About this file

This is Amendment 0007 to solicitation 36C25225R0004 for the Boiler Plant Replacement project at Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The amendment primarily addresses vendor questions and incorporates technical clarifications regarding gates, windows, and other specifications.

Key details include: proposals are due February 5, 2025 at 11:59 PM CST; all exterior windows must be blast resistant meeting GP2=13.5 psi / 51 psi/msec requirements; the vehicle barrier gate shall be 24' wide with ram-resistant drop arm (no anti-personnel gate required); electric or hydraulic operators are acceptable for the gate if meeting power specifications; precast concrete tunnel sections fall under section 34100; split system units must have hardwired terminal strip points and factory-provided BACnet interface cards; and seismic restraints are not required for non-structural components. The amendment also revises specifications for spare parts and changes bolt requirements from A307 to A193 in sections 23 21 13 and 23 22 13.

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_Updated Dwgs_partial_24JAN25.pdf PDF
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.1_P03 Single Source Justification MEDECO.e.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.6c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

01-31-2025

585-25-1-6951-0003

585-21-115

Department of Veterans Affairs

GLAC (69D)

115 South 84th Street, Suite 101

Milwaukee WI 53214-1476

Department of Veterans Affairs

GLAC-MILWAUKEE (69D)

Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25225R0004 12-16-2024

X

Project 585-21-115 Boiler Plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI

Amendment 0007 hereby incorporates the details provided on the following pages(s) into solicitation requirements.

Proposals are due NLT Wednesday, February 5, 2025 at 11:59 p.m. CST (local Milwaukee, WI time).

Acknowledge amendment in your offer in Block 19 of the SF-1442.

Kristi Kluck Contracting Officer

SOLICITATION 36C252250004

AMENDMENT 0007

January 31, 2025

Project: 585-21-115 Replace Boiler Plant

Location:Oscar G. Johnson VA Medical Center
325 E. H Street
Iron Mountain, MI 49801

AMENDMENT 0007 hereby incorporates the following clarifications/change(s) into the solicitation package:

A. Vendor Questions

Question 8c, received 1/3/2025:

8.3.RE: SPEC 34 75 13.13….. 2.1/A/4 Operation: Hdraulic & DWG 1/CS501:
The operator shown in the drawings is an Autogate Shield operator. Autogate does not manufacture hydraulic operators, but only electromechanical units.

Will an electromechanical Autogate brand operator be acceptable?

Also, the drawings show an optional gate panel attached to the crash arm – is this gate panel required, or will a drop beam alone be acceptable?

The Autogate Shield Barrier is allows for a 17’ max opening with a gate panel and 19’ without a gate panel with beam only.

In addition, the DOD vehicle barrier list remarks show this product is approved at a 15’ length. If we were to use two of these gates to cover a wider opening, there would be stanchions required in the middle of the driveway.

Will this be acceptable or are looking for a 34’ clear opening?

VA REPLY: Electric or hydraulic is acceptable, PROVIDED it does not exceed available power per the original design.

Autogate brand operator is acceptable IF it complies with specified salient characteristics.

Gate shall be 24’. Gate shown is not basis of design and is only an example picture. The "Optional gate" shown on the drawings is not required. Only the ram-resistant drop arm is required. Requirements are found in the DOD ANTI-RAM VEHICLE BARRIER LIST, September 2024 "Item: M30 P1 Model 773 Series Drop Arm Barrier."

Reference:
https://www.nwo.usace.army.mil/Portals/23/docs/PDC/DOD_Anti-ram_Vehicle_Barriers_September_2024.pdf?ver=NpRi50sbAa4l4AeT0k6chw%3d%3d BRAND-NAME, or equal.

Question 12, received 1/8/2025:

12. “Can you clarify if the Precast concrete for the fuel line tunnel falls under Section 34100, and if the following sections will pertain to the installation of these sections? Thank yoo.”

B. Installer Qualifications: A precast concrete erector qualified and designated by PCI's Certificate of Compliance, to erect Structural Systems.

C. Installer Qualifications: An experienced precast concrete erector who has retained a "PCI-Certified Field Auditor" to conduct a field audit of a project installed by erector in Structural Systems and who can produce an Erectors' Post Audit Declaration, according to PCI MNL 127, "PCI Erector's Manual - Standards and Guidelines for the Erection of Precast Concrete Products."

VA REPLY: A. Yes, The precast concrete sections for the tunnel construction fall under section 34100. The erector is bound by the requirements outlined in the specification section.

Questions 17, received 1/13/2025

17.73 “Siesmic Requirements: The RFP and drawings note that seismic requirements are not anticipated for this site location as noted in 00 31 32. Can you confirm this project does not specific seismic requirements as there is no spec section 13 00 00 ? And that only requirments needed will be addressed on the drawings and noted in specs specific?”

