These are electrical and construction drawings showing phasing plans and details for a boiler plant replacement project at the VA Medical Center in Iron Mountain, MI. The drawings include site plans, electrical demolition plans, power distribution plans, and panel schedules for a new boiler plant facility. Key details include temporary construction fencing requirements with 6' high chain link fencing, maintenance of minimum 24' travel width, phased utility work including storm sewer modifications, electrical feeder relocations, and installation of new equipment including boilers and support systems. The drawings specify detailed electrical requirements including panel schedules, cable/conduit specifications, and power distribution layouts. Construction phasing is broken into multiple phases including mobilization, site/utility pre-work, and equipment installation, with notes emphasizing maintaining continuous operation of the existing steam generation system throughout construction.
The plans include specific technical requirements such as emergency power connections, temporary blowdown separator installation, and coordination of road crossings with COR approval. Panel schedules detail electrical loads, circuit assignments, and wire specifications. Site utility work includes removal and replacement of storm sewers, site lighting, and electrical distribution infrastructure. The drawings emphasize maintaining facility operations during construction through careful phasing and coordination with VA staff.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EEEEEE
E
E E E EE E
E
E E
E E
E E
E
GATE
E
E
E E
E
E
E
E
E E
E E E
E
E E
E
E
E
E
E
E E
E E E
E
E
E E
E E E E
E E
E E
E E
E E
E
E
E E
E E
E
E
E
E E
E E
E
GATE
CONTROLS
FUEL STATION
RETAINING WALL
E E
E
E
E
E E
E
E E E
E
E
E E E
E E
E
E
WV
WV
GATE
N89° 19' 12"W 878.64'
BLDG 2
GARAGE
BLDG 12
BLDG 16
STORAGE
BLDG 19
SALT SHED
BLDG 10
INCINERATOR STORAGE
METER HOUSE
BLDG 2
BOILER PLANT
BLDG 2
BOILER PLANT
S
E
E E
E E
E
GC101
GC101
LINE POST
TEMPORARY FENCE BASE WITH SAND BAG WEIGHTS
BOTTOM OF FENCE 1" ABOVE GRADE
6'- 0"
M
IN
IM
UM
TERMINAL POST
GALVANIZED CHAIN LINK FENCING
WITH PRIVACY COVERAGE
GALVANIZED CHAIN LINK FENCING
WITH PRIVACY COVERAGE
ELK CJR
REV 0 - 100% BID SET 2024-02-23
SCALE: 1" = 20'-0"
GENERAL PHASING PLAN PHASE 1 - MOBILIZATION1
2/GC101
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING
AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF
PROJECT. COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL
APPROVAL.
2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES
DO NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR
CREATING CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST
TRADES.
3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY
ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE
COMMENCING WORK.
4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND
BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND
INTENT SHOWN THROUGHOUT THIS DRAWING SET.
6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL
PHASING INFORMATION.
PHASE 1 NOTES - MOBILIZATION
1 ESTABLISH CONTRACTOR LAY DOWN AREA. COORDINATE AREA WITH COR/VA.
2 CUT CURB AND ESTABLISH PAVED TURN-AROUND LANES IN PARKING LOT.
3 INSTALL 6' HIGH CHAIN LINK FENCING AROUND WORK AREAS. SECURE FENCE TO
RESIST A 50 LB HORIZONTAL FORCE ALONG TOP OR BOTTOM.
4 MAINTAIN MINIMUM 24' TRAVEL WIDTH NORTH OF CONSTRUCTION FENCE.
5 MAINTAIN ACCESS TO B2 BY BOILER PLANT AND TRANSPORTATION STAFF. BUILDING
WILL REMAIN OCCUPIED AND ACTIVE THROUGHOUT CONSTRUCTION.
6 PROVIDE MINIMUM 12' WIDE GATE FOR VEHICLE ACCESS.
7 MAINTAIN TWO LANE TRAFFIC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL PHASING PLAN - PHASE 1 FINAL BID SET
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
GC101
SITE
585-21-115
KEYPLAN
12 16
SCALE: 1/2" = 1'-0"
TEMPORARY CONSTRUCTION FENCE DETAIL2
AREA OF WORK
REV 1 - OWNER REQUESTED UPDATES 2025-01-24
Sheet 31/24/2025
EEEEEE
E
E E E EE E
E
E E
EXHAUST FAN
E E E E E
E E E E E
E
GATE
E
E
E E
E
E
E
E
E E
E E E
E
E E
E
E
E
E
E
E E
E E E
E
E
E E
E E E E
E E
E E
E E
E E
E
E
E E
E E
E
E
E
E E
E E
E
GATE
CONTROLS
FUEL STATION
RETAINING WALL
E E
E
E
E
E E
E
E E E
E
E
E E E
E
E
E
E
WV
WV
GATE
N89° 19' 12"W 878.64'
E E E
BLDG 2
GARAGE
BLDG 12
BLDG 16
STORAGE
BLDG 19
SALT SHED
BLDG 10
INCINERATOR STORAGE
METER HOUSE
BLDG 2
BOILER PLANT
BLDG 2
BOILER PLANT
S
E
E E
E E
E
FOFOFOFOFO
FO
FO
T
E E
E E E E E E E E E
E E
E E
E
E
FO
FO
FO FO
FO
FO
FO
E E E E E E
E
BLDG 2
BOILER PLANT
DWS
FWFW
D
T T P
H
P
H
H
FW
ST
ST
ST
ST
D
ST
ST
SA SA SA
SA
SA
SA
SA
SS
SA
SA
SA
SA
SF
M
SF
M
SF
M
SF
M
SF
M
SF
M
SF
M
SFM SFM SFM
SA
SA
SA
SA
SA
SA
UE
UE
UE
UE
UE
ST
ST
ST
ST
ST
ST
P
X X X X X X X X X
X X
X X
X X
X X
X
X X X
XX
X X
X
XXX
X X
X X
X X
X X
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X
X X X
X X X X
X X
X X
X X
X X
X X
XXXXXXXX
X X X X X X X X X
X X
X X
X X
X X
X
X X X
XX
X X
X
XXX
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X
X X X
X X X X
X X
X X
X X
X X
X X
XXXXXXXX
GC102
X X
X X
X X
X
X X X
X X
X
X X
X X
X
BLOWDOWN
FROM BOILERS
BLOWDOWN
SEPERATOR
COLD WATER
PIPE TRENCH
BOILER 1
ELK CJR
REV 0 - 100% BID SET 2024-02-23
SCALE: 1" = 20'-0"
GENERAL PHASING PLAN PHASE 2 - SITE & UTILITY PRE-WORK1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL PHASING PLAN - PHASE 2 FINAL BID SET
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
GC102
SITE
585-21-115
KEYPLAN
12 16
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING
AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF PROJECT.
COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL APPROVAL.
2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES DO
NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR CREATING
CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST TRADES.
3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY
ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE
COMMENCING WORK.
4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL PHASING
INFORMATION.
PHASE 2 NOTES - SITE & UTILITY PRE-WORK
1 REMOVE STORM SEWERS IN WORK AREA. CONTRACTOR TO PROVIDE TEMPORARY
STORM WATER TRANSFER AROUND WORK SITE UNTIL NEW PERMANENT SEWERS CAN BE
INSTALLED/ACTIVATED.
2 REMOVE SITE EMERGENCY ELECTRICAL AND SITE LIGHTING, DISTRIBUTION IN WORK
AREA. CONTRACTOR TO PROVIDE TEMPORARY SERVICE FOR SITE EMERGENCY
ELECTRICAL AND SITE LIGHTING AND COORDINATE WITH THE COR.
3 COORDINATE ALL ROAD CROSSINGS WITH COR. CONTRACTOR TO PROVIDE TRAFFIC
PLAN AND OBTAIN COR APPROVAL BEFORE TRENCHING ACROSS ROADS.
4 INSTALL TEMPORARY BLOWDOWN SEPARATOR
5 REMOVE LEGACY FUEL TANK AND BLOWDOWN VAULT IN AREA OF NEW CONSTRUCTION.
6 INSTALL NEW GRAVITY STORM SEWERS.
7 INSTALL NEW ELECTRICAL DISTRIBUTION.
AREA OF WORK
SCALE: 1" = 2'-0"
TEMPORARY BLOWDOWN SEPARATOR2
NOTE:
LOCATE THE BLOWDOWN SEPARATOR BELOW THE ABANDONED VENT PIPE THAT
TERMINATES JUST BELOW THE ROOF. INSTALL A NEW VENT PIPE AND NEW ROOF
PENETRATION. REFER TO PLUMBING DRAWINGS FOR NEW TEMPORARY DRAIN PIPE.
Sheet 41/24/2025
D
T T P
H
P
H
H
D
SS
FUEL TANK
48'-0" x 12'-0"
UE
UE
UE
UE
UE
P
BLDG 2
LAW
N AREA
STORAGE
SHEDS
FU
EL
S
TA
TI
ON
CONTROLS
FUEL STATION
MA
TE
RI
AL
S
TO
RA
GE
N89° 19' 12"W 878.64'
BLDG 2
GARAGE
BLDG 12
BLDG 16
STORAGE
BLDG 19
SALT SHED
BLDG 10
INCINERATOR STORAGE
METER HOUSE
BLDG 2
BOILER PLANT
BLDG 2
BOILER PLANT
ELK CJR
REV 0 - 100% BID SET 2024-02-23
KEYPLAN
12 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL PHASING PLAN - PHASE 4 FINAL BID SET
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
GC104
SITE
585-21-115
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING
AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF
PROJECT. COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL
APPROVAL.
