S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf

PDF 4 MB Posted

Attached to
Y1NB--Project 585-21-115 Replace Boiler Plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI -- NAICS 236220 General Construction
Solicitation number
36C25225R0004
Issued by

About this file

This file contains mechanical drawings and equipment schedules for a boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings detail the installation of three 13,390 MBTU/hr dual-fuel boilers (natural gas and light oil), a 40,000-gallon above-ground double-wall fuel oil storage tank, deaerator system, chemical feed pumps, reverse osmosis water treatment system, and associated piping systems.

The drawings include detailed floor plans, elevations, and equipment schedules showing hydronic piping, fuel piping, steam distribution, condensate return, and support systems. Key components include three Cleaver-Brooks CBLE-4W-200-400-200ST boilers, a 900-gallon vertical tray deaerator, multiple feedwater and condensate pumps, chemical treatment systems, and a GE E4 Series reverse osmosis unit. The drawings specify locations, capacities, electrical requirements, and connection details for all major equipment. The documents are marked as 100% bid set dated February 23, 2024, with a final bid set revision dated April 5, 2024.

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_Updated Dwgs_partial_24JAN25.pdf PDF
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
36C25225R0004 0007.docx DOCX document
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.1_P03 Single Source Justification MEDECO.e.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.6c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

1' 2'

A'

B'

G'

F'

D'

C'

2.8'

E'

CONTROL IT

201-2

EQUIPMENT ACCESS

200-2

OPEN TO BELOW

3"ø FWS

1 1/2"ø SW

3"ø FWS

1 1/2"ø SW

2 1/2"ø FWS

2 1/2"ø FWS

2 1/2"ø FWS

2 1/2"ø FWS

2 1/2"ø FWS

2 1/2"ø FWS

1 2 3

A

B

D

F

H

M

1/2" CF, TYP

2"ø SW

1/2"ø CF

2 1/2"ø FWS

EMERGENCY CONNECTION

2 1/2"ø FWS

2 1/2"ø FWS

2 1/2"ø FWS

2"ø SW

3"ø SW

1"ø SW

2"ø SW

1 1/4"ø FWS

2 1/2"ø CT

3"ø FWS

2"ø CT

2 1/2"ø FWS

1"ø SW 1"ø SW

1"ø SW

MEZZANINE

202-2

MP203

MP203

1"ø CT 1 1/2"ø CT

1 1/2"ø CT

4"ø CT

4"ø CT

3'

MP203

FROM HEAT EXCHANGER

CONDENSATE RECEIVER

1"ø CT

CONNECT CT TO EXISTING

CONDENSATE RETURN

SOFTENED WATER

FROM BUILDING 1

CONDENSATE RETURN

FROM BUILDING 11/2"ø CF

1/2"ø CF

MP501

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MP142

MECHANICAL HYDRONIC PIPING -

MEZZANINE LEVEL 2

DJU LAJ

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

SCALE: 3/16" = 1'-0"1 MECHANICAL HYDRONIC PIPING PLAN - MEZZANINE LEVEL

4. ONLY MAJOR PIPE RUNS BETWEEEN EQUIPMENT ARE SHOWN ON THIS PLAN. REFER TO

D-SERIES DRAWINGS FOR COMPLETE PIPING SCHEMATICS.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYED NOTES

1 KEEP 6'x6' AREA CLEAR TO ELEVATION 20'-0" FOR FORKLIFT ACCSS TO MESSANINE

2 CONDENSATE TO BE ROUTED TO CONDENSATE RECEIVER ON FLOOR BELOW

Revisions: Date:

SHEET 2002/22/2024

A'

B'

G'

F'

D'

C'

2.8'

E'

EQUIPMENT ACCESS

200-2

1 2 3

A

B

D

F

H

M

4"ø NG

3/4"ø LPG

3/4"ø LPG

4"ø NG

4"ø NG 3/4"ø LPG

5"ø NG 1"ø LPG

3/4"ø LPG

4"ø NG

5"ø NG

1"ø LPG

4"ø NG

5"ø NG

1"ø LPG

OPEN TO BELOW

EMERGENCY CONNECTIONS

MEZZANINE

202-2

CONTROL IT

201-2

MP203

MP203

2"ø FOR

1 1/2"ø FOS

3'

2"ø FOS

MP501

3/4 "ø

F

OS

2" ø

NG

2"ø NG

2" ø

NG

2"ø NG 2"ø NG

MP203

PROPANE AND NATURAL GAS

TO FLOOR BELOW

VENTS TO ROOF TYP

TO FUEL PUMP SKID

ON FLOOR BELOW

CONNECT NG TO EXISTING

NATURAL GAS LINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MP143

MECHANICAL FUEL PIPING -

MEZZANINE LEVEL 2

DJU KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

SCALE: 3/16" = 1'-0"1 MECHANICAL FUEL PIPING - MEZZANINE LEVEL

4. ONLY MAJOR PIPE RUNS BETWEEEN EQUIPMENT ARE SHOWN ON THIS PLAN. REFER TO

D-SERIES DRAWINGS FOR COMPLETE PIPING SCHEMATICS.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

N

KEYED NOTES

1 KEEP 6'x6' AREA CLEAR TO ELEVATION 20'-0" FOR FORKLIFT ACCESS TO MEZZANINE

Revisions: Date:

SHEET 2012/22/2024

MP201

MP201

MP201

UP

CLOCK GAUGE

INTERNAL MONITOR PIPE

FUEL OIL SUPPLY

FUEL OIL RETURN

EMERGENCY INTERSTITIAL VENT

EMERGENCY TANK VENT MANWAY

PRESSURE/VACUUM VENT

REMOTE FILL BOX ON POST

FOSFOR

2" ⌀ FOR

2" ⌀ FOS

FILL NOZZLE

CONCRETE BOLLARD

1 1 /2"

F

OF

3'

- 9

1/ 2"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MP171

MECHANICAL FUEL PIPING - FUEL

OIL TANK 2

DJU CCW

PARTIALLY SPRINKLERED

KEYPLAN

N

AREA OF WORK

12 16

N

6. ALL FUEL OIL SUPPPLY AND RETURN PIPING OUTSIDE THE BUILDING IN THE CONCRETE

TRENCH AND ABOVE GROUND SHALL BE DOUBLE WALL CONSTRUCTION

5.

TANK SHALL INCLUDE A PLATFORM AND STAIR IN THE ARRANGEMENT SHOWN ON THIS

DRAWING. THE STAIR EXTENDS LOWER THAN THE SADDLE BASES DUE TO THE HEIGHT

OF THE TANK FOUNDATIONS

4. ONLY MAJOR PIPE RUNS BETWEEEN EQUIPMENT ARE SHOWN ON THIS PLAN. REFER TO

D-SERIES DRAWINGS FOR COMPLETE PIPING SCHEMATICS.

