This file contains mechanical drawings and equipment schedules for a boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The drawings detail the installation of three 13,390 MBTU/hr dual-fuel boilers (natural gas and light oil), a 40,000-gallon above-ground double-wall fuel oil storage tank, deaerator system, chemical feed pumps, reverse osmosis water treatment system, and associated piping systems.
The drawings include detailed floor plans, elevations, and equipment schedules showing hydronic piping, fuel piping, steam distribution, condensate return, and support systems. Key components include three Cleaver-Brooks CBLE-4W-200-400-200ST boilers, a 900-gallon vertical tray deaerator, multiple feedwater and condensate pumps, chemical treatment systems, and a GE E4 Series reverse osmosis unit. The drawings specify locations, capacities, electrical requirements, and connection details for all major equipment. The documents are marked as 100% bid set dated February 23, 2024, with a final bid set revision dated April 5, 2024.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
1' 2'
A'
B'
G'
F'
D'
C'
2.8'
E'
CONTROL IT
201-2
EQUIPMENT ACCESS
200-2
OPEN TO BELOW
3"ø FWS
1 1/2"ø SW
3"ø FWS
1 1/2"ø SW
2 1/2"ø FWS
2 1/2"ø FWS
2 1/2"ø FWS
2 1/2"ø FWS
2 1/2"ø FWS
2 1/2"ø FWS
1 2 3
A
B
D
F
H
M
1/2" CF, TYP
2"ø SW
1/2"ø CF
2 1/2"ø FWS
EMERGENCY CONNECTION
2 1/2"ø FWS
2 1/2"ø FWS
2 1/2"ø FWS
2"ø SW
3"ø SW
1"ø SW
2"ø SW
1 1/4"ø FWS
2 1/2"ø CT
3"ø FWS
2"ø CT
2 1/2"ø FWS
1"ø SW 1"ø SW
1"ø SW
MEZZANINE
202-2
MP203
MP203
1"ø CT 1 1/2"ø CT
1 1/2"ø CT
4"ø CT
4"ø CT
3'
MP203
FROM HEAT EXCHANGER
CONDENSATE RECEIVER
1"ø CT
CONNECT CT TO EXISTING
CONDENSATE RETURN
SOFTENED WATER
FROM BUILDING 1
CONDENSATE RETURN
FROM BUILDING 11/2"ø CF
1/2"ø CF
MP501
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MP142
MECHANICAL HYDRONIC PIPING -
MEZZANINE LEVEL 2
DJU LAJ
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
SCALE: 3/16" = 1'-0"1 MECHANICAL HYDRONIC PIPING PLAN - MEZZANINE LEVEL
4. ONLY MAJOR PIPE RUNS BETWEEEN EQUIPMENT ARE SHOWN ON THIS PLAN. REFER TO
D-SERIES DRAWINGS FOR COMPLETE PIPING SCHEMATICS.
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYED NOTES
1 KEEP 6'x6' AREA CLEAR TO ELEVATION 20'-0" FOR FORKLIFT ACCSS TO MESSANINE
2 CONDENSATE TO BE ROUTED TO CONDENSATE RECEIVER ON FLOOR BELOW
Revisions: Date:
SHEET 2002/22/2024
A'
B'
G'
F'
D'
C'
2.8'
E'
EQUIPMENT ACCESS
200-2
1 2 3
A
B
D
F
H
M
4"ø NG
3/4"ø LPG
3/4"ø LPG
4"ø NG
4"ø NG 3/4"ø LPG
5"ø NG 1"ø LPG
3/4"ø LPG
4"ø NG
5"ø NG
1"ø LPG
4"ø NG
5"ø NG
1"ø LPG
OPEN TO BELOW
EMERGENCY CONNECTIONS
MEZZANINE
202-2
CONTROL IT
201-2
MP203
MP203
2"ø FOR
1 1/2"ø FOS
3'
2"ø FOS
MP501
3/4 "ø
F
OS
2" ø
NG
2"ø NG
2" ø
NG
2"ø NG 2"ø NG
MP203
PROPANE AND NATURAL GAS
TO FLOOR BELOW
VENTS TO ROOF TYP
TO FUEL PUMP SKID
ON FLOOR BELOW
CONNECT NG TO EXISTING
NATURAL GAS LINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MP143
MECHANICAL FUEL PIPING -
MEZZANINE LEVEL 2
DJU KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
SCALE: 3/16" = 1'-0"1 MECHANICAL FUEL PIPING - MEZZANINE LEVEL
4. ONLY MAJOR PIPE RUNS BETWEEEN EQUIPMENT ARE SHOWN ON THIS PLAN. REFER TO
D-SERIES DRAWINGS FOR COMPLETE PIPING SCHEMATICS.
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYED NOTES
1 KEEP 6'x6' AREA CLEAR TO ELEVATION 20'-0" FOR FORKLIFT ACCESS TO MEZZANINE
Revisions: Date:
SHEET 2012/22/2024
MP201
MP201
MP201
UP
CLOCK GAUGE
INTERNAL MONITOR PIPE
FUEL OIL SUPPLY
FUEL OIL RETURN
EMERGENCY INTERSTITIAL VENT
EMERGENCY TANK VENT MANWAY
PRESSURE/VACUUM VENT
REMOTE FILL BOX ON POST
FOSFOR
2" ⌀ FOR
2" ⌀ FOS
FILL NOZZLE
CONCRETE BOLLARD
1 1 /2"
F
OF
3'
- 9
1/ 2"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MP171
MECHANICAL FUEL PIPING - FUEL
OIL TANK 2
DJU CCW
PARTIALLY SPRINKLERED
KEYPLAN
N
AREA OF WORK
12 16
N
6. ALL FUEL OIL SUPPPLY AND RETURN PIPING OUTSIDE THE BUILDING IN THE CONCRETE
TRENCH AND ABOVE GROUND SHALL BE DOUBLE WALL CONSTRUCTION
5.
TANK SHALL INCLUDE A PLATFORM AND STAIR IN THE ARRANGEMENT SHOWN ON THIS
DRAWING. THE STAIR EXTENDS LOWER THAN THE SADDLE BASES DUE TO THE HEIGHT
OF THE TANK FOUNDATIONS
4. ONLY MAJOR PIPE RUNS BETWEEEN EQUIPMENT ARE SHOWN ON THIS PLAN. REFER TO
D-SERIES DRAWINGS FOR COMPLETE PIPING SCHEMATICS.
