May 2019 HQMC_CNAF RESET Policy Message.pdf
PDF 73 KB Posted
- Attached to
- H-53E Aircraft Maintenance and Repair Services
- Solicitation number
- N6264920R0003
About this file
This document contains a draft solicitation and policy message outlining the H-53E aircraft reset program. The draft solicitation seeks maintenance and repair services for H-53 aircraft from the Fleet Readiness Center Western Pacific and NAVSUP Fleet Logistics Center Yokosuka. Interested offerors must submit a signed non-disclosure agreement to receive the draft request for proposals, performance work statement, and additional attachments. The policy message establishes guidelines for inducting H-53E aircraft into reset sites for overhaul, including minimum aircraft quantities at sites, pre-induction requirements, material sourcing procedures, and an aim to return each aircraft to fully mission capable status within 260 calendar days. The program intends to process 135 active and 6 reserve Marine Corps H-53E aircraft through reset to improve readiness.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RAAUZYUW RUOISTA8532 1210816-UUUU--RUJIAAA.
ZNR UUUUU
R 010816Z MAY 19
FM COMNAVAIRFOR SAN DIEGO CA
TO COMNAVAIRFORES SAN DIEGO CA
COMMARFORCOM
COMMARFORPAC
COMMARFORRES
AIG 7706
INFO COMNAVAIRSYSCOM PATUXENT RIVER MD
CMC AVN ASL WASHINGTON DC
CMC AVN APP WASHINGTON DC
CMC AVN APW WASHINGTON DC
FLTREADCEN EAST CHERRY POINT NC
FLTREADCEN WESTERN PACIFIC
COMNAVAIRFOR SAN DIEGO CA
BT
UNCLAS //N13052//
MSGID/GENADMIN/COMNAVAIRFOR SAN DIEGO CA//
SUBJ/H-53E RESET PROGRAM POLICY//
REF/A/MSGID: RMG/CNAF/200416ZOCT2017//
REF/B/MSGID: RMG/CNAF/220516APR2019//
REF/C/MSGID: RMG/HQMC/191414ZAPR19//
REF/D/DESC: DOC/CNAF/YMD: 20170115//
REF/E/DESC: DOC/NAVAIR/YMD: 20171101//
AMPN/REF A IS CNAF RESET POLICY. REF B IS CANCEL MESSAGE.
REF C IS HQMC APRIL 2019 RESET POLICY MESSAGE QUOTED BELOW.
REF D IS CNAFISNT 4790. REF E IS MRC (A1-H53CE-MRC-300). //
POC/STEVE PORCUNA/H-53 CLASS DESK/UNIT: N421J1/-
/TEL:757-836-8779 DSN 836//
GENTEXT/REMARKS/1. THIS IS A COMNAVAIRLANT/COMNAVAIRPAC MESSAGE.
2. REF A CANCELLED BY REF B. TAKE REF B AND C FOR ACTION.
3. A COPY OF THIS DOCUMENT SHALL BE RETAINED ON FILE WITH CNAF,
CNAFR CLASS DESK, MAW AMO, MALS AMO/CLASS DESK AND SQUADRON
MMCO PASSDOWN BINDERS.
4. RESET SCHEDULE:
A. AIRCRAFT INDUCTIONS WILL BE MANAGED BY THE MALS AMO,
WITH OVERSIGHT BY MAW, COMMARFOR, AND CNAF WITH THE
FOLLOWING MINIMUM REQUIREMENTS IN WORK:
(1) NEW RIVER: 5 AIRCRAFT
(2) MIRAMAR: 4 AIRCRAFT
(3) K-BAY: 1 AIRCRAFT
(4) ERICKSON: NUMBER OF AIRCRAFT DETERMINED
BY CAPACITY
(5) FRC-WP/KAL: PER CNAF OUTLINED AND
APPROVED PMI SCHEDULE
5. RESET PRE-INDUCTION:
A. EACH SITE MALS/LNO WILL COORDINATE A MEETING PER
REF E ONCE BUNO IDENTIFICATION IS MADE AND WILL
IDENTIFY AND OUTLINE LOGISTICS REQUIREMENTS AND
ACTIONS TO BE PERFORMED DURING RESET.
(1) SQUADRONS WILL ENSURE AN AIRCRAFT HAS
100% ACCOUNTING OF ALL COMPONENTS
(INSTALLED AND UNINSTALLED). FOR
UNINSTALLED COMPONENTS A VALID OPEN
REQUISITION WILL BE PRESENTED TO
THE RESET CFT OR AN RFI COMPONENT
WITH ASR/SRC/LOGSET WILL
ACCOMPANY THE AIRCRAFT AT INDUCTION.
