S02 Sol 0004 AttJ.1a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf

PDF 7 MB Posted

Attached to
Y1NB--Project 585-21-115 Replace Boiler Plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI -- NAICS 236220 General Construction
Solicitation number
36C25225R0004
Issued by

About this file

This is a construction drawing set for a boiler plant replacement project at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan (Project #585-21-115). The drawings detail a phased construction approach to replace the existing boiler plant while maintaining continuous steam generation operations throughout the project.

The drawing set includes site surveys, general phasing plans, and extensive mechanical, electrical, plumbing, and process diagrams. The five-phase construction sequence involves: (1) Initial mobilization and establishment of construction areas, (2) Site utility pre-work including storm sewer modifications and temporary blowdown separator installation, (3) Parking lot updates and perimeter fence installation, (4) New boiler plant equipment installation and commissioning with 30-day continuous operation requirement, and (5) Demolition of existing boilers 1, 2, and 3. The project includes installation of new boilers, support equipment, a secondary fuel tank, and associated site improvements. The drawings indicate extensive coordination requirements with VA personnel to maintain facility operations throughout construction, particularly regarding steam system transitions and road crossing work.

View the file

Other files

File Type Posted
36C25225R0004 0008.docx DOCX document
S06 36C25223R0004 0007 Att_Updated Dwgs_partial_24JAN25.pdf PDF
S06 36C25223R0004 0007 Att_232213 Steam and Condensate Heating Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_232113 Hydronic Piping.REV01.pdf PDF
S06 36C25223R0004 0007 Att_DOD_Anti-Ram_Vehicle Barriers 2024.09.pdf PDF
36C25225R0004 0007.docx DOCX document
S06 36C25223R0004 0007 Att_230510 Common Work Results_Boiler Plant_Steam Gen.REV01.pdf PDF
36C25225R0004 0006.docx DOCX document
S06 0006 Att_S02 SOL 0004 AttH SAM_DB Wage Rates.R1.pdf PDF
36C25225R0004 0005.docx DOCX document
Copy of S06 0005 Att__S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.xlsx XLSX spreadsheet
Copy of S06 0005 Att_22367-Valve List.xlsx XLSX spreadsheet
36C25225R0004 0004.docx DOCX document
S06 0004 Att_Electric Heater product data.pdf PDF
S06 0004 Att Site Visits 1.2.3_Sign Ins_585-21-115.pdf PDF
S06 0003 Att1_S04 Site Visit Sign In_2 585-21-115 2025.01.03.pdf PDF
36C25225R0004 0003.docx DOCX document
36C25225R0004 0002.docx DOCX document
S06 0002 Att4_S02 SOL AttA VAAR 852.219-75 Certification 585-21-115_rev1.pdf PDF
S06 0002 Att2 Solicitation Instruction and Eval Factors.pdf PDF
S06 0002 Att1_S04 Site Visit 585-21-115 2024.12.27.pdf PDF
S06 0002 Att3_S02 SOL AttJ.5d of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.2 SPECS_FINAL 585-21-115_01AUG24 VOL 2 of 3_.pdf PDF
S06 36C25225R0004 0001.pdf PDF
S02 SOL 0004 AttI.1 SPECS_FINAL 585-21-115_01AUG24 VOL 1 of 3_.pdf PDF
S02 Sol 0004 AttJ.6b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.7 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.6a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.5c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttM Past Performance Client Questionnaire 585-21-115.pdf PDF
S02 Sol 0004 AttJ.5a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttL MI Tax Exempt Form 3520_585-21-115.e__.pdf PDF
S02 SOL 0004 AttK.1_P03 Single Source Justification MEDECO.e.pdf PDF
S02 SOL 0004 AttK.2_P03 Single Source Justification ALLEGION_SCHLAGE.e.pdf PDF
S02 Sol 0004 AttJ.6c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.3 of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttI.3 SPECS_FINAL 585-21-115_01AUG24 VOL 3 of 3.pdf PDF
S02 Sol 0004 AttJ.4c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.4a of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttH SAM_DB Wage Rates MI20240117 2024.07.05 current as of 2024.11.19.pdf PDF
S02 SOL 0004 AttE Subcontractor Info Consent 585-21-115.pdf PDF
S02 SOL 0004 AttG Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0004 AttF Brand Name or Equal_Basis of Design 585-21-115.pdf PDF
S02 SOL 0004 AttB Contractor Info 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4e of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 SOL 0004 AttD Financial Disclosure 585-21-115.pdf PDF
S02 SOL 0004 AttA VAAR 852.219-75 Certification 585-21-115.pdf PDF
S02 Sol 0004 AttJ.4b of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
S02 Sol 0004 AttJ.1c of 7 VA 585-21-115 Final Bid Drawing Set 01AUG24 VOL.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

TITLE SHEET FINAL BID SET

PARTIALLY SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

GI001

585-21-115

ELK CJR

REV 0 - 100% BID SET 2024-02-23

NORTH ARROW

DETAIL NUMBER

DETAIL IDENTIFIER

DETAIL TITLE NUMBER /

SHEET REF NUMBER

SECTION IDENTIFIER

SHEET REF NUMBER

DETAIL

IDENTIFIER

SHEET REF

NUMBER

DETAIL SECTION IDENTIFIER

VIEWING

DIRECTION

VIEW TITLE

BUILDING/WALL SECTION CUT

EXTERIOR ELEVATION

DETAIL SECTION CUT

DETAIL CALLOUT

DRAWING SYMBOLS

N

INTERIOR ELEVATION

DD###

DD###

X

DD###

X

SCALE: 1'-0" = 1'-0"

