CDRL_A001_TECHNICAL_DIRECTIVES_REPORT_10_DAY_REPORT__H-53.pdf

PDF 187 KB Posted

Attached to
H-53E Aircraft Maintenance and Repair Services
Solicitation number
N6264920R0003
Issued by

About this file

This document package includes a Technical Directives Requirement 10 Day Report and information about a draft solicitation for H-53 Aircraft Maintenance and Repair Services.

The Technical Directives Requirement 10 Day Report outlines technical directives that must be incorporated within 10 work days of an aircraft being inducted for programmed depot maintenance. It identifies directives required for review of logbooks and lists, as well as for initial aircraft inspections. The report is submitted to Fleet Readiness Center Western Pacific and includes the aircraft tail number, applicable technical directive numbers, kit requirements, and notes.

The draft solicitation seeks maintenance, repair, and overhaul services in support of U.S. Navy and Marine Corps H-53 aircraft. The Fleet Readiness Center Western Pacific and Naval Supply Systems Command Fleet Logistics Center Yokosuka prepared the draft request for proposals, performance work statement, and additional attachments. Interested parties must submit a signed non-disclosure agreement to obtain the specification and provide feedback on the draft documents. The services required involve depot-level maintenance at a location in Japan.

N6264920R0003 DRAFT CDRL A001

View the file

Other files

File Type Posted
Pre-Sol Conference Q&A_3.docx DOCX document
Pre-Solicitation Conference Q & A_2.docx DOCX document
H-53 Pre Solic Conf QAs.docx DOCX document
May 2019 HQMC_CNAF RESET Policy Message.pdf PDF
H-53E Att 09 Fac and AF Req 2019-12-13.docx DOCX document
CDRL A004 PRODUCTION PLAN H-53 12.13.19.pdf PDF
H-53E_Att_14_Price_Summary_Spreadsheet_DRAFT (2019-12-13).xlsx XLSX spreadsheet
04 - H-53E Att 01 PWS (2019-12-13) v1.docx DOCX document
H-53E_QUESTIONS_AND_ANSWERS_13DEC2019.xlsx XLSX spreadsheet
DRAFT RFP N6264920R0003 12.13.19.docx DOCX document
CDRL A007 SITUATION SUMMARY REPORT H-53 12.13.19.pdf PDF
Attachment_4_H-53_PRE_SOL_CONF_ACCEPTABLE_ID_FOR_NAFA_ACCESS.PPTX PPTX presentation
Attachment_2_H-53_PRE_SOLICITATION_CONFERENCE_Designated_Third_Country_Nationals.docx DOCX document
Attachment_1_H-53_PRE_SOLICITATION_CONFERENCE__Access_to_NAF_Atsugi.docx DOCX document
Attachment_3_H-53_PRE_SOL_CONF_Third_Designated_Country_List.pdf PDF
H-53E_Att_07_TEI_Process_at_Contarctor_Facilities_DRAFT.docx DOCX document
CDRL_B007_FINAL_MATERIAL_CONSUMPTION_REPORT_H-53.pdf PDF
CDRL_C001_MEETING_MINUTES_H-53.pdf PDF
CDRL_B002_AVDLR_TRACKER_H-53.pdf PDF
CDRL_A007_SITUATION_SUMMARY_REPORT_H-53.pdf PDF
CDRL_B009_EXCESS_MATERIAL_REPORT_H-53.pdf PDF
CDRL_A002_TECHNICAL_DIRECTIVES_REPORT__H-53.pdf PDF
CDRL_B010_ANNUAL_PHYSICAL_INVENTORY__H-53.pdf PDF
CDRL_G001_MONTHLY_MATERIAL_EXPENSE_REPORT_H-53.pdf PDF
CDRL_B014_DISCREPANT_PART_ON_INDUCTION_REPORT__H-53.pdf PDF
CDRL_B001_DAILY_REQUISITION_REPORT_(DRR)_H-53.pdf PDF
CDRL_A008_EXAMINATION_&_EVALUATION_(E&E)_DISCREPANCY_REPORT_H-53.pdf PDF
CDRL_A005_NOTIFICATION_OF_AIRCRAFT_DELAY_H-53.pdf PDF
CDRL_B004_RECEIPT_REPORT_H-53.pdf PDF
CDRL_A006_SCHEDULED_REMOVAL_CARDS_H-53.pdf PDF
CDRL_L001_TECHNICAL_DATA_INVENTORY_LIST_H-53.pdf PDF
CDRL_D004_CONTRACTOR_TRAINING_PLAN_H-53.pdf PDF
CDRL_C002_PRESENTATION_DOCUMENTATION_H-53.pdf PDF
CDRL_B008_SUPPORT_EQUIPMENT_(SE)_MAINTENANCE_HISTORY_REPORT_H-53.pdf PDF
CDRL_B011_SUPPORT_EQUIPMENT_MAINTENANCE_AND_CALIBRATION_REPORT_H-53.pdf PDF
CDRL_D002_TRANSITION_STATUS_REPORT_H-53.pdf PDF
CDRL_B013_PARTS_REQUIRED_REPORT_(PRR)_H-53.pdf PDF
CDRL_A004_PRODUCTION_PLAN.pdf PDF
CDRL_B006_ACTIVE_ITEM_REPORT__H-53.pdf PDF
CDRL_B012_COST_PER_BUNO_REPORT_H-53.pdf PDF
CDRL_A003_TDC_KIT_RECEIPT_AND_REPORTING_OF_PARTS_DISCREPANCY_REPORT__H-53.pdf PDF
CDRL_A010_MAINTENANCE_HISTORY_SUMMARY_REPORT_H-53.pdf PDF
CDRL_F001_INTEGRATED_MASTER_SCHEDULE_H-53.pdf PDF
CDRL_A009_NOTED_BUT_NOT_CORRECTED_(NBNC)_REPORT_H-53.pdf PDF
CDRL_D003_TRANSITION_INVENTORY_PLAN_(STAND-DOWN)_H-53.pdf PDF
CDRL_B005_SUPPLY_EFFECTIVENESS_REPORT_H-53.pdf PDF
CDRL_D001_PHASE-IN_TRANSITION_PLAN_H-53.pdf PDF
CDRL_B003_AIRCRAFT_AWAITING_PARTS_(AWP)_REPORT_H-53.pdf PDF
H-53E_Att_12_H-53E_PMID_Induction_Schedule_DRAFT.xlsx XLSX spreadsheet
DRAFT_RFP_N6264920R0003.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages Reset

