S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf

PDF 1 MB Posted

Attached to
Y1NB--Project 585-21-115 Replace Boiler Plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI -- NAICS 236220 General Construction
Solicitation number
36C25225R0004
Issued by

About this file

This is a set of mechanical and electrical engineering drawings related to a boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings include equipment schedules, demolition plans, and system diagrams spanning multiple levels of the facility.

The drawings detail specifications for fuel quality maintenance systems, reverse osmosis units, and various electrical components that need to be removed or modified. Key equipment includes a fuel quality maintenance system rated at 1200 GPH with 25 PSI operating pressure and a reverse osmosis unit with 75% maximum recovery. The electrical demolition plans show removal requirements for existing boiler controls, VFDs, disconnect switches, and associated wiring across basement, ground floor, mezzanine and roof levels. The drawings provide detailed notes for contractor coordination and phasing of work to maintain continued facility operations during construction.

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_Updated Dwgs_partial_24JAN25.pdf PDF
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
36C25225R0004 0007.docx DOCX document
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.1_P03 Single Source Justification MEDECO.e.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.6c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STEAM TO HOT WATER HEAT EXCHANGER SCHEDULE

2-119-HEX-001 SHELL SIDE TUBE SIDE

DIAMETER (IN) 6.5 NO. TUBES 24

FLUID LPS LENGTH (IN) 60

OPERATING PRESSURE/DESIGN (PSI) 15/150 FLUID 30% GLYCOL

TEMPERATURE IN/OUT (F) 249.1 / 249.1 TEMPERATURE IN/OUT (F) 180/200

FLOW (LB/HR) 698.7 FLOW (GPM) 70

HEAT LOAD (MBH) 663.3

EFFECTIVE AREA (SF) 22.6 PRESSURE DROP (PSI) 1.26

LMTD (F) 58.5

INLET/OUTLET (IN) 2"/0.75" INLET/OUTLET (IN) 2" / 2" NPT

BASIS OF DESIGN: BELL AND GOSSETT QSU-65-2

BLOWDOWN SEPARATOR SCHEDULE

UNIT LOCATION PRESSURE

RATING (PSI)

INLET DIAMETER

(IN)

STEAM VENT

DIAMETER (IN) BASIS OF DESIGN

2-119-TK-003 BOILER ROOM 100 2 5 CLEAVER BROOKS

2-201-TK-006 BOILER ROOM 100 2 5 CLEAVER BROOKS

SURGE TANK SCHEDULE

UNIT LOCATION CAPACITY

(GAL) BASIS OF DESIGN

2-119-TK-002 BOILER ROOM 900 CLEAVER-BROOKS SRG-900

AIR SEPARATOR SCHEDULE

UNIT SYSTEM CONNECTION SIZE (IN) MAX GPM BASIS OF DESIGN

2-200-AS-001 FEEDWATER HEATING LOOP 1" 35 BELL & GOSSETT EAS-1

CONDENSATE RECEIVER/PUMP

UNIT SERVICE TYPE CAPACITY ( SQ. FT. E.D.R.) DISCHARGE

PRESSURE (PSI)

FLOW RATE

(GPM)

RECEIVER

CAPACITY (GAL.)

MOTOR POWER

(HP)

