This document contains detailed electrical demolition, site, instrumentation and lighting plans for the VA boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings include electrical site demolition showing removal of underground emergency feeders, manholes, site lighting, and gate operators. The instrumentation plans detail the SCADA system architecture, control panel layouts, and network configurations for monitoring and controlling the new boiler plant systems. Lighting plans show fixture layouts and circuits for the basement, ground floor and mezzanine levels.
Key technical specifications include requirements for cable tray installations, conduit routing, power distribution, lighting controls, and integration of boiler controls with the facility SCADA system. The drawings provide detailed dimensions, elevations, and connection details for electrical equipment placement and wire routing. Safety-related details include specifications for explosion-proof fixtures in the propane room and proper sealing of conduit penetrations. The plans demonstrate a comprehensive electrical system design coordinated with mechanical and architectural elements of the boiler plant replacement project.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR JOB TRAILERS
PARKING LOT
PARKING LOT
PARKING LOT
SH
ED
S (x
3)
BUILDING
(DEMOLITION IS PROGRESS)
LIFT STATIONS
MAINTENANCE GARAGE
1 STORY, BRICK FACADE
AVG. ELEV.: 1162.43'
AREA: ±6925 SQ.FT.
(LESS OVERHANG)
WOODEN SHED
(NO ELEVATION SHOT)
AREA: ±330 SQ.FT.
BUILDING
1 STORY, STEEL
AVG. ELEV.: 1157.08'
AREA: ±1348 SQ.FT.
F.F.E.
1143.49'
BOILER PLANT
FIRST STORY, BRICK FACADE
AVG. ELEV.: 1162.66'
TOTAL BUILDING FOOT PRINT AREA: ±6695 SQ.FT.
BUILDING
1 STORY, STEEL
AVG. ELEV.: 1157.59'
AREA: ±243 SQ.FT.
BUILDING
1 STORY, STEEL
AVG. ELEV.: 1159.29'
AREA: ±1858 SQ.FT.
BUILDING
1 STORY, BRICK FACADE
AVG. ELEV.: 1158.57'
AREA: ±642 SQ.FT.
PREFAB.
SHED
(WOOD)
AREA:
±94 SQ.FT.
F.F.E.
1143.43'
F.F.E.
1143.43'
F.F.E.
1143.28'
F.F.E.
1143.09'
F.F.E.
1143.34'
F.F.E.
1143.80'
F.F.E.
1143.09'
F.F.E.
1143.78'
F.F.E.
1143.44'
F.F.E.
1143.14'
STACK ELEV:
1197.07'
STACK ELEV:
1197.08'
STACK ELEV:
1197.04'
BOILER
PLANT
3RD STORY
AVG. ELEV:
1194.68'
BOILER PLANT
2ND STORY
AVG. ELEV: 1162.66'
(BRICK FACADE)
ENTRYWAY
1 STORY, BRICK FACADE
AVG. ELEV.: 1157.26'
ENTRYWAY
1 STORY, BRICK FACADE
AVG. ELEV.: 1157.26'
STACK ELEV:
1165.78'
STACK ELEV:
1163.87'
STACK ELEV:
1163.67'
STSTST
E
E E
E E
E
WV
EEEEEEEE
E
GATE
STORAGE
SHEDS
E E E EE E
E
E E
E E
EXHAUST FAN
ELECTRIC
JUNCTION
BOX
E
E E E E E
E E E E E
E
GATE
E
E
E E
E
E
E
E E
E E
E E
E E
E E E
E
E E
E
E
E
E
E
E E
E E E
E
E
E E
E E E E
E E
E E
E E
E E
E
E E
E
E
E
E E
E
E E
E
E
E
E E
E E
U
E
E E
E
GATE
U
FU
EL
S
TA
TI
ON
CONTROLS
FUEL STATION
WV
RETAINING WALL
E E
E E
E
E
E
E
E E E
E E
E
E E E E
E
E E E
E
E
E E E
E
E
E
E
E
WV
WV
WV
MA
TE
RI
AL
S
TO
RA
GE
GATE
N89° 19' 12"W 878.64'
E E
E
E E
BLDG 2
GARAGE
BLDG 12
BLDG 16
STORAGE
BLDG 19
SALT SHED
BLDG 10
INCINERATOR STORAGE
METER HOUSE
BLDG 2
BOILER PLANT
BLDG 2
BOILER PLANT
S
1140'
1141'
1142'
1143'
1140'
1141'
1140'
1141' 1141'
1142'
1142'
1141'
1142'
1143'
1143'
1142'
1143'
1143' 1143'
1143' 1143'
1144'
1144'
1143'
1142'
1142'
1143'
1142'
1142'
1142'
1143'
1143'
1142'
1141'
1140'
1142'
1140'
1139'
1142'
1142'
1142'
1143'
1141'
1143'
1142'
1143'
1143'1142'
1143'
1142'
1142'
1143'
1139.5'
1139.5'
1141.5'
1142.5'
1141.5'
1141.5' 11
.5'
1141.5'
1142.5'
1142.5'
1142.5'
1142.5'
1142.5'
1141.5'
.5
1141.5'
1140.5'
1143.5'
.5 '11
.5
1143.5'
1142.5'
1142.5'
1140.5'
1141.5'
1142.5'
1141.5' 1142.5'
1143.5'
1143.5'
1141'
1141.5'
1139.5'
1140.5'
1143.5'
1144'
1142.5' 1142.5'
E
EXISTING
UNDERGROUND
FUEL OIL TANKS
X X X X X X X X X
X X
X X
X X
X X
X
X
X X X
XX
X X
X
XXX
X X
X X
X X
X X
X X
X
X X
X X
X
X
X
X
X X
X X
X X
X
X
X
X X
2 1
X X X X X X X X X
SECURITY CAMERA
(EXISTING TO REMAIN)
SECURITY CAMERA
(EXISTING TO REMAIN)
X X
X X
X X
JFF CJR
REV 0 - 100% BID SET 2024-02-23
SCALE: 1:20
ELECTRICAL DEMOLITION SITE PLAN1
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
4. SEE ES171 FOR ADDITIONAL ELECTRICAL PHASING NOTES FOR THE EMERGENCY FEEDER
RELOCATIONS.
KEYED NOTES
1 REMOVE UNDERGROUND EMERGENCY ELECTRICAL FEEDER FROM BUILDING 2 TO
BUILDING 11. REMOVE DUCT BANK TO EXTENT SHOWN.
2 REMOVE EXISTING MANHOLES.
REMOVE CABLING AND ASSOCIATED CONDUIT BACK TO EXTENT SHOWN. VERIFY
EXISTING CABLING IS NO LONGER USED. UNUSED CABLING TO BE ABANDONED AT
MANHOLE.
4 REMOVE UNDERGROUND SITE LIGHTING FROM BUILDING 2 TO EXTENT SHOWN.
5 REMOVE EXISTING FEEDER TO GATE OPERATOR. COORDINATE WITH GATE REMOVAL.
6 EXISTING ELECTRICAL MANHOLE TO REMAIN. MAINTAIN AND PROTECT THROUGH
CONSTRUCTION.
