR;

ADJUSTABLE FROM FULLY

CLOSED POSITION TO CFM

NOTED ON FLOOR PLANS

ADJUSTABLE

METAL ROD

OR LINKAGE

TOP REGISTERMAIN SUPPLY

DUCTPROVIDE

VOLUME

DAMPER

SUPPLY REGISTER OR

BRANCH DUCT

1/4 W OR

4" MIN

MAIN SUPPLY

PROVIDE

VOLUME

DAMPER

NOTE:

ALL DUCTWORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THROUGH ATTIC FLOORS AND

FAN ROOM FLOORS SHALL BE PROVIDED WITH A 3" HIGH CONCRETE CURB AROUND OPENING

FOR DUCT.

1/2 INCH WG TO 4 INCHES WG DUCT RISER SUPPORT

2"X2"X1/4" ANGLE INSTALL ON

BOTH LONG DIMENSION

SIDES OF DUCT

ARRANGE RISER SO

REINFORCER

TRANSVERSE JOINT IS AT

RISER SUPPORT POINT

DUCT RISER

HOLE IN STRUCTURAL FLOOR

1-1/2"X1-1/2"X1/8" ANGLE INSTALL ON

BOTH LONG DIMENSION SIDES OF

DUCT. FOR DUCTS OVER 60" USE

2"X2"X1/8" ANGLE.

SHEET METAL SCREWS 4" ON

CENTER

FLOOR

SEAL HOLE WITH

FIREPROOFING MATERIAL

AFTER DUCT INSTALLATION

DUCT RISER - SEE FLOOR

PLANS FOR DETAILS

EXTEND ANGLE 3" BEYOND DUCT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MH501

MECHANICAL HVAC DETAILS

DJU KRL

PARTIALLY SPRINKLERED

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

NTS1 DUCTWORK SQUARE VANE ELBOWS

NTS2 DUCTWORK TRANSITION WITH EQUIPMENT IN DUCT

NTS3 TYPICAL BRANCH DUCTWORK

NTS4 LOW-SILHOUETTE EXHAUST

NTS5 POWER ROOF VENTILATOR

NTS6 SUPPLY DUCTWORK TAKE-OFFS

NTS7 DUCT RISER SUPPORTS

SCALE: 12" = 1'-0"9 BOOSTER COIL DETAIL

SCALE: 1" = 1'-0"8 UNIT HEATERS (HOT WATER) - PIPING CONNECTIONS

Revisions: Date: SHEET 1872/22/2024

HANGER RODS,

TYP

FROM SYSTEM

RUN DRAIN LINE TO

GLYCOL TANK

BUTTERFLY

OR BALL

ISOLATION

VALVE

AIR SEPARATOR

CONNECTOR PIPE

AUTO AIR VENT TO DRAINREDUCED PRESSURE

BACKFLOW PREVENTER

RUN DRAIN LINE

TO NEAREST FD

COLD WATER FILL LINE

AIR CHARGING

SHRAEDER

VALVE

6" HOUSEKEEPING PAD

FLOOR MOUNTING BASE RING WITH

DRAIN ACCESS OPENING SHOWN.

ANGLE IRON LEGS MAY BE USED AS AN

OPTION

D

DRAIN

DRAIN

TO

PUMP

SUCTION

NCD

MV

PI

BLADDER

EXPANSION

TANK

NOTES:

1. SEE EXPANSION TANK SYSTEM SCHEDULE

FOR COMPONENT SIZES.

2. SET PRESSURE REDUCING VALVE SO

PRESSURE AT HIGHEST POINT IN SYSTEM

HAS A MINIMUM OF 4 PSIG.

PLUMBING HVAC

STRAINER

1/2"

PRESSURE GAGE

FLEXIBLE

CONNECTION

BALL OR

BUTTERFLY, TYP

BALANCING DEVICE

PIPE HANGERS - PROVIDE DOUBLE

DEFLECTION NEOPRENE (TYPE

HN) FOR FIRST TWO ON EACH

SIDE OF PUMP (SEE NOTE 1)

NOTES:

1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM MOTOR.

FLOOR

3" THICK CONCRETE PAD

55 GALLON

GLYCOL-WATER

STORAGE TANK

BACK PRESSURE REGULATING VALVE

SEE NOTE 2

FROM OTHER GLYCOL-WATER

RELIEF VALVES

AIR SEPARATOR

LOW WATER

LEVEL ALARM

SEE NOTE 1

GLYCOL-WATER

MAKE-UP PUMP

5 GPM @ 30 PSIG

3/4"

WALL MOUNTED

"ON-OFF" MOTOR

CONTROL-SEE

NOTE 4

3/4"

TANK FILL

D

TO EXPANSION

TANK

PUMP

SUCTION

PLUMBING HVAC

NOTES:

1. PROVIDE LOW WATER LEVEL ALARM. PROVIDE A LOW WATER LEVEL AT ECC.

RELIEF VALVE DRAIN SHALL RETURN TO TANK AS SHOWN ON THIS DETAIL.

2. SET REGULATING VALVE TO MAINTAIN MAKE-UP PRESSURE AT 15 PSIG ABOVE

HIGHEST SYSTEM PRV SETTING.

3. MAKE-UP PIPING SYSTEM DOES NOT REQUIRE INSULATION.

4. OPERATE PUMP MANUALLY AS REQUIRED TO FILL.

AVHOT WATER RETURNS

OA

CO

IL

HOT WATER

SUPPLY

BYPASS DAMPER

FACE DAMPER

MODULATING CONTROL VALVE

STRAINER

DRAIN

44"x48" EXHAUST DUCT

ROOF SUPPORT STEEL

ROOF

12" ROOF CURB

DAMPER ACCESS DOOR

EXHAUST FAN HOOD

45"x50" ROOF OPENING

1"

DRIP TRAY FOR EF-001, 002

NOTE:

DUCT SIZE FOR EF-001 IS 40"x48", ROOF OPENING IS 41"x48"

31"x36"x4" INTAKE

LOUVER

12"x12" ACCESS DOOR

WELD ANGLE TO

4"x4" WALLPLATE

MOTORIZED

4" DAMPER WELD ANGLE TO 6"x6"

FLOOR PLATE

1-1/2"x1-1/2"x1/4"

ANGLE, TYP

3" HSS SUPPORT

UIB ISOLATOR

SUPPORT

29"x29" 20 GAUGE SHEET METAL CONNECTION

M

MAU

ELEVATION VIEW END VIEW

4'-2"

"x

"x

3"

54"x60"x4" LOUVER

WINDOW

2 1/2" WINDOW

MULLION

TRANSITION

56"X56" TO 60"X54"

MOTORIZED BACK

DRAFT DAMPER

FAN WALL HOUSING

3"X3"X1/4" CROSS SUPPORT

W/ 3"X3"X1/4" LEG TO

FLOOR EACH SIDE

3"X3"X1/4"∠ 5'8" LONG

ATTACH TO WALL ON EITHER

SIDE OF WALL OPENING

M

5/

2'-9 1/2"

2'-8 1/16"

MAX WIDTH OF ARMS

2'-1"

42"

MAX LENGTH

MA

X

HE

IG

HT

20"

MAX DEPTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MH502

MECHANICAL HVAC DETAILS

DJU IJS

PARTIALLY SPRINKLERED

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

NTS1 FLOOR MOUNTED EXPANSION TANK - PIPING CONNECTIONS

NTS2 IN-LINE PUMPS - CONNECTIONS

NTS3 INDIRECT GLYCOL MAKE-UP SYSTEM (PIPING AND CONTROLS)

NTS4 MAKEUP AIR UNIT - PIPING CONNECTIONS

NTS5 EXHAUST FAN DETAIL - TYP FOR EF-001, 002, 004

NTS6 MAKEUP AIR HEATER INSTALLATION DETAIL

NTS7 SUPPLY FAN DETAIL

SCALE: 1 1/2" = 1'-0"8 A/C CONDENSING UNIT WALL BRACKET SYSTEMS

Revisions: Date: SHEET 1882/22/2024

DIFFUSER, REGISTER, AND GRILLE SCHEDULE

UNIT TYPE BASIS OF

DESIGN PANEL SIZE FEATURES

SD SUPPLY DIFFUSER PRICE 24"X24" COLLAR SIZE TO MATCH CONNECTING DUCT SIZE

RG RETURN GRILLES PRICE 24"X24" COLLAR SIZE TO MATCH CONNECTING DUCT SIZE

ER EXHAUST REGISTERS PRICE 12"X12" COLLAR SIZE TO MATCH CONNECTING DUCT SIZE

CONDENSING UNIT (CU) SCHEDULE

UNIT COOLING

BTU/HR (1)

HEATING

BTU/HR

INDOOR ELECTRICAL

MCA MOCP

BASIS OF

NOTES

UNITS (ITU) # V/P/HZ R.L.A. L.R.A. DESIGN (TRANE)

2-EXT-CU-001 18,000 NA 001,002 208/1/60 17.2 20 10.7 15.5 NTXMMX20A122A 1,2,3

2-EXT-CU-002 18,000 NA 003,004 208/1/60 17.2 20 10.7 15.5 NTXMMX20A122A 1,2,3

2-EXT-CU-003 48,000 NA 005,006, 007 208/1/60 37 52 19 22 NTXMMX48A182A 1,2,3,4

NOTES:

1. COOLING RATED @ OA 95/75 DEG.F. DB/WB; IA 80/67 DEG.F. DB/WB

2. ELECTRICAL POWER, 24 V CONTROL WIRING FROM OUTDOOR UNIT

3. PROVIDE WITH BACnet INTERFACE

4. UNIT REQUIRES BRANCH BOX FOR OPERATION

5. PROVIDE WITH LOW AMBIENT KIT

CEILING FAN SCHEDULE

UNIT LOCATION TYPE DRIVE MAX SPEED

(RPM)