ELECTRICAL

BASIS OF DESIGN

V/P/HZ MAX RPM

2-119-PMP-011 RO WATER HEATER SIMPLEX 2000 20 3 6 1/3 115/1/60 1750 ARMSTRONG 4222-G

2-119-PMP-012 BUILDING HEATING/DEAERATOR SIMPLEX 4000 30 6 15 1/2 115/1/61 1750 ARMSTRONG 4134-J

2-119-PMP-013 OLD BUILDING HEATING SIMPLEX 2000 20 3 6 1/3 115/1/62 1750 ARMSTRONG 4222-G

FUEL QUALITY MAINTENANCE SYSTEM

UNIT LOCATION FLUID GPH PSI

MOTOR

BASIS OF DESIGN

Power (VAC) RPM HP

2-119-FQM-001 119 BOILER ROOM NO. 2 FUEL OIL 1200 25 120 1725 3/4 SKIMOIL FTRFS 5

STEAM TO FUEL OIL HEATER SCHEDULE

2-200-HEX-003 SHELL SIDE TUBE SIDE

DIAMETER (IN) 4.5 NO. TUBES 44

FLUID LPS LENGTH (IN) 12

OPERATING PRESSURE/DESIGN (PSI) 15/150 FLUID FUEL OIL

TEMPERATURE IN/OUT (F) 249.1 / 249.1 TEMPERATURE IN/OUT (F) 65/115

FLOW (LB/HR) 47.9 FLOW (GPM) 5

HEAT LOAD (MBH) 45.5

EFFECTIVE AREA (SF) 4.9 PRESSURE DROP (PSI) 6.5

LMTD (F) 157.8

INLET/OUTLET (IN) 2" / 1" NPT INLET/OUTLET (IN) 1.5"/1.5" NPT

BASIS OF DESIGN: BELL AND GOSSETT QSUS-412-2

REVERSE OSMOSIS UNIT SCHEDULE

UNIT LOCATION DESIGN

TEMPERATURE (F)

MAXIMUM

RECOVERY

MINIMUM INLET

PRESSURE (PSIG) BASIS OF DESIGN

2-119-RO-001 BOILER ROOM 77 75% 30 GE E4 SERIES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MK602

MECHANICAL EQUIPMENT

SCHEDULES 2

DJU KRL

PARTIALLY SPRINKLERED

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

SHEET 2184/5/2024

KRK CJR

SWITCH, SINGLE BREAK

FUSE WITH RATING

NORMALLY CLOSED RELAY CONTACT

NORMALLY OPEN RELAY CONTACT

MOLDED CASE CIRCUIT BREAKER

LOW-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER

HIGH-VOLTAGE OIL CIRCUIT BREAKER

HIGH-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER

SWITCH AND FUSE UNIT

FUSED DRAWOUT POTENTIAL TRANSFORMER

FUSIBLE LINK

GENERATOR, POWERG

CAPACITOR

METER

AMMETER

VOLTMETER

WATTMETER

WATT-HOUR METER

PANELBOARD CABINET, FLUSH MOUNTED

PANELBOARD CABINET, SURFACE MOUNTED

RECEPTACLE, DUPLEX

RECEPTACLE, DUPLEX ON EMERGENCY POWER

RECEPTACLE, DUPLEX WITH GROUND FAULT

CIRCUIT INTERRUPTER

RECEPTACLE, QUADRAPLEX

RECEPTACLE, SINGLE

RECEPTACLE, SINGLE WITH SWITCHS

S RECEPTACLE, SWITCHED DUPLEX

ELECTRICAL SYMBOLS - POWER PLAN:

MOTOR, SINGLE-PHASE

MOTOR, THREE-PHASE

DELTA CONNECTION

TRANSFORMER

WYE CONNECTION

EARTH GROUND

TRANSFORMER, PLANT

BRANCH CIRCUIT HOMERUN. LINES INDICATE

NUMBER OF CIRCUITS, NEUTRAL, AND SWITCH LEG

CONDUCTORS. ONE SEPARATE GREEN

GROUNDING CONDUCTOR SHALL BE PROVIDED

FOR EACH HOMERUN; NOT SHOWN

PB PULL BOX/JUNCTION BOX

WIREWAY

RIGID CONDUIT LINE = RC

DUCT BANK

POWER DUCT = P

BUSWAY

DISCONNECT SWITCH, FUSED

DISCONNECT SWITCH, UNFUSED

STARTER, COMBINATION WITH DISCONNECT SWITCH

STARTER OR MOTOR CONTROLLER

CONDUIT TERMINATED 6" [152mm] AFF

IN STANDARD BOX FOR EXTENSION TO

EQUIPMENT AS DIRECTED.

CONDUIT TERMINATED W/COUPLING

(FLUSH W/FINISHED FLOOR) FOR

EXTENSION TO EQUIPMENT AS DIRECTED.

