S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25225R0004
About this file
This is a set of mechanical and electrical engineering drawings related to a boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings include equipment schedules, demolition plans, and system diagrams spanning multiple levels of the facility.
The drawings detail specifications for fuel quality maintenance systems, reverse osmosis units, and various electrical components that need to be removed or modified. Key equipment includes a fuel quality maintenance system rated at 1200 GPH with 25 PSI operating pressure and a reverse osmosis unit with 75% maximum recovery. The electrical demolition plans show removal requirements for existing boiler controls, VFDs, disconnect switches, and associated wiring across basement, ground floor, mezzanine and roof levels. The drawings provide detailed notes for contractor coordination and phasing of work to maintain continued facility operations during construction.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STEAM TO HOT WATER HEAT EXCHANGER SCHEDULE
2-119-HEX-001 SHELL SIDE TUBE SIDE
DIAMETER (IN) 6.5 NO. TUBES 24
FLUID LPS LENGTH (IN) 60
OPERATING PRESSURE/DESIGN (PSI) 15/150 FLUID 30% GLYCOL
TEMPERATURE IN/OUT (F) 249.1 / 249.1 TEMPERATURE IN/OUT (F) 180/200
FLOW (LB/HR) 698.7 FLOW (GPM) 70
HEAT LOAD (MBH) 663.3
EFFECTIVE AREA (SF) 22.6 PRESSURE DROP (PSI) 1.26
LMTD (F) 58.5
INLET/OUTLET (IN) 2"/0.75" INLET/OUTLET (IN) 2" / 2" NPT
BASIS OF DESIGN: BELL AND GOSSETT QSU-65-2
BLOWDOWN SEPARATOR SCHEDULE
UNIT LOCATION PRESSURE
RATING (PSI)
INLET DIAMETER
(IN)
STEAM VENT
DIAMETER (IN) BASIS OF DESIGN
2-119-TK-003 BOILER ROOM 100 2 5 CLEAVER BROOKS
2-201-TK-006 BOILER ROOM 100 2 5 CLEAVER BROOKS
SURGE TANK SCHEDULE
UNIT LOCATION CAPACITY
(GAL) BASIS OF DESIGN
2-119-TK-002 BOILER ROOM 900 CLEAVER-BROOKS SRG-900
AIR SEPARATOR SCHEDULE
UNIT SYSTEM CONNECTION SIZE (IN) MAX GPM BASIS OF DESIGN
2-200-AS-001 FEEDWATER HEATING LOOP 1" 35 BELL & GOSSETT EAS-1
CONDENSATE RECEIVER/PUMP
UNIT SERVICE TYPE CAPACITY ( SQ. FT. E.D.R.) DISCHARGE
PRESSURE (PSI)
FLOW RATE
(GPM)
RECEIVER
CAPACITY (GAL.)
MOTOR POWER
(HP)
ELECTRICAL
BASIS OF DESIGN
V/P/HZ MAX RPM
2-119-PMP-011 RO WATER HEATER SIMPLEX 2000 20 3 6 1/3 115/1/60 1750 ARMSTRONG 4222-G
2-119-PMP-012 BUILDING HEATING/DEAERATOR SIMPLEX 4000 30 6 15 1/2 115/1/61 1750 ARMSTRONG 4134-J
2-119-PMP-013 OLD BUILDING HEATING SIMPLEX 2000 20 3 6 1/3 115/1/62 1750 ARMSTRONG 4222-G
