S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25225R0004
About this file
This file contains plumbing and process piping diagrams for the boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings include detailed schematics for domestic water systems, sanitary systems, fuel oil systems, and natural gas systems with comprehensive pipe sizing, valve locations, instrumentation details, and equipment specifications.
The drawings show three new boilers (designated as BLR-001, BLR-002, and BLR-003) with associated fuel trains for both natural gas and fuel oil operation, water softening systems, deaerators, feedwater pumps, and blowdown separators. Key specifications include pressure reducing valve settings, safety valve setpoints, pump capacities, and detailed instrumentation and control diagrams. The drawings use standard process and instrumentation diagram (P&ID) symbols and include general notes and legends explaining abbreviations and symbology. The drawings were issued as part of the 100% bid set dated February 23, 2024, and include sheet numbers ranging from PP601 through D-624.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
CW
CW CW
GROUND FLOOR
0'-0"
CW
CW
CW
CW
INTERIOREXTERIOR
WH-1
MEZZANINE
12'-0"
HW
P-101P-502
HW
SCW
SC
W
P-401
HWSC
W
P-101
SC
W
P-401
HWSC
W
P-701
HWSC
W
P-401
HWSC
W
HW
HWR
P-707
HWRHWRHWRHWRHWRHWRHWRHWRHWR
HW HW HW HW HW HW HW HW HW HW
4"
2" 2" 1/2"
3/4" 1/2" 1/2"
1/2"
1 1/2 1/2"
1/2"
1/2"
PMP-2
CW
CW CW
P-604 P-801
SCW SCW SCW SCW SCW SCW SCW SCW SCW
EXPT-1
P-709
P-802
4" RPZ4" METER
3"
1/2
CW
TO BLOWDOWN SEPARATOR COORDINATE
WITH MECHANICAL DRAWINGS
2"
2" 3/4"
P-802
1/2
CW CW CW
NC
2"
2"WATER SOFTENER
D-631
WATER SOFTENER
D-631
2"
2"
P-802P-801
1/2
1/2"
1/2"3/4"
1/2
1/2
1/2
3/4
SC
W
SCW SCW SCW SCW SCW SCW SCW SCW SCW SCW SCW
SCW
SCW
1/2"
3/4
1/2
P-528
HWSC
W
SCW
SCW1/2"
P-528
HWSC
W
CW
P-101
SC
W
TMV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PLUMBING DOMESTIC WATER
RISER DIAGRAM
100% BID SET
PARTIALLY
SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
PP601
585-21-115
AJW CCW
REV 0 - 100% BID SET 2024-02-23
GENERAL NOTES
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
KEYED NOTES
1 BREAKROOM REFRIGERATOR WATER SUPPLY
SHEET 1352/23/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
GROUND FLOOR
0'-0"
MEZZANINE
12'-0"
TRENCH
-2'-0"
ROOF
33'-3 1/2"
BASEMENT
0'-0"
INTERIOREXTERIOR
SSSSSSSSSSSSSSSSSS
P-401
V
SS
P-701
SS
P-101
SS
FD COFD
P-401
V
SS SS
P-101
P-401
V
SS
SS
SS
SS
SS
FDFD
SS
P-101
4" SS TO SITE SEWER
INV. 1140.50
SS
P-502
P-528
V
SS
P-604
V
SS
V V V V V V1 1/2" 1 1/2"
V V
V V
2"2" 2"2"
4"
V V
V V
4"
CO
SSSSSSSSSSSSSSSSSSSS
6" SS TO O/W SEPARATOR
INV. 1136.65
SS
SS SS SS SS SS SS SS SS SS SS
SS SS SS SS
TD
SS
TD
SS
TD
SS
TD
SS
TD
SS
TD
SS
COORDINATE WITH MECHANICAL
DRAWINGS TO PROVIDE CONNECTION
TO BLOWDOWN SEPARATOR
FD
SS
CO
SS
CO
SS
FD
SS
V V
V V
V V
V V
6" 4" 6"
FD
SS
TD
SS
TD
SS
SS
TD
SS
FD
SS
TD
SS
TD
SS
SS
TD
SS
CO
SS
CO
SS
FD
SS
CO
SS
SS
SS
V V
V
V V
V V
V V
V V
3" 3"
VV
1 1/2" 1 1/2" 1 1/2"
PMP-1
2"
4" 4"
4" 3"4" 3" 3" 3"
FD
3"
3" 3"
3" 3"
3"3"
3"
COORDINATE WITH MECHANICAL
DRAWING TO PROVIDE CONNECTION
TO DEAERATOR DRAIN AND
OVERFLOW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PLUMBING SANITARY RISER