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 1/4" = 1'-0"1 MECHANICAL EQUIPMENT PLAN - FUEL OIL TANK

Revisions: Date:

SHEET 2022/22/2024

GROUND FLOOR

0' - 0"

2-100-CP-019

2" ø

FO

R

/1 MP171

40,000 GALLON 144" ⌀

ABOVEGROUND DOUBLE

WALL HORIZONTAL TANK

1 1/2"ø FOF

2" ø

FO

S

GROUND FLOOR

0' - 0"

2-100-CP-019

/1 MP171

REMOTE FILL BOX ON POST

FILL NOZZLE

CLOCK GAUGE

PRESSURE VACUUM VENT

EMERGENCY INTERSTITIAL VENT

EMERGENCY TANK VENT

MANWAY

FUEL OIL SUPPLY

FUEL OIL RETURN

INTERNAL INTERSTITIAL MONITOR PIPE

52' - 1"

2"ø FOS

2"ø FOR

2" ø

FO

F

GROUND FLOOR

0' - 0"

2-100-CP-019

/1 MP171

ANCHOR TO SLAB

1 1 /2" ø

FO

F

2"ø FOS

2"ø FOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MP201

MECHANICAL ELEVATIONS - FUEL

TANK 2

DJU KRL

PARTIALLY SPRINKLERED

SCALE: 3/8" = 1'-0"1 NORTHWEST ELEVATION - FUEL TANK

SCALE: 3/8" = 1'-0"2 NORTHEAST ELEVATION - FUEL TANK

SCALE: 3/8" = 1'-0"3 SOUTHWEST ELEVATION - FUEL TANK

REMOTE FILL

BOX ON POST

Revisions: Date:

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SHEET 2032/22/2024

A' B'

6" ø

HP

S

1"ø HPR

2" ø

SW

3" ø

HP

S

4" ø

CT

2"ø SW

/2 MP102

/2 MP101

4"ø CT3"ø HPS

A'B'

AB

4"ø CT

3"ø HPS

1"ø HPR

2"ø SW

1 1 /2" ø

SS

/2 MP102

/2 MP101

GROUND FLOOR

0' - 0"

A' A

4"ø CT

3"ø HPS

2"ø SW

6"ø HPS

/1 MP102

/1 MP101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MP202

MECHANICAL PIPING ELEVATIONS

DJU KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

SCALE: 3/4" = 1'-0"2 MECHANICAL PIPING EAST ELEVATION - BASEMENT LEVEL

SCALE: 3/4" = 1'-0"1 MECHANICAL PIPING WEST ELEVATION - BASEMENT LEVEL

SCALE: 3/4" = 1'-0"3 MECHANICAL PIPING ELEVATION - TUNNEL

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 REMOVE 4" DIA. CT BACK TO TEE WHEN EXISTING BOILER PLANT IS REMOVED

Revisions: Date: SHEET 2042/22/2024

MEZZANINE

12' - 0"

1 1/2"ø CBD 1 1/2"ø CBD

/1 MP121

1'

MEZZANINE

12' - 0"

MP203

3" ø

HP

S

3"ø HPS 6"ø LPS

2"ø HPS

3"ø HPS 2"ø HPS

3"ø HPS

3"ø HPSSTEAM TRAP

STEAM TRAP

PRV

/1 MP141

2"ø HPS

PRV

F'

MEZZANINE

12' - 0"

MP203

2"ø HPS 6"ø HPS

6" ø

HP

S

2 1/2"ø HPS

4"ø HPS1 1/4"ø HPS 1"ø HPS

1"ø HPS

3"ø HPS

3" ø

HP

S

3"ø HPS

3/4"ø HPS

STEAM TRAP STEAM TRAP

PRV

PRV

/1 MP141

2'

MEZZANINE

12' - 0"

1 1/2"ø CT

3"ø HPS

DEAERATOR

2-200-TK-001

6"ø LPS

2 1/2"ø FWS

3"ø FWS

3"ø FWS

2 1/2"ø CT 2 1/2"ø SW

1/2"ø CF

1"ø SW

/1 MP142

/1 PP142

/1 MP141

2'

MEZZANINE

12' - 0"

6"ø HPS 6"ø HPS

3"ø HPS

2 1 /4"

6"ø HPS

5"ø NG

1"ø LPG3/4"ø LPG 4"ø NG

/1 MP141

/1 MP143

/1 MP142

B'

MEZZANINE

12' - 0"

3"ø HPS

6"ø HPS 6"ø HPS 6"ø HPS 6"ø HPS

/1 MP141

2.8'

MEZZANINE

12' - 0"

1"ø FPW

3/4 "ø

H W

R

3/4 "ø

H W

S

1"ø LPG

5"ø NG

3/4"ø CA

/1 MP143

3'

EXISTING 2ND FLOOR

15' - 6"

MEZZANINE

12' - 0"

6"ø HPS

/1 MP141

/1 MP142

/1 MP143

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

FINAL BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MP203

MECHANICAL PIPING ELEVATIONS

DJU KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/4" = 1'-0"1 BLOWDOWN PIPING ELEVATION

SCALE: 3/8" = 1'-0"2 MECHANICAL PIPING ELEVATION

SCALE: 3/8" = 1'-0"3 MECHANICAL PIPING ELEVATION

SCALE: 3/8" = 1'-0"4 MECHANICAL PIPING ELEVATION

SCALE: 1/2" = 1'-0"5 MECHANICAL PIPING ELEVATION

SCALE: 3/8" = 1'-0"6 MECHANICAL PIPING ELEVATION

SCALE: 3/8" = 1'-0"7 MECHANICAL PIPING ELEVATION

KEYED NOTES

1 PROVIDE PIPE SUPPORT STAND (9/MP502) WITH PIPE ROLLER SUPPORT (8/MP502)

2 PROVIDE PIPE SUPPORT STAND (9/MP502) WITH SMALL PIPE ANCHOR (3/MP502)

3 INSTALL A BLIND FLANGE AT THE END OF EACH OF THE PIPES PENETRATING THE

EXTERIOR WALL. PIPES SHALL EXTEND 6" FROM THE FACE OF THE WALL

SCALE: 3/8" = 1'-0"8 MECHANICAL PIPING ELEVATION

Revisions: Date:

REV 0 - 100% BID SET 2024-02-23

REV 1 - FINAL BID SET 2024-04-05

SHEET 2054/5/2024

MI

NI

MU

M

2" B

EL

OW

LI

D

1 5/8" GALVANIZED

STRUT SUPPORT

PIPE CLAMP

WELD STRUT SUPPORT

TO EMBEDDED PLATE

DOUBLE WALL PIPE

PLAN VIEW

SIZE OF PIPE

SCHEDULE

SIZE OF "U" BOLT SIZE OF CHANNEL

SCHEDULE FOR 8 FT SPAN OR LESS

1" - 2" 3/8" DIA 6" x 10.5" 2-1/2" - 5" 1/2" DIA 8" x 13.75"

6" - 8" 3/4" DIA 10" x 20"

CONCRETE TRENCH

BLOWDOWN LINE PROVIDE TWO "U" BOLTS

WITH NUT AND LOCK NUT ON

LINE.

