S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf

PDF 2 MB Posted

Attached to
Y1NB--Project 585-21-115 Replace Boiler Plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI -- NAICS 236220 General Construction
Solicitation number
36C25225R0004
Issued by

About this file

This file contains fire alarm and fire suppression system drawings for the VA boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings detail the layout and specifications for fire protection systems across basement, ground floor, and mezzanine levels of the facility.

The drawings include fire alarm plans showing device locations, riser diagrams, and input/output matrices for system operation. Fire suppression plans show sprinkler layouts, pipe routing, and typical installation details. Key specifications include requirements for connecting electronic door locks to the fire alarm system, ambient noise considerations for speaker placement in the 85dB boiler room environment, coordination with existing campus master fire alarm control panels, and detailed sprinkler system components including flexible connections, pipe hangers, and penetrations. The drawings indicate a partially sprinklered building classification and include schedules for devices like the air compressor system (duplex 5HP, 175 PSI) and fire protection equipment. All work must be coordinated between contractors to ensure continued facility operations during phased construction.

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_Updated Dwgs_partial_24JAN25.pdf PDF
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
36C25225R0004 0007.docx DOCX document
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.1_P03 Single Source Justification MEDECO.e.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.6c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA'

B'

D'

C'

E'

1 2 3

A

B

D

F F

H

TO BUILDING 1

STORAGE

RM/TUNNEL ACCESS

001-2

STORAGE

RM/TUNNEL ACCESS

001-2

BASEMENT

003-2

D002

EXISTING FIRE ALARM EQUIPMENT TO

REMAIN UNLESS OTHERWISE NOTED

BASEMENT HALLWAY

002-2

15CD

AOM1

3'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-24

FA101

FIRE ALARM PLAN - BASEMENT

LEVEL 2

AJW KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

SCALE: 3/16" = 1'-0"1 FIRE ALARM PLAN - BASEMENT LEVEL

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYED NOTES

1 CONNECT TO ELECTRONIC DOOR LOCK. DOOR SHALL AUTOMATICALLY UNLOCK UPON

ACTIVATION OF BUILDING FIRE ALARM SYSTEM.

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

SHEET 1114/5/2024

F

F

F

MF

AC

U

F

F

F

MFACP

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

CONTROL ROOM

130-2SUPERVISOR

129-2

CHEM FEED

128-2

BOILER ROOM

119-2

PROPANE

131-2

GENERATOR ROOM

120B-2

TOILET

122-2

JANITOR

121-2

TOILET

123-2

SHOWER AREA

126-2

LOCKER ROOM

125-2

CHANGING AREA

127-2

BREAK ROOM

124-2

1 2 3

A

B

D

F

H

M

EXISTING CAMPUS MASTER FIRE

ALARM CONTROL UNIT TO REMAIN

BOILER ROOM

101-2

PARALLEL

SWITCHING GEAR

101B-2

ELECTRICAL ROOM

120A-2

30CD

30CD

30CD

75CD

34CD

75CD

75CD

75CD

75CD

GAS

75CD

E

E

EXISTING FIRE ALARM EQUIPMENT TO

REMAIN UNLESS OTHERWISE NOTED

D120BD119A

D130B

3'

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-24

FA121

FIRE ALARM PLAN - GROUND

FLOOR LEVEL 2

AJW KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

SCALE: 3/16" = 1'-0"1 FIRE ALARM PLAN - GROUND FLOOR LEVEL

5. SEE EI DRAWINGS FOR CO AND EXPLOSIVE GAS DETECTION SYSTEM INFORMATION.

4.