DIAMETER

(IN)

ELECTRICAL *

BASIS OF DESIGN

WATTS V/P/HZ

2-119-CF-001 BOILER ROOM SUSPENDED PROPELLER DIRECT 140 72 41.6 115/1/60 BIG ASS FANS MK-161-06 2-119-CF-002 BOILER ROOM SUSPENDED PROPELLER DIRECT 140 72 41.6 115/1/60 BIG ASS FANS MK-161-06

* FURNISH WITH VARIABLE SPEED DRIVE, WIRED WALL CONTROLLER

SUPPLY FAN SCHEDULE

UNIT LOCATION TYPE CFM SP (IN. WG) FAN RPM DRIVE DIAMETER

(IN)

ELECTRICAL *

BASIS OF DESIGN

HP V/P/HZ

2-200-SF-001 BOILER ROOM SIDEWALL PROPELLER 18699 0.3 860 DIRECT 48 2 460/3/60 GREENHECK MODEL S2-48-410-C20 2-200-SF-002 BOILER ROOM SIDEWALL PROPELLER 18699 0.3 860 DIRECT 48 2 460/3/60 GREENHECK MODEL S2-48-410-C20

* FURNISH WITH VARIABLE SPEED DRIVE

GLYCOL MAKEUP UNIT SCHEDULE (GMU)

UNIT LOCATION SERVICE TANK PUMP ELECTRICAL BASIS OF DESIGNGAL FLOW (GPM) HEAD (FT) POWER (HP) CONTROL

2-200- GMU-001 MEZZANINE HOT WATER LOOP 55 10 70 0.5 PRESSURE SWITCH BELL & GOSSETT GMU-30P

NOTES:

1. FURNISH WITH PRESSURE SWITCH/STARTER, LOW WATER CUT OFF AND PRESSUE GAUGE.

FINNED TUBE RADIATION SCHEDULE

UNIT # FIN LENGTH

(FT) FIN SIZE (IN) FINS/INCH TUBE DIAMETER COVER

ROOM BTUH (2) GPM

2-124- FTR-001 BREAK ROOM 1560 1 3 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP

2-126- FTR-002 SHOWER AREA 1560 1 3 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP

2-127- FTR-003 CHANGING AREA 1040 0.5 2 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP

2-123- FTR-004 TOILET 123-2 2080 1.5 4 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP

2-128- FTR-005 CHEM FEED 1560 1 3 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP

2-129- FTR-006 SUPERVISOR 1560 1 3 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP

2-130- FTR-007 CONTROL RM 1560 1 3 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP

2-131- FTR-008 PROPANE (1) 1560 1 3 4 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP

2-201- FTR-009 CONTROL IT RM 1560 1 3 5 1/4 X 2 3/4 34 3/4" 10" HIGH SLOPE TOP

NOTES:

1. FURNISH WITH SELF-CONTAINED NON ELECTRIC CONTROL VALVE

2. RATED AT: 170 DEG.F AWT, 65 DEG. F EAT. SYSTEM FLUID IS 35% PROPYLENE GLYCOL

3. BASIS OF DESIGN: MODINE MODEL SP SLOPE TOP TRIMFIN, 35% GLYCOL

MAKE-UP AIR HEATER SCHEDULE

UNIT LOCATION CFM LEAVING AIR

TEMP (F) (2) MBH (1) GPM (4)

MOTOR

WEIGHT (LBS) BASIS OF DESIGN (3)

HP V/P/HZ

2-200-MAU-001 MEZZANINE 3700 44.6 268.1 24 1/2 460/3/60 258 LJ WING MODEL: FASC-B2-24

2-200-MAU-002 MEZZANINE 3700 44.6 268.1 24 1/2 460/3/60 258 LJ WING MODEL: FASC-B2-24

NOTES:

1. BASED ON: EWT = 200 DEG. F, EAT = -20 DEG.F SYSTEM FLUID IS 35% PROPYLENE GLYCOL.

2. AUX HEATING OF 141.7 MBH @ -20 EAT PROVIDED BY UNIT HEATERS AND BOILER, PIPING LOSSES

3. FURNISH WITH VARIABLE SPEED DRIVE, LEAVING AIR TEMPERATURE CONTROL (SET FOR 65 DEG. F)

4. 35% GLYCOL

INDOOR TERMINAL UNIT (ITU) SCHEDULE

UNIT

LOCATION COOLING

BTU/HR (1)

HEATING

BTU/HR

AIRFLOW ELECTRICAL OUTDOOR

BASIS OF DESIGN NOTES

CFM (4) V/P/HZ UNIT (CU)

2-129-ITU-001 SUPERVISOR'S OFC. 6000 NA 364 208/1/60 CU-001 TRANE NTXWST06A112A 1,2

2-130-ITU-002 CONTROL ROOM 9000 NA 270 208/1/60 CU-001 TRANE NTXCKS09A112A 1,2,3

2-124-ITU-003 BREAK ROOM 9000 NA 270 208/1/60 CU-002 TRANE NTXCKS09A112A 1,2,3

2-125-ITU-004 LOCKER ROOM 6000 NA 364 208/1/60 CU-002 TRANE NTXWST06A112A 1,2

2-120A-ITU-005 ELECTRICAL ROOM 22400 NA 661 208/1/60 CU-003 TRANE NTXWST24A112A 1,2 2-120B-ITU-006 GENERATOR ROOM 9000 NA 270 208/1/60 CU-003 TRANE NTXCKS09A112A 1,2,3 2-201-ITU-007 CONTROL IT ROOM 14000 NA 498 208/1/60 CU-003 TRANE NTXWST15A112A 1,2

NOTES:

1. COOLING RATED @ OA 95/75 DEG.F. DB/WB; IA 80/67 DEG.F. DB/WB

2. ELECTRICAL POWER, 24 V CONTROL WIRING FROM OUTDOOR UNIT

3. 4-WAY CEILING CASSETT UNIT

4. CFM @ RATED CONDITIONS

AIR SEPARATOR SCHEDULE

UNIT SYSTEM CONNECTION SIZE (IN) MAX GPM BASIS OF DESIGN

2-200-AS-001 HW HEATING LOOP 3" 70 BELL & GOSSETT R-3F

2-200-AS-002 HW HEATING LOOP (1) 2" 13.5 BELL & GOSSETT R-2F

NOTES

1. OLD BOILER PLANT SYSTEM

HEAT RECOVERY VENTILATOR (HRV) SCHEDULE

UNIT

SERVICE

LOCATION AIRFLOW (CFM) RATED/DESIGN

EXHAUST SUPPLY

SENSIBLE

EFFECTIVENESS

FANS

( AMPS) DRIVE WEIGHT (LB)

ELECTRICAL

BASIS OF DESIGN

AMPS V/P/HZ

2-128-HRV-001 SUPERVISOR, ETC. MEZZANINE 450/150 450/150 0.56 1.96 DIRECT 146 3.92 115/1/60 FANTECH SHR 450 (1) 2-124-HRV-002 BREAK ROOM, ETC. MEZZANINE 450/300 450/200 0.56 1.96 DIRECT 146 3.92 115/1/60 FANTECH SHR 450 (1)

NOTES

1. FURNISH WITH BOOSTER COIL, 8.5 MBH, 200 CFM @ .04 " SP, 2.0 GPM, 8" H x 12" W. SYSTEM FLUID IS 35% PROPYLENE GLYCOL.

WATER CIRCULATION PUMP SCHEDULE

UNIT LOCATION SERVICE CIRCULATING FLUID (1) ELECTRICAL BASIS OF DESIGNFLOW (GPM) HEAD (FT) POWER (HP) SPEED CONTROL

2-200-PMP-001 MEZZANINE HOT WATER LOOP 77 35 2 YES BELL & GOSSETT ECOCIRC XL 70-145

2-200-PMP-002 MEZZANINE HOT WATER LOOP 77 35 2 YES BELL & GOSSETT ECOCIRC XL 70-145

2-202-PMP-003 MEZZANINE HOT WATER LOOP 13.5 35 0.5 YES BELL & GOSSETT ECOCIRC XL 55-45

2-202-PMP-004 MEZZANINE HOT WATER LOOP 13.5 35 0.5 YES BELL & GOSSETT ECOCIRC XL 55-45

NOTES:

1. FLUID FOR P-001 & 002 IS 35% GLYCOL

STEAM TO HOT WATER HEAT EXCHANGER SCHEDULE

2-200-HEX-001, 002 SHELL SIDE TUBE SIDE

DIAMETER (IN) 6.5 NO. TUBES 24

FLUID LPS LENGTH (IN) 60

OPERATING PRESSURE/DESIGN (PSI) 15/150 FLUID 35% GLYCOL

TEMPERATURE IN/OUT (F) 249.1 / 249.1 TEMPERATURE IN/OUT (F) 180/200

FLOW (LB/HR) 698.7 FLOW (GPM) 77

HEAT LOAD (MBH) 663.3

EFFECTIVE AREA (SF) 22.6 PRESSURE DROP (PSI) 1.26

LMTD (F) 58.5

INLET/OUTLET (IN) 2"/0.75" INLET/OUTLET (IN) 2" / 2" NPT

BASIS OF DESIGN: BELL AND GOSSETT QSU-65-2

STEAM TO HOT WATER HEAT EXCHANGER SCHEDULE

2-202-HEX-001 SHELL SIDE TUBE SIDE

DIAMETER (IN) 4.5 NO. TUBES 12

FLUID LPS LENGTH (IN) 24

OPERATING PRESSURE/DESIGN (PSI) 15/150 FLUID WATER

TEMPERATURE IN/OUT (F) 249.1 / 249.1 TEMPERATURE IN/OUT (F) 160 / 180

FLOW (LB/HR) 138.9 FLOW (GPM) 13.5

HEAT LOAD (MBH) 131.8

EFFECTIVE AREA (SF) 4.2 PRESSURE DROP (PSI) 0.13

LMTD (F) 78.64

INLET/OUTLET (IN) 2" / 1" NPT INLET/OUTLET (IN) 1.5" / 1.5" NPT

BASIS OF DESIGN: BELL AND GOSSETT SU-42-2

EXHAUST FAN SCHEDULE

UNIT

SERVICE

LOCATION TYPE CFM SP (IN. WG) FAN RPM DRIVE DIAMETER

(IN)

ELECTRICAL

BASIS OF DESIGN

HP V/P/HZ

2-R-EF-001 BOILER ROOM ROOF PROPELLER - ROOF 18930 0.15 860 DIRECT 48 2 460/3/60 GREENHECK MODEL RE2-48-409-C20 (1,2) 2-R-EF-002 BOILER ROOM ROOF PROPELLER - ROOF 18930 0.15 860 DIRECT 48 2 460/3/60 GREENHECK MODEL RE2-48-409-C20 (1,2) 2-R-EF-003 PROPANE STORAGE ROOF CENTRIFUGAL - ROOF 53 0.15 1050 DIRECT 8 4 WATTS 115/1/60 GREENHECK MODEL G-060E (2) 2-R-EF-004 GENERATOR ROOM ROOF PROPELLER - ROOF 18066 1 742 BELT 48 5 460/3/60 GREENHECK MODEL RBE-3H48-50 (1,2)

NOTES:

1. FURNISH WITH VARIABLE SPEED DRIVE. PROVIDE HIGH BASE OPTION, WITH INTERNAL MOTORIZED BACKDRAFT DAMPER WITH ACCESS DOOR.

2. FURNISH WITH ROOF CURB, MOTORIZED BACKDRAFT DAMPER

EXPANSION TANK SCHEDULE

UNIT SERVICE REQUIRED (GAL) TANK VOLUME

ACTUAL (GAL)

REQUIRED

ACCEPTANCE (GAL)

ACTUAL ACCEPTANCE

(GAL) FILL PRESSURE (PSI) TYPE BASIS OF DESIGN

2-200 -TK-001 HEATING LOOP - NEW BOILER PLANT 32.98 34 4.75 34 15 BLADDER, VERTICAL BELL&GOSSETT B130

2-200 -TK-002 HEATING LOOP - OLD BOILER PLANT 7.78 10 1.12 10 15 BLADDER, VERTICAL BELL&GOSSETT B35

UNIT HEATER SCHEDULE

UNIT LOCATION TYPE CFM HEATING

BTU/HR (1) GPM

MOTOR MAXIMUM MOUNTING

HEIGHT (FT) WEIGHT (LBS) BASIS OF DESIGN NOTES

HP V/P/HZ

2-200-UH-001 BOILER PLANT VERTICAL HOT WATER 1740 43,600 4.5 1/15 115/1/60 26 46 MODINE V78L 1,2,4 2-200-UH-002 BOILER PLANT VERTICAL HOT WATER 1740 43,600 4.5 1/15 115/1/60 26 46 MODINE V78L 1,2,4 2-200-UH-003 BOILER PLANT VERTICAL HOT WATER 1740 43,600 4.5 1/15 115/1/60 26 46 MODINE V78L 1,2,4 2-202-UH-001 OLD BOILER PLNT VERTICAL HOT WATER 1740 43,600 4.5 1/15 115/1/60 26 46 MODINE V78L 1,2,4

2-202-UH-002 OLD BOILER PLNT VERTICAL HOT WATER 1740 43,600 4.5 1/15 115/1/60 26 46 MODINE V78L 1,2,4

2-202-UH-003 OLD BOILER PLNT VERTICAL HOT WATER 1740 43,600 4.5 1/15 115/1/60 26 46 MODINE V78L 1,2,4

2-120B-UH-004 GENERATOR RM HOROZ. HOT WATER 630 21,700 2.3 1/25 115/1/60 11 34 MODINE HSB/HC 33 1,2,4

2-125- CH-001 LOCKER RM CABINET HEATER 200 11,041 1.3. 1/15 115/1/60 NA 85 MODINE WCC 3,4

NOTES:

1. RATED @ 200 DEG.F EWT, 160 DEG. F LWT, 65 DEG.F EAT. SYSTEM FLUID IS 35% GLYCOL

2. L- LOW OUTLET TEMPERATURE MODEL, EQUIPPED WITH CONE-JET AIR OUTLET ACCESSORY.

3. CEILING, RECESSED MOUNTING

4. 35% GLYCOL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MH601

MECHANICAL HVAC SCHEDULES

DJU KRL

PARTIALLY SPRINKLERED

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

Revisions: Date: SHEET 1892/22/2024

T

CS

M

DDC

CONTROLLER

SA

HWCHWS HWR

V-1

T-1

BMS

CS-1

R-1

T M

INDOOR

UNIT

OUTDOOR

UNIT

REFRIGERANT PIPING

BACNET

INTERFACE

BMS

T-1FTRHWS

V-1

T

T

CS CS M

M

DDC

CONTROLLER

SF

EF

FILTERFILTERT-2

BMS

T-1

HRV UNIT

CONTROLLER

CS-1 CS-2

R-1

M

D-2

D-1

M D-3

Q.A.

EA

HWS

HWR

EA

SA

V-1

JOB: 22367

BUILDING: 2 BOILER PLANT

POINT LEGEND

SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL

PAGE:

BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION

SYSTEM:

UNIT HEATER

SYSTEM COMPONENT:

PO

IN

T

ID

AB

BR

EV

IA

TI

ON

PR

IO

RI

TY

/A

DD

-A

LT

ER

NA

TE

N

O.

-- EL

EC

TR

IC

D

EV

IC

E

ST

AR

T/

ST

OP

OP

EN

/C

LO

SE

-- SP

EE

D

CO

MM

AN

D

VA

LV

E

PO

SI

TI

ON

DA

MP

ER

P

OS

IT

IO

N

ST

AT

US

AL

AR

M

PR

ES

SU

RE

HI

GH

H

UM

ID

IT

Y

HI

GH

S

TA

TI

C

PR

ES

SU

RE

LO

W

T

EM

PE

RA

TU

RE

-- TE

MP

ER

AT

UR

E

(T I)

PR

ES

SU

RE

PO

SI

TI

ON

F

EE

DB

AC

K

FL

OW

ST

AT

IC

P

RE

SS

UR

E

CA

RB

ON

M

ON

OX

ID

E

HU

MI

DI

TY

VA

CU

UM

LO

CA

L A

LA

RM

P

AN

EL

AR

EA

A

LA

RM

P

AN

EL

MA

ST

ER

A

LA

RM

P

AN

EL

HI

GH

LI

MI

T

LO

W

LI

MI

T

-- -- SC

HE

DU

LE

S

TA

RT

/S

TO

P

FU

NC

TI

ON

DU

TY

C

YC

LE

TE

MP

ER

AT

UR

E

EC

ON

OM

IZ

ER

EN

TH

AL

PY

E

CO

NO

MI

ZE

R

TE

MP

ER

AT

UR

E

RE

SE

T

DE

MA

ND

LI

MI

TI

NG

TE

MP

ER

AT

UR

E

OV

ER

RI

DE

ST

AT

IC

P

RE

SS

UR

E

RE

SE

T

SN

OW

M

EL

T

SY

ST

EM

-- PR

ES

SU

RE

/V

OL

UM

E

CO

NT

RO

L

FA

ILU

RE

M

OD

E

SP

AC

E

TE

MP

. C

ON

TR

OL

FU

LL

C

OM

MU

NI

TC

AT

IO

N

TR

EN

DI

NG

REMARKS

SPACE TEMPERATURE T-1 X X X X X

FAN R-1 X X X X X

FAN MOTOR CURRENT SENSOR CS-1 X

HOT WATER COIL VALVE V-1 X X X

JOB: 22367

BUILDING: 2 BOILER PLANT

POINT LEGEND

SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL

PAGE:

BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION

SYSTEM:

HRV UNIT

SYSTEM COMPONENT:

PO

IN

T

ID

AB

BR

EV

IA

TI

ON

PR

IO

RI

TY

/A

DD

-A

LT

ER

NA

TE

N

O.

-- EL

EC

TR

IC

D

EV

IC

E

ST

AR

T/

ST

OP

OP

EN

/C

LO

SE

-- SP

EE

D

CO

MM

AN

D

VA

LV

E

PO

SI

TI

ON

DA

MP

ER

P

OS

IT

IO

N

ST

AT

US

AL

AR

M

PR

ES

SU

RE

DA

MP

ER

P

OS

IT

IO

N

HI

GH

S

TA

TI

C

PR

ES

SU

RE

LO

W T

EM

PE

RA

TU

RE

-- TE

MP

ER

AT

UR

E (T

I)

PR

ES

SU

RE

PO

SI

TI

ON

F

EE

DB

AC

K

FL

OW

PE

RC

EN

T

ST

AT

IC

P

RE

SS

UR

E

CA

RB

ON

M

ON

OX

ID

E

HU

MI

DI

TY

VA

CU

UM

LO

CA

L A

LA

RM

P

AN

EL

AR

EA

A

LA

RM

P

ER

A

LA

RM

P

AN

EL

HI

GH

LI

MI

T

LO

W

LI

MI

T

-- -- SC

HE

DU

LE

S

TA

RT

/S

TO

P

FU

NC

TI

ON

DE

FR

OS

T

SE

QU

EN

CE

TE

MP

ER

AT

UR

E

EC

ON

OM

IZ

ER

EN

TH

AL

PY

E

CO

NO

MI

ZE

R

TE

MP

ER

AT

UR

E

RE

SE

T

DE

MA

ND

LI

MI

ER

AT

UR

E

OV

ER

RI

DE

ST

AT

IC

P

RE

SS

UR

E

RE

SE

T

FA

N

IN

B

YP

AS

S

SP

AC

E

VE

NT

ILA

TI

ON

PR

ES

SU

RE

/V

OL

UM

E

CO

NT

RO

L

FA

ILU

RE

M

OD

E

SP

AC

E

TE

MP

. C

ON

TR

OL

FU

LL

C

OM

MU

NI

TC

AT

IO

N

TR

EN

DI

NG

REMARKS

SUPPLY AIR TEMPERATURE T-1 X

OUTSIDE AIR TEMPERATURE T-2 X X X X

HVR REMOTE START/STOP R-1 X X

SUPPLY FAN CURRENT SENSOR CS-1 X X X X

EXHAUST FAN CURRENT SENSOR CS-2 X X X X

EXHAUST AIR DAMPER D-1 X X

OUTSIDE AIR DAMPER D-2 X X

BYPASS DAMPER D-3 X X X

BOOSTER COIL VALVE V-1 X X

JOB: 22367

BUILDING: 2 BOILER PLANT

POINT LEGEND

SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL

PAGE:

BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION

SYSTEM:

DUCTLESS SPLIT SYSTEM COOLING

UNITS

SYSTEM COMPONENT:

PO

IN

T

ID

AB

BR

EV

IA

TI

ON

PR

IO

RI

TY

/A

DD

-A

LT

ER

NA

TE

N

O.

-- EL

EC

TR

IC

D

EV

IC

E

ST

AR

T/

ST

OP

OP

EN

/C

LO

SE

-- SP

EE

D

CO

MM

AN

D

VA

LV

E

PO

SI

TI

ON

DA

MP

ER

P

OS

IT

IO

N

ST

AT

US

AL

AR

M

PR

ES

SU

RE

HI

GH

H

UM

ID

IT

Y

HI

GH

S

TA

TI

C

PR

ES

SU

RE

LO

W

T

EM

PE

RA

TU

RE

-- TE

MP

ER

AT

UR

E

(T I)

PR

ES

SU

RE

PO

SI

TI

ON

F

EE

DB

AC

K

FL

OW

PE

RC

EN

T

ST

AT

IC

P

RE

SS

UR

E

CA

RB

ON

M

ON

OX

ID

E

HU

MI

DI

TY

VA

CU

UM

LO

CA

L A

LA

RM

P

AN

EL

AR

EA

A

LA

RM

P

ER

A

LA

RM

P

AN

EL

HI

GH

LI

MI

T

LO

W

LI

MI

T

-- -- SC

HE

DU

LE

S

TA

RT

/S

TO

P

FU

NC

TI

ON

DU

TY

C

YC

LE

TE

MP

ER

AT

UR

E

EC

ON

OM

IZ

ER

EN

TH

AL

PY

E

CO

NO

MI

ZE

R

TE

MP

ER

AT

UR

E

RE

SE

T

DE

MA

ND

LI

MI

ER

AT

UR

E

OV

ER

RI

DE

ST

AT

IC

P

RE

SS

UR

E

RE

SE

T

SN

OW

M

EL

T

SY

ST

EM

-- PR

ES

SU

RE

/V

OL

UM

E

CO

NT

RO

L

FA

ILU

RE

M

OD

E

SP

AC

E

TE

MP

. C

ON

TR

OL

FU

LL

C

OM

MU

NI

TC

AT

IO

N

TR

EN

DI

NG

REMARKS

SPACE TEMPERATURE T-1 X X X X X

UNIT OFF/ON SETUP BO0 X X X

UNIT OFF/ON STATE BI1 X

FAN SPEED SETUP MS05 X

MODE SETUP MS03 X X

FAULT CODE AI11 X X X

HOT WATER VALVE V-1 X X X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MI601

MECHANICAL HVAC CONTROLS

DIAGRAMS 2

DJU KRL

PARTIALLY SPRINKLERED

UNIT HEATER SEQUENCE OF OPERATION:

OCCUPANCY: UNIT HEATERS SHALL BE STARTED BY BMS.

SET-POINTS: UPON START UP UNIT SHALL MODULATE CONTROL VALVE V-1 TO OPEN POSITION. FAN SHALL START AND RUN CONTINOUSLY. UNIT HEATER SHALL MODULATE CONTROL VALVE V-1 TO MAINTAIN SPACE

TEMPERATURE OF 70°F (ADJ.)

ALARMS: FAN MOTOR CURRENT SENSOR SHALL DETECT FAN FAILURE AND REPORT ALARM TO BMS SYSTEM.

UNIT HEATER SHALL BE SET IN ALARM IF SPACE TEMPERATURES REACH AND STAY IN HIGH AND LOW

TEMPERATURE LIMITS FOR 10 MIN. (ADJ.)

HEAT RECOVERY VENTILATION (HRV) UNIT SEQUENCE OF OPERATION

OCCUPANCY: HVR SYSTEM SHALL BE ENABLED BY BMS OCCUPIED SCHEDULE AND SET TO VENTILATION MODE.

FAN: POWER OUTDOOR AIR AND EXHAUST AIR DAMPER (D-2, D-1) TO OPEN POSITION. ONCE DAMPERS OPEN POSITION IS PROVEN SUPPLY AND EXHAUST FAN SHALL START AND RUN CONTINUOUSLY. MONITOR FANS STATUS AND GENERATE ALARM WHEN THE FAN FAILS TO RUN AFTER 2 MIN. (ADJ.). FAN SPEED SHALL BE

MANUALLY SET BY TEST AND BALANCE.

SUPPLY AIR TEMPERATURE CONTROL: MODULATE OPEN HWS VALVE FOR BOOSTER COIL TO MAINTAIN S.A.

TEMPERATURE OF 70°F. (ADJ.).

DEFROST MODE: THE SYSTEM SHALL MONITOR OUTDOOR AIR TEMPERATURE (T-2) TO PERFORM DEFROST SEQUENCE. SYSTEM SHALL ACTIVATE DEFROST CONTROL SEQUENCE WHEN OUTDOOR AIR TEMPERATURE HAS REACHED OR IS BELOW 23°F (ADJ.). OUTDOOR AIR DAMPER (D-2) SHALL TURN TO CLOSE POSITION AND BYPASS DAMPER (D-3) SHALL OPEN FOR 10 MIN. (ADJ.) OR UNTIL NORMAL OPERATION IS RESTORED. AFTER DEFROST, THE UNIT SHALL RETURN TO VENTILATION MODE.

ALARMS: SYSTEM SHALL SEND ALARM IN THE EVENT OF ANY FAN OR DAMPER FAILURE.

DUCTLESS SPLIT SYSTEM AIR CONDITIONING UNITS - SEQUENCE OF OPERATION

OCCUPANCY: SPLIT SYSTEM SHALL START BASED ON BMS OCCUPIED SCHEDULE. DURING UNOCCUPIED PERIOD SPLIT

SYSTEM SHALL REMAIN OFF.

SPLIT SYSTEM CONTROL: DURING OCCUPIED COOLING MODE SYSTEM SHALL START TO MAINTAIN A SPACE TEMPERATURE OF 75°F (ADJ.). DURING OCCUPIED HEATING MODE, SYSTEM SHALL ACTIVATE ROOM FINNED TUBE

RADIATION TO MAINTAIN SPACE TEMPERATURE OF 70°F (ADJ.).

ALARMS: IF SPACE TEMPERATURE IS OUTSIDE HIGH AND LOW LIMITS REPORT ALARM TO BMS.REPORT BACNET

MODULE FAULT CODES THROUGH BMS.

NTS2 UNIT HEATER SCHEMATIC

NTS6 DUCTLESS SYSTEM SCHEMATIC

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

UNIT HEATER CONTROLS DIAGRAMS1

SCALE: 12" = 1'-0"4 HRV UNIT SCHEMATIC

HRV UNIT CONTROLS DIAGRAM (HRV-001,HRV-002)3

Revisions: Date:

DUCTLESS SPLIT SYSTEM COOLING5

SHEET 1902/22/2024

M M

CS T

M

T

PDS

HW

C

VFD

M

HWS

HWR

OA

DDC

CONTROLLER

BMS

CS-1

T-1

SA

D-1D-2

V-1

T-2

BOILER

CONTROLS

SC-2

R-2

R-1

SC-1

PDS-1

M

T

DP

CS

CS

HS

VFD

VFD

M

M

M

SF-001,0002

DDC

CONTROLLER

ROOF

VENT

BOILER ROOM

EF-001,0002

T-1

CS-2

R-2

BMS

CS-1

R-1

HS-1

DP-1D-2

D-1

CS

T

M

DDC

CONTROLLER

BMS

CS-1

T-1

R-1

JOB: 22367

BUILDING: 2 BOILER PLANT

POINT LEGEND

SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL

PAGE:

BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION

SYSTEM:

BOILER ROOM VENTILATION: EXHAUST

FAN

SYSTEM COMPONENT:

PO

IN

T

ID

AB

BR

EV

IA

TI

ON

PR

IO

RI

TY

/A

DD

-A

LT

ER

NA

TE

N

O.