(2) PER REF E, SQUADRONS WILL ENSURE THE
AIRCRAFT IS IN A PRE-INDUCT MATERIAL CONDITION
THAT ALLOWS BOTH HYDRAULIC AND ELECTRIC POWER
TO BE APPLIED FOR SYSTEM OP/FUNCTIONAL CHECKS
AND LEAK CHECKS. DEVIATION FROM THIS REQUIREMENT
WILL REQUIRE MALS, MAW AND CNAF CONCURRENCE VIA EMAIL.
(3) SQUADRONS WILL ENSURE 100% SCRUB OF
CONFIGURATION MANAGEMENT (CM) IN OOMA TO ENSURE
CORRECT PARTS ARE INSTALLED AND ACCOUNTED FOR IN THE
CORRECT LOCATION ON THE AIRCRAFT.
(4) ALL MAIN SPONSON FUEL TANKS SHALL BE FULL
FOR LONG TERM STORAGE/PRESERVATION OF INTERNAL
FUEL CELL COMPONENTS AND TO ENSURE NO FUEL CELL
COLLAPSES DURING RESET (EXCEPTIONS ARE
COMMERCIAL SITES).
(5) ALL AUX FUEL TANKS SHALL BE EMPTY AND PENCIL
DRAINED FOR REMOVAL UPON INDUCTION.
(6) SQUADRONS WILL ENSURE THE REMOVAL OR
DISABLING OF ALL PYROTECHNICS PRIOR TO INDUCTION.
EXCEPTIONS FOR FERRY FLIGHTS TO COMMERCIAL SITES,
HOWEVER UPON ARRIVAL THE UNIT WILL REMOVE OR DISABLE
PRIOR TO INDUCTION. PRIOR TO INITIAL GROUND TURN
COMING OUT OF RESET THE UNIT IS RESPONSIBLE FOR
ENABLING AND REINSTALLATION OF ALL PYROTECHNICS
UPON REQUEST BY THE RESET SITE CFT.
6. RESET MATERIAL REQUIREMENTS:
A. ALL REQUISITIONS WILL BE ORDERED VIA THE NAVAL
SUPPLY SYSTEM WITH NO LOWER THAN AN 'O3' PRIORITY
USING RESET PROJECT CODES Z7R/Z7S/Z7T WITH RDD 999 PER
AGREEMENTS BETWEEN CNAF, DLA, AND NAVSUP. RESET
BOM MATERIAL WILL BE REQUISITIONED AND SOURCED BY
EACH MALS/ASD IN ADVANCE OF AN AIRCRAFT INDUCTION
USING THE SAME PROJECT/PRIORITY/RDD. EACH RESET SITE
CFT IS RESPONSIBLE FOR MATERIAL CONTROL
(INCLUDES EXCESS).
B. EACH SUPPORTING MALS/ASD IS REQUIRED TO PROCESS
AND EXPEDITE REQUISITIONS PLACED BY THEIR RESPECTIVE
RESET SITE CFT. RECONCILIATION OF MATERIAL REQUIREMENTS
BETWEEN MALS/ASD AND RESET SITE CFT ALONG WITH DISTRIBUTION
OF AN OMRR IS REQUIRED DAILY TO ENSURE TIMELY SUPPORT.
DUE DILIGENCE IS EXPECTED WITH PRIORITIZING CRITICAL
DEGRADER ITEMS HAVING FLEET IMPACTS TO INCLUDE REQUESTING
LATERAL SUPPORT FROM OTHER ACTIVITIES WHEN PRUDENT AND
ROTATING FSA STOCK TO CONTINUE PROGRESSION ON AN
AIRCRAFT TOWARDS DELIVERY AS AN FMC ASSET. MALS/MAG/WING
OVERSIGHT AND DIRECTION IS REQUIRED TO ENSURE AN ACHIEVED
RESET END STATE WITHIN THE TURNAROUND TIMELINE OUTLINED
REF C.
C. EACH RESET SITE CFT IS GRANTED DEVIATION FROM REF D
(PARA 5.1.1.12F) AND ARE AUTHORIZED TO CANNIBALIZE
BETWEEN BUNOS INTERNAL TO THEIR RESET LINES (WIP).