ESTIMATED AMBIENT NOISE WITHIN THE BOILER ROOM IS 85dB WHEN BOILERS ARE

RUNNING AT FULL CAPACITY. FIRE ALARM CONTRACTOR SHALL ENSURE SPEAKER

TAPS ARE ADJUSTED TO TAKE INTO CONSIDERATION THIS EXPECTED BACKGROUND

NOISE. PROVIDE ADDITIONAL SPEAKERS AS REQUIRED TO MEET VOICE INTELLIGIBILITY

REQUIREMENTS OF NFPA 72.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYED NOTES

PROVIDE NEW CAMPUS MASTER FIRE ALARM CONTROL PANEL. SYSTEM SHALL BE

CONNECTED TO THE EXISTING CAMPUS FIRE ALARM SYSTEM VIA THE EXISTING

CAMPUS MASTER FIRE ALARM CONTROL PANEL. THE EXISTING CAMPUS MASTER FIRE

ALARM CONTROL PANEL SHALL CONTINUE TO ACT AS THE CAMPUS MASTER FIRE

ALARM CONTROL PANEL AND SHALL CONTINUE TO REPORT TO THE FACILITY'S

DESIGNATED CENTRAL STATION OR OTHER REMOTE MONITORING SERVICE. THE NEW

CAMPUS MASTER FIRE ALARM CONTROL PANEL SHALL BE PROGRAMMED TO RECEIVE

ALARMS FROM ALL CAMPUS FACILITIES, ALERT THE OPERATORS WITHIN THE NEW

CONTROL ROOM, AND OTHERWISE PROVIDE ALL CAPABILITIES CURRENTLY PROVIDED

BY THE EXISTING CAMPUS MASTER FIRE ALARM CONTROL PANEL, WITH THE

EXCEPTION OF REPORTING TO THE FACILITY'S CENTRAL STATION OR OTHER REMOTE

MONITORING SERVICE.

2 CONNECT TO ELECTRONIC DOOR LOCK. DOOR SHALL AUTOMATICALLY UNLOCK UPON

ACTIVATION OF BUILDING FIRE ALARM SYSTEM.

3 CONNECT TO GAS MONITORING PANEL SYSTEM TROUBLE OUTPUT

4 CONNECT TO GAS MONITORING PANEL EXPLOSIVE GAS SUPERVISORY ALARM

OUTPUT

5 CONNECT TO GAS MONITORING PANE EXPLOSIVE GAS ALARM OUTPUT

6 CONNECT TO GAS MONITORING PANEL EXPLOSIVE GAS SUPERVISORY ALARM

OUTPUT

7 CONNECT TO GAS MONITORING PANE CO ALARM OUTPUT

THE EXISTING CAMPUS MASTER FIRE ALARM CONTROL PANEL SHALL REMAIN IN

OPERATION THROUGHOUT THE DURATION OF THE PROJECT. ONCE THE VA BOILER

PLANT STAFF HAVE STOPPED PROVIDING 24 HOUR COVERAGE OF THIS SPACE

FOLLOWING COMMISSIONING OF THE NEW BOILER PLANT AND DEACTIVATION OF THE

EXISTING BOILER PLANT, THIS PANEL SHALL BE REPROGRAMMED SUCH THAT IT NO

LONGER PROVIDES AUDIBLE NOTIFICATIONS FOR OPERATOR ACTION UPON RECEIPT

OF ALARMS FROM THE REMAINDER OF THE CAMPUS.

AOM

S

AIM

WF VS

AIM AIM AIM

VS VS

AOMAOMAOMAOM

P

AOM

34567

AOM

AOM

AOM

S C

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

SHEET 1124/5/2024

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

EQUIPMENT ACCESS

200-2

OPEN TO BELOW

1 2 3

A

B

D

F

H

M

CONTROL IT

201-2

30CD

15CD

110CD

30CD

30CD

30CD

75CD

MEZZANINE

202-2

AOMAOM

3'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-24

FA141

FIRE ALARM PLAN - MEZZANINE

LEVEL 2

AJW KRL

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 FIRE ALARM PLAN - MEZZANINE LEVEL

KEYPLAN

N AREA OF WORK

12 16

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYED NOTES

1 CONNECT TO FAN SHUTDOWN RELAY LOCATED IN CEILING FANS. AOMs SHALL BE

LOCATED AT THE MEZZANINE LEVEL FOR EASE OF MAINTENANCE.