VARIABLE FREQUENCY DRIVE

VFD

SWITCH (# SUBSCRIPT AS INDICATED BELOW):

BLANK = SINGLE POLE 2 = DOUBLE POLE

3 = THREE-WAY 4 = FOUR-WAY

D = DIMMER DS = DOOR SWITCH

F = FUSED K = KEY OPERATED

LV = LOW VOLTAGE LM = LOW VOLTAGE MASTER

M = MOTOR SNAP MP = MOTOR SNAP WITH PILOT LIGHT

MO= OCCUPANCY SENSOR P = WITH PILOT LIGHT

PB= PUSH BUTTON STATION RC= REMOTE CONTROL

T = TIMER OPERATED WP= WEATHER PROOF

X = EXPLOSION PROOF

ELECTRICAL SYMBOLS - LIGHTING PLAN:

LIGHT FIXTURE, CEILING MOUNTED

A = FIXTURE ID

B = PANEL & CIRCUIT NUMBER

LIGHTING, ONE HEAD EMERGENCY BATTERY POWER

LIGHTING, TWO HEAD EMERGENCY BATTERY POWER

EXIT SIGN, WALL MOUNTED WITH DIRECTIONAL ARROWS AND FACES AS SHOWN

EXIT SIGN, CEILING MOUNTED WITH DIRECTIONAL ARROWS AND FACES AS SHOWN

GENERAL ELECTRICAL NOTES:

A. ALL FINAL LOCATIONS AND ARRANGEMENTS OF LIGHTING FIXTURES SHALL BE OBTAINED FROM THE

ARCHITECTURAL REFLECTED CEILING PLAN.

B. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED EQUIPMENT GROUNDING CONDUCTOR.

C. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF EMERGENCY AND NORMAL BRANCH

WIRING DEVICES SHALL HAVE DIVIDERS BETWEEN DEVICES.

D. COORDINATE ALL SHUTDOWNS AND INTERRUPTIONS OF SERVICE WITH THE COR IN ACCORDANCE WITH

THE SPECIFICATION REQUIREMENTS.

E. ALL CONDUIT TO BE LABELED AT EACH END TO IDENTIFY TERMINATION LOCATIONS.

F. ALL SPARE CONDUIT SHALL CONTAIN A PULL STRING TO FACILITATE FUTURE USE.

G. THE CONTRACTOR IS TO PROVIDE EXCAVATION/TRENCHING PLANS TO THE VA COR FOR APPROVAL

PRIOR TO STARTING ANY EXCAVATION OR TRENCHING WORK.

H. CONTRACTOR TO LABEL ALL EQUIPMENT, CONDUIT, JUNCTION BOXES, PULL BOXES, ETC IN

ACCORDANCE WITH VA COR PROVIDED DIRECTION..

I. REFER TO GC101 THROUGH GC103, GC601 FOR PHASING DETAILS.

GENERAL ELECTRICAL NOTES - DEMOLITION:

A. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES, CONDUITS, ETC, SHOWN ON PLANS TO BE REMOVED, COMPLETELY REMOVE CONDUIT AND WIRING TO THE SOURCE (OVER CURRENT

PROTECTIVE DEVICE, DISCONNECT, ETC).

B. DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE OVERCURRENT PROTECTIVE DEVICE.

COMPLETELY REMOVE ALL ABANDONED WIRING.

C. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS PASSING THROUGH

RENOVATED AREAS AND SERVICING UNDISTURBED AREAS.

PHOTOCELLPC

ELECTRICAL DUCTBANK:

X# FEEDER ID

X# = SEE FEEDER SCHEDULE EP601

LIGHT FIXTURE, WALL MOUNTED

A = FIXTURE ID

B = PANEL & CIRCUIT NUMBER

A

B

K KEY INTERLOCKED SWITCH

UNDERGROUND ELECTRICUE

GENERAL LINETYPES:

EXISTING DUCT BANK

EXTENTS OF DETAIL

DEMOLITION/REMOVAL

UNDERGROUND FUEL LINEFOS

ABANDON DUCT BANK

SAW CUT CONCRETE

WATER LINEW

STORM LINESD

FIREWATER LINEFW

SANITARY SEWER LINESS

GAS LINEG

FENCE LINE

ABANDON UNDERGROUND ELECTRICAUE

GROUND LINE

* PROTECTIVE RELAY (* INDICATES ANSI FUNCTION

NUMBER AND NUMBER INDICATES QUANTITY)

