These are civil and structural engineering construction drawings for a boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings show detailed plans for utility infrastructure including sanitary sewer, storm drainage, water lines, and fuel pipe trenches, with specific elevations, slopes, and connection points indicated throughout the site.

The drawings include foundation demolition plans, new foundation construction details, equipment pad specifications, and fuel oil tank site plans. Key technical details include 30" PVC DR35 pipe installations at 0.75% slope, various manhole specifications with rim and invert elevations, concrete pad dimensions up to 24" thick, and precast tunnel sections for fuel lines. The plans incorporate coordination requirements with mechanical, electrical, and plumbing systems, and specify minimum 4,000 PSI concrete strength where required. The drawings are part of the final bid set dated February 23, 2024, prepared by Encorus Group for the Department of Veterans Affairs Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_Updated Dwgs_partial_24JAN25.pdf PDF
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
36C25225R0004 0007.docx DOCX document
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.1_P03 Single Source Justification MEDECO.e.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.6c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0+

0+

0+

0+

0+

1+

1+

1+

1+

1+

2+

2+

2+

2+

2+

3+

3+

154' OF 30" PVC DR 35 @ 0.75%

60' OF 30" PVC DR 35 @ 0.75%

S

TA

+0

TI

E

TO

E

XI

ST

IN

G P

AV

EM

EN

T

41' OF 30" PVC DR 35 @

0.75%

EX 30"

CONC. PIPE

EX 10"

CONC. PIPE

EX 6" WATER

MAIN

EX 24"

CONC. PIPE

NEW UTILITY

LINE

NEW 6" RAIN

DRAIN

EX 6" WATER

MAIN NEW SANITARY

FORCE MAIN 4"

NEW TRENCH

DRAIN 15"

PROPOSED

GRADE EXISTING

GRADE

+2

SM

H P

ST

A:

2+

R

IM

.3

IN

V:

3.

N E

IN

V

IN

: 1

2.

N

IN

V

O U

T:

2.

E

+6

SM

H P

ST

A:

0+

R

IM

.6

IN

V

IN

: 1

3.

E

IN

V

O U

T:

3.

+9

EX

S M

H

ST

A:

2+

R

IM

.3

IN

V

IN

: 1

2.

N

IN

V

IN

: 1

1.

N W

IN

V

IN

: 1

1.

W

IN

V

O U

T:

1.

+1

EX

S M

H

3/

ST

A:

0+

R

IM

.9

IN

V

IN

: 1

3.

N

IN

V O

U T:

3.

S P

LU

G

IN

V

IN

: 1

8.

E

IN

V

O U

T:

3.

W

+4

N

EW

F

U

EL

P

IP

E

TR

EN

C

H

0+

0+

0+

0+

0+

1+

1+

1+

1+

1+

2+

2+

2+

2+

2+

3+

3+

3+

3+

3+

4+

4+

4+

4+

4+

5+

5+

5+

5+

+0

FA

C E

O F

BU

IL

D

IN

G

302' OF 4" HDPE DR 21 @ 0%

EXISTING

GRADEPROPOSED

GRADE

39' OF 4" CAST IRON@ 2% INV OUT 1140.50

31' OF 6" CAST IRON@ 2% 50' ARC LENGTH

INSULATE PIPE

+1

N

EW

" F

IR

EW

AT

ER

S

ER

VI

C

+1

N

EW

" P O

TA

BL

E W

AT

ER

S

ER

VI

+0

EX

" W

AT

ER

M

AI

N

FM

V

ER

TI

C

AL

O

BS

TR

U C

TI

O

N

TA 0+

NEW 30

" S

TORM

WATER LI

NE

+5

N

EW

F

U

EL

P

IP

E

TR

EN

H

STA 4+

EX 10

" C

ONC. P

IPE

+4

SA

N -D

R O

P M

H

R

IM

3.

IN

V

IN

: 1

1.

W

IN

V

O U

T:

6.

+5

EX

S

AN

M H

0/

R

IM

: 1

3.

IN

V

IN

: 1

2.

N W

IN

V

IN

: 1

2.

S

IN

V

O U

T:

2.

+3

SA

N -D

R O

P M

H

R

IM

2.

IN

V

IN

: 1

5.

W

IN

V

O U

T:

4.

E

89' OF 8" PVC DR 35 @ 2%

116' OF 8" PVC DR 35 @ 2.3%

+3

O

IL

/W

AT

ER

S

EP

AR

AT

O R

IN

V

IN

6.

STA 0+

LIF

T STATIO

N

IN

V IN

.78

IN

V IN

.03

IN

V O

UT 11

.56

EXISTING UTILITY

LINE

+8

ST

AR

T

IN

SU

LA

TI

O N

O F

PI

PE

+3

TO

P O

F

TU

N N

EL

IN

V

.9

FM

IN

V

.4

+3

EL

EC

TR

IC

AL

+4

EL

EC

TR

+2

EL

EC

TR

STA 3+

ELE

CTRIC

STA 3+

ELE

CTRIC

AL

STA 0+

EX 6"

W

ATER M

AIN

FM VERTIC

AL

OBSTRUCTIO

STORM LI

NE

STA 0+

VALV

E PIT

+1

ST

O R

M S

EW

ER

IN

V

.8

+2

ST

O R

M S

EW

ER

IN

V

.8

0+

0+

0+

0+

0+

1+

1+

1+

1+

1+

+0

FA

C E

O F

BU

IL

D

IN

G

STA 1+

MATCH FUEL T

ANK FOUNDATIO

N

4" FORCE

MAIN

SANITARY C

ROSSIN

G

EX 6" WATER

MAIN

ELE

CTRIC

AL U

TILI

TY C

ROSSIN

G

EX W

ATER M

AIN

C

ROSSIN

G

NEW

UTILITY

LINE

EXISTING

GRADE

PROPOSED

GRADE

+1

TR

EN

C

H T

U R

TRENCH TURN

TRENCH TURN

STA 0+

STORMWATER C

EX STORMWATER C

TA 1+

TRENCH D

RAIN

IN

V 11

.95

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

CIVIL UTILITY PROFILES FINAL BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

CU172

SITE

585-21-115

Br DJL

REV 0 - 100% BID SET 2024-02-23

SCALE: VERTICAL: 1" = 5'-0" HORIZTONAL: 1" = 20'-0"

STORM PROFILE2

2/CU171

12 16

GENERAL NOTES

1. SEE C-001 FOR CIVIL SERIES NOTES AND LEGENDS

SCALE: VERTICAL: 1" = 5'-0" HORIZTONAL: 1" = 20'-0"

SANITARY PROFILE1

1/CU171

SCALE: VERTICAL: 1" = 5'-0" HORIZTONAL: 1" = 20'-0"

FUEL PIPE TRENCH3

3/CU171

REV 1 - PRE-BID UPDATES 2024-08-01

8/1/2024 SHEET 22

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

REMOVABLE COVER

2" FUEL OIL SUPPLY

PLAN

ASPHALT JOINT

A A

SECTION A-A

56"

8"

8"

8"

5"

MIN

8" MI

N

CAST IN PLACE TOOTHED ANCHOR

CHANNELS WITH 5/8" DIA TOOTHED

T-BOLTS AND (3) WELDED "I" ANCHORS,

HOT-DIPPED GALVANIZED

4.5" DIA (TYP)

1 5/8" METAL FRAMING SYSTEM CHANNEL

(TYP)

ELECTRICAL CONDUIT (TYP)

SEE ELECTRICAL DRAWINGS

FOR ADDITIONAL INFORMATION

1.5" CALCIUM SILICATE

INSULATION W/

ALUMINUM JACKET

(TYP)

2" FUEL OIL RETURN

PIPE SUPPORT (TYP)

PIPE SADDLE (TYP)

1 5/8" METAL FRAMING SYSTEM POST

BACK-TO-BACK STRUT CHANNEL

2" FUEL OIL SUPPLY 4" CONTAINMENT PIPE

PIPE INSULATION

2" FUEL OIL RETURN

ELECTRICAL CONDUIT

NOTE:

1. FOR DESIGN OF CONCRETE UTILITY TUNNEL, REFER TO STRUCTURAL DRAWINGS.

8'

MA

X

SU

PP

OR

T

SP

AC

IN

G

90° FITTING

MIN WORKING LOAD: 500LB (TYP)

FLOOR MOUNT POST BASE

ANCHOR WITH ONE 1/2" DIA ASTM THREADED ROD

WITH EPOXY ADHESIVE, 4 1/2" EMBEDMENT.

