CDRL_A001_TECHNICAL_DIRECTIVES_REPORT_10_DAY_REPORT__H-53.pdf
PDF 187 KB Posted
- Attached to
- H-53E Aircraft Maintenance and Repair Services
- Solicitation number
- N6264920R0003
About this file
This document package includes a Technical Directives Requirement 10 Day Report and information about a draft solicitation for H-53 Aircraft Maintenance and Repair Services.
The Technical Directives Requirement 10 Day Report outlines technical directives that must be incorporated within 10 work days of an aircraft being inducted for programmed depot maintenance. It identifies directives required for review of logbooks and lists, as well as for initial aircraft inspections. The report is submitted to Fleet Readiness Center Western Pacific and includes the aircraft tail number, applicable technical directive numbers, kit requirements, and notes.
The draft solicitation seeks maintenance, repair, and overhaul services in support of U.S. Navy and Marine Corps H-53 aircraft. The Fleet Readiness Center Western Pacific and Naval Supply Systems Command Fleet Logistics Center Yokosuka prepared the draft request for proposals, performance work statement, and additional attachments. Interested parties must submit a signed non-disclosure agreement to obtain the specification and provide feedback on the draft documents. The services required involve depot-level maintenance at a location in Japan.
N6264920R0003 DRAFT CDRL A001
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages Reset
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY: X
TDP TM OTHER
D. SYSTEM/ITEM
H-53 PMID AIRCRAFT
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
TECHNICAL DIRECTIVES REQUIREMENT
10 DAY REPORT
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
NONE
5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
FRCWP
7. DD 250 REQ
NO
9. DIST STATEMENT
REQUIRED
NONE
10. FREQUENCY
Each PMI Aircraft
12. DATE OF FIRST SUBMISSION
NOTE 4
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
NOTE 4
13. DATE OF SUBSEQUENT
SUBMISSION
NOTE 4 Draft
Final
Reg Repro
16. REMARKS
(1) Description: Contractor shall submit Technical Directives Requirement 10 Day Report report within 10 work days after an aircraft is inducted to PMI.
(2). Purpose: This document identifies Technical Directives required for incorporation after review of the aircraft logbooks, List 02 and List 04, or the PMI special work request. This document is required also for aircraft initial inspection.
(3) Format: A sample document is attached.
(4) Frequency: 10 work days after PMI aircraft is inducted.
Shall be emailed to FRCWP at: usn.atsugi.frcwp.mbx.h53-contract@mail.mil
FRCWP Prod 1 FRCWP Bus Ops 1
DCMA 1
15. TOTAL 0 3 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP
mailto:usn.atsugi.frcwp.mbx.h53-contract@mail.mil
Date:
From: Contractor To: FRCWP AFC Mod Manager Via: DCMA Subj: AIRCRAFT CONFIGURATION - 10 DAY REPORT FOR T/M/S BUNO
FRCWP's DECISION
TD NO. SUBJECT KIT FUND CODE COMPLY/NBNC NOTE
AFC-519 Pt3
INTERGRADED MECHANICAL DIAGNOSTICS SYSTEM (IMDS)
INSTALLATION OF
A3/A4
AFC-540
ADVANCED DIGITAL ANTENNA PRODUCTION (ADAP) SYSTEM,
INSTALLATION OF
A2/A3
AFC-562 Pt2
CRASH ATTENUATING CREW CHIEF SEAT, INSTALLATION IN
THE MH HELICOPTERS
A1
AFC-573
REPLACEMENT OF STARBOARD FORWARD AND AFT GUN
MOUNT BRACKETS
A1
AFC-583 AM1 PANEL, TAKEOFF LANDING INSTRUCTION, REPLACEMENT OF NA
AFB-339 REV-A
ONE TIME INSPECTION FOR RADIOLOGICAL CONTAMINATION
OF AIRCRAFT AND WRA
NA
AFB-340 REV-A
SWITCH GUARD SHEARWIRE INSTALLATION PN MS25225-1,
INSPECTION OF
NA
DCB-169
MAIN GEARBOX (MGB) INPUT DRIVE SHAFT FLANGE CRACKS,
INSPECTION OF
NA
File details come from the government source that posted it. Updated .