These are electrical engineering drawings for a VA boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings include detailed electrical plans for lighting, grounding, power distribution, and lightning protection systems across basement, ground floor, and mezzanine levels.

The drawings show specifications for explosion-rated lighting fixtures in the propane room, lighting fixture schedules detailing manufacturers and models, electrical grounding details including ground rods and bonding requirements, power distribution plans showing VFD locations for pumps, conduit routing plans, and lightning protection system layouts. Key technical requirements include Class I Division 2 rated fixtures in hazardous areas, 0-10V dimming capabilities for LED fixtures, 2/0 AWG bare copper grounding conductors, and specific mounting details for air terminals and down conductors in the lightning protection system. The drawings are labeled as "Final Bid Set" and include general notes regarding phasing and coordination requirements for contractors.

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_Updated Dwgs_partial_24JAN25.pdf PDF
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
36C25225R0004 0007.docx DOCX document
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.1_P03 Single Source Justification MEDECO.e.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

33D

D

D

D

D

D

D D D

3 3

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

CHEM FEED

128-2

SUPERVISOR

129-2

CONTROL ROOM

130-2

PROPANE

131-2

BOILER ROOM

119-2

BREAK ROOM

124-2

JANITOR

121-2

TOILET

122-2

TOILET

123-2

SHOWER AREA

126-2

LOCKER ROOM

125-2

CHANGING AREA

127-2

1 2 3

A

B

D

F

H

M

D01

D01

D01

PARALLEL

SWITCHING GEAR

101B-2

SEE EL151 FOR CEILING MOUNTED LIGHT FIXTURES IN THIS AREA

BOILER ROOM

101-2

GENERATOR ROOM

120B-2

ELECTRICAL ROOM

120A-2

3'

G01

G01

DP1

I01

DP1

DP1

DP1

DP1

DP1

DP1

DP1

8 8

DP1

K02

DP1

DP1

K02

K02

I01

K01

H01

G01

02-DP3

2-119-BLR-001

2-119-BLR-002

2-119-BLR-003

2-119-CP-002

2-119-CP-001

2-119-CP-003

L01

H01

02-DP3

9 1/4"

A

B

C

A C

B

M01

02-DP3

02-DP3

02-DP3

M01

02-DP3

M01

M01

02-DP3

M01

H01

02-DP3

02-DP3

H01

M01

EL401

EL401

C01

C02 C02

C01 B01

B01 B01

B01 B01

B01

B01

B01

B01 B01

C01

C02 B01

B02

B01

F02

C01

M01

02-DP3

M01

02-DP3

K02

K02

K02

K01

H01

K01 K01

K02 K01 K02

DP1

I01

B01

B01

B01

H01

02-DP3

G01

02-DP3

02-DP1

02-DP2

D01

M01

M01

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EL131

ELECTRICAL LIGHTING PLAN -

GROUND FLOOR LEVEL 2

KRK LAJ

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 ELECTRICAL LIGHTING PLAN - GROUND FLOOR LEVEL

KEYPLAN

N AREA OF WORK

12 16

N

4. SEE EL601 FOR LIGHTING FIXTURE SCHEDULE.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

SWITCHES A, B AND C COORDINATE TO CIRCUIT NUMERS 3, 5 AND 7, RESPECTIVELY, IN

PANEL DP-5. THESE SWITCHES CONTROL THE HIGH BAY LIGHTS, FIXTURE A01, SHOWN

ON EL151.

2 SWITCH SHALL BE EXPLOSION RATED TO MATCH LIGHT FIXTURE. ALL CONDUIT

PENETRATIONS INTO PROPANE ROOM SHALL BE SEALED

Revisions: Date:

REV 1 - FINAL BID SET 2024-04-04

SHEET 2354/4/2024

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

A01 A01

A01 A01

A01 A01

B02

A

B

D

F

H

M

02-DP4

5 7

02-DP4

02-DP4

02-DP4

7 5 5 7 3

7502-DP4

02-DP4

7 5 5 7 3

702-DP4

5 7 3 5

3'