INSTALL PER MANUFACTURER'S INSTRUCTIONS.

1 5/8" METAL FRAMING SYSTEM POST

BACK-TO-BACK STRUT CHANNEL

1 5/8" METAL FRAMING SYSTEM CHANNEL

(TYP)

5"

MIN

1 1 /2"

MI

N

1 1/2"

MIN

1 1 /2"

MI

N

(T

YP

1 1/2"

MIN

NOTES:

1. IT IS NECESSARY TO ENSURE MINIMUM DIMENSIONS SHOWN ARE SUITABLE FOR EXISTING GROUND CONDITIONS.

2. MINIMUM CONCRETE STRENGTH OF 4,000 PSI IS REQUIRED. CONCRETE SHOULD BE VIBRATED TO ELIMINATE AIR POCKETS.

3. EXPANSION AND CONTRACTION CONTROL JOINTS AND REINFORCEMENT ARE REQUIRED TO PROTECT CHANNEL AND CONCRETE

SURROUND.

4. THE FINISHED LEVEL OF THE CONCRETE SURROUND MUST BE APPROX. 1/8" ABOVE THE TOP OF THE CHANNEL EDGE.

5. CONCRETE BASE THICKNESS SHOULD MATCH SLAB THICKNESS.

6. THE SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS.

EXPANSION JOINT

SEE NOTE 3

PAVEMENT PER

DESIGN DOCUMENTS

SEE NOTE 4

6"

6"

6"

1/8

6"

6"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

CIVIL UTILITY FUEL TRENCH

DETAILS

100% BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

CU501

SITE

585-21-115

Br CJR

REV 0 - 100% BID SET 2024-02-23

SCALE: 1" = 10'

FUEL TUNNEL DETAIL1 SCALE: NTS

TRENCH DRAIN DETAIL - EXPOSED CONCRETE2

GENERAL NOTES

1. SEE C-001 FOR CIVIL SERIES NOTES AND LEGENDS

SHEET 232/22/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

ECCENTRIC CONE

"O" RING JOINT

FOR "O" RING JOINTS, ASPHALTIC JOINT

COMPOUND (60-100mil) SHALL BE BUTTERED

ON SPIGOTS AND BELLS PRIOR TO

ASSEMBLING THE MANHOLE SECTIONS.

AFTER THE BARREL SECTIONS ARE

ASSEMBLED, THE EXCESS JOINT COMPOUND

SHALL BE TROWELED OFF THE INSIDE AND

OUTSIDE FACES. THE INSIDE FACE OF THE

JOINT SHALL THEN BE TROWELED.

2° TAPER

FIRST MANHOLE STEP SHALL BE 6"

FROM THE TOP OF THE CONE.

6" CLASS 1, NO. 1 STONE COMPACTED TO THE

PROPER ELEVATION, REQUIRED UNDER ALL

MANHOLE BASES.

6" BELOW LOWEST INVERT (EMBED MIN. 12"

INTO CLEAN #1 STONE)

70"

6"

8"

6" (M

IN

THE CHANNEL WIDTHS OF ALL BENCH TROUGHS

SHALL BE EQUAL TO THE DIAMETER OF THE PIPE.

2 1 /2"

C L

RIM ELEVATION OF THE COVER TO BE FLUSH

WITH PAVEMENT

THE JOINT BETWEEN THE MANHOLE FRAME AND

THE EXTENSION RING TO BE MADE WITH AN

APPROVED COMPOUND SUCH AS DEWITT NO.10,

DURASEAL 3101, PIONEER 301 OR EQUAL.

5'-0" 5"

8" 2'-0"

6"

8"

2'- 6"

(M

IN

) 4 '-0

"(M

AX

3'- 0"

MI

N.

6' -0

"M

AX

1"

6"

#4 6" EW (12' DEPTH OR LESS)

#5 5" EW (12' DEPTH OR MORE)

4000 P.S.I. CONCRETE FILL

ADJUST TO GRADE WITH APPROVED PRE-CAST

EXTENSION RINGS.

(A) THE JOINTS BETWEEN THE CONE SECTION AND THE

EXTENSION RINGS SHALL BE MORTARED IN PLACE,

(B) THE INDIVIDUAL RINGS SHALL NOT EXCEED 6" IN

THICKNESS. THE TOTAL NUMBER PLACED SHALL BE

LIMITED TO 2 OR A MAXIMUM OF 12" IN HEIGHT.

(C) THE ENTIRE OUTSIDE SURFACE FROM THE FRAME

CASTING TO THE CONE SECTION SHALL BE COATED

WITH COATING MATERIAL.

SEWER PIPE SHALL NOT BE CLOSER THAN

6" TO MANHOLE JOINT SURFACES FOR BASE

AND BARREL SECTIONS.

WATERTIGHT MANHOLE BOOT SEAL OR LINK-SEAL CONSISTING

OF SOLID SYNTHETIC RUBBER LINKS CONNECTED WITH HEAVY

ELONGATED WASHERS, BOLTS AND NUTS.

AFTER INSTALLATION, THE LINK SEAL ASSEMBLIES AT THE

WALL PENETRATIONS OF THE MANHOLE SHALL BE COATED.

ASTM C478 (LATEST DATE) REINFORCED

CONCRETE (4000 PSI) TONGUE AND GROOVE

SECTIONS WITH ROUND NEOPRENE GASKETS

OR SUPERSEAL.

SEE DETAIL 3

THIS SHEET

FINISHED GRADE

5'-0"

PIPE SIZE MANHOLE I. D.

18"

TEE FITTING EQUAL

IN SIZE TO SEWER

2/3 D

IA

"TEE CUTOUT"

PLAN

SANITARY SEWER

CONCRETE BENCH

SECTION D-D

STAINLESS STEEL SCREWS THROUGH

STRAPS AND INTO PRESSURE

TREATED WOOD (BOTH SIDES) WOOD

BLOCKING SHALL BE HAUNCHED TO

ACCEPT THE CURVATURE OF THE

PIPE DIAMETER

COUPLING (AS NECESSARY)

90° SWEEPING ELBOW OR (2)

45° BENDS ANGLED

DOWNSTREAM

MAXIMUM DISTANCE 4"

MANHOLE WALL

CORE DRILL & PROVIDE WATERTIGHT

CONNECTION (SEE CONNECTION TO EXISTING

MH DETAIL)

SANITARY SEWER

3'-0"MIN

SEE DETAIL ``TEE

CUTOUT"

RUN EQUAL IN SIZE

TO SEWER

DROP ASSEMBLY CAN ALSO BE A DURAN,

INC INSIDE DROP BOWL, OR APPROVED

EQUAL

DROP LEG SIZE AS NOTED ON

PLANS (P.V.C. )

ANCHOR AS REQUIRED WITH ALUMINUM OR

STAINLESS STEEL STRAPS AND BOLTS (4'-0"

O.C. MAXIMUM SPACING)

1. A DROP PIPE SHALL BE PROVIDED FOR A SEWER ENTERING A MANHOLE AT AN ELEVATION OF 24 INCHES

OR MORE ABOVE THE MANHOLE INVERT ONLY INSIDE DROP ASSEMBLIES WILL BE ALLOWED.