ELEVATION VIEW

ANCHOR TO CONCRETE WALL OF TRENCH

L3x3x5/16 BOLT OR WELD TO CHANNEL

NOTE:

MAINTAIN UPSTREAM AND DOWN STREAM DISTANCES RECOMMENDED

BY METER

MANUFACTURERS

TT

PT

PRESSURE

TRANSMITTER

TEMPERATURE

TRANSMITTER

TO METERING SYSTEM

BUILDING INCOMING

MAIN STEAM

FLOW METER

INTERFACE WITH

BACNET SYSTEM

DIFFERENTIAL PRESSURE

(DP) CELL STEAM FLOW

MEASUREMENT

SHUTOFF VALVE

D

SW

FW

S

BW

S

BW

S

BW

S

ELEVATION

FD

3/4" COOLING WATER

1/4" SAMPLE

OUTLET

3/4"

ANTI-SIPHON

VACUUM BREAKER

SAMPLE COOLER

PROVIDE SEPARATE COOLERS FOR BWS AND FWS.

MOUNT BWS COOLER 4' ABOVE FINISHED FLOOR ON

WALL OR COLUMN. MOUNT FWS COOLER 2' ± ABOVE

MEZZANINE FLOOR AT

DEAERATOR

PROVIDE SAME WATER SAMPLE AS COOLER'S

PIPING ARRANGEMENT AND EQUIPMENT FOR

THE BOILER WATER AS SHOWN FOR THE

FEEDWATER SAMPLE COOLER

1/2" FROM

EACH BOILER

1/4" FROM

DEAERATOR

1/2"

SW

0-83°C

1" BY-PASS GATE VALVE (TYP)

PRESSURE GAUGE WITH

GATE VALVE (TYP)

1" BY-PASS GLOBE VALVE (TYP AT

ALL GATE VALVES 6" OR LARGER)

3000 LBS STEEL HALF COUPLING

OR SOCKET WELDED (TYP)

SEE PLANS FOR PIPE SIZES

BUTT WELD (TYP)

GATE VALVE

GROUND FLOOR

0' - 0"

1"ø FOR 1 1/2"ø FOS

2"ø BBD

3"ø SS

/1 MP121

/1 MP123

/1 PP122

BLOWDOWN INLET

5" BLOWDOWN DRAIN

2" BLOWDOWN

IN TRENCH

TRENCH COVER

/1 MP121

HPR HEADER

1"ø HPR 1"ø HPR

1"ø HPR 1"ø HPR

4"ø CT

/1 MP142

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MP501

MECHANICAL PIPING DETAILS

DJU KRL

PARTIALLY SPRINKLERED

SCALE: 1 1/2" = 1'-0"1 TRENCH FLOOR DRAIN DETAIL

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

NTS3 PIPE TRENCH OUTSIDE BUILDING

NTS4 PIPE SUPPORT FOR BLOWDOWN LINE IN TRENCH

NTS5 STEAM METER

NTS6 WATER SAMPLE COOLERS DETAILS

NTS7 GATE VALVE BYPASS

SCALE: 1" = 1'-0"2 BLOWDOWN SEPERATOR DETAIL

SCALE: 1" = 1'-0"8 CONDENSATE HEADER DETAIL

Revisions: Date: SHEET 2062/22/2024

SIDE VIEW TRAPEZE HANGER FOR UP TO

1000 LB UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER

TYPE 1 - SEE SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER

TYPE 43 - SEE SPECIFICATIONS

WELD

SADDLE

1/2" DIA HANGER RODS

WITH 36" MAX SPACING

ON EACH CHANNEL

1 5/8" 12 GAUGE CHANNEL

OR 2"x2"x1/4" ANGLE

PROVIDE INSULATION SHIELD

& INSERT FOR ALL PIPING

(8" MIN)

INSULATION SHIELD

AT HANGER

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION (9

PSF MIN DENSITY) UNDER

INSULATION SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

HANGER ROD

BAND

FRAMING MEMBER

OPTION A OPTION B

BEAM CLAMP

1-5/8" GALVANIZED STRUT

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOM

SIZE IN

THRU

3/4 1 1 1/4

1/2 2 2 1/2 3 4 5 6 8 10 12 14 16 18 20 24

PIPE FT 7 7 7 9 10 11 12 14 16 17 19 22 23 25 27 28 30 32

TUBING

FT 5 FT 6 7 8 8 9 10 12 13 14 16 - - - - - - -

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE

NOTES:

SEE SPECIFER FOR DETAILED

HANGER REQUIREMENTS 1" MA

X

NOTES:

PROVIDE RESTRAINING CLAMPS 8'-0" OC

2 1/2" STEEL PIPE

2" STEEL PIPE

INSULATION

PROTECTION SHIELD

PIPE AND INSULATION

8"x8"x3/8" STEEL PLATE

WELD PLATE TO PIPE

SECURE TO SLAB WITH (4) 3/8" DIA

EXPANSION BOLTS OR WELD TO

STEEL DECK

CONCRETE SLAB OR

STEEL DECK

WELD PIPE SADDLE SUPPORT

TO PIPE.

HIGH COMPRESSIVE

STRENGTH

INSULATION INSERT

UNDER SHIELD

PROVIDE ALUMINUM

JACKET

NOTE:

WHERE USED FOR COPPER TUBE OR PIPE, BRAZE TO FABRICATED STEEL ANCHOR

PIPE ANCHOR SCHEDULE

D P C N S BOLT PATTERN

mm in mm in mm in mm in mm in

13 1/2"

102 4

19 3/4

21/2

11/2

5/8

1/2

3/8 3/8

3/8

1/2

3/8 3/8 1/4

3/4 5/8

5/8

5/8

INSULATE AS INDICATED FOR ALL CHILLED WATER.

INSULATE PIPE ONLY FOR STEAM, CONDENSATE

AND HEATING WATER.

STL PIPE OR

COPPER TUBE

NOTE A

ANCHOR BOLTS

N=NUMBER

S=SIZE

DRILL ∅ = S+1/16"

D+3 3/4"

D+1 1/2"

D+1"

D=PIPE OD

D+ P

D+4 3/4"

D+2 1/2"

C5/16"

PIPE ANCHOR SCHEDULE

D L P T E N S BOLT PATTERN

mm

NOTES:

A. INSTALL WALL PLATE FIRST THEN WELD ON

REMAINING ASSEMBLY. ONE WALL PLATE

FOR BOTH CHILLED WATER S.&R. IS

OPTIONAL.

in mm in mm in mm in mm in mm in mm in

7/8

7/8

7/8

7/8

7/8

7/8

6 1/4

6 1/4

6 1/4

6 1/4

13 1/2

13 1/2

13 1/2

13 1/2

13 1/2

13 1/2

13 1/2

13 1/2

13 5/8

10 3/8

25 1

19 3/4

19 3/4

19 3/4

19 3/4

19 3/4

19 3/4

508 20

216 81/2

D+8"

D+4"

P

NOTE A L+8"

L+4"

T

D=PIPE OD

E

T

L+3" L

ANCHOR BOLTS

N=NUMBER S=SIZE

DRILL ∅ = S+1/8"

INSULATE AS INDICATED FOR ALL CHILLED WATER. INSULATE

PIPE ONLY FOR STEAM, CONDENSATE & HEATING WATER.