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 1/4" = 1'-0"1 MECHANICAL EQUIPMENT PLAN - FUEL OIL TANK
Revisions: Date:
SHEET 2022/22/2024
GROUND FLOOR
0' - 0"
2-100-CP-019
2" ø
FO
R
/1 MP171
40,000 GALLON 144" ⌀
ABOVEGROUND DOUBLE
WALL HORIZONTAL TANK
1 1/2"ø FOF
2" ø
FO
S
GROUND FLOOR
0' - 0"
2-100-CP-019
/1 MP171
REMOTE FILL BOX ON POST
FILL NOZZLE
CLOCK GAUGE
PRESSURE VACUUM VENT
EMERGENCY INTERSTITIAL VENT
EMERGENCY TANK VENT
MANWAY
FUEL OIL SUPPLY
FUEL OIL RETURN
INTERNAL INTERSTITIAL MONITOR PIPE
52' - 1"
2"ø FOS
2"ø FOR
2" ø
FO
F
GROUND FLOOR
0' - 0"
2-100-CP-019
/1 MP171
ANCHOR TO SLAB
1 1 /2" ø
FO
F
2"ø FOS
2"ø FOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MP201
MECHANICAL ELEVATIONS - FUEL
TANK 2
DJU KRL
PARTIALLY SPRINKLERED
SCALE: 3/8" = 1'-0"1 NORTHWEST ELEVATION - FUEL TANK
SCALE: 3/8" = 1'-0"2 NORTHEAST ELEVATION - FUEL TANK
SCALE: 3/8" = 1'-0"3 SOUTHWEST ELEVATION - FUEL TANK
REMOTE FILL
BOX ON POST
Revisions: Date:
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SHEET 2032/22/2024
A' B'
6" ø
HP
S
1"ø HPR
2" ø
SW
3" ø
HP
S
4" ø
CT
2"ø SW
/2 MP102
/2 MP101
4"ø CT3"ø HPS
A'B'
AB
4"ø CT
3"ø HPS
1"ø HPR
2"ø SW
1 1 /2" ø
SS
/2 MP102
/2 MP101
GROUND FLOOR
0' - 0"
A' A
4"ø CT
3"ø HPS
2"ø SW
6"ø HPS
/1 MP102
/1 MP101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MP202
MECHANICAL PIPING ELEVATIONS
DJU KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
SCALE: 3/4" = 1'-0"2 MECHANICAL PIPING EAST ELEVATION - BASEMENT LEVEL
SCALE: 3/4" = 1'-0"1 MECHANICAL PIPING WEST ELEVATION - BASEMENT LEVEL
SCALE: 3/4" = 1'-0"3 MECHANICAL PIPING ELEVATION - TUNNEL
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 REMOVE 4" DIA. CT BACK TO TEE WHEN EXISTING BOILER PLANT IS REMOVED
Revisions: Date: SHEET 2042/22/2024
MEZZANINE
12' - 0"
1 1/2"ø CBD 1 1/2"ø CBD
/1 MP121
1'
MEZZANINE
12' - 0"
MP203
3" ø
HP
S
3"ø HPS 6"ø LPS
2"ø HPS
3"ø HPS 2"ø HPS
3"ø HPS
3"ø HPSSTEAM TRAP
STEAM TRAP
PRV
/1 MP141
2"ø HPS
PRV
F'
MEZZANINE
12' - 0"
MP203
2"ø HPS 6"ø HPS
6" ø
HP
S
2 1/2"ø HPS
4"ø HPS1 1/4"ø HPS 1"ø HPS
1"ø HPS
3"ø HPS
3" ø
HP
S
3"ø HPS
3/4"ø HPS
STEAM TRAP STEAM TRAP
PRV
PRV
/1 MP141
2'
MEZZANINE
12' - 0"
1 1/2"ø CT
3"ø HPS
DEAERATOR
2-200-TK-001
6"ø LPS
2 1/2"ø FWS
3"ø FWS
3"ø FWS
2 1/2"ø CT 2 1/2"ø SW
1/2"ø CF
1"ø SW
/1 MP142
/1 PP142
/1 MP141
2'
MEZZANINE
12' - 0"
6"ø HPS 6"ø HPS
3"ø HPS
2 1 /4"
6"ø HPS
5"ø NG
1"ø LPG3/4"ø LPG 4"ø NG
/1 MP141
/1 MP143
/1 MP142
B'
MEZZANINE
12' - 0"
3"ø HPS
6"ø HPS 6"ø HPS 6"ø HPS 6"ø HPS
/1 MP141
2.8'
MEZZANINE
12' - 0"
1"ø FPW
3/4 "ø
H W
R
3/4 "ø
H W
S
1"ø LPG
5"ø NG
3/4"ø CA
/1 MP143
3'
EXISTING 2ND FLOOR
15' - 6"
MEZZANINE
12' - 0"
6"ø HPS
/1 MP141
/1 MP142
/1 MP143
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
FINAL BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MP203
MECHANICAL PIPING ELEVATIONS
DJU KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/4" = 1'-0"1 BLOWDOWN PIPING ELEVATION
SCALE: 3/8" = 1'-0"2 MECHANICAL PIPING ELEVATION
SCALE: 3/8" = 1'-0"3 MECHANICAL PIPING ELEVATION
SCALE: 3/8" = 1'-0"4 MECHANICAL PIPING ELEVATION
SCALE: 1/2" = 1'-0"5 MECHANICAL PIPING ELEVATION
SCALE: 3/8" = 1'-0"6 MECHANICAL PIPING ELEVATION
SCALE: 3/8" = 1'-0"7 MECHANICAL PIPING ELEVATION
KEYED NOTES
1 PROVIDE PIPE SUPPORT STAND (9/MP502) WITH PIPE ROLLER SUPPORT (8/MP502)
2 PROVIDE PIPE SUPPORT STAND (9/MP502) WITH SMALL PIPE ANCHOR (3/MP502)
3 INSTALL A BLIND FLANGE AT THE END OF EACH OF THE PIPES PENETRATING THE
EXTERIOR WALL. PIPES SHALL EXTEND 6" FROM THE FACE OF THE WALL
SCALE: 3/8" = 1'-0"8 MECHANICAL PIPING ELEVATION
Revisions: Date:
REV 0 - 100% BID SET 2024-02-23
REV 1 - FINAL BID SET 2024-04-05
SHEET 2054/5/2024
MI
NI
MU
M
2" B
EL
OW
LI
D
1 5/8" GALVANIZED
STRUT SUPPORT
PIPE CLAMP
WELD STRUT SUPPORT
TO EMBEDDED PLATE
DOUBLE WALL PIPE
PLAN VIEW
SIZE OF PIPE
SCHEDULE
SIZE OF "U" BOLT SIZE OF CHANNEL
SCHEDULE FOR 8 FT SPAN OR LESS
1" - 2" 3/8" DIA 6" x 10.5" 2-1/2" - 5" 1/2" DIA 8" x 13.75"
6" - 8" 3/4" DIA 10" x 20"
CONCRETE TRENCH
BLOWDOWN LINE PROVIDE TWO "U" BOLTS
WITH NUT AND LOCK NUT ON
LINE.
