S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf
PDF 7 MB Posted
- Solicitation number
- 36C25225R0004
About this file
This is a construction drawing set for a boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan (Project #585-21-115). The drawings detail a phased construction approach to replace the existing boiler plant while maintaining continuous steam generation operations throughout the project.
The drawing set includes site surveys, general phasing plans, and extensive mechanical, electrical, plumbing, and process diagrams. The five-phase construction sequence involves: (1) Initial mobilization and establishment of construction areas, (2) Site utility pre-work including storm sewer modifications and temporary blowdown separator installation, (3) Parking lot updates and perimeter fence installation, (4) New boiler plant equipment installation and commissioning with 30-day continuous operation requirement, and (5) Demolition of existing boilers 1, 2, and 3. The project includes installation of new boilers, support equipment, a secondary fuel tank, and associated site improvements. The drawings indicate extensive coordination requirements with VA personnel to maintain facility operations throughout construction, particularly regarding steam system transitions and road crossing work.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
TITLE SHEET FINAL BID SET
PARTIALLY SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
GI001
585-21-115
ELK CJR
REV 0 - 100% BID SET 2024-02-23
NORTH ARROW
DETAIL NUMBER
DETAIL IDENTIFIER
DETAIL TITLE NUMBER /
SHEET REF NUMBER
SECTION IDENTIFIER
SHEET REF NUMBER
DETAIL
IDENTIFIER
SHEET REF
NUMBER
DETAIL SECTION IDENTIFIER
VIEWING
DIRECTION
VIEW TITLE
BUILDING/WALL SECTION CUT
EXTERIOR ELEVATION
DETAIL SECTION CUT
DETAIL CALLOUT
DRAWING SYMBOLS
N
INTERIOR ELEVATION
DD###
DD###
X
DD###
X
SCALE: 1'-0" = 1'-0"
DETAIL TITLEX
1 / DD###
DD###
X
DD###
X
TRUE NORTH
PLAN NORTH
VIEWING
DIRECTION
SHEET REF NUMBER
SHEET REF NUMBER
EAST H STREET
CE
DA
R
AV
EN
UE
JA
CK
SO
N
ST
RE
ET
PROJECT LOCATION
STEPHENSON AVENUE
BLDG 1
BLDG 2
REV 2 - PRE-BID UPDATES 2024-08-01
REV 1 - FINAL BID SET 2024-04-05
8/1/2024 SHEET 1
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text REPLACE BOILER PLANT 325 EAST "H" STREET IRON MOUNTAIN, MI 49801, MI 49801MI 49801 4980149801
AutoCAD SHX Text N
AutoCAD SHX Text
OSCAR G. JOHNSON VAMC
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
DRAWING INDEX FINAL BID SET
PARTIALLY
SPRINKLERED
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
GI002
585-21-115
CJR ELK
REV 0 - 100% BID SET 2024-02-23
DRAWING INDEX
DRAWING
NUMBER
DRAWING TITLE
GENERAL
GI001 TITLE SHEET
GI002 DRAWING INDEX
GC101 GENERAL PHASING PLAN - PHASE 1
GC102 GENERAL PHASING PLAN - PHASE 2
GC103 GENERAL PHASING PLAN - PHASE 3
GC104 GENERAL PHASING PLAN - PHASE 4
GC105 GENERAL PHASING PLAN - PHASE 5
SURVEY
VF101 SITE SURVEY
VF102 SITE SURVEY
VF103 SITE SURVEY
VF104 SITE SURVEY
VF105 SITE SURVEY