DETAIL TITLEX

1 / DD###

DD###

X

DD###

X

TRUE NORTH

PLAN NORTH

VIEWING

DIRECTION

SHEET REF NUMBER

SHEET REF NUMBER

EAST H STREET

CE

DA

R

AV

EN

UE

JA

CK

SO

N

ST

RE

ET

PROJECT LOCATION

STEPHENSON AVENUE

BLDG 1

BLDG 2

REV 2 - PRE-BID UPDATES 2024-08-01

REV 1 - FINAL BID SET 2024-04-05

8/1/2024 SHEET 1

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text REPLACE BOILER PLANT 325 EAST "H" STREET IRON MOUNTAIN, MI 49801, MI 49801MI 49801 4980149801

AutoCAD SHX Text N

AutoCAD SHX Text

OSCAR G. JOHNSON VAMC

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

DRAWING INDEX FINAL BID SET

PARTIALLY

SPRINKLERED

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

GI002

585-21-115

CJR ELK

REV 0 - 100% BID SET 2024-02-23

DRAWING INDEX

DRAWING

NUMBER

DRAWING TITLE

GENERAL

GI001 TITLE SHEET

GI002 DRAWING INDEX

GC101 GENERAL PHASING PLAN - PHASE 1

GC102 GENERAL PHASING PLAN - PHASE 2

GC103 GENERAL PHASING PLAN - PHASE 3

GC104 GENERAL PHASING PLAN - PHASE 4

GC105 GENERAL PHASING PLAN - PHASE 5

SURVEY

VF101 SITE SURVEY

VF102 SITE SURVEY

VF103 SITE SURVEY

VF104 SITE SURVEY

VF105 SITE SURVEY

CIVIL

C-001 CIVIL NOTES AND LEGENDS

CD171 CIVIL DEMOLITION SITE PLAN

CS171 CIVIL SITE PLAN

CS501 CIVIL SITE TYPICAL DETAILS

CG171 CIVIL GRADING PLAN

CG501 CIVIL GRADING & DRAINAGE DETAILS

CP171 CIVIL PAVEMENT AND SIGNAGE PLAN

CP501 CIVIL PAVEMENT AND SIGNAGE DETAILS

CU171 CIVIL UTILITIES PLAN

CU172 CIVIL UTILITY PROFILES

CU501 CIVIL UTILITY FUEL TRENCH DETAILS

CU502 CIVIL UTILITY SEWER DETAILS

CU503 CIVIL UTILITY SEWER DETAILS

CU504 CIVIL UTILITY WATER DETAILS

STRUCTURAL

S-001 STRUCTURAL NOTES AND LEGENDS

SD101 STRUCTURAL DEMOLITION PLAN - BASEMENT LEVEL

SD121 STRUCTURAL DEMOLITION PLAN - GROUND FLOOR LEVEL

SD141 STRUCTURAL DEMOLITION PLAN - MEZZANINE LEVEL

SD201 STRUCTURAL DEMOLITION FOUNDATION ELEVATIONS

SB101 STRUCTURAL FOUNDATION PLAN - BASEMENT LEVEL

SB121 STRUCTURAL FOUNDATION PLAN - GROUND FLOOR LEVEL

SB171 STRUCTURAL FOUNDATION PLAN - FUEL OIL TANK SITE

SB172 STRUCTURAL FOUNDATION PLAN - FUEL OIL TANK

SB201 STRUCTURAL FOUNDATION SECTIONS

SB301 STRUCTURAL FOUNDATION SECTIONS

SB302 STRUCTURAL FOUNDATION SECTIONS

SB303 STRUCTURAL FOUNDATION SECTIONS

SB304 STRUCTURAL FOUNDATION SECTIONS

SB305 STRUCTURAL FOUNDATION SECTIONS

SB401 STRUCTURAL FOUNDATION ENLARGED PLAN

SB501 STRUCTURAL FOUNDATION DETAILS

SB502 STRUCTURAL FOUNDATION DETAILS

SB503 STRUCTURAL FOUNDATION DETAILS

SB601 STRUCTURAL FOUNDATION SCHEDULE

SF101 STRUCTURAL FRAMING PLAN - BASEMENT LEVEL

SF121 STRUCTURAL FRAMING PLAN - GROUND FLOOR LEVEL

SF141 STRUCTURAL FRAMING PLAN - MEZZANINE LEVEL

SF151 STRUCTURAL FRAMING PLAN - LOWER ROOF LEVEL

SF161 STRUCTURAL FRAMING PLAN - UPPER ROOF LEVEL

SF201 STRUCTURAL FRAMING EXTERIOR ELEVATIONS

SF202 STRUCTURAL FRAMING EXTERIOR ELEVATIONS

SF203 STRUCTURAL FRAMING INTERIOR ELEVATIONS

SF204 STRUCTURAL FRAMING INTERIOR ELEVATIONS

SF301 STRUCTURAL FRAMING SECTIONS

SF302 STRUCTURAL FRAMING SECTIONS

SF303 STRUCTURAL FRAMING SECTIONS

SF401 STRUCTURAL FRAMING ENLARGED PLANS

SF402 STRUCTURAL FRAMING ENLARGED PLANS

SF501 STRUCTURAL FRAMING DETAILS

SF502 STRUCTURAL FRAMING DETAILS

SF503 STRUCTURAL FRAMING DETAILS

