This file contains fire alarm and fire suppression system drawings for the VA boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings detail the layout and specifications for fire protection systems across basement, ground floor, and mezzanine levels of the facility.
The drawings include fire alarm plans showing device locations, riser diagrams, and input/output matrices for system operation. Fire suppression plans show sprinkler layouts, pipe routing, and typical installation details. Key specifications include requirements for connecting electronic door locks to the fire alarm system, ambient noise considerations for speaker placement in the 85dB boiler room environment, coordination with existing campus master fire alarm control panels, and detailed sprinkler system components including flexible connections, pipe hangers, and penetrations. The drawings indicate a partially sprinklered building classification and include schedules for devices like the air compressor system (duplex 5HP, 175 PSI) and fire protection equipment. All work must be coordinated between contractors to ensure continued facility operations during phased construction.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA'
B'
D'
C'
E'
1 2 3
A
B
D
F F
H
TO BUILDING 1
STORAGE
RM/TUNNEL ACCESS
001-2
STORAGE
RM/TUNNEL ACCESS
001-2
BASEMENT
003-2
D002
EXISTING FIRE ALARM EQUIPMENT TO
REMAIN UNLESS OTHERWISE NOTED
BASEMENT HALLWAY
002-2
15CD
AOM1
3'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-24
FA101
FIRE ALARM PLAN - BASEMENT
LEVEL 2
AJW KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
SCALE: 3/16" = 1'-0"1 FIRE ALARM PLAN - BASEMENT LEVEL
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYED NOTES
1 CONNECT TO ELECTRONIC DOOR LOCK. DOOR SHALL AUTOMATICALLY UNLOCK UPON
ACTIVATION OF BUILDING FIRE ALARM SYSTEM.
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
SHEET 1114/5/2024
F
F
F
MF
AC
U
F
F
F
MFACP
1' 2'
A'
B'
G'
F'
D'
C'
2.8'
E'
CONTROL ROOM
130-2SUPERVISOR
129-2
CHEM FEED
128-2
BOILER ROOM
119-2
PROPANE
131-2
GENERATOR ROOM
120B-2
TOILET
122-2
JANITOR
121-2
TOILET
123-2
SHOWER AREA
126-2
LOCKER ROOM
125-2
CHANGING AREA
127-2
BREAK ROOM
124-2
1 2 3
A
B
D
F
H
M
EXISTING CAMPUS MASTER FIRE
ALARM CONTROL UNIT TO REMAIN
BOILER ROOM
101-2
PARALLEL
SWITCHING GEAR
101B-2
ELECTRICAL ROOM
120A-2
30CD
30CD
30CD
75CD
34CD
75CD
75CD
75CD
75CD
GAS
75CD
E
E
EXISTING FIRE ALARM EQUIPMENT TO
REMAIN UNLESS OTHERWISE NOTED
D120BD119A
D130B
3'
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-24
FA121
FIRE ALARM PLAN - GROUND
FLOOR LEVEL 2
AJW KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
SCALE: 3/16" = 1'-0"1 FIRE ALARM PLAN - GROUND FLOOR LEVEL
5. SEE EI DRAWINGS FOR CO AND EXPLOSIVE GAS DETECTION SYSTEM INFORMATION.
4.
ESTIMATED AMBIENT NOISE WITHIN THE BOILER ROOM IS 85dB WHEN BOILERS ARE
RUNNING AT FULL CAPACITY. FIRE ALARM CONTRACTOR SHALL ENSURE SPEAKER
TAPS ARE ADJUSTED TO TAKE INTO CONSIDERATION THIS EXPECTED BACKGROUND
NOISE. PROVIDE ADDITIONAL SPEAKERS AS REQUIRED TO MEET VOICE INTELLIGIBILITY
REQUIREMENTS OF NFPA 72.