VA REPLY: Seismic restraints are not required on the non-structural components as would be outlined in specification section 13 05 41. All requirements are outlined in the released construction documents.

Question 20.8, received 1/13/2025
20.8“Please confirm blast requirements for exterior windows.”

VA REPLY: All Exterior windows are to be blast resistant. Refer to Specification Section 08 56 53 Blast Resistant Windows as well as 08 80 00 - Glazing, Paragraph 3.12 for glazing requirements specific to exterior windows.

Contractor proposals shall be based on GP2=13.5 psi / 51 psi/msec.

Question(s) 21, received, 1/14/2025 (REVISED):
21.2“On plan page MI601 Mechanical HVAC Controls Diagrams details 5 and 6 show the split systems to have the capability to communicate through BACnet. The specification section 23 81 00 for Decentralized Unitary HVAC Equipment, 2.3 Split-System Air Conditioners does not detail any means to interface with the building management system. Is it the intent these split units be supplied with means of hardwired terminal strip points as detailed on MI601 and factory provided BACnet interface cards?”
VA REPLY: Confirmed; it is the intent that these split units be supplied with means of hardwired terminal strip points as detailed on MI601 and factory provided BACnet interface cards.

Question(s) 33, received 1/16/2025:

33.1 - “26.Ref drawing AE603- There is a discrepancy between the drawing AE603 and the glazing specification 08 80 00. The window schedule on drawing calls for glass type IG #1 for window types W3 and W4. The specification 08 80 00 does not include a description for IG#1. Will a description for IG#1 be provided?”
VA REPLY: Refer to drawing AE603, Window Schedule. Windows W-3 & W-4 is called out as IG#1. This should be revised to IL#1 to correspond with Specification section 08 80 00, Page 08 80 00-18, paragraph 3.12A.
33.2 - “27 - Ref spec 08 56 53- Does the blast resistant window spec section apply to this project as there is no information on the drawings indicating blast resistant windows are required?”
VA REPLY: All new exterior windows are to be blast resistant.
Per 08 56 53 paragraph 1.5.F, the contractor has to hire someone who can provide the calculations that meet the criteria listed in 2.1.A. These calculations will show that the selected window meets the performance requirements. We were informed that the blast resistance values are not something that are shared publicly for security concerns. That is why we also included the statement in 08 80 00, paragraph 3.12.A.8:
Contractor proposals shall be based on GP2=13.5 psi / 51 psi/msec.

Question 35, received 1/17/2025:

35.1 - “28.1 Ref drawing SB171- Are vertical joints between the precast tunnel sections to be sealed to keep out water? If so how will joints be sealed and what will keep the 8’ tunnel sections from moving in freeze/thaw conditions to keep the joints sealed?”
VA REPLY: The vertical joints are sealed with 1/2" joint sealant as shown on SB302. The joint sealant is specified in 079200. The precast sections will be installed on crushed stone to frost depth as shown in the detail below:
“28.2 What will keep the tunnel sections top surfaces uniform and level to each 8’ segment over time?
VA REPLY: See detail from question above.
“28.3 Are the removable tunnel caps to be installed flush with surrounding asphalt?
VA REPLY: The lids are to be installed flush with the pavement.
“28.4 Will piping in trench be supported in a way that allows movement if tunnel sections shift during freeze thaw cycle?”
VA REPLY: The anticipated movement is small and will be taken up by the flexibility of the pipe. The pipe in the trench will be installed on roller supports, not fixed anchors.

Question(s) 38 received 1/20/2025:

38.1 - “31. Ref Drawing CS171- Based on scaling this drawing the drop arm security gate appears to be about 34’ wide. To meet the specification section 34 75 13.13 for this gate, the maximum width allowed is 20’. Is a 20’ wide gate acceptable?
VA REPLY: Gate shall be 24’. Gate shown is not basis of design and is only an example picture. The "Optional gate" shown on the drawings is not required. Only the ram-resistant drop arm is required. Requirements are found in the DOD ANTI-RAM VEHICLE BARRIER LIST, September 2024 "Item: M30 P1 Model 773 Series Drop Arm Barrier."
Reference:
https://www.nwo.usace.army.mil/Portals/23/docs/PDC/DOD_Anti-ram_Vehicle_Barriers_September_2024.pdf?ver=NpRi50sbAa4l4AeT0k6chw%3d%3d BRAND-NAME, or equal.
38.2“ 32. Ref drawing CS501, detail 1- This detail shows an optional gate for Anti-personnel. Is this required for this project in addition to the drop arm gate? If so will further details be provided on operation and installation requirements?
VA REPLY: No anti-personal gate is required for this project..

Question 39 received 1/21/2025:

39.0 - “76 - Vehicle Drop Arm Vehicle Barrier – 34 75 13.13: The drop arm barrier gate per spec section specifies a M30/K4 rating for 30MPH at the drop arm vehicle barrier. The maximum width per this rating is 20' width. Drawing CS171 notes width of the gate on drawing approximately 33' to 34' wide back of curb to back-of-curb. This width is too wide making the required gate opening non-compliant to M30/K4 and the solicitation RFP documents. Shall we bid as shown noting that we can only fit 20' wide drop arm gate in the 33'-34' width? Shall two (2) drop arm systems be utilized? Please note that this drop arm barrier gate also requires pavement detector loops in the asphalt paving along with electrical circuits and controls. How shall we price/propose?”
VA REPLY: Gate shall be 24’. Gate shown is not basis of design and is only an example picture.
The "Optional gate" shown on the drawings is not required. Only the ram-resistant drop arm is required. Requirements are found in the DOD ANTI-RAM VEHICLE BARRIER LIST, September 2024 "Item: M30 P1 Model 773 Series Drop Arm Barrier"
Reference:
https://www.nwo.usace.army.mil/Portals/23/docs/PDC/DOD_Anti-ram_Vehicle_Barriers_September_2024.pdf?ver=NpRi50sbAa4l4AeT0k6chw%3d%3d BRAND-NAME, or equal.
Pavement detector loops are not necessary.

Question 44 received 1/21/2025:

44.1In regard to the answer provided for question 20.8 of amendment 4- what blast level is required for the glass in the exterior windows? No blast level is given in section 08 80 00.
VA REPLY: All new exterior windows are to be blast resistant.
Per 08 56 53 paragraph 1.5.F, the contractor has to hire someone who can provide the calculations that meet the criteria listed in 2.1.A. These calculations will show that the selected window meets the performance requirements. We were informed that the blast resistance values are not something that are shared publicly for security concerns. That is why we also included the statement in 08 80 00, paragraph 3.12.A.8:
Contractor proposals shall be based on GP2=13.5 psi / 51 psi/msec.

Question(s) 45 received 1/27/2025:

45.1“33. Drawing EI121:Med Gas Monitor Annunciator, who is supplying/installing? Any cable/conduit required by electrical contractor? No information shown on plumbing drawings. Can further info be provided?”
VA REPLY: Contractor will provide and install Med Gas Monitoring Panel compatible with existing system.
45.2“34. Drawing CG102: Site & Utility pre-work Notes 2 & 7: Can the temporary power be taken from the existing boiler house or do you want a new service provided by the utility? If new service by the utility, would VA cover the utility fees?"
VA REPLY: Temporary power feeds are covered on ES 171. No new utility feed is required. All new Boiler Plant power is routed through the existing plant.
45.3“35. Drawing ES171: Can you provide specific dimensions for the 24” dia. Manhole? Is it a manhole or just a pull box?
VA REPLY: See ES501 for typical electrical manhole.
45.4"36. SCADA: Went through the spec and didn’t find anything that would pertain on what the customer would want for the Scada system. Just mentions Scada. This could be a basic job – Putting in a PanelView and showing some data in a different room OR a full fledge complex job tying into their infrastructure with multiple computers with proprietary software and reporting requirements.
We will need additional information on the requirement of the SCADA. Can further information be provided?"
VA REPLY: The level of SCADA is based on the Boiler manufacturer’s requirements as well as connections to the Facility’s Building Automation DESIGO system. General contractor must coordinate subcontractors, accordingly, based on what type of boiler is being provided.
46.1“37. Ref spec 01 45 35, Qualifications : In reviewing the specifications for the concrete and soils testing packages it lists NICET certified personnel for special inspections for concrete and soils, we have no such certifications and know of no persons with these certifications, can you make inquires to the VA to see if these certifications are necessary or if there is another avenue of qualification that the VA will accept. Is NICET certifications required for soils and concrete testing?”
VA REPLY : Spec Section 01 46 35 provides a number of approved certifications for the special inspectors, including, but not limited to NICET.
Testing laboratories certified to do Michigan Department of Transportation testing will also be acceptable.

B. Incorporate revised specifications into solicitation (see attachments):

a. 23 05 10: added spare parts information

b. 23 21 13 and 23 22 13: change bolts from A307 to A193

· ADD: Under the Applicable Publications section, change bolts from A307 to A193-2017 -- “Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service”

· DELETE A307-2021 – ““Standard Specification for Carbon Steel Bolts, Studs and Threaded Rod 60,000 PSI Tensile-Strength.”

C. Incorporate revised drawings into the solicitation; revisions are clouded areas, dated 01/24/2025.

D. NO FURTHER QUESTIONS WILL BE ANSWERED.

E. The time and due date for offers has not changed since Amendment 00006; offers are due NLT Wednesday, February 5, 2025 at 11:59 p.m. CST (local Milwaukee, WI time).

ATTACHMENTS -

-- END OF DOCUMENT --

image2.png image1.png