This file contains mechanical HVAC floor plans and demolition drawings for a VA medical center boiler plant replacement project. The drawings show detailed mechanical layouts for multiple levels including ground floor, mezzanine level, and tunnel areas.

The drawings include demolition plans showing asbestos-containing materials (ACM) locations in tunnels and subbasement areas, with specific details for pipe fittings, joints, and elbows containing ACM. The HVAC plans show new equipment layouts including boilers, unit heaters, ductless split systems, and associated piping/ductwork. Key elements include condensate routing, temperature sensors, ventilation requirements, and coordination notes regarding phasing of work while maintaining facility operations. The drawings contain detailed general notes about asbestos abatement requirements, safety protocols, and coordination with the Contracting Officer's Representative (COR) for material storage and workspace access.

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_Updated Dwgs_partial_24JAN25.pdf PDF
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
36C25225R0004 0007.docx DOCX document
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.1_P03 Single Source Justification MEDECO.e.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.6c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUND FLOOR

0' - 0"

EXISTING BASEMENT FLOOR

-11' - 0"

A

/1 MD101

4"ø CT

6"ø HPS

3"ø HPS

4"ø RW

2"ø SW

MD201

2" SOFT WATER

4" RAW WATER

LOWER PIPE ELBOW

ELBOW

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MD201

MECHANICAL DEMOLITION

ELEVATION - TUNNEL 2

DJU KRL

PARTIALLY SPRINKLERED

KEYPLAN

N

12 16

AREA OF WORK

SCALE: 3/4" = 1'-0"1 MECHANICAL DEMOLITION ELEVATION - TUNNEL

10.

ALL ABATEMENT AND/OR REMOVAL OF ASBESTOS CONTAINING MATERIALS MUST PASS

VISUAL INSPECTION AND CLEARANCE PROCEDURES BEFORE GENERAL

CONSTRUCTION WORK MAY COMMENCE.

9.

ESTABLISH WASTE AND PERSONAL DECONTAMINATION SYSTEM ENCLOSURES AS

REQUIRED TO PERFORM ABATEMENT WITHIN THE BUILDING, INCLUDING ANY ISOLATION

BARRIERS.

8.

THE LOCATION OF ANY ON-SITE STORAGE OF MATERIALS, EQUIPMENT

DUMPSTER/WASTE TRAILER AND DECONTAMINATION FACILITIES SHALL BE

COORDINATED WITH AND APPROVED BY THE COR.

7. REFER TO THE ENTIRE SET OF CONTRACT DOCUMENTS FOR COORDINATION OF

SCOPE.

6.

KEEP THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDE TEMPORARY

PROTECTION, PROTECT BUILDING MATERIALS SCHEDULED TO REMAIN, AND PREVENT

UNAUTHORIZED ACCESS DURING THE DURATION OF THE PROJECT. THE CONTRACTOR

IS RESPONSIBLE FOR THE CLEAN-UP OF ALL CONTAINMENT WORK AREAS;

SPECIFICALLY, TAPE/ADHESIVES RESIDUE FROM ALL SURFACES. REPAIR OF DAMAGE

CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR CONTRACTOR

ACTIVITIES, INCLUDING DAMAGE TO FINISHES RESULTING FROM CONTAINMENT

MEASURES, WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.

5. AREAS UNDER ABATEMENT SHALL BE PROPERLY POSTED WITH WARNING SIGNS AND

SECURED TO PREVENT UNAUTHORIZED ENTRIES.

4. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL, OR SUSPECT MATERIAL,

SHALL BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR.

3.

PERFORM ALL HAZARDOUS MATERIALS WORK, INCLUDING AREA CONTAINMENT

MEASURES AND REMOVAL, IN STRICT ACCORDANCE WITH: THE PROJECT

SPECIFICATION, ALL FEDERAL, STATE AND LOCAL REGULATIONS, AND ANY

APPROPRIATE APPLICABLE VARIANCES AND SITE-SPECIFIC VARIANCES. APPLICABLE

REGULATIONS INCLUDE, BUT ARE NOT LIMITED TO: OSHA 29 CFR 1926 SUBPART Z, 40

CFR PART 763 (AHERA), 40 CFR PART 61 SUBPART M (NESHAP STANDARD FOR

DEMOLITION AND RENOVATION).