7 FUEL OIL TANK ALARM, COORDINATE REMOVAL WITH FUEL OIL TANK REMOVAL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL DEMOLITION SITE
PLAN
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
ED171
SITE
585-21-115
KEYPLAN
12 16
REV 1 - PRE-BID UPDATES 2024-08-01
8/1/2024 SHEET 224
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
PIV
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
PIV
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text N
AutoCAD SHX Text N
WE ENERGIES
13.8kV DISTRIBUTION LINE
FROM BLR HOUSE
SUB (B2)
500kVA13.8kV 480/277V
A
600 AF
600 AT
LSIGN/C
600 AF
600 AT
LSIN/O
480/277V
600 AF
350 AT
250 AF
160 AT
250 AF
100 AT
TO ATS #3 TO ATS #2 TO ATS #1
BLDG 2 BOILERHOUSE NORM
150 AF
100 AT
PANEL P2
X
G
1200KW @ 0.8PF
13.8KV, 60HZ, 3Ø, 4W
1500kVA
70 AT
LS
200 AF
GEN. #3
G
1200KW @ 0.8PF
13.8KV, 60HZ, 3Ø, 4W
1500kVA
70 AT
LS
200 AF
GEN. #1
G
1200KW @ 0.8PF
13.8KV, 60HZ, 3Ø, 4W
1500kVA
70 AT
LS
200 AF
GEN. #2
A
50 AT
LSI
100 AF
B
120 AT
LSI
200 AF
C
100 AT
LSI
100 AF
D
MIN AT
LSI
200 AF
E
50 AT
LSI
100 AF
F
120 AT
LSI
200 AF
G
50 AT
LSI
100 AF
H
MIN AT
LSI
200 AF
13.8kV GENERATOR DISTRIBUTION SUBSTATION
GENERATOR BUILDING ADDITION TO BUILDING #2
HV
SELECTOR
SWITCH
30A
600 AT 600 AT
N/C
PANEL P
(SWGR ROOM)
400A 480V 3P
ATS #3
N L E
200A 480V 3P
ATS #2
N L E
100A 480V 3P
ATS #1
N L E
NORMAL
FEED
NORMAL
FEED
NORMAL
FEED
EDP
120/208V 400A 3P 4W
(EM SWBD ROOM)
112.5kVA 3P AA 480-208Y/120V Z=4.3%
EM
100A 3P 4W
(EM SWBD ROOM)
L P-2A
(GARAGE)
L P-1
(BOILER
ROOM)
A
(BOILER
ROOM)
C
(BOILER
ROOM)
BLDG 12
BLDG 10
BOILER HOUSE
BLDG 2
TO BLDG 2
BOILERHOUSE
NORM
13.8kV 480/277V 500kVA
480/277V
350 AT 150 AT 100 AT
'GS-BLDG'
SPARE
45kVA 480V-208Y/120V
3Ø, 4W
'T-GS-BLDG'
PANEL BPP
(BOILER ROOM)
3 1/2" C-4 #500
MCM THWN/THHN,
#2 GND
X X
BOILER
EXHAUST
X X
X X
X
N/C
TO BLDG 11FUTURE FUTURE
SPARE
X
X
TO BLDG 11
X
EXISTING FEEDER TO BE RE-ROUTED SEE ES
DRAWINGS FOR ADDITIONAL INFORMATION.
COORDINATE ALL DISCONNECTIONS AND
RECONNECTIONS WITH THE VA COR.
BLR HOUSE SUB (B2)
(EM SWBD)
2-UPS
(BOILER
ROOM)
15 KVA UPS
(EM SWBD
ROOM)
KRK CJR
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
REV 0 - 100% BID SET 2024-02-23
SCALE: NTS
EXISTING BUILDING 2 NORMAL POWER SYSTEM1 SCALE: NTS
EXISTING BUILDING 2 STAND-BY POWER SYSTEM2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL DEMOLITION POWER
ONE-LINE DIAGRAM
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
ED601
585-21-115
REV 2 - PRE-BID UPDATES 2024-08-01
REV 1 - FINAL BID SET 2024-04-04
8/1/2024 SHEET 225
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
BLDG 2
BOILER PLANT
D
T T P
H
P
H
H
D
SS
UE
FUEL TANK
48'-0" x 12'-0"
EEEEEEEE
E
STORAGE
SHEDS
E
E
E E
FU
EL
S
TA
TI
ON
CONTROLS
FUEL STATION
MA
TE
RI
AL
S
TO
RA
GE
N89° 19' 12"W 878.64'
BLDG 2
GARAGE
BLDG 12
BLDG 16
STORAGE
BLDG 19
SALT SHED
BLDG 10
INCINERATOR STORAGE
METER HOUSE
BLDG 2
BOILER PLANT
BLDG 2
BOILER PLANT
S
E
FOFOFOFOFO
FO
FO
JB
C
C
C
C
T
UE
UE
UE UE UE UE
PB
UE
UE
P
E
UE UE
E
UE UE UE UE
UE
UE
UE
12 5
10 11
2 4
(2) 2" EMT CONDUIT
(18) #18 AWG, SHIELDED 2 CONDUCTOR, SCADA
(3) #* AWG, LIGHTING
(1) #X AWG, CONDUCTOR, TANK HEATERS
(2) 2" SCH 40 PVC CONDUIT
(1) 12 STRAND OS2 FO CABLE
(1) SPARE
(1) 2" EMT CONDUIT
(1) 6 STRAND OS2 FO CABLE,
SECURITY
(4) 2" SCH 40 PVC CONDUIT
(18) #18AWG SHIELDED 2 CONDUCTOR, SCADA
(3) #8 AWG, LIGHTING
(1) SPARE
(1) 6 CONDUCTOR OS2 FO CABLE, SECURITY
PB
E E
E
E E
E E
UE
JB
FO
FO
FO FO
18"x18"
HANDHOLE
ES501
24" DIA MANHOLE
ES501
CAMERA 6
CAMERA 3
CAMERA 5
EMERGENCY PHONE (EP4)
FO
FO
FO
C
C
C
ET603
ET603
ET603
(1) 1" SCH 40 PVC
(3) #4 AWG
(1) #4 AWG GND
(1) 1" SCH 40 PVC
(2) #4 AWG
(1) #4 AWG GND
UE UE UE UE UE
(1) 1" SCH 40 PVC CONDUIT
(2) #4 AWG
(1) #4 AWG GND
(1) 1" SCH 40 PVC CONDUIT
(3) #4 AWG
(1) #4 AWG GND
(1) 3/4" SCH 40 PVC CONDUIT
(3) #12 AWG
(1) #12 AWG GND
(1) 4" SCH 40 PVC CONDUIT
FEEDER F
(3) 4/0 AWG, 15KV
(1) #6 AWG GND
(3) SPARE 4" SCH 40 PVC CONDUIT
(1) 4" SCH 40 PVC CONDUIT
FEEDER B
(3) 4/0 AWG, 15KV
(1) #6 AWG GND
(3) SPARE 4" SCH 40 PVC CONDUIT
C
UE
UE
UE UE
J01
J01 J01
MATCH SIZE AND QUANTITY OF
EXISTING CONDUIT. (2) 4" ASSUMED
JFF CJR
REV 0 - 100% BID SET 2024-02-23
SCALE: 1:20
ELECTRICAL SITE PLAN1
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
4. SEE ET603 FOR CAMERA SCHEDULE AND DETAILS.
KEYED NOTES
1 TIE INTO EXISTING UNDERGROUND SITE LIGHTING CIRCUIT.
2 PROVIDE NEW POWER MANHOLE.
3 TIE INTO EXISTING PRIMARY DUCT BANK TO ROUTE GENERATOR FEEDER B TO BUILDING
2. ALL CABLING SHALL BE NEW FROM BUILDING 2 EQUIPMENT TO BUILDING 11
EQUIPMENT. CONTRACTOR SHALL NOT SPLICE TOGETHER NEW AND EXISTING CABLE.
4 TIE INTO EXISTING PRIMARY DUCT BANK TO ROUTE GENERATOR FEEDER F TO BUILDING
2. ALL CABLING SHALL BE NEW FROM BUILDING 2 EQUIPMENT TO BUILDING 11
EQUIPMENT. CONTRACTOR SHALL NOT SPLICE TOGETHER NEW AND EXISTING CABLE.
5 ROUTE GENERATOR FEEDER B OUT THE TOP OF SUBSTATION AND THROUGH ROOF. FOR
FEEDER DETAILS SEE EP601.
6 ROUTE GENERATOR FEEDER F OUT THE TOP OF SUBSTATION AND THROUGH ROOF. FOR
FEEDER DETAILS SEE EP601.
