S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf

PDF 7 MB Posted

Attached to
Y1NB--Project 585-21-115 Replace Boiler Plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI -- NAICS 236220 General Construction
Solicitation number
36C25225R0004
Issued by

About this file

This is an architectural drawing set for Project 585-21-115 to replace the boiler plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings detail architectural plans for a partially sprinklered facility including floor plans, elevations, sections, and details for multiple levels (basement, ground floor, mezzanine, and roof). The building includes spaces such as a boiler room, control room, breakroom, locker room, electrical room, generator room, and propane room. The drawings contain extensive details about fire protection systems, door and window schedules, equipment layouts, signage plans, and finish schedules.

Key technical specifications shown include sprinkler system requirements (wet pipe system with quick response sprinklers rated for different temperature ranges based on room usage), fire barrier details, emergency systems, and equipment placement. The building is designed with various hazard classifications - light hazard areas (breakroom/restrooms), ordinary hazard group 2 (boiler room), and extra hazard group 2 (propane room). The drawings provide comprehensive construction details including wall sections, door/window details, roof details and equipment mounting specifications required for building the replacement boiler plant facility.

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_Updated Dwgs_partial_24JAN25.pdf PDF
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
36C25225R0004 0007.docx DOCX document
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.1_P03 Single Source Justification MEDECO.e.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.6c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET 71

SHEET 72

SHEET 73

SHEET 74

SHEET 75

SHEET 76

SHEET 77

SHEET 78

SHEET 79

SHEET 80

SHEET 81

SHEET 82

SHEET 83

SHEET 84

SHEET 85

SHEET 86

SHEET 87

SHEET 88

SHEET 89

SHEET 90

SHEET 91

SHEET 92

SHEET 93

SHEET 94

SHEET 95

SHEET 96

SHEET 97

SHEET 98

SHEET 99

SHEET 100

SHEET 101

SHEET 102

SHEET 103

SHEET 104

SHEET 105

SHEET 106

SHEET 107

SHEET 108

SHEET 109

AJW CJR

REV 0 - 100% BID SET 2024-02-23

SPRINKLER SYMBOLS

PENDANT SPRINKLER, ON DROP NIPPLE

ENDCAP

UPRIGHT SPRINKLER

WET PIPE SPRINKLER RISER

TOP CONNECTION, 45° OR 90°

BOTTOM CONNECTION, 45° OR 90°

CAPPED OUTLET

PENDANT SPRINKLER

UPRIGHT SPRINKLER, ELEVATION

PLUG WITH BLEEDER

GENERIC VALVE SYMBOL

UPRIGHT SPRINKLER WITH GUARD, ELEVATION

PIPE SECTION

■ ■ ■ NEW FIRE BARRIER, 1 HOUR

NEW FIRE BARRIER, 2 HOUR

3/4-HOUR FIRE-RATED DOOR

1 1/2-HOUR FIRE-RATED DOOR

S 3/4-HOUR FIRE-RATED, SMOKE-RESISTANT DOOR

■ ■ ■ EXISTING FIRE BARRIER, 1 HOUR

EXISTING FIRE BARRIER, 2 HOUR■ ■ ■ ■ ■ ■

NEW SMOKE BARRIERS

EXISTING FIRE-BARRIER, SMOKE BARRIER,1 HOUR■S ■S

EXISTING FIRE-BARRIER, SMOKE BARRIER, 2 HOUR■ ■S ■ ■S

S EXISTING SMOKE BARRIER LINE

NEW FIRE-BARRIER, SMOKE BARRIER,1 HOUR■S ■S

NEW FIRE-BARRIER, SMOKE BARRIER, 2 HOUR■ ■S ■ ■S

SMOKE AND FIRE BARRIER SYMBOLS

GENERAL PLUMBING SYMBOLS

GENERAL NOTES

1. NOTIFY CONTRACTING OFFICE REPRESENTATIVE (COR) 2 DAYS PRIOR TO PERFORMING WORK ON FIRE DETECTION OR FIRE

SUPPRESSION SYSTEMS.

2. COMMISSIONING SHALL BE COMPLETED PER SPECIFICATION 019100, AND 280800.

3. PERFORM WORK IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. INSTALL ALL EQUIPMENT PER MANUFACTURERS

INSTALLATION INSTRUCTIONS.