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY: X

TDP TM OTHER

D. SYSTEM/ITEM

H-53 PMID AIRCRAFT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

TECHNICAL DIRECTIVES REQUIREMENT

10 DAY REPORT

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

NONE

5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

FRCWP

7. DD 250 REQ

NO

9. DIST STATEMENT

REQUIRED

NONE

10. FREQUENCY

Each PMI Aircraft

12. DATE OF FIRST SUBMISSION

NOTE 4

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

NOTE 4

13. DATE OF SUBSEQUENT

SUBMISSION

NOTE 4 Draft

Final

Reg Repro

16. REMARKS

(1) Description: Contractor shall submit Technical Directives Requirement 10 Day Report report within 10 work days after an aircraft is inducted to PMI.

(2). Purpose: This document identifies Technical Directives required for incorporation after review of the aircraft logbooks, List 02 and List 04, or the PMI special work request. This document is required also for aircraft initial inspection.

(3) Format: A sample document is attached.

(4) Frequency: 10 work days after PMI aircraft is inducted.

Shall be emailed to FRCWP at: usn.atsugi.frcwp.mbx.h53-contract@mail.mil

FRCWP Prod 1 FRCWP Bus Ops 1

DCMA 1

15. TOTAL 0 3 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP

mailto:usn.atsugi.frcwp.mbx.h53-contract@mail.mil

Date:

From: Contractor To: FRCWP AFC Mod Manager Via: DCMA Subj: AIRCRAFT CONFIGURATION - 10 DAY REPORT FOR T/M/S BUNO

FRCWP's DECISION

TD NO. SUBJECT KIT FUND CODE COMPLY/NBNC NOTE

AFC-519 Pt3

INTERGRADED MECHANICAL DIAGNOSTICS SYSTEM (IMDS)

INSTALLATION OF

A3/A4

AFC-540

ADVANCED DIGITAL ANTENNA PRODUCTION (ADAP) SYSTEM,

INSTALLATION OF

A2/A3

AFC-562 Pt2

CRASH ATTENUATING CREW CHIEF SEAT, INSTALLATION IN

THE MH HELICOPTERS

A1

AFC-573

REPLACEMENT OF STARBOARD FORWARD AND AFT GUN

MOUNT BRACKETS

A1

AFC-583 AM1 PANEL, TAKEOFF LANDING INSTRUCTION, REPLACEMENT OF NA

AFB-339 REV-A

ONE TIME INSPECTION FOR RADIOLOGICAL CONTAMINATION

OF AIRCRAFT AND WRA

NA

AFB-340 REV-A

SWITCH GUARD SHEARWIRE INSTALLATION PN MS25225-1,

INSPECTION OF

NA

DCB-169

MAIN GEARBOX (MGB) INPUT DRIVE SHAFT FLANGE CRACKS,

INSPECTION OF

NA

File details come from the government source that posted it. Updated .