7 RUN CONDUIT DOWN BUILDING EXTERIOR AND TO UNDERGROUND DUCT BANK.
8 PROVIDE NEW ELECTRICAL HANDHOLE FOR RE-ROUTED UNDERGROUND SITE LIGHTING.
9 RE-ROUTE UNDERGROUND SITE LIGHTING TO AVOID NEW BUILDING.
10 MOUNT SECURITY CAMERA 20 FEET ABOVE GRADE. CONNECT TO CAMERA BOX VIA
CAT6A CABLE THROUGH LIGHT POLE INTERNAL CAVITY.
11 MOUNT CAMERA NETWORK BOX 15 FEET ABOVE GRADE. USE INTERNAL CAVITY OF LIGHT
POLE TO ROUTE POWER, FIBER OPTIC, AND CAT6A CABLING.
12 RISER TO SECOND FLOOR SCADA CONTROL RACK. USE 2" EMT INSIDE BUILDING. USE 2"
SCH 40 CONDUIT BELOW GRADE.
13 RISER FROM BASEMENT LEVEL. FEEDS SECURITY CAMERA BOX WITH OS2 6 CONDUCTOR
FIBER OPTICS FROM TELECOMMUNICATIONS ROOM 001-3. USE 2" EMT INSIDE BUILDING.
USE 2" SCH 40 CONDUIT BELOW GRADE.
14 PROVIDE 16" X 16" NEMA 3R JUNCTION BOX. CONNECT ALL TANK DEVICES BACK TO
JUNCTION BOX. JUNCTION BOX TO BE FED FROM 2-119-CP-009 FUEL OIL TANK CONTROL.
SEE EI121 FOR CONTROL PANEL LOCATION.
15 PROVIDE DATA AND POWER CONNECTIONS TO PREFAB GUARD HOUSE SLAB, SEE ES501
AND ET502 FOR MORE DETAILS.
16 CABLE AND CONDUIT ROUTE FOR ANTI RAM GATE CONTROLLER AND GUARD SHACK
POWER POINT
17 POWER SUPPLY TO LIFT STATION CONTROLLER FROM A 20A BREAKER IN 02-DP-1 CKT
20,22,24
18 STUB-UP CONDUIT IN BUILDING AND CAP. PROVIDE WITH PULL STRING FOR FUTURE USE
19 POWER FEED TO ANTI RAM GATE CONTROLLER
20 POWER FEED TO GUARD SHACK POWER POINT
KEYPLAN
12 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL SITE PLAN FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
ES171
SITE
585-21-115
ELECTRICAL PHASING NOTES
1. EMERGENCY FEEDER WORK SHALL BE PHASED SUCH THAT ONE OF THE TWO FEEDERS (B AND F) SERVING BUILDING 11 SHALL REMAIN IN SERVICE AT ALL TIMES WITH THE EXCEPTIONS OF ANY SHORT DURATION SHUTDOWNS REQUIRED FOR ISOLATION OR CONNECTION OF NEW CABLING TO EXISTING EQUIPMENT, OR WORK IN SHARED MANHOLES. ALL SHUTDOWNS SHALL BE COORDINATED WITH AND APPROVED BY THE COR WITH A NOTICE PERIOD AS DICTATED BY THE COR. SHUTDOWNS SHALL BE COORDINATED TO MINIMIZE RISK TO PATIENT CARE AND WORK MAY BE REQUIRED TO BE
SCHEDULED ON WEEKENDS.
2. PHASING SHOULD BE ANTICIPATED AS FOLLOWS:
A. A SHORT DURATION SHUTDOWN TO ISOLATE FEEDER B AND CLOSE THE TIE BREAKER WITHIN BUILDING 11. REMOVAL OF FEEDER B SHALL NOT OCCUR UNTIL THE VA HAS TESTED THE EMERGENCY POWER SUPPLY SYSTEM AND VERIFIED
THAT IT IS FUNCTIONING CORRECTLY WHILE UTILIZING A SINGLE FEEDER.
B. REMOVAL OF EXISTING FEEDER B CONDUIT AND CABLING. INSTALLATION OF NEW CONDUIT, DUCTBANKS, MANHOLES, AND CABLING FOR FEEDER B UP TO THE EXISTING EQUIPMENT IN BUILDING 11 AND BUILDING 2.
C. A SHORT DURATION SHUTDOWN TO TERMINATE FEEDER B AND ISOLATE FEEDER F. NOTE, THE VA MAY ELECT TO SPLIT THIS INTO TWO SEPARATE SHUTDOWNS TO ENSURE THE FUNCTIONALITY OF THE NEWLY INSTALLED FEEDER B PRIOR TO
THE ISOLATION OF FEEDER F.
D. REMOVAL OF EXISTING FEEDER F CONDUIT AND CABLING. INSTALLATION OF NEW CONDUIT, DUCTBANKS, MANHOLES, AND CABLING FOR FEEDER F UP TO THE EXISTING EQUIPMENT IN BUILDING 11 AND BUILDING 2.
E. A SHORT DURATION SHUTDOWN TO TERMINATE FEEDER F AND RESTORE THE SYSTEM TO NORMAL OPERATION.
NOTE: ANY WORK WITHIN EXISTING ELECTRICAL MANHOLES WHICH REQUIRES LOTO OF EXISTING FEEDERS SHALL BE
COORDINATED WITH THE OWNER AND SHALL BE OF THE SHORTEST DURATION PRACTICABLE.
REV 2 - PRE-BID UPDATES 2024-08-01
REV 1 - FINAL BID SET 2024-04-04
8/1/2024 SHEET 226
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
PIV
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text N
N
DETAIL NOTES:
A. REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR
ADDITIONAL INFORMATION.
B. PROVIDE #6 GROUND WIRE AND GROUND ROD FOR EACH LOCATION.
C. REFER TO PLANS FOR QUANTITY, LOCATION, AND RECEPTACLE
TYPES AND QUANTITIES.
6" GRAVEL
CONDUITS PER
PLANS TO
HANDHOLE
#5 REBAR CAGE
RECEPTACLE
SECTION
CIRCUIT BREAKER
SECTION
NEMA 3R POWER
DISTRIBUTION UNIT
PEDESTAL PER
SPECIFICATIONS.
ES501
ET502
L14-50R 50A
GFCI
20A
DETAIL NOTES:
A. PROVIDE 120V PHASE POWER DISTRIBUTION BOX FOR VENDOR
CONNECTION WITH RECEPTACLES INDICATED.
a. PROVIDE UNIT WITH NEMA 3R ENCLOSURE AND LOCKING 'IN-USE'
COVER (NOT SHOWN).
B. PROVIDE 208V SINGLE PHASE 60A CIRCUIT TO PANELBOARD INDICATED
ON DRAWINGS.
C. MULTIPLE POWER ENCLOSURES ARE TO BE KEYED ALIKE. RETURN ALL
KEYS TO OWNER. REFER TO PLANS FOR QUANTITY AND LOCATION.
(4) 20A-1P
50A/2P
GFCI
20A
GFCI
20A
GFCI
20A
LOCKING
RECEPTACLE
(3
3" mm mm mm
3"
76mm (3") 76mm
(3")
(3") 76mm
152mm
(6")(SEE NOTE 4)
(3")
(3") 76mm
(3 mm
(3 ") 76 mm
76mm
(3") 76mm
3"
) 76 mm
3" mm (3 mm (3")
(3") 76mm
(3") 76mm76mm
(T
YP
DETAIL NOTES:
1. CONCRETE SHALL BE 2000 P.S.I. @ 28 DAYS, OR AS SPECIFIED.
2. PROVIDE #4 REINFORCING RODS ON TOP AND BOTTOM OF DUCTS
WHEN CROSSING OR PLACED IN ROADWAYS.
3. MINIMUM COVER TO TOP OF ENVELOPE SHALL BE 610MM (24") OR AS
OTHERWISE SPECIFIED IN SECTION 26 05 41.
4. PROVIDE MINIMUM 152MM (6") SPACE BETWEEN POWER AND
TELECOMMUNICATION DUCTS. INCREASE SIZE AS REQUIRED.