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYED NOTES
PROVIDE NEW CAMPUS MASTER FIRE ALARM CONTROL PANEL. SYSTEM SHALL BE
CONNECTED TO THE EXISTING CAMPUS FIRE ALARM SYSTEM VIA THE EXISTING
CAMPUS MASTER FIRE ALARM CONTROL PANEL. THE EXISTING CAMPUS MASTER FIRE
ALARM CONTROL PANEL SHALL CONTINUE TO ACT AS THE CAMPUS MASTER FIRE
ALARM CONTROL PANEL AND SHALL CONTINUE TO REPORT TO THE FACILITY'S
DESIGNATED CENTRAL STATION OR OTHER REMOTE MONITORING SERVICE. THE NEW
CAMPUS MASTER FIRE ALARM CONTROL PANEL SHALL BE PROGRAMMED TO RECEIVE
ALARMS FROM ALL CAMPUS FACILITIES, ALERT THE OPERATORS WITHIN THE NEW
CONTROL ROOM, AND OTHERWISE PROVIDE ALL CAPABILITIES CURRENTLY PROVIDED
BY THE EXISTING CAMPUS MASTER FIRE ALARM CONTROL PANEL, WITH THE
EXCEPTION OF REPORTING TO THE FACILITY'S CENTRAL STATION OR OTHER REMOTE
MONITORING SERVICE.
2 CONNECT TO ELECTRONIC DOOR LOCK. DOOR SHALL AUTOMATICALLY UNLOCK UPON
ACTIVATION OF BUILDING FIRE ALARM SYSTEM.
3 CONNECT TO GAS MONITORING PANEL SYSTEM TROUBLE OUTPUT
4 CONNECT TO GAS MONITORING PANEL EXPLOSIVE GAS SUPERVISORY ALARM
OUTPUT
5 CONNECT TO GAS MONITORING PANE EXPLOSIVE GAS ALARM OUTPUT
6 CONNECT TO GAS MONITORING PANEL EXPLOSIVE GAS SUPERVISORY ALARM
OUTPUT
7 CONNECT TO GAS MONITORING PANE CO ALARM OUTPUT
THE EXISTING CAMPUS MASTER FIRE ALARM CONTROL PANEL SHALL REMAIN IN
OPERATION THROUGHOUT THE DURATION OF THE PROJECT. ONCE THE VA BOILER
PLANT STAFF HAVE STOPPED PROVIDING 24 HOUR COVERAGE OF THIS SPACE
FOLLOWING COMMISSIONING OF THE NEW BOILER PLANT AND DEACTIVATION OF THE
EXISTING BOILER PLANT, THIS PANEL SHALL BE REPROGRAMMED SUCH THAT IT NO
LONGER PROVIDES AUDIBLE NOTIFICATIONS FOR OPERATOR ACTION UPON RECEIPT
OF ALARMS FROM THE REMAINDER OF THE CAMPUS.
AOM
S
AIM
WF VS
AIM AIM AIM
VS VS
AOMAOMAOMAOM
P
AOM
34567
AOM
AOM
AOM
S C
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
SHEET 1124/5/2024
1' 2'
A'
B'
G'
F'
D'
C'
2.8'
E'
EQUIPMENT ACCESS
200-2
OPEN TO BELOW
1 2 3
A
B
D
F
H
M
CONTROL IT
201-2
30CD
15CD
110CD
30CD
30CD
30CD
75CD
MEZZANINE
202-2
AOMAOM
3'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-24
FA141
FIRE ALARM PLAN - MEZZANINE
LEVEL 2
AJW KRL
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 FIRE ALARM PLAN - MEZZANINE LEVEL
KEYPLAN
N AREA OF WORK
12 16
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYED NOTES
1 CONNECT TO FAN SHUTDOWN RELAY LOCATED IN CEILING FANS. AOMs SHALL BE
LOCATED AT THE MEZZANINE LEVEL FOR EASE OF MAINTENANCE.
Revisions: Date:
SHEET 1132/22/2024
MFACU
BUILDING 2
CONTROL ROOM
EXISTING
MFACU
BUILDING 2
FROM SITE AND BUILDING FACU'S
EXISTING BUILDING 2 NAC
EXISTING BUILDING 2 SLC
F F F F AIM
WF VS
AIM
VS
AIM
VS
AIM FAOM
GAS
AOM
GAS
AOM
GAS
AOM
GAS
AOM
GAS
AOM
FSC
AOM
FSC
AOM AOM
DOOR
CONTROLLER
AOM
DOOR
CONTROLLER
AOM
DOOR
CONTROLLER
NAC
AUDIO
SLC
NETWORK DATA AND AUDIO
CONNECTIONS PROVIDE 5 PAIR
FIBER OPTIC CABLE; TYPE TO EXISTING
SYSTEM NETWORK CABLING
AOM
DOOR
CONTROLLER
ROOM 101B-2
EXISTING BUILDING 2 AUDIO
DOOR
CONTROLLER
ADD NEW DEVICE TO EXISTING BUILDING 2 SLC CIRCUIT
VS
AIM
PS
AIM
C S
S P
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
FIRE ALARM RISER DIAGRAM FINAL BID SET
PARTIALLY
SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
FA601
585-21-115
AJW IJS
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
SCALE: NTS
FIRE ALARM RISER DIAGRAM1
GENERAL NOTES
1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.
