S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf
PDF 4 MB Posted
- Solicitation number
- 36C25225R0004
About this file
This file contains mechanical HVAC floor plans and demolition drawings for a VA medical center boiler plant replacement project. The drawings show detailed mechanical layouts for multiple levels including ground floor, mezzanine level, and tunnel areas.
The drawings include demolition plans showing asbestos-containing materials (ACM) locations in tunnels and subbasement areas, with specific details for pipe fittings, joints, and elbows containing ACM. The HVAC plans show new equipment layouts including boilers, unit heaters, ductless split systems, and associated piping/ductwork. Key elements include condensate routing, temperature sensors, ventilation requirements, and coordination notes regarding phasing of work while maintaining facility operations. The drawings contain detailed general notes about asbestos abatement requirements, safety protocols, and coordination with the Contracting Officer's Representative (COR) for material storage and workspace access.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUND FLOOR
0' - 0"
EXISTING BASEMENT FLOOR
-11' - 0"
A
/1 MD101
4"ø CT
6"ø HPS
3"ø HPS
4"ø RW
2"ø SW
MD201
2" SOFT WATER
4" RAW WATER
LOWER PIPE ELBOW
ELBOW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MD201
MECHANICAL DEMOLITION
ELEVATION - TUNNEL 2
DJU KRL
PARTIALLY SPRINKLERED
KEYPLAN
N
12 16
AREA OF WORK
SCALE: 3/4" = 1'-0"1 MECHANICAL DEMOLITION ELEVATION - TUNNEL
10.
ALL ABATEMENT AND/OR REMOVAL OF ASBESTOS CONTAINING MATERIALS MUST PASS
VISUAL INSPECTION AND CLEARANCE PROCEDURES BEFORE GENERAL
CONSTRUCTION WORK MAY COMMENCE.
9.
ESTABLISH WASTE AND PERSONAL DECONTAMINATION SYSTEM ENCLOSURES AS
REQUIRED TO PERFORM ABATEMENT WITHIN THE BUILDING, INCLUDING ANY ISOLATION
BARRIERS.
8.
THE LOCATION OF ANY ON-SITE STORAGE OF MATERIALS, EQUIPMENT
DUMPSTER/WASTE TRAILER AND DECONTAMINATION FACILITIES SHALL BE
COORDINATED WITH AND APPROVED BY THE COR.
7. REFER TO THE ENTIRE SET OF CONTRACT DOCUMENTS FOR COORDINATION OF
SCOPE.
6.
KEEP THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDE TEMPORARY
PROTECTION, PROTECT BUILDING MATERIALS SCHEDULED TO REMAIN, AND PREVENT
UNAUTHORIZED ACCESS DURING THE DURATION OF THE PROJECT. THE CONTRACTOR
IS RESPONSIBLE FOR THE CLEAN-UP OF ALL CONTAINMENT WORK AREAS;
SPECIFICALLY, TAPE/ADHESIVES RESIDUE FROM ALL SURFACES. REPAIR OF DAMAGE
CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR CONTRACTOR
ACTIVITIES, INCLUDING DAMAGE TO FINISHES RESULTING FROM CONTAINMENT
MEASURES, WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
5. AREAS UNDER ABATEMENT SHALL BE PROPERLY POSTED WITH WARNING SIGNS AND
SECURED TO PREVENT UNAUTHORIZED ENTRIES.
4. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL, OR SUSPECT MATERIAL,
SHALL BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR.
3.
PERFORM ALL HAZARDOUS MATERIALS WORK, INCLUDING AREA CONTAINMENT
MEASURES AND REMOVAL, IN STRICT ACCORDANCE WITH: THE PROJECT
SPECIFICATION, ALL FEDERAL, STATE AND LOCAL REGULATIONS, AND ANY
APPROPRIATE APPLICABLE VARIANCES AND SITE-SPECIFIC VARIANCES. APPLICABLE
REGULATIONS INCLUDE, BUT ARE NOT LIMITED TO: OSHA 29 CFR 1926 SUBPART Z, 40
CFR PART 763 (AHERA), 40 CFR PART 61 SUBPART M (NESHAP STANDARD FOR
DEMOLITION AND RENOVATION).
