FUEL OIL PUMP SKID
TO BE REMOVED
1 2 3
A
B
D
F
H
TO BUILDING 1
MD101
3'
6"ø HPS 4"ø HPR 3"ø HPS 4"ø RW 2"ø SW
EXISTING FUEL OIL
TO BOILERS
EXISTING FUEL OIL TO
TEMPORARY FUEL TANK
MD2011
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MD101
MECHANICAL DEMOLITION PLAN -
BASEMENT LEVEL 2
DJU KRL
PARTIALLY SPRINKLERED
KEYPLAN
N
12 16
AREA OF WORK
5. ALL EQUIPMENT SHOWN FOR REMOVAL ON THIS SHEET SHALL REMAIN FUNCTIONAL
UNTIL COMMISSIONING IS COMPLETED ON THE NEW BOILER PLANT.
4.
ALL BOILER PLANT EQUIPMENT SHALL BE REMOVED, ALONG WITH ALL ASSOCIATED
PIPING, VALVES, HANGERS, ETC. FOR ANY PIPING THAT LEAVES THE BOILER PLANT,
COORDINATE THE EXTENT OF DEMOLITION WITH THE COR AND ENSURE THE
REMAINING SYSTEMS ARE FUNCTIONING CORRECTLY.
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/16" = 1'-0"1 MECHANICAL DEMOLITION PLAN - BASEMENT LEVEL
N
FUEL OIL PUMP SKID2
Revisions: Date:
4 5
KEYED NOTES
1 CIRCULATION HEATER TO BE REUSED FOR NEW BOILER PLANT. TO BE RELOCATED TO
EQUIPMENT ACCESS 200-2
SHEET 1762/22/2024
STEAM HEADER TO BE REMOVED
REVERSE OSMOSIS SYSTEM
AND RO STORAGE TANK TO
BE REMOVED
WATER SOFTENER TO BE REMOVED
BOILER TO BE
REMOVED
1 2 3
A
B
D
F
H
M
BOILER TO BE
REMOVED
BOILER TO BE
REMOVED
FEEDWATER PUMPS
TO BE REMOVED
MD121 2
MD121
MD121
MD1215 MD121
MD121
MD1218
PIPING TO FUEL OIL SKID
TO BE REMOVED
EXISTING
BOILER
EXISTING
BOILER
EXISTING
BOILER
MD121
MD12110
MD121
MD12112
MD121
MD12114
5 GALLON CARDBOARD BUCKET
CONTAINING LOOSE ACM ON THE
TOP LEVEL 4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MD121
MECHANICAL DEMOLITION PLAN -
GROUND FLOOR LEVEL 2
DJU KRL
PARTIALLY SPRINKLERED
KEYPLAN
N
12 16
AREA OF WORK
SCALE: 3/16" = 1'-0"1 MECHANICAL DEMOLITION PLAN - GROUND FLOOR LEVEL
14.
ALL ABATEMENT AND/OR REMOVAL OF ASBESTOS CONTAINING MATERIALS MUST PASS
VISUAL INSPECTION AND CLEARANCE PROCEDURES BEFORE GENERAL
CONSTRUCTION WORK MAY COMMENCE.
13.
ESTABLISH WASTE AND PERSONAL DECONTAMINATION SYSTEM ENCLOSURES AS
REQUIRED TO PERFORM ABATEMENT WITHIN THE BUILDING, INCLUDING ANY
ISOLATION BARRIERS.
12.
THE LOCATION OF ANY ON-SITE STORAGE OF MATERIALS, EQUIPMENT
DUMPSTER/WASTE TRAILER AND DECONTAMINATION FACILITIES SHALL BE
COORDINATED WITH AND APPROVED BY THE COR.
11. REFER TO THE ENTIRE SET OF CONTRACT DOCUMENTS FOR COORDINATION OF
SCOPE.
10.