INPUT DEVICE OUTPUT
SO
UN
D
GE
NE
RA
L B
UI
LD
IN
G
AL
AR
M
NO
TI
FY
F
IR
E
DE
PA
RT
ME
NT
IN
IT
IA
TE
S
UP
ER
VI
SO
RY
S
IG
NA
L T
O A
-H
OU
R
MA
NN
ED
P
OI
NT
F
OR
IM
ME
DI
AT
E
RE
SP
ON
SE
SH
UT
OF
F
HV
LS
F
AN
S
AT
C
EI
LIN
G
LE
VE
L O F
MA
IN
BO
ILE
R
PL
AN
T
AR
EA
MANUAL PULL STATION X X X
SPRINKLER WATERFLOW/PRESSURE SWITCH X X X
WATER CONTROL VALVE TAMPER X
CO OR EXPLOSIVE GAS ALARM X X
CO OR EXPLOSIVE GAS SUPERVISORY SIGNAL X
SCALE: NTS
FIRE ALARM SYSTEM INPUT OUTPUT MATRIX2
SHEET 1144/5/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
B'
D'
C'
E'
1 2 3
A
B
D
F
H
1" FROM ABOVE
INSTALL 3/4" VALVE
BELOW FOR DRAIN
TO BUILDING 1
1" ø
1"ø
3'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-24
FX101
FIRE SUPPRESION PLAN -
BASEMENT LEVEL 2
AJW KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/16" = 1'-0"1 FIRE SUPPRESION PLAN - BASEMENT LEVEL
N
Revisions: Date:
SHEET 1152/22/2024
B'
G'
F'
D'
C'
2.8'
E'
1 2 3
A
B
D
F
H
M
1" UP AND DN
1" UP, INSTALL 3/4"
DRAIN VALVE BELOW
1 1/2" UP
BOILER ROOM
119-2
CHEM FEED
128-2
SUPERVISOR
129-2
CONTROL ROOM
130-2
PROPANE
131-2
BREAK ROOM
124-2
CHANGING AREA
127-2
LOCKER ROOM
125-2
SHOWER AREA
126-2
JANITOR
121-2
TOILET
122-2
GENERATOR ROOM
120B-2
FDC
TOILET
123-2
1"ø
1 1 /2" ø
1" ø
2"ø
1" ø
1" ø
1 1/4"ø
2"ø 2"ø
SPRINKLER UNDER
SURGE TANK
1"ø
1"ø
1"ø
2" ø
1"ø
2"ø 1"ø
1"ø
1"ø 1"ø
2" ø
1"ø
FX201
2"ø 1"ø
14" WET PIPE RISER
CONTINUES UP
1" ø
ELECTRICAL ROOM
120A-2
1" UP, INSTALL 3/4
DRAIN VALVE BELOW
1"ø1 1/4"ø
1"ø
3'
1" ø
1" ø
1"ø
1" ø
1 1/2"ø 1 1/2"ø1"ø
1" ø
1"ø
1" ø
1"ø
1" ø
1"ø 1"ø
1 1 /2" ø
1" ø
1"ø1"ø
1"ø
6" WATER SUPPLY
FROM SITE
1 1/2"ø
1"ø
DRY-PIPE SYSTEM PIPING
TO SLOPE BACK TO RISER
1 1/2" DRY-PIPE RISER
(SERVES GENERATOR
ROOM 120B-2)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-24
FX121
FIRE SUPPRESION PLAN -
GROUND FLOOR LEVEL 2
AJW KRL
PARTIALLY SPRINKLERED
N
KEYPLAN
N AREA OF WORK
12 16
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 ADD SIGNAGE ABOVE FDC FOR "FIRE DEPARTMENT AUTOMATIC SPRINKLER