DIAGRAM
FINAL BID SET
PARTIALLY
SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
PP602
585-21-115
AJW CCW
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
GENERAL NOTES
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
KEYED NOTES
1 EXTEND AND TERMINATE VENT PIPE 24 INCHES ABOVE ROOF
1 1 1
SHEET 1364/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
P-604
P-528
P-502
P-101
P-401
P-101
P-101
P-701
P-528
P-401
SCW
SCW
SCW
SCW
SCW
CW
CW
CW
CW
CW
HW
S
HW
S
SCW
SCW
SCW
HWR
HWR
HWR
HWR
HWR
HWS
HWS
HWS
HWS
HWS
CW
CW
CW
CW
P-801
SCW
SCW
SCW
SCW
SCW
SCW
SCW
SCW
SCW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
HWS
HWS
HWS
HWS
HWS
HWS
HWR
HWR
HWR
HWR
HWR
HWR
HWR
HWR
HWR
HWS
HWS
SCW
SCWCW
CW
SCW
SCW
HW
S
SC
W HW
S
SCW
HW
S
P-401
HWS
HWS
SCW
SCW
SCW
SCW
HWS
HWS
SCW
SCW
SC
W
SCW
SCW
HWS
HWS
SCW HW
S
SCW HW
S
SCW
SCW
SCW
SCW
HWS
HWS
HWS
HWS
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
SCW
SCW
SCW
SCW
SCW
SCW
SCW
SCW
HWR
HWR
HWR
HWR
HWR
HWR
HWR
HWRHWS
HWS
HWS
HWS
HWS
HWS
HWS
HWS
WH-1
CW
CW
HWS
HWS
HWS
HWS
HWS
HWR
HWR
HWR
HWR
HWR
HWS
HWS
HWS
HWS
HWS
HWS
HWS
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
SCW
SCW
SCW
SCWSCW
SCW
SCW
SCW
SCW
SCW
SCW
CW
CW
CW
P-802
HWR
HWR
HWR
HWR
HWR
HWR
HWR
HWR
P-707
SCW
SCW
CW
CW
SCW
SCW
CW
CW
CW
CW
CW
CW
CW
CW
CW
CW
P-802
CW
CW
CW
CW
CW
CW
CW
CW
P-801
HW
S
SCW
SCW
FROM SCW
TO EXTERIOR
THERMOSTATIC MIXING VALVE
FROM HWR
BREAK ROOM
REFRIGERATOR
4" Ø CW
2" Ø CW
3/4" Ø CW
1/2" Ø CW
1/2" Ø CW
1/2" Ø CW
1/2" Ø CW
1/2" Ø CW
1/2" Ø CW
1/2" Ø HWR
1/2" Ø HWR
1/2" Ø HWR
3/4" Ø HWS
3/4" Ø HWS
3/4" Ø HWS
1/2" Ø HWS
1/2" Ø HWS
1/2" Ø HWS
1/2" Ø HWS
1/2" Ø HWS
1/2" Ø HWS
1/2" Ø HWS
3/4" Ø HWS
3/4" Ø SCW2" Ø SCW
2" Ø SCW
1 1/2" Ø SCW
1/2" Ø SCW
1/2" Ø SCW
1" Ø SCW
1/2" Ø SCW
1/2" Ø SCW
1/2" Ø SCW
1" Ø SCW
1/2" Ø SCW
1/2" Ø SCW
3/4" Ø SCW
2" Ø SCW
REDUCED PRESSURE ZONE ASSEMBLY
GATE VALVE
WATER METER
3" Ø CW
3" Ø CW
FROM HWS TO WH-1
1/2" Ø CW
1 1/4" Ø SCW
2" Ø SCW
3" Ø CW
1/2" Ø CW
2" Ø CW
3/4" Ø CW
2" Ø SCW
1/2" Ø SCW
3/4" Ø SCW
1/2" Ø HWR
CW
P-802
1/2" Ø HWS
CW
CW SC
W
SCW
SCW
1" Ø SCW
P-709
THERMOSTATIC MIXING VALVE
1/2" Ø CW
1/2" Ø CW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
DOMESTIC WATER
PIPING - ISOMETRIC
100% BID SET
PARTIALLY
SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
PP901
585-21-115
AJW IJS
REV 0 - 100% BID SET 2024-02-23
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
2. SEE RISER DIAGRAMS FOR COMPLETE VALVE REQUIREMENTS.
KEYED NOTES
2" CW TO SUPPLY BOILER PLANT EQUIPMENT. SEE "M" DRAWINGS FOR CONTINUATION
COORDINATE PLUMBING WITH THE SELECTION AND INSTALLATION OF THE WATER
SOFTENER AND RO SYSTEMS
SHEET 1372/23/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
CO
TD
4" Ø SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
CO
3" Ø SS
3" Ø SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
FD
SS
SS
SS
SS
SS
SS
SS
SS
CO SS
SS
SS
SS SS
FD
SS
SS
SS
SS SS
4" Ø MAIN SEWER
CO
FD
SS
V
V
V V V
V V
V
V
V V
V
V
V
V
V
V
V
V
4" Ø MAIN VENT STACK
V
TD
TD
TD
TD
3" Ø SS
FD
CO
SS
CO
V V
V
V
V
V
V
V
V V
V V
V V
V V
V V
4" Ø SS
4" Ø SS
V
V
V
V
V
V
V
V
V V
V V
V
V
V
V
V
V
V
V
V
TD
V
V
V
V
V
V
V
SS
SS
SS
SS
SS
SS
SS
SS
SS
TD
SS
SS
SS
SS
SS
SS
SS
SS
FD
CO
CO
TD
SS
SS
V
V
V
V
V
V
V
V
V
V
V
TO SUMP PUMP IN
BASEMENT LEVEL
TO BLOWDOWN
SEPARATOR
P-604
SS P-528
P-502
SS
P-101
P-401
SS
P-101 P-401
SS
P-101
P-701
SS
P-528
SS
SS
V
V V
V V
V V
V V
V V
P-401
45° TO SINK
IN CEILING
BELOW FLOOR
BELOW FLOOR
BELOW
FLOOR
BELOW
FLOOR
V V
SS
DRAIN AT MEZZANINE
DRAIN AT MEZZANINE
3" Ø V TO ROOF
TO ROOF
TO EXTERIOR
TO EXTERIOR
V V
V
1 1/2" Ø V
SS
TD
TD
45° TO 90° BEND UP
TYP ALL TRENCH DRAINS
TD
FD
CO
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
6" Ø SS
4" Ø SS
3" Ø SS
2" Ø SS
3" Ø SS
FD
FD
CO
3" Ø SS
3" Ø SS
3" Ø SS
1 1/2" Ø SS
4" Ø MAIN SEWER
4" Ø MAIN SEWER
3" Ø SS
2" Ø SS
2" Ø SS
1 1/2" Ø SS
3" Ø SS
3" Ø SS
1 1/2" Ø SS
3" Ø SS
3" Ø SS
3" Ø SS
1 1/2" Ø SS
3" Ø SS
3" Ø SS
1 1/2" Ø SS
2" Ø V
1 1/2" Ø V
V V
4" Ø MAIN VENT STACK
V
4" Ø SS
4" MAIN SEWER
33" Ø SS
2" Ø V
2" Ø V
2" Ø V
3" TYP
3" Ø SS
3" Ø V
3" Ø SS
1 1/2" Ø V
1 1/2" Ø V
2" Ø V
2" Ø V
1 1/2" Ø V
2" Ø V
2" Ø V
2" Ø V
3" Ø SS
V V
V
V
V
V
V
V
V
V
3" Ø SS
FD
FD
FD
FD
FD
10 GPM=20 DFU
28 DFU
6 DFU
42 DFU
14 DFU 110 GPM= 220 DFU
(NOT-CONTINUOUS)
15 DFU
4 DFU
31 DFU
276 DFU
47 DFU
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PLUMBING SANITARY PIPING
ISOMETRIC
100% BID SET
PARTIALLY
SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
PP902
585-21-115
AJW IJS
REV 0 - 100% BID SET 2024-02-23
GENERAL NOTES
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
SHEET 1382/23/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BEH TJD
GENERAL LINETYPES ABBREVIATIONS
PIPE INSULATION
MOTOR
TEMPERATURE PROTECTION
DOUBLE WALL PIPE
INSTRUMENT SYMBOLSPROCESS VALVESEQUIPMENT SYMBOLS
INSTRUMENTATION IDENTIFICATION TABLE
CONTINUATION ARROWS
TRANSFER TO SAME SHEET(X-X)
PRIMARY LOCATION ACCESSIBLE TO
OPERATOR-DISCRETE INSTRUMENT
FIELD MOUNTED-DISCRETE INSTRUMENT
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
AUXILIARY LOCATION ACCESSIBLE TO
OPERATOR-DISCRETE INSTRUMENT
INACCESSIBLE, HIDDEN, OR BACK/INSIDE
PANEL-DISCRETE INSTRUMENT
XXX
XXX
XXX
XXX
FIELD MOUNTED-SHARED DISPLAY, SHARED
CONTROL
PRIMARY LOCATION ACCESSIBLE TO OPERATOR-SHARED
DISPLAY, SHARED CONTROL FOR PUMP SKID
(LOCATED IN FUEL OIL PUMP SKID HMI/PLC), * = PANEL LEGEND
INACCESSIBLE, HIDDEN, OR BACK/INSIDE
PANEL-SHARED DISPLAY, SHARED CONTROL
AUXILIARY LOCATION ACCESSIBLE TO
OPERATOR-SHARED DISPLAY, SHARED CONTROL
DRAWING
POS1 POS2
XXXX
XXXX
FLOW ARROW
FLOW DIRECTION
(SINGLE )
FLOW DIRECTION
(BOTH)
FLOW DIRECTION
AREA A
AREA BOUNDRY
PILOT LIGHT
PUMP
AREA B
LEVEL FLOAT
SUMP PUMP
CHECK VALVE
VALVES (GENERAL)
DUPLEX STRAINER
S