KEEP THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDE TEMPORARY
PROTECTION, PROTECT BUILDING MATERIALS SCHEDULED TO REMAIN, AND PREVENT
UNAUTHORIZED ACCESS DURING THE DURATION OF THE PROJECT. THE CONTRACTOR
IS RESPONSIBLE FOR THE CLEAN-UP OF ALL CONTAINMENT WORK AREAS;
SPECIFICALLY, TAPE/ADHESIVES RESIDUE FROM ALL SURFACES. REPAIR OF DAMAGE
CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR CONTRACTOR
ACTIVITIES, INCLUDING DAMAGE TO FINISHES RESULTING FROM CONTAINMENT
MEASURES, WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
9. AREAS UNDER ABATEMENT SHALL BE PROPERLY POSTED WITH WARNING SIGNS AND
SECURED TO PREVENT UNAUTHORIZED ENTRIES.
8. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL, OR SUSPECT MATERIAL,
SHALL BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR.
7.
PERFORM ALL HAZARDOUS MATERIALS WORK, INCLUDING AREA CONTAINMENT
MEASURES AND REMOVAL, IN STRICT ACCORDANCE WITH: THE PROJECT
SPECIFICATION, ALL FEDERAL, STATE AND LOCAL REGULATIONS, AND ANY
APPROPRIATE APPLICABLE VARIANCES AND SITE-SPECIFIC VARIANCES. APPLICABLE
REGULATIONS INCLUDE, BUT ARE NOT LIMITED TO: OSHA 29 CFR 1926 SUBPART Z, 40
CFR PART 763 (AHERA), 40 CFR PART 61 SUBPART M (NESHAP STANDARD FOR
DEMOLITION AND RENOVATION).
6.
ALL EQUIPMENT SHOWN FOR REMOVAL ON THIS SHEET, WITH THE EXCEPTION OF THE
FOUR (4) EXHAUST FANS ON THE WEST WALL, SHALL REMAIN FUNCTIONAL UNTIL
COMMISSIONING IS COMPLETED ON THE NEW BOILER PLANT.
5. THE THREE EXISTING BOILERS ARE ZURN WATER TUBE STEAM BOILERS WITH 15,000
LB/HR CAPACITY. THE BOILERS WERE INSTALLED IN 1980.
4.
ALL BOILER PLANT EQUIPMENT SHALL BE REMOVED, ALONG WITH ALL ASSOCIATED
PIPING, VALVES, HANGERS, ETC. FOR ANY PIPING THAT LEAVES THE BOILER PLANT,
COORDINATE THE EXTENT OF DEMOLITION WITH THE COR AND ENSURE THE
REMAINING SYSTEMS ARE FUNCTIONING CORRECTLY.
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
WATER SOFTENER5
FEEDWATER PUMPS7 FAN8
BOILER 12 BOILER 23 STEAM HEADER4
REVERSE OSMOSIS6 RO STORAGE TANK9
KEYED NOTES
1 FANS (8/MD121) ARE TO BE REMOVED AS PART OF CONSTRUCTION OF THE NEW BOILER
PLANT - PHASE 3
2 REMOVE ALL ASBESTOS-CONTAINING THERMAL SYSTEM INSULATION FROM PIPE
ELBOWS, JOINTS, VALVES, AND ALL ASBESTOS-CONTAINING GASKETS BETWEEN VALVE
FLANGES. INCLUDES REMOVAL OF ANY ADJACENT CONTAMINATED FIBERGLASS PIPE
INSULATIONS WITHIN THE REGULATED WORK AREA.
< 5 LINEAR FEET TSI EA
< 5 SQUARE FEET GASKETING EA
3 REMOVE ASBESTOS-CONTAINING VALVE GASKETS IN ENTIRETY
< 2 SQUARE FEET GASKETING EA
4 REMOVE FIVE-GALLON BUCKET AND ASBESTOS-CONTAINING CONTENTS IN ENTIRETY.
AT A MINIMUM CONDUCT REMOVAL AS OSHA CLASS I WORK AND WASTE GENERATED
AS EPA RACM.
