About this file

This is a Justification for Single Source Award document from the Department of Veterans Affairs for keyed access hardware cores from Medeco, associated with RFP 36C25225R0004 for Project 585-21-115 Replace Boiler Plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI.

The document justifies a single source procurement of Medeco keyed access hardware cores valued at approximately $20,000, which must be compatible with the existing security system per the VA Physical Security Manual requirements. While the hardware must be sourced from Medeco, the installation services do not need to be single-sourced. The justification notes that market research was deemed unnecessary since this is a brand-name requirement for daily operations and maintenance. The document is signed by Contracting Officer Kristi Kluck on November 21, 2024, and includes certification that price reasonableness will be verified prior to award in accordance with FAR 13.106-3.

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_Updated Dwgs_partial_24JAN25.pdf PDF
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
36C25225R0004 0007.docx DOCX document
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.6c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Part 813.106-1(b) Simplified Acquisition Procedures: Soliciting from a Single Source (sharepoint.com) Page 1 of 1 Revision: 01 - Effective Date: 11/15/2024 Acquisition ID#: 36C252-24-AP-4238

RFP 36C25225R0004

DEPARTMENT OF VETERANS AFFAIRS

Justification for Single Source Awards IAW FAR 13.106-1 (Over Micro-Purchase Threshold but Not Exceeding the SAT - $250K)

Acquisition ID#: 36C252-24-AP-4238

RFP#: 36C25225R0004

Project: 585-21-115 Replace Boiler Plant Single Source Item: Keyed Access Hardware

1. Contracting Activity: Department of Veterans Affairs, VISN 12, Oscar G. Johnson VA Medical Center in Iron Mountain, MI. Reference 2237 #585-25-1-6951-0003.

2. Brief Description of Supplies/ Services required and the intended use/Estimated Amount:

Keyed access hardware core from Medeco. Per the Physical Security Manual, all new keying hardware cores must be compatible with the existing security system to maintain safety at each facility. Single sourcing will only be for the hardware; installation does not need to be procured from a single source. Estimated amount is $20,000.

3. Unique characteristics that limit availability to only one source, with the reason no other supplies or services can be used:

Again, per the Physical Security Manual, all new keying hardware cores must be compatible with the existing security system to maintain safety. Reference Physical Security Design Manual for Mission Critical Facilities (va.gov).

4. Description of market research conducted and results or statement why it was not conducted:

Again, per the Physical Security Manual, all new keying hardware cores must be compatible with the existing security system to maintain campus safety. Market research is unnecessary for brand-name daily operations and maintenance requirements.

5. Contracting Officer's Certification: In accordance with FAR13.106-1(b), single source purchase is approved. I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief. IAW FAR 13.106-3, price reasonableness will be verified prior to award.

Contracting Officer Date

KRISTI

KLUCK

Digitally signed by KRISTI KLUCK Date: 2024.11.21 16:25:52 -06'00'

Solicitation 36C25225R0004 Project 58521-115 Replace Boiler Plant Attachment K.1 Single Source (MEDECO)

File details come from the government source that posted it. Updated .