This is Amendment 0007 to solicitation N40085-25-R-2549, providing answers to contractors' questions regarding the repair of Bachelor Enlisted Quarters (BEQ) Building HP505 at Camp Lejeune. The amendment clarifies 69 technical questions about construction specifications, including confirmation that TVs and mounts are included in the base bid, requirements for quality control personnel certifications cannot be waived, clarification on mechanical systems orientation, and details about fire protection requirements. The amendment also includes environmental documentation regarding the categorical exclusion determination for the project.
The amendment confirms the proposal due date remains January 8, 2025 at 1500 hours. The project involves comprehensive repairs to a 120-room, 48,930 square foot BEQ facility built in 1989, including replacement of flooring, CMU closet partitions, doors, windows, roof system, plumbing fixtures, HVAC system, electrical systems, and fire protection upgrades. The work must comply with applicable ATFP, Fire Suppression, Seismic, Accessibility, ASHRAE, and LEEDS codes. The project falls within UXO-07 boundaries requiring special safety considerations, and contractors must complete 3R UXO Safety Awareness Training.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0016.pdf | ||
| Amend 0015.pdf | ||
| Amend 0014.pdf | ||
| Amend 0013.pdf | ||
| 60040360.pdf | ||
| 60040406.pdf | ||
| 60040345.pdf | ||
| 60040454.pdf | ||
| 60040373.pdf | ||
| 60040328.pdf | ||
| 60040433.pdf | ||
| 60040414.pdf | ||
| N4008523B0034 SpecsAsOne Addendum 01.pdf | ||
| 60040411.pdf | ||
| 60040407.pdf | ||
| 60040434.pdf | ||
| 60040420.pdf | ||
| 60040412.pdf | ||
| 60040343.pdf | ||
| Amend 0012.pdf | ||
| 60040362.pdf | ||
| 60040342.pdf | ||
| 60040447.pdf | ||
| 60040408.pdf | ||
| 60040436.pdf | ||
| 60040424.pdf | ||
| 60040329.pdf | ||
| 60040422.pdf | ||
| 60040366.pdf | ||
| 60040376.pdf | ||
| 60040359.pdf | ||
| Amend 0011.pdf | ||
| Amend 0010.pdf | ||
| Amend 0009.pdf | ||
| Amend 0008.pdf | ||
| Amend 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| 23-0034 Asbestos and Lead Assessment.pdf | ||
| 23-0034 Appendix D.pdf | ||
| N4008523B0034 DWGs.pdf | ||
| RFP 230034.pdf | ||
| N4008523B0034 SPECS.pdf |
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 24
AMENDMENT NO. 0007 12/16/24 23-0034
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107 A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-25-R-2549
11/18/24
23-0034, Repair BEQ HP505: Answers to RFI's.
The time and date for receipt of proposals remains 1500, on 8 January 2025.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
N40085-25-R-2549 Amendment 0007
CONTINUATION SHEET
Answers to RFI’s:
1. QUESTION: Drawing sheet, I-401 indicates CFCI TV’s, are these TVs to be included in base bid or the planned FF&E modification?
ANSWER: TVs and Mounts are included in the base bid.
2. QUESTION: Spec Section 03 30 00 Cast-in-place Concrete - Para 1.6.6 “Quality Control
Personnel Certifications: requires ACI certification for the QCM. Para 1.6.6.1 “Quality Manager Qualifications”: requires quality manager to hold a current PE License with experience of at least 5 similar projects. Can these requirements be waived?
ANSWER: No.
3. QUESTION: 02 41 00 3.1.8 Finish Flooring Removal: States “Remove residual adhesive using mechanical cleaning methods. Do not use hydrocarbon petrochemicals or solvents to alter adhesive composition.” Historically, there has been black mastic under flooring that must be removed for new finishes. The mastic gums up machine pads and grinders when removing. Troy to send container and product data on 12/6/24 for what we used at 4310.
There are 2 types, one for asbestos and non-asbestos containing materials. Pending MSDS info on material we can complete this RFI.