PRESSURE RELIEF VALVE
GLOBE VALVE
REDUCER (CONCENTRIC)
LINE WITH PLUG
BACK PRESSURE REGULATOR VALVE
STRAINER
HOSE CONNECTION
PRESSURE/VACUUM VENT
PRESSURE RUPTURE DISK
BALL VALVE
SOLENOID ACTUATED VALVE
DRAIN
MATERIAL
A
POINT OF CONNECTION BETWEEN NEW AND
EXISTING WORK
MATERIAL
B
PRIMARY LOCATION ACCESSIBLE TO OPERATOR-SHARED
DISPLAY, SHARED CONTROL FOR TANK MONITORING SYSTEM
(LOCATED IN TANK MONITORING SYSTEM HMI/PLC)
* = PANEL LEGEND
ELECTRIC TANK IMMERSION HEATER
DIAPHRAGM VALVE
SIGHT GLASS WITH ROTOR
FILTER
FLEX CONNECTION
PLUG VALVE
PRESSURE REDUCING VALVE WITH
INTEGRAL OUTLET PRESSURE RELIEF
UNION
POSITION ON ACTUATOR
RESTRICTION ORIFICE
CONVERSIONI/P
THREE WAY VALVE
C CONDENSATE POT
SIPHON
ANGLE GLOBE VALVE
WATER COLUMN
FLOAT TRAP
NEEDLE VALVE
XXX
XXX
XXX
XXX
XXX
XXX
POSITIVE DISPLACEMENT FLOW METER
MAGNETIC FLOW METER
VORTEX SHEDDING FLOW METER
GATE VALVE W/ GLOBE VALVE BYPASS
EQUIPMENT TYPE
BLR = BOILER
CF = CHEMICAL FEED
ECO = ECONOMIZER
PMP = PUMP
RO=REVERSE OSMOSIS UNIT
TK = TANK
2-100-BLR-001
NUMBERING DESIGNATIONS FOR EQUIPMENT
IDENTIFIER NUMBER
BUILDING NUMBER
LEVEL NUMBER
STEAM TRAP- INVERTED BUCKET
SKID LIMITS
UV FLAME SCANNER
STRAINER WITH BLOW-OFF VALVE
STEAM TRAP- FLOAT & THERMOSTATIC
REDUCER (ECCENCTRIC)
A COMPRESSED AIR
AFF ABOVE FINISHED FLOOR
AFGSOV AUTOMATIC FUEL GAS SHUTOFF VALVES AND
SOLENOID VENT VALVE
AFGSVV AUTOMATIC FUEL GAS SHUTOFF SOLENOID VENT
VALVE
AFOSV AUTOMATIC FUEL OIL SHUTOFF VALVES
ALWCO AUXILIARY LOW WATER CUTOFF ON STEAM
BOILERS
APFGSOV AUTOMATIC PILOT FUEL GAS SHUTOFF VALVES
APFGSVV AUTOMATIC PILOT FUEL GAS SOLENOID VENT
VALVE
BAPS DTM BOILER AND ASSOCIATED PLANT SAFETY DEVICE
TESTING MANUAL
BBD BOTTOM BLOWDOWN
BD BLOWDOWN
CAPS COMBUSTION AIR PRESSURE SWITCH
CBD CONTINUOUS BLOWDOWN
CF CHEMICAL FEED
CIP CLEAN-IN-PLACE
CO CLEAN OUT
CT CONDENSATE TRANSFER
CW COLD WATER
DR DRAIN
DAODS DEAERATOR OVERFLOW DRAIN SYSTEM
DASV DEAERATOR SAFETY VALVE
ESPB EMERGENCY STOP/PANIC BUTTON
FDDWOPS FORCED DRAFT DAMPER WIDE OPEN POSITION
SWITCH
FOF FUEL OIL FILL
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPI FURNACE PRESSURE INTERLOCK
FW FEEDWATER
G NATURAL GAS
HFGPAMG HIGH FUEL GAS PRESSURE ALARM ON MAIN GAS
LINE
HFGPCS HIGH FUEL GAS PRESSURE CUTOFF SWITCH
HFOPCS HIGH FUEL OIL PRESSURE CUTOFF SWITCH
HPR HIGH PRESSURE CONDENSATE RETURN
HPS HIGH PRESSURE STEAM
HSPLS HIGH STEAM PRESSURE LIMIT SWITCH
HW HOT WATER
HWAB HIGH WATER ALARM ON BOILER
HWACT HIGH WATER ALARM ON CONDENSATE TANK
HWADT HIGH WATER ALARM ON DEAERATOR TANK
LAMPS LOW ATOMIZING MEDIA PRESSURE SWITCH
LC LOCKED CLOSED
LFPS LOW FIRE PROVING SWITCH
LFGPCS LOW FUEL GAS PRESSURE CUTOFF SWITCH
LFOPCS LOW FUEL OIL PRESSURE CUTOFF SWITCH
LO LOCKED OPEN
LPS LOW PRESSURE STEAM
LPR LOW PRESSURE CONDENSATE RETURN
LPG LIQUEFIED PETROLEUM GAS
LPFGPCS LOW PILOT FUEL GAS PRESSURE CUTOFF
SWITCH
LRVOPS LIQUID RELIEF VALVE ON OIL PUMP SET
LWA LOW WATER ALARM
LWACT LOW WATER ALARM ON CONDENSATE TANK
LWADT LOW WATER ALARM ON DEAERATOR TANK
LWCO LOW WATER CUTOFF ON STEAM BOILER
MV MANUAL VALVE
NC NORMALLY CLOSED
NO NORMALLY OPEN
NRBSPLS NON-RECYCLE BOILER STEAM PRESSURE LIMIT
SWITCH
O/W OIL AND WATER SEPARATOR
OFL OVER FLOW LEVEL
OSDPI OUTLET STACK DAMPER POSITION INTERLOCK
SWITCH
PAPS PURGE AIRFLOW PROVING SWITCH
POC PROOF OF CLOSURE
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
RBSPLS RECYCLE BOILER STEAM PRESSURE LIMIT
SWITCH
RO REVERSE OSMOSIS
SLAMPS SECONDARY LOW ATOMIZING MEDIA
PRESSURE SWITCH
SVB STEAM SAFETY VALVES ON BOILER
SVFPRV SAFETY VALVE FOLLOWING PRV
SW SOFTENED WATER
TP TEST POINT
V VENT
VTR VENT TO ROOF
PRESSURE REDUCING VALVE
FAN
MOTORIZED DAMPER
M
SHUTOFF VALVE
EQUIPMENT TYPE
0 = GENERAL
1 = BOILER 1
2 = BOILER 2
3 = BOILER 3
4 = DEAERATOR / SURGE TANK
5 = FLASH TANK / BLOW DOWN SEPERATOR
6 = WATER SOFTENER
7 = NORTH LOOP
8 = SOUTH LOOP
12-FO-V-11001
NUMBERING DESIGNATIONS FOR INSTRUMENTATION
IDENTIFIER NUMBER
BUILDING NUMBER
ASSOCIATED SYSTEM
TYPE
UNIQUE IDENTIFIER
SHEET NUMBER
M
MOTORIZED CONTROL VALVE
DRIP PAN ELBOW
XXX
XXX
XXX
XXX *
XXX
XXX *
LPG TANK
VACUUM BREAKER
FIRST LETTERS SUCCEEDING LETTERS
COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4 COLUMN 5
LETTER MEASURED/INITIATING
VARIABLE
VARIABLE MODIFIER READOUT/PASSIVE
FUNCTION
OUTPUT/ACTIVE FUNCTION FUNCTION MODIFIER
A ANALYSIS ALARM
B BURNER, COMBUSTION USER'S CHOICE USER'S CHOICE USER'S CHOICE
C USER'S CHOICE CONTROL CLOSE
D USER'S CHOICE DIFFERENCE,
DIFFERENTIAL
DEVIATION
E VOLTAGE SENSOR, PRIMARY
ELEMENT
F FLOW, FLOW RATE RATIO
G USER'S CHOICE GLASS, GAUGE, VIEWING
DEVICE
H HAND HIGH
I CURRENT INDICATE
J POWER SCAN
K TIME, SCHEDULE TIME RATE OF CHANGE CONTROL STATION
L LEVEL LIGHT LOW
M USER'S CHOICE MIDDLE, INTERMEDIATE
N USER'S CHOICE USER'S CHOICE USER'S CHOICE USER'S CHOICE
O USER'S CHOICE- OIL LEAK
DETECTION
ORIFICE, RESTRICTION OPEN
P PRESSURE POINT (TEST
CONNECTION)
Q QUANTITY INTEGRATE, TOTALIZE INTEGRATE, TOTALIZE
R RADIATION RECORD RUN
S SPEED, FREQUENCY SAFETY SWITCH STOP
T TEMPERATURE TRANSMIT
U MULTIVARIABLE MULTIFUNCTION (21) MULTIFUNCTION
V VIBRATION, MECHANICAL
ANALYSIS
VALVE, DAMPER, LOUVER
W WEIGHT, FORCE WELL, PROBE
X UNCLASSIFIED X-AXIS ACCESSORY DEVICES,
UNCLASSIFIED
UNCLASSIFIED UNCLASSIFIED
Y EVENT, STATE, PRESENCE Y-AXIS AUXILIARY DEVICES
Z POSITION, DIMENSION Z-AXIS, SAFETY
INSTRUMENTED SYSTEM
DRIVER, ACTUATOR,
UNCLASSIFIED FINAL
CONTROL ELEMENT
REV 0 - 100% BID SET 2024-02-23
BACKFLOW PREVENTER
(REDUCED PRESSURE ZONE)
ANALOG SIGNAL
PIPING PROCESS
NETWORK CONNECTION
PROCESS SYMBOLS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS NOTES AND LEGENDS FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-001
585-21-115
SILENCER
HEAT EXCHANGER
DRAWING
POS1 POS2
XXX
NON-RETURN STOP-CHECK
PRESSURE RELIEF VALVE (HANDLE)