4. SEE THE MOST RECENT EDITION OF THE VA FIRE PROTECTION DESIGN MANUAL FOR SPECIFIC VA REQUIREMENTS.

5. ALL EQUIPMENT AND MATERIALS PROCURED FOR THIS PROJECT SHALL BE NEW. EQUIPMENT AND MATERIALS DIRECTLY RELATED TO

THE FIRE DETECTION OR SUPPRESSION SYSTEM SHALL BE UNDERWRITERS LABORATORY (UL) LISTED OR FACTORY MUTUAL (FM)

APPROVED.

FIRE ALARM AND DETECTION SYSTEM

1. INSTALLATION OF THE FIRE ALARM SYSTEM COMPONENTS SHALL BE IN ACCORDANCE WITH NFPA 72, NATIONAL FIRE ALARM CODE.

2. INSTALLATION OF CONDUIT AND WIRING SHALL BE IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE (NEC).

3. WIRING INSTALLED IN METAL RACEWAYS WITH THE BUILDING THAT IS PROTECTED BY AUTOMATIC SPRINKLER SYSTEM SHALL BE

CONSIDERED TO MEET THE REQUIREMENTS FOR PATHWAY SURVIVABILITY LEVEL 2 IN ACCORDANCE WITH NFPA 72.

4. IDENTIFICATION OF CONDUIT, JUNCTION BOXES AND TERMINAL CABINETS SHALL BE IN ACCORDANCE WITH THE CONTRACT

SPECIFICATIONS AND THE VA DESIGN MANUALS. ENSURE ALL COMPONENTS ARE COLORED RED PER SPECIFICATION 283100. USE FACTORY COLORED CONDUIT AND BOXES WHERE AVAILABLE. FIELD PAINTED COMPONENTS ARE ACCEPTABLE WHEN FACTORY

COLORED CONDUIT AND BOXES ARE NOT AVAILABLE.

5. ALL NEW DEVICES SHALL BE COMPATIBLE WITH THE EXISTING SYSTEM. EXISTING SYSTEM IS A SIMPLEX 4100ES SYSTEM.

6. FIRE ALARM SUBCONTRACTOR SHALL MARKUP (REDLINE) EXISTING FIRE ALARM DRAWINGS TO SHOW CHANGES AND SUBMIT

CHANGES TO THE COR.

7. SMOKE DETECTORS SHALL NOT BE INSTALLED WITHIN 3'-0" OF AN AIR SUPPLY OR RETURN VENT.

8. TESTING, ACCEPTANCE, AND COMMISSIONING: (SEE SPECIFICATIONS FOR CRITERIA)

a. TESTING OF THE FIRE ALARM DEVICES SHALL BE IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS AND NFPA 72.

b. TESTING WILL ALSO INCLUDE FUNCTION TEST OF THE SPRINKLER FLOW AND TAMPER SWITCH.

c. PROVIDE TESTING REPORTS PER NFPA 72.

d. NOTIFY COR 2 DAYS PRIOR TO PRELIMINARY TESTING.

e. NOTIFY COR 3 DAYS PRIOR TO FINAL COMMISSIONING.

SPRINKLER SYSTEM INSTALLATION

1. ALL WORK TO COMPLY WITH THE VA FIRE PROTECTION DESIGN MANUAL, NFPA 101 LIFE SAFETY CODE, AND ALL OTHER APPLICABLE

CODES ADOPTED BY THE VA. ALL EQUIPMENT AND FIXTURES SHALL BE INSTALLED PER THE MANUFACTURER'S RECOMMENDATIONS.

ALL SPRINKLER PIPING SHALL CONFORM TO NFPA 13 STANDARD FOR THE INSTALLATION OF AUTOMATIC SPRINKLER SYSTEMS.

2. THE CONTRACTOR SHALL COORDINATE PIPE ROUTINGS WITH STRUCTURE, DUCTWORK, PIPING, LIGHTS, ETC. PIPING SHALL NOT BE

INSTALLED ABOVE ELECTRICAL PANELS.

3. PROVIDE FACTORY MUTUAL (FM) APPROVED, QUICK RESPONSE SPRINKLERS IN ALL AREAS.

4. THE CONTRACTOR SHALL COORDINATE SPRINKLER HEAD LOCATIONS WITH STRUCTURE, DUCTWORK, DIFFUSERS, LIGHTS, REFLECTED CEILING PLANS, ETC.

