CDRL_B003_AIRCRAFT_AWAITING_PARTS_(AWP)_REPORT_H-53.pdf

PDF 104 KB Posted

Attached to
H-53E Aircraft Maintenance and Repair Services
Solicitation number
N6264920R0003
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) and information related to a draft solicitation for H-53 Aircraft Maintenance and Repair Services. The CDRL requires the contractor to submit a weekly Aircraft Awaiting Parts Report in Microsoft Excel format with details on parts required to support aircraft production that are not expected to be received by the needed date based on order and shipping status, including part numbers, quantities, delivery dates, serial numbers and aircraft tail numbers. The report is due by close of business every Friday and must be emailed to the Fleet Readiness Center Western Pacific. The related draft solicitation seeks proposals for depot-level maintenance, repair and overhaul services for U.S. Navy and Marine Corps H-53 helicopters and interested offerors are requested to provide feedback on the draft documents before a formal solicitation is issued.

N6264920R0003 DRAFT CDRL B003

View the file

Other files

File Type Posted
Pre-Sol Conference Q&A_3.docx DOCX document
Pre-Solicitation Conference Q & A_2.docx DOCX document
H-53 Pre Solic Conf QAs.docx DOCX document
May 2019 HQMC_CNAF RESET Policy Message.pdf PDF
H-53E Att 09 Fac and AF Req 2019-12-13.docx DOCX document
CDRL A004 PRODUCTION PLAN H-53 12.13.19.pdf PDF
H-53E_Att_14_Price_Summary_Spreadsheet_DRAFT (2019-12-13).xlsx XLSX spreadsheet
04 - H-53E Att 01 PWS (2019-12-13) v1.docx DOCX document
H-53E_QUESTIONS_AND_ANSWERS_13DEC2019.xlsx XLSX spreadsheet
DRAFT RFP N6264920R0003 12.13.19.docx DOCX document
CDRL A007 SITUATION SUMMARY REPORT H-53 12.13.19.pdf PDF
Attachment_4_H-53_PRE_SOL_CONF_ACCEPTABLE_ID_FOR_NAFA_ACCESS.PPTX PPTX presentation
Attachment_2_H-53_PRE_SOLICITATION_CONFERENCE_Designated_Third_Country_Nationals.docx DOCX document
Attachment_1_H-53_PRE_SOLICITATION_CONFERENCE__Access_to_NAF_Atsugi.docx DOCX document
Attachment_3_H-53_PRE_SOL_CONF_Third_Designated_Country_List.pdf PDF
H-53E_Att_07_TEI_Process_at_Contarctor_Facilities_DRAFT.docx DOCX document
CDRL_B007_FINAL_MATERIAL_CONSUMPTION_REPORT_H-53.pdf PDF
CDRL_C001_MEETING_MINUTES_H-53.pdf PDF
CDRL_B002_AVDLR_TRACKER_H-53.pdf PDF
CDRL_A007_SITUATION_SUMMARY_REPORT_H-53.pdf PDF
CDRL_B009_EXCESS_MATERIAL_REPORT_H-53.pdf PDF
CDRL_A002_TECHNICAL_DIRECTIVES_REPORT__H-53.pdf PDF
CDRL_B010_ANNUAL_PHYSICAL_INVENTORY__H-53.pdf PDF
CDRL_G001_MONTHLY_MATERIAL_EXPENSE_REPORT_H-53.pdf PDF
CDRL_B014_DISCREPANT_PART_ON_INDUCTION_REPORT__H-53.pdf PDF
CDRL_B001_DAILY_REQUISITION_REPORT_(DRR)_H-53.pdf PDF
CDRL_A008_EXAMINATION_&_EVALUATION_(E&E)_DISCREPANCY_REPORT_H-53.pdf PDF
CDRL_A005_NOTIFICATION_OF_AIRCRAFT_DELAY_H-53.pdf PDF
CDRL_B004_RECEIPT_REPORT_H-53.pdf PDF
CDRL_A006_SCHEDULED_REMOVAL_CARDS_H-53.pdf PDF
CDRL_L001_TECHNICAL_DATA_INVENTORY_LIST_H-53.pdf PDF
CDRL_D004_CONTRACTOR_TRAINING_PLAN_H-53.pdf PDF
CDRL_C002_PRESENTATION_DOCUMENTATION_H-53.pdf PDF
CDRL_A001_TECHNICAL_DIRECTIVES_REPORT_10_DAY_REPORT__H-53.pdf PDF
CDRL_B008_SUPPORT_EQUIPMENT_(SE)_MAINTENANCE_HISTORY_REPORT_H-53.pdf PDF
CDRL_B011_SUPPORT_EQUIPMENT_MAINTENANCE_AND_CALIBRATION_REPORT_H-53.pdf PDF
CDRL_D002_TRANSITION_STATUS_REPORT_H-53.pdf PDF
CDRL_B013_PARTS_REQUIRED_REPORT_(PRR)_H-53.pdf PDF
CDRL_A004_PRODUCTION_PLAN.pdf PDF
CDRL_B006_ACTIVE_ITEM_REPORT__H-53.pdf PDF
CDRL_B012_COST_PER_BUNO_REPORT_H-53.pdf PDF
CDRL_A003_TDC_KIT_RECEIPT_AND_REPORTING_OF_PARTS_DISCREPANCY_REPORT__H-53.pdf PDF
CDRL_A010_MAINTENANCE_HISTORY_SUMMARY_REPORT_H-53.pdf PDF
CDRL_F001_INTEGRATED_MASTER_SCHEDULE_H-53.pdf PDF
CDRL_A009_NOTED_BUT_NOT_CORRECTED_(NBNC)_REPORT_H-53.pdf PDF
CDRL_D003_TRANSITION_INVENTORY_PLAN_(STAND-DOWN)_H-53.pdf PDF
CDRL_B005_SUPPLY_EFFECTIVENESS_REPORT_H-53.pdf PDF
CDRL_D001_PHASE-IN_TRANSITION_PLAN_H-53.pdf PDF
H-53E_Att_12_H-53E_PMID_Induction_Schedule_DRAFT.xlsx XLSX spreadsheet
DRAFT_RFP_N6264920R0003.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages Adobe Professional 8.0