2-WAY DUCT LINE 4-WAY DUCT LINE
6-WAY DUCT LINE
24"
" O
R
AS
N
OT
ED
4"
HEIGHT AS REQUIRED
TO MEET DRAINAGE
REQUIREMENTS
GRADE CAST IRON COLLAR & LID
24"x24" SUMP
FILL W/GRAVEL
6" CABLE RACK
4" THICK PRECAST
CONCRETE COVER
ELECTRIC
4" THICK PRECAST
COCNCRETE WALLS & FLOOR
DUCT BANK KNOCKOUT 18"x18"
96" 18"
TYPICAL
TOP
A
A
4" SUMP HOLE
PROVIDE REMOVABLE PLUG
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL SITE DETAILS FINAL BID SET
PARTIALLY
SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
ES501
585-21-115
XXX XXX
REV 0 - 100% BID SET 2024-02-23
SCALE: NTS
RECEPTACLE PEDESTAL DETAIL1
1/ES171
SCALE: NTS
POWER DISTRIBUTION PANEL DETAIL2
1/ES171
7/ET501
SCALE: NTS
DUCTBANK DETAILS3 SCALE: NTS
ELECTRICAL POWER MANHOLE DETAIL4
REV 1 - PRE-BID UPDATES 2024-08-01
8/1/2024 SHEET 227
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL INSTRUMENTATION -
NOTES AND LEGENDS
100% BID SET
PARTIALLY
SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
EI001
585-21-115
AMC IJS
REV 0 - 100% BID SET 2024-02-23
FIBEROPTICS LINE = FO
COMMUNICATION SYMBOLS
OUTLET DATA ONLY
2 = DUAL PORT
OUTLET; LETTER INDICATES AS FOLLOWS:
A = AUDIO V = VIDEO I = INTERCOM
1PH SINGLE-PHASE
1P SINGLE POLE
2/C TWO-CONDUCTOR
3/C THREE-CONDUCTOR
3PH THREE-PHASE
4/C FOUR-CONDUCTOR
4W FOUR-WIRE
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
ADO AUTOMATIC DOOR OPENER
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
AMB OR A AMBIENT
ARCH ARCHITECT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BAT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISH FLOOR
BLDG BUILDING
BOP BALANCE OF PLANT
BPIP BOILER PLANT INSTRUMENTATION PANEL
BYP BY PASS
C CONDUIT
CAB CABINET
CALC CALCULATE
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CLG CEILING
CMU CONCRETE MASONRY UNIT
COAX COAX CABLE
COMM COMMUNICATION
COMPT COMPARTMENT
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CP CONTROL PANEL
CTV CABLE TELEVISION
CU COPPER
CU FT CUBIC FEET
CUR CURRENT
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISTR DISTRIBUTION
DN DOWN
DRSW DOOR SWITCH
DWG DRAWING
EC EMPTY CONDUIT
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
EXIST EXISTING
FLEX FLEXIBLE METALLIC CONDUIT
FO FIBER OPTIC CABLE
FOUTT TELEPHONE FLOOR OUTLET
FP FIRE PROTECTION
FT FEET OR FOOT
FU SW FUSED SWITCH
G OR GND GROUND OR GENERATOR
GEN GENERATOR
GTB GROUND TERMINAL BOX
HOA HAND-OFF-AUTOMATIC
HT HEIGHT
HZ HERTZ
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
J-BOX JUNCTION BOX
LF LINEAR FEET (FOOT)
LTNG LIGHTNING
LV LOW VOLTAGE
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MT MOUNT
MTD MOUNTED
MTG MOUNTING
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEUT OR N NEUTRAL
NIC NOT IN CONTRACT
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
P POLE
PA PUBLIC ADDRESS
PB PANELBOARD, PULL BOX, OR PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
RGS RIGID GALVANIZED STEEL
RM ROOM
REQD REQUIRED
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SURF SURFACE
SW SWITCH
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
WP WEATHERPROOF
WAP WIRELESS ACCESS POINT
COMMUNICATION AND ELECTRONIC SAFETY AND SECURITY ABBREVIATIONS
APPLICABLE CODES
THE APPLICABLE MODEL CODES, STANDARDS AND REFERENCES DOCUMENTS
PERTINENT TO THE PROJECT ARE AS FOLLOWS:
· NFPA 101 LIFE SAFETY CODE (LATEST EDITION)
· NATIONAL ELECTRICAL CODE NFPA70 (LATEST EDITION)
· SEE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
1. VERIFY LOCATIONS WITH COR PRIOR TO ROUGHING IN THE INSTALLATION.
2. ALL WALL MOUNTED BACK BOXES TO A MINIMUM OF 18 INCHES ABOVE THE
FINISHED FLOOR UNLESS OTHERWISE SPECIFIED.
3. FOR SPACES WITH DROP CEILINGS, ALL DATA AND PHONE LINES SHALL BE
INSTALLED IN A MINIMUM 1" EMT CONDUIT RUN VERTICALLY IN THE WALLS
AND STUBBING ABOVE THE CEILING BY AT LEAST 1 INCH. INSTALL WITH A
PULL STRING.
4. ALL WIRING FOR COMMUNICATION DEVICES SHALL BE INSTALLED WITH A
PULL STRING.
5. USE EXISTING TIE-IN POINTS FOR WIRE TERMINATION.
6. ALL WIRING ABOVE SUSPENDED CEILING WILL BE SUSPENDED USING
APPROVED WIRE HANGERS OR BASKET CABLE TRAYS.
7. OUTLET BOXES SHALL BE THE SAME MINIMUM SIZE AS NEC STANDARD 6 IN x
6 IN x 2.5 IN THAT COULD CONTAIN DUAL DUPLEX ELECTRICAL OUTLETS.
8. OUTLET BOXES SHALL BE EQUIPPED WITH FULL COVERED WALL FACEPLATES
THAT SHALL COVER THE ENTIRE BOX WITHOUT TRIM RINGS ADDED, AND
SHALL EMPLOY TWO EACH MODULAR CATEGORY 6A (OR BETTER) RJ-45
JACKS FOR DATA. THE BOX SHALL ALSO PROVIDE SPACE FOR THE ADDITION
OF TWO ADDITIONAL CATEGORY 6A.
9. PLENUM/ CMP RATED WIRE OR CABLE SHALL BE PROVIDED IN ALL
AIR-HANDLING PLENUM LOCATIONS. NON-PLENUM/CM WIRE OR CABLE MAY
BE PROVIDED IN ALL OTHER AREAS.