5. WATER SUPPLY FOR ALL CONTROL VALVES SHALL BE ELECTRICALLY SUPERVISED AND MECHANICALLY LOCKED FOR PROPER

POSITION. WATER FLOW AND SUPERVISORY CIRCUITS SHALL BE IN ACCORDANCE WITH NFPA 13 STANDARD FOR THE INSTALLATION

OF AUTOMATIC SPRINKLER SYSTEMS AND NFPA 72 NATIONAL FIRE ALARM CODE.

6. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION SHALL BE FIRESTOPPED. REFER TO SPECIFICATIONS.

7. ALL PIPING TO BE PAINTED RED PER SPECIFICATION.

HYDRANT FLOW TEST DATA:

1. FLOW TEST DATA

A. LOCATION: NORTH OF BOILER PLANT, BUILDING 2

B. BY: CHRIS RASMUSSEN

C. DATE: 08/22/2023

D. STATIC PRESSURE: 83 PSI (HYDRANT: SOUTH OF BUILDING 1 LOADING DOCK)

E. RESIDUAL PRESSURE: 53 PSI (HYDRANT: SOUTH OF BUILDING 1 LOADING DOCK)

F. FLOW: 1275 GPM (HYDRANT; NORTHWEST OF BUILDING 11)

2. CONTRACTOR SHALL OBTAIN CURRENT FLOW TEST DATA AS REQUIRED BY CODE.

NAC NOTIFICATION APPLIANCE CIRCUIT

BATTERIESBATT

FSC FAN SHUTDOWN CONTROL

AHU AIR HANDLING UNIT

EOL

XX

END OF LINE DEVICE

XX=TYPE: R=RESISTOR

FIRE ALARM EQUIPMENT

PANELS/CABINETS/MISC DEVICES

FACP

FACC

FAA

OPA

FIRE ALARM CONTROL PANEL

FIRE ALARM CENTRAL CONSOLE

FIRE ALARM MASTER CONTROL UNIT

FIRE ALARM ANNUNCIATOR

OPERATOR STATION

UPS UNINTERRUPTIBLE POWER SUPPLY

MFACU

PRN PRINTER

MIC MICROPHONE

FACU FIRE ALARM CONTROL UNIT

FATC FIRE ALARM TERMINAL CABINET

CARBON MONOXIDE DETECTOR

E=EXISTING

FIRE PROTECTION MISC SYMBOLS

COMBINATION SPEAKER/VISIBLE

C=CEILING MOUNT

CD = CANDELA RATING

W = SPEAKER WATTAGE

CD

W

DUCT SMOKE DETECTOR

P = PHOTOELECTRIC

WP = WEATHERPROOF

S P/WP

ALARM, SPEAKER ONLY

X LETTER INDICATES AS FOLLOWS:

C=CEILING MOUNTED

W=WATTAGE

XX LETTER INDICATES AS FOLLOWS:

WP = WEATHERPROOF

X

XX

S

ADDRESSABLE INPUT MODULE

2 = DUAL INPUTAIM

WF FLOW DETECTOR SWITCH

AOM ADDRESSABLE ALARM OUTPUT MODULE

FIRE EXTINGUISHER - CLEAN AGENT

FIRE DAMPER

S

SMOKE DAMPER

SPD

TSS

LOW TEMPERATURE SWITCH

(AMBIENT AIR TEMPERATURE)