GENERAL NOTES
1. ALL VALVES SPECIFIED AS LOCKABLE (LOCK OPEN) SHALL NOT HAVE THE ABILITY TO BE LOCKED CLOSED.
PIPE CAP
REV 1 - FINAL BID SET 2024-04-05
SHEET 1394/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
STEAM HEADER
TO BOILER BURNERS
TO BOILER BURNERS
FUEL OIL
PUMP SKID
2-100-PMP-006
NATURAL GAS
SUPPLY
NO.2 FUEL OIL
SUPPLY
COLD WATER
FROM BUILDING 2
BUILDING HEATING
AND MAKEUP AIR
BUILDING 1
VENT
DRAIN
PUMPED
CONDENSATE RETURN
SOFT WATER
FROM BUILDING 1
WATER
SOFTENER
2-100-TK-004
REVERSE
OSMOSIS
UNIT
2-100-TK-005
SURGE TANK
2-100-TK-002
DEAERATOR
2-100-TK-001
FEEDWATER PUMPS
2-100-PMP-003
2-100-PMP-004
2-100-PMP-005
BLOWDOWN
SEPARATOR
2-100-TK-003
BOILER NO. 1
2-100-BLR-001
BOILER NO. 2
2-100-BLR-002
BOILER NO. 3
2-100-BLR-003
EXHAUST
STACK
EXHAUST
STACK
EXHAUST
STACK
CT PUMPS
2-100-PMP-001
2-100-PMP-002
RO TRANSFER PUMP
2-100-TK-XXX
RO STORAGE TANK
2-100-TK-005
PRE-FILTER
2-100-TK-XXX
32658 CFH G
4 GPM @ 75 PSIG FO
74 GPM CT
10 GPM SW
10 GPM CW
10 GPM RO
84 GPM CT
G
PM
9 P
SI
G
FW
929 LB/HR @ 5 PSIG LPS
13197 LB/HR @ 100 PSIG HPS
13197 LB/HR @ 100 PSIG HPS
13197 LB/HR @ 100 PSIG HPS
2973 LB/HR @ 5 PSIG LPS
FUEL OIL HEATERS
2-200-HTR-001
2-200-HEX-003
FUEL OIL QUALITY
MAINTENANCE SYSTEM
2-119-PMP-011
FEEDWATER
HEATER
2-119-HEX-001
BEH TJD
REV 0 - 100% BID SET 2024-02-23
GENERAL NOTES
1. SEE D-001 FOR D-SERIES GENERAL NOTES AND LEGENDS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - PFD FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-601
585-21-115
REV 1 - PRE-BID UPDATES 2024-08-01
8/1/2024 SHEET 140
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LSHH
11008
LSH
11008
LAH
11008
LAHH
11008
LIT
11008
S
LI
11005
OE
11011
OA
11011
ZI
11016
ZI
11016
ZAC
11016
SITE
ABOVEGROUND
SITE
UNDERGROUND
(IN TUNNEL)
SUMP
O/W
NC
LC
11022
LA
11022
M
YA
11022
YI
11022
TO SANITARY
SEWER
TANK FILL BOX
2" FOR
2 x 1-1/2"
TAL
11010
OE
11013
S
NC
2" FOR
2" FOS
NC
DOUBLE
WALL PIPE
SINGLE
WALL PIPE
TE
11010
ZC
11003
ZI
11003
ZI
11003
ZC
11018
ZI
11018
ZC
11018
ZI
11018
LOCAL FILL PANEL
TRENCH DRAIN AT
FUEL FILL AREA
ZI
11020
ZI
11020
OA
11013
OA
11013
OA
11011
LAHH
11008
LAH
11008
LAL
11008
LI
11008
ZI
11003
LAH
11008
LAL
11008
LAHH
11008
LI
11008
PCV-11003CKV-11002V-11001 ST-11004
PSE-11006 PSE-11007
PCV-11009
CK
V-
V-11014
V-11021
V-11020V-11018ST-11017V-11016
V-
NC
BUILDING 2
OE
11019
OA
11019
OA
11019
FUEL OIL TANK
2-100-TK-019
2-EXT-PMP-007
D-616 10 C
FROM PUMP SKID
D-612 1 C
TO PUMP SKID
TO STORM SEWER
TT
11010
TI
11010
CP-9
CP-5
CP-9
CP-9
CP-8
CP-8
CP-5
CP-9
CP-9 CP-8
2" FOR
2" FOF
2" FOS
EXTENT OF
INSULATION
EXTENT OF
INSULATION
1-1/2" FOS
SITE
UNDERGROUND
(IN TUNNEL)
BEH TJD
2-100-TK-019
FUEL OIL TANK
CAPACITY: 40,000 GAL
PCV-11009
TANK NORMAL VENT
SIZE: 3"
SET POINT: 1 PSI
PSE-11006
EMERGENCY RELIEF VENT
SIZE: 10"
SET POINT: 2.5 PSI
REV 0 - 100% BID SET 2024-02-23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FUEL OIL 100% BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-611
585-21-115
PSE-11007
EMERGENCY RELIEF VENT
SIZE: 10"
SET POINT: 2.5 PSI
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
KEYED NOTES
1 REFER TO C-SERIES DRAWINGS FOR STORM/SANITARY SEWER DIMENSIONS AND
DETAILS
SHEET 1412/22/2024
one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PIT
12010
ZI
12015
YC
12009
HSS
12009
HSR
12009
HS
12009
LOR
ZI
12008
ZIC
12008
YI
12009
ZIC
12015
ZIO
12015
YC
12009
YA
12009
PI
12010
PDIT
12005
PDI
12005
YI
12009
M
ZIO
12008
OE
12021
OA
12021
FUEL OIL PUMP SKID
2-119-PMP-006
3/4"x2"
1" x2
2" FOR
1"
1-1/2" FOS
1-1/2"
DS-12007
V-
V-
V-12008
V-
CKV-12027
CKV-12013 V-12015
PIT
12020
3/4" FOR
1 1/2" FOS
FE
12002
FIT
12002
NC
V-12004
V-12001 V-12003
V-
PI
12020
CP-8
FE
12017
FIT
12017
NC
V-12019
V-12018V-12016
CP-8
FQI
12002
FI
12002
SG-12012
LRVOPS
1-1/2" FOS
ZI
12022
ZIC
120XX
ZIO
12022
V-12022
1-1/2" FOS
PIT
12024
YC
12023
HSS
12023
HSR
12023
HS
12023
LOR
YI
12023
YC
12023
YA
12023
PI
12024
YI
12023
M V-
LRVOPS
SG-12026
ZI
12029
ZIC
12029
ZIO
12029
V-12029
1"
1"