CIVIL
C-001 CIVIL NOTES AND LEGENDS
CD171 CIVIL DEMOLITION SITE PLAN
CS171 CIVIL SITE PLAN
CS501 CIVIL SITE TYPICAL DETAILS
CG171 CIVIL GRADING PLAN
CG501 CIVIL GRADING & DRAINAGE DETAILS
CP171 CIVIL PAVEMENT AND SIGNAGE PLAN
CP501 CIVIL PAVEMENT AND SIGNAGE DETAILS
CU171 CIVIL UTILITIES PLAN
CU172 CIVIL UTILITY PROFILES
CU501 CIVIL UTILITY FUEL TRENCH DETAILS
CU502 CIVIL UTILITY SEWER DETAILS
CU503 CIVIL UTILITY SEWER DETAILS
CU504 CIVIL UTILITY WATER DETAILS
STRUCTURAL
S-001 STRUCTURAL NOTES AND LEGENDS
SD101 STRUCTURAL DEMOLITION PLAN - BASEMENT LEVEL
SD121 STRUCTURAL DEMOLITION PLAN - GROUND FLOOR LEVEL
SD141 STRUCTURAL DEMOLITION PLAN - MEZZANINE LEVEL
SD201 STRUCTURAL DEMOLITION FOUNDATION ELEVATIONS
SB101 STRUCTURAL FOUNDATION PLAN - BASEMENT LEVEL
SB121 STRUCTURAL FOUNDATION PLAN - GROUND FLOOR LEVEL
SB171 STRUCTURAL FOUNDATION PLAN - FUEL OIL TANK SITE
SB172 STRUCTURAL FOUNDATION PLAN - FUEL OIL TANK
SB201 STRUCTURAL FOUNDATION SECTIONS
SB301 STRUCTURAL FOUNDATION SECTIONS
SB302 STRUCTURAL FOUNDATION SECTIONS
SB303 STRUCTURAL FOUNDATION SECTIONS
SB304 STRUCTURAL FOUNDATION SECTIONS
SB305 STRUCTURAL FOUNDATION SECTIONS
SB401 STRUCTURAL FOUNDATION ENLARGED PLAN
SB501 STRUCTURAL FOUNDATION DETAILS
SB502 STRUCTURAL FOUNDATION DETAILS
SB503 STRUCTURAL FOUNDATION DETAILS
SB601 STRUCTURAL FOUNDATION SCHEDULE
SF101 STRUCTURAL FRAMING PLAN - BASEMENT LEVEL
SF121 STRUCTURAL FRAMING PLAN - GROUND FLOOR LEVEL
SF141 STRUCTURAL FRAMING PLAN - MEZZANINE LEVEL
SF151 STRUCTURAL FRAMING PLAN - LOWER ROOF LEVEL
SF161 STRUCTURAL FRAMING PLAN - UPPER ROOF LEVEL
SF201 STRUCTURAL FRAMING EXTERIOR ELEVATIONS
SF202 STRUCTURAL FRAMING EXTERIOR ELEVATIONS
SF203 STRUCTURAL FRAMING INTERIOR ELEVATIONS
SF204 STRUCTURAL FRAMING INTERIOR ELEVATIONS
SF301 STRUCTURAL FRAMING SECTIONS
SF302 STRUCTURAL FRAMING SECTIONS
SF303 STRUCTURAL FRAMING SECTIONS
SF401 STRUCTURAL FRAMING ENLARGED PLANS
SF402 STRUCTURAL FRAMING ENLARGED PLANS
SF501 STRUCTURAL FRAMING DETAILS
SF502 STRUCTURAL FRAMING DETAILS
SF503 STRUCTURAL FRAMING DETAILS
SF504 STRUCTURAL FRAMING DETAILS
SF505 STRUCTURAL FRAMING DETAILS
SF506 STRUCTURAL FRAMING DETAILS
SF507 STRUCTURAL FRAMING DETAILS
SF508 STRUCTURAL FRAMING DETAILS
SF601 STRUCTURAL FRAMING SCHEDULES
ARCHITECTURAL
A-001 ARCHITECTURAL NOTES AND LEGENDS
A-002 ARCHITECTURAL LIFE SAFTEY PLAN - GROUND FLOOR LEVEL
A-003 ARCHITECTURAL LIFE SAFETY PLAN - MEZZANINE LEVEL
AD101 ARCHITECTURAL DEMOLITION PLAN - BASEMENT LEVEL
AD121 ARCHITECTURAL DEMOLITION PL AN - GROUND FLOOR LEVEL
AD141 ARCHITECTURAL DEMOLITION PLAN - MEZZANINE LEVEL
AD161 ARCHITECTURAL DEMOLITION PLAN - ROOF LEVEL
AE101 ARCHITECTURAL PLAN - BASEMENT LEVEL
AE121 ARCHITECTURAL PLAN - GROUND FLOOR LEVEL
AE131 ARCHITECTURAL RCP - GROUND FLOOR LEVEL
AE141 ARCHITECTURAL PLAN - MEZZANINE LEVEL
AE142 ARCHITECTURAL RCP - MEZZANINE LEVEL
AE161 ARCHITECTURAL PLAN - ROOF LEVEL
AE201 ARCHITECTURAL EXTERIOR ELEVATIONS
AE202 ARCHITECTURAL EXTERIOR ELEVATIONS
