S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf

PDF 9 MB Posted

Attached to
Y1NB--Project 585-21-115 Replace Boiler Plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI -- NAICS 236220 General Construction
Solicitation number
36C25225R0004
Issued by

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_Updated Dwgs_partial_24JAN25.pdf PDF
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
36C25225R0004 0007.docx DOCX document
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.1_P03 Single Source Justification MEDECO.e.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.6c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FUEL OIL PUMP SKID

TO BE REMOVED

1 2 3

A

B

D

F

H

TO BUILDING 1

MD101

3'

6"ø HPS 4"ø HPR 3"ø HPS 4"ø RW 2"ø SW

EXISTING FUEL OIL

TO BOILERS

EXISTING FUEL OIL TO

TEMPORARY FUEL TANK

MD2011

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MD101

MECHANICAL DEMOLITION PLAN -

BASEMENT LEVEL 2

DJU KRL

PARTIALLY SPRINKLERED

KEYPLAN

N

12 16

AREA OF WORK

5. ALL EQUIPMENT SHOWN FOR REMOVAL ON THIS SHEET SHALL REMAIN FUNCTIONAL

UNTIL COMMISSIONING IS COMPLETED ON THE NEW BOILER PLANT.

4.

ALL BOILER PLANT EQUIPMENT SHALL BE REMOVED, ALONG WITH ALL ASSOCIATED

PIPING, VALVES, HANGERS, ETC. FOR ANY PIPING THAT LEAVES THE BOILER PLANT,

COORDINATE THE EXTENT OF DEMOLITION WITH THE COR AND ENSURE THE

REMAINING SYSTEMS ARE FUNCTIONING CORRECTLY.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/16" = 1'-0"1 MECHANICAL DEMOLITION PLAN - BASEMENT LEVEL

N

FUEL OIL PUMP SKID2

Revisions: Date:

4 5

KEYED NOTES

1 CIRCULATION HEATER TO BE REUSED FOR NEW BOILER PLANT. TO BE RELOCATED TO

EQUIPMENT ACCESS 200-2

SHEET 1762/22/2024

STEAM HEADER TO BE REMOVED

REVERSE OSMOSIS SYSTEM

AND RO STORAGE TANK TO

BE REMOVED

WATER SOFTENER TO BE REMOVED

BOILER TO BE

REMOVED

1 2 3

A

B

D

F

H

M

BOILER TO BE

REMOVED

BOILER TO BE

REMOVED

FEEDWATER PUMPS

TO BE REMOVED

MD121 2

MD121

MD121

MD1215 MD121

MD121

MD1218

PIPING TO FUEL OIL SKID

TO BE REMOVED

EXISTING

BOILER

EXISTING

BOILER

EXISTING

BOILER

MD121

MD12110

MD121

MD12112

MD121

MD12114

5 GALLON CARDBOARD BUCKET

CONTAINING LOOSE ACM ON THE

TOP LEVEL 4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MD121

MECHANICAL DEMOLITION PLAN -

GROUND FLOOR LEVEL 2

DJU KRL

PARTIALLY SPRINKLERED

KEYPLAN

N

12 16

AREA OF WORK

SCALE: 3/16" = 1'-0"1 MECHANICAL DEMOLITION PLAN - GROUND FLOOR LEVEL

14.

ALL ABATEMENT AND/OR REMOVAL OF ASBESTOS CONTAINING MATERIALS MUST PASS

VISUAL INSPECTION AND CLEARANCE PROCEDURES BEFORE GENERAL

CONSTRUCTION WORK MAY COMMENCE.

13.

ESTABLISH WASTE AND PERSONAL DECONTAMINATION SYSTEM ENCLOSURES AS

REQUIRED TO PERFORM ABATEMENT WITHIN THE BUILDING, INCLUDING ANY

ISOLATION BARRIERS.

12.

THE LOCATION OF ANY ON-SITE STORAGE OF MATERIALS, EQUIPMENT

DUMPSTER/WASTE TRAILER AND DECONTAMINATION FACILITIES SHALL BE

COORDINATED WITH AND APPROVED BY THE COR.

11. REFER TO THE ENTIRE SET OF CONTRACT DOCUMENTS FOR COORDINATION OF

SCOPE.