2" FOR1" FOR
FI
12017
FQI
12017
PSV
12011
PSV
12025
2-119-PMP-008
2-119-PMP-009
D-613 10 E
FROM BOILERS
D-611 10 D
FROM FUEL OIL TANK
D-613
1 C
TO BOILERS
D-611 1 A
TO FUEL OIL TANK
CP-8
CP-8
FROM EMERGENCY
SHUTDOWN CIRCUIT
HSSS
12009
CP-8 CP-8
CP-8CP-8
CP-8
CP-8
CP-8 CP-8
CP-8
CP-8
HSSS
12023
CP-8
CP-8
1-1/2" FOS
1-1/2" FOS
NC
V-12028
2-119-PMP-010
PIT
12032
PSV
12033
M
V-12030
YC
12031
D-616 1 C
TO FUEL OIL
HEATER
1 1/2" FOS
V-12034
HS
12031
HS
12031
HS
12031
HS
12031
YI
12031
YI
12031
YC
12031
YA
12031
PI
12032
D-616 1 D
TO FUEL OIL QUALITY
MOUNT SYSTEM
1 1/2" FOS
SG-120XX
LRVOPS
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
GENERAL NOTES
1. SEE D-001 FOR D-SERIES GENERAL NOTES AND LEGENDS.
2-119-PMP-008
FUEL OIL TRANSFER PUMP
FLOWRATE: 120 GPH
POWER: 2 HP
PRESSURE: 90 PSIG
PSV-12011
PRESSURE SAFETY VALVE
SET POINT: 85 PSIG
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FUEL OIL -
BALANCE OF PLANT
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-612
585-21-115
2-119-PMP-009
FUEL OIL TRANSFER PUMP
FLOWRATE: 120 GPH
POWER: 2 HP
PRESSURE: 90 PSIG
PSV-12025
PRESSURE SAFETY VALVE
SET POINT: 85 PSIG
PSV-12033
PRESSURE SAFETY VALVE
SET POINT: 85 PSIG
2-119-PMP-010
FUEL OIL RECIRCULATION PUMP
FLOWRATE: 5 GPM
POWER: 0.75 HP
PRESSURE: 50 PSIG
SHEET 1424/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1-1/2" FOS
V-13002
V-13039
V-13038V-13036
BACK PRESSURE
CONTROL VALVE
NC
PCV-13037
S S
NC
NC
NC
PG
13025
BURNER
2-119-BLR-001
SIGHT GLASS WITH ROTOR
FE
13016
FIT
13016
NC
M
NC NC
1/2" FOR
TG
13013
PSL
13030
PIT
13029
SLAMPS
FUEL FLOW
CONTROL VALVE AFOSOV
PG
13020
AFOSOV
TP
TP
V-13006 FCV-13014
V-13018
V-13017V-13015 YSV-13019 YSV-13021
V-13025
AIR BLEED
PI
13003
PT
13003
PI
13003
PDI
13003
PDI
13003
PI
13008
PI
13008
CP-1
FG
13034
ZIC
13014
ZC
13014
ZI
13014
ZI
13014
ZCO
13019
ZSO
13019
ZSC
13019
ZCO
13019
CP-1
ZIO
13019
ZIC
13019
ZIO
13019
ZIC
13019
ZCO
13021
ZSO
13021
ZSC
13021
ZCO
13021
CP-1
ZIO
13021
ZIC
13021
ZIO
13021
ZIC
13021
PI
13029
PI
13029
PAL
13030
PAL
13030
CP-1
FI
13016
FQI
13016
CP-1
CP-1
CP-1
FQI
13016
FI
13016
F-13005
INCLUDED WITH BOILER #1
V-
PG
13004
V-
V-
V-
13009
PSL
V-
NC
V-13010
TP
LOCKABLE
(LOCK OPEN)
LFOPCS
CP-1
PG
13010
PAL
13009
13011
PSH
V-
NC
V-13012
TP
LOCKABLE
(LOCK OPEN)
HFOPCS
CP-1
PG
13012
PAH
13011
V-
V-
0 V-
AIR CONTROLS
BY BURNER
MANUFACTURER
AIR COMPRESSOR
BY BURNER
MANUFACTURER
PSV
13031
PG
13007
PT
13008
V-
V-
CK
V-
CK
V-
D-612 10 C
SUPPLY FROM PUMPS
D-614 10 E
RETURN TO TANK
D-615 10 E
RETURN TO TANK
D-612 1 B
RETURN TO TANK
D-615 1 C
SUPPLY FROM PUMPS
D-614 1 C
SUPPLY FROM PUMPS
PSL
13032
LAMPS
PAL
13032
PAL
13032
CP-1
TP
LOCKABLE
(LOCK OPEN)
PG
13040
V-
13040
TP
LOCKABLE
(LOCK OPEN)
PG
13041
V-
13041
CP-1
PAH
13011
PAL
13009
1/2" FOR
1/2" FOR
1" F
OR
3/4" FOS
1- 1/2
" F
OS
1" x
1- 1/2
3/4" FOS
3/4" FOS
3/4" FOS
3/4" FOS
1" FOR
3/4" FOS
NC 2EMERGENCY BOILER
CONNECTION
LOW POINT DRAIN
BEH TJD
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
KEYED NOTES
1 CHANGE OF FUELS SHALL NOT REQUIRE ANY DISASSEMBLY AND REASSEMBLY OF
THE FUEL TRAIN OR FUEL NOZZLES
2 SEE MP123 FOR LOCATION OF EMERGENCY BOILER CONNECTION
3 LOW-FIRE PROVING SWITCH REQUIRED ON FLOW CONTROL VALVE, REFER TO
BAPSDTM
4 PROOF OF CLOSURE SWITCH REQUIRED ON SOLENOID VALVES, REFER TO BAPSDTM
PCV-13037
BACK PRESSURE CONTROL VALVE
SET POINT: 75 PSIG
REV 0 - 100% BID SET 2024-02-23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FUEL OIL - BOILER
#1
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-613
585-21-115
PSV-13031
PRESSURE SAFETY VALVE
SET POINT: 125 PSIG
REV 1 - FINAL BID SET 2024-04-05
SHEET 1434/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
S S
NC
NC
NC
PG
14024
BURNER
2-119-BLR-002
SIGHT GLASS WITH ROTOR
FE
14015
FIT
14015
NC
M
NC NC
3/4" FOS
1/2" FOR
TG
14012
PSL
14029
PIT
14028
SLAMPS
FUEL FLOW
CONTROL VALVE AFOSOV
PG
14019
AFOSOV
TP
TP
V-14001 V-14005 FCV-14013
V-14017
V-14016V-14014 YSV-14018 YSV-14020
V-14024
AIR BLEED
PI
14002
PT
14002
PI
14002
CP-2
PDI
14002
PDI
14002
PI
14007
PI
14007
CP-2
FG
14033
ZIC
14013
ZC
14013
ZI
14013
ZI
14013
ZCO
14018
ZSO
14018
ZSC
14018
ZCO
14018
CP-2
ZIO
14018
ZIC
14018
ZIO
14018
ZIC
14018
ZCO
14020
ZSO
14020
ZSC
14020
ZCO
14020
CP-2
ZIO
14020
ZIC
14020
ZIO
14020
ZIC
14020
PI
14028
PI
14028
PAL
14029
PAL
14029
CP-2
FI
14015
FQI
14015
CP-2
CP-2
CP-2
FQI
14015
FI
14015
F-14004
INCLUDED WITH BOILER #2
V-
PG
14003
V-
V-
V-
14008
PSL
V-
NC
V-14009
TP
LOCKABLE
(LOCK OPEN)
LFOPCS
CP-2
PG
14009
PAL
14008
14010
PSH
V-
NC
V-14011
TP
LOCKABLE
(LOCK OPEN)
HFOPCS
CP-2
PG
14011
PAH
14010
V-
V-
9 V-
1/2" FOR
AIR CONTROLS
BY BURNER
MANUFACTURER
AIR COMPRESSOR
BY BURNER
MANUFACTURER
PSV
14030
PG
14006
PT
14007
V-
V-
CK
V-
CK
V-
D-613 10 D
SUPPLY FROM PUMPS
D-613 1 D
RETURN TO TANK
PSL
14031
LAMPS
PAL
14031
PAL
14031
CP-2
TP
LOCKABLE
(LOCK OPEN)
PG
14034
V-
14034
TP
LOCKABLE
(LOCK OPEN)
PG
14035
V-
14035
PAL
14008
PAH
14010
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
KEYED NOTES
1 CHANGE OF FUELS SHALL NOT REQUIRE ANY DISASSEMBLY AND REASSEMBLY OF
THE FUEL TRAIN OR FUEL NOZZLES.
