CDRL_B001_DAILY_REQUISITION_REPORT_(DRR)_H-53.pdf

PDF 64 KB Posted

Attached to
H-53E Aircraft Maintenance and Repair Services
Solicitation number
N6264920R0003
Issued by

About this file

This document contains a draft Contract Data Requirements List (CDRL) for a Daily Requisition Report (DRR) to be provided by a contractor in support of H-53 aircraft maintenance for the Navy. The CDRL requires the contractor to submit a daily DRR to the Supply Management Representative and others as directed by the Government. The DRR must be in Microsoft Excel format and include part numbers, quantities, purchase information and other details for material requisitions. It must separate requirements for PMID, Reset and Depot Level Repairables into different worksheets and include additional data for DLR parts like serial numbers. The frequency of submission is daily or as required by the SMR, and the DRR must be emailed to the provided Navy email address. No pricing or value information is included in this CDRL.

The related opportunity notice is a draft pre-solicitation for depot-level maintenance, repair and overhaul services for H-53 aircraft to be conducted by Fleet Readiness Center Western Pacific and NAVSUP Fleet Logistics Center Yokosuka. Interested parties must fill out a non-disclosure agreement to receive the full specification and are invited to provide feedback on the draft documents. Questions should be directed to the listed Navy contacts. The final solicitation is not yet released.

N6264920R0003 DRAFT CDRL B001

View the file

Other files

File Type Posted
Pre-Sol Conference Q&A_3.docx DOCX document
Pre-Solicitation Conference Q & A_2.docx DOCX document
H-53 Pre Solic Conf QAs.docx DOCX document
May 2019 HQMC_CNAF RESET Policy Message.pdf PDF
H-53E Att 09 Fac and AF Req 2019-12-13.docx DOCX document
CDRL A004 PRODUCTION PLAN H-53 12.13.19.pdf PDF
H-53E_Att_14_Price_Summary_Spreadsheet_DRAFT (2019-12-13).xlsx XLSX spreadsheet
04 - H-53E Att 01 PWS (2019-12-13) v1.docx DOCX document
H-53E_QUESTIONS_AND_ANSWERS_13DEC2019.xlsx XLSX spreadsheet
DRAFT RFP N6264920R0003 12.13.19.docx DOCX document
CDRL A007 SITUATION SUMMARY REPORT H-53 12.13.19.pdf PDF
Attachment_4_H-53_PRE_SOL_CONF_ACCEPTABLE_ID_FOR_NAFA_ACCESS.PPTX PPTX presentation
Attachment_2_H-53_PRE_SOLICITATION_CONFERENCE_Designated_Third_Country_Nationals.docx DOCX document
Attachment_1_H-53_PRE_SOLICITATION_CONFERENCE__Access_to_NAF_Atsugi.docx DOCX document
Attachment_3_H-53_PRE_SOL_CONF_Third_Designated_Country_List.pdf PDF
H-53E_Att_07_TEI_Process_at_Contarctor_Facilities_DRAFT.docx DOCX document
CDRL_B007_FINAL_MATERIAL_CONSUMPTION_REPORT_H-53.pdf PDF
CDRL_C001_MEETING_MINUTES_H-53.pdf PDF
CDRL_B002_AVDLR_TRACKER_H-53.pdf PDF
CDRL_A007_SITUATION_SUMMARY_REPORT_H-53.pdf PDF
CDRL_B009_EXCESS_MATERIAL_REPORT_H-53.pdf PDF
CDRL_A002_TECHNICAL_DIRECTIVES_REPORT__H-53.pdf PDF
CDRL_B010_ANNUAL_PHYSICAL_INVENTORY__H-53.pdf PDF
CDRL_G001_MONTHLY_MATERIAL_EXPENSE_REPORT_H-53.pdf PDF
CDRL_B014_DISCREPANT_PART_ON_INDUCTION_REPORT__H-53.pdf PDF
CDRL_A008_EXAMINATION_&_EVALUATION_(E&E)_DISCREPANCY_REPORT_H-53.pdf PDF
CDRL_A005_NOTIFICATION_OF_AIRCRAFT_DELAY_H-53.pdf PDF
CDRL_B004_RECEIPT_REPORT_H-53.pdf PDF
CDRL_A006_SCHEDULED_REMOVAL_CARDS_H-53.pdf PDF
CDRL_L001_TECHNICAL_DATA_INVENTORY_LIST_H-53.pdf PDF
CDRL_D004_CONTRACTOR_TRAINING_PLAN_H-53.pdf PDF
CDRL_C002_PRESENTATION_DOCUMENTATION_H-53.pdf PDF
CDRL_A001_TECHNICAL_DIRECTIVES_REPORT_10_DAY_REPORT__H-53.pdf PDF
CDRL_B008_SUPPORT_EQUIPMENT_(SE)_MAINTENANCE_HISTORY_REPORT_H-53.pdf PDF
CDRL_B011_SUPPORT_EQUIPMENT_MAINTENANCE_AND_CALIBRATION_REPORT_H-53.pdf PDF
CDRL_D002_TRANSITION_STATUS_REPORT_H-53.pdf PDF
CDRL_B013_PARTS_REQUIRED_REPORT_(PRR)_H-53.pdf PDF
CDRL_A004_PRODUCTION_PLAN.pdf PDF
CDRL_B006_ACTIVE_ITEM_REPORT__H-53.pdf PDF
CDRL_B012_COST_PER_BUNO_REPORT_H-53.pdf PDF
CDRL_A003_TDC_KIT_RECEIPT_AND_REPORTING_OF_PARTS_DISCREPANCY_REPORT__H-53.pdf PDF
CDRL_A010_MAINTENANCE_HISTORY_SUMMARY_REPORT_H-53.pdf PDF
CDRL_F001_INTEGRATED_MASTER_SCHEDULE_H-53.pdf PDF
CDRL_A009_NOTED_BUT_NOT_CORRECTED_(NBNC)_REPORT_H-53.pdf PDF
CDRL_D003_TRANSITION_INVENTORY_PLAN_(STAND-DOWN)_H-53.pdf PDF
CDRL_B005_SUPPLY_EFFECTIVENESS_REPORT_H-53.pdf PDF
CDRL_D001_PHASE-IN_TRANSITION_PLAN_H-53.pdf PDF
CDRL_B003_AIRCRAFT_AWAITING_PARTS_(AWP)_REPORT_H-53.pdf PDF
H-53E_Att_12_H-53E_PMID_Induction_Schedule_DRAFT.xlsx XLSX spreadsheet
DRAFT_RFP_N6264920R0003.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages Reset

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY: X

TDP TM OTHER

D. SYSTEM/ITEM

H-53 PMID AIRCRAFT

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

DAILY REQUISITION REPORT (DRR)

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

N/A

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

FRCWP

7. DD 250 REQ

NO

9. DIST STATEMENT

REQUIRED

NONE

10. FREQUENCY

DAILY

12. DATE OF FIRST SUBMISSION

NOTE 4

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

NOTE 4

13. DATE OF SUBSEQUENT

SUBMISSION

NOTE 4 Draft

Final

Reg Repro

16. REMARKS

(1) Description: Contractor shall submit a Daily Requisition Report (DRR) to the Supply Management Representative (SMR), and others as the Government directs.

(2) Purpose: To provide material requirements for ordering and input into Navy Enterprise Resource Planning (ERP) and the Navy Supply System, and tracking Depot Level Repairables (DLR).

(3) Format: DRR shall be submitted in Microsoft Excel or compatible software.

DRR shall contain the following information at a minimum in the following order:

- Nomenclature

- Material (NIIN) or Part Number/CAGE Code if NIIN is not available

- Quantity (QTY)

- Unit of Issue (UI)

- Purchase Organization(P-ORG)

- Vendor

- Work Breakdown Structure (WBS)

- Requisition Number, Supplementary Address (SUPP ADDRESS)

- Signal Code

- Fund Code

- Routing Identifier Code (RIC)

- Project Code

- Advice Code

- Media/Status

- Priority

- Unit Price (USD)

- Total Price (USD)

- OPTAR Balance

- OPTAR Amendment

- Purchase Order (P.O.) Number (Will remain blank for input by FRCWP Supply)

For PMID/Reset Concurrent inductions, Reset requisitions shall be on a separate worksheet from the PMID requisitions and clearly distinguishable. PMI and Reset DLRs shall also be on separate worksheets and shall include Part Numbers and Serial Numbers.

(4) Frequency: Daily or as required by SMR.

Shall be emailed to FRCWP at: usn.atsugi.frcwp.mbx.h53-contract@mail.mil

FRCWP Prod 1 FRCWP Supp 1 FRCWP Bus Off 1

15. TOTAL 0 4 0

G. PREPARED BY

H. DATE

I. APPROVED BY J. DATE

17. PRICE GROUP

PWS

DCMA 1

mailto:usn.atsugi.frcwp.mbx.h53-contract@mail.mil

PREVIOUS EDITION MAY BE USED.
Pages