CONNECTION - SIAMESE", PER CHAPTER 5 OF NFPA 170
SCALE: 3/16" = 1'-0"1 FIRE SUPPRESSION PLAN - GROUND FLOOR LEVEL
Revisions: Date:
SHEET 1162/22/2024
B'
G'
F'
D'
C'
2.8'
E'
EQUIPMENT ACCESS
200-2
1 2 3
A
B
D
F
H
M
CONTROL IT
201-2
1"ø FPW
TO BELOW
PENDANT SPRINKLERS
IN CEILING OF RM 201-2
SPRINKLER AT HIGH
CEILING OF BOILER ROOM
4" DN 1-1/2" TO
IT CONTROL ROOM
1" ø
1"ø
1"ø
1 1/2"ø
1"ø1"ø1"ø1"ø
1"ø 1"ø 1"ø 1"ø
1 1/4"ø
1 1/4"ø
1"ø 1"ø
1"ø
1"ø 1"ø 1"ø
1"ø1"ø
1 1/4"ø1"ø1"ø
1"ø 1"ø 1 1/4"ø
1 1/4"ø
1 1/4"ø
1 1/4"ø
1 1/4"ø
1 1/4"ø
1"ø1"ø
1"ø 1"ø
1"ø
1"ø 1"ø
1"ø 1 1/4"ø
1 1/4"ø
1 1/4"ø1"ø1"ø
1"ø 1"ø
1 1/4"ø1 1/4"ø
4" ø
4" ø
1"ø 1"ø
1" ø
1 1/4"ø
1 1/4"ø
1 1/2"ø
1 1/4"ø
4" ø
4" ø
4" ø
1"ø
1"ø
1" TO BELOW
1" DOWN
AVOID BOILER STACK
WITH PIPE ROUTING (TYP)
3'
1"ø
1"ø
1" ø
1" ø
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-24
FX141
FIRE SUPPRESSION PLAN -
MEZZANINE LEVEL 2
AJW KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
SCALE: 3/16" = 1'-0"1 FIRE SUPPRESSION PLAN - MEZZANINE LEVEL
Revisions: Date:
SHEET 1172/22/2024
GROUND FLOOR
0' - 0"
/1 FX121
4" TO FDC
4" WET-PIPE
RISER ASSEMBLY
2" TEST AND
DRAIN
6" FW SUPPLY FROM SITE
4" TO MAIN BOILER
PLANT SPRINKLERS
FLOW SWITCH
4" DOUBLE CHECK
DETECTOR ASSEMBLY
2" TO RESTROOMS AND
BREAKROOM
2" TO SPRINKLERS UNDER
MEZZANINE AND STAIRS
1 1/2" TO GENERATOR AND
ELECTRICAL ROOMS
INSTALL WALL MOUNT POST INDICATING
VALVE, ACTUATED FROM THE EXTERIOR
OF THE BUILDING
6x4 REDUCER
4" FDC CHECK VALVE
DRY-PIPE SYSTEM DRAIN
1 1/2" DRY-PIPE SPRINKLER
RISER ASSEMBLY. INSTALL
WITH RISER MOUNTED AIR-
COMPRESSOR (NOT SHOWN)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-24
FX201
FIRE SUPPRESION ELEVATION
AJW KRL
PARTIALLY SPRINKLERED
1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYPLAN
N AREA OF WORK
12 16
SCALE: 1" = 1'-0"1 FIRE PROTECTON RISER ELEVATION
Revisions: Date: SHEET 1182/22/2024
NOTE:
APPLICABLE TO PENETRATIONS OF ALL FIRE RATED
MEMBRANES, IN ACCORDANCE WITH NFPA 101.