SF504 STRUCTURAL FRAMING DETAILS

SF505 STRUCTURAL FRAMING DETAILS

SF506 STRUCTURAL FRAMING DETAILS

SF507 STRUCTURAL FRAMING DETAILS

SF508 STRUCTURAL FRAMING DETAILS

SF601 STRUCTURAL FRAMING SCHEDULES

ARCHITECTURAL

A-001 ARCHITECTURAL NOTES AND LEGENDS

A-002 ARCHITECTURAL LIFE SAFTEY PLAN - GROUND FLOOR LEVEL

A-003 ARCHITECTURAL LIFE SAFETY PLAN - MEZZANINE LEVEL

AD101 ARCHITECTURAL DEMOLITION PLAN - BASEMENT LEVEL

AD121 ARCHITECTURAL DEMOLITION PL AN - GROUND FLOOR LEVEL

AD141 ARCHITECTURAL DEMOLITION PLAN - MEZZANINE LEVEL

AD161 ARCHITECTURAL DEMOLITION PLAN - ROOF LEVEL

AE101 ARCHITECTURAL PLAN - BASEMENT LEVEL

AE121 ARCHITECTURAL PLAN - GROUND FLOOR LEVEL

AE131 ARCHITECTURAL RCP - GROUND FLOOR LEVEL

AE141 ARCHITECTURAL PLAN - MEZZANINE LEVEL

AE142 ARCHITECTURAL RCP - MEZZANINE LEVEL

AE161 ARCHITECTURAL PLAN - ROOF LEVEL

AE201 ARCHITECTURAL EXTERIOR ELEVATIONS

AE202 ARCHITECTURAL EXTERIOR ELEVATIONS

AE203 ARCHITECTURAL INTERIOR ELEVATIONS

AE204 ARCHITECTURAL INTERIOR ELEVATIONS CONTINUED

AE301 ARCHITECTURAL BUILDING SECTIONS

AE302 ARCHITECTURAL BUILDING SECTIONS

AE303 ARCHITECTURAL WALL SECTIONS

AE304 ARCHITECTURAL WALL SECTIONS

AE421 ARCHITECTURAL ENLARGED PLAN - GROUND FLOOR LEVEL

AE422 ARCHITECTURAL ENLARGED PLAN - GROUND FLOOR LEVEL

AE423 ARCHITECTURAL ENLARGED PLAN - GROUND FLOOR LEVEL

AE501 ARCHITECTURAL WALL DETAILS

AE502 ARCHITECTURAL BUILDING DETAILS

AE503 ARCHITECTURAL ROOF DETAILS

AE504 ARCHITECTURAL ROOF DETAILS

AE505 ARCHITECTURAL BUILDING DETAILS

AE601 ARCHITECTURAL DOOR SCHEDULE AND DETAILS

AE602 ARCHITECTURAL DOOR DETAILS

AE603 ARCHITECTURAL WINDOW SCHEDULE AND DETAILS

AE604 ARCHTECTURAL FINISH SCHEDULES

AE801 ARCHITECTURAL BOILER PLANT SIGNAGE

AG101 ARCHITECTURAL SIGNAGE PLAN - BASEMENT LEVEL

AG121 ARCHITECTURAL SIGNAGE PLAN - GROUND FLOOR LEVEL

AG141 ARCHITECTURAL SIGNAGE PLAN - MEZZANINE LEVEL

AK121 ARCHITECTURAL EQUIPMENT PLAN - GROUND FLOOR LEVEL

AK141 ARCHITECTURAL EQUIPMENT PLAN - MEZZANINE LEVEL

AK161 ARCHITECTURAL EQUIPMENT PLAN - ROOF LEVEL

FIRE PROTECTION

F-001 FIRE PROTECTION NOTES AND LEGENDS

FA101 FIRE ALARM PLAN - BASEMENT LEVEL

FA121 FIRE ALARM PLAN - GROUND FLOOR LEVEL

FA141 FIRE ALARM PLAN - MEZZANINE LEVEL

FA601 FIRE ALARM RISER DIAGRAM

FX101 FIRE SUPPRESION PLAN - BASEMENT LEVEL

FX121 FIRE SUPPRESION PLAN - GROUND FLOOR LEVEL

FX141 FIRE SUPPRESSION PLAN - MEZZANINE LEVEL

FX201 FIRE SUPPRESSION ELEVATION

FX501 FIRE SUPPRESSION TYPICAL DETAILS

PLUMBING

P-001 PLUMBING NOTES AND LEGENDS

PD101 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL

PD121 PLUMBING DEMOLITION PLAN - GROUND FLOOR LEVEL

PD141 PLUMBING DEMOLITION PLAN - MEZZANINE LEVEL

PP101 PLUMBING PLAN - BASEMENT LEVEL

PP121 PLUMBING PLAN - GROUND FLOOR LEVEL

PP122 SANITARY PLAN - GROUND FLOOR LEVEL

PP123 COMPRESSED AIR PIPING - GROUND FLOOR LEVEL

PP124 COMPREESSED AIR PIPING- GROUND LEVEL

PP141 SANITARY PLAN - MEZZANINE LEVEL

PP142 COMPRESSED AIR PIPING - MEZZANINE LEVEL

PP161 SANITARY PLAN - ROOF LEVEL

PP201 PLUMBING ELEVATIONS

PP401 PLUMBING ENLARGED PLANS

PP501 PLUMBING DETAILS

PP601 PLUMBING DOMESTIC WATER RISER DIAGRAM

PP602 PLUMBING SANITARY RISER DIAGRAM

PP901 PLUMBING PIPING ISOMETRIC

PP902 PLUMBING SANITARY PIPING ISOMETRIC

