These are electrical and construction drawings showing phasing plans and details for a boiler plant replacement project at the VA Medical Center in Iron Mountain, MI. The drawings include site plans, electrical demolition plans, power distribution plans, and panel schedules for a new boiler plant facility. Key details include temporary construction fencing requirements with 6' high chain link fencing, maintenance of minimum 24' travel width, phased utility work including storm sewer modifications, electrical feeder relocations, and installation of new equipment including boilers and support systems. The drawings specify detailed electrical requirements including panel schedules, cable/conduit specifications, and power distribution layouts. Construction phasing is broken into multiple phases including mobilization, site/utility pre-work, and equipment installation, with notes emphasizing maintaining continuous operation of the existing steam generation system throughout construction.

The plans include specific technical requirements such as emergency power connections, temporary blowdown separator installation, and coordination of road crossings with COR approval. Panel schedules detail electrical loads, circuit assignments, and wire specifications. Site utility work includes removal and replacement of storm sewers, site lighting, and electrical distribution infrastructure. The drawings emphasize maintaining facility operations during construction through careful phasing and coordination with VA staff.

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
36C25225R0004 0007.docx DOCX document
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.1_P03 Single Source Justification MEDECO.e.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.6c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EEEEEE

E

E E E EE E

E

E E

E E

E E

E

GATE

E

E

E E

E

E

E

E

E E

E E E

E

E E

E

E

E

E

E

E E

E E E

E

E

E E

E E E E

E E

E E

E E

E E

E

E

E E

E E

E

E

E

E E

E E

E

GATE

CONTROLS

FUEL STATION

RETAINING WALL

E E

E

E

E

E E

E

E E E

E

E

E E E

E E

E

E

WV

WV

GATE

N89° 19' 12"W 878.64'

BLDG 2

GARAGE

BLDG 12

BLDG 16

STORAGE

BLDG 19

SALT SHED

BLDG 10

INCINERATOR STORAGE

METER HOUSE

BLDG 2

BOILER PLANT

BLDG 2

BOILER PLANT

S

E

E E

E E

E

GC101

GC101

LINE POST

TEMPORARY FENCE BASE WITH SAND BAG WEIGHTS

BOTTOM OF FENCE 1" ABOVE GRADE

6'- 0"

M

IN

IM

UM

TERMINAL POST

GALVANIZED CHAIN LINK FENCING

WITH PRIVACY COVERAGE

GALVANIZED CHAIN LINK FENCING

WITH PRIVACY COVERAGE

ELK CJR

REV 0 - 100% BID SET 2024-02-23

SCALE: 1" = 20'-0"

GENERAL PHASING PLAN PHASE 1 - MOBILIZATION1

2/GC101

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING

AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF

PROJECT. COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL

APPROVAL.

2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES

DO NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR

CREATING CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST

TRADES.

3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY

ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE

COMMENCING WORK.

4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND

BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND

INTENT SHOWN THROUGHOUT THIS DRAWING SET.

6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL

PHASING INFORMATION.

PHASE 1 NOTES - MOBILIZATION

1 ESTABLISH CONTRACTOR LAY DOWN AREA. COORDINATE AREA WITH COR/VA.

2 CUT CURB AND ESTABLISH PAVED TURN-AROUND LANES IN PARKING LOT.

3 INSTALL 6' HIGH CHAIN LINK FENCING AROUND WORK AREAS. SECURE FENCE TO

RESIST A 50 LB HORIZONTAL FORCE ALONG TOP OR BOTTOM.

4 MAINTAIN MINIMUM 24' TRAVEL WIDTH NORTH OF CONSTRUCTION FENCE.

5 MAINTAIN ACCESS TO B2 BY BOILER PLANT AND TRANSPORTATION STAFF. BUILDING

WILL REMAIN OCCUPIED AND ACTIVE THROUGHOUT CONSTRUCTION.

6 PROVIDE MINIMUM 12' WIDE GATE FOR VEHICLE ACCESS.

7 MAINTAIN TWO LANE TRAFFIC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN - PHASE 1 FINAL BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

GC101

SITE

585-21-115

KEYPLAN

12 16

SCALE: 1/2" = 1'-0"

TEMPORARY CONSTRUCTION FENCE DETAIL2

AREA OF WORK

REV 1 - OWNER REQUESTED UPDATES 2025-01-24

Sheet 31/24/2025

EEEEEE

E

E E E EE E

E

E E

EXHAUST FAN

E E E E E

E E E E E

E

GATE

E

E

E E

E

E

E

E

E E

E E E

E

E E

E

E

E

E

E

E E

E E E

E

E

E E

E E E E

E E

E E

E E

E E

E

E

E E

E E

E

E

E

E E

E E

E

GATE

CONTROLS

FUEL STATION

RETAINING WALL

E E

E

E

E

E E

E

E E E

E

E

E E E

E

E

E

E

WV

WV

GATE

N89° 19' 12"W 878.64'

E E E

BLDG 2

GARAGE

BLDG 12

BLDG 16

STORAGE

BLDG 19

SALT SHED

BLDG 10

INCINERATOR STORAGE

METER HOUSE

BLDG 2

BOILER PLANT

BLDG 2

BOILER PLANT

S

E

E E

E E

E

FOFOFOFOFO

FO

FO

T

E E

E E E E E E E E E

E E

E E

E

E

FO

FO

FO FO

FO

FO

FO

E E E E E E

E

BLDG 2

BOILER PLANT

DWS

FWFW

D

T T P

H

P

H

H

FW

ST

ST

ST

ST

D

ST

ST

SA SA SA

SA

SA

SA

SA

SS

SA

SA

SA

SA

SF

M

SF

M

SF

M

SF

M

SF

M

SF

M

SF

M

SFM SFM SFM

SA

SA

SA

SA

SA

SA

UE

UE

UE

UE

UE

ST

ST

ST

ST

ST

ST

P

X X X X X X X X X

X X

X X

X X

X X

X

X X X

XX

X X

X

XXX

X X

X X

X X

X X

X

X X

X X

X

X X

X X

X X

X X

X X

X X

X

X X X

X X X X

X X

X X

X X

X X

X X

XXXXXXXX

X X X X X X X X X

X X

X X

X X

X X

X

X X X

XX

X X

X

XXX

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X

X X X

X X X X

X X

X X

X X

X X

X X

XXXXXXXX

GC102

X X

X X

X X

X

X X X

X X

X

X X

X X

X

BLOWDOWN

FROM BOILERS

BLOWDOWN

SEPERATOR

COLD WATER

PIPE TRENCH

BOILER 1

ELK CJR

REV 0 - 100% BID SET 2024-02-23

SCALE: 1" = 20'-0"

GENERAL PHASING PLAN PHASE 2 - SITE & UTILITY PRE-WORK1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN - PHASE 2 FINAL BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

GC102

SITE

585-21-115

KEYPLAN

12 16

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING

AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF PROJECT.

COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL APPROVAL.

2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES DO

NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR CREATING

CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST TRADES.

3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY

ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE

COMMENCING WORK.

4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

PHASE 2 NOTES - SITE & UTILITY PRE-WORK

1 REMOVE STORM SEWERS IN WORK AREA. CONTRACTOR TO PROVIDE TEMPORARY

STORM WATER TRANSFER AROUND WORK SITE UNTIL NEW PERMANENT SEWERS CAN BE

INSTALLED/ACTIVATED.

2 REMOVE SITE EMERGENCY ELECTRICAL AND SITE LIGHTING, DISTRIBUTION IN WORK

AREA. CONTRACTOR TO PROVIDE TEMPORARY SERVICE FOR SITE EMERGENCY

ELECTRICAL AND SITE LIGHTING AND COORDINATE WITH THE COR.

3 COORDINATE ALL ROAD CROSSINGS WITH COR. CONTRACTOR TO PROVIDE TRAFFIC

PLAN AND OBTAIN COR APPROVAL BEFORE TRENCHING ACROSS ROADS.

4 INSTALL TEMPORARY BLOWDOWN SEPARATOR

5 REMOVE LEGACY FUEL TANK AND BLOWDOWN VAULT IN AREA OF NEW CONSTRUCTION.

6 INSTALL NEW GRAVITY STORM SEWERS.

7 INSTALL NEW ELECTRICAL DISTRIBUTION.

AREA OF WORK

SCALE: 1" = 2'-0"

TEMPORARY BLOWDOWN SEPARATOR2

NOTE:

LOCATE THE BLOWDOWN SEPARATOR BELOW THE ABANDONED VENT PIPE THAT

TERMINATES JUST BELOW THE ROOF. INSTALL A NEW VENT PIPE AND NEW ROOF

PENETRATION. REFER TO PLUMBING DRAWINGS FOR NEW TEMPORARY DRAIN PIPE.