FUEL QUALITY MAINTENANCE SYSTEM
UNIT LOCATION FLUID GPH PSI
MOTOR
BASIS OF DESIGN
Power (VAC) RPM HP
2-119-FQM-001 119 BOILER ROOM NO. 2 FUEL OIL 1200 25 120 1725 3/4 SKIMOIL FTRFS 5
STEAM TO FUEL OIL HEATER SCHEDULE
2-200-HEX-003 SHELL SIDE TUBE SIDE
DIAMETER (IN) 4.5 NO. TUBES 44
FLUID LPS LENGTH (IN) 12
OPERATING PRESSURE/DESIGN (PSI) 15/150 FLUID FUEL OIL
TEMPERATURE IN/OUT (F) 249.1 / 249.1 TEMPERATURE IN/OUT (F) 65/115
FLOW (LB/HR) 47.9 FLOW (GPM) 5
HEAT LOAD (MBH) 45.5
EFFECTIVE AREA (SF) 4.9 PRESSURE DROP (PSI) 6.5
LMTD (F) 157.8
INLET/OUTLET (IN) 2" / 1" NPT INLET/OUTLET (IN) 1.5"/1.5" NPT
BASIS OF DESIGN: BELL AND GOSSETT QSUS-412-2
REVERSE OSMOSIS UNIT SCHEDULE
UNIT LOCATION DESIGN
TEMPERATURE (F)
MAXIMUM
RECOVERY
MINIMUM INLET
PRESSURE (PSIG) BASIS OF DESIGN
2-119-RO-001 BOILER ROOM 77 75% 30 GE E4 SERIES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MK602
MECHANICAL EQUIPMENT
SCHEDULES 2
DJU KRL
PARTIALLY SPRINKLERED
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
SHEET 2184/5/2024
KRK CJR
SWITCH, SINGLE BREAK
FUSE WITH RATING
NORMALLY CLOSED RELAY CONTACT
NORMALLY OPEN RELAY CONTACT
MOLDED CASE CIRCUIT BREAKER
LOW-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
HIGH-VOLTAGE OIL CIRCUIT BREAKER
HIGH-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
SWITCH AND FUSE UNIT
FUSED DRAWOUT POTENTIAL TRANSFORMER
FUSIBLE LINK
GENERATOR, POWERG
CAPACITOR
METER
AMMETER
VOLTMETER
WATTMETER
WATT-HOUR METER
PANELBOARD CABINET, FLUSH MOUNTED
PANELBOARD CABINET, SURFACE MOUNTED
RECEPTACLE, DUPLEX
RECEPTACLE, DUPLEX ON EMERGENCY POWER
RECEPTACLE, DUPLEX WITH GROUND FAULT
CIRCUIT INTERRUPTER
RECEPTACLE, QUADRAPLEX
RECEPTACLE, SINGLE
RECEPTACLE, SINGLE WITH SWITCHS
S RECEPTACLE, SWITCHED DUPLEX
ELECTRICAL SYMBOLS - POWER PLAN:
MOTOR, SINGLE-PHASE
MOTOR, THREE-PHASE
DELTA CONNECTION
TRANSFORMER
WYE CONNECTION
EARTH GROUND
TRANSFORMER, PLANT
BRANCH CIRCUIT HOMERUN. LINES INDICATE
NUMBER OF CIRCUITS, NEUTRAL, AND SWITCH LEG
CONDUCTORS. ONE SEPARATE GREEN
GROUNDING CONDUCTOR SHALL BE PROVIDED
FOR EACH HOMERUN; NOT SHOWN
PB PULL BOX/JUNCTION BOX
WIREWAY
RIGID CONDUIT LINE = RC
DUCT BANK
POWER DUCT = P
BUSWAY
DISCONNECT SWITCH, FUSED
DISCONNECT SWITCH, UNFUSED
STARTER, COMBINATION WITH DISCONNECT SWITCH
STARTER OR MOTOR CONTROLLER
CONDUIT TERMINATED 6" [152mm] AFF
IN STANDARD BOX FOR EXTENSION TO
EQUIPMENT AS DIRECTED.
CONDUIT TERMINATED W/COUPLING
(FLUSH W/FINISHED FLOOR) FOR
EXTENSION TO EQUIPMENT AS DIRECTED.