2. INSIDE DROP LEG SHALL BE INSTALLED ON MANHOLE WALL LOCATED AS SHOWN OR AS APPROVED BY

ECDSM

3. ON NEW CONSTRUCTION INSIDE DROP ASSEMBLIES SHALL BE INSTALLED IN MANHOLES NOT LESS THAN

5'-0" IN DIAMETER

NOTES:

PROPOSED SEWER

STAIRS

REDUCER SECTION

D

D

1. FOR TRENCH WIDTHS EXCEEDING 4' REFER TO VA STANDARD

DETAIL 32 12 16-02 "TYPE 2 UTILITY TRENCH PATCH". FOR TRENCH

WHERE PORTLAND CEMENT CONCRETE (PCC) PAVEMENT EXISTS,

REFER TO 32 12 16-03 "TYPE 3 UTILITY TRENCH PATCH".

2. 2" MINIMUM OR THICKNESS OF EXISTING PAVEMENT WHICHEVER IS

GREATER.

3. BITUMINOUS SURFACE TREATMENT (CHIPSEAL) REQUIRED ONLY

FOR LONGITUDINAL TRENCHES WITH WIDTHS GREATER THAN 6'.

4. 4" MINIMUM ABC OR THICKNESS OF EXISTING GRANULAR BASE

COURSE MATERIALS (E.G. ABC & SELECT MATERIAL) WHICHEVER IS

GREATER.

REFER TO VA STANDARD DETAIL 32 12 16-04 "UTILITY TRENCH

PAVEMENT PATCH NOTES" FOR ADDITIONAL INFORMATION.

4'-0" MAX

1'-0" MAX1'-0" MAX

ABC 100% MIN

COMPACTION

ASPHALTIC CONCRETE

EXISTING

PAVEMENT

TACK COAT (TYP)

TRENCH

BACKFILL

SAW CUT EXISTING

ASPHALT (FULL DEPTH

BOTH SIDES)

90% MIN COMPACTION

4. 4" MINIMUM ABC OR THICKNESS OF EXISTING GRANULAR BASE

COURSE MATERIALS (E.G. ABC & SELECT MATERIAL) WHICHEVER IS

GREATER. PORTLAND CEMENT CONCRETE (PCC) THICKNESS EQUAL

TO EXISTING.

1. FOR TRENCH WIDTHS 4' OR LESS REFER TO VA STANDARD DETAIL

32 12 16-01 "TYPE 1 UTILITY TRENCH PATCH". FOR TRENCH WHERE

PORTLAND CEMENT CONCRETE (PCC) PAVEMENT EXISTS, REFER

TO 32 12 16-03 "TYPE 3 UTILITY TRENCH PATCH".

2. 2" MINIMUM OR THICKNESS OF EXISTING PAVEMENT WHICHEVER IS

GREATER.

3. BITUMINOUS SURFACE TREATMENT (CHIPSEAL) REQUIRED ONLY

FOR LONGITUDINAL TRENCHES WITH WIDTHS GREATER THAN 6'.

REFER TO VA STANDARD DETAIL 32 12 16-04 "UTILITY TRENCH

PAVEMENT PATCH NOTES" FOR ADDITIONAL INFORMATION.

TRENCH WIDTHS

GREATER THAN 4'-0"

PATCH WIDTH IN

ACCORDANCE

WITH AGENCY

REQUIREMENTS

TRENCH

BACKFILL

EXISTING

PAVEMENT

TACK COAT (TYP)

SAW CUT EXISTING

ASPHALT (FULL DEPTH

BOTH SIDES)

GRANULAR MATERIAL

OR PCC

90% MIN COMPACTION

SST SAFETY CHAINS (TYP)

8"

VENT OUT EAST SIDE OF TANK AND RUN TO

BUILDING WALL ADJACENT TO CONTROL BOX

4'X4' ALUMINUM ACCESS HATCH

304 SST SCHED 40 DOUBLE GUIDE

RAIL SYSTEM PER WWS PRODUCTS

SPECIFICATION SHEETS

EL 1138.55

LIFTING CABLE PER PUMP

MANUFACTURER REQUIREMENTS

PRECAST WETWELL, SHOP

DRAWING SUBMITTAL REQUIREDBASE BELOW

PUMP DISCHARGE DIAMETER

304 SST ANCHOR BOLTS PER PUMP

MANUFACTURER REQUIREMENTS

GROUT FILLET ALL AROUND

ANGLE=30°-45°

6" M

IN

NOTES:

1. THE WETWELL HATCH SHALL BE US FOUNDRY, NEEHAN (OR APPROVED EQUAL) THD/TPD ALUMINUM ACCESS HATCHES. ALL

HARDWARE TO BE 316 STAINLESS STEEL.

2. FALL PROTECTION REQUIRED FOR WETWELL (SUBMITTAL REQUIRED).

3. HATCHES TO BE EQUIPPED WITH AUTOMATIC HOLD OPEN ARMS, HORIZONTAL COMPRESSION SPRINGS, WATERTIGHT SLAM

LOCKS, RECESSED OVERSIZE,

PADLOCK BOX, AND SAFETY CHAINS. HINGES TO BE ATTACHED USING TAMPER PROOF CARRIAGE BOLTS WITH WELDED BUTS.

5. SHOP DRAWINGS REQUIRED FOR PRECAST WETWELL. ALL PRECAST STRUCTURES MUST MEET ASTM C478 SPECIFICATIONS.

6. GRINDER PUMP 3hp, 3 PHASE, 460V & 4" DISCHARGING PIPE.

2 STRIPS OF "RAMNEK"

(OR APPROVED EQUAL)

3/4" x 45 CHAMFER CAST IN SLAB ON

TOP AND UNDERSIDES OF ALL SLAB

OPENINGS AND EXTERIOR SURFACES.

2 STRIPS OF "RAMNEK" (OR

APPROVED EQUAL) AT ALL JOINTS

WALL PENETRATION SEAL (TYP)

ALL PIPE OPENINGS

2"

PUMPS OFF EL 1131.00

EL 1136.03N

EL1142.88

6" MIN

4" 316 STAINLESS

STEEL

4" DR 14 HDPE

8'

LEAD PUMP ON

LAG PUMP ON

HIGH WATER ALARM

EL 1133.50

EL 1134.50

EL 1135.00

WETWELL BOTTOM EL 1130.50

EL 1139.78W

PLUG VALVE

GRAVITY

SEWER

VENT

1'

PRESSURE

GAUGE

FLANGED PLUG

FLANGED WEIGHT AND LEVER

CHECK VALVE W/SST BOLTS

PRECAST VALVE VAULT

PIPE SUPPORT

3" PLUG W/316 SST WIRE ROPE

CABLE ATTATCH TO TOP SLAB

3' MIN

CHECK VALVE

W/BUNA-N

TEE (FL X FL) (TYP)

GROUT SLOPE (1:12)

TOWARD SUMP (MIN)

4' MIN

CHECK VALVE

PLUG VALVE

DRAIN LINE

3" DR 35 PJ

6'

4'X4' ALUMINUM ACCESS HATCH

9" MIN

" M

IN

A

A

FOUR 7/8" DIAMETER HOLES ON

33 3/4" DIAMETER BOLT CIRCLE

" D

IA

ME

TE

R

25 1/2"

24 1/4"

7"

1 1 /2"

22"

26 3/16"

36" DIAMETER

B B

24" DIAMETER

24" DIAMETER

1 1 /2"

1 1 /2"

1/4

1/4

SECTION A-A

SECTION B-B

SECTION B-BATERNATE PROFILES

PERMITTED

NOTES:

1. THE CASTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT STANDARD

SPECIFICATION FOR GRAY IRON CASTINGS.

2. ALL CASTINGS SHALL BE CLEARED BY CURRENT APPROVED BLASTING

METHODS.

3. THE SEATING FACE OF THE LID AND THE SEAT FOR THE SAME ON THE

FRAME SHALL BE GROUND OR MACHINED SO THAT THE LID WILL HAVE AN

EVEN BEARING ON ITS SEAT TO PREVENT ROCKING OR TILTING.

4. THE CASTINGS SHALL BE FREE OF POURING FAULTS, BLOW HOLES, CRACKS

AND OTHER IMPERFECTIONS. THEY SHALL BE SOUND, TRUE TO FORM AND

THICKNESS, CLEAN AND NEATLY FINISHED, AND SHALL BE COATED WITH COAL TAR

PITCH VARNISH.