AE203 ARCHITECTURAL INTERIOR ELEVATIONS
AE204 ARCHITECTURAL INTERIOR ELEVATIONS CONTINUED
AE301 ARCHITECTURAL BUILDING SECTIONS
AE302 ARCHITECTURAL BUILDING SECTIONS
AE303 ARCHITECTURAL WALL SECTIONS
AE304 ARCHITECTURAL WALL SECTIONS
AE421 ARCHITECTURAL ENLARGED PLAN - GROUND FLOOR LEVEL
AE422 ARCHITECTURAL ENLARGED PLAN - GROUND FLOOR LEVEL
AE423 ARCHITECTURAL ENLARGED PLAN - GROUND FLOOR LEVEL
AE501 ARCHITECTURAL WALL DETAILS
AE502 ARCHITECTURAL BUILDING DETAILS
AE503 ARCHITECTURAL ROOF DETAILS
AE504 ARCHITECTURAL ROOF DETAILS
AE505 ARCHITECTURAL BUILDING DETAILS
AE601 ARCHITECTURAL DOOR SCHEDULE AND DETAILS
AE602 ARCHITECTURAL DOOR DETAILS
AE603 ARCHITECTURAL WINDOW SCHEDULE AND DETAILS
AE604 ARCHTECTURAL FINISH SCHEDULES
AE801 ARCHITECTURAL BOILER PLANT SIGNAGE
AG101 ARCHITECTURAL SIGNAGE PLAN - BASEMENT LEVEL
AG121 ARCHITECTURAL SIGNAGE PLAN - GROUND FLOOR LEVEL
AG141 ARCHITECTURAL SIGNAGE PLAN - MEZZANINE LEVEL
AK121 ARCHITECTURAL EQUIPMENT PLAN - GROUND FLOOR LEVEL
AK141 ARCHITECTURAL EQUIPMENT PLAN - MEZZANINE LEVEL
AK161 ARCHITECTURAL EQUIPMENT PLAN - ROOF LEVEL
FIRE PROTECTION
F-001 FIRE PROTECTION NOTES AND LEGENDS
FA101 FIRE ALARM PLAN - BASEMENT LEVEL
FA121 FIRE ALARM PLAN - GROUND FLOOR LEVEL
FA141 FIRE ALARM PLAN - MEZZANINE LEVEL
FA601 FIRE ALARM RISER DIAGRAM
FX101 FIRE SUPPRESION PLAN - BASEMENT LEVEL
FX121 FIRE SUPPRESION PLAN - GROUND FLOOR LEVEL
FX141 FIRE SUPPRESSION PLAN - MEZZANINE LEVEL
FX201 FIRE SUPPRESSION ELEVATION
FX501 FIRE SUPPRESSION TYPICAL DETAILS
PLUMBING
P-001 PLUMBING NOTES AND LEGENDS
PD101 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL
PD121 PLUMBING DEMOLITION PLAN - GROUND FLOOR LEVEL
PD141 PLUMBING DEMOLITION PLAN - MEZZANINE LEVEL
PP101 PLUMBING PLAN - BASEMENT LEVEL
PP121 PLUMBING PLAN - GROUND FLOOR LEVEL
PP122 SANITARY PLAN - GROUND FLOOR LEVEL
PP123 COMPRESSED AIR PIPING - GROUND FLOOR LEVEL
PP124 COMPREESSED AIR PIPING- GROUND LEVEL
PP141 SANITARY PLAN - MEZZANINE LEVEL
PP142 COMPRESSED AIR PIPING - MEZZANINE LEVEL
PP161 SANITARY PLAN - ROOF LEVEL
PP201 PLUMBING ELEVATIONS
PP401 PLUMBING ENLARGED PLANS
PP501 PLUMBING DETAILS
PP601 PLUMBING DOMESTIC WATER RISER DIAGRAM
PP602 PLUMBING SANITARY RISER DIAGRAM
PP901 PLUMBING PIPING ISOMETRIC
PP902 PLUMBING SANITARY PIPING ISOMETRIC
PROCESS
D-001 PROCESS NOTES AND LEGENDS
D-601 PROCESS - PFD
D-611 PROCESS - P&ID - FUEL OIL
D-612 PROCESS - P&ID - FUEL OIL - BALANCE OF PLANT
D-613 PROCESS - P&ID - FUEL OIL - BOILER #1
D-614 PROCESS - P&ID - FUEL OIL - BOILER #2
D-615 PROCESS - P&ID - FUEL OIL - BOILER #3
D-616 PROCESS - P&ID FUEL OIL - HEATING & FILTRATION
D-621 PROCESS - P&ID - NATURAL GAS - BALANCE OF PLANT
D-622 PROCESS - P&ID - NATURAL GAS - BOILER #1
D-623 PROCESS - P&ID - NATURAL GAS - BOILER #2
D-624 PROCESS - P&ID - NATURAL GAS - BOILER #3
D-631 PROCESS - P&ID - FEEDWATER - BALANCE OF PLANT
D-632 PROCESS - P&ID - FEEDWATER - BALANCE OF PLANT
D-633 PROCESS - P&ID - FEEDWATER - BALANCE OF PLANT
D-634 PROCESS - P&ID - FEEDWATER - BALANCE OF PLANT