2. DETAILS 3-8 SHOW ACM LOCATION IN TUNNEL AT MAIN HOSPITAL SUBBASEMENT
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 6" HPS SHALL REMAIN CONNECTED TO THE EXISTING BOILER PLANT UNTIL
COMMISSIONING IS COMPLETE. WHEN THE EXISTING BOILERS ARE REMOVED,
CONNECT THIS LINE TO THE NEW PLANT AS SHOWN ON MP202
2 4" CT SHALL BE CONNECTED TO THE EXISITING AND NEW BOILER PLANTS
CONCURRENTLY. UPON THE COMPLETION OF COMMISSIONING, REMOVE THE PIPING
FROM THE EXISTING PLANT BACK TO THE TEE SHOWN ON MP202
3 3" HPS SHALL BE DISCONNECTED FROM THE EXISTING PLANT AND CONNECTED TO THE
NEW PLANT BEFORE COMMISSIONING
4 4" RW SHALL BE REMOVED BACK TO BUILDING 1 AFTER COMMISSIONING IS COMPLETE.
REFER TO PLUMBING DRAWINGS FOR DETAILS ABOUT REMOVAL IN BUILDING 1
5 2" SW SHALL REMAIN CONNECTED TO THE EXISTING BOILER PLANT UNTIL
COMMISSIONING IS COMPLETE. WHEN THE EXISTING BOILERS ARE REMOVED,
CONNECT THIS LINE TO THE NEW PLANT AS SHOWN ON MP202
6 REMOVE ALL ASBESTOS-CONTAINING THERMAL SYSTEM INSULATION FROM PIPE
ELBOWS, JOINTS, VALVES, AND ALL ASBESTOS-CONTAINING GASKETS BETWEEN VALVE
FLANGES. INCLUDES REMOVAL OF ANY ADJACENT CONTAMINATED FIBERGLASS PIPE
INSULATIONS WITHIN THE REGULATED WORK AREA.
< 5 LINEAR FEET TSI EA
< 5 SQUARE FEET GASKETING EA
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
REV 1 PRE-BID UPDATES 2024-08-01
ACM-6 FITTINGS2 ACM-7 IN TUNNEL - 4" RAW WATER3
ACM-8 IN TUNNEL - 4" RAW WATER JOINTS4 ACM-9 IN TUNNEL - 4" RAW WATER ELBOW5
ACM-10 IN TUNNEL - 4" RAW WATER FITTINGS6 ACM-11 IN SUBBASEMENT - 4" RAW WATER FITTINGS7 ACM-12 IN SUBBASEMENT - 4" RAW WATER FITTINGS8
6 6
6 6 6
8/1/2024 SHEET 180
1' 2'
A'
B'
G'
F'
D'
C'
2.8'
E'
2-128-FTR-005 2-129-FTR-006
2-130-FTR-007
2-131-FTR-008
2-124-FTR-001
2-126-FTR-002
2-123-FTR-004
BREAK ROOM
124-2
LOCKER ROOM
125-2CHANGING AREA
127-2 SHOWER AREA
126-2
TOILET
123-2
TOILET
122-2
JANITOR
121-2
GENERATOR ROOM
120B-2
BOILER ROOM
119-2
CONTROL ROOM
130-2
SUPERVISOR
129-2
CHEM FEED
128-2
PROPANE
131-22
1"ø HWS
1 2 3
A
B
D
F
H
M
3/4"ø HWS
3/4"ø HWR
1"ø HWS
1"ø HWS
PARALLEL
SWITCHING GEAR
101B-2
2-127-FTR-0031
ELECTRICAL ROOM
120A-2
BOILER ROOM
101-2
MH201
2-EXT-CU-003
2-EXT-CU-002
2-EXT-CU-001
3'
2-120B-480-GEN-011
6" EXHAUST FROM
GENERATOR TO ROOF
66"x72" INTAKE LOUVER
T
T
T
T
T
T
T T T T
T
T