Sheet 41/24/2025

D

T T P

H

P

H

H

D

SS

FUEL TANK

48'-0" x 12'-0"

UE

UE

UE

UE

UE

P

BLDG 2

LAW

N AREA

STORAGE

SHEDS

FU

EL

S

TA

TI

ON

CONTROLS

FUEL STATION

MA

TE

RI

AL

S

TO

RA

GE

N89° 19' 12"W 878.64'

BLDG 2

GARAGE

BLDG 12

BLDG 16

STORAGE

BLDG 19

SALT SHED

BLDG 10

INCINERATOR STORAGE

METER HOUSE

BLDG 2

BOILER PLANT

BLDG 2

BOILER PLANT

ELK CJR

REV 0 - 100% BID SET 2024-02-23

KEYPLAN

12 16

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN - PHASE 4 FINAL BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

GC104

SITE

585-21-115

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING

AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF

PROJECT. COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL

APPROVAL.

2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES

DO NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR

CREATING CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST

TRADES.

3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY

ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE

COMMENCING WORK.

4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND

BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND

INTENT SHOWN THROUGHOUT THIS DRAWING SET.

6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL

PHASING INFORMATION.

PHASE 4 NOTES - EQUIPMENT INSTALLATION

1. CONSTRUCT FOUNDATION AND SUPERSTRUCTURE FOR B2 ADDITION. CONTRACTOR

TO COORDINATE ALL ACTIVITIES TO ENSURE NO NEGATIVE IMPACT TO CONTINUED

OPERATION OF EXISTING STEAM GENERATION SYSTEM

2. INSTALL BOILERS AND SUPPORT EQUIPMENT

3. COMPLETE ROADWAY CONSTRUCTION UTILITIES AND SITE IMPROVEMENTS WITHIN

THE WORK AREA.

4. CONSTRUCT SECONDARY FUEL TANK

5. FIT OUT SUPPORT SPACES FOR OCCUPATION COMMISSION NEW BOILER PLANT

EQUIPMENT.

6. THE NEW SYSTEM MUST OPERATE CONTINUOUSLY FOR A MINIMUM OF 30 DAYS

BEFORE MOVING TO THE NEXT PHASE.THE EXISTING BOILER PLANT SHALL REMAIN

FULLY OPERATIONAL DURING THIS PERIOD.

7. REMOVE FEEDER F CROSS-TIE AND REPLACE WITH PERMANENT FEEDER F THROUGH

NEW BOILER ROOM

AREA OF WORK

SCALE: 1:20

GENERAL PHASE PLAN - PHASE 4 EQUIPMENT INSTALLATION1

Sheet 61/24/2025

STSTST

EEEEEEE

E

E

E E

E

FU

EL

S

TA

TI

ON

CONTROLS

FUEL STATION

WV

E

E

E

WV

WV

WV

MA

TE

RI

AL

S

TO

RA

GE

N89° 19' 12"W 878.64'

BLDG 2

GARAGE

BLDG 12

BLDG 16

STORAGE

BLDG 19

SALT SHED

BLDG 10

INCINERATOR STORAGE

METER HOUSE

BLDG 2

BOILER PLANT

BLDG 2

BOILER PLANT

S

BLDG 2

BOILER PLANT

DWS

FWFW

D

T T P

H

P

H

H

FW

ST

ST

ST

ST

D

ST

ST

SA SA SA

SA

SA

SA

SA

SS

FUEL TANK

48'-0" x 12'-0"

SA

SA

SA

SA

SF

M

SF

M

SF

M

SF

M

SF

M

SF

M

SF

M

SFM SFM SFM

SA

SA

SA

SA

SA

SA

UE

UE

UE

UE

UE

ST

ST

ST

ST

ST

ST

P

NEW 4" POTABLE

WATER SERVICE

NEW 6" FIRE

WATER SERVICE

NEW 4"

SANITARY PIPE

INV 1140.50-S

OIL WATER

SEPARATOR

TAP EXISTING MAIN

INSTALL VALVE 6X4 TAP

TIE TO EX SMH 103

FUEL TRUCK

UNLOADING AREA

TIE TO EX

EX SMH 1053/2100

SMH P01

HYDRANT

ASSEMBLY

LAW

N AREA

FOFOFOFOFO

FO

FO

JB

C

C

C

C

T

UE

UE

UE UE UE UE

PB

UE UE UE UE

UE

UE

UE

PB

E E

E

E E

E E

UE

JB

FO

FO

FO FO

FO

FO

FO

C

C

C

UE UE UE UE UE

C

PB

UE

ST-02

ST-03

F.F.E 1143.65

NEW 6" ROOF DRAIN

IE 1140.65-N

EXISTING 10"

ROOF

DRAINAGE

1125.59

SA-01

SA-02

SA-04

SA-05

SMH P02

SAN MH02

EX SMH 1050/2202

SAN MH01

ST-01

LIFT STATION

FOUNDATION DRAIN

EL 1141.53

TRENCH

DRAIN

EL 1137.95

SA-03

CU172

CU172

DUPLEX CONTROL

PANEL

CU172

FUEL PIPE TRENCH

NEW 6"

INDUSTRIAL PIPE

INV 1136.65-S

ST-04

CU503

TAP EXISTING MAIN

INSTALL VALVE 6X6 TAP

VALVE PIT

CLEAN OUT

CLEAN OUT

Br CJR

SCALE: 1" = 20'-0"

CIVIL UTILITIES PLAN1

REV 0 - 100% BID SET 2024-02-23

GENERAL NOTES

1. SEE C-001 FOR C-SERIES NOTES AND LEGENDS.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

KEYPLAN

12 16

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

CIVIL UTILITIES PLAN FINAL BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

CU171

SITE

585-21-115

STORM SEWER DATA

ID RIM PIPE INV IN TYPE SIZE PIPE INV OUT TYPE SIZE NOTES

EX SMH 1053

/2100

1141.96 ROOF DRAIN

EX PIPE

EX PIPE

1140.57(S)

1128.80 (E)

1123.85 (N)

CAST IRON

CONCRETE

CONCRETE

6" 10" 24"

EX PIPE

ST-01

1123.71 (S)

1123.71 (W)

CONCRETE

PVC

30" 30"

REPLACE

EXISTING

GRATE & LID

SMH P01 1142.60 ST-01 1123.29 (E) PVC 30" ST-02 1123.25 (S) PVC 30" NEW

STRUCTURE

SMH P02 1142.71 ST-05

ST-02

1123.07 (NE)

1122.16 (N)

CAST IRON

PVC

10" 30"

ST-03 1122.11(SE) PVC 30" NEW

STRUCTURE

EX SMH 1057 1142.50 EX PIPE

ST-03

EX PIPE

1132.94 (N)

1121.64 (NW)

1121.36 (W)

PVC

PVC

CONCRETE

4" 30" 30"

EX PIPE 1121.37 (SE) CONCRETE 30" REPLACE

EXISTING

GRATE & LID

SANITARY SEWER DATA

ID RIM PIPE INV IN TYPE SIZE PIPE INV OUT TYPE SIZE NOTES

OIL/ WATER

SEPERATOR

1142.76 INDUSTRIAL PIPE 1136.06 (S) CAST IRON 6" DISCHARGE

TO LIFT

STATION

1135.85 (SE) CAST IRON 6" NEW

STRUCTURE

LIFT

STATION

1142.88 SANITARY PIPE

DISHCARGE FROM

O/S SEPARATOR

1139.88 (N)

1135.59 (NW)

CAST IRON

CAST IRON

6" 6"

SA-02 1136.45 HDPE DR 14 4" NEW

STRUCTURE

SAN MH01 1143.35 SA-02 1141.65 (W) HDPE DR 21 4" SA-03 1138.35 (E) PVC DR 35 8" NEW

STRUCTURE

SAN MH02 1142.69 SA-03 1136.64 (W) PVC DR 35 8" SA-04 1136.47 (E) PVC DR 35 8" NEW

STRUCTURE

EX SMH 1050

/2202

1143.06 SA-04

EX PIPE

1132.23 (NW)

1132.13 (S)

PVC DR 35

CLAY

8" 8"

EX PIPE 1132.16 (N) CLAY 8" REPLACE

EXISTING

GRATE & LID

STORM PIPE DATA

PIPE LENGTH SIZE TYPE SLOPE NOTES

ST-01 41' 30" PVC 0.0075

ST-02 154' 30" PVC 0.0075

ST-03 60' 30" PVC 0.0075

ST-04 64' 10" PVC 0.02

SANITARY PIPE DATA

PIPE LENGTH SIZE TYPE SLOPE NOTES

SA-01 37' 15" PVC 0.02 FITTING TIES

TRENCH AND

FOUNDATION

DRAINS TOGETHER

SA-02 299' 4" HDPE N/A PIPE CURVES TO

CLEAR EX TUNNEL

& WATER MAIN

SA-03 85' 8" PVC 0.02

SA-04 112' 8" PVC 0.0376

REV 1 - FINAL BID SET 2024-04-05

REV 2 - PRE-BID UPDATES 2024-08-01

REV 3 - OWNER REQUESTED UPDATES 2025-01-24

SHEET 211/24/2025

CONTRACTOR JOB TRAILERS

PARKING LOT

PARKING LOT

PARKING LOT

SH

ED

S (x

3)

BUILDING

(DEMOLITION IS PROGRESS)

LIFT STATIONS

MAINTENANCE GARAGE

1 STORY, BRICK FACADE

AVG. ELEV.: 1162.43'

AREA: ±6925 SQ.FT.

(LESS OVERHANG)

WOODEN SHED

(NO ELEVATION SHOT)

AREA: ±330 SQ.FT.

