This document contains a draft Contract Data Requirements List (CDRL) and information on a related federal contract opportunity. The CDRL outlines reporting requirements for a contractor providing aircraft maintenance and repair services for H-53 helicopters, including submitting a Situation Summary Report and RESET Production Report in Microsoft Excel format on a weekly basis. It details the required report formats and submission deadlines.

The related federal contract opportunity is a draft solicitation for H-53 aircraft maintenance and repair services to be provided to the Fleet Readiness Center Western Pacific and NAVSUP Fleet Logistics Center Yokosuka. It requests that interested parties submit a Non-Disclosure Agreement to obtain the draft specifications and provide feedback. The services include depot-level maintenance, repair, and overhaul of H-53 aircraft for the U.S. Navy and Marine Corps.

N6264920R0003 DRAFT CDRL A007

View the file

Other files

File Type Posted
Pre-Sol Conference Q&A_3.docx DOCX document
Pre-Solicitation Conference Q & A_2.docx DOCX document
H-53 Pre Solic Conf QAs.docx DOCX document
May 2019 HQMC_CNAF RESET Policy Message.pdf PDF
H-53E Att 09 Fac and AF Req 2019-12-13.docx DOCX document
CDRL A004 PRODUCTION PLAN H-53 12.13.19.pdf PDF
H-53E_Att_14_Price_Summary_Spreadsheet_DRAFT (2019-12-13).xlsx XLSX spreadsheet
04 - H-53E Att 01 PWS (2019-12-13) v1.docx DOCX document
H-53E_QUESTIONS_AND_ANSWERS_13DEC2019.xlsx XLSX spreadsheet
DRAFT RFP N6264920R0003 12.13.19.docx DOCX document
CDRL A007 SITUATION SUMMARY REPORT H-53 12.13.19.pdf PDF
Attachment_4_H-53_PRE_SOL_CONF_ACCEPTABLE_ID_FOR_NAFA_ACCESS.PPTX PPTX presentation
Attachment_2_H-53_PRE_SOLICITATION_CONFERENCE_Designated_Third_Country_Nationals.docx DOCX document
Attachment_1_H-53_PRE_SOLICITATION_CONFERENCE__Access_to_NAF_Atsugi.docx DOCX document
Attachment_3_H-53_PRE_SOL_CONF_Third_Designated_Country_List.pdf PDF
H-53E_Att_07_TEI_Process_at_Contarctor_Facilities_DRAFT.docx DOCX document
CDRL_B007_FINAL_MATERIAL_CONSUMPTION_REPORT_H-53.pdf PDF
CDRL_C001_MEETING_MINUTES_H-53.pdf PDF
CDRL_B002_AVDLR_TRACKER_H-53.pdf PDF
CDRL_B009_EXCESS_MATERIAL_REPORT_H-53.pdf PDF
CDRL_A002_TECHNICAL_DIRECTIVES_REPORT__H-53.pdf PDF
CDRL_B010_ANNUAL_PHYSICAL_INVENTORY__H-53.pdf PDF
CDRL_G001_MONTHLY_MATERIAL_EXPENSE_REPORT_H-53.pdf PDF
CDRL_B014_DISCREPANT_PART_ON_INDUCTION_REPORT__H-53.pdf PDF
CDRL_B001_DAILY_REQUISITION_REPORT_(DRR)_H-53.pdf PDF
CDRL_A008_EXAMINATION_&_EVALUATION_(E&E)_DISCREPANCY_REPORT_H-53.pdf PDF
CDRL_A005_NOTIFICATION_OF_AIRCRAFT_DELAY_H-53.pdf PDF
CDRL_B004_RECEIPT_REPORT_H-53.pdf PDF
CDRL_A006_SCHEDULED_REMOVAL_CARDS_H-53.pdf PDF
CDRL_L001_TECHNICAL_DATA_INVENTORY_LIST_H-53.pdf PDF
CDRL_D004_CONTRACTOR_TRAINING_PLAN_H-53.pdf PDF
CDRL_C002_PRESENTATION_DOCUMENTATION_H-53.pdf PDF
CDRL_A001_TECHNICAL_DIRECTIVES_REPORT_10_DAY_REPORT__H-53.pdf PDF
CDRL_B008_SUPPORT_EQUIPMENT_(SE)_MAINTENANCE_HISTORY_REPORT_H-53.pdf PDF
CDRL_B011_SUPPORT_EQUIPMENT_MAINTENANCE_AND_CALIBRATION_REPORT_H-53.pdf PDF
CDRL_D002_TRANSITION_STATUS_REPORT_H-53.pdf PDF
CDRL_B013_PARTS_REQUIRED_REPORT_(PRR)_H-53.pdf PDF
CDRL_A004_PRODUCTION_PLAN.pdf PDF
CDRL_B006_ACTIVE_ITEM_REPORT__H-53.pdf PDF
CDRL_B012_COST_PER_BUNO_REPORT_H-53.pdf PDF
CDRL_A003_TDC_KIT_RECEIPT_AND_REPORTING_OF_PARTS_DISCREPANCY_REPORT__H-53.pdf PDF
CDRL_A010_MAINTENANCE_HISTORY_SUMMARY_REPORT_H-53.pdf PDF
CDRL_F001_INTEGRATED_MASTER_SCHEDULE_H-53.pdf PDF
CDRL_A009_NOTED_BUT_NOT_CORRECTED_(NBNC)_REPORT_H-53.pdf PDF
CDRL_D003_TRANSITION_INVENTORY_PLAN_(STAND-DOWN)_H-53.pdf PDF
CDRL_B005_SUPPLY_EFFECTIVENESS_REPORT_H-53.pdf PDF
CDRL_D001_PHASE-IN_TRANSITION_PLAN_H-53.pdf PDF
CDRL_B003_AIRCRAFT_AWAITING_PARTS_(AWP)_REPORT_H-53.pdf PDF
H-53E_Att_12_H-53E_PMID_Induction_Schedule_DRAFT.xlsx XLSX spreadsheet
DRAFT_RFP_N6264920R0003.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages Reset