IF OPTIONS WITHIN THE RESET LINES ARE NOT AVAILABLE
FOR CANNIBALIZATION, A REQUEST PER REF D IS REQUIRED
(INCLUDES CROSS-RESET SITE AND CROSS-WING). IN ALL
CASES PROPER DOCUMENTATION WITHIN OOMA IS REQUIRED
TO INCLUDE DOCUMENT TRANSFER BETWEEN BUNOS WITH
THE SUPPORTING SUPPLY DEPARTMENTS.
7. SE/IMRL REQUIREMENTS:
A. O-LEVEL ITEMS (INCLUDES PEMAS) WILL BE MANAGED,
COORDINATED, AND SOURCED BETWEEN MALS AMO, SQUADRON
MMCO AND RESET SITE CFT FOR NEW RIVER, MIRAMAR
AND K-BAY RESET SITES.
(1) FRC-WP/KAL REQUIREMENTS WILL HAVE 1ST MAW
ALD OVERSIGHT TO ENSURE OPERATIONAL
REQUIREMENTS ARE NOT IMPACTED BY RESET
REQUIREMENTS DUE TO SHARING OF THE
REQUIREMENT BETWEEN MAG-24 AND MAG-36.
(2) ERICKSON REQUIREMENTS WILL BE MANAGED AND
SOURCED BY EACH RESPECTIVE MALS/MAG
THAT INDUCTS AN AIRCRAFT FOR RESET.
EACH MALS/MAG WILL ENSURE OPERATIONAL
REQUIREMENTS ARE NOT IMPACTED BY RESET
REQUIREMENTS. ADDITIONAL GFE SOURCES
MAY BE USED AS APPLICABLE.
B. D-LEVEL ITEMS WILL BE MANAGED AND COORDINATED PER
OUTLINED SE/IMRL INSTRUCTIONS AND SOPS.
8. TECHNICAL ENGINEERING:
A. H53ISST HAS ENGINEERING AUTHORITY OVER REF E AND
ALL TECHNICAL ISSUES WILL BE RESOLVED PER REF D.
EACH RESET SITE CFT QA HAS DIRLAUTH WITH THE
DESIGNATED H53ISST LEAD RESET ENGINEER WHEN
REQUIRED.
9. D-LEVEL IN-SERVICE REPAIR (ISR) ACTIONS:
A. REPAIR DISCOVERY BY EACH RESET SITE CFT WHICH
IS DEEMED BEYOND THEIR CAPABILITIES WILL BE
HANDLED PER REF D. EACH RESET SITE CFT QA SHALL
PROVIDE REQUISITE INFORMATION TO THE APPLICABLE
AIRCRAFT REPORTING CUSTODIAN FOR SUBMISSION IN
JDRS (ERICKSON IS THE EXCEPTION).
B. ALL ISR ACTIONS WILL BE FUNDED USING 1A5A
(ISR) FUNDS.
C. DEFERRAL OF ANY FLYABLE ISR ACTIONS IMPACTING
THE DELIVERY OF AN FMC AIRCRAFT DUE TO LENGTH
OF REPAIR OR MATERIAL AVAILABILITY WILL BE
COMMUNICATED BETWEEN THE RESET SITE CFT,
SQUADRON MMCO, AND MALS AMO TO CNAF FOR
APPROVAL IN ADVANCE OF THE PLANNED INITIAL
FLY DATE.
10. REPORTING CUSTODIANS:
A. RESET INDUCTION EVENTS DO NOT CONSTITUTE
OR REQUIRE AN AIRCRAFT TRANSFER. AIRCRAFT
REMAIN IN THE CUSTODY OF REPORTING CUSTODIAN
WITHIN REPORTING STATUS OUTLINED IN REF C.
SINCE THE AIRCRAFT REMAIN IN THE CUSTODY OF
THE REPORTING CUSTODIAN, THERE IS NO
REQUIREMENT FOR TRANSFER/ ACCEPTANCE
INSPECTION OR UNIT SERIALIZATION PER
REF D AND E.
B. SHALL, TO THE BEST OF THEIR ABILITY, MAINTAIN
RESET COMPLETE AIRCRAFT IN AN FMC STATUS
THROUGH TWO PHASE CYCLES (400 HRS) POST
RESET TO ENSURE ADEQUATE RETURN ON INVESTMENT
METRICS ARE ACHIEVED WITH RESPECT TO READINESS,
FLIGHT HOURS, UTILIZATION, AND COST PER FLIGHT
HOUR.
11. DEVIATIONS FROM DELIVERING LESS THAN A FULL MISSION
CAPABLE AIRCRAFT WITH ALL MISSION SYSTEMS FUNCTIONAL
UPON CONCLUSION OF A RESET EVENT WILL REQUIRE
APPROVAL OF THE CNAF H53 TYPE COMMANDER VIA
NAVAL MESSAGE.