NOTES:

1. PROVIDE ANCHORS

ONLY WHERE

SHOWN ON

DRAWINGS.

2. EXTEND SLEEVE

ABOVE FLOOR

WHERE

SPECIFIED.

ELEVATION

PLAN

RISER

FLOOR SLAB

INSULATION

BOLT (TYP)

RISER CLAMP (BOTTOM

CLAMP REQUIRED AT

ANCHOR POINTS ONLY)

PIPE SLEEVE

WHERE SPECIFIED

RISER CLAMP

FIRE-STOPPING MATERIAL

BOLT

RISER CLAMP

PIPE SLEEVE

WHERE SPECIFIED

PIPE

SAFETY VALVE

OPEN DRAIN (NOTE 3)

CONNECTION TO

PRESSURE VESSEL

OR PIPE

PROVIDE UNION UNLESS

SAFETY VALVE HAS

FLANGED OUTLET

VENT PIPE THROUGH

ROOF SUPPORT AS

INDICATED ON DWGS

(NOTES 1, 2)

PIPE THREADED

INTO ELBOW (SAME

SIZE AS ELBOW)

DRIP PAN ELBOW

(SECTIONAL VIEW)

FLEXIBLE CONNECTOR

3/4" DRAIN TO FLOOR

DRAIN OR OPEN SIGHT

DRAIN (NOTE 4)

1" M

IN

24" MAX

3"

D

ELEVATION

NOTES:

1. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS

NOT BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD

CONTAINED IN ANSI B31.1. POWER PIPING CODE, APPENDIX II. THE VENT PIPE SHOULD GO

VERTICAL THRU THE ROOF WITH NO TURNS OR ANGLES. WHERE REQUIRED THERE SHALL

BE NO MORE THEN A TOTAL OR 180 DEGREES IN DIRECTIONAL CHANGES MADE WITH 45

DEG.

ELBOWS.2. VENT PIPE SHALL TERMINATE 6' MIN. ABOVE FINISHED ROOF.

3. DISCHARGE OF DRAIN SHALL BE DIRECTED AWAY FROM PLATFORMS OR OTHER AREAS

WHERE PERSONNEL MAY

OCCUPY.4. DO NOT CONNECT ANY OTHER DRAIN TO THE DRIP PAN ELBOW DRAIN PIPE.

5. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

TYPICAL WATER PIPING

REDUCER, IF REQUIRED

3/4" BALL VALVE

ADAPTER TO 3/4"

HOSE

THREAD-PROVIDE

HOSE CAP NUT

1/4" COPPER

TUBING

1/2" x 4"

NIPPLE

AIR VENT

1/2" BALL

VALVE

CIRCULATING WATER PIPING

TYPICAL MANUAL AIR VENT

TYPICAL CHILLED AND

HOT WATER PIPING

DRAIN VALVE

CONNECTIONS

ELEVATION

THREADED

PIPING

ELEVATION

WELDED

PIPING

NOTES:

1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.

2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS

AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE

POCKET.

ELEVATION

NOTES:

1. VENT ALL HIGH POINTS INDICATED ABOVE.

2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.

MV

OR

AV

8"x8"x3/8" STEEL PLATE

WELD PLATE TO PIPE

SECURE TO SLAB WITH (4) 1/2" DIA

EXPANSION BOLTS

CONCRETE SLAB

WELD PIPE TO PLATE

4" SCH 40 PIPE

3/8" STEEL PLATE, SIZE TO

MATCH PIPE SUPPORT

SADDLE

WELD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MP502

MECHANICAL PIPING DETAILS

DJU KRL

PARTIALLY SPRINKLERED

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

NTS1 PIPE HANGERS

NTS2 PIPE SUPPORTS STAND

NTS3 SMALL PIPE ANCHORS

NTS4 LARGE PIPE ANCHORS

NTS5 SUPPORT ANCHOR FOR RISERS

NTS6 STEAM SAFETY VALVE

NTS7 DRAIN VAVLE AND AIR VENT CONNECTIONS

NTS8 PIPE ROLLER SUPPORT

NTS9 PIPE SUPPORT STAND FOR PRV

Revisions: Date: SHEET 2072/22/2024

CAP (TYP)

DRIP RETURN

3/8" TEST

CONNECTION

PIPE TO STEAM

TRAP (TYP)

STEAMLINE (TYP)

DRIP LEG (TYP)

3/4" DRAIN

(ALTERNATE

LOCATIONS), TYP

3/4" MIN

FROM DRIP

CONNECTION

2"

2"

STEAM TRAP ASSEMBLY

NOTE:

DRIP POCKET PIPE SIZE

SAME AS STEAM MAIN

UNLESS OTHERWISE

NOTED

STEAM LINE DRIP POCKET

1" GATE VALVE

SCHEDULE 80

STEEL PIPE

INVERTED BUCKET TRAP,

SEE PLANS AND SCHEDULES

DIELECTRIC FITTING WHERE

RETURN IS COPPER PIPESEE DRAWINGS FOR PIPE SIZES

SCHEDULE 80 STEEL PIPE

TO RETURN MAIN

PIPE SIZE SHALL BE

SAME SIZE AS TRAP

BYPASS-INSTALL IN HORIZONTAL

PLANE LEVEL WITH TRAP OR IN

VERTICAL PLANE AND BELOW TRAP

DRIP LEG OR EQUIPMENT

CONNECTION. MAKE THE SAME SIZE

AS THE SUPPLY MAIN OR EQUIPMENT

CONNECTION. SEE NOTE 1

6" M

IN

" M

IN

FLOW

NOTE:

1. ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12"

MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP

INLET. DRIP LEG SHALL HAVE 6" SCALE POCKET BELOW TRAP

INLE

T.

2. PROVIDE BYPASS PIPING.

1" GATE

VALVE

SCHEDULE 80

STEEL PIPE

FLOAT AND

THERMOSTATIC TRAP,

SEE PLANS AND

SCHEDULES

DIELECTRIC FITTING WHERE

RETURN IS COPPER PIPE

SEE DRAWINGS FOR PIPE SIZES

SCHEDULE 80 STEEL PIPE

TO RETURN MAIN

PIPE SIZE SHALL BE

SAME SIZE AS TRAP

BYPASS-INSTALL IN HORIZONTAL

PLANE LEVEL WITH TRAP OR IN

VERTICAL PLANE AND BELOW TRAP

PROVIDE BYPASS PIPING FOR ALL

TRAPS 1" AND LARGER

DRIP LEG OR EQUIPMENT

CONNECTION. MAKE THE SAME SIZE

AS THE SUPPLY MAIN OR EQUIPMENT

CONNECTION. SEE NOTE 1

6" M

IN

" M

IN

FLOW

NOTE:

1. ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12"

MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP

INLET. DRIP LEG SHALL HAVE 6" SCALE POCKET BELOW TRAP

INLE

T.

