H-53E_QUESTIONS_AND_ANSWERS_13DEC2019.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- H-53E Aircraft Maintenance and Repair Services
- Solicitation number
- N6264920R0003
About this file
This document contains questions and answers related to a draft solicitation for H-53E aircraft maintenance and repair services. The solicitation will be issued by Fleet Readiness Center Western Pacific and NAVSUP Fleet Logistics Center Yokosuka to provide depot-level maintenance, repair, and overhaul services for U.S. Navy and Marine Corps H-53 aircraft. The questions and answers provide clarification on work scope definitions, contract line item changes, certification and training requirements, cost allowability, and schedule details to support contractor planning for the solicitation. Feedback is requested on the draft performance work statement, contract data requirements list, and other attachments.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q AND A
| NO. | REFERENCE | KEYWORD 1 | KEYWORD 2 | QUESTIONS | ANSWERS | |
| 1 | RFP | Section C, Page 107 | H-53E Reset (Concurrent and Standalone) | - It seems that CLIN of '3.1.6.1.1 H-53E Reset (Concurrent and Standalone)' needs to be changed as below; |
FROM : 0002
| TO: 0003, 0008 | Concur. RFP updated. | |||||
| 2 | RFP | Section C, Page 108 | Contractor Field Team (CFT) | - It seems that CLIN of '5.2.2 Contractor Field Team (CFT)' needs to be changed as below; |
FROM : 0003, 0008
| TO : 0003, 0009 | Concur . RFP updated. | |||||||
| 3 | PWS | Para. 1.3, Page 2 | Main rotor blade | Overhaul | - Would you provide the work scope for overhauling this item? | |||
| If avaiable provide relevant TO. | PWS Paragraph 1.3, 5.2.1.1 modified to remove "overhaul". Gov data package will be made available as soon as practical. | |||||||
| 4 | PWS | Para. 1.3, Page 2 | Sponson | Overhaul | - Would you provide the work scope for overhauling this item? | |||
| If avaiable provide relevant TO. | Includes inpsection and repair of corroded and/or damaged internal sheet metal and fuel cell components. Gov data package will be made available as soon as practical. | |||||||
| 5 | PWS | Para. 1.3, Page 2 | Ttransition bulkhead repair | ISR Team | - Would you provide the requirement for renewing certification such as renewal cycle or the way to renew it? | FRC East would be required to overview the training of ISR Tasks for Bulhead, Pylon Alignment, and TRDC Fitting Installation. This would require observation of several installations under FRC East Quality Control. Specific certification requirements will be provided when the repair is anticipated. | ||
| 6 | PWS | Para. 1.3, Page 2 | Tail rotor disconnect alignment | ISR Team | - Would you provide the requirement for renewing certification such as renewal cycle or the way to renew it? | FRC East would be required to overview the training of ISR Tasks for Bulhead, Pylon Alignment, and TRDC Fitting Installation. This would require observation of several installations under FRC East Quality Control. Specific certification requirements will be provided when the repair is anticipated. | ||
| 7 | PWS | Para. 2.2, Page 6 | Headquaters Marine Corps | HQMC Message DTG | ||||
| 181905ZOCT2017 | - Would you provide 'CH-53E Reset Program Policy' ? | PWS Paragraph 2.2 modified to reference latest message. See file "May 2019 HQMC_CNAF RESET Policy Message" | ||||||
| 8 | PWS | Para. 2.2, Page 6 | Fleet Readiness Center Western Pacific (FRCWP) | NAPRA P4000 | - Would you provide 'Naval Air Pacific Repair Activity (now FRCWP) Supply Handbook' ? | Gov data package will be made available as soon as practical. | ||
| 9 | PWS | Para. 3.1.1, Page 7 | Induction of the Aircraft | - Para. 3.1.1 says that "The date of induction will be recordede as the day immediately following the Government's delivery of the aircraft." | ||||
| Does "following" mean the next day (calender day) of arrival date? | Next calendar day after arrival will be the Induction Day. | |||||||
| 10 | PWS | Para. 3.1.1, Page 7 | High Time Components | - Would you provide definition of High Time Component for PMID aircraft and RESET aircraft ? | Any component with less than 200 hours of operational time remaining prior to replacement or overhaul is considered a high time component that requires extention by TYCOM. | |||
| 11 | PWS | Para. 3.1.3, Page 8 | Surface Conditioning of the Aircraft | Stripping | - Is the stripping by Chemical Method allowable for exterior stripping ? | Chemical and mechanical stripping are approved stripping techniques. Chemical stripping ensures that residual oils are removed prior to aircraft painting. | ||
| 12 | PWS | Para. 3.1.6.1, Page 9 | - It seems that correction is required as below; |