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER X

D. SYSTEM/ITEM

H-53 PMID AIRCRAFT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B003

2. TITLE OF DATA ITEM

AIRCRAFT AWAITING PARTS (AWP) REPORT

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

FRCWP

7. DD 250 REQ

NO

9. DIST STATEMENT

REQUIRED

NONE

10. FREQUENCY

WEEKLY

12. DATE OF FIRST SUBMISSION

SEE 16(4)

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE 16(4)

13. DATE OF SUBSEQUENT

SUBMISSION

SEE 16(4) Draft

Final

Reg Repro

16. REMARKS

(1) Description: A list of parts or material required to support production, which has been ordered through the Navy supply system or squadron whose status indicates it will not be available for use by the contractor production line personnel by the date required. This also includes items with a shipping status (AS1) or being processed for shipment (BA) whose estimated delivery date will not meet date required by the contractor production line.

The Contractor shall analyze past discrepancies requiring long lead parts are identified to the maximum extent practicable. The parts should remain on the list after receipt for tracking purposes. The Contractor shall provide separate worksheets for Reset data.

(2) Purpose: Used to assist in expediting receipt of the identified parts and materials.

(3) Format: Report shall be submitted in Microsoft Excel, Access or compatible software.

The following fields shall be represented:

- Line Item (L/I)

- BUNO

- Responsibility/COG (Contractor/Squadron)

- Document Number

- NIIN

- Nomenclature

- Quantity (QTY)

- Unit of Issue (U/I)

- Date Ordered

- Requested Delivery Date (RDD)

- Estimated Delivery Date (EDD)

- Date Received of Cannibalized/NBNC

- Status

- Comments (Contractor)

- Comments (LMS/PMTR)

- Comments (Supply)

Additional information, for Cannibalized Material:

The following fields shall be represented:

- NIIN

- Part Number

- Nomenclature

FRCWP Prod 1 FRCWP Supp 1 FRCWP Bus Ops 1

15. TOTAL 0 4 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP

DCMA 1

Reset

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY: X

TDP TM OTHER

D. SYSTEM/ITEM

H-53 PMID AIRCRAFT

E. CONTRACT/PR NO.

F. CONTRACTOR

16. REMARKS (Continued)

- Quantity (QTY)

- Serial Number

- BUNO (Cannibalized from)

- BUNO (Cannibalized to)

- Document Number

- Status

- Requested Delivery Date (RDD)

- Comments

(4) Frequency: Close of Business (COB) every Friday.

Shall be emailed to FRCWP at: usn.atsugi.frcwp.mbx.h53-contract@mail.mil

DD FORM 1423-1, FEB 2001 Page of 2 Pages mailto:usn.atsugi.frcwp.mbx.h53-contract@mail.mil

File details come from the government source that posted it. Updated .