ANSWER: Please propose per specifications
4. QUESTION: Per Spec Section 23 05 48.19 SEISMIC BRACING FOR HVAC Para 3.11
“Special Testing For Seismic-Resisting Equipment” and 3.12 “Special Inspection For Seismic-Resisting Systems and Equipment” Callout specific requirements for HVAC systems in regards to testing and inspections for seismic activity. Due to the historical lack of seismic activity in the area can these requirements be waived?
ANSWER: Requirements specified in 3.11 and 3.12 may be waived.
5. QUESTION: Spec section 09 97 11 – Epoxy Coatings references an epoxy coating on the exterior balconies of the barracks. Drawings A-101 and A-102, General Construction Note #18 states “Inspect all existing balcony plank lift points. remove damaged filler and replace to flush with existing plank surface prior to application of traffic coating.” Is the “traffic coating” that is mentioned in the above construction note a reference to the epoxy coating in 09 97 11? If so, there are no further details in the plans. Please confirm whether this epoxy coating on the exterior walkways is a requirement, and if so, please provide further detail on finish and extent of application.
ANSWER: Spec section is in reference to traffic coating. All exterior walking surfaces with exception of first floor perimeter sidewalk slab on grade to receive traffic coating.
6. QUESTION: Spec section 09 96 60 references a low-profile textured acrylic wall coating.
However, the drawings and finish schedule do not show any requirement for this acrylic wall coating. Please confirm that this spec section does not apply to the referenced project.
ANSWER: Specification does not apply.
7. QUESTION: In previous renovations with the open web design, with no roof sheathing on the main building, Detail B1 on A-501, there was either Plywood or Metal Deck installed at the hip ends and dormers where the Standing Seam Roof Panels run parallel with the top chord roof purlins. Please provide what materials are to be used in these locations.
ANSWER: Metal deck is to be used due to the non-combustible construction type.
8. QUESTION: The Fan schedule on drawing M-601 shows EF-2,3,4. As Inline Fans These are drawn in as a Wall mounted fans throughout the mechanical drawings. These fans have been Wall mounted exhaust fans in previous BEQ projects that we have bid. Should these exhaust fans be installed as wall mounted instead of inline for this project?
ANSWER: EF-2,3,4 should be installed as wall mounted with no ductwork.
9. QUESTION: HP135 – For the 14,000sf of asbestos silver membrane in attic. Due to the roof being a truss roof over a flat roof, access to demo is an issue. Will the existing roof need to be separated and craned off to be demolished on the ground by hand or can we use equipment to demo/separate the roof while attached?
ANSWER: Removal of asbestos during building demolition is a means and methods item to be determined by contractor.
10. QUESTION: Spec Section 064116 1.1 States SCS Global and UL Greenguard. Please confirm whether the Forest Stewardship Council or UL Greenguard is needed for the casework materials on this project?
ANSWER: Provide proposal in accordance with drawings and specifications.
11. QUESTION: Spec Section 064116 2.4.4 states recessed mortise mounted metal standards.
2.7.5.2.2 states Line Hole method. Please confirm which is acceptable.
ANSWER: Recessed mortised mounted is recommended.
12. QUESTION: Spec Section 064116 2.7.1.1.2 states Face Frame and Rails. Please confirm whether this is a face frame job or a 32mm Frameless box construction is acceptable.
ANSWER: Frameless box construction is acceptable.
13. QUESTION: Division 02 82 (Asbestos Removal ) is not included in the project specifications. HP-135 is noted as having 14,000sf of built-up roofing and 1,200sf of perimeter roof flashing. These materials are noted as being in the attic under a truss roof system. Will this ACM material be accepted at Camp Lejeune landfill?
ANSWER: The contractor will need to follow all applicable state laws regarding the transportation and disposal of asbestos. Also see spec 01 57 19 1.9a.
14. QUESTION: Division 02 82 (Asbestos Removal ) is not included in the project specifications. HP-135 is noted as having 14,000sf of built-up roofing and 1,200sf of perimeter roof flashing. These materials are noted as being in the attic under a truss roof system. Are there fees or restrictions related to ACM disposal at the Camp Lejeune Landfill?
ANSWER: If the material is in concrete, the concrete will need to be no larger than 1’x1’ pieces and with no rebar sticking out. ACM cannot be taken off base.