FROM : There are six(6) as-required maintenance tasks pre-defined in this contract
| TO : There are seven(7) as-required maintenance tasks pre-defined in this contract | Concur/ PWS Paragraph 3.1.6.1 modified. | |||||||
| 13 | PWS | Para. 3.1.7, Page 11 | Final Processing | Aircraft Sell Package | - What kind of files shall be included in Aircraft Sell Package? | The following items should be included in the Aircraft Sell Package, BUNO Maintenance State, Miscellaneous History, BUNO Weight and Balance, Joint Inventory, all customer provided historical records to include all new Scheduled Removal Component (SRC) Cards, and DD-250 cards (Partical Aircraft and final Over and Above). This list is representative only. | ||
| 14 | PWS | Para. 3.1.8, Page 12 | Fuctional Check Flight (FCF) | - If assume that there is no FCF defects so that one time FCF is enough to release aircraft, One time Daily Inspection and Two times Turnaround Inspectoin (one for FCF, one for prior to aircraft delivery) are required. |
- Depends on aircraft condition, it's not possible to estimate how many times Daily Inspectoin & Turnaround Inspection are required.
- Based on this reason, more than minimum requirement for each inspection (Daily Inspection is one time & Turnaround Inspectioni is two times) need to be chargable to Unscheduled Maintenance. Is it agreeable?
| - For Other airfield/flight line support services, it is not possible to estimate how many times these services are required. So it needs to be chargable to Unscheduled Maintenance also. Is it agreeable ? | All tasks that exceed the initial contract covered Dailies and Turn-Around Inspections must be submitted to the ACO for pre-approval of Over and Above charges for manpower required for maintenance tasks of unscheduled events during FCF. The offeror is expected to describe its methodology for dailies and turn-around inspections included in CLIN x001 and x003. | |||||
| 15 | PWS | Para. 3.2.1.2, Page 14 | Correction of Discrepancies Related to PMI and /or Reset | - It seems that correction is reqiured as below; |
FROM : O&A tasks requiring over 200 man-hours to complete ~
| TO : O&A tasks requiring over 500 man-hours to complete ~ | Disagree. Sentence is correct as stands. | |||||||
| 16 | PWS | Para. 4.1.2, Page 16 | Work Deck Validation Requirement | Work Deck | - Para. 4.1.2 says that "The contractor shall provide work decks to the Government quality assurance representative for validation that all items were correctly stamped and certified as work completed." | |||
| Does "work decks" mean the work packages ? | Work Decks are Detailed Planning Packages with all contractor maintenance actions, contractor quality verifications and DCMA/DTaQ Safety of Flight Verifications. | |||||||
| 17 | PWS | Para. 4.2.1 | Turn Around Time(TAT) | Threshold | - Does threshold TAT include any kind of delay caused by Government? What if contractor can not meet threshold TAT due to any reason by Government? | Threshold TAT assumes no delays. PWS Paragraph 4.2.2 also states: "When DCMA requests the Contractor perform additional work beyond the basic requirement that cannot reasonably be accomplished within the TAT, the Contractor may negotiate an increase to TAT." | ||
| 18 | PWS | Para. 4.2.2 | Workload Expectation | induction plan | - Draft PWS says the Government will provide the H-53E induction plan on regular intervals to facilitate workload planning. Is it possible to define the specific meaning of regular intervals?(Annual? Quartely? Monthly?) | Unnecessary to provide this detail in PWS. Induction plans are laid out months in advance and provided to the contractor with sufficient time to plan work execution. | ||
| 19 | PWS | Para. 5.2.1, Page 24 | - It seems that correction is reqiured as below; |
FROM : NAVAIR V-22 PMI Specification
| TO : NAVAIR H-53E PMID Specification | Concur. PWS Paragraph 5.2.1 modified. | ||||||
| 20 | PWS | Para. 5.2.1, Page 25 | Workforce Qualification | - What are these qualification like Locking devices and Quality holes? | PWS Paragraph 5.2.1.1 modified to remove wording. | ||
| 21 | PWS | Para. 5.2.1, Page 25 | (d) NDI | - It seems that correction is reqiured as below; |
FROM : equivalent authorized by the V-22 FST
| TO : equivalent authorized by the H-53 FST (?) | Concur. PWS Paragraph 5.2.1.(d) modified. | ||||||
| 22 | PWS | Para. 5.2.4, Page 27 | Training | CDRL | - Provide the detail description of all trainings that contractor shall make effort to independently acquire. The title of training does not seem to be enough to make sure which job is for trainner or trainne and which requirement is needed. |
For example, The definition of 'Flight data' on the 'Analysis of flight data training' is needed to be explained.