VARIABLE FREQUENCY DRIVE
VFD
SWITCH (# SUBSCRIPT AS INDICATED BELOW):
BLANK = SINGLE POLE 2 = DOUBLE POLE
3 = THREE-WAY 4 = FOUR-WAY
D = DIMMER DS = DOOR SWITCH
F = FUSED K = KEY OPERATED
LV = LOW VOLTAGE LM = LOW VOLTAGE MASTER
M = MOTOR SNAP MP = MOTOR SNAP WITH PILOT LIGHT
MO= OCCUPANCY SENSOR P = WITH PILOT LIGHT
PB= PUSH BUTTON STATION RC= REMOTE CONTROL
T = TIMER OPERATED WP= WEATHER PROOF
X = EXPLOSION PROOF
ELECTRICAL SYMBOLS - LIGHTING PLAN:
LIGHT FIXTURE, CEILING MOUNTED
A = FIXTURE ID
B = PANEL & CIRCUIT NUMBER
LIGHTING, ONE HEAD EMERGENCY BATTERY POWER
LIGHTING, TWO HEAD EMERGENCY BATTERY POWER
EXIT SIGN, WALL MOUNTED WITH DIRECTIONAL ARROWS AND FACES AS SHOWN
EXIT SIGN, CEILING MOUNTED WITH DIRECTIONAL ARROWS AND FACES AS SHOWN
GENERAL ELECTRICAL NOTES:
A. ALL FINAL LOCATIONS AND ARRANGEMENTS OF LIGHTING FIXTURES SHALL BE OBTAINED FROM THE
ARCHITECTURAL REFLECTED CEILING PLAN.
B. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED EQUIPMENT GROUNDING CONDUCTOR.
C. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF EMERGENCY AND NORMAL BRANCH
WIRING DEVICES SHALL HAVE DIVIDERS BETWEEN DEVICES.
D. COORDINATE ALL SHUTDOWNS AND INTERRUPTIONS OF SERVICE WITH THE COR IN ACCORDANCE WITH
THE SPECIFICATION REQUIREMENTS.
E. ALL CONDUIT TO BE LABELED AT EACH END TO IDENTIFY TERMINATION LOCATIONS.
F. ALL SPARE CONDUIT SHALL CONTAIN A PULL STRING TO FACILITATE FUTURE USE.
G. THE CONTRACTOR IS TO PROVIDE EXCAVATION/TRENCHING PLANS TO THE VA COR FOR APPROVAL
PRIOR TO STARTING ANY EXCAVATION OR TRENCHING WORK.
H. CONTRACTOR TO LABEL ALL EQUIPMENT, CONDUIT, JUNCTION BOXES, PULL BOXES, ETC IN
ACCORDANCE WITH VA COR PROVIDED DIRECTION..
I. REFER TO GC101 THROUGH GC103, GC601 FOR PHASING DETAILS.
GENERAL ELECTRICAL NOTES - DEMOLITION:
A. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES, CONDUITS, ETC, SHOWN ON PLANS TO BE REMOVED, COMPLETELY REMOVE CONDUIT AND WIRING TO THE SOURCE (OVER CURRENT
PROTECTIVE DEVICE, DISCONNECT, ETC).
B. DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE OVERCURRENT PROTECTIVE DEVICE.
COMPLETELY REMOVE ALL ABANDONED WIRING.
C. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS PASSING THROUGH
RENOVATED AREAS AND SERVICING UNDISTURBED AREAS.