PROCESS

D-001 PROCESS NOTES AND LEGENDS

D-601 PROCESS - PFD

D-611 PROCESS - P&ID - FUEL OIL

D-612 PROCESS - P&ID - FUEL OIL - BALANCE OF PLANT

D-613 PROCESS - P&ID - FUEL OIL - BOILER #1

D-614 PROCESS - P&ID - FUEL OIL - BOILER #2

D-615 PROCESS - P&ID - FUEL OIL - BOILER #3

D-616 PROCESS - P&ID FUEL OIL - HEATING & FILTRATION

D-621 PROCESS - P&ID - NATURAL GAS - BALANCE OF PLANT

D-622 PROCESS - P&ID - NATURAL GAS - BOILER #1

D-623 PROCESS - P&ID - NATURAL GAS - BOILER #2

D-624 PROCESS - P&ID - NATURAL GAS - BOILER #3

D-631 PROCESS - P&ID - FEEDWATER - BALANCE OF PLANT

D-632 PROCESS - P&ID - FEEDWATER - BALANCE OF PLANT

D-633 PROCESS - P&ID - FEEDWATER - BALANCE OF PLANT

D-634 PROCESS - P&ID - FEEDWATER - BALANCE OF PLANT

D-635 PROCESS - P&ID - FEEDWATER - BALANCE OF PLANT

D-636 PROCESS - P&ID - FEEDWATER - CHEM PUMPS

D-637 PROCESS - P&ID - FEEDWATER - BOILER #1

D-638 PROCESS - P&ID - FEEDWATER - BOILER #2

D-639 PROCESS - P&ID - FEEDWATER - BOILER #3

D-641 PROCESS - P&ID - STEAM - BOILER #1

D-642 PROCESS - P&ID - STEAM - BOILER #2

D-643 PROCESS - P&ID - STEAM - BOILER #3

D-644 PROCESS - P&ID - STEAM - BALANCE OF PLANT

D-645 PROCESS - P&ID - STEAM - BALANCE OF PLANT

D-651 PROCESS - P&ID - COMBUSTION AIR - BOILER #1

D-652 PROCESS - P&ID - COMBUSTION AIR - BOILER #2

D-653 PROCESS - P&ID - COMBUSTION AIR - BOILER #3

DI601 SEQUENCE OF OPERATION

DI602 POINT LISTS

DI603 FUEL OIL POINT LIST

DI604 NATURAL & LOW PRESSURE GAS POINT LIST

DI605 DEAERATOR FEEDWATER POINT LIST

DI606 BOILERS FEEDWATER POINT LIST

DI607 SUPPLY & COMBUSTION AIR POINT LIST

MECHANICAL

M-001 MECHANICAL NOTES AND LEGENDS

MD101 MECHANICAL DEMOLITION PLAN - BASEMENT LEVEL

MD121 MECHANICAL DEMOLITION PLAN - GROUND FLOOR LEVEL

MD141 MECHANICAL DEMOLITION PLAN - MEZZANINE LEVEL

MD161 MECHANICAL DEMOLITION PLAN - ROOF LEVEL

MD201 MECHANICAL DEMOLITION ELEVATION - TUNNEL

MH121 MECHANICAL HVAC PLAN- GROUND FLOOR LEVEL

MH131 MECHANICAL HVAC RCP PLAN - GROUND FLOOR LEVEL

MH141 MECHANICAL HVAC PLAN - MEZZANINE LEVEL

MH161 MECHANICAL HVAC PLAN - ROOF LEVEL

MH201 MECHANICAL HVAC ELEVATIONS

MH401 MECHANIAL ENLARGED PLANS

MH501 MECHANICAL HVAC DETAILS

MH502 MECHANICAL HVAC DETAILS

MH601 MECHANICAL HVAC SCHEDULES

MI601 MECHANICAL HVAC CONTROLS DIAGRAMS

MI602 MECHANICAL HVAC CONTROLS DIAGRAMS

MI603 MECHANICAL HVAC CONTROLS DIAGRAMS

MI604 MECHANICAL HVAC CONTROLS DIAGRAMS

MP101 MECHANICAL STEAM PIPING - BASEMENT LEVEL

MP102 MECHANICAL HYDRONIC PIPING - BASEMENT LEVEL

MP121 MECHANICAL STEAM PIPING - GROUND FLOOR LEVEL

MP122 MECHANICAL HYDRONIC PIPING - GROUND FLOOR LEVEL

MP123 MECHANICAL FUEL PIPING - GROUND FLOOR LEVEL

MP141 MECHANICAL STEAM PIPING - MEZZANINE LEVEL

MP142 MECHANICAL HYDRONIC PIPING - MEZZANINE LEVEL

MP143 MECHANICAL FUEL PIPING - MEZZANINE LEVEL

MP171 MECHANICAL FUEL PIPING - FUEL OIL TANK

MP201 MECHANICAL ELEVATIONS - FUEL TANK

MP202 MECHANICAL PIPING ELEVATIONS

MP203 MECHANICAL PIPING ELEVATIONS

MP501 MECHANICAL PIPING DETAILS

MP502 MECHANICAL PIPING DETAILS

MP503 MECHANICAL PIPING DETAILS

MP504 MECHANICAL PIPING DETAILS

MK121 MECHANICAL EQUIPMENT PLAN - GROUND FLOOR LEVEL

MK141 MECHANICAL EQUIPMENT PLAN - MEZZANINE LEVEL

MK201 MECHANICAL ELEVATIONS