The purpose of TD training is needed such as for mechanics to do the work or for QA to issue TD to be done or for whoever is responsible for TD. Can you explain what the TD training is for? Flight data includes basic aircarft logbooks and records. The skill needed is the ability to read and obtain aircraft history, previous repair actions, flight hours, cats/traps, landings, etc.
Technical Directives (TDs) are issued to correct problems in the maintenance and upgrades to the fleet. Orginizational TDs cover simple usually quick inspections and adjustments that can easily be accomplished. Intermediate and Depot TDs will require the contractor (Engineering and Maintenance Teams) to review the TD and forward questions through REI to FRCWP Engineering prior to confirmation that the contractor can accomplish all required tasks. Additional training will be accomplished if required at that time.
| 23 | PWS | Para. 5.3.2.1.1, Page 29 | Procurement of Parts | material handling cost | - What kind of cost elements can this 'material handling cost' contain? | ||
| - Is G&A (General Administration fee) able to be incldued in this 'material handling cost'? | It is up to the Contractor to determine what cost elements to include in their pricing; however, PWS Section 5.3.2.1.1, Procurement of Parts, describes the process to be used. This CLIN also has a not to exceed value associated with it and invoicing will be reviewed by the ACO who will make the final determination. | ||||||
| 24 | PWS | Para. 5.3.2.4 | Government Furnished Equipment (GFE) / Support Equipment (SE) | - It is stated that the contractor shall ensure all calibration, load testing, and NDI requirements are performed. |
These effort shall include daily and pre-operational inspection, preventative maintenance, calibration, load testing, NDI, and associated requirement.
| - Contractor does not know how many, how much, or how frequently these efforts are required so that these efforts need to be chargable to Unscheduled Maintenance. Is it agreeable ? | Do not concur. Offerors are provided the list of GFE in Attachment 10. From there, they can look up the required support schedule and include their estimated workliad in CLIN 0007. | |||||||
| 25 | PWS | Para. 5.5.4 | Personal Electronic Maintenance Aids (PEMA) | - Does PEMA computer hardware need to be procured by Contractor Expense or Government Funding (using SLIN X004AA) ? | Concur. | |||
| 26 | CDRL | CDRL F001 | Integrated Master Schedule | - (4) Format says that The IMS shall be submitted as a Microsoft Project document or Government approved equivalent. | ||||
| Is the Microsoft EXCEL document acceptable? | No, Excel file is not acceptable. | |||||||
| 27 | Price Summary Spreadsheet | CLIN X0008 | Reset | Assumptions | - Assumptions of SLIN X008AA & X008AB say that 'NTE / Offeror Auto-populate.' | |||
| It seems that it needs to be changed as "Offeror provide hourly rate and estimated hours for each SLIN X008AA (or SLIN X008AB)'. | Concur. Attachment 14 modified. | |||||||
| 28 | PMID Induction Schedule | Sheet1 | Period | - Acc. to Draft RFP (DELIVERY INFORMATION), POP of each Year is from 17 JUL to 16 JUL. | ||||
| IAW this Draft RFP (DELIVERY INFORMATION), Period at PMID Induction Schedule (1 June ~ 31 May) needs to be chaged accordingly. | Concur. This is a draft PMID schedule. The PoP and PMID schedule will be updated to reflect the finalized dates upon the release of the actual solicitation. |
QUESTIONS AND ANSWERS
FOR
H-53 IMC/P PMID Contract N62649-14-R-0124
&P