26"x 37"
T
T
EXHAUST MUFFLER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MH121
MECHANICAL HVAC PLAN-
GROUND FLOOR LEVEL 2
DJU LAJ
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 MECHANICAL HVAC FLOOR PLAN - GROUND FLOOR LEVEL
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYED NOTES
1 PIPING RISER TO CONNECT TO PIPING IN CEILING, SEE MH131
2 MOUNT FTR @ 4'-0" AFF IN THIS ROOM. DROP SUPPLY & RETURN PIPING TO FLOOR
LEVEL & THROUGH WALL FOR FLOOR LEVEL FTR IN NEXT 2 ROOMS
3 PIPING RISER TO CONNECT TO PIPING ON MEZZANINE LEVEL, SEE MH141
4 MOUNT FTR @ 4'-0" AFF IN THIS ROM
5 PROVIDE NON-ELECTRIC THERMOSTATIC CONTROL VALVE FOR THIS UNIT
6 12"x12" BRICK VENT 12" AFF
7 TEMPERATURE SENSOR FOR UNIT HEATERS ON MH141
8 MOUNT CU UNITS ON WALL, 3'-0" ABOVE GRADE, USING MOUNTING BRACKET
FURNISHED WITH UNIT, SHOWN ON DETAIL 8/MK502
KEYPLAN
N AREA OF WORK
12 16
Revisions: Date:
SHEET 1812/22/2024
A'
B'
G'
F'
D'
C'
2.8'
E'
BREAK ROOM
124-2
LOCKER ROOM
125-2
SHOWER AREA
126-2
TOILET
123-2
TOILET
122-2
JANITOR
121-2
GENERATOR ROOM
120B-2
BOILER ROOM
119-2
CONTROL ROOM
130-2
SUPERVISOR
129-2
CHEM FEED
128-2
PROPANE
131-2
CHANGING AREA
127-2
12"x12"
EA
50 CFM
6" D
IA
12"x12"
EA
50 CFM
12"x12"
EA
50 CFM
12"x12"
EA
50 CFM
4" DIA
6" D
IA
2-129-ITU-0011
12"x12"
EA
50 CFM
8" DIA 6" DIA
6" DIA
12"x12"
EA
50 CFM
12"x12"
EA
50 CFM
12"x12"
EA
50 CFM
12"x12"
EA
50 CFM
2-120A-ITU-005
1 2 3
A
B
D
F
H
M
2-130-ITU-002
2-124-ITU-003
2-125-ITU-004
6" D
IA
3/4"ø HWR
3/4"ø HWS
3/4 "ø
H W
R
3/4"ø HWS
1" HWS FROM
ABOVE
3/4"ø HWS
3/4"ø HWR
2-125-CH-001
ELECTRICAL ROOM
120A-2
BOILER ROOM
101-2
12"x12"
SA
75 CFM
12"x12"
SA
75 CFM
6" DIA
12"x12"
SA
100 CFM
8" DIA
6" D
IA
2-EXT-CU-002
2-EXT-CU-001
12"x12"
SA
100 CFM 2-EXT-CU-003
8" DIA
BOOSTER COIL
BOOSTER COIL
MH401
MH401
6" EXHAUST AIR
FROM GENERATOR
TO ROOF
2-120B-ITU-006
3'
3/4"ø HWR
3/4"ø HWS
BYPASS
2-119-HRV-002
T
T
T
3/4"ø HWS 3/4"ø HWR
BYPASS
2-102B-UH-004
EXHAUST MUFFLER
EXHAUST PIPE THIMBLE TO BE PROVIDED AT EVERY
PENETRATION THROUGH FLOOR OR ROOF
1 5
40"x30" EXHAUST DUCT8
GENERATOR ROOM
120B-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MH131
MECHANICAL HVAC RCP PLAN -
GROUND FLOOR LEVEL 2
DJU KRL
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 MECHANICAL HVAC RCP PLAN - GROUND FLOOR LEVEL