Revisions: Date:

SHEET 1132/22/2024

MFACU

BUILDING 2

CONTROL ROOM

EXISTING

MFACU

BUILDING 2

FROM SITE AND BUILDING FACU'S

EXISTING BUILDING 2 NAC

EXISTING BUILDING 2 SLC

F F F F AIM

WF VS

AIM

VS

AIM

VS

AIM FAOM

GAS

AOM

GAS

AOM

GAS

AOM

GAS

AOM

GAS

AOM

FSC

AOM

FSC

AOM AOM

DOOR

CONTROLLER

AOM

DOOR

CONTROLLER

AOM

DOOR

CONTROLLER

NAC

AUDIO

SLC

NETWORK DATA AND AUDIO

CONNECTIONS PROVIDE 5 PAIR

FIBER OPTIC CABLE; TYPE TO EXISTING

SYSTEM NETWORK CABLING

AOM

DOOR

CONTROLLER

ROOM 101B-2

EXISTING BUILDING 2 AUDIO

DOOR

CONTROLLER

ADD NEW DEVICE TO EXISTING BUILDING 2 SLC CIRCUIT

VS

AIM

PS

AIM

C S

S P

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

FIRE ALARM RISER DIAGRAM FINAL BID SET

PARTIALLY

SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

FA601

585-21-115

AJW IJS

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

SCALE: NTS

FIRE ALARM RISER DIAGRAM1

GENERAL NOTES

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

INPUT DEVICE OUTPUT

SO

UN

D

GE

NE

RA

L B

UI

LD

IN

G

AL

AR

M

NO

TI

FY

F

IR

E

DE

PA

RT

ME

NT

IN

IT

IA

TE

S

UP

ER

VI

SO

RY

S

IG

NA

L T

O A

-H

OU

R

MA

NN

ED

P

OI

NT

F

OR

IM

ME

DI

AT

E

RE

SP

ON

SE

SH

UT

OF

F

HV

LS

F

AN

S

AT

C

EI

LIN

G

LE

VE

L O F

MA

IN

BO

ILE

R

PL

AN

T

AR

EA

MANUAL PULL STATION X X X

SPRINKLER WATERFLOW/PRESSURE SWITCH X X X

WATER CONTROL VALVE TAMPER X

CO OR EXPLOSIVE GAS ALARM X X

CO OR EXPLOSIVE GAS SUPERVISORY SIGNAL X

SCALE: NTS

FIRE ALARM SYSTEM INPUT OUTPUT MATRIX2

SHEET 1144/5/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

B'

D'

C'

E'

1 2 3

A

B

D

F

H

1" FROM ABOVE

INSTALL 3/4" VALVE

BELOW FOR DRAIN

TO BUILDING 1

1" ø

1"ø

3'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-24

FX101

FIRE SUPPRESION PLAN -

BASEMENT LEVEL 2

AJW KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/16" = 1'-0"1 FIRE SUPPRESION PLAN - BASEMENT LEVEL

N

Revisions: Date:

SHEET 1152/22/2024

B'

G'

F'

D'

C'

2.8'

E'

1 2 3

A

B

D

F

H

M

1" UP AND DN

1" UP, INSTALL 3/4"

DRAIN VALVE BELOW

1 1/2" UP

BOILER ROOM

119-2

CHEM FEED

128-2

SUPERVISOR

129-2

CONTROL ROOM

130-2

PROPANE

131-2

BREAK ROOM

124-2

CHANGING AREA

127-2

LOCKER ROOM

125-2

SHOWER AREA

126-2

JANITOR

121-2

TOILET

122-2

GENERATOR ROOM

120B-2

FDC

TOILET

123-2

1"ø

1 1 /2" ø

1" ø

2"ø

1" ø

1" ø

1 1/4"ø

2"ø 2"ø

SPRINKLER UNDER

SURGE TANK

1"ø

1"ø

1"ø

2" ø

1"ø

2"ø 1"ø

1"ø

1"ø 1"ø

2" ø

1"ø

FX201

2"ø 1"ø

14" WET PIPE RISER

CONTINUES UP

1" ø

ELECTRICAL ROOM

120A-2

1" UP, INSTALL 3/4

DRAIN VALVE BELOW

1"ø1 1/4"ø

1"ø

3'