MK202 MECHANICAL ELEVATIONS

MK203 MECHANICAL ELEVATIONS

MK401 MECHANICAL ENLARGED PLAN - GROUND FLOOR LEVEL

MK501 MECHANICAL EQUIPMENT DETAILS

MK601 MECHANICAL EQUIPMENT SCHEDULES

MK602 MECHANICAL EQUIPMENT SCHEDULES

ELECTRICAL

E-001 ELECTRICAL NOTES AND LEGENDS

ED101 ELECTRICAL DEMOLITION PLAN - BASEMENT LEVEL

ED121 ELECTRICAL DEMOLITION PLAN - GROUND FLOOR LEVEL

ED141 ELECTRICAL DEMOLITION PLAN - MEZZANINE LEVEL

ED161 ELECTRICAL DEMOLITION PLAN - ROOF LEVEL

ED171 ELECTRICAL DEMOLITION SITE PLAN

ED601 ELECTRICAL DEMOLITION POWER ONE-LINE DIAGRAM

ES171 ELECTRICAL SITE PLAN

ES501 ELECTRICAL SITE DETAILS

EI001 ELECTRICAL INSTRUMENTATION - NOTES AND LEGENDS

EI121 ELECTRICAL INSTRUMENTATION PLAN - GROUND FLOOR LEVEL

EI141 ELECTRICAL INSTRUMENTATION PLAN - MEZZANINE LEVEL

EI501 ELECTRICAL INSTRUMENTATION DETAILS

EI502 ELECTRICAL INSTRUMENTATION DETAILS

EI601 ELECTRICAL INSTRUMENTATION - CONTROLS NETWORK ARCH

EL111 ELECTRICAL LIGHTING PLAN - BASEMENT LEVEL

EL131 ELECTRICAL LIGHTING PLAN - GROUND FLOOR LEVEL

EL151 ELECTRICAL LIGHTING PLAN - MEZZAININE LEVEL

EL401 ELECTRICAL LIGHTING ENLARGED PLAN - GROUND FLOOR LEVEL

EL601 ELECTRICAL LIGHTING FIXTURE SCHEUDULE

EG121 ELECTRICAL GROUNDING PLAN

EG161 ELECTRICAL LIGHTNING PROTECTION PLAN

EG501 ELECTRCIAL GROUNDING DETAILS

EP101 ELECTRICAL POWER PLAN - BASEMENT LEVEL

EP121 ELECTRICAL POWER PLAN - GROUND FLOOR LEVEL

EP122 ELECTRICAL CONDUIT ROUTING PLAN - GROUND FLOOR LEVEL

EP141 ELECTRICAL POWER PLAN - MEZZANINE LEVEL

EP161 ELECTRICAL POWER PLAN - ROOF LEVEL

EP201 ELECTRICAL POWER ELEVATIONS - GROUND FLOOR LEVEL

EP202 ELECTRICAL POWER ELEVATIONS - GROUND FLOOR LEVEL

EP401 ELECTRICAL POWER ENLARGED PLAN - GROUND FLOOR LEVEL

EP601 ELECTRICAL POWER ONE-LINE DIAGRAM

EP602 ELECTRICAL POWER PANEL SCHEDULES

EP603 ELECTRICAL POWER PANEL SCHEDULES

EP604 ELECTRICAL POWER CABLE AND CONDUIT SCHEDULES

ET001 ELECTRICAL TELECOMMUNICATIONS - NOTES AND LEGENDS

ET101 ELECTRICAL TELECOMMUNICATIONS PLAN - BASEMENT LEVEL

ET121 ELECTRICAL TELECOMMUNICATIONS PLAN - GROUND FLOOR LEVEL

ET141 ELECTRICAL TELECOMMUNICATIONS PLAN - MEZZANINE LEVEL

ET501 ELECTRICAL TELECOMMUNICATIONS - DETAILS

ET502 ELECTRICAL TELECOMMUNICATIONS - DETAILS

ET503 ELECTRICAL TELECOMMUNICATIONS - DETAILS

ET601 ELECTRICAL TELECOMMUNICATIONS - NETWORK ARCH

ET602 ELECTRICAL TELECOMMUNICATIONS - SECURITY NETWORK ARCH

ET603 ELECTRICAL TELECOMMUNICATIONS - SECURITY CAMERA SCHEDULE

REV 2 - PRE-BID UPDATES 2024-08-01

REV 1 - FINAL BID SET 2024-04-05

8/1/2024 SHEET 2

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

EEEEEE

E

E E E EE E

E

E E

E E

E E

E

GATE

E

E

E E

E

E

E

E E

E E

E E

E E

E E E

E

E E

E

E

E

E

E

E E

E E E

E

E

E E

E E E E

E E

E E

E E

E E

E

E

E

E

E

E

E E

E

E E

E

E

E

E E

E E

E

GATE

CONTROLS

FUEL STATION

RETAINING WALL

E E

E

E

E

E E

E

E E E

E

E

E E E

E E

E

E

WV

WV

GATE

N89° 19' 12"W 878.64'

BLDG 2

GARAGE

BLDG 12

BLDG 16

STORAGE

BLDG 19

SALT SHED

BLDG 10

INCINERATOR STORAGE

METER HOUSE

BLDG 2

BOILER PLANT

BLDG 2

BOILER PLANT

S

E

GC101

GC101

LINE POST

TEMPORARY FENCE BASE WITH SAND BAG WEIGHTS

BOTTOM OF FENCE 1" ABOVE GRADE

6'- 0"

M

IN

IM