15. QUESTION: Does the installation have the salvage rights for all debris?
ANSWER: The installation does not have salvage rights written in this contract.
16. QUESTION: The transformer at 165 does that get returned back to the Government?
ANSWER: We assume "165" is incorrect and it should have been referring to HP135 as that is the building slated for demo. Both transformers are fed thru and need to remain on site; we will disconnect the secondary when needed but transformers cannot be removed.
17. QUESTION: Has the site been determined to have no ordnances?
ANSWER: HP505 does not fall within the UXO-7 boundaries and has not been investigated for UXO. Because the NEPA for this project did not define the project extents and to make sure the utilities are covered we noted the UXO-07 requirements. See the green areas of page 8 on the attached DM.
10% of the UXO-07 area was surveyed using digital geophysical mapping. Out of 1433 geophysical anomalies, only 3 UXO items were identified. No high risk UXO was identified in the UXO-07 area. This area was given closed for investigation as there was a very low probability of encountering subsurface UXO. 3R training is required for any construction workers throughout MCB Camp Lejeune.
18. QUESTION: Are there any PCB in the ballast of existing light fixtures?
ANSWER: Any building built pre-1978 or per the EPA July 1, 1979, is known to have this type of ballast. If the building was built after this date, there should be a label that states “No PCB’s.
HP505 was built in 1984 so it shouldn’t be an issue. As far as we are aware, there should be no PCB’s left on the base.
19. QUESTION: Is there a DPAS letter issued for this project for acceleration of materials
ANSWER: Yes; will be issued along with Award Letter
20. QUESTION: What are the M1-M6 Corridors noted on the finish schedule? Are there any finish notes for the Mechanical Rooms? Are there any notes for a sealer to be provided on the exterior walkways?
ANSWER: M1-M6 includes both mechanical room and mechanical chases (corridors) open to rooms. See Interior Design plans.
21. QUESTION: Should the architectural demolition and architectural new work drawings be stamped and issued for construction prior to bid solicitation?
ANSWER: Drawings are correct, title block to be updated after award.
22. QUESTION: Who is providing commissioning agent?
ANSWER: Please reference Section 01 80 00.15 20
23. QUESTION: Who is providing the firestop special inspector?
ANSWER: The contractor is responsible for providing a firestop special inspector.
24. QUESTION: Are the floors/roof fire rated? Please provide fire rating of horizontal assemblies on life safety sheets and building cut sections.
ANSWER: The floors of the sleeping rooms are required to be 1/2-hr fire rated.
25. QUESTION: Per wall sections on S-203, CMU doesn’t show vapor barrier, Arch details show no vapor barrier, wall type legend shows vapor barrier. Clarify if the backup CMU infills at the sleeping rooms get vapor barrier. What vapor barrier is installed on the existing backup CMU? If a new vapor barrier is required at CMU infill, will it need to be compatible with existing?
ANSWER: New walls to receive air and moisture barrier per wall type. There are no wall types for existing walls.
26. QUESTION: General demolition note 14 on AD101/AD102 states to inspect all existing rails to remain and to remove damaged/deteriorated portions of handrail /guardrail system and prepare existing for replacement in kind of removed elements. Other than the rails specifically indicated to be removed/replaced or provided new, what other rails will need to be replaced?
ANSWER: All rails to be inspected. Assume remove and replace 50% of existing handrail/guardrail systems.
27. QUESTION: Are there existing CMU bond beams crossing above hollow metal doors to be demolished and replaced?
ANSWER: Existing openings are in sound condition. Existing condition to remain.
28. QUESTION: What is the thickness of the existing hollow plank floor and cast in place concrete slabs?
ANSWER: Existing hollow plank is 6" thick with 2" topping. Existing cast in place concrete slabs are approximately 8" thick.
29. QUESTION: Other than indicated on AD402, is there additional concrete floor slab demolition required to install trade rough in items?
ANSWER: Coordinate with plumbing, mechanical, and electrical plans for penetrations.
30. QUESTION: Other than indicated on AD402, is there additional wall demolition required to install trade rough in items?
ANSWER: Coordinate with plumbing, mechanical, and electrical plans for penetrations.