10.

KEEP THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDE TEMPORARY

PROTECTION, PROTECT BUILDING MATERIALS SCHEDULED TO REMAIN, AND PREVENT

UNAUTHORIZED ACCESS DURING THE DURATION OF THE PROJECT. THE CONTRACTOR

IS RESPONSIBLE FOR THE CLEAN-UP OF ALL CONTAINMENT WORK AREAS;

SPECIFICALLY, TAPE/ADHESIVES RESIDUE FROM ALL SURFACES. REPAIR OF DAMAGE

CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR CONTRACTOR

ACTIVITIES, INCLUDING DAMAGE TO FINISHES RESULTING FROM CONTAINMENT

MEASURES, WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.

9. AREAS UNDER ABATEMENT SHALL BE PROPERLY POSTED WITH WARNING SIGNS AND

SECURED TO PREVENT UNAUTHORIZED ENTRIES.

8. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL, OR SUSPECT MATERIAL,

SHALL BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR.

7.

PERFORM ALL HAZARDOUS MATERIALS WORK, INCLUDING AREA CONTAINMENT

MEASURES AND REMOVAL, IN STRICT ACCORDANCE WITH: THE PROJECT

SPECIFICATION, ALL FEDERAL, STATE AND LOCAL REGULATIONS, AND ANY

APPROPRIATE APPLICABLE VARIANCES AND SITE-SPECIFIC VARIANCES. APPLICABLE

REGULATIONS INCLUDE, BUT ARE NOT LIMITED TO: OSHA 29 CFR 1926 SUBPART Z, 40

CFR PART 763 (AHERA), 40 CFR PART 61 SUBPART M (NESHAP STANDARD FOR

DEMOLITION AND RENOVATION).

6.

ALL EQUIPMENT SHOWN FOR REMOVAL ON THIS SHEET, WITH THE EXCEPTION OF THE

FOUR (4) EXHAUST FANS ON THE WEST WALL, SHALL REMAIN FUNCTIONAL UNTIL

COMMISSIONING IS COMPLETED ON THE NEW BOILER PLANT.

5. THE THREE EXISTING BOILERS ARE ZURN WATER TUBE STEAM BOILERS WITH 15,000

LB/HR CAPACITY. THE BOILERS WERE INSTALLED IN 1980.

4.

ALL BOILER PLANT EQUIPMENT SHALL BE REMOVED, ALONG WITH ALL ASSOCIATED

PIPING, VALVES, HANGERS, ETC. FOR ANY PIPING THAT LEAVES THE BOILER PLANT,

COORDINATE THE EXTENT OF DEMOLITION WITH THE COR AND ENSURE THE

REMAINING SYSTEMS ARE FUNCTIONING CORRECTLY.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

WATER SOFTENER5

FEEDWATER PUMPS7 FAN8

BOILER 12 BOILER 23 STEAM HEADER4

REVERSE OSMOSIS6 RO STORAGE TANK9

KEYED NOTES

1 FANS (8/MD121) ARE TO BE REMOVED AS PART OF CONSTRUCTION OF THE NEW BOILER

PLANT - PHASE 3

2 REMOVE ALL ASBESTOS-CONTAINING THERMAL SYSTEM INSULATION FROM PIPE

ELBOWS, JOINTS, VALVES, AND ALL ASBESTOS-CONTAINING GASKETS BETWEEN VALVE

FLANGES. INCLUDES REMOVAL OF ANY ADJACENT CONTAMINATED FIBERGLASS PIPE

INSULATIONS WITHIN THE REGULATED WORK AREA.

< 5 LINEAR FEET TSI EA

< 5 SQUARE FEET GASKETING EA

3 REMOVE ASBESTOS-CONTAINING VALVE GASKETS IN ENTIRETY

< 2 SQUARE FEET GASKETING EA

4 REMOVE FIVE-GALLON BUCKET AND ASBESTOS-CONTAINING CONTENTS IN ENTIRETY.

AT A MINIMUM CONDUCT REMOVAL AS OSHA CLASS I WORK AND WASTE GENERATED

AS EPA RACM.