REFER TO SPECIFICATIONS SECTION 07 84 00, FIRE
STOPPING SYSTEMS.FLOOR OR DECK PENETRATION
PARTITION OR CHASE PENETRATION
DRYWALL
PARTITION
PARTITION SUPPORT
FIRESTOP
MATERIAL
MASONRY
PARTITION
FLOOR
FIRESTOP MATERIAL
INLET NIPPLE
BAR FIXING CLAMP
SUPPORT BAR
REDUCER
BRACKET
FLEXIBLE HOSE
TO BE INSTALLED WITH MINIMUM BEND
RADIUS AND NUMBER OF BENDS ALLOWED
PER MANUFACTURER REQUIREMENTS
HOSE THREADED
SPRINKLER REDUCER
(STRAIGHT SHOWN)
BRANCHLINE
FITTING OUTLET
TYPICAL CONCEALED SPRINKLER
ASSEMBLY
CEILING GRID T-BAR
DROP-IN CEILING PANEL
AS
R
EQ
UI
RE
D
2" -1
2"
CEILING
3/8" Ø FLUSH ANCHOR
3/8" DIA HANGER ROD
ADJUSTABLE CLEVIS HANGER
PER NFPA 13, CHAPTER 9
NOTES:
SEE SPECIFICATION AND
NFPA 13, CHAPTER 9
FOR HANGER REQUIREMENTS
3/8" NUT AND WASHER
BEAM CLAMP HANGER
IF OFFSET LENGTH
EXCEEDS 2'-0" PROVIDE
PIPE HANGER
TWO PIECE ESCUTCHEON WITH
3/4" VERTICAL ADJUSTMENT
PENDANT STYLE SPRINKLER HEAD
SPRINKLER
BRANCH
LINE
CLOSE
NIPPLE
THREADED
DEG
ELBOW
(TYP)
DROP
NIPPLE
REDUCER
SUSPENDED
CEILING
WHITE FINISH UNLESS OTHERWISE CALLED
OUT BY ARCHITECTURAL DRAWINGS OR
REQUESTED BY OWNER
NOTE: APPROVED FLEXIBLE SPRINKLER CONNECTIONS CAN BE USED IN PLACE OF RETURN BENDS, INSTALL PER MANUFACTURERS INSTRUCTIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
FIRE SUPPRESSION TYPICAL
DETAILS
100% BID SET
PARTIALLY
SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
FX501
585-21-115
AJW IJS
REV 0 - 100% BID SET 2024-02-23
SCALE: NTS
TYPICAL PENETRATION OF SMOKE/FIRE BARRIERS1 SCALE: NTS
TYPICAL FLEXIBLE SPRINKLER CONNECTION2 SCALE: NTS
TYPICAL UPRIGHT SPRINKLER3 SCALE: NTS
STANDARD PIPE HANGERS4
GENERAL NOTES
1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.
SCALE: NTS
TYPICAL RETURN BEND5
SHEET 1192/22/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AJW CJR
REV 0 - 100% BID SET 2024-02-23
GENERAL NOTES:
1. DESIGN CONSTRUCTION AND SAFETY SHALL CONFORM TO ALL LOCAL, STATE AND OWNER SPECIFIC CODES, INCLUDING (BUT NOT LIMITED TO) THE INTERNATIONAL BUILDING CODE, THE INTERNATIONAL PLUMBING CODE, ANSI A117.1, OSHA, AND ANY OTHER CODES GOVERNED BY THE JURISDICTION IN
WHICH THIS PROJECT IS BEING CONSTRUCTED.
2. PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED TO COMPLETE DEMOLITION OF THE CURRENT PIPING, AS WELL AS AN OPERABLE FINAL CONFIGURATION PLUMBING SYSTEM AS INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY APPLICABLE LOCAL CODES AND REGULATIONS.
3. CONTRACT DOCUMENT DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.
4. INSTALL ALL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND ALL
APPLICABLE CODES AND REGULATIONS.
5. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL, ELECTRICAL, AND HVAC WORK SHOWN ON OTHER
CONTRACT DRAWINGS.
6. LABEL ALL PIPING IN ACCORDANCE WITH ASME A13.1.
7. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS, OR CALLED OUT IN THE SPECIFICATIONS, ARE APPROXIMATE ONLY. DO NOT SCALE DRAWINGS.
8. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSET IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO
ADDITIONAL COST TO THE OWNER. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL OTHER TRADES.
9. ALL PENETRATIONS THROUGH FLOORS AND FULL HEIGHT WALLS TO BE FIRE STOPPED. ALL GAPS AND JOINTS AT FIRE RESISTIVE FLOORS, ROOFS AND
WALL TO BE FIRE AND SMOKE STOPPED. GAPS AND JOINTS INCLUDE (BUT ARE NOT LIMITED TO) TOP OF WALL TO FLOOR OR ROOF DECK WALL TO BEAMS, AND CONTROL OR EXPANSION FIRE STOPPING INCLUDES BOTH FORM OR PACKING MATERIAL AND THE FILL, VOID OR CAVITY MATERIAL.
10. ALL PIPING SHALL CLEAR DOORS.
11. INCLUDE FLOW-DIRECTION ARROWS INTEGRAL WITH PIPING SYSTEM SERVICE LETTERING TO ACCOMMODATE BOTH DIRECTIONS OR AS SEPARATE UNIT ON
EACH PIPE LABEL TO INDICATE FLOW DIRECTION.