PHOTOCELLPC
ELECTRICAL DUCTBANK:
X# FEEDER ID
X# = SEE FEEDER SCHEDULE EP601
LIGHT FIXTURE, WALL MOUNTED
A = FIXTURE ID
B = PANEL & CIRCUIT NUMBER
A
B
K KEY INTERLOCKED SWITCH
UNDERGROUND ELECTRICUE
GENERAL LINETYPES:
EXISTING DUCT BANK
EXTENTS OF DETAIL
DEMOLITION/REMOVAL
UNDERGROUND FUEL LINEFOS
ABANDON DUCT BANK
SAW CUT CONCRETE
WATER LINEW
STORM LINESD
FIREWATER LINEFW
SANITARY SEWER LINESS
GAS LINEG
FENCE LINE
ABANDON UNDERGROUND ELECTRICAUE
GROUND LINE
* PROTECTIVE RELAY (* INDICATES ANSI FUNCTION
NUMBER AND NUMBER INDICATES QUANTITY)
25 - SYNCHRONIZING OR SYNCHRONISM- CHECK
DEVICE
50 - INSTANTANEOUS OVERCURRENT
51 - AC INVERSE TIME OVERCURRENT RELAY
52 - AC CIRCUIT BREAKER
67 - AC DIRECTIONAL OVER CURRENT RELAY
87 - DIFFERENTIAL PROTECTIVE RELAY
SUFFIXES INDICATING ZONE OF PROTECTION
B - BUS G - GROUND L - LINE
N - NEUTRAL T - TRANSFORMER U - UNIT
SPARE CONDUIT
FILLED CONDUIT
CURRENT TRANSFORMER
FO FIBER OPTIC
B A
GFCI
DEMOLITION/REMOVALX X X X
GND
CONDUIT SYMBOLS:
CONDUIT UP
CONDUIT DOWN
VERTICAL RISER
DEMOLITION/REMOVAL/ / / / / / / / / / / /
E ELECTRICAL CABLE/CONDUIT
LIGHT FIXTURE
A = FIXTURE ID
B = PANEL & CIRCUIT NUMBER
LIGHT FIXTURE, RECESSED
A = FIXTURE ID
B = PANEL & CIRCUIT NUMBER
LIGHT FIXTURE, CEILING MOUNTED EMERGENCY
A = FIXTURE ID
B = PANEL & CIRCUIT NUMBERB
B
A
B A
LIGHT FIXTURE, CEILING MOUNTED
A = FIXTURE ID
B = PANEL & CIRCUIT NUMBERB
B
LIGHT FIXTURE, RECESSED EMERGENCY
A = FIXTURE ID
B = PANEL & CIRCUIT NUMBER
GENERAL SYMBOLS:
DEMOLISH/REMOVE
ROOM NAME AND NUMBERC2
CORRIDOR
PHASE CALLOUT#
O.C.B.
BB
P
DB
RC
WW
WH
W
V
A
M
EN ATS
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-04
H HANDHOLE
P POWER MANHOLE
LIGHT POLE, ONE MAST ARM, ONE LUMINAIRE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL NOTES AND LEGENDS FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 E-001
585-21-115
X
POWER MANHOLET
JUNCTION BOXJ
RECEPTACLE, SPECIAL PURPOSE
A = 120V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 5-20R.
B = 208V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 6-20R.
C = 120V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 5-30R.
D = 208V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 6-30R.
E = 208V, 60A, 1 PHASE, 3-POLE, 4W, NEMA 14-60R.
F = 208V, 30A, 3 PHASE, 3-POLE 4W, NEMA 15-30R.
G = 208V, 50A, 3 PHASE, 3 POLE, 4W, NEMA 15-30R.
H = 208V, 60A, 3 PHASE, 3 POLE, 4W, NEMA 15-60R.
WP WEATHERPROOF RECEPTACLE
A
A
A
SHEET 2194/4/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
1 2 3
A
B
D
F
H
FUEL OIL
PUMP SKID
EMERGENCY FUEL
OIL SHUT OFF
STORAGE
RM/TUNNEL ACCESS
001-2
BASEMENT HALLWAY
002-2
3'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
ED101
ELECTRICAL DEMOLITION PLAN -
BASEMENT LEVEL 2
KRK LAJ
PARTIALLY SPRINKLERED
KEYPLAN
N
12 16
AREA OF WORK
SCALE: 3/16" = 1'-0"1 ELECTRICAL DEMOLITION PLAN - BASEMENT LEVEL
N
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 REMOVE EXISTING FUEL OIL PUMP SKID ELECTRICAL DISCONNECT. REMOVE ALL
ASSOCIATED CONDUIT AND WIRING BACK TO SOURCE. MARK SOURCE BREAKER AS
SPARE. SEE MECHANICAL DEMOLITION PLANS FOR ADDITIONAL INFORMATION ON THE
FUEL PUMP SKID REMOVAL
Revisions: Date:
SHEET 2202/22/2024
COX
COX
COXX G
AS
COX
CO X
PANEL 2UPS
PANEL BOILER
EXHAUST
PANEL C
PANEL A
1 2 3
A
B
D
F
H
M
BOILER #1
BOILER #2
BOILER #3
BOILER #3 120V
DISC.BOILER #3 480V
DISC.