ELEVATION VIEW
ANCHOR TO CONCRETE WALL OF TRENCH
L3x3x5/16 BOLT OR WELD TO CHANNEL
NOTE:
MAINTAIN UPSTREAM AND DOWN STREAM DISTANCES RECOMMENDED
BY METER
MANUFACTURERS
TT
PT
PRESSURE
TRANSMITTER
TEMPERATURE
TRANSMITTER
TO METERING SYSTEM
BUILDING INCOMING
MAIN STEAM
FLOW METER
INTERFACE WITH
BACNET SYSTEM
DIFFERENTIAL PRESSURE
(DP) CELL STEAM FLOW
MEASUREMENT
SHUTOFF VALVE
D
SW
FW
S
BW
S
BW
S
BW
S
ELEVATION
FD
3/4" COOLING WATER
1/4" SAMPLE
OUTLET
3/4"
ANTI-SIPHON
VACUUM BREAKER
SAMPLE COOLER
PROVIDE SEPARATE COOLERS FOR BWS AND FWS.
MOUNT BWS COOLER 4' ABOVE FINISHED FLOOR ON
WALL OR COLUMN. MOUNT FWS COOLER 2' ± ABOVE
MEZZANINE FLOOR AT
DEAERATOR
PROVIDE SAME WATER SAMPLE AS COOLER'S
PIPING ARRANGEMENT AND EQUIPMENT FOR
THE BOILER WATER AS SHOWN FOR THE
FEEDWATER SAMPLE COOLER
1/2" FROM
EACH BOILER
1/4" FROM
DEAERATOR
1/2"
SW
0-83°C
1" BY-PASS GATE VALVE (TYP)
PRESSURE GAUGE WITH
GATE VALVE (TYP)
1" BY-PASS GLOBE VALVE (TYP AT
ALL GATE VALVES 6" OR LARGER)
3000 LBS STEEL HALF COUPLING
OR SOCKET WELDED (TYP)
SEE PLANS FOR PIPE SIZES
BUTT WELD (TYP)
GATE VALVE
GROUND FLOOR
0' - 0"
1"ø FOR 1 1/2"ø FOS
2"ø BBD
3"ø SS
/1 MP121
/1 MP123
/1 PP122
BLOWDOWN INLET
5" BLOWDOWN DRAIN
2" BLOWDOWN
IN TRENCH
TRENCH COVER
/1 MP121
HPR HEADER
1"ø HPR 1"ø HPR
1"ø HPR 1"ø HPR
4"ø CT
/1 MP142
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MP501
MECHANICAL PIPING DETAILS
DJU KRL
PARTIALLY SPRINKLERED
SCALE: 1 1/2" = 1'-0"1 TRENCH FLOOR DRAIN DETAIL
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
NTS3 PIPE TRENCH OUTSIDE BUILDING
NTS4 PIPE SUPPORT FOR BLOWDOWN LINE IN TRENCH
NTS5 STEAM METER
NTS6 WATER SAMPLE COOLERS DETAILS
NTS7 GATE VALVE BYPASS
SCALE: 1" = 1'-0"2 BLOWDOWN SEPERATOR DETAIL
SCALE: 1" = 1'-0"8 CONDENSATE HEADER DETAIL
Revisions: Date: SHEET 2062/22/2024
SIDE VIEW TRAPEZE HANGER FOR UP TO
1000 LB UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
WELD
SADDLE
1/2" DIA HANGER RODS
WITH 36" MAX SPACING
ON EACH CHANNEL
1 5/8" 12 GAUGE CHANNEL
OR 2"x2"x1/4" ANGLE
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" MIN)
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9
PSF MIN DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
BAND
FRAMING MEMBER
OPTION A OPTION B
BEAM CLAMP
1-5/8" GALVANIZED STRUT
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOM
SIZE IN
THRU
3/4 1 1 1/4
1/2 2 2 1/2 3 4 5 6 8 10 12 14 16 18 20 24
PIPE FT 7 7 7 9 10 11 12 14 16 17 19 22 23 25 27 28 30 32
TUBING
FT 5 FT 6 7 8 8 9 10 12 13 14 16 - - - - - - -
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE
NOTES:
SEE SPECIFER FOR DETAILED
HANGER REQUIREMENTS 1" MA
X
NOTES:
PROVIDE RESTRAINING CLAMPS 8'-0" OC
2 1/2" STEEL PIPE
2" STEEL PIPE
INSULATION
PROTECTION SHIELD
PIPE AND INSULATION
8"x8"x3/8" STEEL PLATE
WELD PLATE TO PIPE
SECURE TO SLAB WITH (4) 3/8" DIA
EXPANSION BOLTS OR WELD TO
STEEL DECK
CONCRETE SLAB OR
STEEL DECK
WELD PIPE SADDLE SUPPORT
TO PIPE.
HIGH COMPRESSIVE
STRENGTH
INSULATION INSERT
UNDER SHIELD
PROVIDE ALUMINUM
JACKET
NOTE:
WHERE USED FOR COPPER TUBE OR PIPE, BRAZE TO FABRICATED STEEL ANCHOR
PIPE ANCHOR SCHEDULE
D P C N S BOLT PATTERN
mm in mm in mm in mm in mm in
13 1/2"
102 4
19 3/4
21/2
11/2
5/8
1/2
3/8 3/8
3/8
1/2
3/8 3/8 1/4
3/4 5/8
5/8
5/8
INSULATE AS INDICATED FOR ALL CHILLED WATER.
INSULATE PIPE ONLY FOR STEAM, CONDENSATE
AND HEATING WATER.
STL PIPE OR
COPPER TUBE
NOTE A
ANCHOR BOLTS
N=NUMBER
S=SIZE
DRILL ∅ = S+1/16"
D+3 3/4"
D+1 1/2"
D+1"
D=PIPE OD
D+ P
D+4 3/4"
D+2 1/2"
C5/16"
PIPE ANCHOR SCHEDULE
D L P T E N S BOLT PATTERN
mm
NOTES:
A. INSTALL WALL PLATE FIRST THEN WELD ON
REMAINING ASSEMBLY. ONE WALL PLATE
FOR BOTH CHILLED WATER S.&R. IS
OPTIONAL.
in mm in mm in mm in mm in mm in mm in
7/8
7/8
7/8
7/8
7/8
7/8
6 1/4
6 1/4
6 1/4
6 1/4
13 1/2
13 1/2
13 1/2
13 1/2
13 1/2
13 1/2
13 1/2
13 1/2
13 5/8
10 3/8
25 1
19 3/4
19 3/4
19 3/4
19 3/4
19 3/4
19 3/4
508 20
216 81/2
D+8"
D+4"
P
NOTE A L+8"
L+4"
T
D=PIPE OD
E
T
L+3" L
ANCHOR BOLTS
N=NUMBER S=SIZE
DRILL ∅ = S+1/8"
INSULATE AS INDICATED FOR ALL CHILLED WATER. INSULATE
PIPE ONLY FOR STEAM, CONDENSATE & HEATING WATER.
NOTES:
1. PROVIDE ANCHORS
ONLY WHERE
SHOWN ON
DRAWINGS.
2. EXTEND SLEEVE
ABOVE FLOOR
WHERE
SPECIFIED.