GENERAL NOTES
FO
A
NETWORK EQUIPMENT, TYPE=X
R = TYPE 1 EQUIPMENT RACK
W = TYPE 4 WALL MOUNT
WIREWAY SYMBOLS
CONDUIT UP
CONDUIT DOWN
VERTICAL RISER
FL
RK
INSTRUMENTATION SYMBOLS
RF REPEATER OR ACCESS POINT; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK/TABLE F-FLUSH FL-FLOOR G-GROUND
H-HIDDEN M-MULLION O-OUTDOOR P-PEDESTAL RK-RACK
R-ROOF REC-RECESSED S-SURFACE W-WALL PL-POLE
T=TECHNOLOGY/TYPE
C-CELLULAR REPEATER PR-PHONE REPEATER RX-RECEIVER
TR-TRANSCEIVER TX-TRANSMITTER WAP-WIRELESS ACCESS POINT
WP-WIRELESS PROCESSOR REPEATER A-ANTENNA A-ANTENNA
T2=SECONDARY TECHNOLOGY
X=LEGEND REF
E-EXISTING VZ-VERIZON WIRELESS OD-OMNI-DIRECTIONAL
M T
T2 X
GENERAL SYMBOLS
ROOM NAME AND NUMBER
DEMOLISH/REMOVE
A1
ROOM
2 OUTLET, COMBINATION TELEPHONE/DATA COMMUNICATION
2 = DUAL PORT (TYPE B FACEPLATE)
COPPER COMMUNICATION LINE = CU (CAT6A)CU
EMERGENCY PHONE
CABLE TRAY
CABLE TRAY WATERFALL
DUCT JUNCTION BOX
CARBON MONOXIDE DETECTOR
COMBUSTIBLE GAS DETECTOR
SHEET 2282/22/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
CO
GAS
CO
CO
CO
CO
GA
S GA
S
MFACP
F F
CO
MFACP
PRIMARY NUMBER 1
LIFT STATION
SECONDARY NUMBER 2 LIFT
STATION
POWER ON HIGH LEVEL POWER ON HIGH LEVEL
PUMP 1
RUNNING
PUMP 2
RUNNING
PUMP 1
RUNNING
PUMP 2
RUNNING
ALARM
ON - OFF
ALARM
TEST
NUMBER 3
LIFT STATION ALARM CONTROLS
POWER ON HIGH LEVEL
PUMP 1
RUNNING
PUMP 2
RUNNING
FUEL PUMP SKID
OE-13001
OE-13035
PT-13003
PT-14002
PT-15002
SUMP PUMP (2-EXT-PMP-007)
LC-11022
CHEMICAL STORAGE:
SULFITE OXYGEN SCAVENGER
PG-36004
SIC-36005
HS-36005
LSL-36006
HS-36007
SIC-36007
PG-36008
AMINE
HS-36016
SIC-36016
PG-36017
HS-36019
SIC-36019
PG-36020
HS-36022
SIC-36022
PG-36023
LSL-36025
SCALE INHIBITOR
LSL-36035
HS-36032
SIC-36032
PG-36033
HS-36029
SIC-36029
PG-36030
HS-36026
SIC-36026
PG-36027
SODIUM HYDROXIDE
PG-31029
HS-31030
SIC-31030
LSL-31031
LPG STORAGE
PIT-21103
PIT-21108
PSH-21109
ZCO-21106
ZSO-21106
ZSC-21106
WATER SOFTENER TANKS
PG-31002
PG-31007
FQI-3009
KIC-31053
YY-31054
HEAT EXCHANGER
TG34028
REVERSE OSMOSIS SYSTEM
PI-31021
KIC-31022
PI-31024
REVERSE OSMOSIS TANK
LSH-31048
LS-31055
LSL-31049
FQI-31052
SURGE TANK
PG-33003
2-119-CP-001
2-119-CP-002
2-119-CP-003
2-100-PMP-005
FEEDWATER PUMP
ZI-35044
ZI-35045
ELECTRICAL ROOM
120A-2
GENERATOR ROOM
120B-2
BOILER ROOM
119-2
BREAK ROOM
124-2
LOCKER ROOM
125-2CHANGING AREA
127-2
SHOWER AREA
126-2
TOILET
123-2
TOILET
122-2
JANITOR
121-2
CONTROL ROOM
130-2SUPERVISOR
129-2
CHEM FEED
128-2
2-100-PMP-003
FEEDWATER PUMP
ZI-35016
ZI-35017
2-100-PMP-004
FEEDWATER PUMP
ZI-35032
ZI-35033
2-119-TK-004
2-119-HEX-001
2-119-RO-001 2-119-TK-005
2-119-TK-002
2-119-RO-001
2-119-PMP-001
2-119-PMP-002
FUEL OIL DUPLEX PUMP SKID
2-119-CP-005
2-119-CP-008
2-119-CP-009
2-119-BLR-001
2-119-BLR-002
2-119-BLR-003
NATURAL GAS SUPPLY ROOM
ZCO-21001
ZSO-21001
ZSC-21001
PSH-21004
PIT-21006
FIT-21008
BLOWDOWN SEPARATOR
ZIC-42103
TIT-42103
TE-42103
TG-42104
STEAM MANIFOLD
PIT-44001 ZI-44026
FE-44004 ZT-44027
FIT-44004 ZT-44028
FE-44019 PIT-44030
FIT-44019
ZI-44025
ROUTE TRAY UP
OVERHEAD TO
MEZZANINE SEE
DRAWING EI141
CONTROL SYSTEM LOW
VOLTAGE CABLE TRAY
GAS MONITOR STATION
GENERATOR MONITOR PANELS x4
SCADA SCREEN 1
SCADA SCREEN 2
SCADA SCREEN 3
MOUNT 1' AFF
MOUNT 5' AFF
MOUNT 5' AFF
MOUNT 5' AFF
W
SCADA
W
SCADA
W
SCADA
W
SCADA
W
SCADA
W
SCADA
MED GAS MONITOR
EMERGENCY FUEL
CUTOFF SWITCH
EMERGENCY FUEL
CUTOFF SWITCH
EMERGENCY FUEL
CUTOFF SWITCH
EI121
2-119-CP-004DUPLEX CONTROL PANEL
PROVIDE SAFETY TEST PANEL
AT EACH BOILER CONTROL
PANEL. SEE 4/EI501.
TANK LEVEL INDICATOR
LI-11005
TANK FILL PIPING
ZI-11003
ZC-11003
TANK FILL SENSORS
LSHH-11008
LSH-11008
LIT-11008
TANK INTERSTITIAL SPACE
OE-11011
FUEL OIL PIPING (FROM PUMP)
OE-11013
FUEL OIL PIPING (TO PUMP)
ZI-11016
ZI-11018
ZC-11018
ZI-11020
OE-11019
TANK FILL BOX
TANK TEMP SENSORS
TT-11010
TE-11010
2-100-TK-019
W
SCADA
W
SCADA
W
SCADA
EMERGENCY FUEL
CUTOFF SWITCH
CONTROL ROOM
130-2
EI121
/2 EI121
FIRE ALARM CONTROL PANEL
SEE FA DRAWINGS
BOILER EMERGENCY
STOP BUTTONS
SECURITY CAMERA
DISPLAY
ENGINEERING WORKSTATION
OPERATOR
WORKSTATION
VA WORKSTATION
OPERATOR
WORKSTATION
/2 EI121
SECURITY CAMERA
SCREEN
GENERATOR ANNUNCIATOR
PANELS
CO AND COMBUSTIBLE GAS
MONITOR ANNUNCIATOR
MED GAS MONITOR
ANNUNCIATOR
PACS SECURITY
PANEL
LIFT STATIONS ANNUNCIATOR PANEL
SEE 1/EI501
BOILER E-STOP BUTTONS (1 PER BOILER)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
EI121
ELECTRICAL INSTRUMENTATION
PLAN - GROUND FLOOR LEVEL 2
KRK KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
9. SEE NETWORK ARCHITECTURE DRAWINGS EI601 FOR CONTROL PANEL SCHEDULE.
8. DRAWINGS ONLY SHOW SENSORS NOT PRE-INSTALLED ON SKIDS OR BOILERS.
REFERENCE D AND DI DRAWINGS FOR CONNECTIONS AND TYPES.
7. PROVIDE CABLE DIVIDER WITHIN CABLE TRAY TO SEPERATE BOP I/O CABLES FROM
CAT6 IP DATA CABLES.
6. SEE DI-SERIES DRAWINGS FOR SEQUENCE OF OPERATION AND POINTS LIST.
5. SEE ET101 FOR BASEMENT LEVEL GAS DETECTION DEVICES.
4. SEE D-SERIES DRAWINGS FOR PROCESS P&ID DIAGRAMS AND CONNECTIONS.
3. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE EI-001 FOR EI-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 1/8" = 1'-0"2 ELECTRICAL INSTRUMENTATION PLAN - GROUND FLOOR LEVEL
SCALE: 1/8" = 1'-0"1 ELECTRICAL INSTRUMENTATION PLAN - GROUND FLOOR LEVEL
NN
KEYED NOTES
RUN EMT CONDUIT FROM CABLE TRAY TO TOP OF BOILER CONTROL CABINET TO MAKE
CONTROLS AND SCADA NETWORK CONNECTIONS. ROUTE CAT6 CABLE VIA CONDUIT
AND CABLE TRAY BACK TO SCADA RACK IN ROOM 201-2 FROM BOILER CONTROL
CABINET SWITCH. SIZE FOR 30% CONDUIT FILL. SEE EI502 FOR TRANSITION DETIALS.
RUN EMT CONDUIT FROM CABLE TRAY TO VFD. ROUTE BOP I/O CABLE THROUGH
CONDUIT AND CABLE TRAY BACK TO SCADA RACK IN ROOM 201-2. SIZE CONDUIT FOR
30% FILL. SEE EI502 FOR TRANSITION DETAILS.