1" ø

1" ø

1"ø

1" ø

1 1/2"ø 1 1/2"ø1"ø

1" ø

1"ø

1" ø

1"ø

1" ø

1"ø 1"ø

1 1 /2" ø

1" ø

1"ø1"ø

1"ø

6" WATER SUPPLY

FROM SITE

1 1/2"ø

1"ø

DRY-PIPE SYSTEM PIPING

TO SLOPE BACK TO RISER

1 1/2" DRY-PIPE RISER

(SERVES GENERATOR

ROOM 120B-2)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-24

FX121

FIRE SUPPRESION PLAN -

GROUND FLOOR LEVEL 2

AJW KRL

PARTIALLY SPRINKLERED

N

KEYPLAN

N AREA OF WORK

12 16

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 ADD SIGNAGE ABOVE FDC FOR "FIRE DEPARTMENT AUTOMATIC SPRINKLER

CONNECTION - SIAMESE", PER CHAPTER 5 OF NFPA 170

SCALE: 3/16" = 1'-0"1 FIRE SUPPRESSION PLAN - GROUND FLOOR LEVEL

Revisions: Date:

SHEET 1162/22/2024

B'

G'

F'

D'

C'

2.8'

E'

EQUIPMENT ACCESS

200-2

1 2 3

A

B

D

F

H

M

CONTROL IT

201-2

1"ø FPW

TO BELOW

PENDANT SPRINKLERS

IN CEILING OF RM 201-2

SPRINKLER AT HIGH

CEILING OF BOILER ROOM

4" DN 1-1/2" TO

IT CONTROL ROOM

1" ø

1"ø

1"ø

1 1/2"ø

1"ø1"ø1"ø1"ø

1"ø 1"ø 1"ø 1"ø

1 1/4"ø

1 1/4"ø

1"ø 1"ø

1"ø

1"ø 1"ø 1"ø

1"ø1"ø

1 1/4"ø1"ø1"ø

1"ø 1"ø 1 1/4"ø

1 1/4"ø

1 1/4"ø

1 1/4"ø

1 1/4"ø

1 1/4"ø

1"ø1"ø

1"ø 1"ø

1"ø

1"ø 1"ø

1"ø 1 1/4"ø

1 1/4"ø

1 1/4"ø1"ø1"ø

1"ø 1"ø

1 1/4"ø1 1/4"ø

4" ø

4" ø

1"ø 1"ø

1" ø

1 1/4"ø

1 1/4"ø

1 1/2"ø

1 1/4"ø

4" ø

4" ø

4" ø

1"ø

1"ø

1" TO BELOW

1" DOWN

AVOID BOILER STACK

WITH PIPE ROUTING (TYP)

3'

1"ø

1"ø

1" ø

1" ø

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-24

FX141

FIRE SUPPRESSION PLAN -

MEZZANINE LEVEL 2

AJW KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

SCALE: 3/16" = 1'-0"1 FIRE SUPPRESSION PLAN - MEZZANINE LEVEL

Revisions: Date:

SHEET 1172/22/2024

GROUND FLOOR

0' - 0"