-- EL

EC

TR

IC

D

EV

IC

E

ST

AR

T/

ST

OP

OP

EN

/C

LO

SE

-- SP

EE

D

CO

MM

AN

D

VA

LV

E

PO

SI

TI

ON

DA

MP

ER

P

OS

IT

IO

N

ST

AT

US

AL

AR

M

PR

ES

SU

RE

HI

GH

H

UM

ID

IT

Y

HI

GH

S

TA

TI

C

PR

ES

SU

RE

LO

W

T

EM

PE

RA

TU

RE

-- TE

MP

ER

AT

UR

E

(T I)

PR

ES

SU

RE

PO

SI

TI

ON

FL

OW

PE

RC

EN

T

ST

AT

IC

P

RE

SS

UR

E

CA

RB

ON

M

ON

OX

ID

E

HU

MI

DI

TY

VA

CU

UM

LO

CA

L A

LA

RM

P

AN

EL

AR

EA

A

LA

RM

P

ER

A

LA

RM

P

AN

EL

HI

GH

LI

MI

T

LO

W

LI

MI

T

-- -- SC

HE

DU

LE

S

TA

RT

/S

TO

P

FU

NC

TI

ON

DU

TY

C

YC

LE

TE

MP

ER

AT

UR

E

EC

ON

OM

IZ

ER

EN

TH

AL

PY

E

CO

NO

MI

ZE

R

TE

MP

ER

AT

UR

E

RE

SE

T

DE

MA

ND

LI

MI

ER

AT

UR

E

OV

ER

RI

DE

ST

AT

IC

P

RE

SS

UR

E

RE

SE

T

SN

OW

M

EL

T

SY

ST

EM

-- PR

ES

SU

RE

/V

OL

UM

E

CO

NT

RO

L

FA

ILU

RE

M

OD

E

SP

AC

E

TE

MP

. C

ON

TR

OL

FU

LL

C

OM

MU

NI

TC

AT

IO

N

TR

EN

DI

NG

REMARKS

CIRCULATING FAN R-1 X

FAN MOTOR CURRENT SWITCH CS-1 X X

JOB: 22367

BUILDING: 2 BOILER PLANT

POINT

LEGEND

SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL

PAGE:

BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION

SYSTEM:

MAKEUP AIR UNIT

SYSTEM COMPONENT:

PO

IN

T

ID

PR

IO

RI

TY

-- EL

EC

TR

IC

D

EV

IC

E

ST

AR

T/

ST

OP

OP

EN

/C

LO

SE

-- SP

EE

D

CO

MM

AN

D

VA

LV

E

PO

SI

TI

ON

DA

MP

ER

P

OS

IT

IO

N

ST

AT

US

AL

AR

M

PR

ES

SU

RE

HI

GH

H

UM

ID

IT

Y

HI

GH

S

TA

TI

C

PR

ES

SU

RE

LO

W T

EM

PE

RA

TU

RE

AI

RF

LO

W

TE

MP

ER

AT

UR

E (T

I)

PR

ES

SU

RE

PO

SI

TI

ON

FL

OW

PE

RC

EN

T

ST

AT

IC

P

RE

SS

UR

E

CA

RB

ON

M

ON

OX

ID

E

HU

MI

DI

TY

VA

CU

UM

LO

CA

L A

LA

RM

P

AN

EL

AR

EA

A

LA

RM

P

ER

A

LA

RM

P

AN

EL

HI

GH

LI

MI

T

LO

W

LI

MI

T

BO

ILE

R

CO

NT

RO

LS

-- BO

ILE

R

CO

NT

RO

LS

SC

HE

DU

LE

S

TA

RT

/S

TO

P

FU

NC

TI

ON

DU

TY

C

YC

LE

TE

MP

ER

AT

UR

E

EC

ON

OM

IZ

ER

EN

TH

AL

PY

E

CO

NO

MI

ZE

R

TE

MP

ER

AT

UR

E

RE

SE

T

DE

MA

ND

LI

MI

ER

AT

UR

E

CO

NT

RO

L

ST

AT

IC

P

RE

SS

UR

E

RE

SE

T

SN

OW

M

EL

T

SY

ST

EM

-- PR

ES

SU

RE

/V

OL

UM

E

CO

NT

RO

L

FA

ILU

RE

M

OD

E

SP

AC

E

TE

MP

. C

ON

TR

OL

FU

LL

C

OM

MU

NI

TC

AT

IO

N

TR

EN

DI

NG

REMARKS

OUTSIDE AIR TEMPERATURE T-2 X X X

BOILER CONTROL COMBUSTION AIR INTAKE DAMPER D-2 X X X X X X

SUPPLY FAN VFD RUN R-1 X X X

SUPPLY FAN VFD SPEED CONTROL SC-1 X

BOILER CONTROL REQUEST TO START R-2 X X X

BOILER CONTROL FIRING RATE SC-2 X X X X

FAN MOTOR CURRENT SENSOR CS-1 X X

AIR FLOW SWITCH PDS-1 X X X

HOT WATER VALVE V-1 X X

FACE AND BYPASS DAMPER D-1 X X X X

SUPPLY AIR TEMPERATURE T-1 X X X X X X

JOB: 22367

BUILDING: 2 BOILER PLANT

POINT LEGEND

SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL

PAGE:

BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION

SYSTEM:

BOILER ROOM VENTILATION: SUPPLY

AND EXHAUST FANS

SYSTEM COMPONENT:

PO

IN

T

ID

AB

BR

EV

IA

TI

ON

PR

IO

RI

TY

/A

DD

-A

LT

ER

NA

TE

N

O.

-- EL

EC

TR

IC

D

EV

IC

E

ST

AR

T/

ST

OP

OP

EN

/C

LO

SE

-- SP

EE

D

CO

MM

AN

D

VA

LV

E

PO

SI

TI

ON

DA

MP

ER

P

OS

IT

IO

N

ST

AT

US

AL

AR

M

PR

ES

SU

RE

HI

GH

H

UM

ID

IT

Y

HI

GH

S

TA

TI

C

PR

ES

SU

RE

LO

W

T

EM

PE

RA

TU

RE

-- TE

MP

ER

AT

UR

E

(T I)

PR

ES

SU

RE

PO

SI

TI

ON

FL

OW

PE

RC

EN

T

ST

AT

IC

P

RE

SS

UR

E

CA

RB

ON

M

ON

OX

ID

E

HU

MI

DI

TY

VA

CU

UM

LO

CA

L A

LA

RM

P

AN

EL

AR

EA

A

LA

RM

P

ER

A

LA

RM

P

AN

EL

HI

GH

LI

MI

T

LO

W

LI

MI

T

-- -- SC

HE

DU

LE

S

TA

RT

/S

TO

P

FU

NC

TI

ON

DU

TY

C

YC

LE

TE

MP

ER

AT

UR

E

EC

ON

OM

IZ

ER

EN

TH

AL

PY

E

CO

NO

MI

ZE

R

TE

MP

ER

AT

UR

E

RE

SE

T

DE

MA

ND

LI

MI

ER

AT

UR

E

OV

ER

RI

DE

ST

AT

IC

P

RE

SS

UR

E

RE

SE

T

SN

OW

M

EL

T

SY

ST

EM

MA

NU

AL

O

VE

RR

ID

E

PR

ES

SU

RE

/V

OL

UM

E

CO

NT

RO

L

FA

ILU

RE

M

OD

E

SP

AC

E

TE

MP

. C

ON

TR

OL

FU

LL

C

OM

MU

NI

TC

AT

IO

N

TR

EN

DI

NG

REMARKS

SPACE TEMPERATURE 1 T-1 X X X X X

SUPPLY AIR FAN H.O.A. SWITCH HS-1 X

SUPPLY AIR FAN R-1 X X X X

SA FAN CURRENT SWITCH CS-1 X

EXHAUST AIR FAN R-2 X X X

EA FAN CURRENT SWITCH CS-2 X

SUPPLY AIR DAMPER D-2 X

EXHAUST AIR DAMPER D-1 X

BOILER ROOM PRESSURE DP-1 X X X X X X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MI602

MECHANICAL HVAC CONTROLS

DIAGRAMS 2

DJU KRL

PARTIALLY SPRINKLERED

CIRCULATING FAN CONTROL DIAGRAM (EF-001,002)5

NTS2 MAKEUP AIR UNIT SCHEMATIC

NTS4 BOILER ROOM VENTILATION SCHEMATIC

MAKE UP AIR UNIT SEQUENCE OF OPERATION:

GENERAL: MAKE-UP AIR UNIT PROVIDES COMBUSTION AIR FOR THE BOILERS.

SYSTEM CONTROL: ON A CALL FOR COMBUSTION AIR FROM THE BOILER CONTROL SYSTEM, COMBUSTION AIR DAMPER (D-2) SHALL OPEN AND PROVE OPEN POSITION WITH ACTUATOR END SWITCH. PROVIDE SEPARATE PROVING (AUXILARY) DEVICES AND CONNECTIONS DEDICATED ON DAMPERS AND FAN FOR BOILER SYSTEM INTERLOCKS SEPARATE FROM HVAC (BMS) CONTROLS.

THE MAKE UP AIR UNIT FAN SHALL START AND CONFIRM OPERATION BEFORE LEAD BOILER IS ENABLED TO START. ON A CALL FROM THE BOILER CONTROL INTERLOCK TO COMMAND THE SECOND MAKE UP AIR UNIT, THE UNIT SHALL START AND CONFIRM OPERATION BEFORE ENABLING THE BOILER. UPON COMMAND, THE MAKE UP AIR UNIT SHALL START THE SUPPLY FAN.