D-635 PROCESS - P&ID - FEEDWATER - BALANCE OF PLANT
D-636 PROCESS - P&ID - FEEDWATER - CHEM PUMPS
D-637 PROCESS - P&ID - FEEDWATER - BOILER #1
D-638 PROCESS - P&ID - FEEDWATER - BOILER #2
D-639 PROCESS - P&ID - FEEDWATER - BOILER #3
D-641 PROCESS - P&ID - STEAM - BOILER #1
D-642 PROCESS - P&ID - STEAM - BOILER #2
D-643 PROCESS - P&ID - STEAM - BOILER #3
D-644 PROCESS - P&ID - STEAM - BALANCE OF PLANT
D-645 PROCESS - P&ID - STEAM - BALANCE OF PLANT
D-651 PROCESS - P&ID - COMBUSTION AIR - BOILER #1
D-652 PROCESS - P&ID - COMBUSTION AIR - BOILER #2
D-653 PROCESS - P&ID - COMBUSTION AIR - BOILER #3
DI601 SEQUENCE OF OPERATION
DI602 POINT LISTS
DI603 FUEL OIL POINT LIST
DI604 NATURAL & LOW PRESSURE GAS POINT LIST
DI605 DEAERATOR FEEDWATER POINT LIST
DI606 BOILERS FEEDWATER POINT LIST
DI607 SUPPLY & COMBUSTION AIR POINT LIST
MECHANICAL
M-001 MECHANICAL NOTES AND LEGENDS
MD101 MECHANICAL DEMOLITION PLAN - BASEMENT LEVEL
MD121 MECHANICAL DEMOLITION PLAN - GROUND FLOOR LEVEL
MD141 MECHANICAL DEMOLITION PLAN - MEZZANINE LEVEL
MD161 MECHANICAL DEMOLITION PLAN - ROOF LEVEL
MD201 MECHANICAL DEMOLITION ELEVATION - TUNNEL
MH121 MECHANICAL HVAC PLAN- GROUND FLOOR LEVEL
MH131 MECHANICAL HVAC RCP PLAN - GROUND FLOOR LEVEL
MH141 MECHANICAL HVAC PLAN - MEZZANINE LEVEL
MH161 MECHANICAL HVAC PLAN - ROOF LEVEL
MH201 MECHANICAL HVAC ELEVATIONS
MH401 MECHANIAL ENLARGED PLANS
MH501 MECHANICAL HVAC DETAILS
MH502 MECHANICAL HVAC DETAILS
MH601 MECHANICAL HVAC SCHEDULES
MI601 MECHANICAL HVAC CONTROLS DIAGRAMS
MI602 MECHANICAL HVAC CONTROLS DIAGRAMS
MI603 MECHANICAL HVAC CONTROLS DIAGRAMS
MI604 MECHANICAL HVAC CONTROLS DIAGRAMS
MP101 MECHANICAL STEAM PIPING - BASEMENT LEVEL
MP102 MECHANICAL HYDRONIC PIPING - BASEMENT LEVEL
MP121 MECHANICAL STEAM PIPING - GROUND FLOOR LEVEL
MP122 MECHANICAL HYDRONIC PIPING - GROUND FLOOR LEVEL
MP123 MECHANICAL FUEL PIPING - GROUND FLOOR LEVEL
MP141 MECHANICAL STEAM PIPING - MEZZANINE LEVEL
MP142 MECHANICAL HYDRONIC PIPING - MEZZANINE LEVEL
MP143 MECHANICAL FUEL PIPING - MEZZANINE LEVEL
MP171 MECHANICAL FUEL PIPING - FUEL OIL TANK
MP201 MECHANICAL ELEVATIONS - FUEL TANK
MP202 MECHANICAL PIPING ELEVATIONS
MP203 MECHANICAL PIPING ELEVATIONS
MP501 MECHANICAL PIPING DETAILS
MP502 MECHANICAL PIPING DETAILS
MP503 MECHANICAL PIPING DETAILS
MP504 MECHANICAL PIPING DETAILS
MK121 MECHANICAL EQUIPMENT PLAN - GROUND FLOOR LEVEL
MK141 MECHANICAL EQUIPMENT PLAN - MEZZANINE LEVEL
MK201 MECHANICAL ELEVATIONS
MK202 MECHANICAL ELEVATIONS
MK203 MECHANICAL ELEVATIONS
MK401 MECHANICAL ENLARGED PLAN - GROUND FLOOR LEVEL
MK501 MECHANICAL EQUIPMENT DETAILS
MK601 MECHANICAL EQUIPMENT SCHEDULES
MK602 MECHANICAL EQUIPMENT SCHEDULES
ELECTRICAL
E-001 ELECTRICAL NOTES AND LEGENDS
ED101 ELECTRICAL DEMOLITION PLAN - BASEMENT LEVEL
ED121 ELECTRICAL DEMOLITION PLAN - GROUND FLOOR LEVEL
ED141 ELECTRICAL DEMOLITION PLAN - MEZZANINE LEVEL
ED161 ELECTRICAL DEMOLITION PLAN - ROOF LEVEL
ED171 ELECTRICAL DEMOLITION SITE PLAN
ED601 ELECTRICAL DEMOLITION POWER ONE-LINE DIAGRAM