ELEVATION
PLAN
RISER
FLOOR SLAB
INSULATION
BOLT (TYP)
RISER CLAMP (BOTTOM
CLAMP REQUIRED AT
ANCHOR POINTS ONLY)
PIPE SLEEVE
WHERE SPECIFIED
RISER CLAMP
FIRE-STOPPING MATERIAL
BOLT
RISER CLAMP
PIPE SLEEVE
WHERE SPECIFIED
PIPE
SAFETY VALVE
OPEN DRAIN (NOTE 3)
CONNECTION TO
PRESSURE VESSEL
OR PIPE
PROVIDE UNION UNLESS
SAFETY VALVE HAS
FLANGED OUTLET
VENT PIPE THROUGH
ROOF SUPPORT AS
INDICATED ON DWGS
(NOTES 1, 2)
PIPE THREADED
INTO ELBOW (SAME
SIZE AS ELBOW)
DRIP PAN ELBOW
(SECTIONAL VIEW)
FLEXIBLE CONNECTOR
3/4" DRAIN TO FLOOR
DRAIN OR OPEN SIGHT
DRAIN (NOTE 4)
1" M
IN
24" MAX
3"
D
ELEVATION
NOTES:
1. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS
NOT BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD
CONTAINED IN ANSI B31.1. POWER PIPING CODE, APPENDIX II. THE VENT PIPE SHOULD GO
VERTICAL THRU THE ROOF WITH NO TURNS OR ANGLES. WHERE REQUIRED THERE SHALL
BE NO MORE THEN A TOTAL OR 180 DEGREES IN DIRECTIONAL CHANGES MADE WITH 45
DEG.
ELBOWS.2. VENT PIPE SHALL TERMINATE 6' MIN. ABOVE FINISHED ROOF.
3. DISCHARGE OF DRAIN SHALL BE DIRECTED AWAY FROM PLATFORMS OR OTHER AREAS
WHERE PERSONNEL MAY
OCCUPY.4. DO NOT CONNECT ANY OTHER DRAIN TO THE DRIP PAN ELBOW DRAIN PIPE.
5. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" BALL VALVE
ADAPTER TO 3/4"
HOSE
THREAD-PROVIDE
HOSE CAP NUT
1/4" COPPER
TUBING
1/2" x 4"
NIPPLE
AIR VENT
1/2" BALL
VALVE
CIRCULATING WATER PIPING
TYPICAL MANUAL AIR VENT
TYPICAL CHILLED AND
HOT WATER PIPING
DRAIN VALVE
CONNECTIONS
ELEVATION
THREADED
PIPING
ELEVATION
WELDED
PIPING
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE
POCKET.
ELEVATION
NOTES:
1. VENT ALL HIGH POINTS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
MV
OR
AV
8"x8"x3/8" STEEL PLATE
WELD PLATE TO PIPE
SECURE TO SLAB WITH (4) 1/2" DIA
EXPANSION BOLTS
CONCRETE SLAB
WELD PIPE TO PLATE
4" SCH 40 PIPE
3/8" STEEL PLATE, SIZE TO
MATCH PIPE SUPPORT
SADDLE
WELD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MP502
MECHANICAL PIPING DETAILS
DJU KRL
PARTIALLY SPRINKLERED
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
NTS1 PIPE HANGERS
NTS2 PIPE SUPPORTS STAND
NTS3 SMALL PIPE ANCHORS
NTS4 LARGE PIPE ANCHORS
NTS5 SUPPORT ANCHOR FOR RISERS
NTS6 STEAM SAFETY VALVE
NTS7 DRAIN VAVLE AND AIR VENT CONNECTIONS
NTS8 PIPE ROLLER SUPPORT
NTS9 PIPE SUPPORT STAND FOR PRV
Revisions: Date: SHEET 2072/22/2024
CAP (TYP)
DRIP RETURN
3/8" TEST
CONNECTION
PIPE TO STEAM
TRAP (TYP)
STEAMLINE (TYP)
DRIP LEG (TYP)
3/4" DRAIN
(ALTERNATE
LOCATIONS), TYP
3/4" MIN
FROM DRIP
CONNECTION
2"
2"
STEAM TRAP ASSEMBLY
NOTE:
DRIP POCKET PIPE SIZE
SAME AS STEAM MAIN
UNLESS OTHERWISE
NOTED
STEAM LINE DRIP POCKET
1" GATE VALVE
SCHEDULE 80
STEEL PIPE
INVERTED BUCKET TRAP,
SEE PLANS AND SCHEDULES
DIELECTRIC FITTING WHERE
RETURN IS COPPER PIPESEE DRAWINGS FOR PIPE SIZES
SCHEDULE 80 STEEL PIPE
TO RETURN MAIN
PIPE SIZE SHALL BE
SAME SIZE AS TRAP
BYPASS-INSTALL IN HORIZONTAL
PLANE LEVEL WITH TRAP OR IN
VERTICAL PLANE AND BELOW TRAP
DRIP LEG OR EQUIPMENT
CONNECTION. MAKE THE SAME SIZE
AS THE SUPPLY MAIN OR EQUIPMENT
CONNECTION. SEE NOTE 1
6" M
IN
" M
IN
FLOW
NOTE:
1. ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12"
MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP
INLET. DRIP LEG SHALL HAVE 6" SCALE POCKET BELOW TRAP
INLE
T.
2. PROVIDE BYPASS PIPING.
1" GATE
VALVE
SCHEDULE 80
STEEL PIPE
FLOAT AND
THERMOSTATIC TRAP,
SEE PLANS AND
SCHEDULES
DIELECTRIC FITTING WHERE
RETURN IS COPPER PIPE
SEE DRAWINGS FOR PIPE SIZES
SCHEDULE 80 STEEL PIPE
TO RETURN MAIN
PIPE SIZE SHALL BE
SAME SIZE AS TRAP
BYPASS-INSTALL IN HORIZONTAL
PLANE LEVEL WITH TRAP OR IN
VERTICAL PLANE AND BELOW TRAP
PROVIDE BYPASS PIPING FOR ALL
TRAPS 1" AND LARGER
DRIP LEG OR EQUIPMENT
CONNECTION. MAKE THE SAME SIZE
AS THE SUPPLY MAIN OR EQUIPMENT
CONNECTION. SEE NOTE 1
6" M
IN
" M
IN
FLOW
NOTE:
1. ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12"
MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP
INLET. DRIP LEG SHALL HAVE 6" SCALE POCKET BELOW TRAP
INLE
T.