WHEN OUTSIDE TEMPERATURE IS BELOW SUPPLY AIR TEMPERATURE SETPOINT THE HOT WATER COIL VALVE (V-1) SHALL BE OPEN AND FACE AND BYPASS DAMPER (D-1) SHALL BE MODULATED TO MAINTAIN A MINIMUM SUPPLY AIR TEMPERATURE (T-1) OF

65°F (ADJ.). THE SETPONT SHALL BE ADJUSTABLE FROM THE BMS.

BOILER CONTROL SYSTEM SHALL PROVIDE MODULATING SUPPLY FAN VFD SPEED SIGNAL TO MAKE-UP AIR UNIT CONTROLLER TO MATCH BOILER FIRING RATE. SUPPLY FAN VFD SHALL PROVIDE MOTOR SPEED (RPM) AND ORIENTATION TO THE BOILER CONTROL

SYSTEM.

ALARMS: COMBUSTION AIR INTAKE DAMPER END SWITCH SHALL CONFIRM DAMPER OPEN OPPOSITION AND GENERATE ALARM THROUGH BMS AND BOILER CONTROSL IF OPEN POSITION HAS NOT BEEN REACH AFTER 45 SEC. (ADJ) AFTER REQUEST. FAN MOTOR CURRENT SENSOR SHALL DETECT FAN FAILURE AND REPORT ALARM TO BMS AND BOILER CONTROL SYSTEM. MAKE UP AIR UNIT SHALL BE SET IN ALARM IF SUPPLY AIR TEMPERATURE DROPS BELOW SETPOINT FOR 8 MIN. (ADJ.). AIRFLOW SWITCH SHALL GENERATE ALARM THRUGH BMS IF NO AIRFLOW IS PROVEN 45 SEC. (ADJ.) AFTER REQUEST.

BOILER ROOM VENTILATION SEQUENCE OF OPERATIONS

1. SUPPLY AND EXHAUST FANS SHALL BE CONTROLLED TO PROVIDE COOLING VENTILATION FOR THE BOILER ROOM. A FLOOR LEVEL, SPACE TEMPERATURE WILL BE PROVIDED AND USED TO CONTROL THE VENTILATION SYSTEM.

2. A BUILDING DIFFERENTIAL PRESSURE CONTROLLER WILL BE PROVIDED, AND WILL CONTROL SUPPLY AND EXHAUST FAN SPEEDS THROUGH THE FAN VFD ’S TO BALANCE SUPPLY AND EXHAUST AIRFLOWS. THE PURPOSE IS TO MAINTAIN A SLIGHT POSITIVE BUILDING PRESSURE WHEN IN OPERATION, ESPECIALLY WHEN THE EMERGENCY

GENERATOR IS IN OPERATION.

3. VENTILATION SYSTEM TEMPERATURE CONTROL SHALL BE AS FOLLOWS:

A. WHEN SPACE TEMPERATURE SENSOR REACHES SETPOINT (80 DEG. F – ADJ). – BOTH SUPPLY FAN

DAMPERS, AND EXHAUST FAN DAMPERS SHALL OPEN FOR NATURAL CONVECTION.

B. IF SPACE TEMPERATURE RISES TO 85 DEG. F, ONE SUPPLY FAN, AND ONE EXHAUST FAN SHALL START

WITH THE FAN VARIABLE SPEED DRIVE ON LOW SPEED. FAN SPEED SHALL RAMP UP AS SPACE

TEMPERTURE RISES OVER 85 DEG.F.

C. AT A SPACE TEMPERATURE READING OF 90 DEG. F, BOTH SUPPLY FANS, AND BOTH EXHAUST FANS SHALL RUN ON LOW SPEED. FAN SPEED SHALL INCREASE UNTIL FANS ARE AT FULL SPEED WHEN

SPACE TEMPERATURE IS 95 DEG.F (ADJ).

D. SUPPLY AND EXHAUST FAN SPEEDS SHALL BE CONTROLLED SEPERATELY TO MAINTAIN A FLOW

DIFFERENTIAL FOR MAINTAINING A POSITIVE BUILDING PRESSURE DIFFERENTIAL.

E. THE LEAD SUPPLY, EXHAUST FAN PAIR SHALL ALTERNATE WITH EACH CYCLE OF OPERATION.

F. FAN FAILURE SHALL ALARM BMS.

4. VENTILATION SYSTEM PRESSUE CONTROL SHALL BE AS FOLLOWS.

A. WHEN THE BOILER ROOM SUPPLY AN EXHAUST FANS ARE RUNNING – THE FANS SPEEDS SHALL BE BALANCED SO AS TO PROVIDE THE POSITIVE BUILDING PRESSURE DIFFERENTIAL OF 0.10" S.P. (ADJ).

CIRCULATING FAN SEQUENCE OF OPERATION:

FAN CONTROL: FAN SHALL RUN CONTINOUSLY TO CIRCULATE BOILER ROOM AIR. FAN SHALL STOP BY MANUAL OVERRIDE.

ALARMS: IF BMS IS COMMANDED CEILING FAN BUT NO STATUS HAS BEEN RECEIVE BY FAN CURRENT SENSOR (CS-1) AFTER 3

MIN.(ADJ.) REPORT ALARM TO BMS SYSTEM.

NTS6 CIRCULATING FAN SCHEMATIC

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

MAKE UP AIR UNIT CONTROL DIAGRAM (MAU-001, 002)1

BOILER ROOM VENTILATION DIAGRAM (EF-001, 002 SF-001, 002)3

Revisions: Date: SHEET 1912/22/2024

M

M

M

M

VFD1 VFD2

STEAM TRAP

STEAM TO HOT WATER

HEAT EXCHANGER

STRAINER PRV

P

HPS LPS

HWR

HW

S

AIR VENT

T-1

V-1

EXPANSION

TANK

HWR

V-2

M-1

M-2

HEX-001

HEX-002

CONDENSATE RETURN

CONDENSATE RETURN

HIGH PRESSURE STEAM

AIR

SEPARATOR

RETURNBUILDING

HEATING

LOOP

R-1

CS-1

P-1

DDC

CONTROLLER

OUTSIDE AIR

TEMPERATURE

SENSOR T-2

DP-1

R-2

CS-2

P-2

B1-1 A0-1

B1-2 A0-2

BMS

CHEMICAL FEED ADD

(2-202-HEX-001 ONLY)

T

M

DDC

CONTROLLER

FTRHWS HWR

V-1

T-1

BMS

T

M

M

GENERATOR

OA

DDC

CONTROLLER BMS

D-1

T-1

R-1

VFD

ROOF

EA

D-2

CS-1

SC-1

R-2

EXHAUST FAN EF-004

JOB: 22367

BUILDING: 2 NEW BOILER PLANT

POINT LEGEND

SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL

BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION

SYSTEM:

STEAM TO HOT WATER EXCHANGER

SYSTEM COMPONENT:

PO

IN

T

ID

AB

BR

EV

IA

TI

ON

PR

IO

RI

TY

/A

DD

-A

LT

ER

NA

TE

N

O.

-- EL

EC

TR

IC

D

EV

IC

E

ST

AR

T/

ST

OP

OP

EN

/C

LO

SE

-- SP

EE

D

CO

MM

AN

D

VA

LV

E

PO

SI

TI

ON

DA

MP

ER

P

OS

IT

IO

N

ST

AT

US

AL

AR

M

PR

ES

SU

RE

HI

GH

H

UM

ID

IT

Y

HI

GH

S

TA

TI

C

PR

ES

SU

RE

LO

W

T

EM

PE

RA

TU

RE

PO

SI

TI

ON

TE

MP

ER

AT

UR

E

PR

ES

SU

RE

PO

SI

TI

ON

F

EE

DB

AC

K

FL

OW

PE

RC

EN

T

ST

AT

IC

P

RE

SS

UR

E

CA

RB

ON

M

ON

OX

ID

E

HU

MI

DI

TY

-- LO

CA

L A

LA

RM

P

AN

EL

AR

EA

A

LA

RM

P

ER

A

LA

RM

P

AN

EL

HI

GH

LI

MI

T

LO

W

LI

MI

T

-- -- SC

HE

DU

LE

S

TA

RT

/S

TO

P

FU

NC

TI

ON

DU

TY

C

YC

LE

TE

MP

ER

AT

UR

E

CO

NT

RO

L

EN

TH

AL

PY

E

CO

NO

MI

ZE

R

TE

MP

ER

AT

UR

E

RE

SE

T

DE

MA

ND

LI

MI

ER

AT

UR

E

OV

ER

RI

DE

ST

AT

IC

P

RE

SS

UR

E

RE

SE

T

SN

OW

M

EL

T

SY

ST

EM

-- PR

ES

SU

RE

/V

OL

UM

E

CO

NT

RO

L

FA

ILU

RE

M

OD

E

SP

AC

E

TE

MP

. C

ON

TR

OL

FU

LL

C

OM

MU

NI

TC

AT

IO

N

TR

EN

DI

NG

REMARKS

VFD 1 STATUS BI-1 X X X X

VFD 1 SPEED SIGNAL AO-1 X X

PUMP 1 RELAY R-1 X X

PUMP 1 CURRENT SENSOR CS-1 X X X X

SYSTEM DIFFERENTIAL PRESSURE SENSOR DP-1 X X X

VFD 2 STATUS BI-2 X X X X

VFD 2 SPEED SIGNAL AO-2 X X

PUMP 2 RELAY R-2 X X

PUMP 2 CURRENT SENSOR CS-2 X X X X X

HEATING HOT WATER LOOP TEMPERATURE T-1 X X X X

HX-1 STEAM CONTROL VALVE V-1 X X X X

HX-2 STEAM CONTROL VALVE V-2 X X

OUTSIDE AIR TEMPERATURE T-2 X X

HEX-1 HOT WATER CONTROL VALVE M-1 X X

HEX-2 HOT WATER CONTROL VALVE M-2 X X

JOB: 22367

BUILDING: 2 BOILER PLANT

POINT LEGEND

SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL

PAGE:

BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION

SYSTEM:

GENERATOR ROOM VENTILATION

SYSTEM COMPONENT:

PO

IN

T

ID

AB

BR

EV

IA

TI

ON

PR

IO

RI

TY

/A

DD

-A

LT

ER

NA

TE

N

O.