KEYPLAN
N AREA OF WORK
12 16
N
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 MOUNT INDOOR TERMINAL UNIT (ITU) HIGH ON WALL, APPROX 6' AFF. PIPE
REFRIGERANT TO OUTSIDE UNIT (OU) OF DUCTLESS SPLIT SYSTEM
2 DISCHARGE THROUGH 8"x16" BLOCK VENT
3 PIPING RISER TO MEZZANINE, SEE MH141
4 CEILING MOUNTED INDOOR TERMINAL UNIT (ITU). PIPE REFRIGERANT TO OUTSIDE UNIT
(OU) OF DUCTLESS SPLIT SYSTEM
5 CONDENSATE LINE TO BE FIELD ROUTED TO FLOOR DRAIN IN GENERATOR ROOM
120B-2
6 CONDENSATE LINE TO BE FIELD ROUTED TO MOP SINK IN JANITOR 121-2
7 CONDENSATE LINE TO BE FIELD ROUTED TO FLOOR DRAIN IN CHEM FEED 128-2
8 FIRE DAMPER TO BE PROVIDED AT PENETRATION THROUGH FLOOR BETWEEN 120B-2
AND 201-2
Revisions: Date:
SHEET 1822/22/2024
OPEN TO BELOW
A'
B'
G'
F'
D'
C'
2.8'
E'
2-200-SF-001
2-200-HEX-001
2-200-MAU-001
2-200-MAU-002
2-202-HEX-001
2-200-UH-003
2-200-UH-002
2-200-UH-001
2-202-UH-003
2-202-UH-002
2-202-UH-001
2"ø HWR
2"ø HWS
2"ø HWS
1"ø HWS
3/4"ø HWR 1"ø HWR
2-200-CF-001
2-200-CF-002
2-200-SF-002
1"ø HWR
2"ø HWR
3"ø HWR
3"ø HWS
CONTROL IT
201-2
EQUIPMENT ACCESS
200-2
1 2 3
A
B
D
F
H
M
1 1/4"ø HWS
1 1/2"ø HWS
1 1/2"ø HWR
2"ø HWS 2-201-ITU-006
1 1/4"ø HWR
3/4"ø HWS 3/4"ø HWR
1 1/4"ø HWS 1 1/4"ø HWR
1 1 /2" ø
HW
R
1 1 /2" ø
HW
S
1 1 /4" ø
HW
R
1 1 /4" ø
HW
S
1 1 /4" ø
HW
R
1 1 /4" ø
HW
S
2-201-FTR-009
1 1/4"ø HWS 1 1/4"ø HWR
1 1/4"ø HWS
1 1/4"ø HWR
1"ø HWS
1"ø HWR
1" HWS TO BELOW
3/4"ø HWS
3/4"ø HWR
3/4"ø HWS
MH201
2-R-EF-003
2-200-PMP-002
2-200-PMP-001
2-200-HEX-002
3'
T 3/4"ø HWR
2-200-HRV-001
BYPASS
MH401
8" SUPPLY AIR
TO HRV BELOW
MOTORIZED DAMPER
MH201
6" EXHAUST FROM
GENERATOR TO ROOF
EXHAUST PIPE THIMBLE TO BE PROVIDED AT EVERY
PENETRATION THROUGH FLOOR OR ROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MH141
MECHANICAL HVAC PLAN -
MEZZANINE LEVEL 2
DJU KRL
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 MECHANICAL HVAC FLOOR PLAN - MEZZANINE LEVEL
KEYPLAN
N AREA OF WORK
12 16
AREA OF WORK
N
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 DISCHARGE THROUGH 8"x16" BLOCK VENT
2 CONDENSATE TO BE ROUTED TO CONDENSATE RECEIVER ON FLOOR BELOW.
CONDENSATE TO BE ROUTED AS TO NOT CROSS WALKWAY AND CAUSE TRIPPING
HAZARDS
Revisions: Date:
SHEET 1832/22/2024
File details come from the government source that posted it. Updated .