DP1

DP1

DP1

DP1

DP1

DP1

OPEN TO BELOW

I01

I01

I01

02-DP4

K01

K01

02-DP4

02-DP3

02-DP3

02-DP3

02-DP3

02-DP3

02-DP3

02-DP3

26 02-DP3

02-DP3

02-DP3

02-DP3

DP1

B01

B02B01

A01 A01 A01 A01 A01 A01

A01A01

A01A01A01A01

A01 A01 A01 A01 A01 A01

A01A01A01A01

A01

A01 A01 A01

A01 A01

A01

A01

K01

K01

I01

I01

I01

02-DP4

I01

M01

M01

M01 M01

M01

M01

M01

M01

M01

M01

M01

CONTROL/IT

201-2

02-DP2

02-DP2

02-DP2

02-DP2

02-DP2

K01

K01

K01

K01

K01

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EL151

ELECTRICAL LIGHTING PLAN -

MEZZAININE LEVEL 2

KRK LAJ

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

SCALE: 3/16" = 1'-0"1 ELECTRICAL LIGHTING PLAN - MEZZANINE LEVEL

N

4. SEE EL601 FOR LIGHTING FIXTURE SCHEDULE.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 SURFACE MOUNT LIGHTS ON THE UNDERSIDE OF CATWALK

2 FIXTURES SUSPENDED ABOVE PLATFORM

Revisions: Date:

SHEET 2364/4/2024

D

D

D

3 3

D

D

D

D D D

/1 EL131

02-DP3

02-DP3

02-DP3

02-DP3

02-DP3

02-DP3

02-DP3

02-DP3

02-DP3

02-DP3

C01

C02 C02

C01 B01

B01B01

B01 B01

B01

M01 M0102-DP3

02-DP3

02-DP3

H01

/1 EL131

02-DP2

02-DP2

02-DP2

02-DP2

02-DP2

02-DP2

02-DP2

02-DP2

02-DP2

02-DP2

02-DP2

02-DP2

B01

B01

B01

B01

B02

C01

F02 F02

C01

B01B01 C02

02-DP2

F01

G01 G01

G01

G01

02-DP2

02-DP2

02-DP2

D01

D01

D01

M01 H01

02-DP3

02-DP3

02-PP4

02-PP4

02-PP4

02-PP4

B01

B01

02-DP2

02-DP2

B01

02-DP2

02-DP2

02-DP2

K02

K02

D01

02-DP2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EL401

ELECTRICAL LIGHTING ENLARGED

PLAN - GROUND FLOOR LEVEL 2

KRK IJS

PARTIALLY SPRINKLERED

2. SEE EL601 FOR LIGHTING FIXTURE SCHEDULE.

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 ELECTRICAL ENLARGED LIGHTING PLAN - NORTHWEST

SCALE: 3/8" = 1'-0"2 ELECTRICAL ENLARGED LIGHTING PLAN - SOUTHWEST

Revisions: Date:

SHEET 2374/4/2024

JFF CJR

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-04

GENERAL NOTES

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ELECTRICAL LIGHTING FIXTURE

SCHEUDULE

FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

EL601

585-21-115

LIGHTING FIXTURE SCHEDULE

MARK DESCRIPTION

LAMPS

LENS FINISH MOUNTING BASIS OF DESIGN NOTES

TYPE VOLTS WATTS

A01 LED HIGH BAY FIXTURE, 9000LM, MIN 80 CRI LED

UNIVERSAL

(120-277V) 63 CONICAL FROSTED

ACRYLIC NATURAL ALUMINUM FINISH SUSPENDED/ PENDENT

LITHONIA LIGHTING - JCBL 9000LM ACCR

ACRCON MVOLT GZ10 35K 80CRI PM FWG

DNAXD

DIMMING: 0-10V

B01 2FT x 2FT RECESSED LED FIXTURE, 2000LM, MIN 80 CRI LED

UNIVERSAL

(120-277V) 15.9 PRISMATIC ACRYLIC

DEFFUSER WHITE RECESSED LITHONIA LIGHTING - 2VTL2 20L ADPT PDC MVOLT

EZ1 LP835 N80 NES7

B02 2FT x 2FT RECESSED LED FIXTURE, 2000LM, MIN 80 CRI EMERGENCY LED

UNIVERSAL

(120-277V) 15.9 PRISMATIC ACRYLIC

DEFFUSER WHITE RECESSED LITHONIA LIGHTING - 2VTL2 33L ADPT PDC MVOLT

EZ1 LP835 N80 NES7 EMERGENCY BATTERY

C01 2FT x 2FT RECESSED LED FIXTURE, 3300LM, MIN 80 CRI LED

UNIVERSAL

(120-277V) 15.9 PRISMATIC ACRYLIC

DEFFUSER WHITE RECESSED LITHONIA LIGHTING - 2VTL2 20L ADPT PDC MVOLT

EZ1 LP835 N80 NES7

C02 2FT x 2FT RECESSED LED FIXTURE, 3300LM, MIN 80 CRI EMERGENCY LED

UNIVERSAL

(120-277V) 15.9 PRISMATIC ACRYLIC

DEFFUSER WHITE RECESSED LITHONIA LIGHTING - 2VTL2 33L ADPT PDC MVOLT

EZ1 LP835 N80 NES7 EMERGENCY BATTERY

D01 4 INCH ROUND DOWNLIGHT LED

UNIVERSAL

(120-277V) 5.7 FROSTED ACRYLIC WHITE RECESSED LITHONIA LIGHTING - LDN4 35/05 L04 WR LD TRW

MVOLT NPP16D

E01 2FT LINEAR LED FIXTURE, 1500LM, MIN 80 CRI LED

UNIVERSAL

(120-277V) 17 SYMMETRIC/DROP LENS WHITE SURFACE / SUSPENDED LITHONIA LIGHTING - ZL1D L24 2500LM FST MVOLT

35K 80CRI NLTAIR2 RLSXR10 OUTEND HC WH DIMMING: 0-10V

E02 2FT LINEAR LED FIXTURE, 1500LM, MIN 80 CRI EMERGENCY LED

UNIVERSAL

(120-277V) 17 SYMMETRIC/DROP LENS WHITE SURFACE / SUSPENDED LITHONIA LIGHTING - ZL1D L24 2500LM FST MVOLT

35K 80CRI NLTAIR2 RLSXR10 OUTEND HC WH

DIMMING: 0-10V

EMERGENCY BATTERY

F01 2FT x 2FT RECESSED LED FIXTURE, 3000LM, MIN 80 CRI LED

UNIVERSAL

(120-277V) 26.6 FROSTED ACRYLIC WHITE, COLD ROLLED STEEL RECESSED LITHONIA LIGHTING - 2WRTL G L24 3000LM IAW

AFL MVOLT EZ1 30K 80CRI DIMMING: 0-10V

G01 12" UNDER-CABINET LIGHT LED

UNIVERSAL

(120-277V) 6.5 ACRYLLIC WHITE

DIFFUSE WHITE SURFACE JUNO CONTRACTOR SELECT UCES 12IN SWW6

90CRI WH M6

H01 EXIT SIGN LED

UNIVERSAL

(120-277V) 2.5 RED LETTERS WHITE SURFACE LITHONIA LIGHTING - TCE RG EL

I01 LED WALL PACK LED

UNIVERSAL

(120-277V) 58.4 CLEAR ACYLIC OR

GLASS BRONZE POLYESTER POWDER SURFACE LITHONIA LIGHTING - TWH LED 10C 40K T3M

MVOLT VG FS PE DBNB TP

J01 SITE AREA LIGHTING LED

UNIVERSAL

(120-277V) 135 CLEAR ACYLIC BLACK 25', 4" square Steel POLE, MOUNT AT TOP OF POLE