1/2"

AUTOMATIC FLOW

CONTROL DEVICE,

SEE NOTE 2

LOW POINT

DRAIN

DRAIN CONNECTION

PRESSURE

GAUGE

NOTE:

SIZE WATER FILTER FOR 5%

OF TOTAL SYSTEM

FLOW

TO

P

UM

P

SU

CT

IO

N

FR

OM

P

UM

P

DI

SC

HA

RG

E

WATER

FILTER

THERMOMETER

GRAVITY RETURN

FROM FLASH TANK

IF SHOWN ON

FLOOR PLAN

SCHEDULE 80 STEEL PIPE

LPR

FLOOR

3/4" DRAIN, DISCHARGE INTO

NEAREST FLOOR DRAIN, NC

FLUSHING

CONNECTION

5" THICK CONCRETE

HOUSEKEEPING PAD

THERMOMETER

WATER LEVEL GAUGE

RECEIVER

VENT

PUMP DISCHARGE

TO PLANT

CONTROL CABINET

CONCRETE WALL: SECURE

WITH EXPANSION BOLTS

STEEL COLUMN: SECURE WITH

BOLTS OR WELD TO COLUMN

TYPICAL ROLLER SUPPORT

TYPICAL PIPE STRAP

TYPICAL PIPE HANGER

NOTES:

DO NOT EXCEED DESIGN LOAD AS SPECIFIED BY MANUFACTURER

1-5/8" GALVANIZED STRUT

TUBING, TYP

TUBING CLAMP

PERFORATED TUBE TRAY

HANGER ROD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MP503

MECHANICAL PIPING DETAILS

DJU KRL

PARTIALLY SPRINKLERED

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

NTS7 STEAM LINE DRIP POCKET AND STEAM TRAP ASSEMBLY

NTS3 INVERTED BUCKET STEAM TRAP ASSEMBLY

NTS4 FLOAT AND THERMOSTATIC STEAM TRAP ASSEMBLY

NTS5 M-WATER FILTERS - CLOSED LOOP HYDRONIC SYSTEMS

NTS6 M-CONDENSATE PUMPS - PIPING CONNECTIONS

NTS1 PIPE SUPPORT BRACKET DETAIL

SCALE: 12" = 1'-0"2 TUBING SUPPORTS DETAIL

Revisions: Date: SHEET 2082/22/2024

LENGTH AS AVAILABLE BY MANUFACTURER

3"

END VIEW

4" SCH 10S

2" SCH 40S

PIPE SUPPORT (TYP) SPACING PER

MANUFACTURER'S REQUIREMENTS

SECONDARY STEEL

CASING

STAINLESS

STEEL SERVICE

PIPE

SERVICE PIPE

SECONDARY CASING

END VIEW

4" SCH 10S

2" SCH 40S

SERVICE PIPE

SECONDARY CASING

STEEL SERVICE PIPE

STEEL SECONDARY

CONTAINMENT

PIPE SUPPORTS (SPACING PER

MANUFACTURER'S REQUIREMENTS)

90° ELBOW OR

AS REQUIRED

END VIEW

4" M

IN

A

FF

CL

EA

RA

NC

E

AIR SPACE

STEEL SERVICE

PIPE

SECONDARY STEEL

CASING

DRAIN

STEEL SLEEVE

FLANGE

VENT

CONTINUOUSLY WELDED (TYP)

TO STEEL FACE PLATE

SERVICE PIPE

LEAK DETECTION

ALARM PROBE

DRAIN

VENT

1" MIN

4" M

IN

A

FF

CL

EA

RA

NC

E3/4" DRAIN

3" PIPE CAP

LEAK SENSOR

3"x3/4" REDUCER

CORD GRIP

ALARM PROBE

CABLE TO TMS

CONSOLE

SECONDARY STEEL

CASING

STEEL SERVICE

PIPE

2 1 /4"

1 3 /4"

STEEL PIPE

PENETRATION SLEEVE

CONC TRENCH

MODULAR PIPE SEAL

EPDM RUBBER

DOUBLE WALL FOR/FOS PIPE

/1 MP123 /1 MP123

EXISTING NG

EXISTING NG

REMOVE VALVE AND CAP PIPE WHEN

EXISTING BOILERS ARE REMOVED

FROM BUIDING 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MP504

MECHANICAL PIPING DETAILS

BEH KRL

PARTIALLY SPRINKLERED

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

NTS1 TYPICAL DOUBLE WALL PIPE

NTS2 TYPICAL DOUBLE WALL PIPE BEND

NTS3 TYPICAL END SEAL

NTS4 TYPICAL LEAK DETECTION ALARM PROBE PIPING

NTS5 PIPING LINK SEAL DETAIL

Revisions: Date:

SCALE: 1 1/2" = 1'-0"6 NATURAL GAS CONNECTION DETAIL

SHEET 2092/22/2024

MK201

1' 2'

A'

B'

G'

F'

D'

C'

2-119-BLR-001

BOILER

2-119-BLR-002

BOILER

2-119-BLR-003

BOILER

2-119-RO-001

RO UNIT

2-119-PMP-001

2-119-PMP-002

2-119-TK-002

SURGE TANK

2-119-PMP-005

2-119-PMP-004

2-119-PMP-003

FUEL OIL DUPLEX PUMP SKID

FUEL OIL PUMP SKID

2-119-TK-003

BLOWDOWN SEPARATOR

STEAM HEADER

2.8'

E'

MK201

MK202

SUPERVISOR

129-2

CONTROL ROOM

130-2

PROPANE

131-2

CHEM FEED

128-2

BOILER ROOM

119-2

GENERATOR ROOM

120B-2

JANITOR

121-2

TOILET

122-2

TOILET

123-2

SHOWER AREA

126-2LOCKER ROOM

125-2

BREAK ROOM

124-2

CHANGING AREA

127-2

2-119-TK-004

WATER SOFTENER1

MK202

MK202

1 2 3

A

B

D

F

H

M

CHEMICAL DRUM (TYP)

PROPANE TANKS

(FURNISHED BY VA)

2-119-TK-005

RO STORAGE TANK

2-119-HEX-001

PARALLEL

SWITCHING GEAR

101B-2

MK401

ELECTRICAL ROOM

120A-2

BOILER ROOM

101-2

MATCHLINE

SEE MK401

2-119-AS-001

2-119-XPT-001

AIR SEPARATOR

EXPANSION TANK

MK202

STEAM SAMPLE STATIONS

3'

SOLENOID PUMP (TYP)

CONTROLPANEL (TYP)

CONDENSATE RECEIVER

2-119-PMP-012

CONDENSATE RECEIVER W/ PUMP

2-119-PMP-011

FUEL OIL QUALITY MAINTENANCE SYSTEM

2-200-FQM-001

MK203

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MK121

MECHANICAL EQUIPMENT PLAN -

GROUND FLOOR LEVEL 2

DJU KRL

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 MECHANICAL EQUIPMENT PLAN - GROUND FLOOR LEVEL

KEYPLAN

N AREA OF WORK

12 16

N

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

Revisions: Date:

SHEET 2102/22/2024

A'

B'

G'

F'

D'

C'

2.8'

E'

OPEN TO BELOW

MK202

1 2 3

A

B

D

F

H

M

CONTROL IT

201-2

EQUIPMENT ACCESS

200-2

BUILDING HEATING PRV STATION

DEAERATOR PRV STATION

2-200-HEX-003

MEZZANINE

202-2

DEAERATOR

2-200-TK-001

2-200-HTR-001 (EXISTING, RELOCATED) 1

MK202

MONORAIL

ELECTRIC CHAIN

HOIST WITH TROLLY

3'

CONDENSATE RECEIVER

2-119-PMP-013

2-200-ECH-001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MK141

MECHANICAL EQUIPMENT PLAN -

MEZZANINE LEVEL 2

DJU KRL

PARTIALLY SPRINKLERED

SCALE: 3/16" = 1'-0"1 MECHANICAL EQUIPMENT PLAN - MEZZANINE LEVEL

KEYPLAN

N AREA OF WORK

12 16

N

3.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 ELECTRIC FUEL OIL HEATER IS EXISTING. REFER TO GC-SERIES PHASING DRAWINGS

FOR MORE INFORMATION.

Revisions: Date:

SHEET 2112/22/2024

ROOF

33' - 3 1/2"

1'2'2.8'

/1 MK121

2-119-TK-002

SURGE TANK

2-119-BLR-002

BOILER

FUEL OIL DUPLEX PUMP SKID

FUEL OIL PUMP SKID

2-119-RO-001

RO UNIT

MEZZANINE

12' - 0"

2-119-TK-005

RO STORAGE TANK

DEAERATOR

2-200-TK-001

2-200-UH-002

2-200-ECH-001

3'

ELECTRIC CHAIN HOIST

GROUND FLOOR

0' - 0"

ROOF

33' - 3 1/2"

B'D' C'E'

/1 MK121

2-119-TK-003

BLOWDOWN SEPARATOR

MEZZANINE

12' - 0"

2-119-BLR-003

BOILER

2-119-BLR-002

BOILER

2-119-BLR-001

BOILER

TY

P.

0"

PROVIDE SUPPORT

FOR FAN MOUNT

PROVIDE SUPPORT

FOR FAN MOUNT

TRANSITION FROM BOILER

OUTLET TO VENT STACK

EXPANSION JOINT

24" VENT STACK, PRE-ENGINEERED

DOUBLE WALL SYSTEM

SPRING SUPPORTS DESIGNED

BY SYSTEM MANUFACTURER

AP

PR

OX

3'

- 2

1/ 2"

DOUBLE CONE RAIN CAP, TYP

(2) 2" TEST PORTS, TYP

MK501

TYP

TY

P

5'

- 0

1 1 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MK201

MECHANICAL ELEVATIONS

DJU KRL

PARTIALLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 MECHANICAL EQUIPMENT BUILDING ELEVATION

SCALE: 1/4" = 1'-0"2 MECHANICAL EQUIPMENT BUILDING ELEVATION

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

KEYED NOTES

1 PROVIDE CONNECTION PORTS FOR O2 ANALYZER AND TEMPERATURE SENSORS

Revisions: Date: SHEET 2122/22/2024

2-119-TK-004

WATER SOFTENER

2-119-TK-005

RO STORAGE TANK

2-119-TK-002

SURGE TANK

2-119-PMP-003

2 1 /2" ø

FW

S

2 1 /2" ø

FW

S

2-119-PMP-001

2-119-PMP-002

/1 MK121

2-119-RO-001

RO UNIT2-119-HEX-001

2-119-AS-001

2" ø

SW

3" ø

SW

1"ø SW

1 1/2"ø SW

4" ø

CT

2" ø

SW

2" ø

SW2"

ø

CW

S

2"ø SW

1/2 "ø

C F

1" ø

FP

W

2" ø

FW

S

1/2"ø HWS 2" ø

CW

S

2-119-XPT-001

2"ø CT

/1 MK121

2-119-TK-002

SURGE TANK

2-119-PMP-003 2-119-PMP-004 2-119-PMP-005

2 1/2"ø FWS

4" ø

CT

2" ø

FW

S

2" ø

FW

S

2" ø

FW

S

3"ø FWS

2"ø SW

2"ø SW

WORK BENCH

/1 MK121

6" ø

HP

S

6" ø

HP

S

6" ø

HP

S 6" ø

HP

S

3" ø

HP

S

"ø

H

PS

3" ø

HP

S

6" ø

HP

S

FROM 2-100-BLR-002

FROM 2-100-BLR-001

TO BUILDING 1

(WINTER)

FROM 2-100-

BLR-003

TO VENT/SILENCER

DOUBLE BLOCK AND BLEED

TO BUILDING 1

(SUMMER)

TO DEAERATOR/

BUILDING HEAT

EMERGENCY BOILER

CONNECTION

2'

- 0

W10x30 W10x30

ROLLER SUPPORT

ROLLER SUPPORT

W10x30 WELD TO HEADER

/1 MK141

MEZZANINE

12' - 0"

DEAERATOR

2-200-TK-001

2"ø HWR

2"ø FOR

3"ø LPS

1/2 "ø

C F

2 1/2"ø SW

GROUND FLOOR

0' - 0"

MEZZANINE

12' - 0"

/1 MK121

21-100-CP-003

21-100-CP-002

21-100-CP-015

21-100-CP-014

SOLENOID PUMPS, TYP

ROOF

33' - 3 1/2"

B' D'C' D

/1 MK141

ELECTRONIC CHAIN HOIST WITH MONORAIL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MK202

MECHANICAL ELEVATIONS

DJU KRL

PARTIALLY SPRINKLERED

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/8" = 1'-0"1 SURGE TANK AREA ELEVATION

SCALE: 3/8" = 1'-0"2 SURGE TANK AREA ELEVATION

SCALE: 3/8" = 1'-0"3 STEAM HEADER ELEVATION

SCALE: 3/8" = 1'-0"4 DEAERATOR ELEVATION

SCALE: 3/8" = 1'-0"5 CHEMICAL FEED PUMPS ELEVATION

SCALE: 3/8" = 1'-0"6 ELECTRIC CHAIN HOIST ELEVATION

KEYED NOTES

1 WELD W10x30 TO BEAM BELOW METAL GRATING. SEE STRUCTURAL DRAWINGS FOR

LOCATION OF BEAM.TYPICAL (3) PLACES

Revisions: Date: SHEET 2132/22/2024

FUEL OIL QUALITY MAINTENANCE

SYSTEM MOUNTED ON WALL

FUEL OIL PUMP SKID

1 1/2"ø FOR 2"ø FOS1"ø FOR

1 1/2"ø FOS

1 1/2"ø FOS

2"ø FOR

METAL SUPPORT FRAME

USING 2-1/2"x2-1/2"x1/4"

ANGLE STEEL

/1 MK121

2-119-FQM-001

TO HEAT EXCHANGER AND

ELECTRIC CIRCULATION HEATER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MK203

MECHANICAL ELEVATIONS

DJU KRL

PARTIALLY SPRINKLERED

KEYPLAN

N AREA OF WORK

12 16

2. PIPING CONNECTIONS FOR DETAIL 1 TO BE FIELD ROUTED BASED ON FINAL FUEL OIL

PUMP SKID CONFIGURATION. SEE D-612 FOR FUEL OIL PUMP SKID P&ID.