BOILER #2 120V
DISC.
BOILER #2 480V
DISC.
BOILER #1 480V
DISC.
BOILER #1 120V
DISC.
PANEL BPP
P-3P-2P-1
PARKING LOT
LIGHTS
MAU MEZZANINE
EXHAUST FAN
EF-50 EXHAUST FAN
SUPPLY FAN #4
SUPPLY FAN #3
SUPPLY FAN #2
SUPPLY FAN #1
PANEL P1
PANEL GS-BLDG
RO DISC. SWITCH
RO WATER SYSTEM
MOTOR STARTER
480 VOLT POWER
POINT DISC.
BOILER 1 FAN TEST
PANEL
BLR 1 ID FAN VFD
BOILER 2 FAN TEST
PANEL
BLR 2 ID FAN VFD
BOILER 3 FAN TEST
PANEL BLR 3 ID FAN VFD
BOILER #3
CONTROL PANEL
BOILER #2
CONTROL PANEL
BOILER #1
CONTROL PANEL
PARALLEL
SWITCHING GEAR
101B-2
BOILER ROOM
101-2
3'
BLDG. #2
BOILERHOUSE
NORM
BLR HOUSE
SUB (B2)
OFFICE/BOILER CTRL
RM
102-2
UNISEX RESTROOM
104-2
SHOWER & LAB
104A-2
PASSAGEWAY
103-2
SWITCHGEAR
103A-2
RO
RECEPTACLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
ED121
ELECTRICAL DEMOLITION PLAN -
GROUND FLOOR LEVEL 2
KRK LAJ
PARTIALLY SPRINKLERED
KEYPLAN
N
12 16
AREA OF WORK
SCALE: 3/16" = 1'-0"1 ELECTRICAL DEMOLTION PLAN - GROUND FLOOR LEVEL
N
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 REMOVE DISCONNECT DEVICE. REMOVE ALL ASSOCIATED CONDUIT AND WIRING BACK
TO SOURCE PANEL. LABEL SOURCE BREAKER(S) AS SPARE. SEE MECHANICAL
DEMOLITION PLANS FOR ADDITIONAL INFORMATION ON MECHANICAL EQUIPMENT
REMOVAL.
2 REMOVE E-STOP SWITCH. REMOVE ALL ASSOCIATED CONDUIT AND WIRING BACK TO
SOURCE. SEE MECHANICAL DEMOLITION PLANS FOR ADDITIONAL INFORMATION ON
MECHANICAL EQUIPMENT REMOVAL.
3 REMOVE BREAKER PANEL. REMOVE ALL ASSOCIATED CONDUIT AND WIRING BACK TO
SOURCE. MARK SOURCE BREAKER AS SPARE. SEE MECHANICAL DEMOLITION PLANS
FOR ADDITIONAL INFORMATION ON MECHANICAL EQUIPMENT REMOVAL.
4 REMOVE VFD DEVICES SERVING FEEDWATER PUMPS AND EXHAUST FANS . REMOVE
ALL ASSOCIATED CONTROL AND POWER WIRING, AND CONDUIT BACK TO SOURCE.
LABEL POWER SOURCE BREAKERS AS SPARE. SEE MECHANICAL DEMOLITION PLANS
FOR ADDITIONAL INFORMATION.