ES171 ELECTRICAL SITE PLAN
ES501 ELECTRICAL SITE DETAILS
EI001 ELECTRICAL INSTRUMENTATION - NOTES AND LEGENDS
EI121 ELECTRICAL INSTRUMENTATION PLAN - GROUND FLOOR LEVEL
EI141 ELECTRICAL INSTRUMENTATION PLAN - MEZZANINE LEVEL
EI501 ELECTRICAL INSTRUMENTATION DETAILS
EI502 ELECTRICAL INSTRUMENTATION DETAILS
EI601 ELECTRICAL INSTRUMENTATION - CONTROLS NETWORK ARCH
EL111 ELECTRICAL LIGHTING PLAN - BASEMENT LEVEL
EL131 ELECTRICAL LIGHTING PLAN - GROUND FLOOR LEVEL
EL151 ELECTRICAL LIGHTING PLAN - MEZZAININE LEVEL
EL401 ELECTRICAL LIGHTING ENLARGED PLAN - GROUND FLOOR LEVEL
EL601 ELECTRICAL LIGHTING FIXTURE SCHEUDULE
EG121 ELECTRICAL GROUNDING PLAN
EG161 ELECTRICAL LIGHTNING PROTECTION PLAN
EG501 ELECTRCIAL GROUNDING DETAILS
EP101 ELECTRICAL POWER PLAN - BASEMENT LEVEL
EP121 ELECTRICAL POWER PLAN - GROUND FLOOR LEVEL
EP122 ELECTRICAL CONDUIT ROUTING PLAN - GROUND FLOOR LEVEL
EP141 ELECTRICAL POWER PLAN - MEZZANINE LEVEL
EP161 ELECTRICAL POWER PLAN - ROOF LEVEL
EP201 ELECTRICAL POWER ELEVATIONS - GROUND FLOOR LEVEL
EP202 ELECTRICAL POWER ELEVATIONS - GROUND FLOOR LEVEL
EP401 ELECTRICAL POWER ENLARGED PLAN - GROUND FLOOR LEVEL
EP601 ELECTRICAL POWER ONE-LINE DIAGRAM
EP602 ELECTRICAL POWER PANEL SCHEDULES
EP603 ELECTRICAL POWER PANEL SCHEDULES
EP604 ELECTRICAL POWER CABLE AND CONDUIT SCHEDULES
ET001 ELECTRICAL TELECOMMUNICATIONS - NOTES AND LEGENDS
ET101 ELECTRICAL TELECOMMUNICATIONS PLAN - BASEMENT LEVEL
ET121 ELECTRICAL TELECOMMUNICATIONS PLAN - GROUND FLOOR LEVEL
ET141 ELECTRICAL TELECOMMUNICATIONS PLAN - MEZZANINE LEVEL
ET501 ELECTRICAL TELECOMMUNICATIONS - DETAILS
ET502 ELECTRICAL TELECOMMUNICATIONS - DETAILS
ET503 ELECTRICAL TELECOMMUNICATIONS - DETAILS
ET601 ELECTRICAL TELECOMMUNICATIONS - NETWORK ARCH
ET602 ELECTRICAL TELECOMMUNICATIONS - SECURITY NETWORK ARCH
ET603 ELECTRICAL TELECOMMUNICATIONS - SECURITY CAMERA SCHEDULE
REV 2 - PRE-BID UPDATES 2024-08-01
REV 1 - FINAL BID SET 2024-04-05
8/1/2024 SHEET 2
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
EEEEEE
E
E E E EE E
E
E E
E E
E E
E
GATE
E
E
E E
E
E
E
E E
E E
E E
E E
E E E
E
E E
E
E
E
E
E
E E
E E E
E
E
E E
E E E E
E E
E E
E E
E E
E
E
E
E
E
E
E E
E
E E
E
E
E
E E
E E
E
GATE
CONTROLS
FUEL STATION
RETAINING WALL
E E
E
E
E
E E
E
E E E
E
E
E E E
E E
E
E
WV
WV
GATE
N89° 19' 12"W 878.64'
BLDG 2
GARAGE
BLDG 12
BLDG 16
STORAGE
BLDG 19
SALT SHED
BLDG 10
INCINERATOR STORAGE
METER HOUSE
BLDG 2
BOILER PLANT
BLDG 2
BOILER PLANT
S
E
GC101
GC101
LINE POST
TEMPORARY FENCE BASE WITH SAND BAG WEIGHTS
BOTTOM OF FENCE 1" ABOVE GRADE
6'- 0"
M
IN
IM
UM
TERMINAL POST
GALVANIZED CHAIN LINK FENCING
WITH PRIVACY COVERAGE
GALVANIZED CHAIN LINK FENCING
WITH PRIVACY COVERAGE
ELK CJR
REV 0 - 100% BID SET 2024-02-23
SCALE: 1" = 20'-0"
GENERAL PHASING PLAN PHASE 1 - MOBILIZATION1
2/GC101
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING
AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF
PROJECT. COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL
APPROVAL.