2. DETAILS 3-8 SHOW ACM LOCATION IN TUNNEL AT MAIN HOSPITAL SUBBASEMENT

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 6" HPS SHALL REMAIN CONNECTED TO THE EXISTING BOILER PLANT UNTIL

COMMISSIONING IS COMPLETE. WHEN THE EXISTING BOILERS ARE REMOVED,

CONNECT THIS LINE TO THE NEW PLANT AS SHOWN ON MP202

2 4" CT SHALL BE CONNECTED TO THE EXISITING AND NEW BOILER PLANTS

CONCURRENTLY. UPON THE COMPLETION OF COMMISSIONING, REMOVE THE PIPING

FROM THE EXISTING PLANT BACK TO THE TEE SHOWN ON MP202

3 3" HPS SHALL BE DISCONNECTED FROM THE EXISTING PLANT AND CONNECTED TO THE

NEW PLANT BEFORE COMMISSIONING

4 4" RW SHALL BE REMOVED BACK TO BUILDING 1 AFTER COMMISSIONING IS COMPLETE.

REFER TO PLUMBING DRAWINGS FOR DETAILS ABOUT REMOVAL IN BUILDING 1

5 2" SW SHALL REMAIN CONNECTED TO THE EXISTING BOILER PLANT UNTIL

COMMISSIONING IS COMPLETE. WHEN THE EXISTING BOILERS ARE REMOVED,

CONNECT THIS LINE TO THE NEW PLANT AS SHOWN ON MP202

6 REMOVE ALL ASBESTOS-CONTAINING THERMAL SYSTEM INSULATION FROM PIPE

ELBOWS, JOINTS, VALVES, AND ALL ASBESTOS-CONTAINING GASKETS BETWEEN VALVE

FLANGES. INCLUDES REMOVAL OF ANY ADJACENT CONTAMINATED FIBERGLASS PIPE

INSULATIONS WITHIN THE REGULATED WORK AREA.

< 5 LINEAR FEET TSI EA

< 5 SQUARE FEET GASKETING EA

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

REV 1 PRE-BID UPDATES 2024-08-01

ACM-6 FITTINGS2 ACM-7 IN TUNNEL - 4" RAW WATER3

ACM-8 IN TUNNEL - 4" RAW WATER JOINTS4 ACM-9 IN TUNNEL - 4" RAW WATER ELBOW5

ACM-10 IN TUNNEL - 4" RAW WATER FITTINGS6 ACM-11 IN SUBBASEMENT - 4" RAW WATER FITTINGS7 ACM-12 IN SUBBASEMENT - 4" RAW WATER FITTINGS8

6 6

6 6 6

8/1/2024 SHEET 180

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

2-128-FTR-005 2-129-FTR-006

2-130-FTR-007

2-131-FTR-008

2-124-FTR-001

2-126-FTR-002

2-123-FTR-004

BREAK ROOM

124-2

LOCKER ROOM

125-2CHANGING AREA

127-2 SHOWER AREA

126-2

TOILET

123-2

TOILET

122-2

JANITOR

121-2

GENERATOR ROOM

120B-2

BOILER ROOM

119-2

CONTROL ROOM

130-2

SUPERVISOR

129-2

CHEM FEED

128-2

PROPANE

131-22

1"ø HWS

1 2 3

A

B

D

F

H

M

3/4"ø HWS

3/4"ø HWR

1"ø HWS

1"ø HWS

PARALLEL

SWITCHING GEAR

101B-2

2-127-FTR-0031

ELECTRICAL ROOM

120A-2

BOILER ROOM

101-2

MH201

2-EXT-CU-003

2-EXT-CU-002

2-EXT-CU-001

3'