25 - SYNCHRONIZING OR SYNCHRONISM- CHECK

DEVICE

50 - INSTANTANEOUS OVERCURRENT

51 - AC INVERSE TIME OVERCURRENT RELAY

52 - AC CIRCUIT BREAKER

67 - AC DIRECTIONAL OVER CURRENT RELAY

87 - DIFFERENTIAL PROTECTIVE RELAY

SUFFIXES INDICATING ZONE OF PROTECTION

B - BUS G - GROUND L - LINE

N - NEUTRAL T - TRANSFORMER U - UNIT

SPARE CONDUIT

FILLED CONDUIT

CURRENT TRANSFORMER

FO FIBER OPTIC

B A

GFCI

DEMOLITION/REMOVALX X X X

GND

CONDUIT SYMBOLS:

CONDUIT UP

CONDUIT DOWN

VERTICAL RISER

DEMOLITION/REMOVAL/ / / / / / / / / / / /

E ELECTRICAL CABLE/CONDUIT

LIGHT FIXTURE

A = FIXTURE ID

B = PANEL & CIRCUIT NUMBER

LIGHT FIXTURE, RECESSED

A = FIXTURE ID

B = PANEL & CIRCUIT NUMBER

LIGHT FIXTURE, CEILING MOUNTED EMERGENCY

A = FIXTURE ID

B = PANEL & CIRCUIT NUMBERB

B

A

B A

LIGHT FIXTURE, CEILING MOUNTED

A = FIXTURE ID

B = PANEL & CIRCUIT NUMBERB

B

LIGHT FIXTURE, RECESSED EMERGENCY

A = FIXTURE ID

B = PANEL & CIRCUIT NUMBER

GENERAL SYMBOLS:

DEMOLISH/REMOVE

ROOM NAME AND NUMBERC2

CORRIDOR

PHASE CALLOUT#

O.C.B.

BB

P

DB

RC

WW

WH

W

V

A

M

EN ATS

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-04

H HANDHOLE

P POWER MANHOLE

LIGHT POLE, ONE MAST ARM, ONE LUMINAIRE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ELECTRICAL NOTES AND LEGENDS FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 E-001

585-21-115

X

POWER MANHOLET

JUNCTION BOXJ

RECEPTACLE, SPECIAL PURPOSE

A = 120V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 5-20R.

B = 208V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 6-20R.

C = 120V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 5-30R.

D = 208V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 6-30R.

E = 208V, 60A, 1 PHASE, 3-POLE, 4W, NEMA 14-60R.

F = 208V, 30A, 3 PHASE, 3-POLE 4W, NEMA 15-30R.

G = 208V, 50A, 3 PHASE, 3 POLE, 4W, NEMA 15-30R.

H = 208V, 60A, 3 PHASE, 3 POLE, 4W, NEMA 15-60R.

WP WEATHERPROOF RECEPTACLE

A

A

A

SHEET 2194/4/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

1 2 3

A

B

D

F

H

FUEL OIL

PUMP SKID

EMERGENCY FUEL

OIL SHUT OFF

STORAGE

RM/TUNNEL ACCESS

001-2

BASEMENT HALLWAY

002-2

3'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

ED101

ELECTRICAL DEMOLITION PLAN -

BASEMENT LEVEL 2

KRK LAJ

PARTIALLY SPRINKLERED

KEYPLAN

N

12 16

AREA OF WORK

SCALE: 3/16" = 1'-0"1 ELECTRICAL DEMOLITION PLAN - BASEMENT LEVEL

N

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 REMOVE EXISTING FUEL OIL PUMP SKID ELECTRICAL DISCONNECT. REMOVE ALL

ASSOCIATED CONDUIT AND WIRING BACK TO SOURCE. MARK SOURCE BREAKER AS

SPARE. SEE MECHANICAL DEMOLITION PLANS FOR ADDITIONAL INFORMATION ON THE

FUEL PUMP SKID REMOVAL

Revisions: Date:

SHEET 2202/22/2024

COX

COX

COXX G

AS

COX

CO X

PANEL 2UPS

PANEL BOILER

EXHAUST

PANEL C

PANEL A

1 2 3

A

B

D

F

H

M

BOILER #1

BOILER #2

BOILER #3

BOILER #3 120V

DISC.BOILER #3 480V

DISC.