2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES
DO NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR
CREATING CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST
TRADES.
3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY
ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE
COMMENCING WORK.
4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND
BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND
INTENT SHOWN THROUGHOUT THIS DRAWING SET.
6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL
PHASING INFORMATION.
PHASE 1 NOTES - MOBILIZATION
1 ESTABLISH CONTRACTOR LAY DOWN AREA. COORDINATE AREA WITH COR/VA.
2 CUT CURB AND ESTABLISH PAVED TURN-AROUND LANES IN PARKING LOT.
3 INSTALL 6' HIGH CHAIN LINK FENCING AROUND WORK AREAS. SECURE FENCE TO
RESIST A 50 LB HORIZONTAL FORCE ALONG TOP OR BOTTOM.
4 MAINTAIN MINIMUM 24' TRAVEL WIDTH NORTH OF CONSTRUCTION FENCE.
5 MAINTAIN ACCESS TO B2 BY BOILER PLANT AND TRANSPORTATION STAFF. BUILDING
WILL REMAIN OCCUPIED AND ACTIVE THROUGHOUT CONSTRUCTION.
6 PROVIDE MINIMUM 12' WIDE GATE FOR VEHICLE ACCESS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL PHASING PLAN - PHASE 1 100% BID SET
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
GC101
SITE
585-21-115
KEYPLAN
12 16
SCALE: 1/2" = 1'-0"
TEMPORARY CONSTRUCTION FENCE DETAIL2
AREA OF WORK
SHEET 32/22/2024
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text N
N
EEEEEE
E
E E E EE E
E
E E
EXHAUST FAN
E E E E E
E E E E E
E
GATE
E
E
E E
E
E
E
E E
E E
E E
E E
E E E
E
E E
E
E
E
E
E
E E
E E E
E
E
E E
E E E E
E E
E E
E E
E E
E
E
E
E
E
E
E E
E
E E
E
E
E
E E
E E
E
GATE
CONTROLS
FUEL STATION
RETAINING WALL
E E
E
E
E
E E
E
E E E
E
E
E E E
E
E
E
E
WV
WV
GATE
N89° 19' 12"W 878.64'
E E E
BLDG 2
GARAGE
BLDG 12
BLDG 16
STORAGE
BLDG 19
SALT SHED
BLDG 10
INCINERATOR STORAGE
METER HOUSE
BLDG 2
BOILER PLANT
BLDG 2
BOILER PLANT
S
E
FOFOFOFOFO
FO
FO
T
E E
E E E E E
E E
E
PE E
E E E E
E E
E E
E
E
FO
FO
FO FO
FO
FO
FO
E E E E E E
E E
E E
SA
BLDG 2
BOILER PLANT
DWSSA
FWFW
D
T T P
H
P
H
H
FW
ST
ST
ST
ST
D ST
ST
ST
ST
ST
ST
ST
SA SA SA
SA
SA
SA
SA
SS
UE
SA
SA
SFM
SF
M
SF
M
SF
M
SF
M
SFM SFM SFM
X X X X X X X X X
X X
X X
X X
X X
X
X X X
XX
X X
X
XXX
X X
X X
X X
X X
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X
X X X
X X X X
X X
X X
X X
X X
X X
XXXXXXXX
X X X X X X X X X
X X
X X
X X
X X
X
X X X
XX
X X
X
XXX
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X
X X X
X X X X
X X
X X
X X
X X
X X
XXXXXXXX
GC102
BLOWDOWN
FROM BOILERS
BLOWDOWN
SEPERATOR
COLD WATER
PIPE TRENCH
BOILER 1
ELK CJR
REV 0 - 100% BID SET 2024-02-23
SCALE: 1" = 20'-0"
GENERAL PHASING PLAN PHASE 2 - SITE & UTILITY PRE-WORK1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL PHASING PLAN - PHASE 2 100% BID SET
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
GC102
SITE
585-21-115
KEYPLAN
12 16
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING
AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF PROJECT.
COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL APPROVAL.
2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES DO
NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR CREATING
CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST TRADES.
3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY
ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE
COMMENCING WORK.