2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES
DO NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR
CREATING CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST
TRADES.
3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY
ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE
COMMENCING WORK.
4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND
BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND
INTENT SHOWN THROUGHOUT THIS DRAWING SET.
6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL
PHASING INFORMATION.
PHASE 4 NOTES - EQUIPMENT INSTALLATION
1. CONSTRUCT FOUNDATION AND SUPERSTRUCTURE FOR B2 ADDITION. CONTRACTOR
TO COORDINATE ALL ACTIVITIES TO ENSURE NO NEGATIVE IMPACT TO CONTINUED
OPERATION OF EXISTING STEAM GENERATION SYSTEM
2. INSTALL BOILERS AND SUPPORT EQUIPMENT
3. COMPLETE ROADWAY CONSTRUCTION UTILITIES AND SITE IMPROVEMENTS WITHIN
THE WORK AREA.
4. CONSTRUCT SECONDARY FUEL TANK
5. FIT OUT SUPPORT SPACES FOR OCCUPATION COMMISSION NEW BOILER PLANT
EQUIPMENT.
6. THE NEW SYSTEM MUST OPERATE CONTINUOUSLY FOR A MINIMUM OF 30 DAYS
BEFORE MOVING TO THE NEXT PHASE.THE EXISTING BOILER PLANT SHALL REMAIN
FULLY OPERATIONAL DURING THIS PERIOD.
7. REMOVE FEEDER F CROSS-TIE AND REPLACE WITH PERMANENT FEEDER F THROUGH
NEW BOILER ROOM
AREA OF WORK
SCALE: 1:20
GENERAL PHASE PLAN - PHASE 4 EQUIPMENT INSTALLATION1
Sheet 61/24/2025
STSTST
EEEEEEE
E
E
E E
E
FU
EL
S
TA
TI
ON
CONTROLS
FUEL STATION
WV
E
E
E
WV
WV
WV
MA
TE
RI
AL
S
TO
RA
GE
N89° 19' 12"W 878.64'
BLDG 2
GARAGE
BLDG 12
BLDG 16
STORAGE
BLDG 19
SALT SHED
BLDG 10
INCINERATOR STORAGE
METER HOUSE
BLDG 2
BOILER PLANT
BLDG 2
BOILER PLANT
S
BLDG 2
BOILER PLANT
DWS
FWFW
D
T T P
H
P
H
H
FW
ST
ST
ST
ST
D
ST
ST
SA SA SA
SA
SA
SA
SA
SS
FUEL TANK
48'-0" x 12'-0"
SA
SA
SA
SA
SF
M
SF
M
SF
M
SF
M
SF
M
SF
M
SF
M
SFM SFM SFM
SA
SA
SA
SA
SA
SA
UE
UE
UE
UE
UE
ST
ST
ST
ST
ST
ST
P
NEW 4" POTABLE
WATER SERVICE
NEW 6" FIRE
WATER SERVICE
NEW 4"
SANITARY PIPE
INV 1140.50-S
OIL WATER
SEPARATOR
TAP EXISTING MAIN
INSTALL VALVE 6X4 TAP
TIE TO EX SMH 103
FUEL TRUCK
UNLOADING AREA
TIE TO EX
EX SMH 1053/2100
SMH P01
HYDRANT
ASSEMBLY
LAW
N AREA
FOFOFOFOFO
FO
FO
JB
C
C
C
C
T
UE
UE
UE UE UE UE
PB
UE UE UE UE
UE
UE
UE
PB
E E
E
E E
E E
UE
JB
FO
FO
FO FO
FO
FO
FO
C
C
C
UE UE UE UE UE
C
PB
UE
ST-02
ST-03
F.F.E 1143.65
NEW 6" ROOF DRAIN
IE 1140.65-N
EXISTING 10"
ROOF
DRAINAGE
1125.59
SA-01
SA-02
SA-04
SA-05
SMH P02
SAN MH02
EX SMH 1050/2202
SAN MH01
ST-01
LIFT STATION
FOUNDATION DRAIN
EL 1141.53
TRENCH
DRAIN
EL 1137.95
SA-03
CU172
CU172
DUPLEX CONTROL
PANEL
CU172
FUEL PIPE TRENCH
NEW 6"
INDUSTRIAL PIPE
INV 1136.65-S
ST-04
CU503
TAP EXISTING MAIN
INSTALL VALVE 6X6 TAP
VALVE PIT
CLEAN OUT
CLEAN OUT
Br CJR
SCALE: 1" = 20'-0"
CIVIL UTILITIES PLAN1
REV 0 - 100% BID SET 2024-02-23
GENERAL NOTES
1. SEE C-001 FOR C-SERIES NOTES AND LEGENDS.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
KEYPLAN
12 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
CIVIL UTILITIES PLAN FINAL BID SET
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
CU171
SITE
585-21-115
STORM SEWER DATA
ID RIM PIPE INV IN TYPE SIZE PIPE INV OUT TYPE SIZE NOTES
EX SMH 1053
/2100
1141.96 ROOF DRAIN
EX PIPE
EX PIPE
1140.57(S)
1128.80 (E)
1123.85 (N)
CAST IRON
CONCRETE
CONCRETE
6" 10" 24"
EX PIPE
ST-01
1123.71 (S)
1123.71 (W)
CONCRETE
PVC
30" 30"
REPLACE
EXISTING
GRATE & LID
SMH P01 1142.60 ST-01 1123.29 (E) PVC 30" ST-02 1123.25 (S) PVC 30" NEW
STRUCTURE
SMH P02 1142.71 ST-05
ST-02
1123.07 (NE)
1122.16 (N)
CAST IRON
PVC
10" 30"
ST-03 1122.11(SE) PVC 30" NEW
STRUCTURE
EX SMH 1057 1142.50 EX PIPE
ST-03
EX PIPE
1132.94 (N)
1121.64 (NW)
1121.36 (W)
PVC
PVC
CONCRETE
4" 30" 30"
EX PIPE 1121.37 (SE) CONCRETE 30" REPLACE
EXISTING
GRATE & LID
SANITARY SEWER DATA
ID RIM PIPE INV IN TYPE SIZE PIPE INV OUT TYPE SIZE NOTES
OIL/ WATER
SEPERATOR
1142.76 INDUSTRIAL PIPE 1136.06 (S) CAST IRON 6" DISCHARGE
TO LIFT
STATION
1135.85 (SE) CAST IRON 6" NEW
STRUCTURE
LIFT
STATION
1142.88 SANITARY PIPE
DISHCARGE FROM
O/S SEPARATOR
1139.88 (N)
1135.59 (NW)
CAST IRON
CAST IRON
6" 6"
SA-02 1136.45 HDPE DR 14 4" NEW
STRUCTURE
SAN MH01 1143.35 SA-02 1141.65 (W) HDPE DR 21 4" SA-03 1138.35 (E) PVC DR 35 8" NEW
STRUCTURE
SAN MH02 1142.69 SA-03 1136.64 (W) PVC DR 35 8" SA-04 1136.47 (E) PVC DR 35 8" NEW
STRUCTURE
EX SMH 1050
/2202
1143.06 SA-04
EX PIPE
1132.23 (NW)
1132.13 (S)
PVC DR 35
CLAY
8" 8"
EX PIPE 1132.16 (N) CLAY 8" REPLACE
EXISTING
GRATE & LID
STORM PIPE DATA
PIPE LENGTH SIZE TYPE SLOPE NOTES
ST-01 41' 30" PVC 0.0075
ST-02 154' 30" PVC 0.0075
ST-03 60' 30" PVC 0.0075
ST-04 64' 10" PVC 0.02
SANITARY PIPE DATA
PIPE LENGTH SIZE TYPE SLOPE NOTES
SA-01 37' 15" PVC 0.02 FITTING TIES
TRENCH AND
FOUNDATION
DRAINS TOGETHER
SA-02 299' 4" HDPE N/A PIPE CURVES TO
CLEAR EX TUNNEL
& WATER MAIN
SA-03 85' 8" PVC 0.02
SA-04 112' 8" PVC 0.0376
REV 1 - FINAL BID SET 2024-04-05
REV 2 - PRE-BID UPDATES 2024-08-01
REV 3 - OWNER REQUESTED UPDATES 2025-01-24
SHEET 211/24/2025
CONTRACTOR JOB TRAILERS
PARKING LOT
PARKING LOT
PARKING LOT
SH
ED
S (x
3)
BUILDING
(DEMOLITION IS PROGRESS)
LIFT STATIONS
MAINTENANCE GARAGE
1 STORY, BRICK FACADE
AVG. ELEV.: 1162.43'
AREA: ±6925 SQ.FT.
(LESS OVERHANG)
WOODEN SHED
(NO ELEVATION SHOT)
AREA: ±330 SQ.FT.