QUANTITY OF ACM IS <10 SQUARE FEET

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

REV 1 PRE-BID UPDATES 2024-08-01

ACM-1 FITTINGS AND GASKETS10 ACM-2 GASKETS11 ACM-3 GASKETS12 ACM-4 GASKETS13

ACM-5 5 GALLON BUCKET14

8/1/2024 SHEET 177

UNIT HEATER TO BE

REMOVED

DEAERATOR TO BE REMOVED

AIR COMPRESSOR TO BE REMOVED

UNIT HEATER TO BE

REMOVED

UNIT HEATER TO BE

REMOVED

1 2 3

A

B

D

F

H

M

UNIT HEATER TO

BE REMOVED

COMPRESSED AIR TANK TO BE REMOVED

MD141

MD141

MD141

MD141

MD141

MEZZANINE

202-2

BOILER STACK TO

BE REMOVED, TYP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MD141

MECHANICAL DEMOLITION PLAN -

MEZZANINE LEVEL 2

DJU KRL

PARTIALLY SPRINKLERED

KEYPLAN

N

12 16

AREA OF WORK

SCALE: 3/16" = 1'-0"1 MECHANICAL DEMOLITION PLAN - MEZZANINE LEVEL

5.

ALL EQUIPMENT SHOWN FOR REMOVAL ON THIS SHEET, WITH THE EXCEPTION OF THE

STEAM MAKE UP AIR HEATER ON THE WEST WALL, SHALL REMAIN FUNCTIONAL UNTIL

COMMISSIONING IS COMPLETED ON THE NEW BOILER PLANT.

4.

ALL BOILER PLANT EQUIPMENT SHALL BE REMOVED, ALONG WITH ALL ASSOCIATED

PIPING, VALVES, HANGERS, ETC. FOR ANY PIPING THAT LEAVES THE BOILER PLANT,

COORDINATE THE EXTENT OF DEMOLITION WITH THE COR AND ENSURE THE

REMAINING SYSTEMS ARE FUNCTIONING CORRECTLY.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

DEAERATOR2

AIR COMPRESSOR3

COMPRESSED AIR TANK4

STEAM MAKE UP AIR HEATER5

UNIT HEATER6

KEYED NOTES

1 MAKEUP AIR UNIT (5/MD141) IS TO BE REMOVED AS PART OF THE CONSTRUCTION OF

THE NEW BOILER PLANT

Revisions: Date:

SHEET 1782/22/2024

BOILER STACK TO

BE REMOVED

UNIT HEATER AND ASSOCIATED

PIPING TO BE REMOVED

BOILER STACK TO

BE REMOVED

BOILER STACK TO

BE REMOVED

COAL HOPPER

SVB VENT TO

BE REMOVED

SVB VENT TO

BE REMOVED

SVB VENT TO

BE REMOVED

STEAM VENT TO

BE REMOVED

BLOWDOWN VENT

TO BE REMOVED

MD161 2

MD161 3

MD161

FAN TO BE RETAINED

T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MD161

MECHANICAL DEMOLITION PLAN -

ROOF LEVEL 2

DJU KRL

PARTIALLY SPRINKLERED

KEYPLAN

N

12 16

AREA OF WORK

5. ALL EQUIPMENT SHOWN FOR REMOVAL ON THIS SHEET SHALL REMAIN FUNCTIONAL

UNTIL COMMISSIONING IS COMPLETED ON THE NEW BOILER PLANT.

4.

ALL BOILER PLANT EQUIPMENT SHALL BE REMOVED, ALONG WITH ALL ASSOCIATED

PIPING, VALVES, HANGERS, ETC. FOR ANY PIPING THAT LEAVES THE BOILER PLANT,

COORDINATE THE EXTENT OF DEMOLITION WITH THE COR AND ENSURE THE

REMAINING SYSTEMS ARE FUNCTIONING CORRECTLY.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/16" = 1'-0"1 MECHANICAL DEMOLITION PLAN - ROOF LEVEL

N

UNIT HEATER2

FAN3

STACKS4

KEYED NOTES

1 ADD TEMPERATURE SENSOR TO CONTROL RETAINED EXHAUST FAN. FAN SHALL TURN

ON WHEN TEMPERATURE RISES ABOVE 88° F (ADJ.) DURING WARM WEATHER SEASON

Revisions: Date:

SHEET 1792/22/2024