BOILER #2 120V

DISC.

BOILER #2 480V

DISC.

BOILER #1 480V

DISC.

BOILER #1 120V

DISC.

PANEL BPP

P-3P-2P-1

PARKING LOT

LIGHTS

MAU MEZZANINE

EXHAUST FAN

EF-50 EXHAUST FAN

SUPPLY FAN #4

SUPPLY FAN #3

SUPPLY FAN #2

SUPPLY FAN #1

PANEL P1

PANEL GS-BLDG

RO DISC. SWITCH

RO WATER SYSTEM

MOTOR STARTER

480 VOLT POWER

POINT DISC.

BOILER 1 FAN TEST

PANEL

BLR 1 ID FAN VFD

BOILER 2 FAN TEST

PANEL

BLR 2 ID FAN VFD

BOILER 3 FAN TEST

PANEL BLR 3 ID FAN VFD

BOILER #3

CONTROL PANEL

BOILER #2

CONTROL PANEL

BOILER #1

CONTROL PANEL

PARALLEL

SWITCHING GEAR

101B-2

BOILER ROOM

101-2

3'

BLDG. #2

BOILERHOUSE

NORM

BLR HOUSE

SUB (B2)

OFFICE/BOILER CTRL

RM

102-2

UNISEX RESTROOM

104-2

SHOWER & LAB

104A-2

PASSAGEWAY

103-2

SWITCHGEAR

103A-2

RO

RECEPTACLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

ED121

ELECTRICAL DEMOLITION PLAN -

GROUND FLOOR LEVEL 2

KRK LAJ

PARTIALLY SPRINKLERED

KEYPLAN

N

12 16

AREA OF WORK

SCALE: 3/16" = 1'-0"1 ELECTRICAL DEMOLTION PLAN - GROUND FLOOR LEVEL

N

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 REMOVE DISCONNECT DEVICE. REMOVE ALL ASSOCIATED CONDUIT AND WIRING BACK

TO SOURCE PANEL. LABEL SOURCE BREAKER(S) AS SPARE. SEE MECHANICAL

DEMOLITION PLANS FOR ADDITIONAL INFORMATION ON MECHANICAL EQUIPMENT

REMOVAL.

2 REMOVE E-STOP SWITCH. REMOVE ALL ASSOCIATED CONDUIT AND WIRING BACK TO

SOURCE. SEE MECHANICAL DEMOLITION PLANS FOR ADDITIONAL INFORMATION ON

MECHANICAL EQUIPMENT REMOVAL.

3 REMOVE BREAKER PANEL. REMOVE ALL ASSOCIATED CONDUIT AND WIRING BACK TO

SOURCE. MARK SOURCE BREAKER AS SPARE. SEE MECHANICAL DEMOLITION PLANS

FOR ADDITIONAL INFORMATION ON MECHANICAL EQUIPMENT REMOVAL.

4 REMOVE VFD DEVICES SERVING FEEDWATER PUMPS AND EXHAUST FANS . REMOVE

ALL ASSOCIATED CONTROL AND POWER WIRING, AND CONDUIT BACK TO SOURCE.

LABEL POWER SOURCE BREAKERS AS SPARE. SEE MECHANICAL DEMOLITION PLANS

FOR ADDITIONAL INFORMATION.