QUOTE
R 191414Z APR 19
FM CMC AVN ASL WASHINGTON DC
TO RUOIAAA/COMNAVAIRFOR SAN DIEGO CA
INFO RUOIAAA/COMNAVAIRSYSCOM PATUXENT RIVER MD
RUOIAAA/PEOASWASM PATUXENT RIVER MD
RUJIAAA/COMMARFORCOM
RUJDAAA/COMMARFORPAC
RUJIAAA/COMMARFORRES
RUJIAAA/CMC AVN APP WASHINGTON DC
RUJIAAA/CMC AVN APW WASHINGTON DC
RUJIAAA/CMC AVN ASL WASHINGTON DC
UNCLAS
SUBJ/CH-53E RESET PROGRAM POLICY
REF/A/MSGID: RMG/CNAF/181905ZOCT2017//
REF/B/DOC/HQMC/YMD:20150915//
REF/C/DOC/BOOZEALLENHAMILTON/20150615//
REF/D/DOC/COMNAVAIRFOR/20170115//
REF/E/DOC/NAVAIR/20170815//
AMPN/REF A IS HQMC POLICY MESSAGE. REF B IS HQMC CH-53E
RESET LETTER. REF C IS 2015 SUPER STALLION INDEPENDENT READINESS
REVIEW. REF D IS COMNAVAIRFORINST 4790.2C. REF E IS MRC
(A1-H53CE-MRC-300).//
POC/G. D. CRAWFORD/CWO5/ASL-34A/TEL: DSN 223-9798/COMM
703-693-9798/EMAIL: GARY.D.CRAWFORD1@USMC.MIL//
GENTEXT/REMARKS/
1. THIS MESSAGE CANCELS REF A.
2. IN RESPONSE TO CH-53E READINESS CHALLENGES, REF A
WAS CHARTERED TO IDENTIFY ISSUES, GAPS, AND CONDUCT ROOT CAUSE
ANALYSIS FOR AIRCRAFT, AIRCREW, AND MAINTENANCE PERSONNEL;
RECOMMENDING THE BEST COURSES OF ACTION FOR THE CH-53E COMMUNITY TO
ACHIEVE AND MAINTAIN T-2.0 UNTIL FULL OPERATIONAL CAPABILITY (FOC) OF
THE CH-53K IN 2029. MANY OF THE CH-53E READINESS ISSUES POINT TO THE
EFFECTS OF AIRCRAFT UTILIZATION SIGNIFICANTLY ABOVE PRE-2001 LEVELS
IN THIRTEEN YEARS OF WAR OVERSEAS AND AN INEFFECTUAL RESET EFFORT
UPON THEIR RETURN. BASED ON THE RECOMMENDATIONS FROM THE 2015 SSIRR,
DCA IS DIRECTING THE RESET OF CH-53E AIRCRAFT IN ORDER TO IMPROVE
READINESS AND RETURN THE CH-53E FLEET TO FULL MISSION CAPABILITY.
DCA'S VISION IS TO CREATE A FORMAL AND COMPREHENSIVE AVIATION RESET
PROCESS TO SIGNIFICANTLY IMPROVE THE MATERIAL CONDITION OF ALL USMC
CH-53E AIRCRAFT.
3. RESET MAINTENANCE EVENTS SHALL BE CONDUCTED IAW REF D AND E.
RESET WILL CONSIST OF A COMPLETE SERVICEABILITY INSPECTION AND REPAIR
OF EACH AIRCRAFT TO INCLUDE A THOROUGH CLEANING OF THE AIRFRAME AND
DYNAMIC COMPONENTS, THE COMPLETION OF ALL PHASE CYCLES (A-D), ALL
HOURLY INSPECTIONS (25-1200), ALL CALENDAR INSPECTIONS (14-364),
CORRECTION OF AIRFRAME DISCREPANCIES, AND THE COMPLETION OF ALL
DEFERRED MAINTENANCE. RESET WILL DELIVER A FULLY MISSION CAPABLE
AIRCRAFT WITH ALL APPROVED AIRFRAMES CHANGES AND APPLICABLE
MODIFICATIONS (DEPENDING ON KIT AVAILABILITY) TO MEET BASELINE 2015
CONFIGURATION.