-- EL

EC

TR

IC

D

EV

IC

E

ST

AR

T/

ST

OP

OP

EN

/C

LO

SE

-- SP

EE

D

CO

MM

AN

D

VA

LV

E

PO

SI

TI

ON

DA

MP

ER

P

OS

IT

IO

N

ST

AT

US

AL

AR

M

PR

ES

SU

RE

HI

GH

H

UM

ID

IT

Y

HI

GH

S

TA

TI

C

PR

ES

SU

RE

LO

W

T

EM

PE

RA

TU

RE

OP

EN

/C

LO

SE

D

PO

SI

TI

ON

TE

MP

ER

AT

UR

E

(T I)

PR

ES

SU

RE

PO

SI

TI

ON

F

EE

DB

AC

K

FL

OW

PE

RC

EN

T

ST

AT

IC

P

RE

SS

UR

E

CA

RB

ON

M

ON

OX

ID

E

HU

MI

DI

TY

VA

CU

UM

LO

CA

L A

LA

RM

P

AN

EL

AR

EA

A

LA

RM

P

ER

A

LA

RM

P

AN

EL

HI

GH

LI

MI

T

LO

W

LI

MI

T

-- -- SC

HE

DU

LE

S

TA

RT

/S

TO

P

FU

NC

TI

ON

DU

TY

C

YC

LE

TE

MP

ER

AT

UR

E

EC

ON

OM

IZ

ER

EN

TH

AL

PY

E

CO

NO

MI

ZE

R

TE

MP

ER

AT

UR

E

RE

SE

T

DE

MA

ND

LI

MI

ER

AT

UR

E

OV

ER

RI

DE

ST

AT

IC

P

RE

SS

UR

E

RE

SE

T

VE

NT

ILA

TI

ON

C

ON

TR

OL

-- PR

ES

SU

RE

/V

OL

UM

E

CO

NT

RO

L

FA

ILU

RE

M

OD

E

SP

AC

E

TE

MP

. C

ON

TR

OL

FU

LL

C

OM

MU

NI

TC

AT

IO

N

TR

EN

DI

NG

REMARKS

SPACE TEMPERATURE T-1 X X X X X

GENERATOR VENTILATION REQUEST R-1 X X

OUTSIDE AIR DAMPER D-1 X X X X X

EXHAUST AIR DAMPER D-2 X X X X X

EXHAUST FAN VFD R-2 X

EXHAUST FAN SPEED CONTROL SC-1 X

EXHAUST FAN STATUS CS-1 X X

JOB: 22367

BUILDING: 2 BOILER PLANT

POINT LEGEND

SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL

PAGE:

BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION

SYSTEM:

FIN TUBE RADIATOR

SYSTEM COMPONENT:

PO

IN

T

ID

AB

BR

EV

IA

TI

ON

PR

IO

RI

TY

/A

DD

-A

LT

ER

NA

TE

N

O.

-- EL

EC

TR

IC

D

EV

IC

E

ST

AR

T/

ST

OP

OP

EN

/C

LO

SE

-- SP

EE

D

CO

MM

AN

D

VA

LV

E

PO

SI

TI

ON

DA

MP

ER

P

OS

IT

IO

N

ST

AT

US

AL

AR

M

PR

ES

SU

RE

HI

GH

H

UM

ID

IT

Y

HI

GH

S

TA

TI

C

PR

ES

SU

RE

LO

W

T

EM

PE

RA

TU

RE

-- TE

MP

ER

AT

UR

E

(T I)

PR

ES

SU

RE

PO

SI

TI

ON

F

EE

DB

AC

K

FL

OW

PE

RC

EN

T

ST

AT

IC

P

RE

SS

UR

E

CA

RB

ON

M

ON

OX

ID

E

HU

MI

DI

TY

VA

CU

UM

LO

CA

L A

LA

RM

P

AN

EL

AR

EA

A

LA

RM

P

ER

A

LA

RM

P

AN

EL

HI

GH

LI

MI

T

LO

W

LI

MI

T

-- -- SC

HE

DU

LE

S

TA

RT

/S

TO

P

FU

NC

TI

ON

DU

TY

C

YC

LE

TE

MP

ER

AT

UR

E

EC

ON

OM

IZ

ER

EN

TH

AL

PY

E

CO

NO

MI

ZE

R

TE

MP

ER

AT

UR

E

RE

SE

T

DE

MA

ND

LI

MI

ER

AT

UR

E

OV

ER

RI

DE

ST

AT

IC

P

RE

SS

UR

E

RE

SE

T

SN

OW

M

EL

T

SY

ST

EM

-- PR

ES

SU

RE

/V

OL

UM

E

CO

NT

RO

L

FA

ILU

RE

M

OD

E

SP

AC

E

TE

MP

. C

ON

TR

OL

FU

LL

C

OM

MU

NI

TC

AT

IO

N

TR

EN

DI

NG

REMARKS

SPACE TEMPERATURE T-1 X X X X X

HOT WATER COIL VALVE V-1 X X X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MI603

MECHANICAL HVAC CONTROLS

DIAGRAMS 2

DJU KRL

PARTIALLY SPRINKLERED

NTS4 STEAM TO HOT WATER SYSTEM SCHEMATIC

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

FIN TUBE RADIATOR SEQUENCE OF OPERATION:

OCCUPANCY: FIN TUBE RADIATOR SHALL BE ENABLED BY BMS OCCUPIED SCHEDULE. DURING UNOCCUPIED PERIOD

UNIT SHALL REMAIN DISABLE.

SYSTEM CONTROL: DURING OCCUPIED HEATING MODE UNIT SHALL MODULATE HOT WATER VALVE (V-1) TO MAINTAIN

SPACE TEMPERATURE (T-1) OF 70°F (ADJ.)

ALARMS: FIN TUBE RADIATOR SHALL BE SET IN ALARM IF SPACE TEMPERATURES REACH AND STAY IN HIGH AND LOW

TEMPERATURE LIMITS FOR 10 MIN. (ADJ.)

NTS2 FIN TUBE RADIATOR SCHEMATIC

KEYED NOTES

1 BACK - UP HEAT EXCHANGER FOR 2-200-HEX-001 ONLY. HEAT EXCHANGER

2-202-HEX-001 DOES NOT CONTAIN BACK - UP.

STEAM TO HOT WATER SYSTEM CONTROL DIAGRAM3

STEAM TO HOT WATER HEAT EXCHANGER SEQUENCE OF OPERATION:

(TYPICAL FOR 2-200-HEX-001, 2-200-HEX-002 & 2-202-HEX-001)

START: BMS SHALL ENABLE STEAM TO HEATING HOT WATER SYSTEM WHEN HEATING IS REQUIRED. BMS

SHALL ROTATE LEAD/LAG PUMPS DESIGNATION EVERY 7 DAYS.

START: UPON START UP THE STEAM CONTROL VALVE (V-1) SHALL MODULATE OPEN AND MAINTAIN HEATING HOT WATER LOOP SET POINT AND HOT WATER ISOLATION VALVE (M-1) SHALL OPEN. AFTER HOT WATER ISOLATION VALVE (M-1) HAVE BEEN CONFIRMED OPEN LEAD CIRCULATING PUMP VFD SHALL START BY ENABLING RELAY (R-1) AND SHALL MODULATE SPEED TO MAITAIN HEATING HOT WATER LOOP DIFFERENTIAL PRESSURE (DP-1) AT SET POINT WHILE MEETING BUILDING HEATING DEMAND. IF LEAD PUMP STATUS IS NOT DETECTED 30 SEC. (ADJ.) AFTER VFD HAS BEEN ENABLED, THE LAG PUMP SHALL START AND AN ALARM SHALL BE REPORTED TRHOUGH THE BMS. IF FAILURE IS REPORTED WITH LEAD HEAT

EXCHANGER, REDUNDANT BACKUP HEAT EXCHANGER SHALL TAKE OVER OPERATION.

OPERATION: HEAING HOT WATER SUPPLY WATER TEMPERATURE (T-1) TO THE BUILDING HEATING LOOP SHALL BE RESET BASED ON OUTSIDE AIR TEMPERATERUE (T-2) BY MODULATING STEAM VALVE (V-1).

MODULATE STEAM VALVE TO SUPPLY WATER AT A MAX TEMPERATURE OF 180°F (ADJ.) WHEN OUTSIDE AIR TEMPERATURE IS 30.0 °F (ADJ.) OR BELOW. AND MODULATE STEAM VALVE TO SUPPLY MAX TEMPERATURE OF 140°F (ADJ) WHEN OUTSIDE AIR TEMPERATURE IS 70°F(ADJ) OR HIGHER. FOR OUTSIDE AIR TEMPERATURE READINGS BETWEEN 30-70°F MODULATE HOT WATER LOOP TEMPERATURE SETPOINT BY SCALING SET POINT LINEARLY BETWEEN 140-180°F FOR RESPECTIVE OUTDOOR AIR TEMPEARATURE. THE MAXIMUM PRESSURE LIMIT IS THE PRESSURE REQUIRED TO PROVIDE FULL FLOW TO ALL HEATING CONTROL VALVES SIMULTANEOUSLY (PER TAB). THE MINIMUM PRESSURE LIMIT IS THE PRESSURE CORRELATING TO THE LOWEST SPEED THE PUMP MOTOR IS ALLOWED TO BE OPERATED AT (PER TAB).