5 REMOVE BOILER POWER DISCONNECTS, BOILER FAN VFDS, BOILER FAN TEST PANELS,

AND BOILER CONTROL PANELS. REMOVE ALL ASSOCIATED CONDUIT AND WIRING BACK

TO SOURCE PANEL. LABEL SOURCE BREAKER(S) AS SPARE. COORDINATE WITH THE

REMOVAL OF THE BOILERS. SEE MECHANICAL DEMOLITION PLANS FOR ADDITIONAL

INFORMATION

6 REMOVE RO SYSTEM DISCONNECT SWITCH, MOTOR STARTER, AND SINGLE

RECEPTACLE. COORIDATE WITH REMOVAL OF RO SYSTEM. SEE MECANICAL

DEMOLITION PLANS FOR ADDITIONAL INFORMATION

FEEDWATER

PUMP VFDS

Revisions: Date:

REV 1 - FINAL BID SET 2024-04-04

SHEET 2214/4/2024

1 2 3

A

B

D

F

H

M

AIR COMPRESSOR

DISC

TANK ALARM PANEL

AND BATTERY

BACKUP SYSTEM

STEAM MAKEUP

DISCONNECT

SWITCH

MEZZANINE

202-2

UNIT HEATER

UNIT HEATER

UNIT HEATER

UNIT HEATER

EXISTING

BOILER

EXISTING

BOILER

EXISTING

BOILER

EXISTING STEAM

MAKEUP AIR UNIT

DEARATOR

TANK COMPRESSED

AIR

TANK

AIR

COMPRESSOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

ED141

ELECTRICAL DEMOLITION PLAN -

MEZZANINE LEVEL 2

KRK LAJ

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 ELECTRICAL DEMOLITION PLAN - MEZZANINE LEVEL

N

4. ALL LIGHT FIXTURES SHOWN ARE EXISTING TO REMAIN.

3..

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 REMOVE DISCONNECT SWITCH AND ALL ASSOCIATED CONDUIT AND WIRING BACK TO

SOURCE. MARK SOURCE BREAKER AS SPARE. SEE MECHANICAL DEMOLTION PLANS

FOR ADDITIONAL INFORMATION ON REMOVAL OF AIR COMPRESSOR/STORAGE TANK

AND STEAM MAKE UP AIR SYSTEMS.

2 REMOVE ALL ASSOCIATED CABLE AND CONDUIT BACK TO SOURCE PANEL AND

COORDINATE WITH THE REMOVAL OF UNIT HEATERS. SEE MECHANICAL DEMOLITION

PLANS FOR ADDITIONAL INFORMATION.

3 REMOVE TANK ALARM PANEL AND ASSOCIATED BATTERY BACKUP SYSTEM.

COORDINATE WITH REMOVAL OF DEEAERATOR TANK. SEE MECHANICAL DEMOLITION

PLANS FOR ADDITIONAL INFORMATION.

KEYPLAN

N

12 16

AREA OF WORK

Revisions: Date:

SHEET 2222/22/2024

A

B

D

F

H

EXTERIOR BUILDING LIGHT

(EXISTING TO BE REMOVED)

UNIT HEATER

EXTERIOR BUILDING LIGHT

(EXISTING TO REMAIN)

BOILER EXHAUST STACKS

SEE MECHANICAL DRAWINGS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

ED161

ELECTRICAL DEMOLITION PLAN -

ROOF LEVEL 2

KRK LAJ

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 ELECTRICAL DEMOLITION PLAN - ROOF

N

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYPLAN

N

12 16

AREA OF WORK

Revisions: Date:

KEYED NOTES

1 REMOVE ALL ASSOCIATED CABLE AND CONDUIT BACK TO SOURCE PANEL AND

COORDINATE WITH THE REMOVAL OF UNIT HEATER. SEE MECHANICAL DEMOLITION

PLANS FOR ADDITIONAL INFORMATION ASSOCIATED CONDUIT AND WIRING BACK TO

SOURCE. MARK SOURCE BREAKER AS SPARE. COORDINATE REMOVAL WITH

MECHANICAL CONTRACTOR

2 REMOVE LIGHTING PROTECTION SYSTEM COMPONENTS ASSOCIATED WITH BOILER

STACKS. THIS ONLY INCLUDES AIR TERMINALS, MOUNTING BRACKETS, BONDING

CONDUCTORS, AND CABLE CONNECTORS. LIGHTNING PROTECTION SYSTEM

CONDUCTORS ATTACHED TO ROOF AND MOUNTED TO PARAPET SHALL REMAIN

SHEET 2232/22/2024

File details come from the government source that posted it. Updated .