BUILDING
1 STORY, STEEL
AVG. ELEV.: 1157.08'
AREA: ±1348 SQ.FT.
F.F.E.
1143.49'
BOILER PLANT
FIRST STORY, BRICK FACADE
AVG. ELEV.: 1162.66'
TOTAL BUILDING FOOT PRINT AREA: ±6695 SQ.FT.
BUILDING
1 STORY, STEEL
AVG. ELEV.: 1157.59'
AREA: ±243 SQ.FT.
BUILDING
1 STORY, STEEL
AVG. ELEV.: 1159.29'
AREA: ±1858 SQ.FT.
BUILDING
1 STORY, BRICK FACADE
AVG. ELEV.: 1158.57'
AREA: ±642 SQ.FT.
PREFAB.
SHED
(WOOD)
AREA:
±94 SQ.FT.
F.F.E.
1143.43'
F.F.E.
1143.43'
F.F.E.
1143.28'
F.F.E.
1143.09'
F.F.E.
1143.34'
F.F.E.
1143.80'
F.F.E.
1143.09'
F.F.E.
1143.78'
F.F.E.
1143.44'
F.F.E.
1143.14'
STACK ELEV:
1197.07'
STACK ELEV:
1197.08'
STACK ELEV:
1197.04'
BOILER
PLANT
3RD STORY
AVG. ELEV:
1194.68'
BOILER PLANT
2ND STORY
AVG. ELEV: 1162.66'
(BRICK FACADE)
ENTRYWAY
1 STORY, BRICK FACADE
AVG. ELEV.: 1157.26'
ENTRYWAY
1 STORY, BRICK FACADE
AVG. ELEV.: 1157.26'
STACK ELEV:
1165.78'
STACK ELEV:
1163.87'
STACK ELEV:
1163.67'
STSTST
E
E E
E E
E
WV
EEEEEEEE
E
GATE
STORAGE
SHEDS
E E E EE E
E
E E
E E
EXHAUST FAN
ELECTRIC
JUNCTION
BOX
E
E E E E E
E E E E E
E
GATE
E
E
E E
E
E
E
E
E E
E E E
E
E E
E
E
E
E
E
E E
E E E
E
E
E E
E E E E
E E
E E
E E
E E
E
E E
E
E E
E
E
E
E E
E E
U
E
E E
E
GATE
U
FU
EL
S
TA
TI
ON
CONTROLS
FUEL STATION
WV
RETAINING WALL
E E
E E
E
E
E
E
E E E
E E
E
E E E E
E
E E E
E
E
E E E
E
E
E
E
E
WV
WV
WV
MA
TE
RI
AL
S
TO
RA
GE
GATE
N89° 19' 12"W 878.64'
E E
E
E E
BLDG 2
GARAGE
BLDG 12
BLDG 16
STORAGE
BLDG 19
SALT SHED
BLDG 10
INCINERATOR STORAGE
METER HOUSE
BLDG 2
BOILER PLANT
BLDG 2
BOILER PLANT
S
1140'
1141'
1142'
1143'
1140'
1141'
1140'
1141' 1141'
1142'
1142'
1141'
1142'
1143'
1143'
1142'
1143'
1143' 1143'
1143' 1143'
1144'
1144'
1143'
1142'
1142'
1143'
1142'
1142'
1142'
1143'
1143'
1142'
1141'
1140'
1142'
1140'
1139'
1142'
1142'
1142'
1143'
1141'
1143'
1142'
1143'
1143'1142'
1143'
1142'
1142'
1143'
1139.5'
1139.5'
1141.5'
1142.5'
1141.5'
1141.5' 11
.5'
1141.5'
1142.5'
1142.5'
1142.5'
1142.5'
1142.5'
1141.5'
.5
1141.5'
1140.5'
1143.5'
.5 '11
.5
1143.5'
1142.5'
1142.5'
1140.5'
1141.5'
1142.5'
1141.5' 1142.5'
1143.5'
1143.5'
1141'
1141.5'
1139.5'
1140.5'
1143.5'
1144'
1142.5' 1142.5'
E
E E
E E
E
EXISTING
UNDERGROUND
FUEL OIL TANKS
X X X X X X X X X
X X
X X
X X
X X
X
X
X X X
XX
X X
X
XXX
X X
X X
X X
X X
X X
X
X X
X X
X
X
X
X
X X
X X
X X
X
X
X
X X
2 1
X X X X X X X X X
SECURITY CAMERA
(EXISTING TO REMAIN)
SECURITY CAMERA
(EXISTING TO REMAIN)
X X
X X
X X
X X
X X
X X
X
X X X
X X
X
X X
X X
X
JFF CJR
REV 0 - 100% BID SET 2024-02-23
SCALE: 1:20
ELECTRICAL DEMOLITION SITE PLAN1
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
4. SEE ES171 FOR ADDITIONAL ELECTRICAL PHASING NOTES FOR THE EMERGENCY FEEDER
RELOCATIONS.
KEYED NOTES
1 REMOVE UNDERGROUND EMERGENCY ELECTRICAL FEEDER FROM BUILDING 2 TO
BUILDING 11. REMOVE DUCT BANK TO EXTENT SHOWN.
2 REMOVE EXISTING MANHOLES.
3 REMOVE CABLING AND ASSOCIATED CONDUIT BACK TO EXTENT SHOWN. VERIFY
EXISTING CABLING IS NO LONGER USED.
4 REMOVE UNDERGROUND SITE LIGHTING FROM BUILDING 2 TO EXTENT SHOWN.
5 REMOVE EXISTING FEEDER TO GATE OPERATOR. COORDINATE WITH GATE REMOVAL.
6 EXISTING ELECTRICAL MANHOLE TO REMAIN. MAINTAIN AND PROTECT THROUGH
CONSTRUCTION.
7 FUEL OIL TANK ALARM, COORDINATE REMOVAL WITH FUEL OIL TANK REMOVAL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL DEMOLITION SITE
PLAN
FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
ED171
SITE
585-21-115
KEYPLAN
12 16
REV 1 - PRE-BID UPDATES 2024-08-01
REV 2 - OWNER REQUESTED UPDATES 2025-01-24
SHEET 2241/24/2025
BLDG 2
BOILER PLANT
D
T T P
H
P
H
H
D
SS
FUEL TANK
48'-0" x 12'-0"
UE
UE
UE
UE
UE
P
EEEEEEEE
E
STORAGE
SHEDS
E
E E
FU
EL
S
TA
TI
ON
CONTROLS
FUEL STATION
MA
TE
RI
AL
S
TO
RA
GE
N89° 19' 12"W 878.64'
BLDG 2
GARAGE
BLDG 12
BLDG 16
STORAGE
BLDG 19
SALT SHED
BLDG 10
INCINERATOR STORAGE
METER HOUSE
BLDG 2
BOILER PLANT
BLDG 2
BOILER PLANT
S
FOFOFOFOFO
FO
FO
JB
C
C
C
C
T
UE
UE
UE UE UE UE
PB
UE UE UE UE
UE
UE
UE
10 11
2 4
(2) 2" EMT CONDUIT
(18) #18 AWG, SHIELDED 2 CONDUCTOR, SCADA
(3) #* AWG, LIGHTING
(1) #X AWG, CONDUCTOR, TANK HEATERS
(2) 2" SCH 40 PVC CONDUIT
(1) 12 STRAND OS2 FO CABLE
(1) SPARE
(1) 2" EMT CONDUIT
(1) 6 STRAND OS2 FO CABLE,
SECURITY
(4) 2" SCH 40 PVC CONDUIT
(18) #18AWG SHIELDED 2 CONDUCTOR, SCADA
(3) #8 AWG, LIGHTING
(1) SPARE
(1) 6 CONDUCTOR OS2 FO CABLE, SECURITY
PB
E E
E
E E
E E
UE
JB
FO
FO
FO FO
18"x18"
HANDHOLE
ES501
24" DIA MANHOLE
ES501
CAMERA 6
CAMERA 3
CAMERA 5
EMERGENCY PHONE (EP4)
FO
FO
FO
C
C
C
ET603
ET603
ET603
(1) 1" SCH 40 PVC
(3) #4 AWG
(1) #4 AWG GND
(1) 1" SCH 40 PVC
(2) #4 AWG
(1) #4 AWG GND
UE UE UE UE UE
(1) 4" SCH 40 PVC
CONDUIT FEEDER F
(3) 4/0 AWG, 15KV
(1) #6 AWG GND
(3) SPARE 4" SCH 40
PVC CONDUIT
(1) 1" SCH 40 PVC FOR DUPLEX PUMPS
(3)#6 AND (1)#8GND
(1)1" SCH 40 FOR CONTROL POWER
(2)#4 AND (1)#4GND
(1) 1" SCH 40 FOR INSTRUMENTATION
CABLING TO THE BAS AND BACNET
COMPATIBLE OPEN-PROTOCOL TYPE
INTERFACE TO DDC CONTROLS
SYSTEMS (PER SPEC SECTION 22 13 29
AND ELECTRICAL INSTRUMENTATION
DRAWINGS)
(1) 4" SCH 40 PVC CONDUIT
FEEDER B
(3) 4/0 AWG, 15KV
(1) #6 AWG GND
(3) SPARE 4" SCH 40 PVC CONDUIT
C J01
J01 J01
PB
UE
(1) 4" SCH 40 PVC CONDUIT
TEMPORARY FEEDER F
(3) 4/0 AWG, 15KV
(1) #6 AWG GND
(1) 1" SCH 40 PVC CONDUIT
(2) #4 AWG
(1) #4 AWG GND
(1) 1" SCH 40 PVC CONDUIT
(3) #4 AWG
(1) #4 AWG GND 18
TO ELECTRICAL
ROOM
JFF CJR
REV 0 - 100% BID SET 2024-02-23
SCALE: 1:20
ELECTRICAL SITE PLAN1
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
4. SEE ET603 FOR CAMERA SCHEDULE AND DETAILS.
KEYED NOTES
1 TIE INTO EXISTING UNDERGROUND SITE LIGHTING CIRCUIT.
2 PROVIDE NEW POWER MANHOLE.
3 TIE INTO EXISTING PRIMARY DUCT BANK TO ROUTE GENERATOR FEEDER B TO BUILDING
2. ALL CABLING SHALL BE NEW FROM BUILDING 2 EQUIPMENT TO BUILDING 11
EQUIPMENT. CONTRACTOR SHALL NOT SPLICE TOGETHER NEW AND EXISTING CABLE.