3 55" 1920 x 1080 (16:9) DISPLAY, BASIS OF DESIGN: SAMSUNG OH55A-S 4 46" 1920 x 1080 (16:9) DISPLAY, BASIS OF DESIGN: SAMSUNG OH46B
SCALE: 3/8" = 1'-0"3 CONTROL ROOM ENLARGED PLAN
SCALE: 3/8" = 1'-0"4 EAST CONTROL ROOM WALL ELEVATION
Revisions: Date:
REV 1 - FINAL BID SET 2024-04-04
SHEET 2294/4/2024
RK
GA
S
1' 2'
A'
B'
G'
F'
D'
C'
2.8'
E'
A
B
D
F
H
M
2-200-HEX-002
2-200-MAU-001
2-200-MAU-002
DEAERATOR TANK
HS-34026
YIC-34026
PIT-34001
PIT-34002
ZIC-34005
PIT-34009
PG-34010
ZIC-34013
2-200-HEX-003
2-200-PMP-002
2-200-PMP-001
2-200-CP-006A
FWS COOLER
TG-34030
2-200-HTR-001
CONTROL IT
201-2
BOTTOM OF CABLE TRAY
TO BE ABOVE 19'-0"
ABOVE GROUND FLOOR
TRAY UP FROM GROUND
LEVEL SEE DRAWING EI121
CONTROL SYSTEM
LOW VOLTAGE
CABLE TRAY
SCADA SYSTEM CONTROL RACK
SEE 7/EI502
CABLE TRAY TO ENTER IT
ROOM VIA WALL OPENING
BELOW IT ROOM CEILING
FINISHED INTERIOR
W
SCADA
3'
SCADA SCREEN 4
FUEL OIL HEAT EXCHANGER
ZIC-12033
FE-12034
FE-12037
TT-12045
TE-12045
2-200-CA-001
2-200-HEX-001
ROUTE CABLE TRAY DOWN TO
GROUND LEVEL SEE DRAWING EI141
EQUIPMENT ACCESS
200-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
EI141
ELECTRICAL INSTRUMENTATION
PLAN - MEZZANINE LEVEL 2
KRK KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
9. SEE NETWORK ARCHITECTURE DRAWINGS EI601 FOR CONTROL PANEL SCHEDULE.
8. DRAWINGS ONLY SHOW SENSORS NOT PRE-INSTALLED ON SKIDS OR BOILERS.
REFERENCE D AND DI DRAWINGS FOR CONNECTIONS AND TYPES.
7. PROVIDE CABLE DIVIDER WITHINCABLE TRAY TO SEPERATE BOP I/O CABLES FROM
CAT6 IP DATA CABLES.
6. SEE DI-SERIES DRAWINGS FOR SEQUENCE OF OPERATION AND POINTS LIST.
5. SEE ET101 FOR BASEMENT LEVEL GAS DETECTION DEVICES.
4. SEE D-SERIES DRAWINGS FOR PROCESS P&ID DIAGRAMS AND CONNECTIONS.
3. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE EI001 FOR EI-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/16" = 1'-0"1 ELECTRICAL INSTRUMENTATION PLAN - MEZZANINE LEVEL
KEYED NOTES
1 55" 1920 x 1080 (16:9) DISPLAY, BASIS OF DESIGN: SAMSUNG OH55A-S
Revisions: Date:
SHEET 2302/22/2024
PB
G G G G
RARA
PRIMARY NUMBER 1
LIFT STATION
SECONDARY NUMBER 2
LIFT STATION
POWER ON HIGH LEVEL POWER ON HIGH LEVEL
PUMP 1
RUNNING
PUMP 2
RUNNING
PUMP 1
RUNNING
PUMP 2
RUNNING
ALARM
ON - OFF
ALARM
TEST
G G
RA
NUMBER 3
LIFT STATION ALARM CONTROLS
POWER ON HIGH LEVEL
PUMP 1
RUNNING
PUMP 2
RUNNING
ALARM ON-OFF SWITCH
ALARM TEST PUSH BUTTON
PUMP PILOT LIGHTS (GREEN)
POWER ON PILOT LIGHT (AMBER)
BOX SECTIONS WITH VINYL GRAPHIC OR PAINT
WHITE BACKGROUND WITH BLACK LETTER ENGRAVED PLASTIC
ALARM SIREN
2 HIGH LEVEL ALERT LIGHTS (RED)
PB
ALARM
SILENCE
ALARM SILENCE BUTTON (INHIBITS
CURRENT ALARM FOR 1 HOUR.
NEW ALARMS SHALL STILL SOUND)
13 5/16"
5/
STEAM HIGH PRESSURE LIMIT
TEST
SWITCH
FUEL OIL PROOF OF CLOSURE (POC)
FUEL GAS PROOF OF CLOSURE (POC) AIR DAMPERS PROOF OF CONTACT (POC)
BOILER # 2-119-BLR-XXX
HSPLS
HHSPLS
AFOSV#1
AFOSV#2
APFGSOV#1
APFGSOV#2
APFGSVV
FDDWOPS
OSDPI
LOW-FIRE POSITION PROVING
FUEL OIL CONTROL VALVE
FUEL GAS CONTROL VALVE
FORCED DRAFT DAMPER
OFF ON
TYP
TYP
1A 1B
2B2A
3A 3B
4B4A
5A 5B
6B6A
7B7A
8B8A
9B9A
10A 10B
11B11A
12B12A
A
B
12 13
FORCED DRAFT
FAN MOTOR
INTERLOCK
L1B L2B
L3A L3B
L2A
L1A
/16
10 7/16"
4 1 /8"
/16
1.5 " x
3" W
IR
EW
AY
1.5 " x
3" W
IR
EW
AY
1.5" x 3" WIREWAY
1.5" x 3" WIREWAY
1.5" x 3" WIREWAY
109 9 10
TERMINAL BLOCKS
1A 1B 2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
7A 7B 8A 8B 9A 9B 10A 10B 11A 11B 12A 12B
HS
PL
S
HH
SP
LS
AF
OS
V# 2 P
OC
AP
FG
SO
V#
1 P
OC
AP
FG
SO
V#
2 P
OC
AF
OS
V# 1 P
OC
AP
FG
SV
V
PO
C
FD
DW
OP
S
PO
C
FU
EL
O
IL
CV
LF
P
FU
EL
G
AS
C V
LF
P
FD
D
LF
P
OS
DP
I P
OC
A
B
L3B L3A L2B L2A L1B L1A
FROM FORCED DRAFT FAN
MOTOR INTERLOCK
L3B L3A L2B L2A L1B L1A
TO BOILER
CONTROL SYSTEM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL INSTRUMENTATION