UM

TERMINAL POST

GALVANIZED CHAIN LINK FENCING

WITH PRIVACY COVERAGE

GALVANIZED CHAIN LINK FENCING

WITH PRIVACY COVERAGE

ELK CJR

REV 0 - 100% BID SET 2024-02-23

SCALE: 1" = 20'-0"

GENERAL PHASING PLAN PHASE 1 - MOBILIZATION1

2/GC101

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING

AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF

PROJECT. COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL

APPROVAL.

2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES

DO NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR

CREATING CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST

TRADES.

3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY

ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE

COMMENCING WORK.

4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND

BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND

INTENT SHOWN THROUGHOUT THIS DRAWING SET.

6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL

PHASING INFORMATION.

PHASE 1 NOTES - MOBILIZATION

1 ESTABLISH CONTRACTOR LAY DOWN AREA. COORDINATE AREA WITH COR/VA.

2 CUT CURB AND ESTABLISH PAVED TURN-AROUND LANES IN PARKING LOT.

3 INSTALL 6' HIGH CHAIN LINK FENCING AROUND WORK AREAS. SECURE FENCE TO

RESIST A 50 LB HORIZONTAL FORCE ALONG TOP OR BOTTOM.

4 MAINTAIN MINIMUM 24' TRAVEL WIDTH NORTH OF CONSTRUCTION FENCE.

5 MAINTAIN ACCESS TO B2 BY BOILER PLANT AND TRANSPORTATION STAFF. BUILDING

WILL REMAIN OCCUPIED AND ACTIVE THROUGHOUT CONSTRUCTION.

6 PROVIDE MINIMUM 12' WIDE GATE FOR VEHICLE ACCESS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN - PHASE 1 100% BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

GC101

SITE

585-21-115

KEYPLAN

12 16

SCALE: 1/2" = 1'-0"

TEMPORARY CONSTRUCTION FENCE DETAIL2

AREA OF WORK

SHEET 32/22/2024

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text N

N

EEEEEE

E

E E E EE E

E

E E

EXHAUST FAN

E E E E E

E E E E E

E

GATE

E

E

E E

E

E

E

E E

E E

E E

E E

E E E

E

E E

E

E

E

E

E

E E

E E E

E

E

E E

E E E E

E E

E E

E E

E E

E

E

E

E

E

E

E E

E

E E

E

E

E

E E

E E

E

GATE

CONTROLS

FUEL STATION

RETAINING WALL

E E

E

E

E

E E

E

E E E

E

E

E E E

E

E

E

E

WV

WV

GATE

N89° 19' 12"W 878.64'

E E E

BLDG 2

GARAGE

BLDG 12

BLDG 16

STORAGE

BLDG 19

SALT SHED

BLDG 10

INCINERATOR STORAGE

METER HOUSE

BLDG 2

BOILER PLANT

BLDG 2

BOILER PLANT

S

E

FOFOFOFOFO

FO

FO

T

E E

E E E E E

E E

E

PE E

E E E E

E E

E E

E

E

FO

FO

FO FO

FO

FO

FO

E E E E E E

E E

E E

SA

BLDG 2

BOILER PLANT

DWSSA

FWFW

D

T T P

H

P

H

H

FW

ST

ST

ST

ST

D ST

ST

ST

ST

ST

ST

ST

SA SA SA

SA

SA

SA

SA

SS

UE

SA

SA

SFM

SF

M

SF

M

SF

M

SF

M

SFM SFM SFM

X X X X X X X X X

X X

X X

X X

X X

X

X X X

XX

X X

X

XXX

X X

X X

X X

X X

X

X X

X X

X

X X

X X

X X

X X

X X

X X

X

X X X

X X X X

X X

X X

X X

X X

X X

XXXXXXXX

X X X X X X X X X

X X

X X

X X

X X

X

X X X

XX

X X

X

XXX

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X

X X X

X X X X

X X

X X

X X

X X

X X

XXXXXXXX

GC102

BLOWDOWN

FROM BOILERS

BLOWDOWN

SEPERATOR

COLD WATER

PIPE TRENCH

BOILER 1

ELK CJR

REV 0 - 100% BID SET 2024-02-23

SCALE: 1" = 20'-0"