2-120B-480-GEN-011

6" EXHAUST FROM

GENERATOR TO ROOF

66"x72" INTAKE LOUVER

T

T

T

T

T

T

T T T T

T

T

26"x 37"

T

T

EXHAUST MUFFLER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MH121

MECHANICAL HVAC PLAN-

GROUND FLOOR LEVEL 2

DJU LAJ

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 MECHANICAL HVAC FLOOR PLAN - GROUND FLOOR LEVEL

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYED NOTES

1 PIPING RISER TO CONNECT TO PIPING IN CEILING, SEE MH131

2 MOUNT FTR @ 4'-0" AFF IN THIS ROOM. DROP SUPPLY & RETURN PIPING TO FLOOR

LEVEL & THROUGH WALL FOR FLOOR LEVEL FTR IN NEXT 2 ROOMS

3 PIPING RISER TO CONNECT TO PIPING ON MEZZANINE LEVEL, SEE MH141

4 MOUNT FTR @ 4'-0" AFF IN THIS ROM

5 PROVIDE NON-ELECTRIC THERMOSTATIC CONTROL VALVE FOR THIS UNIT

6 12"x12" BRICK VENT 12" AFF

7 TEMPERATURE SENSOR FOR UNIT HEATERS ON MH141

8 MOUNT CU UNITS ON WALL, 3'-0" ABOVE GRADE, USING MOUNTING BRACKET

FURNISHED WITH UNIT, SHOWN ON DETAIL 8/MK502

KEYPLAN

N AREA OF WORK

12 16

Revisions: Date:

SHEET 1812/22/2024

A'

B'

G'

F'

D'

C'

2.8'

E'

BREAK ROOM

124-2

LOCKER ROOM

125-2

SHOWER AREA

126-2

TOILET

123-2

TOILET

122-2

JANITOR

121-2

GENERATOR ROOM

120B-2

BOILER ROOM

119-2

CONTROL ROOM

130-2

SUPERVISOR

129-2

CHEM FEED

128-2

PROPANE

131-2

CHANGING AREA

127-2

12"x12"

EA

50 CFM

6" D

IA

12"x12"

EA

50 CFM

12"x12"

EA

50 CFM

12"x12"

EA

50 CFM

4" DIA

6" D

IA

2-129-ITU-0011

12"x12"

EA

50 CFM

8" DIA 6" DIA

6" DIA

12"x12"

EA

50 CFM

12"x12"

EA

50 CFM

12"x12"

EA

50 CFM

12"x12"

EA

50 CFM

2-120A-ITU-005

1 2 3

A

B

D

F

H

M

2-130-ITU-002

2-124-ITU-003

2-125-ITU-004

6" D

IA

3/4"ø HWR

3/4"ø HWS

3/4 "ø

H W

R

3/4"ø HWS

1" HWS FROM

ABOVE

3/4"ø HWS

3/4"ø HWR

2-125-CH-001

ELECTRICAL ROOM

120A-2

BOILER ROOM

101-2

12"x12"

SA

75 CFM

12"x12"

SA

75 CFM

6" DIA

12"x12"

SA

100 CFM

8" DIA

6" D

IA

2-EXT-CU-002

2-EXT-CU-001

12"x12"

SA

100 CFM 2-EXT-CU-003

8" DIA

BOOSTER COIL

BOOSTER COIL

MH401

MH401

6" EXHAUST AIR

FROM GENERATOR

TO ROOF

2-120B-ITU-006

3'

