S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf

PDF 2 MB Posted

Attached to
Y1NB--Project 585-21-115 Replace Boiler Plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI -- NAICS 236220 General Construction
Solicitation number
36C25225R0004
Issued by

About this file

This file contains plumbing and mechanical engineering drawings for a boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings include detailed plumbing demolition plans, new plumbing plans, sanitary plans, and compressed air piping plans for the basement, ground floor, mezzanine and roof levels.

The drawings show specifications for floor drains, water supply lines, sanitary sewer lines, compressed air systems, and various plumbing fixtures. Key details include requirements for cast iron sanitary piping, specific pipe sizes and connections, floor drain locations and specifications, eye wash station installations, and compressed air system components. The plans include both demolition work (capping existing drains and removing old piping) and new construction details (pipe routing, fixture locations, and system connections). The drawings are marked as "100% BID SET" and include general notes about phasing of work and coordination requirements between contractors.

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_Updated Dwgs_partial_24JAN25.pdf PDF
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
36C25225R0004 0007.docx DOCX document
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.1_P03 Single Source Justification MEDECO.e.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.6c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.1c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3

A

B

D

F

H

M

PARALLEL

SWITCHING GEAR

101B-2

908 SF

BOILER ROOM

101-2

1 1

FD

FD

FD

FD

FD FD

FD

FD

FD

FD

FD

4"ø RW

EXISTING COLD WATER LINE TO BE REMOVED.

REMOVE ALL ASSOCIATED PIPING FROM THE

EXISTING BOILER PLANT ROOM.

EXISTING 4" DRAIN

STACK TO REMAIN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

PD121

PLUMBING DEMOLITION PLAN -

GROUND FLOOR LEVEL 2

AJW LAJ

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 PLUMBING DEMOLITION PLAN - GROUND FLOOR LEVEL

N

KEYPLAN

N

12 16

AREA OF WORK

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 ALL FLOOR DRAINS OR DRAIN COLLECTION POINTS TO BE MADE FLUSH WITH THE

FLOOR AND CAPPED

Revisions: Date:

SHEET 1222/23/2024

1 2 3

A

B

D

F

H

M

3'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

PD141

PLUMBING DEMOLITION PLAN -

MEZZANINE LEVEL 2

AJW LAJ

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 PLUMBING DEMOLITION PLAN - MEZZANINE LEVEL

N

KEYPLAN

N

12 16

AREA OF WORK

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 ANY AND ALL FLOOR DRAINS OR DRAIN COLLECTION POINTS AT MEZZANINE LEVEL TO

BE MADE FLUSH WITH THE FLOOR AND CAPPED

Revisions: Date:

SHEET 1232/23/2024

A'

B'

2.8'

SUMP

PMP-1

1 2 3

A

B

D

F

H

UP

TO BUILDING 1

STORAGE

RM/TUNNEL ACCESS

001-2

BASEMENT HALLWAY

002-2

BASEMENT

003-2

3"ø SS

7'

- 3

3/ 4"

3'

6" UP

FD

1 1/2"ø V

1 1/2"ø SS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

PP101

PLUMBING PLAN - BASEMENT LEVEL

AJW KRL

PARTIALLY SPRINKLERED

KEYPLAN

N

12 16

AREA OF WORK

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/16" = 1'-0"1 PLUMBING PLAN - BASEMENT LEVEL

N

KEYED NOTES

1 CONNECT 6" PIPE TO 10" STORM PIPE BLOW. STORM PIPE IS APPROXIMATELY 15 FEET

BELOW GRADE. SEE CIVIL UTILITIES DRAWING FOR REFERENCE

Revisions: Date:

SHEET 1242/23/2024

1' 2'

B'

G'

F'

D'

C'

2.8'

E'

4" DOMESTIC

WATER SUPPLY

2"ø CW

P-707

WH-1

BREAK ROOM

124-2

LOCKER ROOM

125-2

CHANGING AREA

127-2

SHOWER AREA

126-2 TOILET

123-2

TOILET

122-2

JANITOR

121-2

GENERATOR ROOM

120B-2

BOILER ROOM

119-2

CONTROL ROOM

130-2

SUPERVISOR

129-2

CHEM FEED

128-2

PROPANE

131-2

1 2 3

A

B

D

F

H

M

2"ø CW

2"ø SCW

2"ø SCW

PARALLEL

SWITCHING GEAR

101B-2

3/4"ø CW 1/2"ø CW

BOILER ROOM

101-2

ELECTRICAL ROOM

120A-2

P-801

PP501

3/4"ø HWS 1/2"ø HWR

1/2"ø CW

EXPT-13/4"ø SCW

4" RPZ

4" WATER METER

SHUTOFF VALVE

3'

1/2"ø CW

3/4"ø SCW

P-802

P-802

4" CITY WATER

PP201

PP401

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

PP121

PLUMBING PLAN - GROUND FLOOR

LEVEL 2

AJW KRL

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 PLUMBING PLAN - GROUND FLOOR LEVEL

KEYPLAN

N AREA OF WORK

12 16

4. EVERY INSTANCE OF PIPE SIZES, VALVES, AND OTHER PIPE ACCESSORIES MAY NOT BE

SHOWN ON PLAN VIEWS. REVIEW RISER DIAGRAMS FOR THESE ITEMS.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYED NOTES

1 2" CW TO SUPPLY BOILER PLANT EQUIPMENT. SEE "M" DRAWINGS FOR CONTINUATION

2 KEEP A 6' X 6' AREA CLEAR TO ELEVATION 20'-0" FOR FORLIFT ACCESS TO MEZZANINE

3 COORDINATIE WITH WATER SOFTENER SELECTION AND INSTALLATION TO PIPE PER

DRAWING D-631

Revisions: Date:

SHEET 1252/23/2024

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

1 2 3

A

B

D

F

H

M

FD

FD

FD

FD

CO

FD

CO

FD CO

FD

3" ø

SS

3"ø SS

3"ø SS

3"ø SS

4"ø SS

4"ø SS

4"ø SS

4"ø SS

3"ø SS

3"ø SS

3"ø SS

3"⌀ VTR

CO

CO

CO

1 1/2" SS UP

FROM SUMP

3"ø SS

3"ø SS

TRENCH DRAIN, 8'-0" LONG, TYP

CONTROL ROOM

130-2

SUPERVISOR

129-2

CHEM FEED

128-2

BOILER ROOM

101-2

BOILER ROOM

119-2

ELECTRICAL ROOM

120A-2

GENERATOR ROOM

120B-2

PARALLEL

SWITCHING GEAR

101B-2

BREAK ROOM

124-2

JANITOR

121-2

TOILET

122-2

TOILET

123-2

LOCKER ROOM

125-2

CHANGING AREA

127-2

6" PRIMARY STORM DRAIN ROUTED

TO SITE STORM. SEE CIVIL UTILITIES

DRAWING FOR CONTINUATION

6" SECONDARY STORM DRAIN ROUTED THROUGH

EXTERIOR WALL FOR DISCHARGE ONTO GROUND.

EQUIP WITH DOWNSPOUT NOZZLE AND PEST SCREEN

6" ST UP

3"ø SS

TRENCH DRAIN, 8'-0" LONG, TYP

CO

FD

3"ø SS

2"ø V

6" DN

5'

- 4

3/ 4"

2' - 3 1/2"

2"ø V

3" V UP

3'

2"ø V

2"ø V

2"ø V

2"ø V

1 1/2"ø V

1 1/2"ø V

3"ø V

2"ø V

2"ø V

2"ø V 2"ø V

1 1/2"ø V

3"ø SS

1 1/2" V DN

2"ø V

1 1 /2" ø V

1 1/2"ø V

3"ø SS

CO

FD

3" ø

SSFD

2"ø SS

6" TO EXTERIOR OIL/WATER SEPARATOR

INV 1136.65. SEE CU171 FOR CONTINUATION

4" TO SITE SANITARY SEWER INV 1140.50.

SEE CU171 FOR CONTINUATION

2" SS UP

2"ø SS

3"ø SS 4"ø SS

3"ø SS

3"ø SS 3"ø SS

CO

1 1/2"ø SS

6"ø SS

2"ø V

1 1/2"ø SS

3"ø SS

2" SS UP

6" ø

SS

3"ø SS

4"ø SS 4"ø SS

4" ø

SS

PP201

PP401

INCLUDE WYE

FITTING WITH 4"

OUTLET AND PLUG

2"ø ST

2" ST UP

FROM EXISTING ROOF DRAIN ON

TOP OF NATURAL GAS ROOM

CO

FD

GENERATOR PAD

3"ø SS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

PP122

SANITARY PLAN - GROUND FLOOR

LEVEL 2

AJW KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

SCALE: 3/16" = 1'-0"1 SANITARY PLAN - GROUND FLOOR LEVEL

4. SANITARY PIPING MATERIAL SHALL BE CAST IRON.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYED NOTES

1 PROVIDE A 6" PIPE STUB UP FOR TEMPORARY BLOWDOWN SEPERATOR CONNECTION.

THIS PIPE IS TO BE REMOVED AND PLUGGED OR CAPPED FLUSH WITH THE FLOOR SLAB

AT THE END OF THE PROJECT

2 VENT PIPES IN THIS AREA ARE UNDER THE SLAB BUT TO BE INSTALLED AT A HIGHER

ELEVATION THAN THE SANITARY SEWER PIPES

3 PIPE EMERGENCY SHOWER AND EYE/FACE WASH WASTE PIPE TO FLOOR DRAIN

4 PIPE IS PROVIDED FOR CONNECTION TO BLOWDOWN SEPARATOR DISCHARGE.

COORDINATE WITH MECHANICAL CONTRACTOR TO PROVIDE APPROPRIATE

CONNECTION

5 LOCATE FLOOR DRAIN AS CLOSE AS TO GENERATOR SKIDS AS POSSIBLE, WITHOUT

DRAIN OR TRAP INTERFERING WITH THE GENERATOR FOUNDATION SLAB

6 KEEP A 6' X 6' AREA CLEAR TO ELEVATION 20'-0" FOR FORLIFT ACCESS TO MEZZANINE

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

SHEET 1264/5/2024

B'

G'

F'

D'

C'

2.8'

E'

1 2 3

A

B

D

F

H

M

BOILER ROOM

101-2

BOILER ROOM

119-2

CONTROL ROOM

130-2

SUPERVISOR

129-2

CHEM FEED

128-2

PROPANE

131-2

ELECTRICAL ROOM

120A-2

PARALLEL

SWITCHING GEAR

101B-2

GENERATOR ROOM

120B-2

BREAK ROOM

124-2

JANITOR

121-2

TOILET

122-2

TOILET

123-2

SHOWER AREA

126-2

LOCKER ROOM

125-2CHANGING AREA

127-2

1/2"⌀ CA UP

1/2"⌀ CA UP

3/4" ⌀ CA UP

1/2"⌀ CA UP

WORK BENCH

3'

HOSE REEL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

PP123

COMPRESSED AIR PIPING -

GROUND FLOOR LEVEL 2

DJU KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

SCALE: 3/16" = 1'-0"1 COMPRESSED AIR PIPING PLAN - GROUND FLOOR LEVEL

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

Revisions: Date:

SHEET 1272/23/2024

D

F

H

3/4"ø CA

3/4 "ø

C A

HOSE REEL

SEE CONTINUATION ON PP142

SWITCHGEAR

103A-2

TRANSPORTATION

ASST

103B-2

TRANSPORTATION

ASST

105B-2

SUPERVISOR

105A-2

GARAGE & MAINT

105-2

PASSAGEWAY

103-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

PP124

COMPREESSED AIR PIPING- GROUND

LEVEL 1

IAR LAJ

PARTIALLY SPRINKLERED

KEYPLAN

N

12 16

AREA OF WORK

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/16" = 1'-0"1 COMPRESSED AIR PIPING PLAN - GROUND FLOOR LEVEL

N

Revisions: Date:

SHEET 1282/23/2024

UP

A'

B'

G'

F'

D'

C'

2.8'

E'

1 2 3

A

B

D

F

H

M

EQUIPMENT ACCESS

200-2

CONTROL IT

201-2

OPEN TO BELOW

6"ø ST

4"ø ST

6"ø ST

(SECONDARY)

(SECONDARY)(PRIMARY)

(PRIMARY)

4"ø ST

4" ⌀ ST DOWN

FROM ROOF DRAIN

4" ⌀ ST DOWN

FROM OVERFLOW

4" ⌀ ST DOWN

FROM ROOF DRAIN

4" ⌀ ST DOWN

FROM OVERFLOW

MEZZANINE

202-2

3'

6" ST DN (PRIMARY)

6" ST DN (SECONDARY)

4" VTR

4" V DN

10' - 0"MIN

4" VTR

3" ST TO BELOW

3"⌀ VTR

FD FD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

PP141

SANITARY PLAN - MEZZANINE LEVEL

AJW KRL

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 PLUMBING PLAN - MEZZANINE LEVEL

KEYPLAN

N AREA OF WORK

12 16

4. ALL SANITARY PIPING MATERIAL SHALL BE CAST IRON.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYED NOTES

1 HUB DRAIN IS PROVIDED FOR CONNECTION TO DEAERATOR OVERFLOW AND DRAIN

DISCHARGE. COORDINATE WITH MECHANICAL CONTRACTOR TO PROVIDE

APPROPRIATE CONNECTION

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

SHEET 1294/5/2024

B'

G'

F'

D'

C'

2.8'

E'

1 2 3

A

B

D

F

H

M

3/4"ø CA

3/4"ø CA

3/4"ø CA

3/4"ø CA

3/4 "ø

C A

2-200-CA-001

CONTROL IT

201-2

MEZZANINE

202-2

EQUIPMENT ACCESS

200-2

OPEN TO BELOW

OPEN TO BELOW

3/4 "ø

C A

3/4 "ø

C A

3/4 "ø

C A

CA TO TUNNEL

3/4 "ø

C A

3/4 "ø

C A

3/4"ø CA

3'

3/4"ø CA1 1/4"ø CA3/4"ø CA

3/4"ø CA 3/4"ø CA

3/4 "ø

C A

3/4 "ø

C A

3/4 "ø

C A

3/4 "ø

C A

CA TO BUILDING 1

1 1 /4" ø

CA

1 1 /4" ø

CA

3/4 "ø

C A

1 1 /4" ø

CA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

PP142

COMPRESSED AIR PIPING -

MEZZANINE LEVEL 2

DJU KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

SCALE: 3/16" = 1'-0"1 COMPRESSED AIR PIPING PLAN - MEZZANINE LEVEL

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYED NOTES

1 COMPRESSED AIR LINE CONTINUES ON DRAWING PP124

Revisions: Date:

SHEET 1302/23/2024

B'

G'

F'

D'

C'

2.8'

E'

1 2 3

A

B

D

F

H

4" ⌀ ROOF DRAIN

4" ⌀ ROOF DRAIN

4" ⌀ V

3" ⌀ V

4" ⌀ OVERFLOW

4" ⌀ OVERFLOW

3'

H.P.3" ⌀ V

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

PP161

SANITARY PLAN - ROOF LEVEL

AJW LAJ

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 PLUMBING SANITARY PLAN - ROOF LEVEL

N

KEYPLAN

N

12 16

AREA OF WORK

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 EXTEND AND TERMINATE VENT PIPE 24 INCHES ABOVE ROOF

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

SHEET 1314/5/2024

GROUND FLOOR

0' - 0"

1'

/1 PP121

MIXING VALVE

P-801

P-707

1/2"ø HWR

3/4"ø SCW3/4"ø HWS

1/2"ø CWS

1-1/4" TEPID

WATER

EMERGENY SHOWER & EYE

WASH STATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

PP201

PLUMBING ELEVATIONS

AJW KRL

PARTIALLY SPRINKLERED

SCALE: 3/4" = 1'-0"1 EYE WASH STATION ELEVATION

Revisions: Date: SHEET 1322/23/2024

2'

G'

F'

E'

P-401

P-101

P-701

P-101

P-401

P-401

P-101

P-528

1/2"ø CWS

REF

P-801

TOILET

123-2

TOILET

122-2

JANITOR

121-2

SHOWER AREA

126-2

BREAK ROOM

124-2

LOCKER ROOM

125-2

P-8021/2"ø CWS

3/4"ø SCW

1/2 "ø

H W

R

2" ø

CW

S

1 1 /2" øS

CW

1/2"ø HWS

1/2"ø SCW

1/2"ø SCW

1/2"ø HWS

1"ø SCW

1/2"ø SCW

1/2"ø HWS

1/2 "ø

C W

S

3/4 "ø

H W

S 1/2

"ø H

W S

1/2"ø HWR

1/2"ø HWS

1/2"ø SCW 1/2"ø CWS

1/2"ø SCW

1/2"ø HWS

3/4 "ø

H W

S

2" øS

CW

P-709

P-528

3"ø CWS 1/2"ø HWR 3/4"ø HWS

2"ø SCW 3/4"ø CWS

P-604

P-502

1"ø SCW

3 1"ø SCW

2'

G'

F'

E'

CO

CO

FD

FD

FD

3"ø SS

3"ø SS

1 1 /2" ø V

2"ø V

1 1/2"ø V

4" ø

SS

P-101

P-401

P-101

P-401

P-101

P-502

P-528

P-604

P-528

3"ø SS 3"ø SS

4" ø

SS

1 1/2"ø SS

1 1/2"ø SS

P-709

BELOW SLAB, ABOVE

DRAIN PIPE ELEVATION

SEE PP122 FOR

CONTINUATION

2" V, BELOW SLAB,

ABOVE DRAIN PIPE

BELOW SLAB, ABOVE

DRAIN PIPE ELEVATION

4" V UP

3" UP

1 1/2" V HEADER ABOVE

CEILING, SERVES DRINKING

FOUNTAIN, SINKS, AND LAVS

P-401

2" V, BELOW SLAB, ABOVE

DRAIN PIPE. SERVES

WATER CLOSETS,

SHOWER, AND MOP BASIN

SEE PP122 FOR

CONTINUATION

3" IN CEILING FOR FLOOR

DRAINS ON MEZZANINE

3"ø SS

2"ø SS

3"ø SS

2" ø

V

3"ø SS

2" ø

V

2"ø SS

1 1/2"ø SS

3"ø SS

1 1/2"ø SS

4"ø

SS

4"ø SS

2" ø

V

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

PP401

PLUMBING ENLARGED PLANS

AJW KRL

PARTIALLY SPRINKLERED

SCALE: 1/2" = 1'-0"1 PLUMBING ENLARGED PLAN - GROUND FLOOR LEVEL

SCALE: 1/2" = 1'-0"2 SANITARY ENLARGED PLAN - GROUND FLOOR LEVEL

2. EVERY INSTANCE OF PIPE SIZES, VALVES, AND OTHER PIPE ACCESSORIES MAY NOT BE

SHOWN ON PLAN VIEWS. REVIEW RISER DIAGRAMS FOR THESE ITEMS.

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N N

KEYED NOTES

1 HOT AND COLD WATER SUPPLIES ARE TO BE SPLIT UNDER THE SINK WITH SEPARATE

1/2" SUPPLIES ROUTED TO AN APPROVED MIXING VALVE TO SUPPLY THE DECK

MOUNTED EYE WASH

2 PROVIDE CONNECTION FOR REFRIGERATOR WATER SUPPLY. DO NOT USE A QUICK

CONNECT SADDLE TYPE VALVE

3 SHOWER HEAD PENETRATION MINIMUM HEIGHT TO BE 6'-6"

Revisions: Date: SHEET 1332/23/2024

RV

D

D

D

D

A

A

A 1/2"

1/2"

AC AIR COMPRESSOR

AND RECEIVER

CONDENSATE TRAP

OSD

CONDENSATE TRAP

AFTERCOOLER

FLEX CONN

0-300 PSIG

COMPRESSED

AIR SYSTEM

A

A

A

A

A

FLEX

CONN.

6" MIN

CLEARANCE TYP

8'-0" MIN 6" MIN

CLEARANCE

6" MIN

CLEARANCE

6"

3" ∅ PIPE

3" ∅ P-TRAP

SLOPE TO DRAIN SLOPE TO DRAIN

FLOOR SLAB; REFER TO STRUCTURAL

DRAWINGS FOR DETAILS

3" ∅ PIPE

SLOPE TO DRAINSLOPE TO DRAIN

FLOOR SLAB; REFER TO STRUCTURAL

DRAWINGS FOR DETAILS

GATE VALVE

UNION/CHECK VALVE

COMBINATION

1-1/2" VENT

3" SS

SUMP BASIN

GRAVEL INFILL

VALVE ESTIMATED 6-8 FEET

FROM TEE (FOR

REFERENCE)

EXISTING BRASS

THREADED TEE

EXISTING 4"-6" WATER IN

HOSPITAL BASEMENT

REMOVE 4" PIPE FROM

BOILER PLANT BACK TO

TEE AND CAP OR PLUG

PP501

/1 PP121

8" MIN

4" RPZ

EXPT-1

WH-1

3/4"ø SCW

1/2"ø HWR

3/4"ø HWS

PMP-2

4" CITY WATER SUPPLY

STRAINER

ISOLATION VALVE,

TYP

WATER METER

4" RPZ

4" SUPPLY LINE

3"ø CWS

/1 PP501

3/4"ø HWS

3/4"ø CWS

3/4"ø SCW

1/2"ø HWR

3/4"ø HWS

EXPT-1

WH-1

NORMALLY CLOSED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

PP501

PLUMBING DETAILS

AJW KRL

PARTIALLY SPRINKLERED

SCALE: 3/4" = 1'-0"1 RPZ BACKFLOW PREVENTOR INSTALLATION DETAIL - PLAN VIEW

SCALE: 1/2" = 1'-0"2 RPZ BACKFLOW PREVETOER INSTALLATION DETAIL - ELEVATION VIEW

NTS3 COMPRESSED AIR SYSTEM DETAIL

NTS4 TRENCH DRAIN DETAIL

2. EVERY INSTANCE OF PIPE SIZES, VALVES, AND OTHER PIPE ACCESSORIES MAY NOT BE

SHOWN ON PLAN VIEWS. REVIEW RISER DIAGRAMS FOR THESE ITEMS.

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

GENERAL NOTES

NTS5 SUMP PUMP BASIN DETAIL

NTS6 COLD WATER LINE REMOVAL DETAIL

KEYED NOTES

1 HOT WATER SUPPLY IS TO BE OUTFITTED WITH A MASTER HOT WATER MIXING VALVE.

SEE RISER DIAGRAM

2 CONTRACTOR IS TO CONTACT THE LOCAL MUNICIPALITY REGARDING WATER METER

ACQUISITION AND REQUIREMENTS

Revisions: Date: SHEET 1342/23/2024

File details come from the government source that posted it. Updated .