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

H-53 PMID AIRCRAFT

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

SITUATION SUMMARY REPORT

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

NAVAIR H-53E PMID

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

FRCWP

7. DD 250 REQ

NO

9. DIST STATEMENT

REQUIRED

NO

10. FREQUENCY

NOTE 4

12. DATE OF FIRST SUBMISSION

NOTE 4

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE

NOTE 4

13. DATE OF SUBSEQUENT

SUBMISSION

NOTE 4 Draft

Final

Reg Repro

16. REMARKS

(1) Description: Contractor shall submit a Situation Summary Report and RESET Production Report. The RESET Production report is only required where RESET is being performed on the subject aircraft. FRCWP H-53 PMTR will prepare smooth copies for transmission to required addressees listed in 6-2.

(2) Purpose: This report shall advise all concerned on the status of the aircraft.

(3) Format: Situation Summary Report shall be submitted in Microsoft Excel in accordance with USG provided format for PMI Situation Summary. Where RESET is applicable, RESET Production Report shall also be submitted in USG provided format. The Contractor shall integrate Concurrent RESET with PMI in a manner that maximizes efficiency, and shall reflect such integration in this CDRL submission. Frequency of submission for the RESET Production Report, where applicable, and PMI Situation Summary shall be in accordance with Remark

(4) of this CDRL.

(4) Frequency/Requirements:

(a) The initial file(s) shall be submitted with the Contractor’s response to the Government’s Induction Package for each Aircraft. For the initial submission of the PMI Situation Summary, the contractor is only required to complete Tables A, B, C, E, and F. It is understood that information requiring the completion of the Evaluation and Inspection (E&I) Phase will not be completed in Tables E and F due to unknown status at the time of induction. For the initial submission of the RESET Production Report, where applicable, all known information at the time of this submission shall be completed.

(b) Revised file(s) shall be submitted within 5 work days from completion of the E&I Phase (completion of combined PMI/RESET E&I Phases where RESET is applicable) to include the submission and need by dates for all REIs. For the Situation Summary Report, this submission shall complete all data known to date for Tables E and F to include "Post Evaluation Start/Completion Date Plans". For the RESET Production Report, this submission should include a completed "Estimated Completion Date" in the appropriate field on the report.

(c) Updated file(s) to include all Tables/fields on the Situation Summary Report and RESET Production Report, as applicable, shall be submitted on a weekly frequency.

Shall be emailed to FRCWP at: usn.atsugi.frcwp.mbx.h53-contract@mail.mil

FRCWP Prod 1 FRCWP Bus Ops 1

15. TOTAL 3 0 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP

DCMA 1