2 LOW-FIRE PROVING SWITCH REQUIRED ON FLOW CONTROL VALVE, REFER TO
BAPSDTM
3 PROOF OF CLOSURE SWITCH REQUIRED ON SOLENOID VALVES, REFER TO BAPSDTM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FUEL OIL - BOILER
#2
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-614
585-21-115
PSV-14030
PRESSURE SAFETY VALVE
SET POINT: 125 PSIG
SHEET 1444/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
S S
NC
NC
NC
PG
15024
BURNER
2-119-BLR-003
SIGHT GLASS WITH ROTOR
FE
15015
FIT
15015
NC
M3/4" FOS
1/2" FOR
TG
15012
PSL
15029
PIT
15028
SLAMPS
FUEL FLOW
CONTROL VALVE AFOSOV
PG
15019
AFOSOV
TP
TP
V-15001 V-15005 FCV-15013
V-15017
V-15016V-15014
YSV-15018
V-15024
AIR BLEED
PI
15002
PT
15002
PI
15002
CP-3
PDI
15002
PDI
15002
PI
15007
PI
15007
CP-3
FG
15033
ZIC
15013
ZC
15013
ZI
15013
ZI
15013
ZCO
15018
ZSO
15018
ZSC
15018
ZCO
15018
CP-3
ZIO
15018
ZIC
15018
ZIO
15018
ZIC
15018
ZCO
15020
ZSO
15020
ZSC
15020
ZCO
15020
CP-3
ZIO
15020
ZIC
15020
ZIO
15020
ZIC
15020
PI
15028
PI
15028
PAL
15029
PAL
15029
CP-3
FI
15015
FQI
15015
CP-3
CP-3
CP-3
FQI
15015
FI
15015
F-15004
V-
PG
150XX
V-
V-
V-
15008
PSL
V-
NC
V-15009
TP
LOCKABLE
(LOCK OPEN)
LFOPCS
CP-3
PG
15009
PAL
15008
15010
PSH
V-
NC
V-15011
TP
LOCKABLE
(LOCK OPEN)
HFOPCS
CP-3
PG
15011
PAH
15010
V-
V-
9 V-
1/2" FOR
AIR CONTROLS
BY BURNER
MANUFACTURER
AIR COMPRESSOR
BY BURNER
MANUFACTURER
PSV
15030
PG
15006
PT
15007
V-
V-
CK
V-
CK
V-
NC
YSV-15020
NC
D-613
10 E
SUPPLY FROM PUMPS
D-613 1 E
RETURN TO TANK
PSL
15031
LAMPS
PAL
15031
PAL
15031
TP
LOCKABLE
(LOCK OPEN)
PG
15034
V-
15034
TP
LOCKABLE
(LOCK OPEN)
PG
15035
V-
15035
INCLUDED WITH BOILER #3
PAL
15008
PAH
15010
CP-3
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
KEYED NOTES
1 CHANGE OF FUELS SHALL NOT REQUIRE ANY DISASSEMBLY AND REASSEMBLY OF
THE FUEL TRAIN OR FUEL NOZZLES.
2 LOW-FIRE PROVING SWITCH REQUIRED ON FLOW CONTROL VALVE, REFER TO
BAPSDTM
3 PROOF OF CLOSURE SWITCH REQUIRED ON SOLENOID VALVES, REFER TO BAPSDTM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FUEL OIL - BOILER
#3
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-615
585-21-115
PSV-15030
PRESSURE SAFETY VALVE
SET POINT: 125 PSIG
SHEET 1454/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
2" FOR
D-611
1 A
TO FUEL OIL TANK
LPR
FE
16006
FI
16006
FE
16011
FI
16011
TT
16015
TE
16015
TI
16015
TAH
16015
M
ZIC
16004
ZC
16004
ZI
16004
CP-8
CP-8 CP-8
CP-8
ST-16001 PCV-16002 PSV-16003 LCV-16004
ROOF
PSV-16005 PSV-16010
V-
V-
V-
V-
CKV-16007 CKV-16012
TRP-16016
D-645 10 B
FROM STEAM PRS
2" LPS (15 PSIG)
3/4" FOR 3/4" FOR
3/4" LPR
HEAT
EXCHANGER
2-200-HTR-001
HEAT
EXCHANGER
2-200-HEX-003
2" FORD-612
10 F
1 1/2" FOS
1 1/2"x2"
CKV-16030
D-611 10 D
FROM FUEL OIL TANK
V-16017
V-
V-
PG
16020
DS-16018
M
YC
16022
YI
16022
YC
16022
YA
16022
HS
16022
HSR
16022
HSS
16022
HSSS
16022
V-
V-
PG
16026
V-16028
V-16025
OE
16029FUEL OIL QUALITY MAINTENANCE SYSTEM
1/2" FOR
F-16024
OA
16029
1 1/2" FOS
1 1/2"x1/2"
FROM EMERGENCY
SHUTDOWN CIRCUIT
2-119-PMP-011
BEH CCW
REV 0 - 100% BID SET 2024-02-23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID FUEL OIL -