DETAILS
FINAL BID SET
PARTIALLY
SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
EI501
585-21-115
AMC IJS
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-04
GENERAL NOTES
1. SEE EI001 FOR EI-SERIES NOTES AND LEGENDS.
SCALE: NTS
LIFT STATION ANNUNCIATOR PANEL DETAIL1
BILL OF MATERIAL - LIFT STATION ALARM PANEL
ITEM # QTY ITEM DESCRIPTION
3 30MM AMBER INDICATOR LIGHT ROUND AMBER LENS AND BULB
3 30MM RED INDICATOR LIGHT ROUND RED LENS AND BULB
6 30MM GREEN INDICATOR LIGHT ROUND GREEN LENS WITH WHITE BULB
1 30MM SELECTOR SWITCH 2 POSITIONS KEY SWITCH
2 30MM PUSH BUTTON BLACK FLUSH PUSH BUTTON
1 70MM BUZZER ALERT SIREN OR BUZZER
1 MINIMUM 18X14X6 INCH ENCLOSURE NEMA 1 OR 12 RATED ENCLOSURE
BILL OF MATERIAL
# DESCRIPTION QUANTITY MANUFACTURER PART NUMBER
RAISED COVER ENCLOSURE WITH HINGED BONDED
WINDOW 14"X12"X7.95 1 HOFFMAN RVJB1412HWPL2
FRONT PLATE 14"X12" 1 HOFFMAN VFPH1412A-KIT
BACK PLATE 14"X12" 1 HOFFMAN MP1412N
TWO POSITION SELECTOR SWITCH 1 ROCKWELL AUTOMATION 800TC-H2A
CUSTOM LEGEND PLATE 1 ROCKWELL AUTOMATION 800-X559E
DIN-RAIL TERMINAL BLOCK 12 EATON NDN63
BANANA JACK-BLACK 13 GRACETECHNOLOGIES Q85
BANANA JACK-RED 13 GRACETECHNOLOGIES Q84
NONMETALIC WIRE DUCT 1.5"X3" AS NEEDED PANDUIT F1.5X3LG6
WIRE DUCT COVER 1.5" AS NEEDED PANDUIT C1.5LG6
STANDARD DIN RAIL 35MM AS NEEDED ROCKWELL AUTOMATION 199-DR2
PLUG-IN TEST SYSTEM 1 PHOENIX CONTACT RSCWE 6-3/6
INTERRUPTION PLUG 1 PHOENIX CONTACT FIP-3/2 SERVICE
SCALE: 6" = 1'-0"
BOILER SAFETY TESTING PANEL - FRONT PANEL4 SCALE: 6" = 1'-0"
BOILER SAFETY TESTING PANEL - BACK PANEL5
SCALE: NTS
TEST SWITCH WIRING DIAGRAM2
SCALE: NTS
FORCED DRAFT FAN MOTOR INTERLOCK TEST WIRING DIAGRAM3
SHEET 2314/4/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DETAIL B
COL
DETAIL A
BURNDY GROUND CLAMP
DRILL TRAY FOR
GROUND CLAMP BOLT
GROUND
CLAMP (TYP)
CLAMP (TYP)
GROUND CLAMP
DRILL HOLE IN PLATE
FOR CLAMP BOLT
BURNDY GROUND CLAMP
UNLESS NOTED
OTHERWISE,
1/C 4/0 STRANDED
COPPER CABLE (TYP)
1/2 x 4" x 6" STEEL PLATE
NOTES:
1. THE ENTIRE TRAY SYSTEM SHALL HAVE A 1/C 3/0 INSULATED (GREEN) COPPER STRANDED
GROUND CABLE INSTALLED AS SHOWN. (EXCEPTION: WHEN A TRAY IS USED STRICTLY FOR
CONTROL, INSTRUMENTATION, COMPUTER, OR OTHER LOW VOLTAGE SIGNALS, A 1/C #6 AWG
INSULATED (GREEN) COPPER STRANDED GROUND IS TO BE USED).
2. ALL SECTIONS OF TRAY INCLUDING FITTINGS SHALL BE GROUNDED AS SHOWN IN DETAIL A.
3. CONNECT TRAY GROUND TO BUILDING APPROXIMATELY EVERY 100 FEET (100') AS SHOWN
IN DETAIL B.
4. REMOVE SUFFICIENT AMOUNT OF INSULATION FROM GROUND CABLE TO MAKE A PROPER
GROUND CONNECTION.
TAP MAIN GROUND IN TRAY
FOR EQUIPMENT GROUND
(TAP SIZED AS REQUIRED)
3/16
CABLE TRAY
CABLE
CABLE TRAY RUNG (TYPICAL)
POLYPROPYLENE CABLE TIES,
WEATHER AND SUNLIGHT RESISTANT
NOTES:
1. ALL CABLES SHALL BE TIED DOWN ON EITHER SIDE OF ALL FITTINGS (ELBOWS, TEES, ETC.)
2. WIRE AND CABLE INSTALLED IN CABLE TRAY SHALL BE SECURELY FASTENED WITH
ULTRAVIOLET RESISTANT NYLON HEAVY DUTY LASHING TIES (TY-RAPS) EVERY 5 FEET
MINIMUMIN IN HORIZONTAL RUNS AND EVERY 3 FEET MINIMUM IN VERTICAL RUNS.
E410. CABLE FASTENER DETAIL
E460. MULTIPLE SUPPORT FROM VERTICAL STEEL DETAIL
CABLE TRAY QUANTITY,
SIZE, & ELEVATION PER
PLAN, TYP
EXISTING
STRUCTURAL
STEEL
WELD
L3 X 3 X 3/8
HORIZONTAL
MEMBER (TYP)
L2 X 2 X 1/4
KNEE BRACE
(TYP)
L3 x 3 x 3/8
VERTICAL
MEMBER (TYP)
24" MINIMUM
ELEVATION PER
PLAN DRAWING
ELEVATION PER
PLAN DRAWING
CABLE TRAY
MANUFACTURER'S
HOLD DOWN CLAMP
TYP
WELD
GENERAL NOTES:
1. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING CHANNEL LONGER THAN 915mm
(36") SHALL BE INSTALLED WITH A CENTER SUPPORT ROD. SUPPORT RODS SHALL
NOT BE GREATER THAN 457mm (18") APART.
2. FASTEN THREADED ROD TO STRUCTURE BY APPROVED METHOD PER
SPECIFICATION 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS. FIELD
VERIFY EXACT CONDITIONS.
3. FOR TRAPEZE INSTALLATIONS IN SEISMIC AREAS REFER TO SPECIFICATION
SECTION 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS.
REFER TO PLANS FOR
QUANTITY & SIZE OF
CONDUITS
CONDUIT CLAMP.
SIZE AS REQUIRED
INTEGRAL GALVANIZED
LIPPED STEEL MOUNTING
CHANNEL
INTEGRAL GALVANIZED
LIPPED STEEL MOUNTING
CHANNEL
E464. VERTICAL TRAY HANGER DETAIL
CABLE TRAY
FLAT WASHER AND NUT ON
TOP AND BOTTOM (TYP)
VERTICAL TRAY
HANGER, GALVANIZED
3/8" DIA MINIMUM TREADED ROD
(TYP) LENGTH AS REQUIRED
A
PLAN
SECTION A-A SECTION B-B
A
B B
CABLE TRAY 90° ENTRY
ONLY
CONDUIT 3/4" THRU
1 1/4" (TYP)
120° VARIABLE
ENTRY
CONDUIT 1 1/2"
THRU 4" (TYP)
CONDUIT BUSHING
OUTSIDE EDGE
OF CABLE TRAY
CONDUIT CLAMP
O-Z/GEDNEY TYPE CTC
CONDUIT BUSHING
OUTSIDE EDGE
OF CABLE TRAYCONDUIT CLAMP
O-Z/GEDNEY TYPE CTC
NOTES:
1. CONTRACTOR SHALL RIGIDLY CONNECT ALL CONDUITS TO CABLE TRAY WITH SUITABLE
CONDUIT CLAMP (EX. O-Z/GEDNEY TYPE CTC "TRAY BOND" CABLE TRAY CLAMP OR
APPROVED EQUAL).
2. GROUND CONTINUITY MUST BE MAINTAINED BETWEEN CONDUIT AND TRAY AT ALL
CONDUIT DROPOUT INSTALLATIONS.
3. CONDUITS SHALL BE SEALED AFTER CABLE INSTALLATION WITH "DOW-CORNING" TYPE
3-6548RTV SILICON SEALANT OR
APPROVED EQUAL.