31. QUESTION: Per General note 4 on the architectural demolition set, previously painted walls are to be painted. Are there any previously painted walls to be painted that are not included on the Architectural Finish Schedule?
ANSWER: Contractor to assume all existing interior walls are to be painted with the exception of Stair 142/242/342 and Corridor 146.
32. QUESTION: Confirm which exterior surfaces are to receive water repellant.
ANSWER: See Gen Note #8 on sheet A-201.
33. QUESTION: Should there be a drywall bulkhead in the first-floor corridor to conceal the ductwork serving the duty hut?
ANSWER: Yes. Provide soffit enclosure to enclose. Soffit height to match height of soffit crossing corridor.
34. QUESTION: Sheet CU101 shows the fire water service entering the building at the south side of mechanical room 140. The sprinkler drawings show lead in to south side of mechanical room 149. Confirm location of the RPZ and fire main riser and utility lead ins.
ANSWER: The building floor plan is 180-degrees off from the site plan. The fire service will enter the south side of the western mechanical room as shown on CU101.
35. QUESTION: Sheet CU101 shows the domestic water utilities entering the south side of mechanical room 149. Sheet P-106 shows the main domestic water utility lead in at the north side of the west mechanical room 140. Confirm the location of the domestic water utility lead in.
ANSWER: The building floor plan is 180-degrees off from the site plan. The fire service will enter the south side of the western mechanical room as shown on CU101.
36. QUESTION: On sheet P-106, the mechanical building is arranged plan south, should the drawing be rotated 180degrees to show the correct orientation of the mechanical building to plan north?
ANSWER: Correct. Plan update will be provided.
37. QUESTION: It appears that there are instances where the maneuvering distances on
C4/A601 cannot be achieved due to existing conditions. What locations are exempt from these maneuvering distances?
ANSWER: Maneuvering distances apply to new work. Please propose as indicated.
38. QUESTION: Does the attic walkway need to be fire rated wood?
ANSWER: See spec section 06 10 00
39. QUESTION: Does the attic need fire alarm notification devices?
ANSWER: The attic is unoccupied and does not require fire alarm notification.
40. QUESTION: Confirm requirement for sprinklers in sleeping room bathrooms and closets. If sprinklers are required in closets, is the upper closet shelving allowable?
ANSWER: Since the bathrooms are less than 55-sf and the closets are less than 24-sf, sprinklers are not required per NFPA 13R 6.6.2 and 6.6.3 respectively.
41. QUESTION: Does the attic need to be sprinklered?
ANSWER: Per NFPA 13R Section 6.6.6, the attic is not required to be sprinklered.
42. QUESTION: Who provides / installs MNS antennae?
ANSWER: The antennae is part of the USMC MNS equipment provided and installed by others.
43. QUESTION: Per Note 9 on FA502, which penetrations through building structural fire barriers are "known?" Will penetrations through non-structural fire rated walls need to be sealed? What is an unconfirmed penetration?
ANSWER: Known fire barriers are indicated on the life safety sheets. Penetrations of fire barriers are required to be firestopped in accordance with Specification 07 84 00.
44. QUESTION: The mechanical rooms and chase areas do not appear to be conditioned, does the sprinkler system need any additional considerations for freeze protection?
ANSWER: DOR typically does not provide heating for the mechanical room. The mechanical room typically has enough heat producing equipment to maintain acceptable temperatures.
45. QUESTION: Per note 8/P001, "ensure that all control devices, shut-off valves, etc. are accessible for maintenance." Which components of the plumbing system are considered "etc." and what are the accessibility requirements for plumbing system components installed in the chase?
ANSWER: Any device that is required to have proper access to maintain, test, repair or replace shall be installed in an accessible location.
46. QUESTION: Confirm BFP-1 to be monitored by only the DDC. Should any other monitoring and/or reporting systems or transmitters be included?
ANSWER: No additional monitoring requirement beyond the DDC for BFP-1.
47. QUESTION: Confirm BFP-2 to be monitored by DDC. Should any other monitoring and/or reporting systems or transmitters be included?
ANSWER: No additional monitoring requirement beyond the DDC for BFP-2.
48. QUESTION: Per E5/701, should sealant be installed in the annular space between the insulation and sleeve?
ANSWER: There is not enough information provided to answer this question.