4 TIE INTO EXISTING PRIMARY DUCT BANK TO ROUTE GENERATOR FEEDER F TO BUILDING
2. ALL CABLING SHALL BE NEW FROM BUILDING 2 EQUIPMENT TO BUILDING 11
EQUIPMENT. CONTRACTOR SHALL NOT SPLICE TOGETHER NEW AND EXISTING CABLE.
5 ROUTE GENERATOR FEEDER B OUT THE TOP OF SUBSTATION AND THROUGH ROOF. FOR
FEEDER DETAILS SEE EP601.
6 ROUTE GENERATOR FEEDER F OUT THE TOP OF SUBSTATION AND THROUGH ROOF. FOR
FEEDER DETAILS SEE EP601.
7 RUN CONDUIT DOWN BUILDING EXTERIOR AND TO UNDERGROUND DUCT BANK.
8 PROVIDE NEW ELECTRICAL HANDHOLE FOR RE-ROUTED UNDERGROUND SITE LIGHTING.
9 RE-ROUTE UNDERGROUND SITE LIGHTING TO AVOID NEW BUILDING.
10 MOUNT SECURITY CAMERA 20 FEET ABOVE GRADE. CONNECT TO CAMERA BOX VIA
CAT6A CABLE THROUGH LIGHT POLE INTERNAL CAVITY.
11 MOUNT CAMERA NETWORK BOX 15 FEET ABOVE GRADE. USE INTERNAL CAVITY OF LIGHT
POLE TO ROUTE POWER, FIBER OPTIC, AND CAT6A CABLING.
12 RISER TO SECOND FLOOR SCADA CONTROL RACK. USE 2" EMT INSIDE BUILDING. USE 2"
SCH 40 CONDUIT BELOW GRADE.
13 RISER FROM BASEMENT LEVEL. FEEDS SECURITY CAMERA BOX WITH OS2 6 CONDUCTOR
FIBER OPTICS FROM TELECOMMUNICATIONS ROOM 001-3. USE 2" EMT INSIDE BUILDING.
USE 2" SCH 40 CONDUIT BELOW GRADE.
14 PROVIDE 16" X 16" NEMA 3R JUNCTION BOX. CONNECT ALL TANK DEVICES BACK TO
JUNCTION BOX. JUNCTION BOX TO BE FED FROM 2-119-CP-009 FUEL OIL TANK CONTROL.
SEE EI121 FOR CONTROL PANEL LOCATION.
15 PROVIDE DATA AND POWER CONNECTIONS TO PREFAB GUARD HOUSE SLAB, SEE ES501
AND ET502 FOR MORE DETAILS.
16 CABLE AND CONDUIT ROUTE FOR ANTI RAM GATE CONTROLLER AND GUARD SHACK
POWER POINT
17 POWER SUPPLY TO LIFT STATION CONTROLLER FROM A 20A BREAKER IN 02-DP-1 CKT
20,22,24. PROVIDE (2) SEPARATE POWER SOURCES TO THE SANITARY LIFT STATION
CONTROL PANEL (SUPPLIED WITH LIFT STATION). (1) 480 V, 50A 3 POLE BRANCH CIRCUIT
FROM 02-DP1. (1) 120 V, 20A 1 POLE BRANCH CIRCUIT FROM 02-PP1. PROVIDE 1" CONDUIT
FOR SIGNAL WIRING TO/FROM THE LIFT STATION ANNUCIATOR PANEL.
18 SEE EP122 FOR CONTINUATION OF FEEDER F INSIDE B2
19 POWER FEED TO ANTI RAM GATE CONTROLLER
20 POWER FEED TO GUARD SHACK POWER POINT
21 CONDUIT TRANSITION FROM METAL TO PVC PRIOR TO GOING BELOW GRADE
KEYPLAN
12 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL SITE PLAN FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
ES171
SITE
585-21-115
ELECTRICAL PHASING NOTES
1. EMERGENCY FEEDER WORK SHALL BE PHASED SUCH THAT ONE OF THE TWO FEEDERS (B AND F) SERVING BUILDING 11 SHALL REMAIN IN SERVICE AT ALL TIMES WITH THE EXCEPTIONS OF ANY SHORT DURATION SHUTDOWNS REQUIRED FOR ISOLATION OR CONNECTION OF NEW CABLING TO EXISTING EQUIPMENT, OR WORK IN SHARED MANHOLES. ALL SHUTDOWNS SHALL BE COORDINATED WITH AND APPROVED BY THE COR WITH A NOTICE PERIOD AS DICTATED BY THE COR. SHUTDOWNS SHALL BE COORDINATED TO MINIMIZE RISK TO PATIENT CARE AND
WORK MAY BE REQUIRED TO BE SCHEDULED ON WEEKENDS.
2. PHASING SHOULD BE ANTICIPATED AS FOLLOWS:
A. A SHORT DURATION SHUTDOWN TO ISOLATE FEEDER B AND CLOSE THE TIE BREAKER WITHIN BUILDING 11. REMOVAL OF FEEDER B SHALL NOT OCCUR UNTIL THE VA HAS TESTED THE EMERGENCY POWER SUPPLY SYSTEM AND VERIFIED THAT IT IS FUNCTIONING CORRECTLY WHILE
UTILIZING A SINGLE FEEDER.
B. REMOVAL OF EXISTING FEEDER B CONDUIT AND CABLING. INSTALLATION OF NEW CONDUIT, DUCTBANKS, MANHOLES, AND CABLING FOR
FEEDER B UP TO THE EXISTING EQUIPMENT IN BUILDING 11 AND BUILDING 2.
C. A SHORT DURATION SHUTDOWN TO TERMINATE FEEDER B AND ISOLATE FEEDER F. NOTE, THE VA MAY ELECT TO SPLIT THIS INTO TWO SEPARATE SHUTDOWNS TO ENSURE THE FUNCTIONALITY OF THE NEWLY INSTALLED FEEDER B PRIOR TO THE ISOLATION OF FEEDER F.
D. REMOVAL OF EXISTING FEEDER F CONDUIT AND CABLING. INSTALLATION OF NEW CONDUIT, DUCTBANKS, MANHOLES, AND CABLING FOR
FEEDER F UP TO THE EXISTING EQUIPMENT IN BUILDING 11 AND BUILDING 2.
E. A SHORT DURATION SHUTDOWN TO TERMINATE FEEDER F AND RESTORE THE SYSTEM TO NORMAL OPERATION.
NOTE: ANY WORK WITHIN EXISTING ELECTRICAL MANHOLES WHICH REQUIRES LOTO OF EXISTING FEEDERS SHALL BE COORDINATED WITH
THE OWNER AND SHALL BE OF THE SHORTEST DURATION PRACTICABLE.