5. THIS COVER IS DESIGNED TO FIT ON ANY MANHOLE OR ON ANY EXISTING

SIMILAR STRUCTURE WHEN SO DESIGNATED ON THE PLAINS.

6. LID SHALL BE LABLED SANITARY MH.

Br CJR

REV 0 - 100% BID SET 2024-02-23

SCALE: NTS

MONOLITHIC PRECAST BASE SANITARY MANHOLES1

GENERAL NOTES

1. SEE C-001 FOR CIVIL SERIES NOTES AND LEGENDS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

CIVIL UTILITY SEWER DETAILS FINAL BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

CU502

SITE

585-21-115

SCALE: NTS

INSIDE DROP PIPE DETAIL2

SCALE: NTS

TYPICAL TYPE 1 UTILITY TRENCH PATCH6 SCALE: NTS

TYPICAL TYPE 2 UTILITY TRENCH PATCH7SCALE: NTS

SEWER LIFT STATION5

SCALE: NTS

MDOT B FRAME & COVER3

REV 1 - PRE-BID UPDATES 2024-08-01

8/1/2024 SHEET 24

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

8" KNOCKOUT

BOTH SIDES

5'-0"

6"

5'- 1"

4'-

VA

RI

ES

RI

SE

T

O

SU

RF

AC

E

6"

4'-0" 6"

FLOW LINE

4'- 3"

6"

SECTION A-A

#2 CRUSHED

STONE

NATIVE SOIL

EXISTING GROUND

3' X 5' ALUMINUM

ACCESS HATCH

'-0

RIM ELEVATION OF THE COVER

TO BE FLUSH WITH PAVEMENT

B

B

RIM ELEVATION OF THE COVER

TO BE FLUSH WITH PAVEMENT

FLOW

6" 45° BEND

CAST IRON OR DUCTILE IRON PIPE

6" PLUG

OMIT WHERE SEWER JOINS

BUILDING CONNECTION

SANITARY WYE

18" X 18" X 6" CONCRETE

SLAB WITH HELIX STEAL

FIBERS

COUNTERSUNK PLUGFINISH

GRADE

IN

UNPAVED

AREA

2"

IN

U

NP

AV

ED

A

RE

A

FINISH

GRADE

IN PAVING

SECTION "A"-"A"

TOP VIEW

NOTES:

CONCRETE: 4000 PSI @ 28 DAYS.

STEEL: ASTM A496-A615 GRADE 60-60 KSI

FRAME W/ NEENAH R-3561 GRATE, OR

APPROVED EQUAL, FOR CATCH BASINS

NOT WITHIN CURB.

5" DIA DRAIN HOLE

6"

42" SQ

6"

30" SQ

AA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

CIVIL UTILITY SEWER DETAILS 100% BID SET

PARTIALLY

SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

CU503

585-21-115

Br CJR

REV 0 - 100% BID SET 2024-02-23

GENERAL NOTES

1. SEE C-001 FOR CIVIL SERIES NOTES AND LEGENDS

SCALE: NTS

OIL/WATER SEPARATOR1 SCALE: NTS

TYPICAL CLEANOUT TO GRADE DETAIL3

SCALE: NTS

TYPICAL CATCH BASIN DETAIL2

SHEET 252/22/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SHOE

HDPE REDUCING TEE

CONCRETE PAD TO

SUPPORT VALVE

MALE ADAPTERS

SAND STABILIZED WITH CEMENT AROUND SHOE

FLANGE

CONNECTION

DRAIN PORT

CU502

HDPE REDUCING TEE

NOTE:

HYDRANT NOZZLES

180° APART

FIRE HYDRANT

HOSE NOZZLES

NOZZLE TO FACE ROAD

MI

N

GRADE

VALVE BOX

LENGTH TO BE ADJUSTABLE

GATE VALVE

CO

VE

R

MECHANICAL JOINT CONNECTIONS

MJ GLAND SEAL

FITTING STIFFNER

MJ END ON VALVE OR PIPE

HDPE ADAPTOR WITH HEAVY WEIGHT C110 METAL GLAND

SEWER MAIN

WATERMAIN

" M

IN

THRUST BLOCK DIMENSIONS

PIPE Ø

TEES & DEAD ENDS 90° ELBOWS 45° ELBOWS

L H L H L H

12" FW 7'-6" 3'-9" 8'-9" 4'-6" 6'-6" 3'-3"

10" FW 6'-0" 3'-3" 7'-6" 3'-9" 5'-6" 2'-9"

8" FW 5'-3" 2'-9" 6'-0" 3'-3" 4'-6" 2'-3"

6" FW 4'-0" 2'-0" 4'-3" 2'-9" 3'-6" 1'-9"

4" FW 2'-9" 1'-6" 3'-3" 1'-9" 2'-9" 1'-6"

NOTES:

1. PLACE 4 MIIL POLYETHYLENE CONCRETE AND FITTING (CONCRETE SHALL

NOT INTERFERE WITH JOINT).

2. CONCRETE MIN THICKNESS SHALL BE 12"

3. THE HORIZONTAL DIMENSION (B) OF THE BEARING AREA SHALL BE

BETWEEN 1.0 AND 2.0 TIMES THE VERTICAL DIMENSION (H). (H <= B <= 2H)

4. THE VERTICAL DIMENSION OF THE BEARING AREA SHALL BE EQUAL TO 1/2

THE TOTAL DEPTH (H) TO THE BOTTOM OF HE THRUST BLOCK BUT NOT

LESS THAN THE OUTSIDE DIAMETER (DO) OF THE FITTING. (DO < H <= H/2)

5. THRUST BLOCK ORIENTATION SHALL BE SUCH THAT THE CENTER OF THE

FITTING CORRESPONDS WITH THE CENTER OF THE THRUST BLOCK.

6. THE MINIMUM ALLOWABLE ANGLE (VERT OR HORZ) SHALL BE 45°.

UNDISTURBED

EARTH

POURED

CONCRETE

BLOCKS

45° MIN

UNDISTURBED EARTH

POURED CONCRETE

BLOCKS

45° MIN

B

2"MIN B

2"

MIN

B

B2" MI

N

MI

N

B

2"

MIN

2"

MIN

H 2H

45° MIN

45° MIN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

CIVIL UTILITY WATER DETAILS 100% BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

CU504

SITE

585-21-115

Br DJL

REV 0 - 100% BID SET 2024-02-23

SCALE: NTS

FIRE HYDRANT BRANCH CONNECTION DETAIL1 SCALE: NTS

FIRE HYDRANT DETAIL2 SCALE: NTS

VALVE BOX DETAIL3

SCALE: NTS

MECHANICAL JOINT FITTING4 SCALE: NTS

STANDARD UTILITY CROSSING5

GENERAL NOTES

1. SEE C-001 FOR CIVIL SERIES NOTES AND LEGENDS

SCALE: NTS

THRUST BLOCK DETAIL6

SHEET 262/22/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DESIGN WIND PRESSURES FOR COMPONENTS AND CLADDING

COMPONENT (FT ²) ZONE EFF AREA +CN (PSF) -CN (PSF) PRES (+VE) PRES (+VE)

< = 56 SF 1 56 0.58 -1.33 8.9 -20.5

112 SF 1 112 0.58 -1.33 8.9 -20.5

> 225 SF 1 225.1 0.58 -1.33 8.9 -20.5

< = 56 SF 2 56 0.91 -2.01 13.9 -31

112 SF 2 112 0.91 -2.01 13.9 -31

> 225 SF 2 225.1 0.58 -1.33 8.9 -20.5

< = 56 SF 3 56 0.91 -2.01 13.9 -31

112 SF 3 112 0.91 -2.01 13.9 -31

> 225 SF 3 225.1 0.58 -1.33 8.9 -20.5

DEMOLITION WALL/EXTENT

TOP OF SLAB

0'-0"

PHASE CALLOUT#

ROOF LEGEND KEY

KEYED NOTEX

X

ELEVATION LABEL

CONCRETE STEP

COLUMN CENTER LINE

"TOE" DIRECTION OF ANGLE / CHANNEL

UNDERPINNING CONCRETE

EXISTING CONCRETE

SPAN OF METAL DECK/ METAL GRATING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23REV 0 - 100% BID SET 2024-02-23 S-001

STRUCTURAL NOTES AND LEGENDS

DJS CCW

PARTIALLY SPRINKLERED

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

CONTRACTOR SHALL SUBMIT A SCHEDULE OF PROPOSED WORK TO THE VA FOR REVIEW.