ALARMS: ALL PUMPS SHALL BE MONITORED, AND PUMP OR VFD FAILURE SHALL BE REPORTED THROUGH THE BMS. HEATING HOT WATER TEMPERATURE SHALL BE MONITORED, HIGH AND LOW LIMITS ALRMS SHALL BE REPORTED THROUGH THE BMS. LOW AND HIGH HEATING HOT WATER DIFFERENTIAL PRESSURE

ALARM SHALL BE REPORTED TO THE BMS.

TYPICAL FOR 2-200-HEX-001, 2-200-HEX-002 AND 2-202-HEX-001

GENERATOR ROOM VENTILATION CONTROL DIAGRAM5

GENERATOR ROOM VENTILATION CONTROL SEQUENCE OF OPERATION:

CONTROL: IN THE EVENT OF A GENERATOR VENTILATION REQUEST (R-1). SYSTEM SHALL OPEN OUTSIDE AIR DAMPER (D-1) AND EXHAUST AIR DAMPER (D-2) AND CONFIRM DAMPERS OPEN POSITION. IF OPEN POSITION IS NOT CONFIRMED AFTER 1 MIN. (ADJ) GENERATE ALARM. AFTER DAMPER POSITION HAS BEEN CONFIRM SYSTEM SHALL REQUEST EXHAUST FAN (R-2) AND MAINTAIN GENERATOR ROOM TEMPERATURE (T-1) SETPOINT OF 75°F (ADJ.) BY MODULATING FAN (SC-1). ONCE GENERATOR VENTILATION REQUEST (R-1) HAS STOP, ALL DAMPERS SHALL RETURN TO THE ORIGINAL POSITION ONCE TEMPERATURE SETPOINT HAS BEEN REACHED. DURING COLD WAETHER SEASON MODULATE EXHAUST FAN (SC-1) AND OUTSIDE AIR DAMPER (D-1) TO MAINTAIN ROOM TEMPERATURE SETPOINT, GENERATOR ROOM UNIT HEATER (2-120B-UH-004) SHALL BE DISABLED UPON

GENERATOR VENTILATION REQUEST (R-1).

ALARMS: SHALL GENERATE ALARM IF OUTSIDE AIR AND EXHAUST AIR DAMPERS REMAIN CLOSE FOR MORE THAN 1 MIN. (ADJ.) AFTER VENTILATION REQUEST (R-1). SHALL GENERATE ALARM IF GENERATOR ROOM

TEMPERATURE (T-1) EXCEEDS 100°F (ADJ.).

NTS6 GENERATOR ROOM VENTILATION SCHEMATIC

FIN TUBE RADIATOR UNIT CONTROL DIAGRAM2

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

REV 1 PRE-BID UPDATES 2024-08-01

8/1/2024 SHEET 192

CS

DDC

CONTROLLER

PROPANE

GAS

MONITORBMS

ROOF

EA

R-Z

M

CS-1

BACKDRAFT DAMPER

BMS

S

PDT

COMPRESSED

AIR TANK

PDT

DDC

CONTROLERBMS

V-1

BUILDING 1 CA

SUPPLY

JOB: 22367

BUILDING: 2 BOILER PLANT

POINT LEGEND

SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL

PAGE:

BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION

SYSTEM:

PROPANE GAS ROOM PURGE

SYSTEM COMPONENT:

PO

IN

T

ID

AB

BR

EV

IA

TI

ON

PR

IO

RI

TY

/A

DD

-A

LT

ER

NA

TE

N

O.

-- EL

EC

TR

IC

D

EV

IC

E

ST

AR

T/

ST

OP

OP

EN

/C

LO

SE

-- SP

EE

D

CO

MM

AN

D

VA

LV

E

PO

SI

TI

ON

DA

MP

ER

P

OS

IT

IO

N

ST

AT

US

AL

AR

M

PR

ES

SU

RE

HI

GH

H

UM

ID

IT

Y

HI

GH

S

TA

TI

C

PR

ES

SU

RE

LO

W

T

EM

PE

RA

TU

RE

FA

N

IN

B

YP

AS

TE

MP

ER

AT

UR

E

(T I)

PR

ES

SU

RE

PO

SI

TI

ON

FL

OW

PE

RC

EN

T

ST

AT

IC

P

RE

SS

UR

E

CA

RB

ON

M

ON

OX

ID

E

HU

MI

DI

TY

VA

CU

UM

LO

CA

L A

LA

RM

P

AN

EL

AR

EA

A

LA

RM

P

ER

A

LA

RM

P

AN

EL

HI

GH

LI

MI

T

LO

W

LI

MI

T

-- -- SC

HE

DU

LE

S

TA

RT

/S

TO

P

FU

NC

TI

ON

DU

TY

C

YC

LE

TE

MP

ER

AT

UR

E

EC

ON

OM

IZ

ER

EN

TH

AL

PY

E

CO

NO

MI

ZE

R

TE

MP

ER

AT

UR

E

RE

SE

T

DE

MA

ND

LI

MI

ER

AT

UR

E

OV

ER

RI

DE

ST

AT

IC

P

RE

SS

UR

E

RE

SE

T

VE

NT

ILA

TO

N

CO

NT

RO

L

-- PR

ES

SU

RE

/V

OL

UM

E

CO

NT

RO

L

FA

ILU

RE

M

OD

E

SP

AC

E

TE

MP

. C

ON

TR

OL

FU

LL

C

OM

MU

NI

TC

AT

IO

N

TR

EN

DI

NG

REMARKS

PROPANE GAS MONITOR REQUEST R-1 X X

FAN MOTOR COMMAND R-2 X X

FAN MOTOR CURRENT SENSOR CS-1 X X X X

JOB: 22367

BUILDING: 2 BOILER PLANT

POINT LEGEND

SYSTEM OUTPUTS SYSTEM INPUTS SYSTEM SOFTWARE/CONTROL

PAGE:

BINARY ANALOG BINARY ANALOG ALARM PROCESSING APPLICATION/FUNCTION

SYSTEM:

GENERAL SERVICE COMPRESSED AIR

SYSTEM COMPONENT:

PO

IN

T

ID

AB

BR

EV

IA

TI

ON

PR

IO

RI

TY

/A

DD

-A

LT

ER

NA

TE

N

O.

-- EL

EC

TR

IC

D

EV

IC

E

ST

AR

T/

ST

OP

OP

EN

/C

LO

SE

-- SP

EE

D

CO

MM

AN

D

VA

LV

E

PO

SI

TI

ON

DA

MP

ER

P

OS

IT

IO

N

ST

AT

US

AL

AR

M

PR

ES

SU

RE

HI

GH

H

UM

ID

IT

Y

HI

GH

S

TA

TI

C

PR

ES

SU

RE

LO

W

T

EM

PE

RA

TU

RE

-- TE

MP

ER

AT

UR

E

(T I)

PR

ES

SU

RE

PO

SI

TI

ON

FL

OW

PE

RC

EN

T

ST

AT

IC

P

RE

SS

UR

E

CA

RB

ON

M

ON

OX

ID

E

HU

MI

DI

TY

VA

CU

UM

LO

CA

L A

LA

RM

P

AN

EL

AR

EA

A

LA

RM

P

ER

A

LA

RM

P

AN

EL

HI

GH

LI

MI

T

LO

W

LI

MI

T

-- -- SC

HE

DU

LE

S

TA

RT

/S

TO

P

FU

NC

TI

ON

DU

TY

C

YC

LE

TE

MP

ER

AT

UR

E

EC

ON

OM

IZ

ER

EN

TH

AL

PY

E

CO

NO

MI

ZE

R

TE

MP

ER

AT

UR

E

RE

SE

T

DE

MA

ND

LI

MI

ER

AT

UR

E

OV

ER

RI

DE

ST

AT

IC

P

RE

SS

UR

E

RE

SE

T

CO

MP

RE

SS

ED

A

IR

C

ON

TR

OL

MA

NU

AL

O

VE

RR

ID

E

PR

ES

SU

RE

/V

OL

UM

E

CO

NT

RO

L

FA

ILU

RE

M

OD

E

SP

AC

E

TE

MP

. C

ON

TR

OL

FU

LL

C

OM

MU

NI

TC

AT

IO

N

TR

EN

DI

NG

REMARKS

RECEIVER PRESSURE SENSOR PDT-1 X X X X X

BUILDING 1 CA SUPPLY SOLENOID VALVE V-1 X X X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MI604

MECHANICAL HVAC CONTROLS

DIAGRAMS 2

IAR IJS

PARTIALLY SPRINKLERED

PROPANE GAS ROOM PURGE SEQUENCE OF OPERATION:

OCCUPANCY: PROPANE GAS ROOM MONITOR SHALL START EXHAUST FAN IN THE EVENT OF MONITOR DETECTING PROPANE GAS. ONCE PROPANE GAS MONITOR REQUEST (R-1) IS DETECTED BY BMS, DDC CONTROLLER SHALL RUN EXHAUST FAN (R-2) CONTINOUSLY UNITL PROPANE GAS MONITOR REQUEST (R-1) STOPS. FAN MOTOR CURRENT

SENSOR (CS-1) SHALL PROVIDE FAN STATUS.

ALARM: IF THERE IS A FAN REQUEST (R-2) BUT NO STATUS HAS BEEN PROVED BY FAN MOTOR CURRENT SENSOR

(…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .