This file contains plumbing and mechanical engineering drawings for a boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings include detailed plumbing demolition plans, new plumbing plans, sanitary plans, and compressed air piping plans for the basement, ground floor, mezzanine and roof levels.
The drawings show specifications for floor drains, water supply lines, sanitary sewer lines, compressed air systems, and various plumbing fixtures. Key details include requirements for cast iron sanitary piping, specific pipe sizes and connections, floor drain locations and specifications, eye wash station installations, and compressed air system components. The plans include both demolition work (capping existing drains and removing old piping) and new construction details (pipe routing, fixture locations, and system connections). The drawings are marked as "100% BID SET" and include general notes about phasing of work and coordination requirements between contractors.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3
A
B
D
F
H
M
PARALLEL
SWITCHING GEAR
101B-2
908 SF
BOILER ROOM
101-2
1 1
FD
FD
FD
FD
FD FD
FD
FD
FD
FD
FD
4"ø RW
EXISTING COLD WATER LINE TO BE REMOVED.
REMOVE ALL ASSOCIATED PIPING FROM THE
EXISTING BOILER PLANT ROOM.
EXISTING 4" DRAIN
STACK TO REMAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
PD121
PLUMBING DEMOLITION PLAN -
GROUND FLOOR LEVEL 2
AJW LAJ
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 PLUMBING DEMOLITION PLAN - GROUND FLOOR LEVEL
N
KEYPLAN
N
12 16
AREA OF WORK
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 ALL FLOOR DRAINS OR DRAIN COLLECTION POINTS TO BE MADE FLUSH WITH THE
FLOOR AND CAPPED
Revisions: Date:
SHEET 1222/23/2024
1 2 3
A
B
D
F
H
M
3'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
PD141
PLUMBING DEMOLITION PLAN -
MEZZANINE LEVEL 2
AJW LAJ
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 PLUMBING DEMOLITION PLAN - MEZZANINE LEVEL
N
KEYPLAN
N
12 16
AREA OF WORK
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 ANY AND ALL FLOOR DRAINS OR DRAIN COLLECTION POINTS AT MEZZANINE LEVEL TO
BE MADE FLUSH WITH THE FLOOR AND CAPPED
Revisions: Date:
SHEET 1232/23/2024
A'
B'
2.8'
SUMP
PMP-1
1 2 3
A
B
D
F
H
UP
TO BUILDING 1
STORAGE
RM/TUNNEL ACCESS
001-2
BASEMENT HALLWAY
002-2
BASEMENT
003-2
3"ø SS
7'
- 3
3/ 4"
3'
6" UP
FD
1 1/2"ø V
1 1/2"ø SS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
PP101
PLUMBING PLAN - BASEMENT LEVEL
AJW KRL
PARTIALLY SPRINKLERED
KEYPLAN
N
12 16
AREA OF WORK
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/16" = 1'-0"1 PLUMBING PLAN - BASEMENT LEVEL
N
KEYED NOTES
1 CONNECT 6" PIPE TO 10" STORM PIPE BLOW. STORM PIPE IS APPROXIMATELY 15 FEET
BELOW GRADE. SEE CIVIL UTILITIES DRAWING FOR REFERENCE
Revisions: Date:
SHEET 1242/23/2024
1' 2'
B'
G'
F'
D'
C'
2.8'
E'
4" DOMESTIC
WATER SUPPLY
2"ø CW
P-707
WH-1
BREAK ROOM
124-2
LOCKER ROOM
125-2
CHANGING AREA
127-2
SHOWER AREA
126-2 TOILET
123-2
TOILET
122-2
JANITOR
121-2
GENERATOR ROOM
120B-2
BOILER ROOM
119-2
CONTROL ROOM
130-2
SUPERVISOR
129-2
CHEM FEED
128-2
PROPANE
131-2
1 2 3
A
B
D
F
H
M
2"ø CW
2"ø SCW
2"ø SCW
PARALLEL
SWITCHING GEAR
101B-2
3/4"ø CW 1/2"ø CW
BOILER ROOM
101-2
ELECTRICAL ROOM
120A-2
P-801
PP501
3/4"ø HWS 1/2"ø HWR
1/2"ø CW
EXPT-13/4"ø SCW
4" RPZ
4" WATER METER
SHUTOFF VALVE
3'
1/2"ø CW
3/4"ø SCW
P-802
P-802
4" CITY WATER
PP201
PP401
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
PP121
PLUMBING PLAN - GROUND FLOOR
LEVEL 2
AJW KRL
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 PLUMBING PLAN - GROUND FLOOR LEVEL
KEYPLAN
N AREA OF WORK
12 16
4. EVERY INSTANCE OF PIPE SIZES, VALVES, AND OTHER PIPE ACCESSORIES MAY NOT BE
SHOWN ON PLAN VIEWS. REVIEW RISER DIAGRAMS FOR THESE ITEMS.