WORK SHALL NOT START UNTIL SUCH TIME AS THE VA APPROVES THE SCHEDULE.

CONTRACTOR SHALL VERIFY ALL COMPONENTS ARE SIZED FOR ACCESS TO THE SITE VIA

TRUCK OR RAIL, AS REQUIRED.

CONTRACTOR IS RESPONSIBLE FOR SAFETY AND SHORING DURING CONSTRUCTION

INCLUDING ANY TEMPORARY SHORING AT EXISTING STRUCTURE.

CONSTRUCTION MEANS, METHODS, AND CRAFTSMANSHIP ARE THE RESPONSIBILITY OF THE

CONTRACTOR.

CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH ALL INFORMATION ON

DRAWINGS, AND SPECIFICATIONS.

CONTRACTOR SHALL PROVIDE ADEQUATE MEANS TO PROTECT EXISTING AREAS FROM

DUST AND FOREIGN MATERIAL DURING CONSTRUCTION.

CONTRACTOR SHALL PROVIDE ADEQUATE PROVISIONS TO ENSURE THAT INTERIOR AREAS

REMAIN WEATHER TIGHT DURING CONSTRUCTION.

CONTRACTOR SHALL VERIFY BY SITE VISIT/FIELD MEASUREMENT ALL EXISTING

CONDITIONS, INCLUDING RELATED STRUCTURAL MEMBERS AND CONNECTIONS, PRIOR TO

COMMENCEMENT OF CONSTRUCTION. NOTIFY VA IN WRITING OF ANY CONDITIONS NOT

MATCHING THESE DRAWINGS OR ANY PROBLEM AREAS WHICH MAY HAVE AN EFFECT ON

THE INTENDED SCOPE OF WORK.

CONTRACTOR SHALL REPORT EXISTING STEEL THAT IS FOUND TO BE IN A DETERIORATED

CONDITION TO THE VA.

CONTRACTOR SHALL DISMANTLE, REMOVE, AND DISPOSE OF EXISTING STRUCTURE,

CONCRETE, AND REINFORCEMENT BARS AS DIRECTED BY VA.

CONTRACTOR SHALL PATCH, MATCH, AND RESTORE TO EXISTING CONDITION ALL AREAS

AFFECTED BY CONSTRUCTION ACTIVITIES.

SHOP DRAWING SUBMITTALS SHALL BE SUBMITTED TO THE VA AND ENGINEER OF RECORD.

APPROVAL BY VA AND ENGINEER OF RECORD REQUIRED PRIOR TO FABRICATION.

ALL SUBMITTALS, INCLUDING SHOP DRAWINGS, MUST BE STAMPED BY THE CONTRACTOR.

BY STAMPING THE SUBMITTAL, CONTRACTOR ACKNOWLEDGES HAVING REVIEWED THE

SUBMITTAL.

SUBSTITUTIONS WILL BE MADE ON AN “OR EQUIVALENT” BASIS AND ARE TO BE APPROVED

BY THE VA AND ENGINEER OF RECORD.

CONTRACTOR SHALL MAINTAIN THE WORKSITE IN AN ORDERLY CONDITION AND PROVIDE

FOR REGULAR CLEANUP OF THE CONSTRUCTION AREA ON A DAILY BASIS.

UPON COMPLETION OF ALL WORK, CONTRACTOR SHALL REMOVE DEMOLISHED MATERIALS

(COORDINATE WITH VA), TEMPORARY FACILITIES, EQUIPMENT, SURPLUS MATERIAL AND

SUPPLIES. FINAL CLEANUP SHALL LEAVE THE SITE IN AN ORDERLY CONDITION.

CONTRACTOR SHALL REVIEW GEOTECHNICAL ENGINEERING REPORT FROM COLEMAN

ENGINEERING COMPANY, DATED JUNE 14, 2023, TITLED 'GEOTECHNICAL INVESTIGATION'.

GENERAL CONDITIONS:

600 S 162-54

MEMBER DEPTH IN 600 = 6"

MEMBER TYPE: (S : "C" MEMBER; T : TRACK)

MATERIAL THICKNESS IN MILS

FLANGE WIDTH IN 162 = 1.62"

33 - 20ga 43 - 18ga 54 - 16ga

GENERAL STUD FRAMING INFORMATION:

IN ITS COMPLETED STATE, REPLACE BOILER PLANT FOR THE OSCAR G. JOHNSON VA MEDICAL CENTER IS DESIGNED FOR

THE FOLLOWING SURCHARGE LOADS. DO NOT EXCEED STATED SURCHARGE LOADS.

1. DEAD LOAD: STRUCTURE SELF WEIGHT

EQUIPMENT WEIGHTS:

BOILER 1 48,860 LBS

BASE WEIGHT (INCLUDING WATER) 48,360 LBS

STACK 500 LBS

BOILER 2 48,860 LBS

BASE WEIGHT (INCLUDING WATER) 48,360 LBS

STACK 500 LBS

BOILER 3 48,860 LBS

BASE WEIGHT (INCLUDING WATER) 48,360 LBS

STACK 500 LBS

ABOVE GROUND FUEL OIL TANK (40,000 GALLONS)

TANK DEAD LOAD 71,000 LBS

TANK CONTENTS 370,000 LBS

TRAY TYPE DEAERATOR SYSTEM

DEAERATOR 15,000 LBS

FEEDWATER PUMPS (3) 200 LBS EACH

CONDENSATE TANK SYSTEM

CONDENSATE TANK 11,000 LBS

TRANSFER PUMPS (2) 100 LBS (EACH)

MAKE-UP WATER SYSTEM

RO SYSTEM 500 LBS

STORAGE TANK 20,850 LBS

RO TRANSFER PUMP 100 LBS

RESIN TANKS (2) 1,000 LBS (EACH)

BRINE TANK 600 LBS

PREFILTER 800 LBS

CHEMICAL FEED STATION

DRUMS (8) 250 LBS EACH

FUEL OIL PUMP SKID 600 LBS

BLOW-DOWN SEPARATOR 1,500 LBS

PIPING ON PIPE RACKS 150 PS

HVAC EQUIPMENT :

COMBUSTION MAKE-UP AHU 500 LBS

AIR HANDLING UNIT (2) 300 LBS (EACH)

CONDENSER UNIT (2) 200 LBS EACH

ELECTRICAL EQUIPMENT

CABLE TRAY 100 PSF

SWITCHGEAR 19,000 LBS (EACH)

PANEL BOXES 150 LBS (EACH)

TRANSFORMER 7,000 LBS (EACH)

GENERATOR 10,000 LBS

2. ROOF LIVE LOAD: 40 PSF

3. LIVE LOAD:

OFFICE AREAS 80 PSF

ALL FUTURE FLOORS 100 PSF

CATWALKS/SERVICE PLATFORMS 40 PSF

CORRIDORS 100 PSF

FILE AND COMPUTER ROOMS 125 PSF

LOADING DOCKS AND EXTERIOR PLATFORMS 250 PSF

MECHANICAL ROOMS 150 PSF

MACHINE ROOM 150 PSF

(AREAS SUPPORTING HEAVY EQUIPMENT SHALL BE DESIGNED

FOR THE ACTUAL OPERATING WEIGHT OF SUCH EQUIPMENT.)