BUILDING

1 STORY, STEEL

AVG. ELEV.: 1157.08'

AREA: ±1348 SQ.FT.

F.F.E.

1143.49'

BOILER PLANT

FIRST STORY, BRICK FACADE

AVG. ELEV.: 1162.66'

TOTAL BUILDING FOOT PRINT AREA: ±6695 SQ.FT.

BUILDING

1 STORY, STEEL

AVG. ELEV.: 1157.59'

AREA: ±243 SQ.FT.

BUILDING

1 STORY, STEEL

AVG. ELEV.: 1159.29'

AREA: ±1858 SQ.FT.

BUILDING

1 STORY, BRICK FACADE

AVG. ELEV.: 1158.57'

AREA: ±642 SQ.FT.

PREFAB.

SHED

(WOOD)

AREA:

±94 SQ.FT.

F.F.E.

1143.43'

F.F.E.

1143.43'

F.F.E.

1143.28'

F.F.E.

1143.09'

F.F.E.

1143.34'

F.F.E.

1143.80'

F.F.E.

1143.09'

F.F.E.

1143.78'

F.F.E.

1143.44'

F.F.E.

1143.14'

STACK ELEV:

1197.07'

STACK ELEV:

1197.08'

STACK ELEV:

1197.04'

BOILER

PLANT

3RD STORY

AVG. ELEV:

1194.68'

BOILER PLANT

2ND STORY

AVG. ELEV: 1162.66'

(BRICK FACADE)

ENTRYWAY

1 STORY, BRICK FACADE

AVG. ELEV.: 1157.26'

ENTRYWAY

1 STORY, BRICK FACADE

AVG. ELEV.: 1157.26'

STACK ELEV:

1165.78'

STACK ELEV:

1163.87'

STACK ELEV:

1163.67'

STSTST

E

E E

E E

E

WV

EEEEEEEE

E

GATE

STORAGE

SHEDS

E E E EE E

E

E E

E E

EXHAUST FAN

ELECTRIC

JUNCTION

BOX

E

E E E E E

E E E E E

E

GATE

E

E

E E

E

E

E

E

E E

E E E

E

E E

E

E

E

E

E

E E

E E E

E

E

E E

E E E E

E E

E E

E E

E E

E

E E

E

E E

E

E

E

E E

E E

U

E

E E

E

GATE

U

FU

EL

S

TA

TI

ON

CONTROLS

FUEL STATION

WV

RETAINING WALL

E E

E E

E

E

E

E

E E E

E E

E

E E E E

E

E E E

E

E

E E E

E

E

E

E

E

WV

WV

WV

MA

TE

RI

AL

S

TO

RA

GE

GATE

N89° 19' 12"W 878.64'

E E

E

E E

BLDG 2

GARAGE

BLDG 12

BLDG 16

STORAGE

BLDG 19

SALT SHED

BLDG 10

INCINERATOR STORAGE

METER HOUSE

BLDG 2

BOILER PLANT

BLDG 2

BOILER PLANT

S

1140'

1141'

1142'

1143'

1140'

1141'

1140'

1141' 1141'

1142'

1142'

1141'

1142'

1143'

1143'

1142'

1143'

1143' 1143'

1143' 1143'

1144'

1144'

1143'

1142'

1142'

1143'

1142'

1142'

1142'

1143'

1143'

1142'

1141'

1140'

1142'

1140'

1139'

1142'

1142'

1142'

1143'

1141'

1143'

1142'

1143'

1143'1142'

1143'

1142'

1142'

1143'

1139.5'

1139.5'

1141.5'

1142.5'

1141.5'

1141.5' 11

.5'

1141.5'

1142.5'

1142.5'

1142.5'

1142.5'

1142.5'

1141.5'

.5

1141.5'

1140.5'

1143.5'

.5 '11

.5

1143.5'

1142.5'

1142.5'

1140.5'

1141.5'

1142.5'

1141.5' 1142.5'

1143.5'

1143.5'

1141'

1141.5'

1139.5'

1140.5'

1143.5'

1144'

1142.5' 1142.5'

E

E E

E E

E

EXISTING

UNDERGROUND

FUEL OIL TANKS

X X X X X X X X X

X X

X X

X X

X X

X

X

X X X

XX

X X

X

XXX

X X

X X

X X

X X

X X

X

X X

X X

X

X

X

X

X X

X X

X X

X

X

X

X X

2 1

X X X X X X X X X

SECURITY CAMERA

(EXISTING TO REMAIN)

SECURITY CAMERA

(EXISTING TO REMAIN)

X X

X X

X X

X X

X X

X X

X

X X X

X X

X

X X

X X

X

JFF CJR

REV 0 - 100% BID SET 2024-02-23

SCALE: 1:20

ELECTRICAL DEMOLITION SITE PLAN1

GENERAL NOTES

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

4. SEE ES171 FOR ADDITIONAL ELECTRICAL PHASING NOTES FOR THE EMERGENCY FEEDER

RELOCATIONS.

KEYED NOTES

1 REMOVE UNDERGROUND EMERGENCY ELECTRICAL FEEDER FROM BUILDING 2 TO

BUILDING 11. REMOVE DUCT BANK TO EXTENT SHOWN.

2 REMOVE EXISTING MANHOLES.

3 REMOVE CABLING AND ASSOCIATED CONDUIT BACK TO EXTENT SHOWN. VERIFY

EXISTING CABLING IS NO LONGER USED.

4 REMOVE UNDERGROUND SITE LIGHTING FROM BUILDING 2 TO EXTENT SHOWN.

5 REMOVE EXISTING FEEDER TO GATE OPERATOR. COORDINATE WITH GATE REMOVAL.

6 EXISTING ELECTRICAL MANHOLE TO REMAIN. MAINTAIN AND PROTECT THROUGH

CONSTRUCTION.

7 FUEL OIL TANK ALARM, COORDINATE REMOVAL WITH FUEL OIL TANK REMOVAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ELECTRICAL DEMOLITION SITE

PLAN

FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

ED171

SITE

585-21-115

KEYPLAN

12 16

REV 1 - PRE-BID UPDATES 2024-08-01

REV 2 - OWNER REQUESTED UPDATES 2025-01-24

SHEET 2241/24/2025

BLDG 2

BOILER PLANT

D

T T P

H

P

H

H

D

SS

FUEL TANK

48'-0" x 12'-0"

UE

UE

UE

UE

UE

P

EEEEEEEE

E

STORAGE

SHEDS

E

E E

FU

EL

S

TA

TI

ON

CONTROLS

FUEL STATION

MA

TE

RI

AL

S

TO

RA

GE

N89° 19' 12"W 878.64'

BLDG 2

GARAGE

BLDG 12

BLDG 16

STORAGE

BLDG 19

SALT SHED

BLDG 10

INCINERATOR STORAGE

METER HOUSE

BLDG 2

BOILER PLANT

BLDG 2

BOILER PLANT

S

FOFOFOFOFO

FO

FO

JB

C

C

C

C

T

UE

UE

UE UE UE UE

PB

UE UE UE UE

UE

UE

UE

10 11

2 4

(2) 2" EMT CONDUIT

(18) #18 AWG, SHIELDED 2 CONDUCTOR, SCADA

(3) #* AWG, LIGHTING

(1) #X AWG, CONDUCTOR, TANK HEATERS

(2) 2" SCH 40 PVC CONDUIT

(1) 12 STRAND OS2 FO CABLE

(1) SPARE

(1) 2" EMT CONDUIT

(1) 6 STRAND OS2 FO CABLE,

SECURITY

(4) 2" SCH 40 PVC CONDUIT

(18) #18AWG SHIELDED 2 CONDUCTOR, SCADA

(3) #8 AWG, LIGHTING

(1) SPARE

(1) 6 CONDUCTOR OS2 FO CABLE, SECURITY

PB

E E

E

E E

E E

UE

JB

FO

FO

FO FO

18"x18"

HANDHOLE

ES501

24" DIA MANHOLE

ES501

CAMERA 6

CAMERA 3

CAMERA 5

EMERGENCY PHONE (EP4)

FO

FO

FO

C

C

C

ET603

ET603

ET603

(1) 1" SCH 40 PVC

(3) #4 AWG

(1) #4 AWG GND

(1) 1" SCH 40 PVC

(2) #4 AWG

(1) #4 AWG GND

UE UE UE UE UE

(1) 4" SCH 40 PVC

CONDUIT FEEDER F

(3) 4/0 AWG, 15KV

(1) #6 AWG GND

(3) SPARE 4" SCH 40

PVC CONDUIT

(1) 1" SCH 40 PVC FOR DUPLEX PUMPS

(3)#6 AND (1)#8GND

(1)1" SCH 40 FOR CONTROL POWER

(2)#4 AND (1)#4GND

(1) 1" SCH 40 FOR INSTRUMENTATION

CABLING TO THE BAS AND BACNET

COMPATIBLE OPEN-PROTOCOL TYPE

INTERFACE TO DDC CONTROLS

SYSTEMS (PER SPEC SECTION 22 13 29

AND ELECTRICAL INSTRUMENTATION

DRAWINGS)