1/2"
AUTOMATIC FLOW
CONTROL DEVICE,
SEE NOTE 2
LOW POINT
DRAIN
DRAIN CONNECTION
PRESSURE
GAUGE
NOTE:
SIZE WATER FILTER FOR 5%
OF TOTAL SYSTEM
FLOW
TO
P
UM
P
SU
CT
IO
N
FR
OM
P
UM
P
DI
SC
HA
RG
E
WATER
FILTER
THERMOMETER
GRAVITY RETURN
FROM FLASH TANK
IF SHOWN ON
FLOOR PLAN
SCHEDULE 80 STEEL PIPE
LPR
FLOOR
3/4" DRAIN, DISCHARGE INTO
NEAREST FLOOR DRAIN, NC
FLUSHING
CONNECTION
5" THICK CONCRETE
HOUSEKEEPING PAD
THERMOMETER
WATER LEVEL GAUGE
RECEIVER
VENT
PUMP DISCHARGE
TO PLANT
CONTROL CABINET
CONCRETE WALL: SECURE
WITH EXPANSION BOLTS
STEEL COLUMN: SECURE WITH
BOLTS OR WELD TO COLUMN
TYPICAL ROLLER SUPPORT
TYPICAL PIPE STRAP
TYPICAL PIPE HANGER
NOTES:
DO NOT EXCEED DESIGN LOAD AS SPECIFIED BY MANUFACTURER
1-5/8" GALVANIZED STRUT
TUBING, TYP
TUBING CLAMP
PERFORATED TUBE TRAY
HANGER ROD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MP503
MECHANICAL PIPING DETAILS
DJU KRL
PARTIALLY SPRINKLERED
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
NTS7 STEAM LINE DRIP POCKET AND STEAM TRAP ASSEMBLY
NTS3 INVERTED BUCKET STEAM TRAP ASSEMBLY
NTS4 FLOAT AND THERMOSTATIC STEAM TRAP ASSEMBLY
NTS5 M-WATER FILTERS - CLOSED LOOP HYDRONIC SYSTEMS
NTS6 M-CONDENSATE PUMPS - PIPING CONNECTIONS
NTS1 PIPE SUPPORT BRACKET DETAIL
SCALE: 12" = 1'-0"2 TUBING SUPPORTS DETAIL
Revisions: Date: SHEET 2082/22/2024
LENGTH AS AVAILABLE BY MANUFACTURER
3"
END VIEW
4" SCH 10S
2" SCH 40S
PIPE SUPPORT (TYP) SPACING PER
MANUFACTURER'S REQUIREMENTS
SECONDARY STEEL
CASING
STAINLESS
STEEL SERVICE
PIPE
SERVICE PIPE
SECONDARY CASING
END VIEW
4" SCH 10S
2" SCH 40S
SERVICE PIPE
SECONDARY CASING
STEEL SERVICE PIPE
STEEL SECONDARY
CONTAINMENT
PIPE SUPPORTS (SPACING PER
MANUFACTURER'S REQUIREMENTS)
90° ELBOW OR
AS REQUIRED
END VIEW
4" M
IN
A
FF
CL
EA
RA
NC
E
AIR SPACE
STEEL SERVICE
PIPE
SECONDARY STEEL
CASING
DRAIN
STEEL SLEEVE
FLANGE
VENT
CONTINUOUSLY WELDED (TYP)
TO STEEL FACE PLATE
SERVICE PIPE
LEAK DETECTION
ALARM PROBE
DRAIN
VENT
1" MIN
4" M
IN
A
FF
CL
EA
RA
NC
E3/4" DRAIN
3" PIPE CAP
LEAK SENSOR
3"x3/4" REDUCER
CORD GRIP
ALARM PROBE
CABLE TO TMS
CONSOLE
SECONDARY STEEL
CASING
STEEL SERVICE
PIPE
2 1 /4"
1 3 /4"
STEEL PIPE
PENETRATION SLEEVE
CONC TRENCH
MODULAR PIPE SEAL
EPDM RUBBER
DOUBLE WALL FOR/FOS PIPE
/1 MP123 /1 MP123
EXISTING NG
EXISTING NG
REMOVE VALVE AND CAP PIPE WHEN
EXISTING BOILERS ARE REMOVED
FROM BUIDING 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MP504
MECHANICAL PIPING DETAILS
BEH KRL
PARTIALLY SPRINKLERED
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
NTS1 TYPICAL DOUBLE WALL PIPE
NTS2 TYPICAL DOUBLE WALL PIPE BEND
NTS3 TYPICAL END SEAL
NTS4 TYPICAL LEAK DETECTION ALARM PROBE PIPING
NTS5 PIPING LINK SEAL DETAIL
Revisions: Date:
SCALE: 1 1/2" = 1'-0"6 NATURAL GAS CONNECTION DETAIL
SHEET 2092/22/2024
MK201
1' 2'
A'
B'
G'
F'
D'
C'
2-119-BLR-001
BOILER
2-119-BLR-002
BOILER
2-119-BLR-003
BOILER
2-119-RO-001
RO UNIT
2-119-PMP-001
2-119-PMP-002
2-119-TK-002
SURGE TANK
2-119-PMP-005
2-119-PMP-004
2-119-PMP-003
FUEL OIL DUPLEX PUMP SKID
FUEL OIL PUMP SKID
2-119-TK-003
BLOWDOWN SEPARATOR
STEAM HEADER
2.8'
E'
MK201
MK202
SUPERVISOR
129-2
CONTROL ROOM
130-2
PROPANE
131-2
CHEM FEED
128-2
BOILER ROOM
119-2
GENERATOR ROOM
120B-2
JANITOR
121-2
TOILET
122-2
TOILET
123-2
SHOWER AREA
126-2LOCKER ROOM
125-2
BREAK ROOM
124-2
CHANGING AREA
127-2
2-119-TK-004
WATER SOFTENER1
MK202
MK202
1 2 3
A
B
D
F
H
M
CHEMICAL DRUM (TYP)
PROPANE TANKS
(FURNISHED BY VA)
2-119-TK-005
RO STORAGE TANK
2-119-HEX-001
PARALLEL
SWITCHING GEAR
101B-2
MK401
ELECTRICAL ROOM
120A-2
BOILER ROOM
101-2
MATCHLINE
SEE MK401
2-119-AS-001
2-119-XPT-001
AIR SEPARATOR
EXPANSION TANK
MK202
STEAM SAMPLE STATIONS
3'
SOLENOID PUMP (TYP)
CONTROLPANEL (TYP)
CONDENSATE RECEIVER
2-119-PMP-012
CONDENSATE RECEIVER W/ PUMP
2-119-PMP-011
FUEL OIL QUALITY MAINTENANCE SYSTEM
2-200-FQM-001
MK203
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MK121
MECHANICAL EQUIPMENT PLAN -
GROUND FLOOR LEVEL 2
DJU KRL
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 MECHANICAL EQUIPMENT PLAN - GROUND FLOOR LEVEL
KEYPLAN
N AREA OF WORK
12 16
N
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
Revisions: Date:
SHEET 2102/22/2024
A'
B'
G'
F'
D'
C'
2.8'
E'
OPEN TO BELOW
MK202
1 2 3
A
B
D
F
H
M
CONTROL IT
201-2
EQUIPMENT ACCESS
200-2
BUILDING HEATING PRV STATION
DEAERATOR PRV STATION
2-200-HEX-003
MEZZANINE
202-2
DEAERATOR
2-200-TK-001
2-200-HTR-001 (EXISTING, RELOCATED) 1
MK202
MONORAIL
ELECTRIC CHAIN
HOIST WITH TROLLY
3'
CONDENSATE RECEIVER
2-119-PMP-013
2-200-ECH-001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MK141
MECHANICAL EQUIPMENT PLAN -
MEZZANINE LEVEL 2
DJU KRL
PARTIALLY SPRINKLERED
SCALE: 3/16" = 1'-0"1 MECHANICAL EQUIPMENT PLAN - MEZZANINE LEVEL
KEYPLAN
N AREA OF WORK
12 16
N
3.
WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 ELECTRIC FUEL OIL HEATER IS EXISTING. REFER TO GC-SERIES PHASING DRAWINGS
FOR MORE INFORMATION.
Revisions: Date:
SHEET 2112/22/2024
ROOF
33' - 3 1/2"
1'2'2.8'
/1 MK121
2-119-TK-002
SURGE TANK
2-119-BLR-002
BOILER
FUEL OIL DUPLEX PUMP SKID
FUEL OIL PUMP SKID
2-119-RO-001
RO UNIT
MEZZANINE
12' - 0"
2-119-TK-005
RO STORAGE TANK
DEAERATOR
2-200-TK-001
2-200-UH-002
2-200-ECH-001
3'
ELECTRIC CHAIN HOIST
GROUND FLOOR
0' - 0"
ROOF
33' - 3 1/2"
B'D' C'E'
/1 MK121
2-119-TK-003
BLOWDOWN SEPARATOR
MEZZANINE
12' - 0"
2-119-BLR-003
BOILER
2-119-BLR-002
BOILER
2-119-BLR-001
BOILER
TY
P.
0"
PROVIDE SUPPORT
FOR FAN MOUNT
PROVIDE SUPPORT
FOR FAN MOUNT
TRANSITION FROM BOILER
OUTLET TO VENT STACK
EXPANSION JOINT
24" VENT STACK, PRE-ENGINEERED
DOUBLE WALL SYSTEM
SPRING SUPPORTS DESIGNED
BY SYSTEM MANUFACTURER
AP
PR
OX
3'
- 2
1/ 2"
DOUBLE CONE RAIN CAP, TYP
(2) 2" TEST PORTS, TYP
MK501
TYP
TY
P
5'
- 0
1 1 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MK201
MECHANICAL ELEVATIONS
DJU KRL
PARTIALLY SPRINKLERED
SCALE: 1/4" = 1'-0"1 MECHANICAL EQUIPMENT BUILDING ELEVATION
SCALE: 1/4" = 1'-0"2 MECHANICAL EQUIPMENT BUILDING ELEVATION
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 PROVIDE CONNECTION PORTS FOR O2 ANALYZER AND TEMPERATURE SENSORS
Revisions: Date: SHEET 2122/22/2024
2-119-TK-004
WATER SOFTENER
2-119-TK-005
RO STORAGE TANK
2-119-TK-002
SURGE TANK
2-119-PMP-003
2 1 /2" ø
FW
S
2 1 /2" ø
FW
S
2-119-PMP-001
2-119-PMP-002
/1 MK121
2-119-RO-001
RO UNIT2-119-HEX-001
2-119-AS-001
2" ø
SW
3" ø
SW
1"ø SW
1 1/2"ø SW
4" ø
CT
2" ø
SW
2" ø
SW2"
ø
CW
S
2"ø SW
1/2 "ø
C F
1" ø
FP
W
2" ø
FW
S
1/2"ø HWS 2" ø
CW
S
2-119-XPT-001
2"ø CT
/1 MK121
2-119-TK-002
SURGE TANK
2-119-PMP-003 2-119-PMP-004 2-119-PMP-005
2 1/2"ø FWS
4" ø
CT
2" ø
FW
S
2" ø
FW
S
2" ø
FW
S
3"ø FWS
2"ø SW
2"ø SW
WORK BENCH
/1 MK121
6" ø
HP
S
6" ø
HP
S
6" ø
HP
S 6" ø
HP
S
3" ø
HP
S
"ø
H
PS
3" ø
HP
S
6" ø
HP
S
FROM 2-100-BLR-002
FROM 2-100-BLR-001
TO BUILDING 1
(WINTER)
FROM 2-100-
BLR-003
TO VENT/SILENCER
DOUBLE BLOCK AND BLEED
TO BUILDING 1
(SUMMER)
TO DEAERATOR/
BUILDING HEAT
EMERGENCY BOILER
CONNECTION
2'
- 0
W10x30 W10x30
ROLLER SUPPORT
ROLLER SUPPORT
W10x30 WELD TO HEADER
/1 MK141
MEZZANINE
12' - 0"
DEAERATOR
2-200-TK-001
2"ø HWR
2"ø FOR
3"ø LPS
1/2 "ø
C F
2 1/2"ø SW
GROUND FLOOR
0' - 0"
MEZZANINE
12' - 0"
/1 MK121
21-100-CP-003
21-100-CP-002
21-100-CP-015
21-100-CP-014
SOLENOID PUMPS, TYP
ROOF
33' - 3 1/2"
B' D'C' D
/1 MK141
ELECTRONIC CHAIN HOIST WITH MONORAIL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MK202
MECHANICAL ELEVATIONS
DJU KRL
PARTIALLY SPRINKLERED
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/8" = 1'-0"1 SURGE TANK AREA ELEVATION
SCALE: 3/8" = 1'-0"2 SURGE TANK AREA ELEVATION
SCALE: 3/8" = 1'-0"3 STEAM HEADER ELEVATION
SCALE: 3/8" = 1'-0"4 DEAERATOR ELEVATION
SCALE: 3/8" = 1'-0"5 CHEMICAL FEED PUMPS ELEVATION
SCALE: 3/8" = 1'-0"6 ELECTRIC CHAIN HOIST ELEVATION
KEYED NOTES
1 WELD W10x30 TO BEAM BELOW METAL GRATING. SEE STRUCTURAL DRAWINGS FOR
LOCATION OF BEAM.TYPICAL (3) PLACES
Revisions: Date: SHEET 2132/22/2024
FUEL OIL QUALITY MAINTENANCE
SYSTEM MOUNTED ON WALL
FUEL OIL PUMP SKID
1 1/2"ø FOR 2"ø FOS1"ø FOR
1 1/2"ø FOS
1 1/2"ø FOS
2"ø FOR
METAL SUPPORT FRAME
USING 2-1/2"x2-1/2"x1/4"
ANGLE STEEL
/1 MK121
2-119-FQM-001
TO HEAT EXCHANGER AND
ELECTRIC CIRCULATION HEATER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MK203
MECHANICAL ELEVATIONS
DJU KRL
PARTIALLY SPRINKLERED
KEYPLAN
N AREA OF WORK
12 16
2. PIPING CONNECTIONS FOR DETAIL 1 TO BE FIELD ROUTED BASED ON FINAL FUEL OIL
PUMP SKID CONFIGURATION. SEE D-612 FOR FUEL OIL PUMP SKID P&ID.