E416. CONDUIT TO CABLE TRAY DETAILS
EXISTING STRUCTURAL
STEEL
FLAT WASHER & NUT
SQUARE WASHER AND NUT
(TYP 4 PLACES)
CABLE TRAY MANUFACTURER'S
HOLD DOWN CLAMP
DUAL (BACK TO BACK)
GALVANIZED STEEL
STRUT
3/8" DIA (MINIMUM)
THREADED ROD
LENGTH AS REQUIRED
I-BEAM CLAMP
" M
IN
IM
UM
E450. SINGLE TRAY FIELD SUPPORT DETAIL
SPACE
PROVIDE VERTICAL CABLE
MANAGEMENT SYSTEM
(NOT SHOW)
45U ENCLOSED RACK
WITH INTEGRATED
POWER DISTRIBUTION
UPS
UPS BATTERY
ADDITIONAL SERVER
MEMORY MODULE
REDUNDANT SCADA SERVER
PRIMARY SCADA SERVER
48 PORT NETWORK SWITCH
HORIZONTAL CABLE MANAGEMENT (TYP)
FIBER OPTIC PATCH PANEL
GROUNDING BUS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL INSTRUMENTATION
DETAILS
100% BID SET
PARTIALLY
SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
EI502
585-21-115
AMC IJS
REV 0 - 100% BID SET 2024-02-23
GENERAL NOTES
1. SEE EI001 FOR EI-SERIES NOTES AND LEGENDS.
SCALE: NTS
CABLE TRAY GROUNDING1 SCALE: NTS
CABLE FASTENER DETAIL2 SCALE: NTS
MULTIPLE SUPPORT FROM VERTICAL3
SCALE: NTS
VERTICAL TRAY HANGER DETAIL4 SCALE: NTS
CABLE TO CABLE-TRAY DETAIL5 SCALE: NTS
CABLE TO CABLE-TRAY DETAIL6 SCALE: NTS
PROPOSED SCADA RACK LAYOUT7
SHEET 2322/22/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
2-119-CP-001
BOILER 1
2-119-CP-002
BOILER 2
2-119-CP-003
BOILER 3
2-119-CP-005
BALANCE OF
PLANT CP
CHEMICAL
PUMP
MONITORING
STEAM
HEADER
MONITORING
CU
CU
CU
CU
CU
CU
CU
CU
CU CU
CU
CONTROL NETWORK SWITCH(S)
CU
CU
SCADA SERVER
UPS
MONTORING
OPERATOR
WORKSTATION 1
CLIENT
ENGINEERING
WORKSTATION
CLIENT
OVERHEAD
SCADA BOARD
CLIENT(S)
VA
WORKSTATION
CUCUCU
CUCUCU
OPERATOR
WORKSTATION 2
CLIENT
CUCUCUCU
CUCUCUCU
CU
CU
CU
CU
CU
FROM VA
NETWORK
EQUIPMENT IN
BOILER PLANT
SUPERVISORS
OFFICE
SCADA SYSTEM
EQUIPMENT
RACK
CU
CU
NATURAL GAS
MONITORING
CU
CU
CU
CU
CU
CU
CU
SUPERVISOR
WORKSTATION
CLIENT
CUCUCU
MAKE-UP
AIR MONITORING
INSTRUMENTATION CABLING
CU
2-200-CP-006A
DEAERATOR
CP
2-119-CP-006
FEEDWATER/
CONDENSATE CP
MAKEUP
AIR UNITS
FUEL OIL
MONITORING 2-119-CP-008
FUEL OIL PUMP
CP
FUEL OIL
RECIRCULATING
HEATER
2-119-CP-009
FUEL OIL TANK CP
RO SYSTEM
MONITORING
INSTRUMENTATION
CABLING
INSTRUMENTATION CABLING
DATA HISTORIAN
SERVER
MAINTENANCE
SERVER
SCADA SERVER
DATA HISTORIAN
SERVER
MAINTENANCE
SERVER
PRIMARY SERVER REDUNDANT SERVER
FUEL OIL QUALITY
MAINTENANCE
SYSTEM
INSTRUMENTATION CABLING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL INSTRUMENTATION -
CONTROLS NETWORK ARCH
100% CONSTRUCTION
BID DOCUMENTS
PARTIALLY
SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
EI601
585-21-115
AMC IJS
REV 0 - 100% BID SET 2024-02-23
GENERAL NOTES
1. SEE EI001 FOR EI-SERIES NOTES AND LEGENDS.
LIST OF CONTROL PANELS
2-119-CP-001 BOILER 1 CONTROL PANEL
2-119-CP-002 BOILER 2 CONTROL PANEL
2-119-CP-003 BOILER 3 CONTROL PANEL
NOT USED
2-119-CP-005 BALANCE OF PLANT CONTROL PANEL
2-119-CP-006 FEEDWATER/CONDENSATE CONTROL PANEL
2-200-CP-006A DEAERATOR CONTROL PANEL
NOT USED
2-119-CP-008 FUEL OIL PUMP CONTROL PANEL
2-119-CP-009 FUEL OIL TANK CONTROL PANEL
SHEET 2332/22/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
A'
B'
G'
F'
D'
C'
2.8'
E'
1 2 3
A
B
D
F
H
M
BASEMENT
003-2
BASEMENT HALLWAY
002-2
STORAGE
RM/TUNNEL ACCESS
001-2
53'
02-DP3
EXISTING LIGHTS
TO REMAIN
K01
02-DP3
25 N01
EXISTING LIGHT TO REMAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
EL111
ELECTRICAL LIGHTING PLAN -
BASEMENT LEVEL 2
KRK LAJ
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 ELECTRICAL LIGHTING PLAN - BASEMENT LEVEL
KEYPLAN
N AREA OF WORK
12 16
4. SEE EL601 FOR LIGHTING FIXTURE SCHEDULE.
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
Revisions: Date:
SHEET 2342/22/2024
33D
D
D
D
D
D
D D D
3 3
1' 2'
A'
B'
G'
F'
D'
C'
2.8'
E'
CHEM FEED
128-2
SUPERVISOR
129-2
CONTROL ROOM
130-2
PROPANE
131-2
BOILER ROOM
119-2
BREAK ROOM
124-2
JANITOR
121-2
TOILET
122-2
TOILET
123-2
SHOWER AREA
126-2
LOCKER ROOM
125-2
CHANGING AREA
127-2
1 2 3
A
B
D
F
H
M
D01
D01
D01
PARALLEL
SWITCHING GEAR
101B-2
SEE EL151 FOR CEILING MOUNTED LIGHT FIXTURES IN THIS AREA
BOILER ROOM
101-2
GENERATOR ROOM
120B-2
ELECTRICAL ROOM
120A-2
3'
G01
G01
DP1
I01
DP1
DP1
DP1
DP1
DP1
DP1
DP1
8 8
DP1
K02
DP1
DP1
K02
K02
I01
K01
H01
G01
02-DP3
2-119-BLR-001
2-119-BLR-002
2-119-BLR-003
2-119-CP-002
2-119-CP-001
2-119-CP-003
L01
H01
02-DP3
9 1/4"
A
B
C
A C
B
M01
02-DP3
02-DP3
02-DP3
M01
02-DP3
M01
M01
02-DP3
M01
H01
02-DP3
02-DP3
H01
M01
EL401
EL401
C01
C02 C02
C01 B01
B01 B01
B01 B01
B01
B01
B01
B01 B01
C01
C02 B01
B02
B01
F02
C01
M01
02-DP3
M01
02-DP3
K02
K02
K02
K01
H01
K01 K01
K02 K01 K02
DP1
I01
B01
B01
B01
H01
02-DP3
G01
02-DP3
02-DP1
02-DP2
D01
M01
M01
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
EL131
ELECTRICAL LIGHTING PLAN -
GROUND FLOOR LEVEL 2
KRK LAJ
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 ELECTRICAL LIGHTING PLAN - GROUND FLOOR LEVEL
KEYPLAN
N AREA OF WORK
12 16
N
4. SEE EL601 FOR LIGHTING FIXTURE SCHEDULE.
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
SWITCHES A, B AND C COORDINATE TO CIRCUIT NUMERS 3, 5 AND 7, RESPECTIVELY, IN
PANEL DP-5. THESE SWITCHES CONTROL THE HIGH BAY LIGHTS, FIXTURE A01, SHOWN
ON EL151.
2 SWITCH SHALL BE EXPLOSION RATED TO MATCH LIGHT FIXTURE. ALL CONDUIT
PENETRATIONS INTO PROPANE ROOM SHALL BE SEALED
Revisions: Date:
REV 1 - FINAL BID SET 2024-04-04
SHEET 2354/4/2024
File details come from the government source that posted it. Updated .