REV 2 - PRE-BID UPDATES 2024-08-01
REV 1 - FINAL BID SET 2024-04-04
REV 3 - OWNER REQUESTED UPDATES 2025-01-24
SHEET 2261/24/2025
G
FC
I G
FC
I G
FC
I
GFCI
G
FC
I
GFCI GFCI
GFCIGFCIGFCI
G
FC
I
GFCI
GFCI
GFCI
GFCI
GFCI
G
FC
I G
FC
I G
FC
I G
FC
I
G
FC
I
G
FC
I G
FC
I G
FC
I G
FC
I G
FC
I
GFCI
F F
1' 2'
A'
B'
G'
F'
D'
C'
2.8'
E'
2-120B-480E-SWBD-001
2-120A-208E-T-001
2-120A-480E-ATS-001
2-120A-480E-ATS-002
02-PP1
02-DP1
LOCKER ROOM
125-2
CHANGING AREA
127-2
SHOWER AREA
126-2
TOILET
123-2
TOILET
122-2
JANITOR
121-2
BREAK ROOM
124-2
GENERATOR ROOM
120B-2
BOILER ROOM
119-2
CONTROL ROOM
130-2
SUPERVISOR
129-2
CHEM FEED
128-2
PROPANE
131-2
DUPLEX
FUEL OIL
PUMP DISC
GD-3 DISC
GD-2 DISC
GD-1 DISC
2-119-BLR-001
2-119-BLR-002
2-119-BLR-003
2-119-PMP-003
2-119-PMP-004
2-119-PMP-005
2-119-PMP-002
2-119-PMP-001
GD-4 DISC
2-120A-480N-SWBD-001
02-DP2
02-PP2
02-PP3
02-DP3
1 2 3
A
B
D
F
H
M
DO
W
N
UP
UP
2-EXT-CU-001-DISC
2-EXT-CU-002-DISC
2-EXT-CU-003-DISC
02-PP4
G
31817
02-PP3
02-PP3
F
F
F
02-PP4
7 12
02-PP4
9 5 12
02-PP4
17,19,21
02-PP4
02-PP4
10 02-PP4
02-PP4
02-PP4
02-PP4
02-PP4
02-PP1
02-PP1
102-PP1
1 02-PP1
02-PP4
18,20,22
02-PP4
02-PP3
02-PP4
PARALLEL
SWITCHING GEAR
101B-2
02-PP4
6,8
02-PP3
13,15
ELECTRICAL ROOM
120A-2
BOILER ROOM
101-2
2-119-PMP-001
VFD
2-119-PMP-002
VFD
2-119-PMP-003
VFD
2-119-PMP-004
VFD
2-119-PMP-005
VFD
02-DP3
10,12,14
02-DP3
11,13,15
02-DP3
16,18,20
EP201
EP201
EP201
EP401
EP201
3'
2-119-CP-005
F
PANEL C
PANEL A
GROUNDING
BAR
02-PP1
9,11
2-EXT-CU-001
2-EXT-CU-002
2-EXT-CU-003DP1
20,22,24
2-119-CP-004
02-PP1
02-PP1
02-PP1
02-PP1
02-PP1
02-PP3
02-PP4
2-119-CP-001
2-119-CP-002
2-119-CP-003
CONTINUOUS
GAS
ANALYZER 3
CONTINUOUS
GAS
ANALYZER 2
CONTINUOUS
GAS
ANALYZER 1
FUEL
OIL
DUPLEX
PUMP
SKID
STEAM
SAMPLE
STATIONS
2-120B-480E-GEN-001
02-PP4
02-PP4
02-PP4
02-PP2
02-PP2
02-PP2
02-PP2
02-PP2
7,9,11
02-PP2
7,9,11
02-PP2
4,6,8
02-PP2
4,6,8
02-PP3
02-DP3
27,29,31
PORTABLE GENERATOR LOADBANK
RECEPTACLE FOR TV
480V 3P, 4W
100A RATED RECPETACLE
WITH INTEGRAL DISCONNECT
02-PP3
2-119-CP-006
2-119-CP-009
2-119-TK-004
02-PP2
02-PP1
2-119-CP-004 WILL BE LOCATED WITH
SANITARY LIFT STATION. SEE ES171 FOR
UPDATED LOCATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
EP121
ELECTRICAL POWER PLAN - GROUND
FLOOR LEVEL 2
KRK KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
5. SEE EP-602 - EP-604 FOR PANEL SCHEDULES.
4. SEE MECHANICAL PLANS FOR ADDITIONAL MECHANICAL EQUIPMENT INFORMATION.
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/16" = 1'-0"1 ELECTRICAL POWER PLAN - GROUND FLOOR LEVEL
N
KEYED NOTES
1 PROVIDE WIRED WALL CONTROLLER, FOR EACH CEILING FAN, PER MANUFACTURER
SPECIFICATIONS. SEE MECHANICAL HVAC SCHEDULE FOR ADDITIONAL INFORMATION.
2 PROVIDE NEMA 3X RATED (OR EQUIVALENT) ENCLOSURE TO PROTECT BOILER
EMERGENCY POWER CONNECTION.
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-04
REV 2 - OWNER REQUESTED UPDATES 2025-01-24
SHEET 243
ARCHITECT/ENGINEER OF RECORD
1/24/2025
1' 2'
A'
B'
G'
F'
D'
C'
2.8'
E'
1 2 3
A
B
D
F
H
M
53'
EP201
EP202
2-120B-480E-SWBD-001
2-120A-208E-T-001
2-120A-480E-ATS-001
2-120A-480E-ATS-002
02-PP1
02-DP1
LOCKER ROOM
125-2CHANGING AREA
127-2
SHOWER AREA
126-2
TOILET
123-2
TOILET
122-2
JANITOR
121-2
BREAK ROOM
124-2
GENERATOR ROOM
120B-2
BOILER ROOM
119-2
CONTROL ROOM
130-2
SUPERVISOR
129-2
CHEM FEED
128-2
PROPANE
131-2
2-119-BLR-001
2-119-BLR-002
2-119-BLR-003
2-120A-480N-SWBD-001
02-DP2
02-PP2
02-PP3
02-DP3
DO
W
N
UP
UP
02-PP4
PARALLEL
SWITCHING GEAR
101B-2
ELECTRICAL ROOM
120A-2
BOILER ROOM
101-2
2-119-PMP-001
VFD
2-119-PMP-002
VFD
2-119-PMP-003
VFD
2-119-PMP-004
VFD
2-119-PMP-005
VFD
2-119-CP-005
PANEL C
PANEL A
GROUNDING
BAR
EP202
EP201
2-120B-480E-GEN-001
BLDG. #2
BOILERHOUSE
NORM
SHOWER & LAB
104A-2
UNISEX RESTROOM
104-2
OFFICE/BOILER CTRL
RM
102-2
PASSAGEWAY
103-2
(1) 4" RGS
FEEDER F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
EP122
ELECTRICAL CONDUIT ROUTING
PLAN - GROUND FLOOR LEVEL 2
KRK LAJ
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 ELECTRICAL CONDUIT ROUTING PLAN - GROUND FLOOR LEVEL
KEYPLAN
N AREA OF WORK
12 16
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYED NOTES
1 ROUTE UP WALL TO ABOVE MEZZANINE LEVEL
2 ROUTE ABOVE ROLL-UP DOOR
3 ROUTE TO SUBSTATION. REFER TO EP601
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-04
REV 2 - OWNER REQUESTED UPDATES 2025-01-24
SHEET 244
1/24/2025
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
EP602
ELECTRICAL POWER PANEL
SCHEDULES 2
KRK CCW
PARTIALLY SPRINKLERED
NOTES:
TOTAL CONN. CURRENT: 256 A
TOTAL CONN. LOAD: 212969 VA
PANEL TOTALS
LEGEND:
TOTAL AMPS: 256 A 254 A 293 A
TOTAL LOAD: 70851 VA 70262 VA 80969 VA
41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26
23 3049 VA -- -- -- 24
21 3049 VA -- -- -- 22
19 -- -- -- 44219 VA 3049 VA 3 50 A SANITARY LIFT STATION PUMPS 20
17 -- -- -- 43264 VA 16653 VA -- -- -- 18
15 02-DP3 175 A 3 44449 VA 16689 VA -- -- -- 16
13 -- -- -- 7019 VA 16759 VA 3 100 A 02-DP2 14
11 -- -- -- 6966 VA 0 VA 1 20 A SPARE 12
9 02-DP5 100 A 3 7049 VA 0 VA 1 20 A SPARE 10
7 RM 120B LTS 20 A 1 102 VA 163 VA 1 20 A RM 120A LTS 8
5 ELECTRIC WATER HEATER 60 A 1 12100 VA 0 VA 1 20 A SPARE 6
3 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 4
1 EXTERIOR LIGHTING 20 A 1 526 VA 0 VA 1 20 A SPARE 2
CKT CIRCUIT DESCRIPTION TRIP POLE
S A B C POLE
S TRIP CIRCUIT DESCRIPTION CKT
NOTES:
ENCLOSURE: TYPE 1 MCB RATING: 225 A
MOUNTING: SURFACE WIRES: 4 MAINS RATING: 400 A
SUPPLY FROM: PHASES: 3 MAINS TYPE:
LOCATION: ELECTRICAL ROOM 120A-2 VOLTS: 480/277 Wye A.I.C. RATING:
BRANCH PANEL: DP1
NOTES:
TOTAL CONN. CURRENT: 60 A
TOTAL CONN. LOAD: 50101 VA
PANEL TOTALS
LEGEND:
TOTAL AMPS: 61 A 60 A 60 A
TOTAL LOAD: 16759 VA 16689 VA 16653 VA
41 42 39 40 37 38 35 36 33 34
31 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 32
29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30
27 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 28
25 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 26
23 RM 125,127 LTS 20 A 1 80 VA 41 VA 1 20 A LTS OUTSIDE RM 121,122,123 24
21 RM 126 LTS 20 A 1 85 VA 71 VA 1 20 A RM 121,122,123 LTS 22
19 LTS UNDER BOILER CATWALK 20 A 1 102 VA 126 VA 1 20 A RM 124 LTS 20
17 -- -- -- 2106 VA 1330 VA -- -- -- 18