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYED NOTES
1 2" CW TO SUPPLY BOILER PLANT EQUIPMENT. SEE "M" DRAWINGS FOR CONTINUATION
2 KEEP A 6' X 6' AREA CLEAR TO ELEVATION 20'-0" FOR FORLIFT ACCESS TO MEZZANINE
3 COORDINATIE WITH WATER SOFTENER SELECTION AND INSTALLATION TO PIPE PER
DRAWING D-631
Revisions: Date:
SHEET 1252/23/2024
1' 2'
A'
B'
G'
F'
D'
C'
2.8'
E'
1 2 3
A
B
D
F
H
M
FD
FD
FD
FD
CO
FD
CO
FD CO
FD
3" ø
SS
3"ø SS
3"ø SS
3"ø SS
4"ø SS
4"ø SS
4"ø SS
4"ø SS
3"ø SS
3"ø SS
3"ø SS
3"⌀ VTR
CO
CO
CO
1 1/2" SS UP
FROM SUMP
3"ø SS
3"ø SS
TRENCH DRAIN, 8'-0" LONG, TYP
CONTROL ROOM
130-2
SUPERVISOR
129-2
CHEM FEED
128-2
BOILER ROOM
101-2
BOILER ROOM
119-2
ELECTRICAL ROOM
120A-2
GENERATOR ROOM
120B-2
PARALLEL
SWITCHING GEAR
101B-2
BREAK ROOM
124-2
JANITOR
121-2
TOILET
122-2
TOILET
123-2
LOCKER ROOM
125-2
CHANGING AREA
127-2
6" PRIMARY STORM DRAIN ROUTED
TO SITE STORM. SEE CIVIL UTILITIES
DRAWING FOR CONTINUATION
6" SECONDARY STORM DRAIN ROUTED THROUGH
EXTERIOR WALL FOR DISCHARGE ONTO GROUND.
EQUIP WITH DOWNSPOUT NOZZLE AND PEST SCREEN
6" ST UP
3"ø SS
TRENCH DRAIN, 8'-0" LONG, TYP
CO
FD
3"ø SS
2"ø V
6" DN
5'
- 4
3/ 4"
2' - 3 1/2"
2"ø V
3" V UP
3'
2"ø V
2"ø V
2"ø V
2"ø V
1 1/2"ø V
1 1/2"ø V
3"ø V
2"ø V
2"ø V
2"ø V 2"ø V
1 1/2"ø V
3"ø SS
1 1/2" V DN
2"ø V
1 1 /2" ø V
1 1/2"ø V
3"ø SS
CO
FD
3" ø
SSFD
2"ø SS
6" TO EXTERIOR OIL/WATER SEPARATOR
INV 1136.65. SEE CU171 FOR CONTINUATION
4" TO SITE SANITARY SEWER INV 1140.50.
SEE CU171 FOR CONTINUATION
2" SS UP
2"ø SS
3"ø SS 4"ø SS
3"ø SS
3"ø SS 3"ø SS
CO
1 1/2"ø SS
6"ø SS
2"ø V
1 1/2"ø SS
3"ø SS
2" SS UP
6" ø
SS
3"ø SS
4"ø SS 4"ø SS
4" ø
SS
PP201
PP401
INCLUDE WYE
FITTING WITH 4"
OUTLET AND PLUG
2"ø ST
2" ST UP
FROM EXISTING ROOF DRAIN ON
TOP OF NATURAL GAS ROOM
CO
FD
GENERATOR PAD
3"ø SS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
PP122
SANITARY PLAN - GROUND FLOOR
LEVEL 2
AJW KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
SCALE: 3/16" = 1'-0"1 SANITARY PLAN - GROUND FLOOR LEVEL
4. SANITARY PIPING MATERIAL SHALL BE CAST IRON.
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYED NOTES
1 PROVIDE A 6" PIPE STUB UP FOR TEMPORARY BLOWDOWN SEPERATOR CONNECTION.
THIS PIPE IS TO BE REMOVED AND PLUGGED OR CAPPED FLUSH WITH THE FLOOR SLAB
AT THE END OF THE PROJECT
2 VENT PIPES IN THIS AREA ARE UNDER THE SLAB BUT TO BE INSTALLED AT A HIGHER
ELEVATION THAN THE SANITARY SEWER PIPES
3 PIPE EMERGENCY SHOWER AND EYE/FACE WASH WASTE PIPE TO FLOOR DRAIN
4 PIPE IS PROVIDED FOR CONNECTION TO BLOWDOWN SEPARATOR DISCHARGE.
COORDINATE WITH MECHANICAL CONTRACTOR TO PROVIDE APPROPRIATE
CONNECTION
5 LOCATE FLOOR DRAIN AS CLOSE AS TO GENERATOR SKIDS AS POSSIBLE, WITHOUT
DRAIN OR TRAP INTERFERING WITH THE GENERATOR FOUNDATION SLAB
6 KEEP A 6' X 6' AREA CLEAR TO ELEVATION 20'-0" FOR FORLIFT ACCESS TO MEZZANINE
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
SHEET 1264/5/2024
B'
G'
F'
D'
C'
2.8'
E'
1 2 3
A
B
D
F
H
M
BOILER ROOM
101-2
BOILER ROOM
119-2
CONTROL ROOM
130-2
SUPERVISOR
129-2
CHEM FEED
128-2
PROPANE
131-2
ELECTRICAL ROOM
120A-2
PARALLEL
SWITCHING GEAR
101B-2
GENERATOR ROOM
120B-2
BREAK ROOM
124-2
JANITOR
121-2
TOILET
122-2
TOILET
123-2
SHOWER AREA
126-2
LOCKER ROOM
125-2CHANGING AREA
127-2
1/2"⌀ CA UP
1/2"⌀ CA UP
3/4" ⌀ CA UP
1/2"⌀ CA UP
WORK BENCH
3'
HOSE REEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
PP123
COMPRESSED AIR PIPING -
GROUND FLOOR LEVEL 2
DJU KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
SCALE: 3/16" = 1'-0"1 COMPRESSED AIR PIPING PLAN - GROUND FLOOR LEVEL
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
Revisions: Date:
SHEET 1272/23/2024
D
F
H
3/4"ø CA
3/4 "ø
C A
HOSE REEL
SEE CONTINUATION ON PP142
SWITCHGEAR
103A-2
TRANSPORTATION
ASST
103B-2
TRANSPORTATION
ASST
105B-2
SUPERVISOR
105A-2
GARAGE & MAINT
105-2
PASSAGEWAY
103-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
PP124
COMPREESSED AIR PIPING- GROUND
LEVEL 1
IAR LAJ
PARTIALLY SPRINKLERED
KEYPLAN
N
12 16
AREA OF WORK
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/16" = 1'-0"1 COMPRESSED AIR PIPING PLAN - GROUND FLOOR LEVEL
N
Revisions: Date:
SHEET 1282/23/2024
UP
A'
B'
G'
F'
D'
C'
2.8'
E'
1 2 3
A
B
D
F
H
M
EQUIPMENT ACCESS
200-2
CONTROL IT
201-2
OPEN TO BELOW
6"ø ST
4"ø ST
6"ø ST
(SECONDARY)
(SECONDARY)(PRIMARY)
(PRIMARY)
4"ø ST
4" ⌀ ST DOWN
FROM ROOF DRAIN
4" ⌀ ST DOWN
FROM OVERFLOW
4" ⌀ ST DOWN
FROM ROOF DRAIN
4" ⌀ ST DOWN
FROM OVERFLOW
MEZZANINE
202-2
3'
6" ST DN (PRIMARY)
6" ST DN (SECONDARY)
4" VTR
4" V DN
10' - 0"MIN
4" VTR
3" ST TO BELOW
3"⌀ VTR
FD FD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
PP141
SANITARY PLAN - MEZZANINE LEVEL
AJW KRL
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 PLUMBING PLAN - MEZZANINE LEVEL
KEYPLAN
N AREA OF WORK
12 16
4. ALL SANITARY PIPING MATERIAL SHALL BE CAST IRON.
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYED NOTES
1 HUB DRAIN IS PROVIDED FOR CONNECTION TO DEAERATOR OVERFLOW AND DRAIN
DISCHARGE. COORDINATE WITH MECHANICAL CONTRACTOR TO PROVIDE
APPROPRIATE CONNECTION
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
SHEET 1294/5/2024
B'
G'
F'
D'
C'
2.8'
E'
1 2 3
A
B
D
F
H
M
3/4"ø CA
3/4"ø CA
3/4"ø CA
3/4"ø CA
3/4 "ø
C A
2-200-CA-001
CONTROL IT
201-2
MEZZANINE
202-2
EQUIPMENT ACCESS
200-2
OPEN TO BELOW
OPEN TO BELOW
3/4 "ø
C A
3/4 "ø
C A
3/4 "ø
C A
CA TO TUNNEL
3/4 "ø
C A
3/4 "ø
C A
3/4"ø CA
3'
3/4"ø CA1 1/4"ø CA3/4"ø CA
3/4"ø CA 3/4"ø CA
3/4 "ø
C A
3/4 "ø
C A
3/4 "ø
C A
3/4 "ø
C A
CA TO BUILDING 1
1 1 /4" ø
CA
1 1 /4" ø
CA
3/4 "ø
C A
1 1 /4" ø
CA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
PP142
COMPRESSED AIR PIPING -
MEZZANINE LEVEL 2
DJU KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
SCALE: 3/16" = 1'-0"1 COMPRESSED AIR PIPING PLAN - MEZZANINE LEVEL
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYED NOTES
1 COMPRESSED AIR LINE CONTINUES ON DRAWING PP124
Revisions: Date:
SHEET 1302/23/2024
B'
G'
F'
D'
C'
2.8'
E'
1 2 3
A
B
D
F
H
4" ⌀ ROOF DRAIN
4" ⌀ ROOF DRAIN
4" ⌀ V
3" ⌀ V
4" ⌀ OVERFLOW
4" ⌀ OVERFLOW
3'
H.P.3" ⌀ V
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
PP161
SANITARY PLAN - ROOF LEVEL
AJW LAJ
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 PLUMBING SANITARY PLAN - ROOF LEVEL
N
KEYPLAN
N
12 16
AREA OF WORK
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 EXTEND AND TERMINATE VENT PIPE 24 INCHES ABOVE ROOF
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
SHEET 1314/5/2024
GROUND FLOOR
0' - 0"
1'
/1 PP121
MIXING VALVE
P-801
P-707
1/2"ø HWR
3/4"ø SCW3/4"ø HWS
1/2"ø CWS
1-1/4" TEPID
WATER
EMERGENY SHOWER & EYE
WASH STATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
PP201
PLUMBING ELEVATIONS
AJW KRL
PARTIALLY SPRINKLERED
SCALE: 3/4" = 1'-0"1 EYE WASH STATION ELEVATION
Revisions: Date: SHEET 1322/23/2024
2'
G'
F'
E'
P-401
P-101
P-701
P-101
P-401
P-401
P-101
P-528
1/2"ø CWS
REF
P-801
TOILET
123-2
TOILET
122-2
JANITOR
121-2
SHOWER AREA
126-2
BREAK ROOM
124-2
LOCKER ROOM
125-2
P-8021/2"ø CWS
3/4"ø SCW
1/2 "ø
H W
R
2" ø
CW
S
1 1 /2" øS
CW
1/2"ø HWS
1/2"ø SCW
1/2"ø SCW
1/2"ø HWS
1"ø SCW
1/2"ø SCW
1/2"ø HWS
1/2 "ø
C W
S
3/4 "ø
H W
S 1/2
"ø H
W S
1/2"ø HWR
1/2"ø HWS
1/2"ø SCW 1/2"ø CWS
1/2"ø SCW
1/2"ø HWS
3/4 "ø
H W
S
2" øS
CW
P-709
P-528
3"ø CWS 1/2"ø HWR 3/4"ø HWS
2"ø SCW 3/4"ø CWS
P-604
P-502
1"ø SCW
3 1"ø SCW
2'
G'
F'
E'
CO
CO
FD
FD
FD
3"ø SS
3"ø SS
1 1 /2" ø V
2"ø V
1 1/2"ø V
4" ø
SS
P-101
P-401
P-101
P-401
P-101
P-502
P-528
P-604
P-528
3"ø SS 3"ø SS
4" ø
SS
1 1/2"ø SS
1 1/2"ø SS
P-709
BELOW SLAB, ABOVE
DRAIN PIPE ELEVATION
SEE PP122 FOR
CONTINUATION
2" V, BELOW SLAB,
ABOVE DRAIN PIPE
BELOW SLAB, ABOVE
DRAIN PIPE ELEVATION
4" V UP
3" UP
1 1/2" V HEADER ABOVE
CEILING, SERVES DRINKING
FOUNTAIN, SINKS, AND LAVS
P-401
2" V, BELOW SLAB, ABOVE
DRAIN PIPE. SERVES
WATER CLOSETS,
SHOWER, AND MOP BASIN
SEE PP122 FOR
CONTINUATION
3" IN CEILING FOR FLOOR
DRAINS ON MEZZANINE
3"ø SS
2"ø SS
3"ø SS
2" ø
V
3"ø SS
2" ø
V
2"ø SS
1 1/2"ø SS
3"ø SS
1 1/2"ø SS
4"ø
SS
4"ø SS
2" ø
V
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
PP401
PLUMBING ENLARGED PLANS
AJW KRL
PARTIALLY SPRINKLERED
SCALE: 1/2" = 1'-0"1 PLUMBING ENLARGED PLAN - GROUND FLOOR LEVEL
SCALE: 1/2" = 1'-0"2 SANITARY ENLARGED PLAN - GROUND FLOOR LEVEL
2. EVERY INSTANCE OF PIPE SIZES, VALVES, AND OTHER PIPE ACCESSORIES MAY NOT BE
SHOWN ON PLAN VIEWS. REVIEW RISER DIAGRAMS FOR THESE ITEMS.
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N N
KEYED NOTES
1 HOT AND COLD WATER SUPPLIES ARE TO BE SPLIT UNDER THE SINK WITH SEPARATE
1/2" SUPPLIES ROUTED TO AN APPROVED MIXING VALVE TO SUPPLY THE DECK
MOUNTED EYE WASH
2 PROVIDE CONNECTION FOR REFRIGERATOR WATER SUPPLY. DO NOT USE A QUICK
CONNECT SADDLE TYPE VALVE
3 SHOWER HEAD PENETRATION MINIMUM HEIGHT TO BE 6'-6"
Revisions: Date: SHEET 1332/23/2024
RV
D
D
D
D
A
A
A 1/2"
1/2"
AC AIR COMPRESSOR
AND RECEIVER
CONDENSATE TRAP
OSD
CONDENSATE TRAP
AFTERCOOLER
FLEX CONN
0-300 PSIG
COMPRESSED
AIR SYSTEM
A
A
A
A
A
FLEX
CONN.
6" MIN
CLEARANCE TYP
8'-0" MIN 6" MIN
CLEARANCE
6" MIN
CLEARANCE
6"
3" ∅ PIPE
3" ∅ P-TRAP
SLOPE TO DRAIN SLOPE TO DRAIN
FLOOR SLAB; REFER TO STRUCTURAL
DRAWINGS FOR DETAILS
3" ∅ PIPE
SLOPE TO DRAINSLOPE TO DRAIN
FLOOR SLAB; REFER TO STRUCTURAL
DRAWINGS FOR DETAILS
GATE VALVE
UNION/CHECK VALVE
COMBINATION
1-1/2" VENT
3" SS
SUMP BASIN
GRAVEL INFILL
VALVE ESTIMATED 6-8 FEET
FROM TEE (FOR
REFERENCE)
EXISTING BRASS
THREADED TEE
EXISTING 4"-6" WATER IN
HOSPITAL BASEMENT
REMOVE 4" PIPE FROM
BOILER PLANT BACK TO
TEE AND CAP OR PLUG
PP501
/1 PP121
8" MIN
4" RPZ
EXPT-1
WH-1
3/4"ø SCW
1/2"ø HWR
3/4"ø HWS
PMP-2
4" CITY WATER SUPPLY
STRAINER
ISOLATION VALVE,
TYP
WATER METER
4" RPZ
4" SUPPLY LINE
3"ø CWS
/1 PP501
3/4"ø HWS
3/4"ø CWS
3/4"ø SCW
1/2"ø HWR
3/4"ø HWS
EXPT-1
WH-1
NORMALLY CLOSED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
PP501
PLUMBING DETAILS
AJW KRL
PARTIALLY SPRINKLERED
SCALE: 3/4" = 1'-0"1 RPZ BACKFLOW PREVENTOR INSTALLATION DETAIL - PLAN VIEW
SCALE: 1/2" = 1'-0"2 RPZ BACKFLOW PREVETOER INSTALLATION DETAIL - ELEVATION VIEW
NTS3 COMPRESSED AIR SYSTEM DETAIL
NTS4 TRENCH DRAIN DETAIL
2. EVERY INSTANCE OF PIPE SIZES, VALVES, AND OTHER PIPE ACCESSORIES MAY NOT BE
SHOWN ON PLAN VIEWS. REVIEW RISER DIAGRAMS FOR THESE ITEMS.
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
GENERAL NOTES
NTS5 SUMP PUMP BASIN DETAIL
NTS6 COLD WATER LINE REMOVAL DETAIL
KEYED NOTES
1 HOT WATER SUPPLY IS TO BE OUTFITTED WITH A MASTER HOT WATER MIXING VALVE.
SEE RISER DIAGRAM
2 CONTRACTOR IS TO CONTACT THE LOCAL MUNICIPALITY REGARDING WATER METER
ACQUISITION AND REQUIREMENTS
Revisions: Date: SHEET 1342/23/2024