This is Amendment 0010 to solicitation N40085-25-R-2549 for the Repair BEQ HP505 project at MCB Camp Lejeune, NC, issued by NAVFAC Mid-Atlantic. The amendment extends the proposal due date to January 22, 2025 at 1500 hours and provides responses to contractor questions regarding serviceable equipment, asbestos removal requirements, and technical specifications.
Key clarifications include: approximately 10% of task chairs and 20% of refrigerators/microwaves will be tagged as serviceable prior to demolition; ACM flat roofing material requires removal prior to demolition due to potential friability; specifications for Packaged Terminal Heat Pumps and Anti Ligature Enclosures will be provided after award; and specification section 33 61 14 for Exterior Buried Preinsulated Water Piping is provided. The amendment maintains the requirement for an ACI certified and PE licensed QCM, and confirms that stainless steel door closers are required per UFGS due to project location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0016.pdf | ||
| Amend 0015.pdf | ||
| Amend 0014.pdf | ||
| Amend 0013.pdf | ||
| 60040360.pdf | ||
| 60040406.pdf | ||
| 60040345.pdf | ||
| 60040454.pdf | ||
| 60040373.pdf | ||
| 60040328.pdf | ||
| 60040433.pdf | ||
| 60040414.pdf | ||
| N4008523B0034 SpecsAsOne Addendum 01.pdf | ||
| 60040411.pdf | ||
| 60040407.pdf | ||
| 60040434.pdf | ||
| 60040420.pdf | ||
| 60040412.pdf | ||
| 60040343.pdf | ||
| Amend 0012.pdf | ||
| 60040362.pdf | ||
| 60040342.pdf | ||
| 60040447.pdf | ||
| 60040408.pdf | ||
| 60040436.pdf | ||
| 60040424.pdf | ||
| 60040329.pdf | ||
| 60040422.pdf | ||
| 60040366.pdf | ||
| 60040376.pdf | ||
| 60040359.pdf | ||
| Amend 0011.pdf | ||
| Amend 0009.pdf | ||
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| Amend 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| 23-0034 Asbestos and Lead Assessment.pdf | ||
| 23-0034 Appendix D.pdf | ||
| N4008523B0034 DWGs.pdf | ||
| RFP 230034.pdf | ||
| N4008523B0034 SPECS.pdf |
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 30
AMENDMENT NO. 0010 01/13/25 23-0034
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107 A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-25-R-2549
11/18/24
23-0034, Repair BEQ HP505: Proposal due date extension.
The time and date for receipt of proposals has changed to 1500, on 22 January 2025.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
N40085-25-R-2549 Amendment 0010
CONTINUATION SHEET
1. Answers to RFI’s:
1. QUESTION: Which task chairs, comforters, refrigerators and microwaves are serviceable?
ANSWER: Supply Management Division will tag the items deemed serviceable prior to demolition occurring. Approximately 10% task chairs and 20% of refrigerators/microwaves will be serviceable.
2. QUESTION: Division 02 82 (Asbestos Removal ) is not included in the project specifications. HP-135 is noted as having 14,000sf of built-up roofing and 1,200sf of perimeter roof flashing. These materials are noted as being in the attic under a truss roof system. Is the contractor required to remove the material prior to demolition or can the asbestos roofing be demolished with the building as a Cat 1 non-friable.
ANSWER: Due to orientation of the truss roof system, demolition of the ACM flat roofing material may not be possible, without causing the material to become friable. Recommend removal of the material prior to demolition.
3. QUESTION: Will there be any asbestos containing material encountered while cutting/drilling/etc. into the existing backup CMU wall?
ANSWER: Asbestos survey sampling methods were limited; no coring, jack hammering, or other mechanical means were utilized to observe areas behind brick, concrete masonry blocks or concrete slabs. ECS should be called to the site to sample such materials if they are discovered during the demolition or they will need to be assumed positive at the time of discovery and treated as ACM.
4. QUESTION: There are no specs for the Packaged Terminal Heat Pumps or the Anti Ligature Enclosures. This has been provided in the previous BEQ’s. Will spec be provided for these items?
ANSWER: Specifications will be provided after award.
5. QUESTION: There seems to be no specification section to address the buried pre-insulated water piping systems consisting of the chilled water, heating hot water, domestic hot water, and the domestic hot water return piping that connects the mechanical building to BEQ 505. Will factory applied pre-insulated piping be required for this project?
ANSWER: Specification section 33 61 14 Exterior Buried Preinsulated Water Piping provided.
N40085-25-R-2549 Amendment 0010
6. QUESTION: If factory applied pre-insulated piping will be required for the buried chilled water, heating hot water, domestic hot water, and domestic hot water return piping, may we have this specification section added to the government specifications set?
ANSWER: Specification section 33 61 14 Exterior Buried Preinsulated Water Piping provided.
7. QUESTION: Will we be able to install field applied insulation kits for the 90* elbows and other joints needed for the buried pre-insulated chilled water, heating hot water, domestic hot water, and the domestic hot water return piping as we have done in the past on similar projects located on Camp Lejeune?
ANSWER: Specification section 33 61 14 Exterior Buried Preinsulated Water Piping provided.
8. QUESTION: Spec section 03 30 00 – Para 1.6.6 calls for the QCM to be ACI certified and hold a current PE license. Question #2 of Amendment 0007 requested these requirements to be waived. This request was denied, and this poses a significant problem for the contractor. The scope of this project contains a relatively small amount of concrete work (sidewalks, mechanical building, etc.). While it is understandable to have an ACI certified QCM on projects with large footprints, such as warehouses or large multistory buildings, the certification seems unnecessary for what is required for HP505. As for the PE license, a QCM does not typically perform work that utilizes the need for this. Being that this is a plan-spec job, the PEs on the design team are there to resolve any issues that require the judgment of a professional engineer. Additionally, all testing and inspections will be performed by qualified firms, concrete or otherwise.
ANSWER: A QCM per the specs is still required.
9. QUESTION: Hardware spec(08 71 00) calls for closers of stainless steel or non-ferrous materials(aluminum). Hardware schedule calls for closers to have a 630 finish. Stainless steel closers are substantially more expensive than aluminum. Going with aluminum door closers at all openings would be a major cost savings to the gov’t. Is the intent to provide stainless steel door closers or will aluminum closers be acceptable?
ANSWER: UFGS requires SS closers due to project location.
2. All other terms and conditions remain unchanged.
Repairs BEQ HP505 Project No. 23-0034 MCB Camp Lejeune, NC
SECTION 33 61 14
EXTERIOR BURIED PREINSULATED WATER PIPING
02/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B16.5 (2020) Pipe Flanges and Flanged Fittings NPS 1/2 Through NPS 24 Metric/Inch Standard
ASME B16.9 (2018) Factory-Made Wrought Buttwelding Fittings
ASME B16.11 (2022) Forged Fittings, Socket-Welding and Threaded
ASME B16.18 (2021) Cast Copper Alloy Solder Joint Pressure Fittings
ASME B16.22 (2021) Wrought Copper and Copper Alloy Solder Joint Pressure Fittings
ASME B16.24 (2022) Cast Copper Alloy Pipe Flanges, Flanged Fittings, and Valves Classes 150, 300, 600, 900, 1500, and 2500
ASME B31.1 (2022) Power Piping
ASTM INTERNATIONAL (ASTM)
ASTM A53/A53M (2022) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A106/A106M (2019a) Standard Specification for Seamless Carbon Steel Pipe for High-Temperature Service
ASTM A193/A193M (2022a) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications
ASTM A194/A194M (2022) Standard Specification for Carbon Steel, Alloy Steel, and Stainless Steel Nuts for Bolts for High-Pressure or High-Temperature Service, or Both
ASTM B32 (2020) Standard Specification for Solder Metal
SECTION 33 61 14 Page 1
ASTM B88 (2022) Standard Specification for Seamless Copper Water Tube
ASTM D229 (2019) Standard Test Methods for Rigid Sheet and Plate Materials Used for Electrical Insulation
ASTM D1330 (2004; R 2010) Rubber Sheet Gaskets
ASTM D1784 (2020) Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds
ASTM D1785 (2015; E 2018) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120
ASTM D2466 (2017) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40
ASTM D2564 (2020) Standard Specification for Solvent Cements for Poly(Vinyl Chloride) (PVC) Plastic Piping Systems
ASTM D2996 (2017) Standard Specification for Filament-Wound "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Pipe
1.2 SYSTEM DESCRIPTION
Provide new exterior buried factory-prefabricated preinsulated water piping system to the first piping connection aboveground or within each building complete and ready for operation. Piping system includes hot domestic water piping, recirculating hot domestic water piping, chilled water piping, and related work . Hot domestic water piping within each building is specified under Section 22 00 00 PLUMBING, GENERAL PURPOSE.
Chilled water piping within each building is specified under Section
23 64 26 CHILLED WATER PIPING SYSTEMS.
1.3 SUBMITTALS
Government approval is required for all submittals. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Factory-prefabricated preinsulated water piping system
Preinsulated plastic pipe field joints
Show layout of piping system. Drawings must have Professional Engineer Seal.
SD-03 Product Data
SECTION 33 61 14 Page 2
Pipe, fittings, and end connections
Factory-prefabricated preinsulated water piping system
Plastic reinforced thermosetting resin (RTR) piping
SD-07 Certificates
Certification of welders' qualifications
SD-08 Manufacturer's Instructions
Installation manual for buried factory-prefabricated preinsulated water piping system
1.4 QUALITY ASSURANCE
1.4.1 Certification of Welders' Qualifications
Submit prior to site welding of steel piping; certifications shall be not more than one year old.
PART 2 PRODUCTS
2.1 BURIED FACTORY-PREFABRICATED PREINSULATED WATER PIPING SYSTEM
Piping (pipe, fittings, and end connections) system shall be suitable for working pressure of 125 psig at 250 degrees F, except plastic polyvinyl chloride (PVC) chilled water piping shall be suitable for working pressure of 125 psig at 75 degrees F. Piping system shall withstand H-20 highway loading with 2 feet of compacted backfill over top of conduit. Mark each section of conduit with fabricator's name, product identification, and publications to which the items conform. Provide each section of carrier pipe including factory-applied insulation and conduit, with waterproof conduit ends at both ends of each section of carrier pipe, except for piping systems which have the field joints insulated and covered with waterproof shrink sleeves.
2.1.1 Factory-Applied Insulation
Polyurethane or polyisocyanate insulation, minimum density of 1.7 pcf, rated for not less than 250 degrees F, completely filling space between carrier pipe and conduit.
2.1.2 Factory-Applied Conduit
Conduit material, size, and thickness shall be as follows:
Carrier Pipe (Inches)
Minimum Conduit Size (Inches)
Minimum Conduit Thickness (Inches)
2 4 0.060
3 6 0.060
SECTION 33 61 14 Page 3
Carrier Pipe (Inches)
Minimum Conduit Size (Inches)
Minimum Conduit Thickness (Inches)
4 8 0.080
6 10 0.100
8 12 0.120
10 14 0.120
a. Plastic PVC pipe conduit: ASTM D1784, Class 12454-B compound extruded seamless PVC plastic pipe.
b. Plastic RTR pipe conduit: ASTM D2996, filament-wound, fiberglass RTR plastic pipe, without liner.
c. Plastic RTR factory lay-up conduit: Conduit shall be machine-applied continuous rovings of fiberglass strands saturated with isophthalic polyester or epoxy resin filament wound in helical pattern directly to the outer surface of the pipe insulation. In lieu of minimum conduit size for each size of carrier pipe, provide minimum of one inch thick insulation for 2 inch carrier pipe and provide minimum of 1.5 inch thick insulation for 3 inch and larger carrier pipe.
2.1.3 Factory-Applied End Seals
Provide watertight end seal, or factory lay-up type end seal between carrier pipe and conduit. Provide sufficient surface bonding area between carrier pipe and conduit to ensure permanent watertight end seal suitable for use with temperature limits of carrier pipe.
2.1.4 Factory-Prefabricated Carrier Piping
Pipe, fittings, flanges, and couplings shall be marked with manufacturer's name, product identification, and publication to which items conform.
Carrier piping shall be as specified in this section. Buried carrier pipe connections between straight sections of pipe beyond 5 feetexterior of buildings may be manufacturer's standard O-ring connections designed to absorb pipe expansion and contraction at working pressure of 125 psig with no leakage. Connections at elbows and tees shall be other than O-ring connections.
2.2 CARRIER PIPING
2.2.1 Copper Tubing
Provide copper tubing for hot domestic water piping, recirculating hot domestic water piping, chilled water piping, chilled-hot water piping, and hot water piping.
a. Copper tubing: Provide ASTM B88, Type L or M copper tubing for buried factory-prefabricated preinsulated piping and for aboveground piping.
Provide ASME B16.18 or ASME B16.22 solder joint fittings, unions, and flanges; provide adapters as required.
b. Solder for copper tubing: Provide ASTM B32, 95-5 tin-antimony solder or provide Plumbing Code approved lead-free solder.
SECTION 33 61 14 Page 4
c. Flanged connections: Provide ASME B16.24, Class 150, solder joint flat face flanged connections.
d. O-ring connections: Provide between straight sections of pipe beyond 5 feet of exterior of buildings.
2.2.2 Steel Piping
Provide steel piping for chilled water piping, chilled-hot water piping, and hot water piping.
a. Steel pipe: Provide ASTM A53/A53M, Type E (electric-resistance welded, Grade A or B), ASTM A53/A53M, Type S (seamless, Grade A or B), or ASTM A106/A106M (seamless, Grade A or B). Provide Weight Class STD (Standard) or Schedule No. 40 black steel pipe for welding end connections. Provide Weight Class XS (Extra Strong) or Schedule No.
80 black steel pipe for threaded end connections.
b. Steel pipe fittings: Provide ASME B16.9 buttwelding fittings of the same material and weight as the piping in which fittings are installed. Provide ASME B16.11 socket welding fittings.
c. Steel pipe flanges: Provide ASME B16.5, Class 150 flanges.
d. O-ring connections: Provide between straight sections of pipe beyond 5 feet of exterior of buildings.
2.2.3 Plastic Reinforced Thermosetting Resin (RTR) Piping
Provide plastic RTR piping for hot domestic water piping, recirculating hot domestic water piping, chilled water piping, chilled-hot water piping, and hot water piping.
a. Plastic carrier pipe, fittings, and adhesive: Provide plastic carrier piping conforming to the Federal Agency Approved Brochure. Pipe, fittings, and adhesive shall be supplied by same manufacturer. Pipe, fittings, flanges, and couplings shall have end connections of the adhesive bell and spigot type. Threaded piping, including pipe, fittings, flanges, and couplings, will not be permitted.
b. Flanged connections: Provide flat face flanged connections between plastic piping and metal piping. Plastic flanges shall be suitable for connecting to ASME Class 150 flanges.
c. Plastic RTR piping sizes: When piping sizes other than 2, 3, 4, 6, and 8 inches are indicated, provide next larger piping size. The connecting system piping shall be of the same size or increased to meet next size of RTR piping.
2.2.4 Plastic PVC Piping
Provide plastic PVC piping only for chilled water piping.
a. Plastic PVC carrier pipe, fittings, and cement: ASTM D1785pipe, ASTM D2466 socket type fittings, and ASTM D2564solvent cement shall be supplied by the same manufacturer. Pipe, fittings, flanges, and couplings shall have solvent cement socket end connections, except piping beyond 5 feet outside of buildings shall have O-ring
SECTION 33 61 14 Page 5 connections. Plastic PVC piping shall be suitable for working pressure of 125 psig at 75 degrees F.
b. Flanged connections: Provide flat face flanged connections between plastic piping and metal piping. Plastic flanges shall be suitable for connecting to ASME Class 150 flanges.
c. O-ring connections: Provide between straight sections of pipe beyond 5 feet of exterior of buildings.
2.3 FLANGED CONNECTIONS
Provide ASME Class 150 flat face flanged connections.
a. Gaskets: ASTM D1330, except Shore A durometer hardness shall be 55 to 65, 0.125 inch thick ethylene propylene. Provide one piece factory cut full-face gaskets.
b. Bolts: ASTM A193/A193M, Grade B7. Extend minimum of two full threads beyond nut with bolts tightened to required torque.
c. Nuts: ASTM A194/A194M, Grade 7, with Teflon coated threads.
d. Washers: Provide galvanized steel flat circular washers under bolt heads and nuts.
e. Electrically isolating (insulating) gaskets for connections between metal flanges: Provide ASTM D229 electrical insulating material of 1000 ohms minimum resistance. Provide one piece factory cut insulating gaskets between flanges. Provide silicon-coated fiberglass insulating sleeves between bolts and holes in flanges; bolts may have reduced shanks of diameter not less than diameter at root of threads.
Provide 0.125 inch thick high-strength insulating washers next to flanges and provide stainless steel flat circular steel washers over insulating washers and under bolt heads and nuts. Provide bolts 0.5 inch longer than standard length to compensate for thicker insulating gaskets and washers under bolt heads and nuts.
2.4 BURIED WARNING AND IDENTIFICATION TAPE
Provide detectable aluminum foil plastic backed tape or detectable magnetic plastic tape manufactured specifically for warning and identification of buried piping. Tape shall be detectable by an electronic detection instrument. Provide tape in rolls, 3 inches minimum width, color coded for the utility involved with warning and identification imprinted in bold black letters continuously and repeatedly over entire tape length. Warning and identification shall read "CAUTION BURIED PREINSULATED WATER PIPING BELOW" or similar wording. Use permanent code and letter coloring unaffected by moisture and other substances contained in trench backfill material.
2.5 CONCRETE THRUST BLOCKS
Provide concrete thrust blocks as specified in Section 03 30 00 CAST-IN-PLACE CONCRETE. Concrete shall be of 4000 psi minimum 28 day compressive strength, air-entrained admixture (3.6 ounces per cubic yard) with water-reducing admixture (22 ounces per cubic yard).
SECTION 33 61 14 Page 6
2.6 PIPE SLEEVES
Provide where piping passes entirely through walls and floors. Provide sleeves of sufficient length to pass through entire thickness of walls and floors. Provide one inch minimum clearance between exterior of piping or pipe insulation, and interior of sleeve or core-drilled hole. Firmly pack space with mineral wool insulation. Seal space at both ends of sleeve or core-drilled hole with plastic waterproof cement which will dry to a firm but pliable mass, or provide mechanically adjustable segmented elastomeric seal. In fire walls and fire floors, seal both ends of sleeves or core-drilled holes with UL listed fill, void, or cavity material.
a. Sleeves in masonry and concrete walls and floors: Provide hot-dip galvanized steel, ductile-iron, or cast-iron sleeves. Core drilling of masonry and concrete may be provided in lieu of sleeves when cavities in the core-drilled hole are grouted smooth.
b. Sleeves in other than masonry and Concrete walls and floors: Provide 26 gage galvanized steel sheet.
2.7 ESCUTCHEON PLATES
Provide split hinge type metal plates for piping entering walls and floors in exposed spaces. Provide polished stainless steel plates or chromium-plated finish on copper alloy plates in finished spaces. Provide paint finish on metal plates in unfinished spaces.
PART 3 EXECUTION
3.1 INSTALLATION
Installation of exterior buried factory-prefabricated preinsulated water piping systems shall be in accordance with manufacturer's installation manual. Welding of steel piping including qualification of welders shall be in accordance with ASME B31.1, metallic arc process. Deviations shall not be permitted unless authorized in writing by Contracting Officer.
Install piping straight and true to bear evenly on sand bedding material.
Installation and field assembly of plastic RTR piping shall be in accordance with the Federal Agency Approved Brochure.
a. Cleaning of piping: Keep interior and ends of new piping and existing piping affected by the Contractor's operations, cleaned of water and foreign matter during installation by means of plugs or other approved methods. When work is not in progress, securely close open ends of pipe and fittings to prevent entry of water and foreign matter.
Inspect piping before placing into position.
b. Demolition: Remove materials so as not to damage materials which are to remain. Replace existing work damaged by the Contractor's operations with new work of the same construction.
3.2 FIELD JOINTS
a. Carrier piping joints without concrete anchor: Pressure test and approve piping joints. Provide joints with polyurethane or polyisocyanate insulation of same type and thickness as insulation on carrier piping. Provide waterproof shrink sleeves to cover insulation and overlap not less than 6 inches of each end of conduit section.
SECTION 33 61 14 Page 7
b. Carrier piping joints with concrete anchor: Pressure test and approve piping joints. Provide each elbow and tee with concrete anchors (thrust blocks). Provide waterproof end seals between carrier piping and conduit adjacent to each carrier pipe fitting. Encase carrier pipe fitting and at least 2 inches of each end of conduit with a minimum of 6 inches of concrete.
3.3 BURIED FACTORY-PREFABRICATED PREINSULATED PIPE INSTALLATION
a. Assembly and alignment: Assemble carrier pipe and fittings according to manufacturer's installation manual; assemble plastic RTR piping in accordance with the Federal Agency Approved Brochure. Maintain proper alignment during assembly of joints.
b. Bedding: Accurately grade trench bedding with a minimum of 6 inches of manufactured or natural sand. Backfill sand to a minimum of 6 inches above and below conduit. Lay bedding to firmly support conduit along entire length.
c. Concrete thrust blocks: Encase each elbow and tee of carrier pipe in thrust block with minimum of 3 square feet of thrust-bearing surface cast against undisturbed soil, minimum pipe-to-bearing surface single dimension of 10 inches perpendicular to bearing surface, and minimum volume of 9 cubic feet, except as indicated otherwise. Disturbed soil under and around thrust blocks shall be compacted.
3.4 FIELD QUALITY CONTROL
Before final acceptance of work, test each system to demonstrate compliance with contract requirements. Thoroughly flush and clean piping before placing in operation. Flush piping at minimum velocity of 8 fps.
Correct defects in the work and repeat tests until work is in compliance with contract requirements. Furnish potable water, electricity, instruments, connecting devices, and personnel for tests.
a. Field tests of carrier piping: Do not cover carrier piping joints with insulation or concrete anchors (thrust blocks), until carrier piping joints pass field tests.
b. Hydrostatic pressure test: Test piping system at 200 psig for minimum holding period of 2 hours during which time pressure shall not drop more than 4 psi; test plastic RTR piping in accordance with Federal Agency Approved Brochure. Pressure drop greater than 4 psicorrected for temperature variation constitutes failure. Valve off piping system and disconnect method of piping system pressurization before starting the 2 hour pressure holding period. During hydrostatic pressure test, examine piping system for leaks. Repair leaking joints, replace damaged and porous pipe and fittings with new materials, and repeat tests.
c. Thrust blocks: If O-ring connections are used, provide temporary thrust blocks prior to hydrostatic pressure testing of piping system.
Place bedding and backfill around center portion of piping system, leaving thrust blocks and field joints clear for observation. After successful completion of hydrostatic pressure test, cast concrete thrust blocks.
d. Field inspections: Prior to initial operation, inspect piping system for compliance with drawings, specifications, and manufacturer's
SECTION 33 61 14 Page 8 submittals.
3.5 DISINFECTION
Disinfect new hot domestic water piping under Section 22 00 00 PLUMBING, GENERAL PURPOSE.
-- End of Section --
SECTION 33 61 14 Page 9
SECTION 23 81 00
DECENTRALIZED UNITARY HVAC EQUIPMENT
05/18
PART 1 GENERAL
1.1 RELATED REQUIREMENTS
Section 23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS, applies to this section with the additions and modifications specified herein.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI 350 (2015) Sound Rating of Non-Ducted Indoor Air-Conditioning Equipment
AHRI 390 (2003) Performance Rating of Single Package Vertical Air-Conditioners and Heat Pumps
AHRI 700 (2016) Specifications for Fluorocarbon Refrigerants
AHRI DCAACP (Online) Directory of Certified Applied Air-Conditioning Products
ANSI/AHRI 210/240 (2008; Add 1 2011; Add 2 2012) Performance Rating of Unitary Air-Conditioning & Air-Source Heat Pump Equipment
ANSI/AHRI 460 (2005) Performance Rating of Remote Mechanical-Draft Air-Cooled Refrigerant Condensers
ANSI/AHRI 495 (2005) Performance Rating of Refrigerant Liquid Receivers
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ANSI/ASHRAE 15 & 34 (2016) ANSI/ASHRAE Standard 15-Safety Standard for Refrigeration Systems and ANSI/ASHRAE Standard 34-Designation and Safety Classification of Refrigerants
ASHRAE 15 & 34 (2013) ASHRAE Standard 34-2016 Safety Standard for Refrigeration Systems/ASHRAE Standard 34-2016 Designation and Safety
SECTION 23 81 00 Page 1
Classification of Refrigerants-ASHRAE Standard 34-2016
ASHRAE 52.2 (2017) Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size
ASHRAE 55 (2010) Thermal Environmental Conditions for Human Occupancy
ASHRAE 62.1 (2016) Ventilation for Acceptable Indoor Air Quality
ASHRAE 90.1 - IP (2019; Errata 1 2019; Errata 2-6 2020;
Addenda BY-CP 2020; Addenda AF-DB 2020;
Addenda A-G 2020; Addenda F-Y 2021;
Errata 7-8 2021; Addenda AS-CB 2022) Energy Standard for Buildings Except Low-Rise Residential Buildings
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME BPVC SEC IX (2017; Errata 2018) BPVC Section IX-Welding, Brazing and Fusing Qualifications
ASME BPVC SEC VIII D1 (2019) BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1
AMERICAN WELDING SOCIETY (AWS)
AWS Z49.1 (2021) Safety in Welding and Cutting and Allied Processes
ASTM INTERNATIONAL (ASTM)
ASTM B117 (2019) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM C1071 (2019) Standard Specification for Fibrous Glass Duct Lining Insulation (Thermal and Sound Absorbing Material)
ASTM D520 (2000; R 2011) Zinc Dust Pigment
ASTM E84 (2020) Standard Test Method for Surface Burning Characteristics of Building Materials
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2018) Motors and Generators
NEMA MG 2 (2014) Safety Standard for Construction and Guide for Selection, Installation and Use of Electric Motors and Generators
SECTION 23 81 00 Page 2
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020;
ERTA 20-3 2020; TIA 20-1; TIA 20-2; TIA
20-3; TIA 20-4; TIA 20-5; TIA 20-6; TIA
20-7; TIA 20-8; TIA 20-9; TIA 20-10; TIA
20-11; TIA 20-12; TIA 20-13; TIA 20-14;
TIA 20-15; TIA 20-16; ERTA 20-4 2022)
National Electrical Code
NFPA 90A (2021) Standard for the Installation of Air Conditioning and Ventilating Systems
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-DTL-5541 (2006; Rev F) Chemical Conversion Coatings on Aluminum and Aluminum Alloys
UNDERWRITERS LABORATORIES (UL)
UL 207 (2009; Reprint Jan 2020) Refrigerant-Containing Components and Accessories, Nonelectrical
UL 586 (2009; Reprint Dec 2017) UL Standard for Safety High-Efficiency Particulate, Air Filter Units
UL 900 (2015) Standard for Air Filter Units
UL 1995 (2015) UL Standard for Safety Heating and Cooling Equipment
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Coil Corrosion Protection
Supplied Products
Manufacturer's Standard Catalog Data
SD-06 Test Reports
Refrigerant Tests, Charging, and Start-Up; G
System Performance Tests; G
SECTION 23 81 00 Page 3
SD-07 Certificates
Service Organizations
SD-11 Closeout Submittals
Ozone Depleting Substances; S
1.4 QUALITY ASSURANCE
Carefully investigate the plumbing, fire protection, electrical, structural and finish conditions that would affect the work to be performed and arrange such work accordingly, furnishing required offsets, fittings, and accessories to meet such conditions. Submit drawings consisting of:
a. Equipment layouts which identify assembly and installation details.
b. Plans and elevations which identify clearances required for maintenance and operation.
c. Wiring diagrams which identify each component individually and interconnected or interlocked relationships between components.
d. Foundation drawings, bolt-setting information, and foundation bolts prior to concrete foundation construction for equipment indicated or required to have concrete foundations.
e. Details, if piping and equipment are to be supported other than as indicated, which include loadings and type of frames, brackets, stanchions, or other supports.
f. Automatic temperature control diagrams and control sequences.
g. Installation details which includes the amount of factory set superheat and corresponding refrigerant pressure/temperature.
h. Equipment schedules
1.5 DELIVERY, STORAGE, AND HANDLING
Protect stored items from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Properly protect and care for all material both before and during installation. Replace any materials found to be damaged, at no additional cost to the Government.
During installation, cap piping and similar openings capped to keep out dirt and other foreign matter.
1.6 ENVIRONMENTAL REQUIREMENTS
For proper Indoor Environmental Quality, maintain pressure within the building as indicated. Ventilation must meet or exceed ASHRAE 62.1 and all published addenda. Meet or exceed filter media efficiency as tested in accordance with ASHRAE 52.2. Thermal comfort must meet or exceed
ASHRAE 55 .
SECTION 23 81 00 Page 4
1.7 WARRANTY
Provide equipment with the Manufacturer's Standard Warranty.
PART 2 PRODUCTS
2.1 ENERGY EFFICIENCY REQUIREMENTS
42 USC 8259b requires the procurement of energy efficient products in product categories covered by the Energy Star program or the Federal Energy Management Program for designated products. A list of covered product categories is available from the Federal Energy Management Web site at http://energy.gov/eere/femp/covered-product-categories. A list of qualified light commercial products is available at http://www.energystar.gov/productfinder/product/certified-light-commercial-hvac/result
Submit Material, Equipment, and Fixtures List of all supplied products within a covered product category, including manufacturer's catalog numbers, specification and drawing reference number, warranty information, fabrication site, and energy performance data. For product categories covered by the Energy Star program, submit documentation that the product is Energy Star-qualified. For product categories covered by the Federal Energy Management Program, submit documentation that the product meets or exceeds FEMP-designated efficiency requirements.
2.1.1 Air-Source Heat Pumps
Selected air-source heat pumps are required to meet applicable performance requirements specified by Energy Star. Information on the requirements can be found for residential models (single-phase units of 65,000 BTU/h or less)at http://www.energystar.gov/products/specs/system/files/Central_ASHP_and_CAC_Program_Req v4_1.pdf and for light commercial models (three-phase units of less than 240,000 BTU/h) at http://www.energystar.gov/products/specs/system/files/lchvac_prog_req_v2_2_0.pdf.
2.2 MATERIALS
Provide Manufacturer's standard catalog data, at least 5 weeks prior to the purchase or installation of a particular component, highlighted to show material, size, options, performance charts and curves, etc. in adequate detail to demonstrate compliance with contract requirements.
Data includes manufacturer's recommended installation instructions and procedures. If vibration isolation is specified for a unit, include vibration isolator literature containing catalog cuts and certification that the isolation characteristics of the isolators provided meet the manufacturer's recommendations. Submit data for each specified component. Minimum efficiency requirements must be in accordance with
ASHRAE 90.1 - IP.
2.2.1 Standard Products
Provide materials and equipment that are standard products of a manufacturer regularly engaged in the manufacturing of such products, which are of a similar material, design and workmanship. The standard products must have been in satisfactory commercial or industrial use for 2 years prior to request for proposal. The 2 year use includes applications of equipment and materials under similar circumstances and of similar
SECTION 23 81 00 Page 5 size. The 2 years' experience must be satisfactorily completed by a product which has been sold or is offered for sale on the commercial market through advertisements, manufacturer's catalogs, or brochures.
Products having less than a 2 year field service record will be acceptable if a certified record of satisfactory field operation, for not less than 6000 hours exclusive of the manufacturer's factory tests, can be shown.
Products must be supported by a service organization. Ensure system components are environmentally suitable for the indicated geographic locations.
2.2.2 Product Sustainability Criteria
2.2.2.1 Energy Efficient Equipment
Provide equipment meeting the efficiency requirements as stated within this section and provide documentation in conformance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph ENERGY EFFICIENT EQUIPMENT.
2.2.2.2 Electrical Equipment / Motors
Provide electrical equipment, motors, motor efficiencies, and wiring which are in accordance with Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.
Electrical motor driven equipment specified must be provided complete with motors, motor starters, and controls. Electrical characteristics must be as shown, and unless otherwise indicated, all motors of 1 horsepower and above with open, dripproof, totally enclosed, or explosion proof fan cooled enclosures, must be the premium efficiency type in accordance with NEMA MG 1. Field wiring must be in accordance with manufacturer's instructions. Each motor must conform to NEMA MG 1 and NEMA MG 2 and be of sufficient size to drive the equipment at the specified capacity without exceeding the nameplate rating of the motor. Motors must be continuous duty with the enclosure specified. Motor starters must be provided complete with thermal overload protection and other appurtenances necessary for the motor control indicated. Motors must be furnished with a magnetic across-the-line or reduced voltage type starter as required by the manufacturer. Motor duty requirements must allow for maximum frequency start-stop operation and minimum encountered interval between start and stop. Motors must be sized for the applicable loads. Motor torque must be capable of accelerating the connected load within 20 seconds with 80 percent of the rated voltage maintained at motor terminals during one starting period. Motor bearings must be fitted with grease supply fittings and grease relief to outside of enclosure. Manual or automatic control and protective or signal devices required for the operation specified and any control wiring required for controls and devices specified, but not shown, must be provided.
2.2.2.3 Ozone Depleting Substances
Unitary air conditioning equipment must not use CFC-based refrigerants.
Refrigerant may be an approved alternative refrigerant in accordance with EPA's Significant New Alternative Policy (SNAP) listing. Provide documentation in conformance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph OZONE DEPLETING SUBSTANCES.
2.2.3 Nameplates
Major equipment including compressors, condensers, receivers, heat exchanges, fans, and motors must have the manufacturer's name, address, type or style, model or serial number, and catalog number on a plate
SECTION 23 81 00 Page 6 secured to the item of equipment. Plates must be durable and legible throughout equipment life and made of stainless steel . Fix plates in prominent locations with nonferrous screws or bolts.
2.2.4 Safety Devices
Exposed moving parts, parts that produce high operating temperature, parts which may be electrically energized, and parts that may be a hazard to operating personnel must be insulated, fully enclosed, guarded, or fitted with other types of safety devices. Safety devices must be installed so that proper operation of equipment is not impaired. Welding and cutting safety requirements must be in accordance with AWS Z49.1.
2.3 EQUIPMENT
2.3.1 Packaged Terminal Heat Pumps
2.3.1.1 Packaged Terminal Unit
Provide a through-the-wall,, heavy-duty commercial grade, factory assembled and precharged heat pump unit in accordance with AHRI 390 and UL 1995. Provide units listed in AHRI DCAACP. Provide unit with a noise rating in accordance with AHRI 350 that does not exceed 85 dB while the entire unit is operating at any fan or compressor speed. Heat pump units must contain a reversing valve to change unit to heating cycle. Provide an outdoor coil temperature sensor to guard against coil freeze-up by either switching to supplemental heat only, or by cycling the compressor to defrost the coil.
2.3.1.2 Compressor
Provide a hermetically sealed rotary type Compressor. Provide compressor with permanent split capacitor motor, overload protection, and vibration isolators. Protect compressor against high discharge pressure, loss of charge, low voltage, and short cycling.
2.3.1.3 Air to Refrigerant Coils
Provide evaporator and condenser coils with copper or aluminum tubes of 3/8 inch minimum diameter with aluminum fins that are mechanically bonded or soldered to the tubes. Provide casing of galvanized steel or aluminum. Avoid contact of dissimilar metals. Test coils in accordance with ASHRAE 15 & 34 at the factory and ensure they are suitable for the working pressure of the installed system. Dehydrate and seal each coil after testing and prior to evaluation and charging. Provide each unit with a factory operating charge of refrigerant and oil. Provide a condensate removal system.
2.3.1.4 Fans
Provide direct driven, statically and dynamically balanced, propeller type fans. Design the outdoor fan so that condensate will evaporate without drip, splash, or spray on building exterior. Provide indoor fan with a minimum two-speed motor with built-in overload protection. Fan motors must be the inherently protected, permanent split-capacitor type.
2.3.1.5 Air Filters
Provide standard filter on all packaged terminal units; 1 inch inch MERV 8 , SECTION 23 81 00 Page 7 washable filter capable of filtering the entire air supply.
2.3.1.6 Primary/Supplemental Heat
Provide heating unit with internal thermal insulation having a fire hazard rating not to exceed 25 for flame spread and 50 for smoke developed as determined by ASTM E84.
2.3.1.6.1 Electric Heating
Provide electric duct heater in accordance with UL 1995 and NFPA 70. Coil must be completely assembled, unit-mounted, and integral to the unit.
Provide coil with nickel chromium elements and a maximum density of 40 watts per square inch. Provide coil with automatic reset high limit control operating through heater backup contactors. Provide coil casing and support brackets of galvanized steel . Mount coil to eliminate noise from expansion and contraction and be completely accessible for service.
Electric resistance heating elements with high temperature-limit safety device, factory-mounted, and wired to chassis.
2.3.1.7 Cabinet Construction
Provide unit with custom ligature proof security cover with kickplate that extends to the floor. Provide cabinet free of visible fasteners, sharp protuberances and edges. Enclosure sheet metal must be a minimum of 18 gauge steel with a protective coating. Provide removable face panels and allow full access to unit appurtenances. Thermally and acoustically insulate the cabinet with materials which conform to NFPA 90A.
2.3.1.8 Louver
Provide storm proof type Louver, constructed of anodized aluminum.
2.3.1.9 Wall Sleeve
Provide water and airtight completely insulated assembly, with weather-resistant protective coating.
2.3.1.10 Unit Controls
Controls must be provided per Contract Drawings. Controls must include a control system interface to a BACnet Control system. The control system interface must meet DDC Hardware requirements of Section 23 09 23.02
BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS.
2.3.2 Split-System Air Conditioners Heat Pumps
2.3.2.1 Small-Capacity Split-System Air-Conditioners (Not Exceeding 65,000 Btu/hr)
Provide an air-cooled, split system which employs a remote condensing unit, a separate ceiling mounted indoor unit, and interconnecting refrigerant piping. Provide the heat pump type unit conforming to applicable Underwriters Laboratories (UL) standards including UL 1995.
Unit must be rated in accordance with ANSI/AHRI 210/240. Provide indoor unit with necessary fans, air filters, and galvanized steel cabinet construction. The remote unit must be as specified in paragraph CONDENSING UNIT. Provide double-width, double inlet, forward curved backward inclined, or airfoil blade, centrifugal scroll type evaporator or
SECTION 23 81 00 Page 8 supply fans. Provide the manufacturer's standard condenser or outdoor fans for the unit specified and may be propeller type. Fan and condenser motors must have totally enclosed enclosures. Design unit to operate at outdoor ambient temperatures up to 115 degrees F.
2.3.2.1.1 Air-to-Refrigerant Coil
Provide condensing coils with copper tubes of 3/8 inch minimum diameter with aluminum fins that are mechanically bonded or soldered to the tubes.
Casing must be galvanized steel or aluminum. Avoid contact of dissimilar metals. Test coils in accordance with ASHRAE 15 & 34 at the factory and ensure suitability for the working pressure of the installed system.
Dehydrate and seal each coil testing and prior to evaluation and charging.
Coat condenser and evaporator coil with a uniformly applied epoxy electrodeposition, phenolic, or vinyl type coating to all coil surface areas without material bridging between fins. Apply coating at either the coil or coating manufacturer's factory. Coating process must ensure complete coil encapsulation and be capable of withstanding a minimum 3000 hours exposure to the salt spray test specified in ASTM B117 using a 5 percent sodium chloride solution.
2.3.2.1.2 Compressor
Provide direct drive scroll type compressor.Provide compressor with internal over temperature and pressure protector; sump heater; oil pump;
high pressure and low pressure controls; and liquid line dryer.
2.3.2.1.3 Refrigeration Circuit
Refrigerant-containing components must comply with ASHRAE 15 & 34 and be factory tested, cleaned, dehydrated, charged, and sealed. Provide each unit with a factory operating charge of refrigerant and oil or a holding charge. Field charge unit shipped with a holding charge. Provide refrigerant charging valves. Provide filter-drier in liquid line.to prevent freeze-up in event of loss of water flow during heating cycle.
2.3.2.1.4 Unit Controls
Provide unit internally prewired with a 24 volt control circuit powered by an internal transformer. Provide terminal blocks for power wiring and external control wiring. Internally protect unit by fuses or a circuit breaker in accordance with UL 1995. Equip units with three-phase power with phase monitoring protection to protect against problems caused by phase loss, phase imbalance and phase reversal. Provide unit with microprocessor controls to provide all 24V control functions.
Controls must include a control system interface to a BACnet Control system. The control system interface, as well as any network between physically separate units, must meet the requirements of Section 23 09 23.13 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC.
2.3.2.1.5 Condensing Coil
Provide coils with copper tubes of 3/8 inch minimum diameter with aluminum fins that are mechanically bonded or soldered to the tubes. Protect coil in accordance with paragraph CORROSION PROTECTION. Provide galvanized steel or aluminum casing. Avoid contact of dissimilar metals. Test coils in accordance with ANSI/ASHRAE 15 & 34 at the factory and ensure suitability for the working pressure of the installed system. Dehydrate
SECTION 23 81 00 Page 9 and seal eacj coil after testing and prior to evaluation and charging.
Provide separate expansion devices for each compressor circuit.
2.3.2.1.6 Remote Condenser or Condensing Unit
Fit each remote condenser coil fitted with a manual isolation valve and an access valve on the coil side. Saturated refrigerant condensing temperature must not exceed 120 degrees F at 104 degrees F ambient.
Provide unit with low ambient condenser controls to ensure proper operation in an ambient temperature of 20degrees F. Provide fan and cabinet construction as specified in paragraph UNITARY EQUIPMENT ACCESSORIES. Fan and condenser motors must have totally enclosed enclosures. 2.3.2.1.6.1 Air-Cooled Condenser
Provide Unit in accordance with ANSI/AHRI 460 and conform to the requirements of UL 1995. Provide factory fabricated, tested, packaged, and self-contained unit; complete with casing, propeller type fans, heat rejection coils, connecting piping and wiring, and all necessary accessories.
2.3.2.1.7 Primary/Supplemental Heat
Provide heating unit with internal thermal insulation having a fire hazard rating not to exceed 25 for flame spread and 50 for smoke developed as determined by ASTM E84.
2.3.2.1.7.1 Electric Heating
Construct electric heater of heavy-duty nickel chromium elements. Achieve staging through the unit control processor. Each heater must have automatically reset high limit control. Heaters must be individually fused from the factory and comply with NEC requirements. Power assemblies must provide single point connection. Electric heat modules must be listed and labeled by a national recognized testing laboratory acceptable to authorities having jurisdiction. Electric heater controls must confirm the supply fan is operating before electric elements are energized.
Operate electric heater in stages when outdoor ambient is too low to maintain space thermostat setting with compressor operation.
2.3.2.1.8 Air Filters
Provide filters of the panel type that are capable of filtering the entire air supply. Mount filter(s) integral within the unit and make accessible by hinged access panel(s). 2 inch MERV 13, provide throwaway filter on all units below 6 Tons.
Provide filter rack that can be converted to 2.0 inch capability. Filters must be MERV 13. Provide UL Class 1 filters.
2.3.2.1.9 Fans
Provide direct driven, statically and dynamically balanced, centrifugal type fans. Design the outdoor fan so that condensate will evaporate without drip, splash, or spray on building exterior. Provide indoor fan with a minimum two-speed motor with built-in overload protection. Fan motors must be the inherently protected, permanent split-capacitor type.
SECTION 23 81 00 Page 10
2.4…