(1) 4" SCH 40 PVC CONDUIT

FEEDER B

(3) 4/0 AWG, 15KV

(1) #6 AWG GND

(3) SPARE 4" SCH 40 PVC CONDUIT

C J01

J01 J01

PB

UE

(1) 4" SCH 40 PVC CONDUIT

TEMPORARY FEEDER F

(3) 4/0 AWG, 15KV

(1) #6 AWG GND

(1) 1" SCH 40 PVC CONDUIT

(2) #4 AWG

(1) #4 AWG GND

(1) 1" SCH 40 PVC CONDUIT

(3) #4 AWG

(1) #4 AWG GND 18

TO ELECTRICAL

ROOM

JFF CJR

REV 0 - 100% BID SET 2024-02-23

SCALE: 1:20

ELECTRICAL SITE PLAN1

GENERAL NOTES

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

4. SEE ET603 FOR CAMERA SCHEDULE AND DETAILS.

KEYED NOTES

1 TIE INTO EXISTING UNDERGROUND SITE LIGHTING CIRCUIT.

2 PROVIDE NEW POWER MANHOLE.

3 TIE INTO EXISTING PRIMARY DUCT BANK TO ROUTE GENERATOR FEEDER B TO BUILDING

2. ALL CABLING SHALL BE NEW FROM BUILDING 2 EQUIPMENT TO BUILDING 11

EQUIPMENT. CONTRACTOR SHALL NOT SPLICE TOGETHER NEW AND EXISTING CABLE.

4 TIE INTO EXISTING PRIMARY DUCT BANK TO ROUTE GENERATOR FEEDER F TO BUILDING

2. ALL CABLING SHALL BE NEW FROM BUILDING 2 EQUIPMENT TO BUILDING 11

EQUIPMENT. CONTRACTOR SHALL NOT SPLICE TOGETHER NEW AND EXISTING CABLE.

5 ROUTE GENERATOR FEEDER B OUT THE TOP OF SUBSTATION AND THROUGH ROOF. FOR

FEEDER DETAILS SEE EP601.

6 ROUTE GENERATOR FEEDER F OUT THE TOP OF SUBSTATION AND THROUGH ROOF. FOR

FEEDER DETAILS SEE EP601.

7 RUN CONDUIT DOWN BUILDING EXTERIOR AND TO UNDERGROUND DUCT BANK.

8 PROVIDE NEW ELECTRICAL HANDHOLE FOR RE-ROUTED UNDERGROUND SITE LIGHTING.

9 RE-ROUTE UNDERGROUND SITE LIGHTING TO AVOID NEW BUILDING.

10 MOUNT SECURITY CAMERA 20 FEET ABOVE GRADE. CONNECT TO CAMERA BOX VIA

CAT6A CABLE THROUGH LIGHT POLE INTERNAL CAVITY.

11 MOUNT CAMERA NETWORK BOX 15 FEET ABOVE GRADE. USE INTERNAL CAVITY OF LIGHT

POLE TO ROUTE POWER, FIBER OPTIC, AND CAT6A CABLING.

12 RISER TO SECOND FLOOR SCADA CONTROL RACK. USE 2" EMT INSIDE BUILDING. USE 2"

SCH 40 CONDUIT BELOW GRADE.

13 RISER FROM BASEMENT LEVEL. FEEDS SECURITY CAMERA BOX WITH OS2 6 CONDUCTOR

FIBER OPTICS FROM TELECOMMUNICATIONS ROOM 001-3. USE 2" EMT INSIDE BUILDING.

USE 2" SCH 40 CONDUIT BELOW GRADE.

14 PROVIDE 16" X 16" NEMA 3R JUNCTION BOX. CONNECT ALL TANK DEVICES BACK TO

JUNCTION BOX. JUNCTION BOX TO BE FED FROM 2-119-CP-009 FUEL OIL TANK CONTROL.

SEE EI121 FOR CONTROL PANEL LOCATION.

15 PROVIDE DATA AND POWER CONNECTIONS TO PREFAB GUARD HOUSE SLAB, SEE ES501

AND ET502 FOR MORE DETAILS.

16 CABLE AND CONDUIT ROUTE FOR ANTI RAM GATE CONTROLLER AND GUARD SHACK

POWER POINT

17 POWER SUPPLY TO LIFT STATION CONTROLLER FROM A 20A BREAKER IN 02-DP-1 CKT

20,22,24. PROVIDE (2) SEPARATE POWER SOURCES TO THE SANITARY LIFT STATION

CONTROL PANEL (SUPPLIED WITH LIFT STATION). (1) 480 V, 50A 3 POLE BRANCH CIRCUIT

FROM 02-DP1. (1) 120 V, 20A 1 POLE BRANCH CIRCUIT FROM 02-PP1. PROVIDE 1" CONDUIT

FOR SIGNAL WIRING TO/FROM THE LIFT STATION ANNUCIATOR PANEL.

18 SEE EP122 FOR CONTINUATION OF FEEDER F INSIDE B2

19 POWER FEED TO ANTI RAM GATE CONTROLLER

20 POWER FEED TO GUARD SHACK POWER POINT

21 CONDUIT TRANSITION FROM METAL TO PVC PRIOR TO GOING BELOW GRADE

KEYPLAN

12 16

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ELECTRICAL SITE PLAN FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

ES171

SITE

585-21-115

ELECTRICAL PHASING NOTES

1. EMERGENCY FEEDER WORK SHALL BE PHASED SUCH THAT ONE OF THE TWO FEEDERS (B AND F) SERVING BUILDING 11 SHALL REMAIN IN SERVICE AT ALL TIMES WITH THE EXCEPTIONS OF ANY SHORT DURATION SHUTDOWNS REQUIRED FOR ISOLATION OR CONNECTION OF NEW CABLING TO EXISTING EQUIPMENT, OR WORK IN SHARED MANHOLES. ALL SHUTDOWNS SHALL BE COORDINATED WITH AND APPROVED BY THE COR WITH A NOTICE PERIOD AS DICTATED BY THE COR. SHUTDOWNS SHALL BE COORDINATED TO MINIMIZE RISK TO PATIENT CARE AND

WORK MAY BE REQUIRED TO BE SCHEDULED ON WEEKENDS.

2. PHASING SHOULD BE ANTICIPATED AS FOLLOWS:

A. A SHORT DURATION SHUTDOWN TO ISOLATE FEEDER B AND CLOSE THE TIE BREAKER WITHIN BUILDING 11. REMOVAL OF FEEDER B SHALL NOT OCCUR UNTIL THE VA HAS TESTED THE EMERGENCY POWER SUPPLY SYSTEM AND VERIFIED THAT IT IS FUNCTIONING CORRECTLY WHILE

UTILIZING A SINGLE FEEDER.

B. REMOVAL OF EXISTING FEEDER B CONDUIT AND CABLING. INSTALLATION OF NEW CONDUIT, DUCTBANKS, MANHOLES, AND CABLING FOR

FEEDER B UP TO THE EXISTING EQUIPMENT IN BUILDING 11 AND BUILDING 2.

C. A SHORT DURATION SHUTDOWN TO TERMINATE FEEDER B AND ISOLATE FEEDER F. NOTE, THE VA MAY ELECT TO SPLIT THIS INTO TWO SEPARATE SHUTDOWNS TO ENSURE THE FUNCTIONALITY OF THE NEWLY INSTALLED FEEDER B PRIOR TO THE ISOLATION OF FEEDER F.

D. REMOVAL OF EXISTING FEEDER F CONDUIT AND CABLING. INSTALLATION OF NEW CONDUIT, DUCTBANKS, MANHOLES, AND CABLING FOR

FEEDER F UP TO THE EXISTING EQUIPMENT IN BUILDING 11 AND BUILDING 2.

E. A SHORT DURATION SHUTDOWN TO TERMINATE FEEDER F AND RESTORE THE SYSTEM TO NORMAL OPERATION.

NOTE: ANY WORK WITHIN EXISTING ELECTRICAL MANHOLES WHICH REQUIRES LOTO OF EXISTING FEEDERS SHALL BE COORDINATED WITH

THE OWNER AND SHALL BE OF THE SHORTEST DURATION PRACTICABLE.