/1 FX121

4" TO FDC

4" WET-PIPE

RISER ASSEMBLY

2" TEST AND

DRAIN

6" FW SUPPLY FROM SITE

4" TO MAIN BOILER

PLANT SPRINKLERS

FLOW SWITCH

4" DOUBLE CHECK

DETECTOR ASSEMBLY

2" TO RESTROOMS AND

BREAKROOM

2" TO SPRINKLERS UNDER

MEZZANINE AND STAIRS

1 1/2" TO GENERATOR AND

ELECTRICAL ROOMS

INSTALL WALL MOUNT POST INDICATING

VALVE, ACTUATED FROM THE EXTERIOR

OF THE BUILDING

6x4 REDUCER

4" FDC CHECK VALVE

DRY-PIPE SYSTEM DRAIN

1 1/2" DRY-PIPE SPRINKLER

RISER ASSEMBLY. INSTALL

WITH RISER MOUNTED AIR-

COMPRESSOR (NOT SHOWN)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-24

FX201

FIRE SUPPRESION ELEVATION

AJW KRL

PARTIALLY SPRINKLERED

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYPLAN

N AREA OF WORK

12 16

SCALE: 1" = 1'-0"1 FIRE PROTECTON RISER ELEVATION

Revisions: Date: SHEET 1182/22/2024

NOTE:

APPLICABLE TO PENETRATIONS OF ALL FIRE RATED

MEMBRANES, IN ACCORDANCE WITH NFPA 101.

REFER TO SPECIFICATIONS SECTION 07 84 00, FIRE

STOPPING SYSTEMS.FLOOR OR DECK PENETRATION

PARTITION OR CHASE PENETRATION

DRYWALL

PARTITION

PARTITION SUPPORT

FIRESTOP

MATERIAL

MASONRY

PARTITION

FLOOR

FIRESTOP MATERIAL

INLET NIPPLE

BAR FIXING CLAMP

SUPPORT BAR

REDUCER

BRACKET

FLEXIBLE HOSE

TO BE INSTALLED WITH MINIMUM BEND

RADIUS AND NUMBER OF BENDS ALLOWED

PER MANUFACTURER REQUIREMENTS

HOSE THREADED

SPRINKLER REDUCER

(STRAIGHT SHOWN)

BRANCHLINE

FITTING OUTLET

TYPICAL CONCEALED SPRINKLER

ASSEMBLY

CEILING GRID T-BAR

DROP-IN CEILING PANEL

AS

R

EQ

UI

RE

D

2" -1

2"

CEILING

3/8" Ø FLUSH ANCHOR

3/8" DIA HANGER ROD

ADJUSTABLE CLEVIS HANGER

PER NFPA 13, CHAPTER 9

NOTES:

SEE SPECIFICATION AND

NFPA 13, CHAPTER 9

FOR HANGER REQUIREMENTS

3/8" NUT AND WASHER

BEAM CLAMP HANGER

IF OFFSET LENGTH

EXCEEDS 2'-0" PROVIDE

PIPE HANGER

TWO PIECE ESCUTCHEON WITH

3/4" VERTICAL ADJUSTMENT

PENDANT STYLE SPRINKLER HEAD

SPRINKLER

BRANCH

LINE

CLOSE

NIPPLE

THREADED

DEG

ELBOW

(TYP)

DROP

NIPPLE

REDUCER

SUSPENDED

CEILING

WHITE FINISH UNLESS OTHERWISE CALLED

OUT BY ARCHITECTURAL DRAWINGS OR

REQUESTED BY OWNER

NOTE: APPROVED FLEXIBLE SPRINKLER CONNECTIONS CAN BE USED IN PLACE OF RETURN BENDS, INSTALL PER MANUFACTURERS INSTRUCTIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

FIRE SUPPRESSION TYPICAL

DETAILS

100% BID SET

PARTIALLY

SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

FX501

585-21-115

AJW IJS

REV 0 - 100% BID SET 2024-02-23

SCALE: NTS

TYPICAL PENETRATION OF SMOKE/FIRE BARRIERS1 SCALE: NTS

TYPICAL FLEXIBLE SPRINKLER CONNECTION2 SCALE: NTS

TYPICAL UPRIGHT SPRINKLER3 SCALE: NTS

STANDARD PIPE HANGERS4

GENERAL NOTES

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

SCALE: NTS

TYPICAL RETURN BEND5

SHEET 1192/22/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AJW CJR

REV 0 - 100% BID SET 2024-02-23

GENERAL NOTES:

1. DESIGN CONSTRUCTION AND SAFETY SHALL CONFORM TO ALL LOCAL, STATE AND OWNER SPECIFIC CODES, INCLUDING (BUT NOT LIMITED TO) THE INTERNATIONAL BUILDING CODE, THE INTERNATIONAL PLUMBING CODE, ANSI A117.1, OSHA, AND ANY OTHER CODES GOVERNED BY THE JURISDICTION IN

WHICH THIS PROJECT IS BEING CONSTRUCTED.

2. PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED TO COMPLETE DEMOLITION OF THE CURRENT PIPING, AS WELL AS AN OPERABLE FINAL CONFIGURATION PLUMBING SYSTEM AS INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY APPLICABLE LOCAL CODES AND REGULATIONS.

3. CONTRACT DOCUMENT DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.

4. INSTALL ALL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND ALL

APPLICABLE CODES AND REGULATIONS.

5. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL, ELECTRICAL, AND HVAC WORK SHOWN ON OTHER

CONTRACT DRAWINGS.

6. LABEL ALL PIPING IN ACCORDANCE WITH ASME A13.1.

7. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS, OR CALLED OUT IN THE SPECIFICATIONS, ARE APPROXIMATE ONLY. DO NOT SCALE DRAWINGS.

8. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSET IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO

ADDITIONAL COST TO THE OWNER. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL OTHER TRADES.

9. ALL PENETRATIONS THROUGH FLOORS AND FULL HEIGHT WALLS TO BE FIRE STOPPED. ALL GAPS AND JOINTS AT FIRE RESISTIVE FLOORS, ROOFS AND

WALL TO BE FIRE AND SMOKE STOPPED. GAPS AND JOINTS INCLUDE (BUT ARE NOT LIMITED TO) TOP OF WALL TO FLOOR OR ROOF DECK WALL TO BEAMS, AND CONTROL OR EXPANSION FIRE STOPPING INCLUDES BOTH FORM OR PACKING MATERIAL AND THE FILL, VOID OR CAVITY MATERIAL.

10. ALL PIPING SHALL CLEAR DOORS.

11. INCLUDE FLOW-DIRECTION ARROWS INTEGRAL WITH PIPING SYSTEM SERVICE LETTERING TO ACCOMMODATE BOTH DIRECTIONS OR AS SEPARATE UNIT ON

EACH PIPE LABEL TO INDICATE FLOW DIRECTION.

12. PIPE LABEL LOCATIONS: LOCATE PIPE LABELS, WHERE PIPING IS EXPOSED OR ABOVE ACCESSIBLE CEILINGS IN FINISHED SPACES; MACHINE ROOMS;

ACCESSIBLE MAINTENANCE SPACES SUCH AS SHAFTS, TUNNELS, AND PLENUMS; AND EXTERIOR EXPOSED LOCATIONS AS FOLLOWS:

A. NEAR EACH VALVE AND CONTROL DEVICE.

B. NEAR EACH BRANCH CONNECTION, EXCLUDING SHORT TAKEOFFS FOR FIXTURES AND TERMINAL UNITS. WHERE FLOW PATTERN IS NOT OBVIOUS, MARK EACH PIPE AT BRANCH.

C. NEAR PENETRATIONS AND ON BOTH SIDES OF THROUGH WALLS, FLOORS, CEILINGS, AND INACCESSIBLE ENCLOSURES.

D. AT ACCESS DOORS, MANHOLES, AND SIMILAR ACCESS POINTS THAT PERMIT VIEW OF CONCEALED PIPING.

E. NEAR MAJOR EQUIPMENT ITEMS AND OTHER POINTS OF ORIGINATION AND TERMINATION.

F. SPACED AT MAXIMUM INTERVALS OF 50 FEET ALONG EACH RUN. REDUCE INTERVALS TO 25 FEET IN AREAS OF CONGESTED PIPING AND EQUIPMENT.

GENERAL SYMBOLS

ROOM NAME AND NUMBER

DEMOLISH/REMOVE DEVICE

EXISTING CONDENSATE DRAIN LINED

GENERAL LINETYPES

GENERAL PLUMBING SYMBOLS

VALVE SYMBOLS

FD FLOOR DRAIN

DIRECTION OF PIPE PITCH (DOWN)

DIRECTION OF FLOW

REDUCER OR INCREASER

ECCENTRIC REDUCER

TOP CONNECTION, 45° OR 90°

BOTTOM CONNECTION, 45° OR 90°

SIDE CONNECTION

CAPPED OUTLET

RISE OR DROP IN PIPE

UNION

PIPE UP

PIPE DOWN

POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK

LIMIT OF DEMOLITION

STRAINER

THERMOMETER

PRESSURE GAGE

CLEAN OUT

HOSE BIBB

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

PRESSURE SAFETY VALVE

AUTOMATIC BALANCING CONTROL VALVE

WATER BALANCE DEVICE

EXISTING SANITARY SEWERSS

NEW SANITARY SEWERSS

NEW CONDENSATE DRAIN LINED

EXISTING DOMESTIC COLD WATERCW

NEW DOMESTIC COLD WATERCW

NEW VENTV

EXISTING DOMESTIC HOT WATERHW

NEW DOMESTIC HOT WATERHW

CO

CO CLEAN OUT

CW COLD WATER

DN DOWN

FS FLOW SENSOR

FT FEET

GPM GALLONS PER MINUTE

HP HORSEPOWER

HW HOT WATER

MAX MAXIMUM

MBH THOUSAND BTU PER HOUR

MIN MINIMUM

NTS NOT TO SCALE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

SP STATIC PRESSURE

SS SANITARY SEWER

ST STORM WATER

SW SOFTENED WATER

TEMP TEMPERATURE

TYP TYPICAL

V VENT

VTR VENT TO ROOF

WCO WALL CLEAN OUT

GENERAL ABBREVIATIONS

DOMESTIC HOT WATER RETURNHWR

C2

CORRIDOR

DEMOLITION LINE

WATER HAMMER ARRESTOR

ABANDONED SANITARY SEWER

ASA

PHASE CALLOUT#

NEW SOFTENED WATER

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION

WASTE

PIPE VENT PIPE COLD WATER HOT WATER WASTE FIXTURE

UNITS

WATER FIXTURE

UNITS ELECTRIC SENSOR

IN IN IN IN

P-101 WATER CLOSET, FLOOR MOUNTED 3.00 2.0 1.25 -- 6.00 10.00 NO

P-401 LAVATORY 2.00 1.50 0.50 0.50 2.00 2.00 NO

P-502 SERVICE SINK (CORNER,FLOOR MOUNTED) 3.00 1.50 0.50 0.50 2.00 4.00 NO

P-528 SINK 1.50 1.50 0.50 0.50 3.00 2.00 NO

P-604 DRINKING FOUNTAIN 2.00 1.50 0.50 -- 1.00 1.00 NO

P-701 SHOWER 2.00 1.50 0.50 0.50 2.00 2.00 NO

P-707 EMERGENCY SHOWER, EYE & FACE WASH -- -- 0.50 0.50 -- -- NO

P-709 EMERGENCY EYE & FACE WASH, DECK MOUNTED -- -- 0.50 0.50 -- -- NO

P-801 FROST PROOF HOSE BIBB -- -- 0.50 -- -- -- NO

P-802 HOSE BIBB -- -- 0.50 -- -- -- NO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PLUMBING NOTES AND LEGENDS 100% BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23 P-001

585-21-115

EXISTING COMPRESSED AIRCA

CA NEW COMPRESSED AIR

SW

DOMESTIC WATER THERMAL EXPANSION TANK SCHEDULE

UNIT ID BASIS OF

DESIGN TYPE

SYSTEM TEMPERATURE

RANGE

INITIAL

PRESSURE

IN TANK

MAX

OPERATING

PRESSURE

RELIEF

VALVE PSIG

MIN TANK

VOLUME

MIN ACCEPT

VOLUME

PIPE SIZE

TO TANK REMARKSMIN MAX

°F °F PSIG PSIG PSIG GAL GAL IN

EXPT-1 WATTS

PLT-12

POTABLE

WATER

EXPANSION

TANK

40 140 70 123 145 4.5 3.42 .75 -----

ELECTRIC WATER HEATER SCHEDULE

MARK LOCATION

AREA

AND/OR

BLDG

SERVED

SYSTEM

AND/OR

SERVICE

TYPE

STORAGE

CAPACITY

RECOVERY @

80 °F RISE

RELIEF

VALVE

SETTING NO. OF

ELEMENTS

ELECTIRCAL INPUT

REMARKS

GAL GAL/HR PSIG TOTAL kW kW PER

ELEMENT PHASE VOLT

WH-1 BOILER

ROOM 100

BOILER

PLANT

DOMESTIC

HOT WATER

LIGHT

SERVICE 80 61 145 2 12.1 6 1 277 -----

SCW SOFTENED COLD WATER

PUMP SCHEDULE SCHEDULE

PUMP BASIS OF DESIGN TYPE FLOW HEAD POWER VOLTAGE AMPS PHASE FREQUENCY

PMP-1 900 SERIES SUMP PACKAGE WITH

M53 PUMP SUMP 10 GPM 17 FT WC 3/10 HP 120 -- 1 60 HZ

PMP-2 GRUNDFOS MAGNA 32-100 N HW CIRCULATION 29 GPM 20.67 FT WC 9.7 - 178 W 120 0.29 - 1.61 1 60 HZ

AIR COMPRESSOR SCHEDULE

MARK BASIS OF

DESIGN LOCATION SYSTEM

SERVICE

INLET

AIRFLOW

DISCHARGE

PRESSURE

RECEIVER

SIZE DIMENSION,

LxWxH

ELECTRIC POWER [60 Hz]

REMARKS

NO.

MOTORS

POWER

EA. PHASE VOLT RPM

CFM PSIG GAL IN HP

2-200-CA-001

CR5-TS-120GH

3PH-PPS (DUPLEX)

MEZZANINE

GENERAL

SERVICE 35 175 120 77X30X52 2 5 3 200 1750 1,2,3

NOTES:

1. PROVIDE WITH FILTER & INTAKE SILENCER

2 PROVIDE WITH AFTER COOLER

3. PROVIDE WITH BELT GUARDS

BACKFLOW PREVENTER, REDUCED PRESSURE ZONE (RPZ) TYPE

GATE VALVE

SHEET 1202/23/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

X

1 2 3

A

B

D

F

H

STORAGE

RM/TUNNEL ACCESS

001-2

BASEMENT HALLWAY

002-2

VA IT

004-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

PD101

PLUMBING DEMOLITION PLAN -

BASEMENT LEVEL 2

AJW LAJ

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL

N

KEYPLAN

N

12 16

AREA OF WORK

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 CONTRACTOR IS TO TRACE THE COLD WATER LINE THROUGH THE TUNNEL, BACK TO

THE POINT OF CONNECTION TO THE WATER SYSTEM IN THE HOSPITAL SUB-BASEMENT.

THIS 4" PIPE IS TO BE COMPLETELY REMOVED FROM THE TUNNEL BACK TO THAT

CONNECTION POINT IN THE HOSPITAL SUB-BASEMENT. IT'S EXPECTED THIS WILL BE

APPROXIMATELY 350-400 FEET OF PIPE REMOVAL. SEE PP501, DETAIL 6 FOR REMOVAL

AND FINAL CONFIGURATION AT THE SUB-BASEMENT CONNECTION.

Revisions: Date:

SHEET 1212/23/2024

File details come from the government source that posted it. Updated .