5 REMOVE BOILER POWER DISCONNECTS, BOILER FAN VFDS, BOILER FAN TEST PANELS,
AND BOILER CONTROL PANELS. REMOVE ALL ASSOCIATED CONDUIT AND WIRING BACK
TO SOURCE PANEL. LABEL SOURCE BREAKER(S) AS SPARE. COORDINATE WITH THE
REMOVAL OF THE BOILERS. SEE MECHANICAL DEMOLITION PLANS FOR ADDITIONAL
INFORMATION
6 REMOVE RO SYSTEM DISCONNECT SWITCH, MOTOR STARTER, AND SINGLE
RECEPTACLE. COORIDATE WITH REMOVAL OF RO SYSTEM. SEE MECANICAL
DEMOLITION PLANS FOR ADDITIONAL INFORMATION
FEEDWATER
PUMP VFDS
Revisions: Date:
REV 1 - FINAL BID SET 2024-04-04
SHEET 2214/4/2024
1 2 3
A
B
D
F
H
M
AIR COMPRESSOR
DISC
TANK ALARM PANEL
AND BATTERY
BACKUP SYSTEM
STEAM MAKEUP
DISCONNECT
SWITCH
MEZZANINE
202-2
UNIT HEATER
UNIT HEATER
UNIT HEATER
UNIT HEATER
EXISTING
BOILER
EXISTING
BOILER
EXISTING
BOILER
EXISTING STEAM
MAKEUP AIR UNIT
DEARATOR
TANK COMPRESSED
AIR
TANK
AIR
COMPRESSOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
ED141
ELECTRICAL DEMOLITION PLAN -
MEZZANINE LEVEL 2
KRK LAJ
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 ELECTRICAL DEMOLITION PLAN - MEZZANINE LEVEL
N
4. ALL LIGHT FIXTURES SHOWN ARE EXISTING TO REMAIN.
3..
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 REMOVE DISCONNECT SWITCH AND ALL ASSOCIATED CONDUIT AND WIRING BACK TO
SOURCE. MARK SOURCE BREAKER AS SPARE. SEE MECHANICAL DEMOLTION PLANS
FOR ADDITIONAL INFORMATION ON REMOVAL OF AIR COMPRESSOR/STORAGE TANK
AND STEAM MAKE UP AIR SYSTEMS.
2 REMOVE ALL ASSOCIATED CABLE AND CONDUIT BACK TO SOURCE PANEL AND
COORDINATE WITH THE REMOVAL OF UNIT HEATERS. SEE MECHANICAL DEMOLITION
PLANS FOR ADDITIONAL INFORMATION.
3 REMOVE TANK ALARM PANEL AND ASSOCIATED BATTERY BACKUP SYSTEM.
COORDINATE WITH REMOVAL OF DEEAERATOR TANK. SEE MECHANICAL DEMOLITION
PLANS FOR ADDITIONAL INFORMATION.
KEYPLAN
N
12 16
AREA OF WORK
Revisions: Date:
SHEET 2222/22/2024
A
B
D
F
H
EXTERIOR BUILDING LIGHT
(EXISTING TO BE REMOVED)
UNIT HEATER
EXTERIOR BUILDING LIGHT
(EXISTING TO REMAIN)
BOILER EXHAUST STACKS
SEE MECHANICAL DRAWINGS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
ED161
ELECTRICAL DEMOLITION PLAN -
ROOF LEVEL 2
KRK LAJ
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 ELECTRICAL DEMOLITION PLAN - ROOF
N
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYPLAN
N
12 16
AREA OF WORK
Revisions: Date:
KEYED NOTES
1 REMOVE ALL ASSOCIATED CABLE AND CONDUIT BACK TO SOURCE PANEL AND
COORDINATE WITH THE REMOVAL OF UNIT HEATER. SEE MECHANICAL DEMOLITION
PLANS FOR ADDITIONAL INFORMATION ASSOCIATED CONDUIT AND WIRING BACK TO
SOURCE. MARK SOURCE BREAKER AS SPARE. COORDINATE REMOVAL WITH
MECHANICAL CONTRACTOR
2 REMOVE LIGHTING PROTECTION SYSTEM COMPONENTS ASSOCIATED WITH BOILER
STACKS. THIS ONLY INCLUDES AIR TERMINALS, MOUNTING BRACKETS, BONDING
CONDUCTORS, AND CABLE CONNECTORS. LIGHTNING PROTECTION SYSTEM
CONDUCTORS ATTACHED TO ROOF AND MOUNTED TO PARAPET SHALL REMAIN
SHEET 2232/22/2024
File details come from the government source that posted it. Updated .