HEATING & FILTRATION
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-616
585-21-115
GENERAL NOTES
1. SEE D-001 FOR D-SERIES GENERAL NOTES AND LEGENDS.
2-119-PMP-011
FUEL OIL CIRCULATING PUMP
FLOWRATE: 5 GPM
POWER: 0.33 HP
16003
PRESSURE SAFETY VALVE
SET POINT: 150 PSIG
PSV-16005
PRESSURE SAFETY VALVE
SET POINT: 150 PSIG
PSV-16010
PRESSURE SAFETY VALVE
SET POINT: 150 PSIG
REV 1 - PRE-BID UPDATES 2024-08-01
8/1/2024 SHEET 146
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NATURAL GAS
SUPPLY
5" G S
FIT
21008
NC
EMERGENCY GAS
SHUTOFF VALVE
WITH EARTHQUAKE
SENSOR
21004
PSH
PIT
21006
CONNECT TO
EXISTING
5" G
4" G
EMERGENCY
BOILER
CONNECTION
S
PIT
21103
FLEX
CONN
FLEX
CONN
5" G
LPG TANKS
(100 LBS/EACH - VA FURNISHED)
1" LPG3/4" LPG
EMERGENCY LP GAS
SHUTOFF VALVE
NC
YSV-21001
V-
V-21007 V-21009
V-21010
1/2
VENT TO
EXTERIOR
PCV-21104 V-21106
ZCO
21001
CP-5
ZSO
21001
ZSC
21001
ZCO
21106
ZSO
21106
ZSC
21106
ZIC
21001
ZIO
21001
ZIC
21106
ZIO
21106
PI
21103
PAH
21004
PI
21006
FI
21008
FQI
21008
V-21003
NC
V-21005
TP
LOCKABLE
(LOCK OPEN)
HFGPAMG
4" G
4" G
3/4" LPG
3/4" LPG
3/4" LPG
FROM EMERGENCY
SHUTDOWN CIRCUIT
V-
V-
NC
4"
V-
V-
V-
NC
3/8
V-
EARTHQUAKE
AUTOMATIC GAS
SHUT-OFF VALVE
V-21107
PIT
21108
PI
21108
V-
PSH
21109
PAH
21109
V-
V-
1"
LP
G
5" G
3/4"x1"
3/4"x1"
3/4"x1"
5" x 4"
5" x 4"
5" x 4"
D-622 1 C
NATURAL GAS
D-623 1 C
NATURAL GAS
D-624 1 C
NATURAL GAS
D-622 1 E
LPG GAS
D-623 1 E
LPG GAS
D-624 1 E
LPG GAS
CP-5
CP-5 CP-5
CP-5
CP-5
CP-5 CP-5
3/4" LPG 1" LPG
1" x 3/4"
1" LPG
3/4" x 1"
3/4 " L
PG
V-XXXXX
TP
LOCKABLE
(LOCK OPEN)
BEH TJD
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
KEYED NOTES
1 EMERGENCY BOILER CONNECTION SHALL BE LOCATED ON EXTERIOR OF THE
BUILDING.
REV 0 - 100% BID SET 2024-02-23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID NATURAL GAS -
BALANCE OF PLANT
100% BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-621
585-21-115
PCV-21104
PRESSURE SAFTEY VALVE
SET POINT: 2 PSIG
SHEET 1472/22/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FIT
22102
NC
PIT
22105
S S
ZCO
22115
ZSC
22115
ZSO
22115
ZCO
22120
ZSC
22120
ZSO
22120
S
ZCC
22117
PG
22116
PG
22118
LOCKABLE
(LOCK OPEN)
FUEL FLOW
CONTROL VALVEDIRT
TP
PSL
22013
LPFGPCS
S S
LOCKABLE
(LOCK OPEN)
IGNITER
2-119-BLR-001
DIRT POCKETS
FLEX
CONN
3/4 " G
4" G
TP
ROOF
NC
NC
NC
AFGSOV AFGSOV
AFGSVV
APFGSVV
APFGSOV APFGSOV
V-22101 V-22103
V-22104
V-22108 PCV-22110 V-22115 V-22122
V-22118
V-22120 V-22126
TP
M
1" V
2" V
1" V
3/4" G/LPG
TP
V-22021V-22019V-22014CKV-22009PCV-22008
V-22010
PCV-22005 CKV-22006
V-22017
V-22003
FI
22102
CP-1
FI
22102
PI
22105
PI
22105 ZCO
22115
ZIO
22115
ZIC
22115
ZIC
22115
ZIO
22115
ZSC
22117
ZSO
22117
ZCC
22117
ZIO
22117
ZIC
22117
ZIC
22117
ZIO
22117
ZCO
22120
ZIO
22120
ZIC
22120
ZIC
22120
ZIO
22120
PAH
22123
FCV-22125
ZIC
22125
ZC
22125
ZI
22125
ZI
22125
ZCO
22019
ZSC
22019
ZSO
22019
ZCO
22019
ZIO
22019
ZIC
22019
ZIC
22019
ZIO
22019
ZCO
22014
ZSC
22014
ZSO
22014
ZCC
22016
ZCO
22014
ZIO
22014
ZIC
22014
ZIC
22014
ZIO
22014
ZSC
22016
ZSO
22016
ZCC
22016
ZIO
22016
ZIC
22016
ZIC
22016
ZIO
22016PAL
22013
PAL
22013
PT
22011
PI
22011
PI
22011
FQI
22102
FQI
22102
CP-1
CP-1 CP-1
CP-1
CP-1
CP-1
CP-1
CP-1
CP-1
CP-1 CP-1
F-22109
V-
DIRT
F-22004
F-22007
INCLUDED WITH BOILER #1
FACTORY LPG CONNECTION
4" G
3/4" LPG
FACTORY NATURAL
GAS CONNECTION
NC
3/4
V-
NC
1/2
V-
V-
PT
22111
PI
22111
PI
22111
CP-1
V-
V-
PG
22002
V-
V-
PG
22112
V-
22113
PSL
V-
PAL
22113
CP-1
NC
V-22114
TP
LOCKABLE
(LOCK OPEN)
LFGPCS
V-
V-
22123
PSH
V-
NC
V-22124
TP
LOCKABLE
(LOCK OPEN)
HFGPCS
PG
22127
V-
V-
PG
22012
V-
V-
V-
V-
S
V-
TP V-
V-
3/4" V
BURNER
2-119-BLR-001
D-621
10 B
NATURAL GAS SUPPLY
D-621 10 D
LPG SUPPLY
3/4" V
TPPG
22022
V-22022
PG
22015
LOCKABLE
(LOCK OPEN)