4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN
ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT
SHOWN THROUGHOUT THIS DRAWING SET.
6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL PHASING
INFORMATION.
PHASE 2 NOTES - SITE & UTILITY PRE-WORK
1 REMOVE STORM SEWERS IN WORK AREA. CONTRACTOR TO PROVIDE TEMPORARY
STORM WATER TRANSFER AROUND WORK SITE UNTIL NEW PERMANENT SEWERS CAN BE
INSTALLED/ACTIVATED.
2 REMOVE SITE EMERGENCY ELECTRICAL AND SITE LIGHTING, DISTRIBUTION IN WORK
AREA. CONTRACTOR TO PROVIDE TEMPORARY SERVICE FOR SITE EMERGENCY
ELECTRICAL AND SITE LIGHTING AND COORDINATE WITH THE COR.
3 COORDINATE ALL ROAD CROSSINGS WITH COR. CONTRACTOR TO PROVIDE TRAFFIC
PLAN AND OBTAIN COR APPROVAL BEFORE TRENCHING ACROSS ROADS.
4 INSTALL TEMPORARY BLOWDOWN SEPARATOR
5 REMOVE LEGACY FUEL TANK AND BLOWDOWN VAULT IN AREA OF NEW CONSTRUCTION.
6 INSTALL NEW GRAVITY STORM SEWERS.
7 INSTALL NEW ELECTRICAL DISTRIBUTION.
AREA OF WORK
SCALE: 1" = 2'-0"
TEMPORARY BLOWDOWN SEPARATOR2
NOTE:
LOCATE THE BLOWDOWN SEPARATOR BELOW THE ABANDONED VENT PIPE THAT
TERMINATES JUST BELOW THE ROOF. INSTALL A NEW VENT PIPE AND NEW ROOF
PENETRATION. REFER TO PLUMBING DRAWINGS FOR NEW TEMPORARY DRAIN PIPE.
SHEET 42/22/2024
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text N
STORAGE
SHEDS
FU
EL
S
TA
TI
ON
CONTROLS
FUEL STATION
MA
TE
RI
AL
S
TO
RA
GE
N89° 19' 12"W 878.64'
BLDG 2
GARAGE
BLDG 12
BLDG 16
STORAGE
BLDG 19
SALT SHED
BLDG 10
INCINERATOR STORAGE
METER HOUSE
BLDG 2
BOILER PLANT
BLDG 2
BOILER PLANT
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X
ELK CJR
SCALE: 1:20
GENERAL PHASE PLAN - PHASE 3 PARKING LOT UPDATES1
REV 0 - 100% BID SET 2024-02-23
KEYPLAN
12 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL PHASING PLAN - PHASE 3 100% BID SET
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
GC103
SITE
585-21-115
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING
AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF
PROJECT. COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL
APPROVAL.
2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES
DO NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR
CREATING CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST
TRADES.
3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY
ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE
COMMENCING WORK.
4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND
BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND
INTENT SHOWN THROUGHOUT THIS DRAWING SET.
6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL
PHASING INFORMATION.
PHASE 3 NOTES - PARKING LOT UPDATES
1. COMPLETE PARKING LOT UPDATES TO WEST OF CONSTRUCTION AREA.
2. INSTALL PERMANENT WESTERN PERIMETER FENCE AND GATE.
3. REMOVE CONSTRUCTION FENCE TO GATE AND TURN OVER AREA TO VA.
4. PREPARE WEST WALL OF EXISTING BOILER PLANT FOR NEW BUILDING
CONSTRUCTION. REMOVE PIPING, CONDUIT, FANS, ETC. AND PROVIDE WINDOW INFILL.
AREA OF WORK
SHEET 52/22/2024
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
PIV
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text N
D
T T P
H
P
H
H
D
SS
UE
FUEL TANK
48'-0" x 12'-0"
BLDG 2
LAW
N AREA
STORAGE
SHEDS
FU
EL
S
TA
TI
ON
CONTROLS
FUEL STATION
MA
TE
RI
AL
S
TO
RA
GE
N89° 19' 12"W 878.64'
BLDG 2
GARAGE
BLDG 12
BLDG 16
STORAGE
BLDG 19
SALT SHED
BLDG 10
INCINERATOR STORAGE
METER HOUSE
BLDG 2
BOILER PLANT
BLDG 2
BOILER PLANT
ELK CJR
REV 0 - 100% BID SET 2024-02-23
KEYPLAN
12 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL PHASING PLAN - PHASE 4 100% BID SET
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
GC104
SITE
585-21-115
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING
AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF
PROJECT. COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL
APPROVAL.
2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES
DO NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR
CREATING CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST
TRADES.
3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY
ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE
COMMENCING WORK.
4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND
BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND
INTENT SHOWN THROUGHOUT THIS DRAWING SET.