LITHONIA LIGHTING - DSX2 LED P1 40K 80CRI BLC3

MVOLT SPA DBLXD PROVIDE WITH DAYLIGHT SENSOR

K01 4 FT LINEAR STRIP LIGHT LED

UNIVERSAL

(120-277V) 18.5 ROUND DIFFUSE WHITE SUSPENDED/ PENDENT LITHONIA LIGHTING CLX L48 3000LM SEF RDL

MVOLT 30K 80CRI

K02 4 FT LINEAR STRIP LIGHT

EMERGENCY LED

UNIVERSAL

(120-277V) 18.5 ROUND DIFFUSE WHITE SUSPENDED/ PENDENT LITHONIA LIGHTING CLX L48 3000LM SEF RDL

MVOLT 30K 80CRI E10WLCP EMERGENCY BATTERY

L01 2FT LINEAR LED FIXTURE LED

UNIVERSAL

(120-277V) 33.2 FLAT POLY CLEAR WHITE SUSPENDED

HOLOPHANE PETROLUX EMXH LED

EMXH L24 5000LM FPCL MD MVOLT 35K 80CRI

DWHXD CR

CLASS I, DIVISION 2, GROUP A, B, C, & D

EMERGENCY BATTERY

CABLE SUSPENDED USING RMBK BRACKET

M01 EMERGECNY LIGHTING UNIT LED

UNIVERSAL

(120-347V) 5 CLEAR WHITE, 20-GUAGE STEEL BACK MOUNT LITHONIA LIGHTING TCU 750L

SHEET 2384/4/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

GND GNDGND GND GND GND GND GND

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GND GND

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GND GNDGND GND GND GND GND

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

DW

S

DW

S

GND GND

FPW

FPW

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

BOILER ROOM

119-2

BREAK ROOM

124-2

JANITOR

121-2

TOILET

122-2

TOILET

123-2

SHOWER AREA

126-2

LOCKER ROOM

125-2CHANGING AREA

127-2

CONTROL ROOM

130-2

SUPERVISOR

129-2

CHEM FEED

128-2

PROPANE

131-2

GENERATOR ROOM

120B-2

1 2 3

A

B

D

F

H

M

DO

W

N

UP

UP

2-120B-480E-SWBD-001

2-120A-480N-SWBD-001

2-120A-480-ATS-001

2-120A-480-ATS-0022-120A-208-TX-001

PARALLEL

SWITCHING GEAR

101B-2

ELECTRICAL ROOM

120A-2

EMERGENCY

GENERATOR

BOILER ROOM

101-2

02-PP1

02-DP1

02-PP2

02-DP2

2 4

3'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EG121

ELECTRICAL GROUNDING PLAN

KRK LAJ

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

SCALE: 3/16" = 1'-0"1 UNDERGROUND ELECTRICAL GROUNDING PLAN

N

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 BOND GROUND RING TO BUILDING STEEL WITH 2/0 AWG BARE COPPER GROUND

CONDUCTOR WHIP, TYP. SEE EG501 FOR DETAIL.

2 PROVIDE GROUND ROD TRIAD AT BUILDING CORNER. SEE EG501 FOR GROUND TRIAD

DETAIL.

3 BOND WITH 2/0 AWG BARE COPPER TO 4" DOMESTIC WATER SUPPLY AND 6" FIRE

WATER SUPPLY USING PIPE CLAMPS.

4 PROVIDE CABLE TO CABLE T CONNECTION, SEE EG501 FOR T CONNECTION DETAIL.

5 CONNECT LIGHTNING PROTECTION SYSTEM DOWN CONDUCTOR TO GROUNDING

ELECTRODE CONDUCTOR. SEE EG161 FOR ADDITIONAL INFORMATION

6 PROVIDE CONNECTION OF GENERATOR TO GROUNDING ELECTRODE CONDUCTOR

7 PROVIDE CONNECTION OF BOILER TO GOUNDING ELECTRODE CONDUCTOR

Revisions: Date:

SHEET 2392/22/2024

GND GNDGND GND GND GND

GND

GND GND

GND GNDGND GND GND

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

GND GND GND GND GND

GN

D

GN

D

GN

D

GN

D

GN

D

GN

D

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

1 1

AT

AT AT

AT ATAT AT AT

AT

AT

AT

AT

AT

ATAT ATATAT

AT

AT

AT

AT

1 2 3

A

B

D

F

H

3'