12. PIPE LABEL LOCATIONS: LOCATE PIPE LABELS, WHERE PIPING IS EXPOSED OR ABOVE ACCESSIBLE CEILINGS IN FINISHED SPACES; MACHINE ROOMS;
ACCESSIBLE MAINTENANCE SPACES SUCH AS SHAFTS, TUNNELS, AND PLENUMS; AND EXTERIOR EXPOSED LOCATIONS AS FOLLOWS:
A. NEAR EACH VALVE AND CONTROL DEVICE.
B. NEAR EACH BRANCH CONNECTION, EXCLUDING SHORT TAKEOFFS FOR FIXTURES AND TERMINAL UNITS. WHERE FLOW PATTERN IS NOT OBVIOUS, MARK EACH PIPE AT BRANCH.
C. NEAR PENETRATIONS AND ON BOTH SIDES OF THROUGH WALLS, FLOORS, CEILINGS, AND INACCESSIBLE ENCLOSURES.
D. AT ACCESS DOORS, MANHOLES, AND SIMILAR ACCESS POINTS THAT PERMIT VIEW OF CONCEALED PIPING.
E. NEAR MAJOR EQUIPMENT ITEMS AND OTHER POINTS OF ORIGINATION AND TERMINATION.
F. SPACED AT MAXIMUM INTERVALS OF 50 FEET ALONG EACH RUN. REDUCE INTERVALS TO 25 FEET IN AREAS OF CONGESTED PIPING AND EQUIPMENT.
GENERAL SYMBOLS
ROOM NAME AND NUMBER
DEMOLISH/REMOVE DEVICE
EXISTING CONDENSATE DRAIN LINED
GENERAL LINETYPES
GENERAL PLUMBING SYMBOLS
VALVE SYMBOLS
FD FLOOR DRAIN
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK
LIMIT OF DEMOLITION
STRAINER
THERMOMETER
PRESSURE GAGE
CLEAN OUT
HOSE BIBB
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
PRESSURE SAFETY VALVE
AUTOMATIC BALANCING CONTROL VALVE
WATER BALANCE DEVICE
EXISTING SANITARY SEWERSS
NEW SANITARY SEWERSS
NEW CONDENSATE DRAIN LINED
EXISTING DOMESTIC COLD WATERCW
NEW DOMESTIC COLD WATERCW
NEW VENTV
EXISTING DOMESTIC HOT WATERHW
NEW DOMESTIC HOT WATERHW
CO
CO CLEAN OUT
CW COLD WATER
DN DOWN
FS FLOW SENSOR
FT FEET
GPM GALLONS PER MINUTE
HP HORSEPOWER
HW HOT WATER
MAX MAXIMUM
MBH THOUSAND BTU PER HOUR
MIN MINIMUM
NTS NOT TO SCALE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
SP STATIC PRESSURE
SS SANITARY SEWER
ST STORM WATER
SW SOFTENED WATER
TEMP TEMPERATURE
TYP TYPICAL
V VENT
VTR VENT TO ROOF
WCO WALL CLEAN OUT
GENERAL ABBREVIATIONS
DOMESTIC HOT WATER RETURNHWR
C2
CORRIDOR
DEMOLITION LINE
WATER HAMMER ARRESTOR
ABANDONED SANITARY SEWER
ASA
PHASE CALLOUT#
NEW SOFTENED WATER
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION
WASTE
PIPE VENT PIPE COLD WATER HOT WATER WASTE FIXTURE
UNITS
WATER FIXTURE
UNITS ELECTRIC SENSOR
IN IN IN IN
P-101 WATER CLOSET, FLOOR MOUNTED 3.00 2.0 1.25 -- 6.00 10.00 NO
P-401 LAVATORY 2.00 1.50 0.50 0.50 2.00 2.00 NO
P-502 SERVICE SINK (CORNER,FLOOR MOUNTED) 3.00 1.50 0.50 0.50 2.00 4.00 NO
P-528 SINK 1.50 1.50 0.50 0.50 3.00 2.00 NO
P-604 DRINKING FOUNTAIN 2.00 1.50 0.50 -- 1.00 1.00 NO
P-701 SHOWER 2.00 1.50 0.50 0.50 2.00 2.00 NO
P-707 EMERGENCY SHOWER, EYE & FACE WASH -- -- 0.50 0.50 -- -- NO
P-709 EMERGENCY EYE & FACE WASH, DECK MOUNTED -- -- 0.50 0.50 -- -- NO