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 3/4" = 1'-0"1 MECHANICAL ELEVATION - FUEL OIL PUMP SKID

Revisions: Date: SHEET 2142/22/2024

B'

C'

/1 MK121

1'

- 6

1'

- 6

2-119-BLR-001 BOILER CLEARANCE3'

- 1

1/ 4"

G'

2.8' 1 2

M

GENERATOR ROOM

101C-2

MATCHLINE

SEE MK121

1" ø

DR

1" ø

DS

MODIFY OR REPLACE HEADER

TO ADD BRANCH FOR NEW

GENERATOR

DIESEL PIPING FROM

GENERATOR ROOM

3'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MK401

MECHANICAL ENLARGED PLAN -

GROUND FLOOR LEVEL

DJU LAJ

FULLY SPRINKLERED

SCALE: 1/2" = 1'-0"1 MECHANICAL ENLARGED EQUIPMENT PLAN - GROUND FLOOR LEVEL BOILER ROOM

KEYPLAN

N AREA OF WORK

12 16

N

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 1/4" = 1'-0"2 MECHANICAL DIESEL PIPING ENLARGED PLAN - GENERATOR ROOM

Revisions: Date: SHEET 2152/22/2024

5'- 0"

, T

YP

AP

PR

OX

'-0

MA

XM

IU

M

SP

AC

IN

G

BE

TW

EE

N

GU

ID

ES

P

ER

M

FG

IN

ST

AL

LA

TI

ON

IN

ST

RU

CT

IO

NS

MA

XM

IU

M

SP

AC

IN

G

BE

TW

EE

N

GU

ID

ES

P

ER

M

FG

. IN

ST

AL

LA

TI

ON

IN

ST

RU

CT

IO

NS

MA

XI

MU

M

FR

EE

ST

AN

DI

NG

FL

UE

H

EI

GH

T

PE

R

MF

G.

IN

ST

AL

LA

TI

ON

IN

ST

RU

CT

IO

NS

DOUBLE CONE RAIN CAP

TERMINATION DESIGNED BY

MANUFACTURER OF THE

STACK SYSTEM

GUY WIRE BAND

GUY WIRE BAND

ROOF

ROOF OPENING AND ANCHOR

PLATE SUPPORT FRAMING

DOUBLE WALL FLUE SYSTEM

ROOF CURB

STORM COLLAR

(2) 2" TEST PORTS

ANCHOR PLATE

/2 MK201

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MK501

MECHANICAL EQUIPMENT

DETAILS 2

BEH KRL

PARTIALLY SPRINKLERED

NTS1 BOILER STACK SUPPORT DETAIL

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

Revisions: Date: SHEET 2162/22/2024

VORTEX FLOW METER SCHEDULE

UNIT FLUID MEDIUM

SATURATED STEAM FEEDWATER

PIPE SIZE

(NPS)

METER SIZE

(NPS)

MAXIMUM PRESSURE

DROP AT FULL FLOW

(PSI)

MAXIMUM FLOW RATE

(LB/HR)

MINIMUM FLOW RATE

(LB/HR)

INLET PRESSURE

(PSIG)

MAXIMUM FLOW RATE

(GPM)

MINIMUM FLOW RATE

(GPM)

MAXIMUM INLET

PRESSURE (PSIG)

FLUID TEMPERATURE

(°F)

2-100-FLO-001 STEAM 13,197 750 100 - - - - 6 4 6

2-100-FLO-002 STEAM 13,197 750 100 - - - - 6 4 6

2-100-FLO-003 STEAM 13,197 750 100 - - - - 6 4 6

2-100-FLO-004 STEAM 14,895 1000 100 - - - - 6 4 3

2-100-FLO-005 STEAM 8,000 750 100 - - - - 3 3 2

2-100-FLO-006 STEAM TBD TBD 100 - - - - 3 - -

2-100-FLO-007 FEEDWATER - - - 28 2.8 160 227 2 1/2 1 -

2-100-FLO-008 FEEDWATER - - - 28 2.8 160 227 2 1/2 1 -

2-100-FLO-009 FEEDWATER - - - 28 2.8 160 227 2 1/2 1 -

2-100-FLO-010 FEEDWATER - - - 28 2.8 160 227 2 1/2 1 -

2-100-FLO-011 FEEDWATER - - - 28 2.8 160 227 2 1/2 1 -

2-100-FLO-012 FEEDWATER - - - 28 2.8 160 227 2 1/2 1 -

BOILER UNIT SCHEDULE

UNIT LOCATION

RATINGS FUEL

POWER (HP)

ELECTRICAL ESTIMATED OPERATING

WEIGHT (LBS) BASIS OF DESIGN

CAPACITY (MBTU/HR) EFF (%) NOX LEVEL (PPM) LIGHT OIL (GPH) NATURAL GAS (SCFH) V PH HZ 2-119-BLR-001 BOILER ROOM 13,390 84.4 30 116.6 16,329 400 480 3 60 48,360 CLEAVER-BROOKS CBLE-4W-200-400-200ST

2-119-BLR-002 BOILER ROOM 13,390 84.4 30 116.6 16,329 400 480 3 60 48,360 CLEAVER-BROOKS CBLE-4W-200-400-200ST

2-119-BLR-003 BOILER ROOM 13,390 84.4 30 116.6 16,329 400 480 3 60 48,360 CLEAVER-BROOKS CBLE-4W-200-400-200ST

CHEMICAL FEED PUMP SCHEDULE

UNIT LOCATION OUTLET SIZE OUTPUT RANGE

(GPH) PRESSURE (PSI)

ELECTRICAL

BASIS OF DESIGN

V/P/HZ

2-128-CF-201A; AMINE PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71

2-128-CF-201B; AMINE PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71

2-128-CF-201C; AMINE PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71

2-128-CF-202A; SCALE INHIBITOR PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71

2-128-CF-202B; SCALE INHIBITOR PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71

2-128-CF-202C; SCALE INHIBITOR PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71

2-128-CF-203A; SULFITE OXYGEN SCAVENGER PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71

2-128-CF-203B; SULFITE OXYGEN SCAVENGER PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71

2-128-CF-204; SODIUM HYDROXIDE PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71

DEAERATOR SCHEDULE

UNIT LOCATION TYPE TANK CAPACITY

(GAL)

OPERATING PRESSURE

(PSIG) BASIS OF DESIGN

2-200-TK-001 200 VERTICAL TRAY 900 5 CLEAVER-BROOKS TRAYMASTER TMV-030 / 900

STEAM TRAP SCHEDULE

UNIT LOCATION TYPE CONN. SIZE (IN) OPERATING

PRESSURE (PSIG)

RETURN LINE

(PSIG)