AT

TYP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EG161

ELECTRICAL LIGHTNING

PROTECTION PLAN 2

KRK LAJ

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

SCALE: 3/16" = 1'-0"1 ELECTRICAL LIGHTNING PROTECTION PLAN - ROOF

N

4. AIR TERMINALS SHALL BE MOUNTED WITH 24 IN. FROM ROOF EDGES AND OUTSIDE

CORNERS

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 MOUNT AIR TERMINALS ON TOP OF EQUIPMENT. RUN GROUND CONDUCTOR DOWN TO

ROOF AND CONNECT TO LIGHTNING PROTECTION SYSTEM AS SHOWN

2 MOUNT AIR TERMINAL AT TOP OF BOILER STACK. USING BONDING PLATE AND GROUND

CONDUCTOR TO CONNECT BASE OF STACK INTO THE LIGHTNING PROTECTION SYSTEM.

3 USE BONDING STRAP AND GROUND CONDUCTOR TO CONNECT STEAM PIPES TO THE

LIGHTNING PROTECTION SYSTEM.

4 BOND LIGHTNING PROTECTION SYSTEM TO EXISTING LIGHTNING PROTECTION SYSTEM

5 BOND ROOF HATCH SYSTEM INTO LPS

6 PROVIDE LIGHTNING PROTECTION DOWN CONDUCTOR . TIE INTO GROUNDING

ELECTRODE SYSTEM. SEE EG121 FOR ADDITIONAL INFORMATION

Revisions: Date:

SHEET 2402/22/2024

6"

2'- 0"

M

IN

IM

UM

6"

ROUND CAST IRON COVER, WITH

"GROUND" EMBOSSED ON COVER

TOP OF GRADE

8" DIAMETER CAST IRON

HEAVY SOIL PIPE

W/BELLED END

COMPRESSION

TYPE CONNECTOR

CLEAN GRAVEL

BACKFILL TO BOTTOM

OF PIPE

UNLESS NOTED OTHERWISE,

3/4" DIAMETER COPPER CLAD

GROUND ROD (MIN LENGTH 10'-0")

UNLESS NOTED OTHERWISE,

1/C 2/0 AWG BARE STRANDED

COPPER GROUND CABLE TO

MAIN BURIED GROUND

CONDUCTOR

E216. BELOW GRADE- GROUND INSPECTION WELL DETAIL

CABLE TO CABLE TEE

CONNECTION (TYP)

BURIED MAIN GROUND

CONDUCTOR. UNLESS

NOTED OTHERWISE,

1/C 2/0 AWG BARE

STRANDED COPPER (TYP)

BURIED MAIN

GROUND

CONDUCTOR. UNLESS

NOTED OTHERWISE,

1/C 2/0 AWG BARE

STRANDED COPPER

1'-0"

(MINIMUM)

'-0

" M

IN

IM

UM

BURIED MAIN GROUND

CONDUCTOR UNLESS NOTED

OTHERWISE, 1/C 2/0 AWG BARE

STRANDED COPPER (TYP)

UNLESS NOTED

OTHERWISE

3/4" DIAMETER COPPER

CLAD GROUND ROD

(TYP) (MIN LENGTH

10'-0")

10'-0" (MAXIMUM)

(TYP)

CONCRETE FOOTER

UNLESS NOTED OTHERWISE,

1/C 2/0 AWG BARE STRANDED

COPPER, CONNECT TO MAIN

BURIED GROUND CONDUCTOR

USING PARALLEL TAP CABLE TO

CABLE CONNECTION WITH

EXOTHERMIC WELDS.

TOP OF FINISHED

FLOOR OR GRADE

SINGLE HOLE PIPE STRAP

UNLESS NOTED OTHERWISE,

1/C 2/0 AWG BARE STRANDED

COPPER CABLE, EXOTHERMIC

WELD TO COLUMN.