GENERAL PHASING PLAN PHASE 2 - SITE & UTILITY PRE-WORK1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN - PHASE 2 100% BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

GC102

SITE

585-21-115

KEYPLAN

12 16

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING

AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF PROJECT.

COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL APPROVAL.

2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES DO

NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR CREATING

CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST TRADES.

3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY

ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE

COMMENCING WORK.

4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN

ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT

SHOWN THROUGHOUT THIS DRAWING SET.

6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

PHASE 2 NOTES - SITE & UTILITY PRE-WORK

1 REMOVE STORM SEWERS IN WORK AREA. CONTRACTOR TO PROVIDE TEMPORARY

STORM WATER TRANSFER AROUND WORK SITE UNTIL NEW PERMANENT SEWERS CAN BE

INSTALLED/ACTIVATED.

2 REMOVE SITE EMERGENCY ELECTRICAL AND SITE LIGHTING, DISTRIBUTION IN WORK

AREA. CONTRACTOR TO PROVIDE TEMPORARY SERVICE FOR SITE EMERGENCY

ELECTRICAL AND SITE LIGHTING AND COORDINATE WITH THE COR.

3 COORDINATE ALL ROAD CROSSINGS WITH COR. CONTRACTOR TO PROVIDE TRAFFIC

PLAN AND OBTAIN COR APPROVAL BEFORE TRENCHING ACROSS ROADS.

4 INSTALL TEMPORARY BLOWDOWN SEPARATOR

5 REMOVE LEGACY FUEL TANK AND BLOWDOWN VAULT IN AREA OF NEW CONSTRUCTION.

6 INSTALL NEW GRAVITY STORM SEWERS.

7 INSTALL NEW ELECTRICAL DISTRIBUTION.

AREA OF WORK

SCALE: 1" = 2'-0"

TEMPORARY BLOWDOWN SEPARATOR2

NOTE:

LOCATE THE BLOWDOWN SEPARATOR BELOW THE ABANDONED VENT PIPE THAT

TERMINATES JUST BELOW THE ROOF. INSTALL A NEW VENT PIPE AND NEW ROOF

PENETRATION. REFER TO PLUMBING DRAWINGS FOR NEW TEMPORARY DRAIN PIPE.

SHEET 42/22/2024

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text N

STORAGE

SHEDS

FU

EL

S

TA

TI

ON

CONTROLS

FUEL STATION

MA

TE

RI

AL

S

TO

RA

GE

N89° 19' 12"W 878.64'

BLDG 2

GARAGE

BLDG 12

BLDG 16

STORAGE

BLDG 19

SALT SHED

BLDG 10

INCINERATOR STORAGE

METER HOUSE

BLDG 2

BOILER PLANT

BLDG 2

BOILER PLANT

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X

ELK CJR

SCALE: 1:20

GENERAL PHASE PLAN - PHASE 3 PARKING LOT UPDATES1

REV 0 - 100% BID SET 2024-02-23

KEYPLAN

12 16

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN - PHASE 3 100% BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

GC103

SITE

585-21-115

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING

AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF

PROJECT. COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL

APPROVAL.

2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES

DO NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR

CREATING CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST

TRADES.

3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY

ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE

COMMENCING WORK.

4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND

BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND

INTENT SHOWN THROUGHOUT THIS DRAWING SET.

6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL

PHASING INFORMATION.

PHASE 3 NOTES - PARKING LOT UPDATES

1. COMPLETE PARKING LOT UPDATES TO WEST OF CONSTRUCTION AREA.

2. INSTALL PERMANENT WESTERN PERIMETER FENCE AND GATE.

3. REMOVE CONSTRUCTION FENCE TO GATE AND TURN OVER AREA TO VA.

4. PREPARE WEST WALL OF EXISTING BOILER PLANT FOR NEW BUILDING

CONSTRUCTION. REMOVE PIPING, CONDUIT, FANS, ETC. AND PROVIDE WINDOW INFILL.

AREA OF WORK

SHEET 52/22/2024

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text

PIV

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text N

D

T T P

H

P

H

H

D

SS

UE

FUEL TANK

48'-0" x 12'-0"

BLDG 2

LAW

N AREA

STORAGE

SHEDS

FU

EL

S

TA

TI

ON

CONTROLS

FUEL STATION

MA

TE

RI

AL

S

TO

RA

GE

N89° 19' 12"W 878.64'

BLDG 2

GARAGE

BLDG 12

BLDG 16

STORAGE

BLDG 19

SALT SHED

BLDG 10

INCINERATOR STORAGE

METER HOUSE

BLDG 2

BOILER PLANT

BLDG 2

BOILER PLANT

ELK CJR

REV 0 - 100% BID SET 2024-02-23

KEYPLAN

12 16

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN - PHASE 4 100% BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

GC104

SITE

585-21-115

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING

AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF

PROJECT. COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL

APPROVAL.