QUANTITY OF ACM IS <10 SQUARE FEET
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
REV 1 PRE-BID UPDATES 2024-08-01
ACM-1 FITTINGS AND GASKETS10 ACM-2 GASKETS11 ACM-3 GASKETS12 ACM-4 GASKETS13
ACM-5 5 GALLON BUCKET14
8/1/2024 SHEET 177
UNIT HEATER TO BE
REMOVED
DEAERATOR TO BE REMOVED
AIR COMPRESSOR TO BE REMOVED
UNIT HEATER TO BE
REMOVED
UNIT HEATER TO BE
REMOVED
1 2 3
A
B
D
F
H
M
UNIT HEATER TO
BE REMOVED
COMPRESSED AIR TANK TO BE REMOVED
MD141
MD141
MD141
MD141
MD141
MEZZANINE
202-2
BOILER STACK TO
BE REMOVED, TYP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MD141
MECHANICAL DEMOLITION PLAN -
MEZZANINE LEVEL 2
DJU KRL
PARTIALLY SPRINKLERED
KEYPLAN
N
12 16
AREA OF WORK
SCALE: 3/16" = 1'-0"1 MECHANICAL DEMOLITION PLAN - MEZZANINE LEVEL
5.
ALL EQUIPMENT SHOWN FOR REMOVAL ON THIS SHEET, WITH THE EXCEPTION OF THE
STEAM MAKE UP AIR HEATER ON THE WEST WALL, SHALL REMAIN FUNCTIONAL UNTIL
COMMISSIONING IS COMPLETED ON THE NEW BOILER PLANT.
4.
ALL BOILER PLANT EQUIPMENT SHALL BE REMOVED, ALONG WITH ALL ASSOCIATED
PIPING, VALVES, HANGERS, ETC. FOR ANY PIPING THAT LEAVES THE BOILER PLANT,
COORDINATE THE EXTENT OF DEMOLITION WITH THE COR AND ENSURE THE
REMAINING SYSTEMS ARE FUNCTIONING CORRECTLY.
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
DEAERATOR2
AIR COMPRESSOR3
COMPRESSED AIR TANK4
STEAM MAKE UP AIR HEATER5
UNIT HEATER6
KEYED NOTES
1 MAKEUP AIR UNIT (5/MD141) IS TO BE REMOVED AS PART OF THE CONSTRUCTION OF
THE NEW BOILER PLANT
Revisions: Date:
SHEET 1782/22/2024
BOILER STACK TO
BE REMOVED
UNIT HEATER AND ASSOCIATED
PIPING TO BE REMOVED
BOILER STACK TO
BE REMOVED
BOILER STACK TO
BE REMOVED
COAL HOPPER
SVB VENT TO
BE REMOVED
SVB VENT TO
BE REMOVED
SVB VENT TO
BE REMOVED
STEAM VENT TO
BE REMOVED
BLOWDOWN VENT
TO BE REMOVED
MD161 2
MD161 3
MD161
FAN TO BE RETAINED
T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MD161
MECHANICAL DEMOLITION PLAN -
ROOF LEVEL 2
DJU KRL
PARTIALLY SPRINKLERED
KEYPLAN
N
12 16
AREA OF WORK
5. ALL EQUIPMENT SHOWN FOR REMOVAL ON THIS SHEET SHALL REMAIN FUNCTIONAL
UNTIL COMMISSIONING IS COMPLETED ON THE NEW BOILER PLANT.
4.
ALL BOILER PLANT EQUIPMENT SHALL BE REMOVED, ALONG WITH ALL ASSOCIATED
PIPING, VALVES, HANGERS, ETC. FOR ANY PIPING THAT LEAVES THE BOILER PLANT,
COORDINATE THE EXTENT OF DEMOLITION WITH THE COR AND ENSURE THE
REMAINING SYSTEMS ARE FUNCTIONING CORRECTLY.
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/16" = 1'-0"1 MECHANICAL DEMOLITION PLAN - ROOF LEVEL
N
UNIT HEATER2
FAN3
STACKS4
KEYED NOTES
1 ADD TEMPERATURE SENSOR TO CONTROL RETAINED EXHAUST FAN. FAN SHALL TURN
ON WHEN TEMPERATURE RISES ABOVE 88° F (ADJ.) DURING WARM WEATHER SEASON