CDRL A004 PRODUCTION PLAN H-53 12.13.19.pdf

PDF 278 KB Posted

Attached to
H-53E Aircraft Maintenance and Repair Services
Solicitation number
N6264920R0003
Issued by

About this file

This document includes a draft request for proposal (RFP) and performance work statement (PWS) for depot-level aircraft maintenance, repair, and overhaul services in support of United States Navy and Marine Corps H-53 helicopters. Fleet Readiness Center Western Pacific (FRCWP) and NAVSUP Fleet Logistics Center Yokosuka (FLCY) seek these services and invite interested parties to provide feedback on the draft documents. The RFP will be issued for previously numbered solicitation N62649-18-R-0379. Interested offerors must complete a non-disclosure agreement to obtain the specification, which will then be distributed directly via DoD Safe. All questions and comments should be directed to the listed Navy contacts. The services required include maintenance, repair, and overhaul products to support H-53 aircraft in accordance with the terms of the draft PWS and CDRLs.

View the file

Other files

File Type Posted
Pre-Sol Conference Q&A_3.docx DOCX document
Pre-Solicitation Conference Q & A_2.docx DOCX document
H-53 Pre Solic Conf QAs.docx DOCX document
May 2019 HQMC_CNAF RESET Policy Message.pdf PDF
H-53E Att 09 Fac and AF Req 2019-12-13.docx DOCX document
H-53E_Att_14_Price_Summary_Spreadsheet_DRAFT (2019-12-13).xlsx XLSX spreadsheet
04 - H-53E Att 01 PWS (2019-12-13) v1.docx DOCX document
H-53E_QUESTIONS_AND_ANSWERS_13DEC2019.xlsx XLSX spreadsheet
DRAFT RFP N6264920R0003 12.13.19.docx DOCX document
CDRL A007 SITUATION SUMMARY REPORT H-53 12.13.19.pdf PDF
Attachment_4_H-53_PRE_SOL_CONF_ACCEPTABLE_ID_FOR_NAFA_ACCESS.PPTX PPTX presentation
Attachment_2_H-53_PRE_SOLICITATION_CONFERENCE_Designated_Third_Country_Nationals.docx DOCX document
Attachment_1_H-53_PRE_SOLICITATION_CONFERENCE__Access_to_NAF_Atsugi.docx DOCX document
Attachment_3_H-53_PRE_SOL_CONF_Third_Designated_Country_List.pdf PDF
H-53E_Att_07_TEI_Process_at_Contarctor_Facilities_DRAFT.docx DOCX document
CDRL_B007_FINAL_MATERIAL_CONSUMPTION_REPORT_H-53.pdf PDF
CDRL_C001_MEETING_MINUTES_H-53.pdf PDF
CDRL_B002_AVDLR_TRACKER_H-53.pdf PDF
CDRL_A007_SITUATION_SUMMARY_REPORT_H-53.pdf PDF
CDRL_B009_EXCESS_MATERIAL_REPORT_H-53.pdf PDF
CDRL_A002_TECHNICAL_DIRECTIVES_REPORT__H-53.pdf PDF
CDRL_B010_ANNUAL_PHYSICAL_INVENTORY__H-53.pdf PDF
CDRL_G001_MONTHLY_MATERIAL_EXPENSE_REPORT_H-53.pdf PDF
CDRL_B014_DISCREPANT_PART_ON_INDUCTION_REPORT__H-53.pdf PDF
CDRL_B001_DAILY_REQUISITION_REPORT_(DRR)_H-53.pdf PDF
CDRL_A008_EXAMINATION_&_EVALUATION_(E&E)_DISCREPANCY_REPORT_H-53.pdf PDF
CDRL_A005_NOTIFICATION_OF_AIRCRAFT_DELAY_H-53.pdf PDF
CDRL_B004_RECEIPT_REPORT_H-53.pdf PDF
CDRL_A006_SCHEDULED_REMOVAL_CARDS_H-53.pdf PDF
CDRL_L001_TECHNICAL_DATA_INVENTORY_LIST_H-53.pdf PDF
CDRL_D004_CONTRACTOR_TRAINING_PLAN_H-53.pdf PDF
CDRL_C002_PRESENTATION_DOCUMENTATION_H-53.pdf PDF
CDRL_A001_TECHNICAL_DIRECTIVES_REPORT_10_DAY_REPORT__H-53.pdf PDF
CDRL_B008_SUPPORT_EQUIPMENT_(SE)_MAINTENANCE_HISTORY_REPORT_H-53.pdf PDF
CDRL_B011_SUPPORT_EQUIPMENT_MAINTENANCE_AND_CALIBRATION_REPORT_H-53.pdf PDF
CDRL_D002_TRANSITION_STATUS_REPORT_H-53.pdf PDF
CDRL_B013_PARTS_REQUIRED_REPORT_(PRR)_H-53.pdf PDF
CDRL_A004_PRODUCTION_PLAN.pdf PDF
CDRL_B006_ACTIVE_ITEM_REPORT__H-53.pdf PDF
CDRL_B012_COST_PER_BUNO_REPORT_H-53.pdf PDF
CDRL_A003_TDC_KIT_RECEIPT_AND_REPORTING_OF_PARTS_DISCREPANCY_REPORT__H-53.pdf PDF
CDRL_A010_MAINTENANCE_HISTORY_SUMMARY_REPORT_H-53.pdf PDF
CDRL_F001_INTEGRATED_MASTER_SCHEDULE_H-53.pdf PDF
CDRL_A009_NOTED_BUT_NOT_CORRECTED_(NBNC)_REPORT_H-53.pdf PDF
CDRL_D003_TRANSITION_INVENTORY_PLAN_(STAND-DOWN)_H-53.pdf PDF
CDRL_B005_SUPPLY_EFFECTIVENESS_REPORT_H-53.pdf PDF
CDRL_D001_PHASE-IN_TRANSITION_PLAN_H-53.pdf PDF
CDRL_B003_AIRCRAFT_AWAITING_PARTS_(AWP)_REPORT_H-53.pdf PDF
H-53E_Att_12_H-53E_PMID_Induction_Schedule_DRAFT.xlsx XLSX spreadsheet
DRAFT_RFP_N6264920R0003.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages Adobe Professional 8.0

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

H-53 PMID AIRCRAFT

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

PRODUCTION PLAN

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

N/A

5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

FRCWP Production

7. DD 250 REQ

NO

9. DIST STATEMENT

REQUIRED

NONE

10. FREQUENCY

BLOCK 16(4)

12. DATE OF FIRST SUBMISSION

BLOCK 16(4)

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

BLOCK 16(4)

13. DATE OF SUBSEQUENT

SUBMISSION

BLOCK 16(4) Draft

Final

Reg Repro

16. REMARKS

(1) Purpose: The Contractor’s Production Plan (PP) will provide the Government a detailed and effective tool for understanding the Contractor’s production process for an aircraft in flow. The Government will use the Plan to track progress, aid in understanding the Contractor's US Government dependencies and track changes throughout the PMI.

(2) Requirements:

(a) The PP shall portray the schedule from aircraft arrival through to return of the aircraft to the Government. The plan shall demonstrate how the contractor will meet the CDD. While the CDD is set using calendar days, the PP shall accurately indicate days work is being performed. Holidays and weekends shall not lists tasks unless the Contractor intends to perform work on those days.

(b) The PP shall include the following phases as applicable: Induction, Disassembly, Strip, Paint, Evaluation/Inspection, Repair, Reassembly, Operational Checks, Functional Check Flight (FCF) and Delivery.

(c) The PP shall list every task that is required to be performed prior to the aircraft completing PMI, including modifications, CSRs, etc. Individual tasks shall be grouped under the applicable phase and each individual task shall be no longer than 15 days without Government COR concurrence. Tasks may be grouped if they have common predecessors and resource constraints (for example, most tasks would generally be 1-4 days in length (i.e.

Repair Corrosion Zone 1).

(d) Each task shall indicate all other tasks, called predecessors, which are required for its completion. Tasks that are interchangeable in order shall not be listed as predecessors.

(e) The PP shall indicate what major constrained resources are needed for a particular task (i.e. 2 mechanics, 1 avionics, paint hanger, etc.) and lay the schedule out chronologically avoiding any resource constraints. Tasks shall not be made predecessors to account only for resource constraints.

(f) The PP shall identify and document Request for Engineering Instruction (REI) and Material Requisitioning submission as identified in CDRL A003, and the latest need by date for their return. These need by dates shall be the same across all CDRLs. The PP shall also account for work that is not performed by the Contractor but is needed for completion of

PMI,

FRCWP Prod 1

DCMA

15. TOTAL 0 3 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP

FRCWP Bus Ops

FRCWP Comptroller 1

Reset

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

H-53 PMID AIRCRAFT

E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued) however tasks performed by external entities need not be broken down and can exceed 15 days.

(g) The PP shall explicitly identify the critical path in the process. All REIs and parts affecting the critical path shall be clearly indicated.

(3) Format: The PP shall be submitted as a Microsoft Project document or Government approved equivalent (Excel is acceptable); along with an Adobe PDF copy of the Gantt View. The PP shall contain the Gantt chart and a minimum of the following fields: Task Name, % Complete, Baseline Start and Finish, Current (Scheduled) Start and Finish, Actual Start and Finish, Duration, Predecessors and Resources. Deviations from these minimum fields may be approved with the concurrence of the COR.

(4) Frequency:

(a) An initial PP shall be submitted with the Contractor’s response to the Government’s Induction Package for each Aircraft. For the initial submission, tasks that will be performed after the completion of the evaluation phase may be planned at a high level, can exceed 15 days in duration and do not need to include supply or REI need by dates or resources.

(b) A revised PP shall be submitted within 5 work days from completion of the Evaluation Phase to include the submission and need by dates for all REIs and parts not already in stock. The Repair phase shall account for all non-NBNC discrepancies found during the Evaluation phase. If the work required for the discrepancies will cause the schedule to extend the TAT the Contractor shall inform the Government at this time for consideration of possible extensions. Once the post-evaluation PP has been accepted by the Government extensions for excessive discrepancies discovered during the Evaluation Phase may not be granted.

(c) A revised PP shall be provided alongside notifications of delay.

(d) Each new PP revision shall be re-base-lined (i.e. Baseline 1, 2, 3, etc.); progress updates shall not be re-base-lined.

(e) The PP progress shall be updated and available for review and/or discussion during all production status meetings, technical interchange meetings, and Program management Reviews (PMR). This includes updating actual start and finish dates and % complete. Percent complete shall be time-based (i.e. not number of work cards completed), however the Contractor may choose the calculation method (i.e. days of work remaining, 0% start & 100% finish, etc.).

(5) Initial Production Plan and all revisions shall be emailed to FRCWP/DCMA at: usn.atsugi.frcwp.mbx.h53-contract@mail.mil

(6) The Government shall have five working days for review and acceptance/rejection of each submission. No response will indicate acceptance.

DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages mailto:usn.atsugi.frcwp.mbx.h53-contract@mail.mil