2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES

DO NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR

CREATING CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST

TRADES.

3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY

ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE

COMMENCING WORK.

4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND

BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND

INTENT SHOWN THROUGHOUT THIS DRAWING SET.

6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL

PHASING INFORMATION.

PHASE 4 NOTES - EQUIPMENT INSTALLATION

1. CONSTRUCT FOUNDATION AND SUPERSTRUCTURE FOR B2 ADDITION. CONTRACTOR

TO COORDINATE ALL ACTIVITIES TO ENSURE NO NEGATIVE IMPACT TO CONTINUED

OPERATION OF EXISTING STEAM GENERATION SYSTEM

2. INSTALL BOILERS AND SUPPORT EQUIPMENT

3. COMPLETE ROADWAY CONSTRUCTION UTILITIES AND SITE IMPROVEMENTS WITHIN

THE WORK AREA.

4. CONSTRUCT SECONDARY FUEL TANK

5. FIT OUT SUPPORT SPACES FOR OCCUPATION COMMISSION NEW BOILER PLANT

EQUIPMENT.

6. THE NEW SYSTEM MUST OPERATE CONTINUOUSLY FOR A MINIMUM OF 30 DAYS

BEFORE MOVING TO THE NEXT PHASE.THE EXISTING BOILER PLANT SHALL REMAIN

FULLY OPERATIONAL DURING THIS PERIOD.

AREA OF WORK

SCALE: 1:20

GENERAL PHASE PLAN - PHASE 4 EQUIPMENT INSTALLATION1

SHEET 62/22/2024

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text

PIV

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text N

D

T T P

H

P

H

H

D

SS

UE

FUEL TANK

48'-0" x 12'-0"

N89° 19' 12"W 878.64'

3 4

X X X X X X X X X X X X X X

X X

X

XXXXXXXXXXXXXXXX

X X

X X

X

X X X X X X X X X X X X X X X X

X X

X X

X

X X

X

X X

X X

LAW

N AREA

ELK CJR

REV 0 - 100% BID SET 2024-02-23

KEYPLAN

12 16

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN - PHASE 5 100% BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

GC105

SITE

585-21-115

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING

AREAS. MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF

PROJECT. COORDINATE FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL

APPROVAL.

2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES

DO NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR

CREATING CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST

TRADES.

3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY

ANALYSIS. CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE

COMMENCING WORK.

4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE

PHASED WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND

BETWEEN ANY AND ALL SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND

INTENT SHOWN THROUGHOUT THIS DRAWING SET.

6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL

PHASING INFORMATION.

PHASE 5 NOTES - DEMOLITION OF EXISTING

BOILERS 1, 2, AND 3

1. VERIFY THE DE-ENERGIZATION OF THE STEAM SYSTEM FOR EXISTING BOILERS 1, 2, &

3 BEFORE STARTING DEMOLITION. CONTRACTOR TO COORDINATE WITH THE VA

BOILER PLANT SUPERVISOR TO LOCKOUT/TAGOUT THE SYSTEM.

2. ISOLATE UTILITIES TO BOILER ROOM.

3. REMOVE EXISTING BOILERS 1, 2, & 3 EQUIPMENT AS SHOWN ON MECHANICAL AND

STRUCTURAL DEMOLITION DRAWINGS.

4. PROVIDE B2 BOILER ROOM IMPROVEMENTS SUCH AS REMOVAL OF EQUIPMENT PADS

TO FF ELEVATION, ADDITION OF NEW HEATERS IN AREA, PAINT,OPENINGS TO NEW

BOILER PLANT ADDITION, ETC.

5. REMOVE TEMPORARY FUEL SYSTEM, TANK, AND FOUNDATION.

6. MILL AND REPAVE PAVEMENT DAMAGED DURING CONSTRUCTION. PROVIDE TRAFFIC

PLANS AND COORDINATE CLOSURES AT ALL ROAD CROSSINGS.

7. FINALIZE PROJECT CLOSEOUT AND DEMOBILIZE. RESTORE LAYDOWN AREA TO

AS-FOUND CONDITIONS.

AREA OF WORK

SCALE: 1:20

GENERAL PHASE PLAN - PHASE 5 DEMOLITION OF EXISTING BOILERS 1,2, AND 3

SHEET 72/22/2024

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text

PIV

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text N

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

SITE SURVEY 100% BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

VF101

SITE

585-21-115

ELK CJR

REV 0 - 100% BID SET 2024-02-23

SHEET 8

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

SITE SURVEY 100% BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

VF102

SITE

585-21-115

ELK CJR

REV 0 - 100% BID SET 2024-02-23

SHEET 9

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

SITE SURVEY 100% BID SET

REPLACE BOILER PLANT

325 EAST "H" STREET

IRON MOUNTAIN, MI 49801

2024-02-23

VF103

SITE

585-21-115

ELK CJR

REV 0 - 100% BID SET 2024-02-23

SHEET 10

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

File details come from the government source that posted it. Updated .