SURGE PROTECTION DEVICE

GENERAL SYMBOLS

DEMOLISH/REMOVE DEVICE

GENERAL LINETYPES

DEMOLITION LINE

ROOM NAME AND NUMBERC2

CORRIDOR

ELECTRICAL ABBREVIATIONS

VOICE EVACUATION CONTROL UNIT

LCD LCD ANNUNCIATOR/DISPLAY

EVAC

WCU WIRELESS CONTROL UNIT

FIBER OPTIC/RUI LINEFO

DATA/COMMUNICATION LINECOMM

ECCU EMERGENCY COMMUNICATION CONTROL UNIT

BLDG BUILDING

CORR CORRIDOR

DEMO DEMOLITION

DN PIPE DOWN

DWG DRAWING

ELEC ELECTRIC

EMER EMERGENCY

ENCL ENCLOSURE

EQUIP EQUIPMENT

FO FIBER OPTIC

FP FIRE PROTECTION

HVLS HIGH VELOCITY LOW SPEED

J-BOX JUNCTION BOX

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

N NORTH

NA NOT APPLICABLE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

OCC OCCUPY

OFF OFFICE

OPNG OPENING

OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

RM ROOM

TYP TYPICAL

TTB TELEPHONE TERMINAL BOARD

UP PIPE UP

VALVE SUPERVISORY SWITCH

H

FIRE SERVICE OR EMERGENCY PHONE STATION

H=HANDSET

ALARM, FIRE, MANUAL PULL STATION

E=EXISTING

F

TRN FIRE ALARM TRANSPONDER

VS

DETECTOR, SMOKE;

X LETTER INDICATES AS FOLLOWS:

H=HEAT SMOKE

I=IONIZATION SMOKE

P=PHOTOELECTRIC SMOKE

IH=IONIZATION AND HEAT SMOKE

IP=IONIZATION AND PHOTOELECTRIC SMOKE

PH=PHOTOELECTRIC AND HEAT SMOKE

IPH=IONIZATION, PHOTOELECTRIC, AND HEAT

XX LETTER INDICATES AS FOLLOWS:

SB=SOUNDER BASE

SL=STROBE LIGHT

WET CHEMICAL SYSTEMWC

H F

H R/F

DETECTOR, HEAT

R/F=COMBINATION RATE OF RISE/FIXED TEMPERATURE

DETECTOR, HEAT

F=FIXED TEMPERATURE

SPD SURGE PROTECTION DEVICE

T

CU

TELEPHONE

ELECTRICAL COPPER

3-WAY VALVE

OS&Y VALVE

REDUCED PRESSURE ZONE RPZ

(INDICATE IF IT IS A DETECTOR TYPE)

ANGLE VALVE

ALARM CHECK VALVE

ALARM, WET CHEMICAL MANUAL PULL STATION

E=EXISTING

WC

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

LIMIT OF DEMOLITION

SMOKE DETECTOR/ HEAT DETECTOR COMBINATIONH

X

S

S

XX

SINGLE FIRE DEPARTMENT CONNECTION

DH DOOR HOLDER

CD

CD

VISIBILITY ONLY (STROBE) - CEILING MOUNT

CD = CANDELA RATING

VISIBILITY ONLY (STROBE) - WALL MOUNT

CD = CANDELA RATING

PHASE CALLOUT#

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

FIRE PROTECTION NOTES AND

LEGENDS

FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 F-001

585-21-115

FW FEED WATER

SPRINKLER SCHEDULE

LOCATION TYPE TEMPERATURE

RATING

BOILER ROOM 119-2 QUICK RESPONSE HIGH

PROPANE ROOM 131-2 QUICK RESPONSE INTERMEDIATE

GENERATOR ROOM 120B-2 QUICK RESPONSE INTERMEDIATE

BREAKROOM AND RESTROOMS QUICK RESPONSE ORDINARY

CONTROL ROOM 130-2,

SUPERVISOR 129-2 & CHEM FEED

128-2

QUICK RESPONSE ORDINARY

SYSTEM DESIGNATIONS & HAZARD CLASSIFICATIONS

ROOMS/AREAS SYSTEM TYPE CODE HAZARD

CATEGORY DESIGN AREA COVERAGE/SPRINK

LER

DESIGN

DENSITY

HOSE

STREAM

BREAKROOM AND RESTROOM AREAS WET PIPE NFPA 13 LIGHT HAZARD 1500 SQFT 225 SQFT 0.10 GPM/SQFT 100 GPM

BOILER ROOM WET PIPE NFPA 13 ORDINARY HAZARD GROUP

2 1500 SQFT 130 SQFT 0.20 GPM/SQFT 250 GPM

PROPANE ROOM WET-PIPE NFPA13 EXTRA HAZARD GROUP 2 2500 SQFT 100 SQFT 0.30 GPM/SQFT 500 GPM

CARBON MONOXIDE (CO) AND EXPLOSIVE GAS DETECTION UNITGAS

SIDEWALL SPRINKLER

PS PRESSURE SWITCH

REV 1 - FINAL BID SET 2024-04-05

SHEET 1104/5/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

CO

AutoCAD SHX Text X

File details come from the government source that posted it. Updated .