STEEL COLUMN

STEEL COLUMN BASE PLATE

GROUT

1" PVC SCHEDULE 80

CONDUIT STUB-UP SLEEVE

CONCRETE PIER

UNLESS NOTED OTHERWISE,

1/C 2/0 AWG BARE STRANDED

COPPER GROUND CABLE (TYPICAL)

(CONTINUOUS CABLE, NOT CUT)

CABLE TO CABLE TEE TYPE

EXOTHERMIC WELD CONNECTION

UNLESS NOTED OTHERWISE,

1/C 2/0 AWG BARE STRANDED

COPPER GROUND CABLE

POINT TO EXTEND A MINIMUM

OF 10” ABOVE TOP OF PARAPET

CABLE FASTENER

POINT BASE

POINT

ADHESIVE TYPE

CABLE HOLDER

ADHESIVE TYPE POINT BASE

POINT

LOOP TYPE MASONRY

CABLE ANCHOR

POINT BASE

POINT (>24” HIGH)

ADHESIVE TYPE

TRIPOD HOLDER

ADHESIVE

TYPE CABLE

HOLDER

ADHESIVE TYPE POINT BASE

SECONDARY BONDING WIRE

CAST TERMINAL BONDING LUG.

SECURE WITH STAINLESS STEEL

MACHINE SCREW AND NUT

MAIN SIZE CONDUCTOR

CAST PIPE BONDING CLAMP

MAIN SIZE CONDUCTOR

ADJUSTABLE PIPE

BONDING STRAP

CAST PARALLEL

COMBINATION CABLE

SPLICER

CAST “TEE”

TYPE

CABLE

SPLICER

CAST BRONZE TO

ALUMINUM BIMETALLIC

CABLE SPLICER

SECONDARY

BONDING WIRE

SECONDARY

BONDING WIRE

2’ - 0” MAX

TYPICAL PARAPET AIR TERMINAL

TYPICAL TOP MOUNT AIR TERMINAL

TYPICAL TRI-POD MID-ROOF AIR

TERMINAL

TYPICAL MID-ROOF AIR TERMINAL

TYPICAL AIR TERMINAL PLACEMENT

AT OUTSIDE CORNERS

TYPICAL FLASHING BOND

TYPICAL METALLIC WATER PIPE

BONDING CLAMP

TYPICAL ROOF DRAIN BOND TYPICAL CABLE SPLICERS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EG501

ELECTRCIAL GROUNDING DETAILS

KRK LAJ

PARTIALLY SPRINKLERED

SCALE: 12" = 1'-0"1 BELOW GRADE GROUND INSPECTION WELL DETAIL

SCALE: 12" = 1'-0"2 BELOW GRADE ISOLATED GROUND TRIAD DETAIL

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 12" = 1'-0"3 ABOVE GRADE STEEL COMUMN GROUNDING DETAIL

SCALE: 12" = 1'-0"4 BELOW GRADE CABLE TEE CONNECTION DETAIL

Revisions: Date:

NTS5 LIGHTNING PROTECTION SYSTEM DETAILS

SHEET 2412/22/2024

RK

G

FC

I

GFCI

A'

B'

G'

F'

D'

C'

2.8'

E'

1 2 3

A

B

D

F

H

M

TO BUILDING 1

BASEMENT HALLWAY

002-2BASEMENT

003-2

STORAGE

RM/TUNNEL ACCESS

001-2

3'

02-PP3

02-PP3

SUMP

PUMP

RECEPTACLE

4 5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EP101

ELECTRICAL POWER PLAN -

BASEMENT LEVEL 2

KRK LAJ

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 ELECTRICAL POWER PLAN - BASEMENT LEVEL

KEYPLAN

N AREA OF WORK

12 16

N

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

Revisions: Date:

SHEET 2424/4/2024

G

FC

I G

FC

I

G

FC

I

GFCI

G

FC

I

GFCI GFCI

GFCIGFCIGFCI

G

FC

I

GFCI

GFCI

GFCI

GFCI

GFCI

G

FC

I

G

FC

I

G

FC

I

G

FC

I

G

FC

I

G

FC

I

G

FC

I

G

FC

I

G

FC

I G

FC

I

GFCI

F F

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

2-120B-480E-SWBD-001

2-120A-208E-T-001

2-120A-480E-ATS-001

2-120A-480E-ATS-002

02-PP1

02-DP1

LOCKER ROOM

125-2

CHANGING AREA

127-2

SHOWER AREA

126-2

TOILET

123-2

TOILET

122-2

JANITOR

121-2

BREAK ROOM

124-2

GENERATOR ROOM

120B-2

BOILER ROOM

119-2

CONTROL ROOM

130-2

SUPERVISOR

129-2

CHEM FEED

128-2

PROPANE

131-2

DUPLEX

FUEL OIL

PUMP DISC

GD-3 DISC

GD-2 DISC

GD-1 DISC

2-119-BLR-001

2-119-BLR-002

2-119-BLR-003

2-119-PMP-003

2-119-PMP-004

2-119-PMP-005

2-119-PMP-002

2-119-PMP-001

GD-4 DISC

2-120A-480N-SWBD-001

02-DP2

02-PP2

02-PP3

02-DP3

1 2 3

A

B

D

F

H

M

DO

W

N

UP

UP

2-EXT-CU-001-DISC

2-EXT-CU-002-DISC

2-EXT-CU-003-DISC

02-PP4

G

31817

02-PP3

02-PP3

F

F

F

02-PP4

7 12

02-PP4

9 5 12

02-PP4

17,19,21

02-PP4

02-PP4

10 02-PP4

02-PP4

02-PP4

02-PP4

02-PP4

02-PP1

02-PP1

102-PP1

1 02-PP1

02-PP4

18,20,22

02-PP4

02-PP3

02-PP4

PARALLEL

SWITCHING GEAR

101B-2

02-PP4

6,8

02-PP3

13,15

ELECTRICAL ROOM

120A-2

BOILER ROOM

101-2

2-119-PMP-001

VFD

2-119-PMP-002

VFD

2-119-PMP-003

VFD

2-119-PMP-004

VFD

2-119-PMP-005

VFD

02-DP3

10,12,14

02-DP3

11,13,15

02-DP3

16,18,20

EP201

EP201

EP201

EP401

EP201

3'

2-119-CP-005

F

PANEL C

PANEL A

GROUNDING

BAR

02-PP1

9,11

2-EXT-CU-001

2-EXT-CU-002

2-EXT-CU-003

DP1

20,22,24

2-119-CP-004

02-PP1

02-PP1

02-PP1

02-PP1

02-PP1

02-PP3

02-PP4

2-119-CP-001

2-119-CP-002

2-119-CP-003

CONTINUOUS

GAS

ANALYZER 3

CONTINUOUS

GAS

ANALYZER 2

CONTINUOUS

GAS

ANALYZER 1

FUEL

OIL

DUPLEX

PUMP

SKID

STEAM

SAMPLE

STATIONS

2-120B-480E-GEN-001

02-PP4

02-PP4

02-PP4

02-PP2

02-PP2

02-PP2

02-PP2

02-PP2

7,9,11

02-PP2

7,9,11

02-PP2

4,6,8

02-PP2

4,6,8

02-PP3

02-DP3

27,29,31

PORTABLE GENERATOR LOADBANK

RECEPTACLE FOR TV

480V 3P, 4W

100A RATED RECPETACLE

WITH INTEGRAL DISCONNECT

02-PP3

2-119-CP-006

2-119-CP-009

2-119-TK-004

02-PP2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EP121

ELECTRICAL POWER PLAN - GROUND

FLOOR LEVEL 2

KRK KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

5. SEE EP-602 - EP-604 FOR PANEL SCHEDULES.

4. SEE MECHANICAL PLANS FOR ADDITIONAL MECHANICAL EQUIPMENT INFORMATION.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/16" = 1'-0"1 ELECTRICAL POWER PLAN - GROUND FLOOR LEVEL

N

KEYED NOTES

1 PROVIDE WIRED WALL CONTROLLER, FOR EACH CEILING FAN, PER MANUFACTURER

SPECIFICATIONS. SEE MECHANICAL HVAC SCHEDULE FOR ADDITIONAL INFORMATION.