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 3/4" = 1'-0"1 MECHANICAL ELEVATION - FUEL OIL PUMP SKID
Revisions: Date: SHEET 2142/22/2024
B'
C'
/1 MK121
1'
- 6
1'
- 6
2-119-BLR-001 BOILER CLEARANCE3'
- 1
1/ 4"
G'
2.8' 1 2
M
GENERATOR ROOM
101C-2
MATCHLINE
SEE MK121
1" ø
DR
1" ø
DS
MODIFY OR REPLACE HEADER
TO ADD BRANCH FOR NEW
GENERATOR
DIESEL PIPING FROM
GENERATOR ROOM
3'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MK401
MECHANICAL ENLARGED PLAN -
GROUND FLOOR LEVEL
DJU LAJ
FULLY SPRINKLERED
SCALE: 1/2" = 1'-0"1 MECHANICAL ENLARGED EQUIPMENT PLAN - GROUND FLOOR LEVEL BOILER ROOM
KEYPLAN
N AREA OF WORK
12 16
N
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
GENERAL NOTES
SCALE: 1/4" = 1'-0"2 MECHANICAL DIESEL PIPING ENLARGED PLAN - GENERATOR ROOM
Revisions: Date: SHEET 2152/22/2024
5'- 0"
, T
YP
AP
PR
OX
'-0
MA
XM
IU
M
SP
AC
IN
G
BE
TW
EE
N
GU
ID
ES
P
ER
M
FG
IN
ST
AL
LA
TI
ON
IN
ST
RU
CT
IO
NS
MA
XM
IU
M
SP
AC
IN
G
BE
TW
EE
N
GU
ID
ES
P
ER
M
FG
. IN
ST
AL
LA
TI
ON
IN
ST
RU
CT
IO
NS
MA
XI
MU
M
FR
EE
ST
AN
DI
NG
FL
UE
H
EI
GH
T
PE
R
MF
G.
IN
ST
AL
LA
TI
ON
IN
ST
RU
CT
IO
NS
DOUBLE CONE RAIN CAP
TERMINATION DESIGNED BY
MANUFACTURER OF THE
STACK SYSTEM
GUY WIRE BAND
GUY WIRE BAND
ROOF
ROOF OPENING AND ANCHOR
PLATE SUPPORT FRAMING
DOUBLE WALL FLUE SYSTEM
ROOF CURB
STORM COLLAR
(2) 2" TEST PORTS
ANCHOR PLATE
/2 MK201
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MK501
MECHANICAL EQUIPMENT
DETAILS 2
BEH KRL
PARTIALLY SPRINKLERED
NTS1 BOILER STACK SUPPORT DETAIL
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
Revisions: Date: SHEET 2162/22/2024
VORTEX FLOW METER SCHEDULE
UNIT FLUID MEDIUM
SATURATED STEAM FEEDWATER
PIPE SIZE
(NPS)
METER SIZE
(NPS)
MAXIMUM PRESSURE
DROP AT FULL FLOW
(PSI)
MAXIMUM FLOW RATE
(LB/HR)
MINIMUM FLOW RATE
(LB/HR)
INLET PRESSURE
(PSIG)
MAXIMUM FLOW RATE
(GPM)
MINIMUM FLOW RATE
(GPM)
MAXIMUM INLET
PRESSURE (PSIG)
FLUID TEMPERATURE
(°F)
2-100-FLO-001 STEAM 13,197 750 100 - - - - 6 4 6
2-100-FLO-002 STEAM 13,197 750 100 - - - - 6 4 6
2-100-FLO-003 STEAM 13,197 750 100 - - - - 6 4 6
2-100-FLO-004 STEAM 14,895 1000 100 - - - - 6 4 3
2-100-FLO-005 STEAM 8,000 750 100 - - - - 3 3 2
2-100-FLO-006 STEAM TBD TBD 100 - - - - 3 - -
2-100-FLO-007 FEEDWATER - - - 28 2.8 160 227 2 1/2 1 -
2-100-FLO-008 FEEDWATER - - - 28 2.8 160 227 2 1/2 1 -
2-100-FLO-009 FEEDWATER - - - 28 2.8 160 227 2 1/2 1 -
2-100-FLO-010 FEEDWATER - - - 28 2.8 160 227 2 1/2 1 -
2-100-FLO-011 FEEDWATER - - - 28 2.8 160 227 2 1/2 1 -
2-100-FLO-012 FEEDWATER - - - 28 2.8 160 227 2 1/2 1 -
BOILER UNIT SCHEDULE
UNIT LOCATION
RATINGS FUEL
POWER (HP)
ELECTRICAL ESTIMATED OPERATING
WEIGHT (LBS) BASIS OF DESIGN
CAPACITY (MBTU/HR) EFF (%) NOX LEVEL (PPM) LIGHT OIL (GPH) NATURAL GAS (SCFH) V PH HZ 2-119-BLR-001 BOILER ROOM 13,390 84.4 30 116.6 16,329 400 480 3 60 48,360 CLEAVER-BROOKS CBLE-4W-200-400-200ST
2-119-BLR-002 BOILER ROOM 13,390 84.4 30 116.6 16,329 400 480 3 60 48,360 CLEAVER-BROOKS CBLE-4W-200-400-200ST
2-119-BLR-003 BOILER ROOM 13,390 84.4 30 116.6 16,329 400 480 3 60 48,360 CLEAVER-BROOKS CBLE-4W-200-400-200ST
CHEMICAL FEED PUMP SCHEDULE
UNIT LOCATION OUTLET SIZE OUTPUT RANGE
(GPH) PRESSURE (PSI)
ELECTRICAL
BASIS OF DESIGN
V/P/HZ
2-128-CF-201A; AMINE PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71
2-128-CF-201B; AMINE PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71
2-128-CF-201C; AMINE PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71
2-128-CF-202A; SCALE INHIBITOR PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71
2-128-CF-202B; SCALE INHIBITOR PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71
2-128-CF-202C; SCALE INHIBITOR PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71
2-128-CF-203A; SULFITE OXYGEN SCAVENGER PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71
2-128-CF-203B; SULFITE OXYGEN SCAVENGER PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71
2-128-CF-204; SODIUM HYDROXIDE PUMP 128-2 1/4 NPT .002-.25 450 120/1/60 LMI PD71
DEAERATOR SCHEDULE
UNIT LOCATION TYPE TANK CAPACITY
(GAL)
OPERATING PRESSURE
(PSIG) BASIS OF DESIGN
2-200-TK-001 200 VERTICAL TRAY 900 5 CLEAVER-BROOKS TRAYMASTER TMV-030 / 900
STEAM TRAP SCHEDULE
UNIT LOCATION TYPE CONN. SIZE (IN) OPERATING
PRESSURE (PSIG)
RETURN LINE
(PSIG)
DIFFERENTIAL
PRESSURE (PSIG) BASIS OF DESIGN