DIFFERENTIAL

PRESSURE (PSIG) BASIS OF DESIGN

TRP-1 STEAM HEADER IB 1" 100 5 95 ARMSTRONG IB 983

TRP-2 STEAM HEADER IB 1" 100 5 95 ARMSTRONG IB 983

TRP-3 BUILDING HEATING PRV IB 3/4" 100 5 95 ARMSTRONG IB 981

TRP-4 BUILDING HEATING PRV F&T 3/4" 68 5 63 ARMSTRONG F&T 75-A12

TRP-5 DEAERATOR PRV IB 3/4" 100 5 95 ARMSTRONG IB 981

TRP-6 DEAERATOR PRV F&T 3/4" 10 5 5 ARMSTRONG F&T CS2

PUMP SCHEDULE

UNIT SERVICE TYPE ORIENTATION MOUNTING FLOW RATE

(GPM)

HEAD

(FT WG)

ELECTRICAL

V/P/HZ MAX RPM VFD SPEED CONTROL

2-119-PMP-001 CONDENSATE TRANSFER CENTRIFUGAL SINGLE-STAGE HORIZONTAL SHAFT BASE 84 74 480/3/60 1750 YES CONSTANT 2-119-PMP-002 CONDENSATE TRANSFER CENTRIFUGAL SINGLE-STAGE HORIZONTAL SHAFT BASE 84 74 480/3/60 1750 YES CONSTANT 2-119-PMP-003 FEEDWATER CENTRIFUGAL MULTI-STAGE VERTICAL SHAFT BASE 42 367 480/3/60 3550 YES MODULATING

2-119-PMP-004 FEEDWATER CENTRIFUGAL MULTI-STAGE VERTICAL SHAFT BASE 42 367 480/3/60 3550 YES MODULATING

2-119-PMP-005 FEEDWATER CENTRIFUGAL MULTI-STAGE VERTICAL SHAFT BASE 42 367 480/3/60 3550 YES MODULATING 2-119-PMP-006 RO MAKEUP CENTRIFUGAL SINGLE-STAGE HORIZONTAL SHAFT BASE 10 115 480/3/60 1750 NO CONSTANT 2-119-PMP-008 FUEL OIL SUPPLY ROTARY THREE SCREW HORIZONTAL SHAFT BASE 2 208 480/3/60 1750 YES MODULATING 2-119-PMP-009 FUEL OIL SUPPLY ROTARY THREE SCREW HORIZONTAL SHAFT BASE 2 208 480/3/60 1750 YES MODULATING 2-119-PMP-010 FUEL OIL RECIRCULATION ROTARY GEAR HORIZONTAL SHAFT BASE 5 115 480/3/60 1750 NO CONSTANT

REVERSE OSMOSIS UNIT SCHEDULE

UNIT LOCATION DESIGN

TEMPERATURE (F)

MAXIMUM

RECOVERY

MINIMUM INLET

PRESSURE (PSIG) BASIS OF DESIGN

2-119-RO-001 BOILER ROOM 77 75% 30 GE E4 SERIES

PRESSURE REDUCING VALVE SCHEDULE

SERVICE UNIT INLET PRESSURE

(PSIG)

OUTLET PRESSURE

(PSIG) TEMP (F) FLOW

(PPH)

PIPE SIZING

TYPE SIZE

(IN)

CONTROL

METHOD

CONTROL PIPE

SIZE (IN) BASIS OF DESIGN

INLET (IN) OUTLET (IN) SCH.

BUILDING HEATING V-45016 100 15 338 2973 2 2 40 THREADED 2 PILOT 0.25 ARMSTRONG GP

DA1 V-45029 100 5 338 353 1 2.5 40 THREADED 0.75 PILOT 0.25 ARMSTRONG GP

DA2 V-45035 100 5 338 575 1.25 4 40 THREADED 0.75 PILOT 0.25 ARMSTRONG GP

WATER SOFTENER SCHEDULE

UNIT LOCATION NORMAL FLOWRATE

(GPM)

MAX FLOWRATE

(GPM)

BACKWASH

FLOW (GPM)

BACKWASH

VOLUME (GAL) V/P/HZ BASIS OF DESIGN

2-119-TK-004 BOILER ROOM 22 @ 15 PSIG 26 @ 25 PSIG 9 35 120/1/60 STMPRP COMMERCIAL WATER SOFTENER

EXPANSION TANK SCHEDULE

UNIT SERVICE REQUIRED (GAL) TANK VOLUME

ACTUAL (GAL)

REQUIRED

ACCEPTANCE (GAL)

ACTUAL ACCEPTANCE

(GAL) FILL PRESSURE (PSI) TYPE BASIS OF DESIGN

2-200 -XPT-001 FEEDWATER LOOP - NEW BOILER PLANT 0.5 2 0.07 1 12 DIAPHRAGM, VERTICAL BELL&GOSSETT HFT-15

EXISITING FUEL OIL HEATER SCHEDULE

UNIT LOCATION

SERVICE

AND/OR

SYSTEM

OIL TYPE #

OIL TEMP OIL

FLOW POWER WATT

DENSITY ELECTRICAL

NOTESENT LVG

°F °F GPM kW W/in2 V/P/HZ

2-200-HTR-001 BOILER PLANT FUEL OIL #2 FUEL OIL 45 95 5.0 16 20 208/3/60 1,2

NOTES:

1. NEMA 7 EXPLOSION ENCLOSURE

2. PROVIDE TEMPERATURE CONTROL SYSTEM AND INTERLOCK WITH FUEL OIL PUMPS

ELECTRIC CHAIN HOIST

UNIT CAPACITY

(TONS) LIFT (FT)

HOIST DATA TROLLEY DATA

BASIS OF DESIGN

HP VOLTAGE PHASE FREQUENCY

(HZ) HP VOLTAGE PHASE FREQUENCY

(HZ)

2-200-ECH-001 1/2 30 1 220 1.00 60.00 0.54 220.00 60.00 60.00 HARRINGTON SEQM SERIES

FUEL OIL TANK SCHEDULE

UNIT LOCATION CONTENTS TOTAL CAPACITY

(GAL)

WORKING CAPACITY

(GAL)

DIAMETER

(FT) ORIENTATION CONSTRUCTION MATERIAL

2-100-TK-019 SITE ABOVEGROUND NO 2 FUEL OIL 40,000 36,000 12 HORIZONTAL, ON SADDLES UL 142 DOUBLE WALL

STI F941 FIREGUARD

CARBON STEEL INNER/

CARBON STEEL OUTER

NOTES: MICHIGAN EGLE REGULATIONS USE NFPA-30 2012 EDITION, WHICH LIMITS THE SIZE OF A DOUBLE WALL ABOVEGROUND STORAGE TANK TO 20,000 GALLONS. THE CURRENT EDITION (2024) OF NFPA-30 HAS A LIMIT

OF 50,000 GALLONS. VA TO OBTAIN A VARIANCE FROM EGLE. FOR THIS TANK.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"

6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t

6"

6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t

REV 0 - 100% BID SET 2024-02-23

100% BID SET REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

585-21-115

2024-02-23

MK601

MECHANICAL EQUIPMENT

SCHEDULES 2

DJU KRL

PARTIALLY SPRINKLERED

1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.

Revisions: Date: SHEET 2172/22/2024