REV 2 - PRE-BID UPDATES 2024-08-01

REV 1 - FINAL BID SET 2024-04-04

REV 3 - OWNER REQUESTED UPDATES 2025-01-24

SHEET 2261/24/2025

G

FC

I G

FC

I G

FC

I

GFCI

G

FC

I

GFCI GFCI

GFCIGFCIGFCI

G

FC

I

GFCI

GFCI

GFCI

GFCI

GFCI

G

FC

I G

FC

I G

FC

I G

FC

I

G

FC

I

G

FC

I G

FC

I G

FC

I G

FC

I G

FC

I

GFCI

F F

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

2-120B-480E-SWBD-001

2-120A-208E-T-001

2-120A-480E-ATS-001

2-120A-480E-ATS-002

02-PP1

02-DP1

LOCKER ROOM

125-2

CHANGING AREA

127-2

SHOWER AREA

126-2

TOILET

123-2

TOILET

122-2

JANITOR

121-2

BREAK ROOM

124-2

GENERATOR ROOM

120B-2

BOILER ROOM

119-2

CONTROL ROOM

130-2

SUPERVISOR

129-2

CHEM FEED

128-2

PROPANE

131-2

DUPLEX

FUEL OIL

PUMP DISC

GD-3 DISC

GD-2 DISC

GD-1 DISC

2-119-BLR-001

2-119-BLR-002

2-119-BLR-003

2-119-PMP-003

2-119-PMP-004

2-119-PMP-005

2-119-PMP-002

2-119-PMP-001

GD-4 DISC

2-120A-480N-SWBD-001

02-DP2

02-PP2

02-PP3

02-DP3

1 2 3

A

B

D

F

H

M

DO

W

N

UP

UP

2-EXT-CU-001-DISC

2-EXT-CU-002-DISC

2-EXT-CU-003-DISC

02-PP4

G

31817

02-PP3

02-PP3

F

F

F

02-PP4

7 12

02-PP4

9 5 12

02-PP4

17,19,21

02-PP4

02-PP4

10 02-PP4

02-PP4

02-PP4

02-PP4

02-PP4

02-PP1

02-PP1

102-PP1

1 02-PP1

02-PP4

18,20,22

02-PP4

02-PP3

02-PP4

PARALLEL

SWITCHING GEAR

101B-2

02-PP4

6,8

02-PP3

13,15

ELECTRICAL ROOM

120A-2

BOILER ROOM

101-2

2-119-PMP-001

VFD

2-119-PMP-002

VFD

2-119-PMP-003

VFD

2-119-PMP-004

VFD

2-119-PMP-005

VFD

02-DP3

10,12,14

02-DP3

11,13,15

02-DP3

16,18,20

EP201

EP201

EP201

EP401

EP201

3'

2-119-CP-005

F

PANEL C

PANEL A

GROUNDING

BAR

02-PP1

9,11

2-EXT-CU-001

2-EXT-CU-002

2-EXT-CU-003DP1

20,22,24

2-119-CP-004

02-PP1

02-PP1

02-PP1

02-PP1

02-PP1

02-PP3

02-PP4

2-119-CP-001

2-119-CP-002

2-119-CP-003

CONTINUOUS

GAS

ANALYZER 3

CONTINUOUS

GAS

ANALYZER 2

CONTINUOUS

GAS

ANALYZER 1

FUEL

OIL

DUPLEX

PUMP

SKID

STEAM

SAMPLE

STATIONS

2-120B-480E-GEN-001

02-PP4

02-PP4

02-PP4

02-PP2

02-PP2

02-PP2

02-PP2

02-PP2

7,9,11

02-PP2

7,9,11

02-PP2

4,6,8

02-PP2

4,6,8

02-PP3

02-DP3

27,29,31

PORTABLE GENERATOR LOADBANK

RECEPTACLE FOR TV

480V 3P, 4W

100A RATED RECPETACLE

WITH INTEGRAL DISCONNECT

02-PP3

2-119-CP-006

2-119-CP-009

2-119-TK-004

02-PP2

02-PP1

2-119-CP-004 WILL BE LOCATED WITH

SANITARY LIFT STATION. SEE ES171 FOR

UPDATED LOCATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EP121

ELECTRICAL POWER PLAN - GROUND

FLOOR LEVEL 2

KRK KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

5. SEE EP-602 - EP-604 FOR PANEL SCHEDULES.

4. SEE MECHANICAL PLANS FOR ADDITIONAL MECHANICAL EQUIPMENT INFORMATION.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/16" = 1'-0"1 ELECTRICAL POWER PLAN - GROUND FLOOR LEVEL

N

KEYED NOTES

1 PROVIDE WIRED WALL CONTROLLER, FOR EACH CEILING FAN, PER MANUFACTURER

SPECIFICATIONS. SEE MECHANICAL HVAC SCHEDULE FOR ADDITIONAL INFORMATION.

2 PROVIDE NEMA 3X RATED (OR EQUIVALENT) ENCLOSURE TO PROTECT BOILER

EMERGENCY POWER CONNECTION.

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-04

REV 2 - OWNER REQUESTED UPDATES 2025-01-24

SHEET 243

ARCHITECT/ENGINEER OF RECORD

1/24/2025

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

1 2 3

A

B

D

F

H

M

53'

EP201

EP202

2-120B-480E-SWBD-001

2-120A-208E-T-001

2-120A-480E-ATS-001

2-120A-480E-ATS-002

02-PP1

02-DP1

LOCKER ROOM

125-2CHANGING AREA

127-2

SHOWER AREA

126-2

TOILET

123-2

TOILET

122-2

JANITOR

121-2

BREAK ROOM

124-2

GENERATOR ROOM

120B-2

BOILER ROOM

119-2

CONTROL ROOM

130-2

SUPERVISOR

129-2

CHEM FEED

128-2

PROPANE

131-2

2-119-BLR-001

2-119-BLR-002

2-119-BLR-003

2-120A-480N-SWBD-001

02-DP2

02-PP2

02-PP3

02-DP3

DO

W

N

UP

UP

02-PP4

PARALLEL

SWITCHING GEAR

101B-2

ELECTRICAL ROOM

120A-2

BOILER ROOM

101-2

2-119-PMP-001

VFD

2-119-PMP-002

VFD

2-119-PMP-003

VFD

2-119-PMP-004

VFD

2-119-PMP-005

VFD

2-119-CP-005

PANEL C

PANEL A

GROUNDING

BAR

EP202

EP201

2-120B-480E-GEN-001

BLDG. #2

BOILERHOUSE

NORM

SHOWER & LAB

104A-2

UNISEX RESTROOM

104-2

OFFICE/BOILER CTRL

RM

102-2

PASSAGEWAY

103-2

(1) 4" RGS

FEEDER F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EP122

ELECTRICAL CONDUIT ROUTING

PLAN - GROUND FLOOR LEVEL 2

KRK LAJ

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 ELECTRICAL CONDUIT ROUTING PLAN - GROUND FLOOR LEVEL

KEYPLAN

N AREA OF WORK

12 16

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYED NOTES

1 ROUTE UP WALL TO ABOVE MEZZANINE LEVEL

2 ROUTE ABOVE ROLL-UP DOOR

3 ROUTE TO SUBSTATION. REFER TO EP601

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-04

REV 2 - OWNER REQUESTED UPDATES 2025-01-24

SHEET 244

1/24/2025

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EP602

ELECTRICAL POWER PANEL

SCHEDULES 2

KRK CCW

PARTIALLY SPRINKLERED

NOTES:

TOTAL CONN. CURRENT: 256 A

TOTAL CONN. LOAD: 212969 VA

PANEL TOTALS

LEGEND:

TOTAL AMPS: 256 A 254 A 293 A

TOTAL LOAD: 70851 VA 70262 VA 80969 VA

41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26

23 3049 VA -- -- -- 24

21 3049 VA -- -- -- 22

19 -- -- -- 44219 VA 3049 VA 3 50 A SANITARY LIFT STATION PUMPS 20

17 -- -- -- 43264 VA 16653 VA -- -- -- 18

15 02-DP3 175 A 3 44449 VA 16689 VA -- -- -- 16

13 -- -- -- 7019 VA 16759 VA 3 100 A 02-DP2 14

11 -- -- -- 6966 VA 0 VA 1 20 A SPARE 12

9 02-DP5 100 A 3 7049 VA 0 VA 1 20 A SPARE 10

7 RM 120B LTS 20 A 1 102 VA 163 VA 1 20 A RM 120A LTS 8

5 ELECTRIC WATER HEATER 60 A 1 12100 VA 0 VA 1 20 A SPARE 6

3 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 4

1 EXTERIOR LIGHTING 20 A 1 526 VA 0 VA 1 20 A SPARE 2

CKT CIRCUIT DESCRIPTION TRIP POLE

S A B C POLE

S TRIP CIRCUIT DESCRIPTION CKT

NOTES:

ENCLOSURE: TYPE 1 MCB RATING: 225 A

MOUNTING: SURFACE WIRES: 4 MAINS RATING: 400 A

SUPPLY FROM: PHASES: 3 MAINS TYPE:

LOCATION: ELECTRICAL ROOM 120A-2 VOLTS: 480/277 Wye A.I.C. RATING:

BRANCH PANEL: DP1

NOTES:

TOTAL CONN. CURRENT: 60 A

TOTAL CONN. LOAD: 50101 VA

PANEL TOTALS

LEGEND:

TOTAL AMPS: 61 A 60 A 60 A

TOTAL LOAD: 16759 VA 16689 VA 16653 VA

41 42 39 40 37 38 35 36 33 34

31 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 32

29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30

27 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 28

25 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 26

23 RM 125,127 LTS 20 A 1 80 VA 41 VA 1 20 A LTS OUTSIDE RM 121,122,123 24

21 RM 126 LTS 20 A 1 85 VA 71 VA 1 20 A RM 121,122,123 LTS 22

19 LTS UNDER BOILER CATWALK 20 A 1 102 VA 126 VA 1 20 A RM 124 LTS 20

17 -- -- -- 2106 VA 1330 VA -- -- -- 18

15 -- -- -- 2106 VA 1330 VA -- -- -- 16

13 2-119-PMP-001 20 A 3 2106 VA 1330 VA 3 20 A 2-119-RO-001 14

11 -- -- -- 3880 VA 2106 VA -- -- -- 12

9 -- -- -- 3880 VA 2106 VA -- -- -- 10

7 2-119-PMP-005 20 A 3 3880 VA 2106 VA 3 20 A 2-119-PMP-002 8

5 -- -- -- 3880 VA 3880 VA -- -- -- 6

3 -- -- -- 3880 VA 3880 VA -- -- -- 4

1 2-119-PMP-004 20 A 3 3880 VA 3880 VA 3 20 A 2-119-PMP-003 2

CKT CIRCUIT DESCRIPTION TRIP POLE

S A B C POLE

S TRIP CIRCUIT DESCRIPTION CKT

NOTES:

ENCLOSURE: TYPE 1 MCB RATING: 100 A

MOUNTING: SURFACE WIRES: 4 MAINS RATING: 150 A

SUPPLY FROM: DP1 PHASES: 3 MAINS TYPE:

LOCATION: ELECTRICAL ROOM 120A-2 VOLTS: 480/277 Wye A.I.C. RATING:

BRANCH PANEL: 02-DP2

NOTES:

TOTAL CONN. CURRENT: 159 A

TOTAL CONN. LOAD: 131932 VA

PANEL TOTALS

LEGEND:

TOTAL AMPS: 161 A 156 A 160 A

TOTAL LOAD: 44449 VA 43264 VA 44219 VA

41 42 39 40 37 38 35 36 33 34

31 -- -- -- 10254 VA 0 VA 1 20 A SPARE 32

29 -- -- -- 10254 VA 0 VA 1 20 A SPARE 30

27 EM BLR PWR CONN 75 A 3 10254 VA 0 VA 1 20 A SPARE 28

25 BASEMENT EM WALL LIGHTS 20 A 1 100 VA 1100 VA 1 20 A MEZZ EM WALL LTS 26

23 BASEMENT 003-2 LIGHT 20 A 1 20 VA 1100 VA 1 20 A GR FL EM WALL LTS 24

21 -- -- -- 313 VA 33 VA 1 20 A RM 131 LIGHT 22

19 -- -- -- 313 VA 10254 VA -- -- -- 20

17 PROPANE RM EXHAUST FAN 20 A 3 313 VA 10254 VA -- -- -- 18

15 -- -- -- 10254 VA 10254 VA 3 75 A BOILER 3 16

13 -- -- -- 10254 VA 10254 VA -- -- -- 14

11 BOILER 2 75 A 3 10254 VA 10254 VA -- -- -- 12

9 -- -- -- 942 VA 10254 VA 3 75 A BOILER 1 10

7 -- -- -- 942 VA 942 VA -- -- -- 8

5 2-200-SF-001 20 A 3 942 VA 942 VA -- -- -- 6

3 RM 128,129 LTS 20 A 1 80 VA 942 VA 3 20 A 2-200-SF-002 4

1 EXIT SIGNS 20 A 1 35 VA 120 VA 1 20 A RM 130 LTS 2

CKT CIRCUIT DESCRIPTION TRIP POLE

S A B C POLE

S TRIP CIRCUIT DESCRIPTION CKT

NOTES:

ENCLOSURE: TYPE 1 MCB RATING: 175 A

MOUNTING: SURFACE WIRES: 4 MAINS RATING: 250 A

SUPPLY FROM: DP1 PHASES: 3 MAINS TYPE:

LOCATION: BOILER ROOM 119-2 VOLTS: 480/277 Wye A.I.C. RATING:

BRANCH PANEL: 02-DP3

NOTES:

TOTAL CONN. CURRENT: 25 A

TOTAL CONN. LOAD: 21034 VA

PANEL TOTALS

LEGEND:

TOTAL AMPS: 25 A 25 A 25 A

TOTAL LOAD: 7049 VA 6966 VA 7019 VA

41 42 39 40 37 38 35 36 33 34 31 32

29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30

27 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 28

25 -- -- -- 2106 VA 0 VA 1 20 A SPARE 26

23 -- -- -- 2106 VA 0 VA 1 20 A SPARE 24

21 2-R-EF-004 20 A 3 2106 VA 0 VA 1 20 A SPARE 22

19 -- -- -- 942 VA 942 VA -- -- -- 20

17 -- -- -- 942 VA 942 VA -- -- -- 18

15 2-R-EF-001 20 A 3 942 VA 942 VA 3 20 A 2-R-EF-002 16

13 -- -- -- 1178 VA 1178 VA -- -- -- 14

11 -- -- -- 1178 VA 1178 VA -- -- -- 12

9 2-200-MAU-001 20 A 3 1178 VA 1178 VA 3 20 A 2-200-MAU-002 10

7 BOILER ROOM HIGH BAY LED 20 A 1 693 VA 0 VA -- -- -- 8

5 BOILER ROOM HIGH BAY LED 20 A 1 819 VA 0 VA -- -- -- 6

3 BOILER ROOM HIGH BAY LED 20 A 1 756 VA 0 VA 3 20 A RM 201 COMM RACK 4

1 DA TANK AREA LTS 20 A 1 81 VA 80 VA 1 20 A RM 201 LTS 2

CKT CIRCUIT DESCRIPTION TRIP POLE

S A B C POLE

S TRIP CIRCUIT DESCRIPTION CKT

NOTES:

ENCLOSURE: TYPE 1 MCB RATING: 100 A

MOUNTING: SURFACE WIRES: 4 MAINS RATING: 100 A

SUPPLY FROM: DP1 PHASES: 3 MAINS TYPE:

LOCATION: EQUIPMENT ACCESS 200-2 VOLTS: 480/277 Wye A.I.C. RATING:

BRANCH PANEL: 02-DP4

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-04

REV 2 - OWNER REQUESTED UPDATES 2025-01-24

SHEET 2511/24/2025

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EP603

ELECTRICAL POWER PANEL

SCHEDULES 2

KRK KRK

PARTIALLY SPRINKLERED

NOTES:

TOTAL CONN. CURRENT: 198 A

TOTAL CONN. LOAD: 71458 VA

PANEL TOTALS

LEGEND:

TOTAL AMPS: 187 A 214 A 207 A

TOTAL LOAD: 22393 VA 25304 VA 24485 VA

41 42 39 40 37 38 35 36 33 34 31 32 29 30

27 -- -- -- 6808 VA 180 VA 1 20 A SAN. LIFT ST CONTROL POWER 28

25 -- -- -- 7027 VA 5992 VA -- -- -- 26

23 02-PP4 100 A 3 6628 VA 6086 VA -- -- -- 24

21 -- -- -- 4104 VA 6417 VA 3 100 A 02-PP5 22

19 -- -- -- 4814 VA 20

17 02-PP3 100 A 3 4659 VA 18

15 3140 VA -- -- -- 16

13 2760 VA -- -- -- 14

11 -- -- -- 3848 VA 2588 VA 3 100 A 02-PP2 12

9 2-EXT-CU-003 50 A 2 3848 VA 10

7 2-200-UH-001, 002, 003 20 A 1 900 VA 8

5 2-200-CF-001 10 A 1 768 VA 270 VA -- -- -- 6

3 RM 120A RCPT 20 A 1 900 VA 270 VA 2 20 A FUEL TANK LIGHTS 4

1 RM 120B RCPT 20 A 1 720 VA 768 VA 1 10 A 2-200-CF-002 2

CKT CIRCUIT DESCRIPTION TRIP POLE

S A B C POLE

S TRIP CIRCUIT DESCRIPTION CKT

NOTES:

ENCLOSURE: TYPE 1 MCB RATING: 200 A

MOUNTING: RECESSED WIRES: 4 MAINS RATING: 400 A

SUPPLY FROM: PHASES: 3 MAINS TYPE:

LOCATION: ELECTRICAL ROOM 120A-2 VOLTS: 120/208 Wye A.I.C. RATING:

BRANCH PANEL: 02-PP1

NOTES:

TOTAL CONN. CURRENT: 23 A

TOTAL CONN. LOAD: 8128 VA

PANEL TOTALS

LEGEND:

TOTAL AMPS: 22 A 23 A 26 A

TOTAL LOAD: 2588 VA 2760 VA 3140 VA

41 42 39 40 37 38 35 36 33 34 31 32

29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30

27 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 28

25 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 26

23 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 24

21 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 22

19 CONTINUOUS GAS ANALYZER 3 30 A 1 1500 VA 0 VA 1 20 A SPARE 20

17 CONTINUOUS GAS ANALYZER 2 30 A 1 1500 VA 0 VA -- -- -- 18

15 CONTINUOUS GAS ANALYZER 1 30 A 1 1500 VA 0 VA -- -- -- 16

13 2-119-CP-005 20 A 1 180 VA 0 VA 3 30 A SPARE 14

11 -- -- -- 360 VA 200 VA 1 20 A 2-119-CP-009 12

9 -- -- -- 360 VA 180 VA 1 20 A 2-119-CP-006 10

7 RM 119 3P RCPT 30 A 3 360 VA 360 VA -- -- -- 8

5 RM 119 CNTRLN RCPT 20 A 1 720 VA 360 VA -- -- -- 6

3 RM 119 RCPT EAST 20 A 1 360 VA 360 VA 3 30 A RM 119 3P RCPT 4

1 2-100-TK-004 (WATER SOFTENER) 20 A 1 10 VA 180 VA 1 20 A RO CONTROL RECEPTACLE 2

CKT CIRCUIT DESCRIPTION TRIP POLE

S A B C POLE

S TRIP CIRCUIT DESCRIPTION CKT

NOTES:

ENCLOSURE: Type 1 MCB RATING: 100 A

MOUNTING: SURFACE WIRES: 4 MAINS RATING: 100 A

SUPPLY FROM: 02-PP1 PHASES: 3 MAINS TYPE:

LOCATION: ELECTRICAL ROOM 120A-2 VOLTS: 120/208 Wye A.I.C. RATING:

BRANCH PANEL: 02-PP2

NOTES:

TOTAL CONN. CURRENT: 38 A

TOTAL CONN. LOAD: 13536 VA

PANEL TOTALS

LEGEND:

TOTAL AMPS: 40 A 41 A 34 A

TOTAL LOAD: 4659 VA 4814 VA 4104 VA

41 42 39 40 37 38 35 36 33 34 31 32

29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30

27 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 28

25 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 26

23 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 24

21 MED GAS MONITOR 20 A 1 210 VA 115 VA 1 20 A CO MONITOR 22

19 RM 129 RECPT 20 A 1 720 VA 180 VA 1 20 A RM 003 RCPT 20

17 RM 130 RECPT SOUTH 20 A 1 360 VA 360 VA 1 20 A RM 130 RECPT SOUTH 18

15 -- -- -- 1789 VA 360 VA 1 20 A RM 130 RECPT WEST 16

13 2-EXT-CU-001 25 A 2 1789 VA 360 VA 1 20 A RM 130 RECPT WEST 14

11 RM 129 RECPT 20 A 1 1080 VA 360 VA 1 20 A RM 130 RECPT SOUTH 12

9 RM 003 SUMP PMP 20 A 1 180 VA 1080 VA 1 20 A FA CONTROL PANEL 10

7 RM 130 RECPT EAST 20 A 1 540 VA 1260 VA 1 20 A SEWAGE PUMP PMP-1 8

5 RM 128 RCPT CHEM FD PMP 20 A 1 1080 VA 864 VA 1 20 A RM 128 RCPT CHEM FD PMP 6

3 RM 130 RECPT SOUTH 20 A 1 720 VA 360 VA 1 20 A RM 130 RECPT WEST 4

1 GD-1 20 A 1 0 VA 0 VA 1 20 A GD-4 2

CKT CIRCUIT DESCRIPTION TRIP POLE

S A B C POLE

S TRIP CIRCUIT DESCRIPTION CKT

NOTES:

ENCLOSURE: Type 1 MCB RATING: 100 A

MOUNTING: SURFACE WIRES: 4 MAINS RATING: 100 A

SUPPLY FROM: 02-PP1 PHASES: 3 MAINS TYPE:

LOCATION: BOILER ROOM 119-2 VOLTS: 120/208 Wye A.I.C. RATING:

BRANCH PANEL: 02-PP3

NOTES:

TOTAL CONN. CURRENT: 57 A

TOTAL CONN. LOAD: 20463 VA

PANEL TOTALS

LEGEND:

TOTAL AMPS: 55 A 59 A 57 A

TOTAL LOAD: 6628 VA 7027 VA 6808 VA

41 42 39 40 37 38 35 36 33 34 31 32

29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30

27 SPARE 20 A 1 0 VA 0 VA -- -- -- 28

25 SPARE 20 A 1 0 VA 0 VA -- -- -- 26

23 SPARE 20 A 1 0 VA 0 VA 3 20 A SPARE 24

21 -- -- -- 2667 VA 1273 VA -- -- -- 22

19 -- -- -- 2667 VA 1273 VA -- -- -- 20

17 RM 124 ELEC RANGE 50 A 3 2667 VA 1273 VA 3 20 A DUPLEX FUEL OIL PUMP 18

15 RM 119,121,122,123,126 RECPT 20 A 1 1260 VA 0 VA 1 20 A SPARE 16

13 RM 119 RCPT 20 A 1 540 VA 0 VA 1 20 A SPARE 14

11 RM 124 RCPT 20 A 1 540 VA 360 VA 1 20 A RM 124 CNTRTOP RECPT 12

9 RM 124 RCPT 20 A 1 540 VA 1080 VA 1 20 A RM 125,127 RCPT 10

7 RM 124 CNTRTOP RECPT 20 A 1 360 VA 1789 VA -- -- -- 8

5 RM 124 FRIDGE 20 A 1 180 VA 1789 VA 2 25 A 2-EXT-CU-002 6

3 RM 124 COUNTER LTS 20 A 1 12 VA 195 VA 1 20 A RM 124 WTR FNTN 4

1 GD-2 20 A 1 0 VA 0 VA 1 20 A GD-3 2

CKT CIRCUIT DESCRIPTION TRIP POLE

S A B C POLE

S TRIP CIRCUIT DESCRIPTION CKT

NOTES:

ENCLOSURE: TYPE 1 MCB RATING: 100 A

MOUNTING: RECESSED WIRES: 4 MAINS RATING: 100 A

SUPPLY FROM: 02-PP1 PHASES: 3 MAINS TYPE:

LOCATION: BOILER ROOM 119-2 VOLTS: 120/208 Wye A.I.C. RATING:

BRANCH PANEL: 02-PP4

NOTES:

TOTAL CONN. CURRENT: 51 A

TOTAL CONN. LOAD: 18304 VA

PANEL TOTALS

LEGEND:

TOTAL AMPS: 54 A 51 A 50 A

TOTAL LOAD: 6417 VA 6086 VA 5992 VA

41 42 39 40 37 38 35 36 33 34 31 32

29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30

27 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 28

25 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 26

23 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 24

21 -- -- -- 0 VA 0 VA 1 20 A SPARE 22

19 SPARE 20 A 2 0 VA 0 VA -- -- -- 20

17 -- -- -- 0 VA 0 VA -- -- -- 18

15 SPARE 30 A 2 0 VA 0 VA 3 20 A SPARE 16

13 -- -- -- 875 VA 180 VA 1 20 A 2-200-CP-006A 14

11 2-200-PMP-001 20 A 2 875 VA 3633 VA -- -- -- 12

9 -- -- -- 1248 VA 3633 VA -- -- -- 10

7 ELECTRIC CHAIN HOIST 30 A 2 1248 VA 3633 VA 3 20 A 2-200-CA-001 8

5 ROOF RCPT 20 A 1 720 VA 875 VA -- -- -- 6

3 RM 201 RCPT 20 A 1 540 VA 875 VA 2 20 A 2-200-PMP-002 4

1 RM 201 RCPT 20 A 1 540 VA 180 VA 1 20 A RM 200 RCPT 2

CKT CIRCUIT DESCRIPTION TRIP POLE

S A B C POLE

S TRIP CIRCUIT DESCRIPTION CKT

NOTES:

ENCLOSURE: TYPE 1 MCB RATING: 100 A

MOUNTING: SURFACE WIRES: 4 MAINS RATING: 100 A

SUPPLY FROM: 02-PP1 PHASES: 3 MAINS TYPE:

LOCATION: EQUIPMENT ACCESS 200-2 VOLTS: 120/208 Wye A.I.C. RATING:

BRANCH PANEL: 02-PP5

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-04

REV 2 - OWNER REQUESTED UPDATES 2025-01-24

SHEET 2521/24/2025

02-DP1 CABLE AND CONDUIT SCHEDULE

LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS

EXTERIOR LIGHTING 02-DP1 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

RM 100 101 EXIT SIGNS 02-DP1 2 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

ELECTRIC WATER HEATER 02-DP1 5 1-#6 1-#6 1-#10 1 1 1 3/4" RMC 1

GENERATOR RM LIGHTS 02-DP1 7 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

ELEC RM LIGHTS 02-DP1 8 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

02-DP4 02-DP1 9 11 13 3-#1 1-#1 1-#6 3 1 1 1-1/2" RMC 1

02-DP2 02-DP1 14 16 18 3-#1 1-#1 1-#6 3 1 1 1-1/2" RMC 1

02-DP3 02-DP1 15 17 19 3-#4/0 1-#4/0 1-#4 3 1 1 2-1/2" RMC 1

SANITARY LIFT STATION PUMPS 02-DP1 20 22 24 3-#6 1-#8 3 0 1 1" RMC 1

02-DP2 CABLE AND CONDUIT SCHEDULE

LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS

PMP-004 02-DP2 1 3 5 3-#12 1-#12 3 0 1 3/4" RMC 1

PMP-003 02-DP2 2 4 6 3-#12 1-#12 3 0 1 3/4" RMC 1

PMP-005 02-DP2 7 9 11 3-#12 1-#12 3 0 1 3/4" RMC 1

PMP-002 02-DP2 8 10 12 3-#12 1-#12 3 0 1 3/4" RMC 1

PMP-001 02-DP2 13 15 17 3-#12 1-#12 3 0 1 3/4" RMC 1

RO SYSTEM POWER 02-DP2 14 16 18 3-#12 1-#12 3 0 1 3/4" RMC 1

LTS UNDER BOILER PLATFORMS 02-DP2 19 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