3/4"ø HWR

3/4"ø HWS

BYPASS

2-119-HRV-002

T

T

T

3/4"ø HWS 3/4"ø HWR

BYPASS

2-102B-UH-004

EXHAUST MUFFLER

EXHAUST PIPE THIMBLE TO BE PROVIDED AT EVERY

PENETRATION THROUGH FLOOR OR ROOF

1 5

40"x30" EXHAUST DUCT8

GENERATOR ROOM

120B-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MH131

MECHANICAL HVAC RCP PLAN -

GROUND FLOOR LEVEL 2

DJU KRL

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 MECHANICAL HVAC RCP PLAN - GROUND FLOOR LEVEL

KEYPLAN

N AREA OF WORK

12 16

N

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 MOUNT INDOOR TERMINAL UNIT (ITU) HIGH ON WALL, APPROX 6' AFF. PIPE

REFRIGERANT TO OUTSIDE UNIT (OU) OF DUCTLESS SPLIT SYSTEM

2 DISCHARGE THROUGH 8"x16" BLOCK VENT

3 PIPING RISER TO MEZZANINE, SEE MH141

4 CEILING MOUNTED INDOOR TERMINAL UNIT (ITU). PIPE REFRIGERANT TO OUTSIDE UNIT

(OU) OF DUCTLESS SPLIT SYSTEM

5 CONDENSATE LINE TO BE FIELD ROUTED TO FLOOR DRAIN IN GENERATOR ROOM

120B-2

6 CONDENSATE LINE TO BE FIELD ROUTED TO MOP SINK IN JANITOR 121-2

7 CONDENSATE LINE TO BE FIELD ROUTED TO FLOOR DRAIN IN CHEM FEED 128-2

8 FIRE DAMPER TO BE PROVIDED AT PENETRATION THROUGH FLOOR BETWEEN 120B-2

AND 201-2

Revisions: Date:

SHEET 1822/22/2024

OPEN TO BELOW

A'

B'

G'

F'

D'

C'

2.8'

E'

2-200-SF-001

2-200-HEX-001

2-200-MAU-001

2-200-MAU-002

2-202-HEX-001

2-200-UH-003

2-200-UH-002

2-200-UH-001

2-202-UH-003

2-202-UH-002

2-202-UH-001

2"ø HWR

2"ø HWS

2"ø HWS

1"ø HWS

3/4"ø HWR 1"ø HWR

2-200-CF-001

2-200-CF-002

2-200-SF-002

1"ø HWR

2"ø HWR

3"ø HWR

3"ø HWS

CONTROL IT

201-2

EQUIPMENT ACCESS

200-2

1 2 3

A

B

D

F

H

M

1 1/4"ø HWS

1 1/2"ø HWS

1 1/2"ø HWR

2"ø HWS 2-201-ITU-006

1 1/4"ø HWR

3/4"ø HWS 3/4"ø HWR

1 1/4"ø HWS 1 1/4"ø HWR

1 1 /2" ø

HW

R

1 1 /2" ø

HW

S

1 1 /4" ø

HW

R

1 1 /4" ø

HW

S

1 1 /4" ø

HW

R

1 1 /4" ø

HW

S

2-201-FTR-009

1 1/4"ø HWS 1 1/4"ø HWR

1 1/4"ø HWS

1 1/4"ø HWR

1"ø HWS

1"ø HWR

1" HWS TO BELOW

3/4"ø HWS

3/4"ø HWR

3/4"ø HWS

MH201

2-R-EF-003

2-200-PMP-002

2-200-PMP-001

2-200-HEX-002

3'

T 3/4"ø HWR

2-200-HRV-001

BYPASS

MH401

8" SUPPLY AIR

TO HRV BELOW

MOTORIZED DAMPER

MH201

6" EXHAUST FROM

GENERATOR TO ROOF

EXHAUST PIPE THIMBLE TO BE PROVIDED AT EVERY

PENETRATION THROUGH FLOOR OR ROOF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MH141

MECHANICAL HVAC PLAN -

MEZZANINE LEVEL 2

DJU KRL

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 MECHANICAL HVAC FLOOR PLAN - MEZZANINE LEVEL

KEYPLAN

N AREA OF WORK

12 16

AREA OF WORK

N

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 DISCHARGE THROUGH 8"x16" BLOCK VENT

2 CONDENSATE TO BE ROUTED TO CONDENSATE RECEIVER ON FLOOR BELOW.

CONDENSATE TO BE ROUTED AS TO NOT CROSS WALKWAY AND CAUSE TRIPPING

HAZARDS

Revisions: Date:

SHEET 1832/22/2024