P-801 FROST PROOF HOSE BIBB -- -- 0.50 -- -- -- NO
P-802 HOSE BIBB -- -- 0.50 -- -- -- NO
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
PLUMBING NOTES AND LEGENDS 100% BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23 P-001
585-21-115
EXISTING COMPRESSED AIRCA
CA NEW COMPRESSED AIR
SW
DOMESTIC WATER THERMAL EXPANSION TANK SCHEDULE
UNIT ID BASIS OF
DESIGN TYPE
SYSTEM TEMPERATURE
RANGE
INITIAL
PRESSURE
IN TANK
MAX
OPERATING
PRESSURE
RELIEF
VALVE PSIG
MIN TANK
VOLUME
MIN ACCEPT
VOLUME
PIPE SIZE
TO TANK REMARKSMIN MAX
°F °F PSIG PSIG PSIG GAL GAL IN
EXPT-1 WATTS
PLT-12
POTABLE
WATER
EXPANSION
TANK
40 140 70 123 145 4.5 3.42 .75 -----
ELECTRIC WATER HEATER SCHEDULE
MARK LOCATION
AREA
AND/OR
BLDG
SERVED
SYSTEM
AND/OR
SERVICE
TYPE
STORAGE
CAPACITY
RECOVERY @
80 °F RISE
RELIEF
VALVE
SETTING NO. OF
ELEMENTS
ELECTIRCAL INPUT
REMARKS
GAL GAL/HR PSIG TOTAL kW kW PER
ELEMENT PHASE VOLT
WH-1 BOILER
ROOM 100
BOILER
PLANT
DOMESTIC
HOT WATER
LIGHT
SERVICE 80 61 145 2 12.1 6 1 277 -----
SCW SOFTENED COLD WATER
PUMP SCHEDULE SCHEDULE
PUMP BASIS OF DESIGN TYPE FLOW HEAD POWER VOLTAGE AMPS PHASE FREQUENCY
PMP-1 900 SERIES SUMP PACKAGE WITH
M53 PUMP SUMP 10 GPM 17 FT WC 3/10 HP 120 -- 1 60 HZ
PMP-2 GRUNDFOS MAGNA 32-100 N HW CIRCULATION 29 GPM 20.67 FT WC 9.7 - 178 W 120 0.29 - 1.61 1 60 HZ
AIR COMPRESSOR SCHEDULE
MARK BASIS OF
DESIGN LOCATION SYSTEM
SERVICE
INLET
AIRFLOW
DISCHARGE
PRESSURE
RECEIVER
SIZE DIMENSION,
LxWxH
ELECTRIC POWER [60 Hz]
REMARKS
NO.
MOTORS
POWER
EA. PHASE VOLT RPM
CFM PSIG GAL IN HP
2-200-CA-001
CR5-TS-120GH
3PH-PPS (DUPLEX)
MEZZANINE
GENERAL
SERVICE 35 175 120 77X30X52 2 5 3 200 1750 1,2,3
NOTES:
1. PROVIDE WITH FILTER & INTAKE SILENCER
2 PROVIDE WITH AFTER COOLER
3. PROVIDE WITH BELT GUARDS
BACKFLOW PREVENTER, REDUCED PRESSURE ZONE (RPZ) TYPE
GATE VALVE
SHEET 1202/23/2024
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
X
1 2 3
A
B
D
F
H
STORAGE
RM/TUNNEL ACCESS
001-2
BASEMENT HALLWAY
002-2
VA IT
004-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
PD101
PLUMBING DEMOLITION PLAN -
BASEMENT LEVEL 2
AJW LAJ
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL
N
KEYPLAN
N
12 16
AREA OF WORK
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 CONTRACTOR IS TO TRACE THE COLD WATER LINE THROUGH THE TUNNEL, BACK TO
THE POINT OF CONNECTION TO THE WATER SYSTEM IN THE HOSPITAL SUB-BASEMENT.
THIS 4" PIPE IS TO BE COMPLETELY REMOVED FROM THE TUNNEL BACK TO THAT
CONNECTION POINT IN THE HOSPITAL SUB-BASEMENT. IT'S EXPECTED THIS WILL BE
APPROXIMATELY 350-400 FEET OF PIPE REMOVAL. SEE PP501, DETAIL 6 FOR REMOVAL
AND FINAL CONFIGURATION AT THE SUB-BASEMENT CONNECTION.