BRK RM 102 LTS 02-DP2 20 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

RM 103 104 LTS 02-DP2 21 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

RM 106 107 108 LTS 02-DP2 22 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

RM 103 105 LTS 02-DP2 23 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

LIGHTING OUTSIDE TOILETS 02-DP2 24 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

02-DP3 CABLE AND CONDUIT SCHEDULE

LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS

CONTROL RM 111 EXIT SIGNS 02-DP3 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

RM 109 110 111 LTS 02-DP3 2 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

RM 109 110 111 LTS 02-DP3 3 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

SUPPLY FAN 1 02-DP3 4 6 8 3-#12 1-#12 3 0 1 3/4" RMC 1

SUPPLY FAN 2 02-DP3 5 7 9 3-#12 1-#12 3 0 1 3/4" RMC 1

BOILER 1 02-DP3 10 12 14 3-#4 1-#4 1-#8 3 1 1 1-1/2" RMC 1

BOILER 2 02-DP3 11 13 15 3-#4 1-#4 1-#8 3 1 1 1-1/2" RMC 1

BOILER 3 02-DP3 16 18 20 3-#4 1-#4 1-#8 3 1 1 1-1/2" RMC 1

PROPANE RM EXHAUST FAN 02-DP3 17 19 21 3-#12 1-#12 3 0 1 3/4" RMC 1

PROPANE ROOM LIGHT 02-DP3 22 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

BASEMENT 003-2 LIGHT 02-DP3 23 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

GR FL EM WALL LTS 02-DP3 24 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

BASEMENT EM WALL LIGHTS 02-DP3 25 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

MEZZ EM WALL LTS 02-DP3 26 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

BOILER EMERGENCY POWER POINT 02-DP3 27, 29, 31 3-#4 1-#4 1-#8 3 1 1 1-1/2" RMC 1

02-DP4 CABLE AND CONDUIT SCHEDULE

LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS

DA TANK LIGHTING 02-DP4 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

CONTROL IT RM LIGHTING 02-DP4 2 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

BOILER ROOM HIGH BAY LED 02-DP4 3 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

COMMS RACK 02-DP4 4 6 8 3-#12 1-#12 3 0 1 3/4" RMC 1

BOILER ROOM HIGH BAY LED 02-DP4 5 1-#10 1-#10 1-#10 1 1 1 3/4" RMC 1

BOILER ROOM HIGH BAY LED 02-DP4 7 1-#10 1-#10 1-#10 1 1 1 3/4" RMC 1

MAU-001 02-DP4 9 11 13 3-#12 1-#12 3 0 1 3/4" RMC 1

MAU-002 02-DP4 10 12 14 3-#12 1-#12 3 0 1 3/4" RMC 1

2-R-EF-001 02-DP4 15 17 19 3-#12 1-#12 3 0 1 3/4" RMC 1

2-R-EF-002 02-DP4 16 18 20 3-#12 1-#12 3 0 1 3/4" RMC 1

2-R-EF-004 02-DP4 21 23 25 3-#12 1-#12 3 0 1 3/4" RMC 1

02-PP1 CABLE AND CONDUIT SCHEDULE

LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS

GEN RM RECEPTACLES 02-PP1 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

2-200-CF-002 02-PP1 2 1-#12 1-#12 1-#14 1 1 1 3/4" RMC 1

RECEPTACLE 02-PP1 3 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

FUEL TANK LIGHTS 02-PP1 4 6 2-#12 1-#12 2 0 1 3/4" RMC 1

2-200-CF-001 02-PP1 5 1-#12 1-#12 1-#14 1 1 1 3/4" RMC 1

2-200-UH-001 002 003 02-PP1 7 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

2-EXT-CU-003 02-PP1 9 11 2-#6 1-#6 2 0 1 3/4" RMC 1

02-PP2 02-PP1 12 14 16 3-#1 1-#1 1-#4 3 1 1 1-1/2" RMC 1

02-PP3 02-PP1 17 19 21 3-#1 1-#1 1-#4 3 1 1 1-1/2" RMC 1

02-PP5 02-PP1 22 24 26 3-#1 1-#1 1-#4 3 1 1 1-1/2" RMC 1

02-PP4 02-PP1 23 25 27 3-#1 1-#1 1-#4 3 1 1 1-1/2" RMC 1

02-PP2 CABLE AND CONDUIT SCHEDULE

LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS

2-100-TK-004 02-PP2 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

RO CONTROL RECEPTACLE 02-PP2 2 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

BOILER RM 100 REC EAST WALL 02-PP2 3 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

BOILER RM 100 3P REC 02-PP2 4 6 8 3-#8 1-#8 3 0 1 3/4" RMC 1

BOILER RM 100 REC CENTERLINE 02-PP2 5 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

BOILER RM 100 3P REC 02-PP2 7 9 11 3-#8 1-#8 3 0 1 3/4" RMC 1

SANITARY LIFT STATION CONTROL

POWER

02-PP1 28 1-#6 1-#6 1-#6 1 1 1 1" RMC 1

02-PP3 CABLE AND CONDUIT SCHEDULE

LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS

GARAGE DOOR 1 02-PP3 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

GARAGE DOOR 4 02-PP3 2 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

RECEPTACLES WEST WALL 02-PP3 3 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

CONTROL RM 111 REC 02-PP3 4 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

CHEMICAL FEED PUMPS 02-PP3 5 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

CHEMICAL FEED PUMPS 02-PP3 6 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

RECEPTACLE 02-PP3 7 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

SEWAGE PUMP PMP-1 02-PP3 8 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

RECEPTACLE 02-PP3 9 1-#10 1-#10 1-#10 1 1 1 3/4" RMC 1

FA CONTROL PANEL 02-PP3 10 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

SUPERVISOR RM 110 REC 02-PP3 11 1-#10 1-#10 1-#10 1 1 1 3/4" RMC 1

CONTROL RM 111 REC 02-PP3 12 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

2-EXT-OU-001 02-PP3 13 15 2-#10 1-#6 2 0 1 3/4" RMC 1

02-PP4 CABLE AND CONDUIT SCHEDULE

LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS

GARAGE DOOR 2 02-PP4 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

GARAGE DOOR 3 02-PP4 2 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

BRK RM 102 COUNTER LTS 02-PP4 3 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

WATER FOUNTAIN/BOTTLE FILL 02-PP4 4 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

2-EXT-OU-002 02-PP4 6 8 2-#12 1-#10 2 0 1 3/4" RMC 1

BRK RM 102 COUNTERTOP REC 02-PP4 7 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

BRK RM 102 REFRIGERATOR 02-PP4 9 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

RM 103 105 RECEPTACLE 02-PP4 10 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

BREAKROOM RECEPTACLES 02-PP4 11 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

BOILER RM 100 REC 02-PP4 13 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

RM 104 106 107 108 REC 02-PP4 15 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

BREAKROOM RECEPTACLES 02-PP4 16 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

ELECTRIC RANGE 02-PP4 17 19 21 3-#8 1-#10 3 0 1 3/4" RMC 1

DUPLEX FUEL OIL PUMP 02-PP4 18 20 22 3-#12 1-#12 3 0 1 3/4" RMC 1

02-PP5 CABLE AND CONDUIT SCHEDULE

LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS

RM 201 REC 02-PP5 1 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

RM 201 REC 02-PP5 3 1-#12 1-#12 1-#12 1 1 1 3/4" RMC 1

HOT WATER CIRC PUMP 02-PP5 4 6 2-#12 1-#12 2 0 1 3/4" RMC 1

RECEPTACLE 02-PP5 5 1-#10 1-#10 1-#10 1 1 1 3/4" RMC 1

ELECTRIC CHAIN HOIST 02-PP5 7 9 2-#10 1-#10 2 0 1 3/4" RMC 1

AIR COMPRESSOR 02-PP5 8 10 12 3-#10 1-#10 3 0 1 3/4" RMC 1

HOT WATER CIRC PUMP 02-PP5 11 13 2-#12 1-#12 2 0 1 3/4" RMC 1

GENERATOR CABLE AND CONDUIT SCHEDULE

LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS

2-120B-480E-SWBD-001 GENERATOR 3-#250 1-#250 1-#3 6 2 2 2-1/2" RMC 2

NORMAL POWER CABLE AND CONDUIT SCHEDULE

LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS

2-120A-480N-SWBD-001 NORMAL SWITCHGEAR 3-#250 1-#250 1-#3 6 2 2 2-1/2" RMC 2

PANEL C (EXISTING) CABLE AND CONDUIT SCHEDULE

LOAD NAME PANEL CIRCUIT NUMBER WIRE SIZE # OF HOT # OF NEUTRAL # OF GROUND CONDUIT # OF RUNS

EMERGECNY FUEL OIL SHUT OFF PANEL C 14 16 18 3-#12 1-#12 3 0 1 3/4" RMC 1

2-202-UH-001 -002 -003 PANEL C 20 1-#10 1-#10 1-#10 1 1 1 3/4" RMC 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

EP604

ELECTRICAL POWER CABLE AND

CONDUIT SCHEDULES 2

KRK LAJ

PARTIALLY SPRINKLERED

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

R…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .