This is Amendment 0002 to solicitation N40085-25-R-2549 for Repair BEQ HP505 at Camp Lejeune, issued by NAVFAC Mid-Atlantic on December 4, 2024. The amendment provides answers to contractor questions about the project.

Key clarifications include: as-built drawings are available for the buildings; the buildings have rigid insulation against the CMU between brick/block exterior walls; contractors can either remove scrap metal from base or take it to the on-base recycling center after registering with the landfill clerk; furniture and appliance removal is addressed in "Existing FF&E Removal" notes on sheet I-101; and a tree that interferes with storm drain work can be removed and replaced. The amendment does not extend the proposal submission deadline. Contractors must acknowledge this amendment when submitting their proposals, or risk rejection.

View the file

Other files

File Type Posted
Amend 0016.pdf PDF
Amend 0015.pdf PDF
Amend 0014.pdf PDF
Amend 0013.pdf PDF
60040360.pdf PDF
60040406.pdf PDF
60040345.pdf PDF
60040454.pdf PDF
60040373.pdf PDF
60040328.pdf PDF
60040433.pdf PDF
60040414.pdf PDF
N4008523B0034 SpecsAsOne Addendum 01.pdf PDF
60040411.pdf PDF
60040407.pdf PDF
60040434.pdf PDF
60040420.pdf PDF
60040412.pdf PDF
60040343.pdf PDF
Amend 0012.pdf PDF
60040362.pdf PDF
60040342.pdf PDF
60040447.pdf PDF
60040408.pdf PDF
60040436.pdf PDF
60040424.pdf PDF
60040329.pdf PDF
60040422.pdf PDF
60040366.pdf PDF
60040376.pdf PDF
60040359.pdf PDF
Amend 0011.pdf PDF
Amend 0010.pdf PDF
Amend 0009.pdf PDF
Amend 0008.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0001.pdf PDF
23-0034 Asbestos and Lead Assessment.pdf PDF
23-0034 Appendix D.pdf PDF
N4008523B0034 DWGs.pdf PDF
RFP 230034.pdf PDF
N4008523B0034 SPECS.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 2

AMENDMENT NO. 0002 12/04/24 23-0034

N40085

NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107 A Birch Street Camp Lejeune, NC 28547-2521

See Item 6

✘ N40085-25-R-2549

11/18/24

23-0034, Repair BEQ HP505: RFI answers.

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.

See Continuation Page(s)

N40085-25-R-2549 Amendment 0002

CONTINUATION SHEET

1. QUESTION: Are there as-builts for the buildings?

ANSWER: Yes.

QUESTION: In the past we have encounter a foam insulation between the brick/block of the exterior walls. Can we confirm if the buildings have this insulation?

ANSWER: Yes, rigid insulation against the CMU

QUESTION: Spec 02 41 00 / 3.1.6 – Does the base retain all scrap metal? If so, where is the location for the scrap to be delivered?

ANSWER: The contractor can take the scrap metal off base. If they prefer to take it to the recycling center on base they may do so but the contract will need to be registered with the landfill clerk via contracting officer.

QUESTION: Will furniture and appliances be removed from the buildings prior to demolition?

ANSWER: See “Existing FF&E Removal” notes on sheet I-101.

QUESTION: Drawing CD101 / Keynote #4 – Storm drain runs under tree to remain. Can tree be removed or section of storm drain be left under the existing tree?

ANSWER: Tree can be removed and replaced.