MAINTENANCE AND REPAIR SHOPS 150 PSF

4. SNOW LOAD: RISK CATEGORY IV

GROUND SNOW LOAD, Pg = 60 PSF FLAT ROOF SNOW LOAD, Pr= 46 PSF SNOW LOAD IMPORTANCE FACTOR, Is = 1.2 THERMAL FACTOR, Ct = 1.0 SLOPE FACTOR, Cs = 1.0 DRIFT SURCHARGE, Pd = 42 PSF WIDTH OF SNOW DRIFT, w = 15.5 FT

5. SEISMIC LOAD : RISK CATEGORY IV

SEISMIC IMPORTANCE FACTOR, Ie = 1.50 MAPPED SPECTRAL RESPONSE ACCELERATION (PERIOD = 0.2S) Ss = 0.043

MAPPED SPECTRAL RESPONSE ACCELERATION (PERIOD = 1.0S) S1 = 0.024

SITE CLASS D

DESIGN SPECTRAL RESPOSE ACCELERATION AT 0.2S SA SDS = 0.046

DESIGN SPECTRAL RESPOSE ACCELERATION AT 1.0S SA SD1 = 0.038

SEISMIC DESIGN CATEGORY SDC = A

BASIC SEISMIC FORCE RESISTING SYSTEM: STEEL ORDINARY

CONCENTRICALLY BRACED FRAMES

SEISMIC RESPONSE COEFFICIENT Cs = 0.10

RESPONSE MODIFICATION COEFFICIENT, R = 3.25

SEISMIC BASE SHEAR, V = 37 KIP

DESIGN DATA:

UNO UNLESS NOTED OTHERWISE

BLDG BUILDING

BOT BOTTOM

B/CONC BOTTOM OF CONCRETE

℄ CENTERLINE

CF CONCRETE FLOOR

CJP COMPLETE JOINT PENETRATION

CMU CONCRETE MASONRY UNIT

COL COLUMN

DBL DOUBLE

DIA DIAMETER

DIM DIMENSION

EMB EMBED

(E) EXISTING

EOD EDGE OF DECK

EW EACH WAY

f'c CONCRETE COMPRESSIVE STRENGTH

FF FINISH FLOOR

FNDN FOUNDATION

FT FOOT

FW FOUNDATION WALL

GA GUAGE

HORZ HORIZONTAL

HP HIGH POINT

IN INCH

KB KNEE BRACE

LBS POUNDS

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LP LOW POINT

MAX MAXIMUM

MIN MINIMUM

MPH MILES PER HOUR

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

PL PLATE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PVC POLYVINYL CHLORIDE

R RADIUS

REF REFERENCE

SF SQUARE FEET

SIM SIMILAR

SOG SLAB ON GRADE

STL STEEL

THK THICK

T/STEEL TOP OF STEEL

TYP TYPICAL

VERT VERTICAL

WF WIDE FLANGE

WF WALL FOOTING

WP WORK POINT

GENERAL ABBREVIATION:

GENERAL SYMBOLS:

LINETYPE LEGEND:

6. WIND LOAD : RISK CATEGORY IV

BASIC DESIGN WIND SPEED, VULT = 117 MPH

ALLOWABLE STRESS DESIGN WIND SPEED VASD = 91 MPH

INTERNAL PRESSURE COEFFICIENT +/- 0.18

7. VEHICLE LOADING: HS-20 TRUCK

8 KIPS 32 KIPS 32 KIPS

. 14'-0" - 30'-0"14'-0"

NOTES:

1. WHEEL TO WHEEL WIDTH IS 6'-0".

Revisions: Date: SHEET 272/23/2024

2'

- 1

0" R

EF

4"

R

EF

0" R

EF

0"

R

EF

0" R

EF

1'

- 1

0" R

EF

0" R

EF

1 2 3

A

B

D

F

H

M

.9 2.8 2.9

J.1

SD201

22' - 6" REF 16' - 10" REF

42' - 7" REF 1' - 1" REF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23REV 0 - 100% BID SET 2024-02-23 SD101

STRUCTURAL DEMOLITION PLAN -

BASEMENT LEVEL 2

DJS CCW

PARTIALLY SPRINKLERED

KEYPLAN

N

12 16

AREA OF WORK

4. COORDINATE DEMOLITION WORK WITH OTHER DISCIPLINE DRAWINGS.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND

BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND

INTENT SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE S-001 FOR S-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYED NOTES

1 DEMOLISH OPENING FOR DOORWAY

2 DEMOLISH EXISTING CONCRETE PAD, FOUNDATION WALLS, FOOTING, AND REMOVE ALL

EXISTING REINFORCING ASSOCIATED WITH DOOR ENTRANCE

SCALE: 3/16" = 1'-0"1 STRUCTURAL DEMOLITION PLAN - BASEMENT LEVEL

Revisions: Date:

SHEET 282/23/2024

A

B

D

F

H

M

.9 2.8 2.9

J.1

SD201

22' - 6" REF 16' - 10" REF

0" R

EF

RE

F 1'

- 1 0"

0" R

EF

0"

R

EF

0" R

EF

4"

R

EF

42' - 7" REF 1' - 1" REF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23REV 0 - 100% BID SET 2024-02-23 SD121

STRUCTURAL DEMOLITION PLAN -

GROUND FLOOR LEVEL 2

DJS KRL

PARTIALLY SPRINKLERED

KEYPLAN

N

12 16

AREA OF WORK

SCALE: 3/16" = 1'-0"1 STRUCTURAL DEMOLITION PLAN - GROUND FLOOR LEVEL

KEYED NOTES

1 DEMOLISH EXISTING CONCRETE EQUIPMENT PAD BELOW FINISHED CONCRETE FLOOR

AND REMOVE ALL EXISTING REINFORCING. SCARIFY THE EXISTING SURFACE 2" BELOW

THE EQUIPMENT PAD. WHERE CONCRETE IS DEMOLISHED, CARE SHALL BE TAKEN TO

NOT DAMAGE EXISTING FLOOR. EXISTING FLOOR TO REMAIN, IF FLOOR IS DAMAGED

THEN CONTRACTOR SHALL COMPLETE REPAIRS AS NEEDED

2 DEMOLISH EXISTING CONCRETE PAD AND REMOVE ALL EXISTING REINFORCING

ASSOCIATED WITH DOOR ENTRANCE

3 DEMOLISH EXISTING WALL TO ACCOMMODATE THE NEW WALL OPENING. REFER TO THE

ARCHITECTURAL DRAWINGS FOR EXTENT AND LOCATIONS OF WALL OPENINGS

4 DEMOLISH METAL PLATES, ANGLES, ANCHORS AND OTHER ACCESSORIES. PREPARE

SURFACE TO BE FILLED WITH CONCRETE

5. REFERENCE FOUNDATION DEMOLITION SCHEDULE ON DRAWING SD121.

4. COORDINATE DEMOLITION WORK WITH OTHER DISCIPLINE DRAWINGS.

3. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND

BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND

INTENT SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE S-001 FOR S-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

CONCRETE DEMOLITION SCHEDULE

MARK VOLUME LENGTH WIDTH THICKNESS

01 124.31 CF 12' - 9" 18' - 0" 0' - 6 1/2"

02 2.00 CF 3' - 0" 2' - 0" 0' - 4"

03 124.31 CF 12' - 9" 18' - 0" 0' - 6 1/2"

04 2.00 CF 3' - 0" 2' - 0" 0' - 4"

05 124.31 CF 12' - 9" 18' - 0" 0' - 6 1/2"

06 2.00 CF 3' - 0" 2' - 0" 0' - 4"

07 3.33 CF 5' - 0" 2' - 0" 0' - 4"

08 30.56 CF 21' - 0 1/4" 6' - 4" 0' - 4"

09 12.67 CF 4' - 0" 6' - 4" 0' - 6"

TOTAL CONCRETE: 9 425.50 CF

Revisions: Date:

SHEET 292/23/2024

A

B

D

F

H

M

22' - 6" REF 16' - 10" REF

" R

EF

0"

R

EF

0" R

EF

0"

R

EF

4" R

EF

J.1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23REV 0 - 100% BID SET 2024-02-23 SD141

STRUCTURAL DEMOLITION PLAN -

MEZZANINE LEVEL 2

DJS CCW

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 STRUCTURAL DEMOLITION PLAN - MEZZANINE PLAN

KEYPLAN

N

12 16

AREA OF WORK

N

4. COORDINATE DEMOLITION WORK WITH OTHER DISCIPLINE DRAWINGS.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND

BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND

INTENT SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE S-001 FOR S-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 DEMOLISH AND REMOVE ALL CATWALKS, PLATFORMS AND SUPPORTING MEMBERS

Revisions: Date:

SHEET 302/23/2024

A B D F H MJ.1

20' - 4" REF 19' - 0" REF 19' - 0" REF 12' - 0" REF

REF

1' - 10" 21' - 0" REF

7'

- 0

/1 SD101

/1 SD121

GROUND FLOOR ELEV 0'-0"

GARAGE FLOOR ELEV -0'-3"

B/CONC ELEV -5'-6"

B/CONC ELEV -6'-4"

B/CONC ELEV -8'-4"

B/CONC ELEV -9'-7"

B/CONC ELEV -13'-9"

B/CONC ELEV -10'-0"

B/CONC ELEV -10'-6"

B/CONC ELEV -7'-6"

B/CONC ELEV -12'-3"

/1 SB201

3'

- 6

2' - 10 1/4" 2' - 4"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23REV 0 - 100% BID SET 2024-02-23 SD201

STRUCTURAL DEMOLITION

FOUNDATION ELEVATIONS 2

DJS CCW

PARTIALLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 STRUCTURAL DEMOLITION FOUNDATION ELEVATION

3. COORDINATE THIS DRAWING WITH FOR SEQUENCE OF WORK AFTER

DEMOLITION.

2. COORDINATE DEMOLITION WORK WITH OTHER DISCIPLINE DRAWINGS.

1. SEE S-001 FOR S-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 DEMOLISH OPENING FOR DOORWAY

2 DEMOLISH EXISTING CONCRETE PAD, FOUNDATION WALLS, FOOTING, AND REMOVE ALL

EXISTING REINFORCING ASSOCIATED WITH DOOR ENTRANCE

Revisions: Date: SHEET 312/23/2024

A

B

D

A'

B'

C'

3"

[-7'-3"] [9'-3"] [-11'-3"]

[-1 1'-

3"

[-11'-3"]

[-9 '-3

[-1

1'- 3"

-0'-6"

-0'-6"

-10'-6"

[-6 '-6

3'

[-5'-3"]

4 1 /2"

[-11'-3"]P-1

SB304

3 3 3

SB201

9 1 /2"

2'

- 1

1/ 2"

LEGEND:

[X'-X"] TOP OF FOOTING ELEVATION 0'-0" UNLESS

NOTED OTHERWISE (+ OR -) FROM 0'-0"

X'-X" TOP OF FOUNDATION WALL ELEVATION 0'-0" UNLESS

NOTED OTHERWISE (+ OR -) FROM 0'-0"

TOP OF SLAB ELEVATION 0'-0" UNLESS NOTED

OTHERWISE (+ OR -) FROM 0'-0"X'-X"

/6 SB502

/1 SB501

/9 SB501

/9 SB501

1' - 2"

11' - 2"

1' - 0" 1'

- 7 1/

2" 1'

- 0

8"

[-9 '-6

SB304

SB304

P-1 [-11'-3"]

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23REV 0 - 100% BID SET 2024-02-23 SB101

STRUCTURAL FOUNDATION PLAN -

BASEMENT LEVEL 2

DJS CCW

PARTIALLY SPRINKLERED

N

KEYPLAN

N AREA OF WORK

12 16

5. REFERENCE FOUNDATION SCHEDULES ON DRAWING SB601.

4. COORDINATE SIZE AND LOCATION OF EQUIPMENT WITH MECHANICAL DRAWINGS.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND

BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND

INTENT SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE S-001 FOR S-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 1/4" = 1'-0"1 STRUCTURAL FOUNDATION PLAN - BASEMENT LEVEL

KEYED NOTES

1 THE EXISTING FOUNDATION REQUIRES UNDERPINNING; SEE DETAIL

2 THE NEW FOOTING IS STEPPED TO MATCH EXISTING FOOTINGS; SEE DETAIL

3 STEPPED FOOTING; REFER TO DETAIL

4 1'-6" DIA X 2'-0" DEEP SUMP PIT ASSEMBLY; COORDINATE WITH PLUMBING DRAWINGS

5 6" SLAB ON GRADE WITH 6X6 - W6XW6 WLEDED WIRE REINFORCEMENT SHEETS,

UNLESS NOTED OTHERWISE. TOP OF SLAB ELEVATION 0'-0" UNLESS NOTED OTHERWISE

(= OR -) FROM 0'-0"; REFER TO DETAIL

Revisions: Date:

SHEET 322/23/2024

1 2 3

A

B

D

F

H

M

.9

A'

B'

C'

D'

F'

1' 2'

2.8'

E'

P-1

P-1P-1, P-1, P-1

7 1 /2"

1'

- 0

1' - 0"

SB501

TYP

1' - 2"

18' - 0" 6" 2' - 0"

9" 6'

- 3

9" 6'

- 3

9"

18' - 0"

6'

- 2

1/ 2"

2' - 0"

3'

- 0

3'

- 0

2' - 0"

3'

- 0

6'

- 4

"3'

- 8

2'

- 1

21' - 0 1/4" 3' - 9"2' - 6"

W F-

2 [ -4

'-0

W F-

2 [ -4

'-0

WF-2 [-4'-0"]

LEGEND:

[X'-X"] TOP OF FOOTING ELEVATION -0'-0" UNLESS NOTED

OTHERWISE (+ OR -) FROM 0'-0"

X'-X" TOP OF FOUNDATION WALL ELEVATION

0'-0" UNLESS NOTED OTHERWISE (+ OR -) FROM 0'-0"

-0'-6"-0'-6"

-0'-6"

-0'-6"

-0'-6"

-0'-6"-0'-6"

-0'-6"

MA

TC

HL

IN

E

SB

TOP OF SLAB ELEVATION 0'-0" UNLESS NOTED

OTHERWISE (+ OR -) FROM 0'-0"X'-X"

WF-2 [-4'-0"]

W F-

[-5

'-4

W F-

[-8

'-7

SB502

[-9'-6"]

W F-

1 [ -9

'-6

[-7'-4"]

W F-

[-8

'-7

W F-

[-1

2'- 3"

3'

J.1 W

F-

[-4 '-4

[-4'-4"]

P-1

P-1

SB304

SB304

W F-

3 [ -4

'-0

WF-3 [-4'-0"]

SB304

SB303

SB304

SB303

G'

3"

9 1

/2"

0"

6" 9'

- 6

2 1 /2"

2'

- 1

1/ 2"

/7 SB501

70' - 5" 2' - 1 1/2" 32' - 8 1/4" 34' - 5 1/8" 1' - 2"

8' - 5"

7'

- 0

5'

- 0

2' - 0"

7' - 2"

+0'-6"

/5 SB501

+0'-6"

+0'-6"

/1 SB501

[-4' -0"

F-1

F-2

[-4'-0"]

[-4'-0"]

P-1, F-3[-4'-0"]

P-1, F-2[-4'-0"]

P-1, F-2[-4'-0"]

[-4'-0"]

[-8'-7"]

/5 SB501

7' - 5"

5' - 6" 19' - 5"

18' - 11" 9' - 0"

1/

2" 2'

- 0

1/

2" 2'

- 0

8 3 /4"

2'

- 0

7' - 2"

2" 4'

- 1 0 1

/2"

5' - 6" 19' - 5"

5' - 6" 19' - 5"

4 1 /2"

8'

- 7

6'

- 3 1/

2" 8'

- 7

6'

- 3

1/ 2"

8'

- 7

8" P-1

SB401

6" 6"5 1/4"

5 1/4" 6"

5 1/4" 6" 6"

5 1/4"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

5 1/4"

SB304

TOP OF COLUMN PIER ELEVATION -2'-0" UNLESS NOTED

OTHERWISE (+ OR -) FROM -2'-0"X'-X"

+1'-6"

SB201

1' - 7 1/2"

1'

- 7

1/ 2"

8"

. 8"

8"

1'

- 2

1' - 2"

2'

- 0

1'

- 7

3/ 4"

3'

- 6

SB302

2' - 0" 2' - 0" 17' - 0"5

22' - 5"

SB304

SB304

P-1

[-4' -0"

P-1,[-4'-0"]

P-1, F-2[-4'-0"]

P-1[-4'-0"]

P-1[-4'-0"]

P-1,[-4'-0"]

P-1[-5'-0"]

-0'-6"

/7 SB502/8 SB502

P-1 [-8'-6"]

FW-1

FW-1

FW-1

FW-3

FW-3

FW-4

FW-4

FW-4

FW-2

FW-2

SB401

4 5

/4 SB305

/3 SB305

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23REV 0 - 100% BID SET 2024-02-23 SB121

STRUCTURAL FOUNDATION PLAN -

GROUND FLOOR LEVEL 2

DJS CCW

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

N

5.

REFERENCE FOUNDATION SCHEDULES ON DRAWING SB601. SEE DETAIL

AND FOR PERIMETER AND INTERIOR COLUMN SECTIONS

4. COORDINATE SIZE AND LOCATION OF EQUIPMENT WITH MECHANICAL DRAWINGS.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND

BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND

INTENT SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE S-001 FOR S-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 NEW 24" EQUIPMENT PAD; REFER TO DETAIL

2 NEW 12" THICK EQUIPMENT PAD; REFER TO DETAIL

3 FILL WITH CONCRETE LEVEL WITH FINISHED FLOOR ELEVATION

4 TRENCH DRAIN; REFER TO PLUMBING DRAWINGS FOR SIZES AND LOCATION

5 THICKENED SLAB; REFER TO TYPICAL DETAIL

6 6" SLAB ON GRADE WITH 6X6 - W6XW6 WLEDED WIRE REINFORCEMENT SHEETS,

UNLESS NOTED OTHERWISE. TOP OF SLAB ELEVATION 0'-0" UNLESS NOTED OTHERWISE

(+ OR -) FROM 0'-0"; REFER TO DETAIL

7 BOLLARD; REFER TO DETAIL 2 / CS501

8 PIPE PENETRATION THROUGH FOUNDATION WALL. FOR DETAILS REFER TO DETAILS

. AND COORDINATE WITH MECHANICAL DRAWINGS FOR FINAL

LOCATION

SCALE: 3/16" = 1'-0"1 STRUCTURAL FOUNDATION PLAN - GROUND FLOOR LEVEL

Revisions: Date:

SHEET 332/23/2024

1'

E'

SB302

SB302

SB172

TRANSITION PRE-CAST

TUNNEL SECTION

TRANSITION PRE-CAST

TUNNEL SECTION 1

CLOSURE POUR

NEW LIGHT POLE FOUNDATION TYP

TRANSITION PRE-CAST

TUNNEL SECTION

MATCHLINE

/1 SB121

TRUCK SLAB

6" MAINTENANCE SLAB

TANK FOUNDATION TANK FOUNDATION

TRENCH DRAIN

1 3 /4"

135°

2' - 3"

(4) 8'-

0" P

RECAST TUNNEL S

ECTIONS W

ITH REMOVABLE

LID

S = 3

2' - 0"

CLOSURE

POUR

(4 )8

'-0 " P

RE

CA

ST

T

UN

NE

L S

EC

TI

ON

S W

IT

H

RE

MO

VA

BL

E

LID

S

0" 4'

- 0

9'

- 1

3/ 4"

73' - 6 5/8"38' - 5 3/4"

(8) 8'-0" PRECAST TUNNEL SECTIONS WITH REMOVABLE LIDS = 64' - 0" 7' - 3"

62' - 1"

0"

2' - 0"

2'

- 0

5'

- 0

5' - 0"

5' - 0"

5'

- 0

4' - 0"

(1) 8'-0" PRECAST TUNNEL SECTIONS WITH REMOVABLE LIDS = 8' - 0"

2' - 0"

4' -

1/4

17' - 11 3/8"

SB503

TYP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23REV 0 - 100% BID SET 2024-02-23 SB171

STRUCTURAL FOUNDATION PLAN -

FUEL OIL TANK SITE 2

DJS CCW

PARTIALLY SPRINKLERED

N

KEYPLAN

N

AREA OF WORK

12 16

7. ALL EXPOSED STEEL SHALL HAVE A 2-HOUR FIREPROOFING APPLIED.

6.

SEE CIVIL DRAWINGS FOR ALL SUMPS, FENCE POST, TRENCH DETAILS, AND

LOCATIONS.

5. SEE MECHANICAL DRAWINGS FOR ALL PIPING LOCATIONS.

4. COORDINATE SIZE AND LOCATION OF EQUIPMENT WITH MECHANICAL DRAWINGS.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND

BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND

INTENT SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE S-001 FOR S-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 CAST IN PLACE LID TO BE FLUSH WITH BUILDING

SCALE: 3/16" = 1'-0"1 STRUCTURAL FOUNDATION PLAN - FUEL OIL TANK SITE

Revisions: Date:

SHEET 342/23/2024

LIGHT POLE FOUNDATION TYP

PRE-CAST

CONCRETE TUNNEL

SLOPE 0.5%SLOPE 0.5%

SL

OP

E 0.5

SL

OP

E 0.5

SCJ

SC

J

SC

J

2" HIGH CURB

2" HIGH CURB

SB302

SB301

SB301

SB301

TYP

TYP

SB503

SC

J

SC

J

SC

J

PRE-INSTALLED TRENCH DRAINS,

REFER TO CIVIL DRAWINGS

2" HIGH CURB

9" TRUCK SLAB

ELEVATION 0'-0"

11'-0" MAXIMUM TYP

SB501

SB501

SB501

TANK FOUNDATION TANK FOUNDATION

TRUCK SLAB

HIGH POINT ELEVATION:

LOW POINT ELEVATION:

6" MAINTENANCE SLAB

ELEVATION 0'-0"

/1 SB171

8' - 0 1/2" 46' - 0" 8' - 0 1/2"

6"

6" 2'

- 6

3 1 /8"

2' - 6"

8'

- 6

" T

YP

0" T

YP

9'

- 0

2'

- 4

1/ 2"

30' - 9 1/2" 6"

8" 5'

- 0

2'

- 6

62' - 1"

0"

8'

- 6

2' - 6"

1'

- 9

MANHOLE

/2 SB501

/3 SB501

SB501

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23REV 0 - 100% BID SET 2024-02-23 SB172

STRUCTURAL FOUNDATION PLAN -

FUEL OIL TANK 2

DJS CCW

PARTIALLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 STRUCTURAL FOUNDATION PLAN - FUEL OIL TANKN

KEYPLAN

N

AREA OF WORK

12 16

KEYED NOTES

1 SEE ELECTRICAL DRAWINGS FOR LIGHT POLE ORIENTATION.

2 FOR SLAB DETAILS, REFER TO DETAIL

3 FOR SLAB DETAILS, REFER TO DETAIL

6. SEE CIVIL DRAWINGS FOR ALL SUMPS, FENCE POST, TRENCH DETAILS, AND

LOCATIONS.

5. SEE MECHANICAL DRAWINGS FOR ALL PIPING LOCATIONS.

4. COORDINATE SIZE AND LOCATION OF EQUIPMENT WITH MECHANICAL DRAWINGS.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND

BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND

INTENT SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE S-001 FOR S-SERIES NOTES AND LEGENDS.

GENERAL NOTES

Revisions: Date:

SHEET 352/23/2024