TRP-1 STEAM HEADER IB 1" 100 5 95 ARMSTRONG IB 983
TRP-2 STEAM HEADER IB 1" 100 5 95 ARMSTRONG IB 983
TRP-3 BUILDING HEATING PRV IB 3/4" 100 5 95 ARMSTRONG IB 981
TRP-4 BUILDING HEATING PRV F&T 3/4" 68 5 63 ARMSTRONG F&T 75-A12
TRP-5 DEAERATOR PRV IB 3/4" 100 5 95 ARMSTRONG IB 981
TRP-6 DEAERATOR PRV F&T 3/4" 10 5 5 ARMSTRONG F&T CS2
PUMP SCHEDULE
UNIT SERVICE TYPE ORIENTATION MOUNTING FLOW RATE
(GPM)
HEAD
(FT WG)
ELECTRICAL
V/P/HZ MAX RPM VFD SPEED CONTROL
2-119-PMP-001 CONDENSATE TRANSFER CENTRIFUGAL SINGLE-STAGE HORIZONTAL SHAFT BASE 84 74 480/3/60 1750 YES CONSTANT 2-119-PMP-002 CONDENSATE TRANSFER CENTRIFUGAL SINGLE-STAGE HORIZONTAL SHAFT BASE 84 74 480/3/60 1750 YES CONSTANT 2-119-PMP-003 FEEDWATER CENTRIFUGAL MULTI-STAGE VERTICAL SHAFT BASE 42 367 480/3/60 3550 YES MODULATING
2-119-PMP-004 FEEDWATER CENTRIFUGAL MULTI-STAGE VERTICAL SHAFT BASE 42 367 480/3/60 3550 YES MODULATING
2-119-PMP-005 FEEDWATER CENTRIFUGAL MULTI-STAGE VERTICAL SHAFT BASE 42 367 480/3/60 3550 YES MODULATING 2-119-PMP-006 RO MAKEUP CENTRIFUGAL SINGLE-STAGE HORIZONTAL SHAFT BASE 10 115 480/3/60 1750 NO CONSTANT 2-119-PMP-008 FUEL OIL SUPPLY ROTARY THREE SCREW HORIZONTAL SHAFT BASE 2 208 480/3/60 1750 YES MODULATING 2-119-PMP-009 FUEL OIL SUPPLY ROTARY THREE SCREW HORIZONTAL SHAFT BASE 2 208 480/3/60 1750 YES MODULATING 2-119-PMP-010 FUEL OIL RECIRCULATION ROTARY GEAR HORIZONTAL SHAFT BASE 5 115 480/3/60 1750 NO CONSTANT
REVERSE OSMOSIS UNIT SCHEDULE
UNIT LOCATION DESIGN
TEMPERATURE (F)
MAXIMUM
RECOVERY
MINIMUM INLET
PRESSURE (PSIG) BASIS OF DESIGN
2-119-RO-001 BOILER ROOM 77 75% 30 GE E4 SERIES
PRESSURE REDUCING VALVE SCHEDULE
SERVICE UNIT INLET PRESSURE
(PSIG)
OUTLET PRESSURE
(PSIG) TEMP (F) FLOW
(PPH)
PIPE SIZING
TYPE SIZE
(IN)
CONTROL
METHOD
CONTROL PIPE
SIZE (IN) BASIS OF DESIGN
INLET (IN) OUTLET (IN) SCH.
BUILDING HEATING V-45016 100 15 338 2973 2 2 40 THREADED 2 PILOT 0.25 ARMSTRONG GP
DA1 V-45029 100 5 338 353 1 2.5 40 THREADED 0.75 PILOT 0.25 ARMSTRONG GP
DA2 V-45035 100 5 338 575 1.25 4 40 THREADED 0.75 PILOT 0.25 ARMSTRONG GP
WATER SOFTENER SCHEDULE
UNIT LOCATION NORMAL FLOWRATE
(GPM)
MAX FLOWRATE
(GPM)
BACKWASH
FLOW (GPM)
BACKWASH
VOLUME (GAL) V/P/HZ BASIS OF DESIGN
2-119-TK-004 BOILER ROOM 22 @ 15 PSIG 26 @ 25 PSIG 9 35 120/1/60 STMPRP COMMERCIAL WATER SOFTENER
EXPANSION TANK SCHEDULE
UNIT SERVICE REQUIRED (GAL) TANK VOLUME
ACTUAL (GAL)
REQUIRED
ACCEPTANCE (GAL)
ACTUAL ACCEPTANCE
(GAL) FILL PRESSURE (PSI) TYPE BASIS OF DESIGN
2-200 -XPT-001 FEEDWATER LOOP - NEW BOILER PLANT 0.5 2 0.07 1 12 DIAPHRAGM, VERTICAL BELL&GOSSETT HFT-15
EXISITING FUEL OIL HEATER SCHEDULE
UNIT LOCATION
SERVICE
AND/OR
SYSTEM
OIL TYPE #
OIL TEMP OIL
FLOW POWER WATT
DENSITY ELECTRICAL
NOTESENT LVG
°F °F GPM kW W/in2 V/P/HZ
2-200-HTR-001 BOILER PLANT FUEL OIL #2 FUEL OIL 45 95 5.0 16 20 208/3/60 1,2
NOTES:
1. NEMA 7 EXPLOSION ENCLOSURE
2. PROVIDE TEMPERATURE CONTROL SYSTEM AND INTERLOCK WITH FUEL OIL PUMPS
ELECTRIC CHAIN HOIST
UNIT CAPACITY
(TONS) LIFT (FT)
HOIST DATA TROLLEY DATA
BASIS OF DESIGN
HP VOLTAGE PHASE FREQUENCY
(HZ) HP VOLTAGE PHASE FREQUENCY
(HZ)
2-200-ECH-001 1/2 30 1 220 1.00 60.00 0.54 220.00 60.00 60.00 HARRINGTON SEQM SERIES
FUEL OIL TANK SCHEDULE
UNIT LOCATION CONTENTS TOTAL CAPACITY
(GAL)
WORKING CAPACITY
(GAL)
DIAMETER
(FT) ORIENTATION CONSTRUCTION MATERIAL
2-100-TK-019 SITE ABOVEGROUND NO 2 FUEL OIL 40,000 36,000 12 HORIZONTAL, ON SADDLES UL 142 DOUBLE WALL
STI F941 FIREGUARD
CARBON STEEL INNER/
CARBON STEEL OUTER
NOTES: MICHIGAN EGLE REGULATIONS USE NFPA-30 2012 EDITION, WHICH LIMITS THE SIZE OF A DOUBLE WALL ABOVEGROUND STORAGE TANK TO 20,000 GALLONS. THE CURRENT EDITION (2024) OF NFPA-30 HAS A LIMIT
OF 50,000 GALLONS. VA TO OBTAIN A VARIANCE FROM EGLE. FOR THIS TANK.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e e igh th inc h = on e f oo t thr ee in ch es on e f oo t 6"
6" on e a nd on e h alf in ch es on e f oo t on e i nc h = on e f oo t
6"
6" thr ee qu ar ter s i nc h = on e f oo t on e h alf in ch on e f oo t thr ee ei gh ths in ch on e f oo t on e q ua rte r in ch on e f oo t
REV 0 - 100% BID SET 2024-02-23
100% BID SET REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
585-21-115
2024-02-23
MK601
MECHANICAL EQUIPMENT
SCHEDULES 2
DJU KRL
PARTIALLY SPRINKLERED
1. SEE M-001 FOR M-SERIES NOTES AND LEGENDS.
Revisions: Date: SHEET 2172/22/2024