15 -- -- -- 2106 VA 1330 VA -- -- -- 16
13 2-119-PMP-001 20 A 3 2106 VA 1330 VA 3 20 A 2-119-RO-001 14
11 -- -- -- 3880 VA 2106 VA -- -- -- 12
9 -- -- -- 3880 VA 2106 VA -- -- -- 10
7 2-119-PMP-005 20 A 3 3880 VA 2106 VA 3 20 A 2-119-PMP-002 8
5 -- -- -- 3880 VA 3880 VA -- -- -- 6
3 -- -- -- 3880 VA 3880 VA -- -- -- 4
1 2-119-PMP-004 20 A 3 3880 VA 3880 VA 3 20 A 2-119-PMP-003 2
CKT CIRCUIT DESCRIPTION TRIP POLE
S A B C POLE
S TRIP CIRCUIT DESCRIPTION CKT
NOTES:
ENCLOSURE: TYPE 1 MCB RATING: 100 A
MOUNTING: SURFACE WIRES: 4 MAINS RATING: 150 A
SUPPLY FROM: DP1 PHASES: 3 MAINS TYPE:
LOCATION: ELECTRICAL ROOM 120A-2 VOLTS: 480/277 Wye A.I.C. RATING:
BRANCH PANEL: 02-DP2
NOTES:
TOTAL CONN. CURRENT: 159 A
TOTAL CONN. LOAD: 131932 VA
PANEL TOTALS
LEGEND:
TOTAL AMPS: 161 A 156 A 160 A
TOTAL LOAD: 44449 VA 43264 VA 44219 VA
41 42 39 40 37 38 35 36 33 34
31 -- -- -- 10254 VA 0 VA 1 20 A SPARE 32
29 -- -- -- 10254 VA 0 VA 1 20 A SPARE 30
27 EM BLR PWR CONN 75 A 3 10254 VA 0 VA 1 20 A SPARE 28
25 BASEMENT EM WALL LIGHTS 20 A 1 100 VA 1100 VA 1 20 A MEZZ EM WALL LTS 26
23 BASEMENT 003-2 LIGHT 20 A 1 20 VA 1100 VA 1 20 A GR FL EM WALL LTS 24
21 -- -- -- 313 VA 33 VA 1 20 A RM 131 LIGHT 22
19 -- -- -- 313 VA 10254 VA -- -- -- 20
17 PROPANE RM EXHAUST FAN 20 A 3 313 VA 10254 VA -- -- -- 18
15 -- -- -- 10254 VA 10254 VA 3 75 A BOILER 3 16
13 -- -- -- 10254 VA 10254 VA -- -- -- 14
11 BOILER 2 75 A 3 10254 VA 10254 VA -- -- -- 12
9 -- -- -- 942 VA 10254 VA 3 75 A BOILER 1 10
7 -- -- -- 942 VA 942 VA -- -- -- 8
5 2-200-SF-001 20 A 3 942 VA 942 VA -- -- -- 6
3 RM 128,129 LTS 20 A 1 80 VA 942 VA 3 20 A 2-200-SF-002 4
1 EXIT SIGNS 20 A 1 35 VA 120 VA 1 20 A RM 130 LTS 2
CKT CIRCUIT DESCRIPTION TRIP POLE
S A B C POLE
S TRIP CIRCUIT DESCRIPTION CKT
NOTES:
ENCLOSURE: TYPE 1 MCB RATING: 175 A
MOUNTING: SURFACE WIRES: 4 MAINS RATING: 250 A
SUPPLY FROM: DP1 PHASES: 3 MAINS TYPE:
LOCATION: BOILER ROOM 119-2 VOLTS: 480/277 Wye A.I.C. RATING:
BRANCH PANEL: 02-DP3
NOTES:
TOTAL CONN. CURRENT: 25 A
TOTAL CONN. LOAD: 21034 VA
PANEL TOTALS
LEGEND:
TOTAL AMPS: 25 A 25 A 25 A
TOTAL LOAD: 7049 VA 6966 VA 7019 VA
41 42 39 40 37 38 35 36 33 34 31 32
29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30
27 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 28
25 -- -- -- 2106 VA 0 VA 1 20 A SPARE 26
23 -- -- -- 2106 VA 0 VA 1 20 A SPARE 24
21 2-R-EF-004 20 A 3 2106 VA 0 VA 1 20 A SPARE 22
19 -- -- -- 942 VA 942 VA -- -- -- 20
17 -- -- -- 942 VA 942 VA -- -- -- 18
15 2-R-EF-001 20 A 3 942 VA 942 VA 3 20 A 2-R-EF-002 16
13 -- -- -- 1178 VA 1178 VA -- -- -- 14
11 -- -- -- 1178 VA 1178 VA -- -- -- 12
9 2-200-MAU-001 20 A 3 1178 VA 1178 VA 3 20 A 2-200-MAU-002 10
7 BOILER ROOM HIGH BAY LED 20 A 1 693 VA 0 VA -- -- -- 8
5 BOILER ROOM HIGH BAY LED 20 A 1 819 VA 0 VA -- -- -- 6
3 BOILER ROOM HIGH BAY LED 20 A 1 756 VA 0 VA 3 20 A RM 201 COMM RACK 4
1 DA TANK AREA LTS 20 A 1 81 VA 80 VA 1 20 A RM 201 LTS 2
CKT CIRCUIT DESCRIPTION TRIP POLE
S A B C POLE
S TRIP CIRCUIT DESCRIPTION CKT
NOTES:
ENCLOSURE: TYPE 1 MCB RATING: 100 A
MOUNTING: SURFACE WIRES: 4 MAINS RATING: 100 A
SUPPLY FROM: DP1 PHASES: 3 MAINS TYPE:
LOCATION: EQUIPMENT ACCESS 200-2 VOLTS: 480/277 Wye A.I.C. RATING:
BRANCH PANEL: 02-DP4
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-04
REV 2 - OWNER REQUESTED UPDATES 2025-01-24
SHEET 2511/24/2025
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
EP603
ELECTRICAL POWER PANEL
SCHEDULES 2
KRK KRK
PARTIALLY SPRINKLERED
NOTES:
TOTAL CONN. CURRENT: 198 A
TOTAL CONN. LOAD: 71458 VA
PANEL TOTALS
LEGEND:
TOTAL AMPS: 187 A 214 A 207 A
TOTAL LOAD: 22393 VA 25304 VA 24485 VA
41 42 39 40 37 38 35 36 33 34 31 32 29 30
27 -- -- -- 6808 VA 180 VA 1 20 A SAN. LIFT ST CONTROL POWER 28
25 -- -- -- 7027 VA 5992 VA -- -- -- 26
23 02-PP4 100 A 3 6628 VA 6086 VA -- -- -- 24
21 -- -- -- 4104 VA 6417 VA 3 100 A 02-PP5 22
19 -- -- -- 4814 VA 20
17 02-PP3 100 A 3 4659 VA 18
15 3140 VA -- -- -- 16
13 2760 VA -- -- -- 14
11 -- -- -- 3848 VA 2588 VA 3 100 A 02-PP2 12
9 2-EXT-CU-003 50 A 2 3848 VA 10
7 2-200-UH-001, 002, 003 20 A 1 900 VA 8
5 2-200-CF-001 10 A 1 768 VA 270 VA -- -- -- 6
3 RM 120A RCPT 20 A 1 900 VA 270 VA 2 20 A FUEL TANK LIGHTS 4
1 RM 120B RCPT 20 A 1 720 VA 768 VA 1 10 A 2-200-CF-002 2
CKT CIRCUIT DESCRIPTION TRIP POLE
S A B C POLE
S TRIP CIRCUIT DESCRIPTION CKT
NOTES:
ENCLOSURE: TYPE 1 MCB RATING: 200 A
MOUNTING: RECESSED WIRES: 4 MAINS RATING: 400 A
SUPPLY FROM: PHASES: 3 MAINS TYPE:
LOCATION: ELECTRICAL ROOM 120A-2 VOLTS: 120/208 Wye A.I.C. RATING:
BRANCH PANEL: 02-PP1
NOTES:
TOTAL CONN. CURRENT: 23 A
TOTAL CONN. LOAD: 8128 VA
PANEL TOTALS
LEGEND:
TOTAL AMPS: 22 A 23 A 26 A
TOTAL LOAD: 2588 VA 2760 VA 3140 VA
41 42 39 40 37 38 35 36 33 34 31 32
29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30
27 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 28
25 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 26
23 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 24
21 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 22
19 CONTINUOUS GAS ANALYZER 3 30 A 1 1500 VA 0 VA 1 20 A SPARE 20
17 CONTINUOUS GAS ANALYZER 2 30 A 1 1500 VA 0 VA -- -- -- 18
15 CONTINUOUS GAS ANALYZER 1 30 A 1 1500 VA 0 VA -- -- -- 16
13 2-119-CP-005 20 A 1 180 VA 0 VA 3 30 A SPARE 14
11 -- -- -- 360 VA 200 VA 1 20 A 2-119-CP-009 12
9 -- -- -- 360 VA 180 VA 1 20 A 2-119-CP-006 10
7 RM 119 3P RCPT 30 A 3 360 VA 360 VA -- -- -- 8
5 RM 119 CNTRLN RCPT 20 A 1 720 VA 360 VA -- -- -- 6
3 RM 119 RCPT EAST 20 A 1 360 VA 360 VA 3 30 A RM 119 3P RCPT 4
1 2-100-TK-004 (WATER SOFTENER) 20 A 1 10 VA 180 VA 1 20 A RO CONTROL RECEPTACLE 2
CKT CIRCUIT DESCRIPTION TRIP POLE
S A B C POLE
S TRIP CIRCUIT DESCRIPTION CKT
NOTES:
ENCLOSURE: Type 1 MCB RATING: 100 A
MOUNTING: SURFACE WIRES: 4 MAINS RATING: 100 A
SUPPLY FROM: 02-PP1 PHASES: 3 MAINS TYPE:
LOCATION: ELECTRICAL ROOM 120A-2 VOLTS: 120/208 Wye A.I.C. RATING:
BRANCH PANEL: 02-PP2
NOTES:
TOTAL CONN. CURRENT: 38 A
TOTAL CONN. LOAD: 13536 VA
PANEL TOTALS
LEGEND:
TOTAL AMPS: 40 A 41 A 34 A
TOTAL LOAD: 4659 VA 4814 VA 4104 VA
41 42 39 40 37 38 35 36 33 34 31 32
29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30
27 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 28