6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL
PHASING INFORMATION.
PHASE 4 NOTES - EQUIPMENT INSTALLATION
1. CONSTRUCT FOUNDATION AND SUPERSTRUCTURE FOR B2 ADDITION. CONTRACTOR
TO COORDINATE ALL ACTIVITIES TO ENSURE NO NEGATIVE IMPACT TO CONTINUED
OPERATION OF EXISTING STEAM GENERATION SYSTEM
2. INSTALL BOILERS AND SUPPORT EQUIPMENT
3. COMPLETE ROADWAY CONSTRUCTION UTILITIES AND SITE IMPROVEMENTS WITHIN
THE WORK AREA.
4. CONSTRUCT SECONDARY FUEL TANK
5. FIT OUT SUPPORT SPACES FOR OCCUPATION COMMISSION NEW BOILER PLANT
EQUIPMENT.
6. THE NEW SYSTEM MUST OPERATE CONTINUOUSLY FOR A MINIMUM OF 30 DAYS
BEFORE MOVING TO THE NEXT PHASE.THE EXISTING BOILER PLANT SHALL REMAIN
FULLY OPERATIONAL DURING THIS PERIOD.
AREA OF WORK
SCALE: 1:20
GENERAL PHASE PLAN - PHASE 4 EQUIPMENT INSTALLATION1
SHEET 62/22/2024
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
PIV
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text N
D
T T P
H
P
H
H
D
SS
UE
FUEL TANK
48'-0" x 12'-0"
N89° 19' 12"W 878.64'
3 4
X X X X X X X X X X X X X X
X X
X
XXXXXXXXXXXXXXXX
X X
X X
X
X X X X X X X X X X X X X X X X
X X
X X
X
X X
X
X X
X X
LAW
N AREA
ELK CJR
REV 0 - 100% BID SET 2024-02-23
KEYPLAN
12 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL PHASING PLAN - PHASE 5 100% BID SET
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
GC105
SITE
585-21-115
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING
AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF
PROJECT. COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL
APPROVAL.
2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES
DO NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR
CREATING CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST
TRADES.
3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY
ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE
COMMENCING WORK.
4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA
5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE
PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND
BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND
INTENT SHOWN THROUGHOUT THIS DRAWING SET.
6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL
PHASING INFORMATION.
PHASE 5 NOTES - DEMOLITION OF EXISTING
BOILERS 1, 2, AND 3
1. VERIFY THE DE-ENERGIZATION OF THE STEAM SYSTEM FOR EXISTING BOILERS 1, 2, &
3 BEFORE STARTING DEMOLITION. CONTRACTOR TO COORDINATE WITH THE VA
BOILER PLANT SUPERVISOR TO LOCKOUT/TAGOUT THE SYSTEM.
2. ISOLATE UTILITIES TO BOILER ROOM.
3. REMOVE EXISTING BOILERS 1, 2, & 3 EQUIPMENT AS SHOWN ON MECHANICAL AND
STRUCTURAL DEMOLITION DRAWINGS.
4. PROVIDE B2 BOILER ROOM IMPROVEMENTS SUCH AS REMOVAL OF EQUIPMENT PADS
TO FF ELEVATION, ADDITION OF NEW HEATERS IN AREA, PAINT,OPENINGS TO NEW
BOILER PLANT ADDITION, ETC.
5. REMOVE TEMPORARY FUEL SYSTEM, TANK, AND FOUNDATION.
6. MILL AND REPAVE PAVEMENT DAMAGED DURING CONSTRUCTION. PROVIDE TRAFFIC
PLANS AND COORDINATE CLOSURES AT ALL ROAD CROSSINGS.
7. FINALIZE PROJECT CLOSEOUT AND DEMOBILIZE. RESTORE LAYDOWN AREA TO
AS-FOUND CONDITIONS.
AREA OF WORK
SCALE: 1:20
GENERAL PHASE PLAN - PHASE 5 DEMOLITION OF EXISTING BOILERS 1,2, AND 3
SHEET 72/22/2024
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
PIV
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text N
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
SITE SURVEY 100% BID SET
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
VF101
SITE
585-21-115
ELK CJR
REV 0 - 100% BID SET 2024-02-23
SHEET 8
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
SITE SURVEY 100% BID SET
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
VF102
SITE
585-21-115
ELK CJR
REV 0 - 100% BID SET 2024-02-23
SHEET 9
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
SITE SURVEY 100% BID SET
REPLACE BOILER PLANT
325 EAST "H" STREET
IRON MOUNTAIN, MI 49801
2024-02-23
VF103
SITE
585-21-115
ELK CJR
REV 0 - 100% BID SET 2024-02-23
SHEET 10
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
File details come from the government source that posted it. Updated .