A. RESET WILL BE EXECUTED UTILIZING CONTRACTOR FIELD TEAMS (CFT).
PMA-261 WILL COORDINATE WITH THE CONTRACTING ACTIVITY IN PROVIDING
CONTRACT MANAGEMENT, OVERSIGHT, ON SITE QUALITY SURVEILLANCE STAFFING
AND WEEKLY PRODUCTION/FINANCIAL TRACKING AND REPORTING.
B. IN ORDER TO ENSURE A RELIABLE AND DEPLOYABLE AIRCRAFT UPON
COMPLETION OF THE RESET, ALL 2015 CH-53E BASELINE CONFIGURATION,
SAFETY, AND RELIABILITY/MAINTAINABILITY MODIFICATIONS SHOULD BE
INCORPORATED INTO THE RESET PROCESS. SHOULD THE NUMBER OF
MODIFICATIONS REQUIRED BY AN AIRCRAFT TO MEET THIS BASELINE
CONFIGURATION SIGNIFICANTLY EXCEED THE DURATION OF THE RESET EVENT OF
A PARTICULAR AIRCRAFT, THE DECISION WILL BE MADE DURING THE
PRE-INDUCTION MEETING BETWEEN THE SQUADRON, MALS, AND CNAF FOR
DETERMINATION FOR EXTENDING RESET TIME OR REDUCTION OF INCORPORATED
MODIFICATIONS.
(1) THE RESET PRE-INDUCTION MEETING WILL BE COORDINATED THROUGH THE
SITE MALS AND WILL IDENTIFY AND OUTLINE LOGISTICS REQUIREMENTS AND
ACTIONS TO BE PERFORMED DURING RESET.
(2) AIRCRAFT ENGINE PERFORMANCE SHALL BE ADDRESSED WITH A PLAN TO
ENSURE POST RESET SCHEDULED RELIABILITY UNTIL THE FIRST POST RESET
PHASE CYCLE (200 HRS).
(3) AIRCRAFT WILL BE REPORTED IN A 'G31' STATUS (OOR) FROM THE DAY
OF INDUCTION UNTIL THE DAY OF DELIVERY AS FMC/RBA.
C. THE GOAL IS TO RETURN EACH AIRCRAFT TO ITS UNIT WITHIN 260
CALENDAR DAYS (180 TOUCH DAYS) OF INDUCTION. THE SEVERITY OF THE
AIRCRAFT MATERIAL CONDITION UPON INDUCTION OR NOTED DURING THE
INSPECTION PROCESS AND THE INABILITY TO PERFORM SYSTEM FUNCTIONAL
CHECKS WITH HYDRAULIC/ELECTRIC POWER PRIOR TO INDUCTION MAY DRIVE
EXTENDED TURNAROUND TIME.
4. THE END STATE AIRCRAFT WILL HAVE ZERO OUTSTANDING AWAITING
MAINTENANCE (AWM) DISCREPANCIES, RE-BASELINED PHASE CYCLE,
RE-BASELINED HOURLY/CALENDAR/SPECIAL INSPECTIONS, FREE OF
FUEL/OIL/HYDRAULIC FLUID LEAKS, ALL O-LEVEL TECHNICAL DIRECTIVES
COMPLIED WITH, HIGH TIME COMPONENTS REPLACED AND WILL BE FUNCTIONAL
CHECK FLIGHT (FCF) COMPLETE. THE CFT ALONG WITH THE SUPPORTING
MALS/ASD SHALL MAKE EVERY ATTEMPT TO MITIGATE THE AMOUNT OF OPEN
DISCREPANCIES THAT ARE AWAITING PARTS, ESPECIALLY THOSE IMPACTING
DELIVERY OF THE AIRCRAFT AS FMC.
5. THE CONTINUED SUCCESS OF THE CH-53E RESET PROGRAM IS DEPENDENT
UPON THE MARFORS AND CNAFR PROVIDING SUFFICIENT FUNDING TO FULLY
STAFF THE RESPECTIVE FLEET BASED RESET SITES. IF THERE ARE PROJECTED
FINANCIAL SHORTFALLS OR DELAYS IN APPROPRIATIONS THE MARFORS AND
CNAFR WILL NOTIFY ALCON SO THAT APPROPRIATE CONTRACTUAL ACTIONS CAN
BE INITIATED.
6. 135 ACTIVE DUTY AND 6 RESERVE USMC CH-53E AIRCRAFT WILL BE
PROCESSED THROUGH THE RESET PROGRAM
(1) THE FOLLOWING BUNO WILL NOT BE RESET DUE TO SERVICE
LIFE RETIREMENT:
A. 162002
UNQUOTE//