25 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 26
23 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 24
21 MED GAS MONITOR 20 A 1 210 VA 115 VA 1 20 A CO MONITOR 22
19 RM 129 RECPT 20 A 1 720 VA 180 VA 1 20 A RM 003 RCPT 20
17 RM 130 RECPT SOUTH 20 A 1 360 VA 360 VA 1 20 A RM 130 RECPT SOUTH 18
15 -- -- -- 1789 VA 360 VA 1 20 A RM 130 RECPT WEST 16
13 2-EXT-CU-001 25 A 2 1789 VA 360 VA 1 20 A RM 130 RECPT WEST 14
11 RM 129 RECPT 20 A 1 1080 VA 360 VA 1 20 A RM 130 RECPT SOUTH 12
9 RM 003 SUMP PMP 20 A 1 180 VA 1080 VA 1 20 A FA CONTROL PANEL 10
7 RM 130 RECPT EAST 20 A 1 540 VA 1260 VA 1 20 A SEWAGE PUMP PMP-1 8
5 RM 128 RCPT CHEM FD PMP 20 A 1 1080 VA 864 VA 1 20 A RM 128 RCPT CHEM FD PMP 6
3 RM 130 RECPT SOUTH 20 A 1 720 VA 360 VA 1 20 A RM 130 RECPT WEST 4
1 GD-1 20 A 1 0 VA 0 VA 1 20 A GD-4 2
CKT CIRCUIT DESCRIPTION TRIP POLE
S A B C POLE
S TRIP CIRCUIT DESCRIPTION CKT
NOTES:
ENCLOSURE: Type 1 MCB RATING: 100 A
MOUNTING: SURFACE WIRES: 4 MAINS RATING: 100 A
SUPPLY FROM: 02-PP1 PHASES: 3 MAINS TYPE:
LOCATION: BOILER ROOM 119-2 VOLTS: 120/208 Wye A.I.C. RATING:
BRANCH PANEL: 02-PP3
NOTES:
TOTAL CONN. CURRENT: 57 A
TOTAL CONN. LOAD: 20463 VA
PANEL TOTALS
LEGEND:
TOTAL AMPS: 55 A 59 A 57 A
TOTAL LOAD: 6628 VA 7027 VA 6808 VA
41 42 39 40 37 38 35 36 33 34 31 32
29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30
27 SPARE 20 A 1 0 VA 0 VA -- -- -- 28
25 SPARE 20 A 1 0 VA 0 VA -- -- -- 26
23 SPARE 20 A 1 0 VA 0 VA 3 20 A SPARE 24
21 -- -- -- 2667 VA 1273 VA -- -- -- 22
19 -- -- -- 2667 VA 1273 VA -- -- -- 20
17 RM 124 ELEC RANGE 50 A 3 2667 VA 1273 VA 3 20 A DUPLEX FUEL OIL PUMP 18
15 RM 119,121,122,123,126 RECPT 20 A 1 1260 VA 0 VA 1 20 A SPARE 16
13 RM 119 RCPT 20 A 1 540 VA 0 VA 1 20 A SPARE 14
11 RM 124 RCPT 20 A 1 540 VA 360 VA 1 20 A RM 124 CNTRTOP RECPT 12
9 RM 124 RCPT 20 A 1 540 VA 1080 VA 1 20 A RM 125,127 RCPT 10
7 RM 124 CNTRTOP RECPT 20 A 1 360 VA 1789 VA -- -- -- 8
5 RM 124 FRIDGE 20 A 1 180 VA 1789 VA 2 25 A 2-EXT-CU-002 6
3 RM 124 COUNTER LTS 20 A 1 12 VA 195 VA 1 20 A RM 124 WTR FNTN 4
1 GD-2 20 A 1 0 VA 0 VA 1 20 A GD-3 2
CKT CIRCUIT DESCRIPTION TRIP POLE
S A B C POLE
S TRIP CIRCUIT DESCRIPTION CKT
NOTES:
ENCLOSURE: TYPE 1 MCB RATING: 100 A
MOUNTING: RECESSED WIRES: 4 MAINS RATING: 100 A
SUPPLY FROM: 02-PP1 PHASES: 3 MAINS TYPE:
LOCATION: BOILER ROOM 119-2 VOLTS: 120/208 Wye A.I.C. RATING:
BRANCH PANEL: 02-PP4
NOTES:
TOTAL CONN. CURRENT: 51 A
TOTAL CONN. LOAD: 18304 VA
PANEL TOTALS
LEGEND:
TOTAL AMPS: 54 A 51 A 50 A
TOTAL LOAD: 6417 VA 6086 VA 5992 VA
41 42 39 40 37 38 35 36 33 34 31 32
29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30
27 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 28
25 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 26
23 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 24
21 -- -- -- 0 VA 0 VA 1 20 A SPARE 22
19 SPARE 20 A 2 0 VA 0 VA -- -- -- 20
17 -- -- -- 0 VA 0 VA -- -- -- 18
15 SPARE 30 A 2 0 VA 0 VA 3 20 A SPARE 16
13 -- -- -- 875 VA 180 VA 1 20 A 2-200-CP-006A 14
11 2-200-PMP-001 20 A 2 875 VA 3633 VA -- -- -- 12
9 -- -- -- 1248 VA 3633 VA -- -- -- 10
7 ELECTRIC CHAIN HOIST 30 A 2 1248 VA 3633 VA 3 20 A 2-200-CA-001 8
5 ROOF RCPT 20 A 1 720 VA 875 VA -- -- -- 6
3 RM 201 RCPT 20 A 1 540 VA 875 VA 2 20 A 2-200-PMP-002 4
1 RM 201 RCPT 20 A 1 540 VA 180 VA 1 20 A RM 200 RCPT 2
CKT CIRCUIT DESCRIPTION TRIP POLE
S A B C POLE
S TRIP CIRCUIT DESCRIPTION CKT
NOTES:
ENCLOSURE: TYPE 1 MCB RATING: 100 A
MOUNTING: SURFACE WIRES: 4 MAINS RATING: 100 A
SUPPLY FROM: 02-PP1 PHASES: 3 MAINS TYPE:
LOCATION: EQUIPMENT ACCESS 200-2 VOLTS: 120/208 Wye A.I.C. RATING:
BRANCH PANEL: 02-PP5
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-04
REV 2 - OWNER REQUESTED UPDATES 2025-01-24
SHEET 2521/24/2025
02-DP1 CABLE AND CONDUIT SCHEDULE
LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS
EXTERIOR LIGHTING 02-DP1 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
RM 100 101 EXIT SIGNS 02-DP1 2 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
ELECTRIC WATER HEATER 02-DP1 5 1-#6 1-#6 1-#10 1 1 1 3/4" RMC 1
GENERATOR RM LIGHTS 02-DP1 7 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
ELEC RM LIGHTS 02-DP1 8 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
02-DP4 02-DP1 9 11 13 3-#1 1-#1 1-#6 3 1 1 1-1/2" RMC 1
02-DP2 02-DP1 14 16 18 3-#1 1-#1 1-#6 3 1 1 1-1/2" RMC 1
02-DP3 02-DP1 15 17 19 3-#4/0 1-#4/0 1-#4 3 1 1 2-1/2" RMC 1
SANITARY LIFT STATION PUMPS 02-DP1 20 22 24 3-#6 1-#8 3 0 1 1" RMC 1
02-DP2 CABLE AND CONDUIT SCHEDULE
LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS
PMP-004 02-DP2 1 3 5 3-#12 1-#12 3 0 1 3/4" RMC 1
PMP-003 02-DP2 2 4 6 3-#12 1-#12 3 0 1 3/4" RMC 1
PMP-005 02-DP2 7 9 11 3-#12 1-#12 3 0 1 3/4" RMC 1
PMP-002 02-DP2 8 10 12 3-#12 1-#12 3 0 1 3/4" RMC 1
PMP-001 02-DP2 13 15 17 3-#12 1-#12 3 0 1 3/4" RMC 1
RO SYSTEM POWER 02-DP2 14 16 18 3-#12 1-#12 3 0 1 3/4" RMC 1
LTS UNDER BOILER PLATFORMS 02-DP2 19 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
BRK RM 102 LTS 02-DP2 20 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
RM 103 104 LTS 02-DP2 21 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
RM 106 107 108 LTS 02-DP2 22 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
RM 103 105 LTS 02-DP2 23 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
LIGHTING OUTSIDE TOILETS 02-DP2 24 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
02-DP3 CABLE AND CONDUIT SCHEDULE
LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS
CONTROL RM 111 EXIT SIGNS 02-DP3 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
RM 109 110 111 LTS 02-DP3 2 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
RM 109 110 111 LTS 02-DP3 3 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
SUPPLY FAN 1 02-DP3 4 6 8 3-#12 1-#12 3 0 1 3/4" RMC 1
SUPPLY FAN 2 02-DP3 5 7 9 3-#12 1-#12 3 0 1 3/4" RMC 1
BOILER 1 02-DP3 10 12 14 3-#4 1-#4 1-#8 3 1 1 1-1/2" RMC 1
BOILER 2 02-DP3 11 13 15 3-#4 1-#4 1-#8 3 1 1 1-1/2" RMC 1
BOILER 3 02-DP3 16 18 20 3-#4 1-#4 1-#8 3 1 1 1-1/2" RMC 1
PROPANE RM EXHAUST FAN 02-DP3 17 19 21 3-#12 1-#12 3 0 1 3/4" RMC 1
PROPANE ROOM LIGHT 02-DP3 22 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
BASEMENT 003-2 LIGHT 02-DP3 23 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
GR FL EM WALL LTS 02-DP3 24 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
BASEMENT EM WALL LIGHTS 02-DP3 25 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
MEZZ EM WALL LTS 02-DP3 26 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
BOILER EMERGENCY POWER POINT 02-DP3 27, 29, 31 3-#4 1-#4 1-#8 3 1 1 1-1/2" RMC 1
02-DP4 CABLE AND CONDUIT SCHEDULE
LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS
DA TANK LIGHTING 02-DP4 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
CONTROL IT RM LIGHTING 02-DP4 2 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
BOILER ROOM HIGH BAY LED 02-DP4 3 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
COMMS RACK 02-DP4 4 6 8 3-#12 1-#12 3 0 1 3/4" RMC 1
BOILER ROOM HIGH BAY LED 02-DP4 5 1-#10 1-#10 1-#10 1 1 1 3/4" RMC 1
BOILER ROOM HIGH BAY LED 02-DP4 7 1-#10 1-#10 1-#10 1 1 1 3/4" RMC 1
MAU-001 02-DP4 9 11 13 3-#12 1-#12 3 0 1 3/4" RMC 1
MAU-002 02-DP4 10 12 14 3-#12 1-#12 3 0 1 3/4" RMC 1
2-R-EF-001 02-DP4 15 17 19 3-#12 1-#12 3 0 1 3/4" RMC 1
2-R-EF-002 02-DP4 16 18 20 3-#12 1-#12 3 0 1 3/4" RMC 1
2-R-EF-004 02-DP4 21 23 25 3-#12 1-#12 3 0 1 3/4" RMC 1
02-PP1 CABLE AND CONDUIT SCHEDULE
LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS
GEN RM RECEPTACLES 02-PP1 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
2-200-CF-002 02-PP1 2 1-#12 1-#12 1-#14 1 1 1 3/4" RMC 1
RECEPTACLE 02-PP1 3 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
FUEL TANK LIGHTS 02-PP1 4 6 2-#12 1-#12 2 0 1 3/4" RMC 1
2-200-CF-001 02-PP1 5 1-#12 1-#12 1-#14 1 1 1 3/4" RMC 1
2-200-UH-001 002 003 02-PP1 7 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
2-EXT-CU-003 02-PP1 9 11 2-#6 1-#6 2 0 1 3/4" RMC 1
02-PP2 02-PP1 12 14 16 3-#1 1-#1 1-#4 3 1 1 1-1/2" RMC 1
02-PP3 02-PP1 17 19 21 3-#1 1-#1 1-#4 3 1 1 1-1/2" RMC 1
02-PP5 02-PP1 22 24 26 3-#1 1-#1 1-#4 3 1 1 1-1/2" RMC 1
02-PP4 02-PP1 23 25 27 3-#1 1-#1 1-#4 3 1 1 1-1/2" RMC 1
02-PP2 CABLE AND CONDUIT SCHEDULE
LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS
2-100-TK-004 02-PP2 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
RO CONTROL RECEPTACLE 02-PP2 2 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
BOILER RM 100 REC EAST WALL 02-PP2 3 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
BOILER RM 100 3P REC 02-PP2 4 6 8 3-#8 1-#8 3 0 1 3/4" RMC 1
BOILER RM 100 REC CENTERLINE 02-PP2 5 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
BOILER RM 100 3P REC 02-PP2 7 9 11 3-#8 1-#8 3 0 1 3/4" RMC 1
SANITARY LIFT STATION CONTROL
POWER
02-PP1 28 1-#6 1-#6 1-#6 1 1 1 1" RMC 1
02-PP3 CABLE AND CONDUIT SCHEDULE
LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS
GARAGE DOOR 1 02-PP3 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
GARAGE DOOR 4 02-PP3 2 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
RECEPTACLES WEST WALL 02-PP3 3 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
CONTROL RM 111 REC 02-PP3 4 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
CHEMICAL FEED PUMPS 02-PP3 5 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
CHEMICAL FEED PUMPS 02-PP3 6 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
RECEPTACLE 02-PP3 7 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
SEWAGE PUMP PMP-1 02-PP3 8 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
RECEPTACLE 02-PP3 9 1-#10 1-#10 1-#10 1 1 1 3/4" RMC 1
FA CONTROL PANEL 02-PP3 10 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
SUPERVISOR RM 110 REC 02-PP3 11 1-#10 1-#10 1-#10 1 1 1 3/4" RMC 1
CONTROL RM 111 REC 02-PP3 12 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
2-EXT-OU-001 02-PP3 13 15 2-#10 1-#6 2 0 1 3/4" RMC 1
02-PP4 CABLE AND CONDUIT SCHEDULE
LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS
GARAGE DOOR 2 02-PP4 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
GARAGE DOOR 3 02-PP4 2 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
BRK RM 102 COUNTER LTS 02-PP4 3 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
WATER FOUNTAIN/BOTTLE FILL 02-PP4 4 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
2-EXT-OU-002 02-PP4 6 8 2-#12 1-#10 2 0 1 3/4" RMC 1
BRK RM 102 COUNTERTOP REC 02-PP4 7 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
BRK RM 102 REFRIGERATOR 02-PP4 9 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
RM 103 105 RECEPTACLE 02-PP4 10 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
BREAKROOM RECEPTACLES 02-PP4 11 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
BOILER RM 100 REC 02-PP4 13 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
RM 104 106 107 108 REC 02-PP4 15 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
BREAKROOM RECEPTACLES 02-PP4 16 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
ELECTRIC RANGE 02-PP4 17 19 21 3-#8 1-#10 3 0 1 3/4" RMC 1
DUPLEX FUEL OIL PUMP 02-PP4 18 20 22 3-#12 1-#12 3 0 1 3/4" RMC 1
02-PP5 CABLE AND CONDUIT SCHEDULE
LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS
RM 201 REC 02-PP5 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
RM 201 REC 02-PP5 3 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1
HOT WATER CIRC PUMP 02-PP5 4 6 2-#12 1-#12 2 0 1 3/4" RMC 1
RECEPTACLE 02-PP5 5 1-#10 1-#10 1-#10 1 1 1 3/4" RMC 1
ELECTRIC CHAIN HOIST 02-PP5 7 9 2-#10 1-#10 2 0 1 3/4" RMC 1
AIR COMPRESSOR 02-PP5 8 10 12 3-#10 1-#10 3 0 1 3/4" RMC 1
HOT WATER CIRC PUMP 02-PP5 11 13 2-#12 1-#12 2 0 1 3/4" RMC 1
GENERATOR CABLE AND CONDUIT SCHEDULE
LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS
2-120B-480E-SWBD-001 GENERATOR 3-#250 1-#250 1-#3 6 2 2 2-1/2" RMC 2
NORMAL POWER CABLE AND CONDUIT SCHEDULE
LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS
2-120A-480N-SWBD-001 NORMAL SWITCHGEAR 3-#250 1-#250 1-#3 6 2 2 2-1/2" RMC 2
PANEL C (EXISTING) CABLE AND CONDUIT SCHEDULE
LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS
EMERGECNY FUEL OIL SHUT OFF PANEL C 14 16 18 3-#12 1-#12 3 0 1 3/4" RMC 1
2-202-UH-001 -002 -003 PANEL C 20 1-#10 1-#10 1-#10 1 1 1 3/4" RMC 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
EP604
ELECTRICAL POWER CABLE AND
CONDUIT SCHEDULES 2
KRK LAJ
PARTIALLY SPRINKLERED
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
R…