ZIC
22123
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
KEYED NOTES
1 MAXIMUM DISTANCE FROM AFGSOV TO BURNER IS 4'-0".
2 LOW-FIRE PROVING SWITCH REQUIRED ON FLOW CONTROL VALVE, REFER TO
BAPSDTM
3 PROOF OF CLOSURE SWITCH REQUIRED ON SOLENOID VALVES, REFER TO BAPSDTM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID NATURAL GAS -
BOILER #1
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-622
585-21-115
PCV-22110
PRESSURE REDUCING VALVE
SET POINT: 2 PSIG
PCV-22005
PRESSURE REDUCING VALVE
SET POINT: 2 PSIG
PCV-22008
PRESSURE REDUCING VALVE
SET POINT: 2 PSIG
SHEET 1484/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FACTORY LPG CONNECTION
4" G
3/4" LPG
FACTORY NATURAL
GAS CONNECTION
FIT
23002
NC
PIT
23005
S S
ZCO
23015
ZSC
23015
ZSO
23015
ZCO
23020
ZSC
23020
ZSO
23020
S
ZCC
23017
PG
23016
PG
23018
LOCKABLE
(LOCK OPEN)
FUEL FLOW
CONTROL VALVEDIRT
TP
PSL
23113
LPFGPCS
S S
LOCKABLE
(LOCK OPEN)
DIRT POCKETS
FLEX
CONN
3/4 " G
4" G
TP
NC
NC
NC
AFGSOV AFGSOV
AFGSVV
APFGSVV
APFGSOV APFGSOV
V-23001 V-23003
V-23004
V-23008 PCV-23010 V-23015 V-23022
V-23018
V-23020 V-23026
TP
M
1" V
2" V
1" V
3/4" G/LPG
TP
V-23121V-23119V-23114CKV-23109PCV-23108
V-23110
PCV-23105 CKV-23106
V-23117
V-23103
FI
23002
CP-2
FI
23002
PI
23005
PI
23005 ZCO
23015
ZIO
23015
ZIC
23015
ZIC
23015
ZIO
23015
ZSC
23017
ZSO
23017
ZCC
23017
ZIO
23017
ZIC
23017
ZIC
23017
ZIO
23017
ZCO
23020
ZIO
23020
ZIC
23020
ZIC
23020
ZIO
23020
PAH
23023
FCV-23025
ZIC
23025
ZC
23025
ZI
23025
ZI
23025
ZCO
23119
ZSC
23119
ZSO
23119
ZCO
23119
ZIO
23119
ZIC
23119
ZIC
23119
ZIO
23119
ZCO
23114
ZSC
23114
ZSO
23114
ZCC
23116
ZCO
23114
ZIO
23114
ZIC
23114
ZIC
23114
ZIO
23114
ZSC
23116
ZSO
23116
ZCC
23116
ZIO
23116
ZIC
23116
ZIC
23116
ZIO
23116PAL
23113
PAL
23113
PT
23111
PI
23111
PI
23111
FQI
23002
FQI
23002
CP-2
CP-2 CP-2
CP-2
CP-2
CP-2
CP-2
CP-2
CP-2
CP-2 CP-2
F-23009
V-
DIRT
F-23104
F-23107
INCLUDED WITH BOILER #2
NC
3/4
V-
NC
1/2
V-
V-
PT
23011
PI
23011
PI
23011
CP-2
V-
V-
PG
23102
V-
V-
PG
23102
V-
23013
PSL
V-
PAL
23013
CP-2
NC
V-23014
TP
LOCKABLE
(LOCK OPEN)
LFGPCS
V-
V-
23023
PSH
V-
NC
V-23024
TP
LOCKABLE
(LOCK OPEN)
HFGPCS
PG
23027
V-
V-
PG
23112
V-
V-
V-
S
V-
TP V-
V-
3/4" V
IGNITER
2-119-BLR-002
BURNER
2-119-BLR-002
D-621 10 C
NATURAL GAS SUPPLY
D-621 10 E
LPG SUPPLY
3/4" V
V-
TPPG
23122
V-23122
PG
23015
ROOF
LOCKABLE
(LOCK OPEN)
ZIC
23023
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
KEYED NOTES
1 MAXIMUM DISTANCE FROM AFGSOV TO BURNER IS 4'-0".
2 LOW-FIRE PROVING SWITCH REQUIRED ON FLOW CONTROL VALVE, REFER TO
BAPSDTM
3 PROOF OF CLOSURE SWITCH REQUIRED ON SOLENOID VALVES, REFER TO BAPSDTM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID NATURAL GAS -
BOILER #2
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-623
585-21-115
PCV-23010
PRESSURE REDUCING VALVE
SET POINT: 2 PSIG
PCV-23105
PRESSURE REDUCING VALVE
SET POINT: 2 PSIG
PCV-23108
PRESSURE REDUCING VALVE
SET POINT: 2 PSIG
SHEET 1494/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FACTORY LPG CONNECTION
4" G
3/4" LPG
FACTORY NATURAL
GAS CONNECTION
FIT
24002
NC
PIT
24005
S S
ZCO
24015
ZSC
24015
ZSO
24015
ZCO
24020
ZSC
24020
ZSO
24020
S
ZCC
24017
PG
24016
PG
24018
LOCKABLE
(LOCK OPEN)
FUEL FLOW
CONTROL VALVEDIRT
TP
PSL
24113
LPFGPCS
S S
LOCKABLE
(LOCK OPEN)
DIRT POCKETS
FLEX
CONN
3/4 " G
4" G
TP
NC
NC
NC
AFGSOV AFGSOV
AFGSVV
APFGSVV
APFGSOV APFGSOV
V-24001 V-24003
V-24004
V-24008 PCV-24010 V-24015 V-24022
V-24018
V-24020 V-24026
TP
M
1" V
2" V
1" V
3/4" G/LPG
TP
V-24121V-24119V-24114CKV-24109PCV-24108
V-24110
PCV-24105 CKV-24106
V-24117
V-24103
FI
24002
CP-3
FI
24002
PI
24005
PI
24005 ZCO
24015
ZIO
24015
ZIC
24015
ZIC
24015
ZIO
24015
ZSC
24017
ZSO
24017
ZCC
24017
ZIO
24017
ZIC
24017
ZIC
24017
ZIO
24017
ZCO
24020
ZIO
24020
ZIC
24020
ZIC
24020
ZIO
24020
PAH
24023
FCV-23025
ZIC
24025
ZC
24025
ZI
24025
ZI
24025
ZCO
24119
ZSC
24119
ZSO
24119
ZCO
24119
ZIO
24119
ZIC
24119
ZIC
24119
ZIO
24119
ZCO
24114
ZSC
24114
ZSO
24114
ZCC
24116
ZCO
24114
ZIO
24114
ZIC
24114
ZIC
24114
ZIO
24114
ZSC
24116
ZSO
24116
ZCC
24116
ZIO
24116
ZIC
24116
ZIC
24116
ZIO
24116
PAL
24113
PAL
24113
PT
24111
PI
24111
PI
24111
FQI
24002
FQI
24002
CP-3 CP-3
CP-3
CP-3
CP-3
CP-3
F-24009
V-
DIRT
F-24104
F-24107
INCLUDED WITH BOILER #3
NC
3/4
V-
NC
1/2
V-
V-
PT
24011
PI
24011
PI
24011
V-
V-
PG
24102
V-
V-
PG
24012
V-
24013
PSL
V-
PAL
24013
NC
V-24014
TP
LOCKABLE
(LOCK OPEN)
LFGPCS
V-
V-
24023
PSH
V-
NC
V-24024
TP
LOCKABLE
(LOCK OPEN)
HFGPCS
PG
24027
V-
V-
PG
24112
V-
V-
V-
S
V-
TP V-
V-
3/4" V
IGNITER
2-119-BLR-003
BURNER
2-119-BLR-003
D-621 10 C
NATURAL GAS SUPPLY
D-621 10 E
LPG SUPPLY
3/4" V
V-
TPPG
24120
V-24120
PG
24115
ROOF
LOCKABLE
(LOCK OPEN)
CP-3CP-3
CP-3
CP-3
CP-3
CP-3
CP-3
PAH
24023
BEH TJD
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
GENERAL NOTES
1. SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
KEYED NOTES
1 MAXIMUM DISTANCE FROM AFGSOV TO BURNER IS 4'-0".
2 LOW-FIRE PROVING SWITCH REQUIRED ON FLOW CONTROL VALVE, REFER TO
BAPSDTM
3 PROOF OF CLOSURE SWITCH REQUIRED ON SOLENOID VALVES, REFER TO BAPSDTM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PROCESS - P&ID NATURAL GAS -
BOILER #3
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 D-624
585-21-115
PCV-24010
PRESSURE REDUCING VALVE
SET POINT: 2 PSIG
PCV-24105
PRESSURE REDUCING VALVE
SET POINT: 2 PSIG
PCV-24108
PRESSURE REDUCING VALVE
SET POINT: 2 PSIG
SHEET 1504/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
File details come from the government source that posted it. Updated .