2 PROVIDE NEMA 3X RATED (OR EQUIVALENT) ENCLOSURE TO PROTECT BOILER

EMERGENCY POWER CONNECTION.

Revisions: Date:

SHEET 2434/4/2024

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

1 2 3

A

B

D

F

H

M

53'

EP201

EP202

2-120B-480E-SWBD-001

2-120A-208E-T-001

2-120A-480E-ATS-001

2-120A-480E-ATS-002

02-PP1

02-DP1

LOCKER ROOM

125-2CHANGING AREA

127-2

SHOWER AREA

126-2

TOILET

123-2

TOILET

122-2

JANITOR

121-2

BREAK ROOM

124-2

GENERATOR ROOM

120B-2

BOILER ROOM

119-2

CONTROL ROOM

130-2

SUPERVISOR

129-2

CHEM FEED

128-2

PROPANE

131-2

2-119-BLR-001

2-119-BLR-002

2-119-BLR-003

2-120A-480N-SWBD-001

02-DP2

02-PP2

02-PP3

02-DP3

DO

W

N

UP

UP

02-PP4

PARALLEL

SWITCHING GEAR

101B-2

ELECTRICAL ROOM

120A-2

BOILER ROOM

101-2

2-119-PMP-001

VFD

2-119-PMP-002

VFD

2-119-PMP-003

VFD

2-119-PMP-004

VFD

2-119-PMP-005

VFD

2-119-CP-005

PANEL C

PANEL A

GROUNDING

BAR

EP202

EP201

2-120B-480E-GEN-001

BLDG. #2

BOILERHOUSE

NORM

SHOWER & LAB

104A-2

UNISEX RESTROOM

104-2

OFFICE/BOILER CTRL

RM

102-2

PASSAGEWAY

103-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EP122

ELECTRICAL CONDUIT ROUTING

PLAN - GROUND FLOOR LEVEL 2

KRK LAJ

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 ELECTRICAL CONDUIT ROUTING PLAN - GROUND FLOOR LEVEL

KEYPLAN

N AREA OF WORK

12 16

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

Revisions: Date:

SHEET 2444/4/2024

RK

UP

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

OPEN TO BELOW

2-202-UH-003

2-202-UH-002

2-202-UH-001

EQUIPMENT ACCESS

200-2

2-200-MAU-002

2-200-MAU-001

2-200-SF-001

02-PP5

02-DP4

1 2 3

A

B

D

F

H

M

2-200-SF-002

2-200-SF-002-VFD

2-200-SF-001-VFD

02-PP5

02-PP5

N

CONTROL IT

201-2

MEZZANINE

202-2

02-DP4

9,11,13 02-DP4

10,12,14

2-200-CA-001

02-PP5

8,10,12

02-PP5

11,13

02-PP5

4,6

2-200-PMP-001

2-200-PMP-002

3'

2-200-CP-006A

02-PP1

02-PP1

02-DP3

17,19,21

PANEL C

02-DP4

4,6,8

02-DP3

5,7,9

02-DP3

4,6,8

2-R-EF-003

2-200-CF-001

2-200-CF-002

2-R-EF-001 VFD

2-R-EF-002 VFD

2-R-EF-004 VFD

2-200-MAU-001 VFD

2-200-MAU-002 VFD

02-DP4

15,17,19

02-DP4

16,18,20

02-DP4

21,23,25

6" EXHAUST FROM

GENERATOR TO ROOF

DEAERATOR

2-200-TK-001

TV

RECEPTACLE

02-PP5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EP141

ELECTRICAL POWER PLAN -

MEZZANINE LEVEL 2

KRK KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

SCALE: 3/16" = 1'-0"1 ELECTRICAL POWER PLAN - MEZZANINE LEVEL

Revisions: Date:

5. SEE EP-602 - EP-604 FOR PANEL SCHEDULES.

4. SEE MECHANICAL PLANS FOR ADDITIONAL MECHANICAL EQUIPMENT INFORMATION.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SHEET 2452/22/2024

File details come from the government source that posted it. Updated .