49. QUESTION: Which equipment is required to have seismic bracing per C2/P501?
ANSWER: This detail does not apply and can be removed from the project.
50. QUESTION: Who installs the gas meter and gas piping? If contractor is to install any piping, confirm extents.
ANSWER: Utility company will provide the gas meter as well as the gas piping from the main to the gas meter. Detail is forthcoming.
51. QUESTION: In the core area, domestic water is shown to be routed above electrical panels.
Should the plumbing design route domestic water above electrical panels?
ANSWER: No water piping should be installed above electrical panels. The water piping is shown to be installed plan view north and the electrical panels shall be installed plan view south.
52. QUESTION: Will circuit setters be required on the domestic hot water system?
ANSWER: Circuit setters are not required for this system.
53. QUESTION: Per note 2/M001, considering other building utilities and limited building structure, does the mechanical system have adequate area to be installed per Note 1? Define "adjustments" and what would constitute a "necessary" situation. Confirm that this is a design-bid-build solicitation.
ANSWER: Mechanical design has been coordinated with other trades and existing building structure. This note refers to the means and methods of construction.
54. QUESTION: Per note 4/M001, contractor to install fire dampers for all ducts penetrating rated partitions. Are fire dampers required at the ducts penetrating the sleeping rooms?
Clearly indicate fire rated partitions and locations of all fire dampers on mechanical floor plans, sections.
ANSWER: Fire dampers are not required at sleeping room penetrations. Note 4 will be removed.
55. QUESTION: Per note 4/M001, contractor to install fire dampers for all ducts penetrating rated partitions. Clearly indicate extent of fire rated partitions and locations of all fire dampers on mechanical floor plans, sections. Are fire dampers required at the ducts penetrating the sleeping rooms?
ANSWER: Fire dampers are not required at sleeping room penetrations. Note 4 will be removed.
56. QUESTION: Per note 4/M001, contractor to install fire dampers for all ducts penetrating rated partitions. Are fire dampers required at the ducts penetrating fire rated horizontal assemblies? Which horizontal assemblies are fire rated? Clearly indicate fire rated partitions and locations of all fire dampers on mechanical floor plans, sections.
ANSWER: No fire rated assemblies in building. Fire dampers are required at all horizontal assembly penetrations to comply with IMC/IBC.
57. QUESTION: Note 6/M001 references plumbing and electrical meter control integration.
Has this integration been clearly detailed on the plumbing and electrical drawing sets?
ANSWER: Yes.
58. QUESTION: On sheet M111, the building is arranged plan south, should the drawing be rotated 180degrees to show the correct orientation of the building north?
ANSWER: Mechanical building will be rotated 180 degrees to match other trades.
59. QUESTION: On sheet M111, the building is arranged plan south, should the drawing be rotated 180degrees to show the correct orientation of the building north? Confirm section views reference correct orientation.
ANSWER: While orientation on enlarged sheets are different amongst trades, north arrows and orientation are correct. Bid per plans.
60. QUESTION: Per spec section 01 45 00 - 1.6.5.1.3 - The fire protection DOR is to provide a schedule of fire protection system inspections and frequency of inspections to be conducted by the third-party Fire Protection QC Specialist. Provide inspections and frequency of inspections.
ANSWER: Section 01 45 00 - 1.6.4.1.3 states that the schedule is included at the end of the specification section
61. QUESTION: Can the FPQC be the QFPE? Can the QFPE be 2nd tier?
ANSWER: The FPQC can be the QFPE as long as they meet the qualifications for the both (spec 01 45 00 1.6.5.1.1 and 21 13 13 1.2.3) . The QFPE must be an individual who is a registered professional engineer (P.E.) who has passed the fire protection engineering examination administered by the National Council of Examiners for Engineering and Surveying (NCEES) and has relevant fire protection engineering experience and meet the qualifications in spec 01 45 00 1.6.5.1.1
62. QUESTION: Can OBD balancing grilles with security screw be used in lieu of duct takeoff dampers/access doors above sleeping room bulkhead ceiling?
ANSWER: Yes, OBD balancing grilles are acceptable to use in lieu of duct takeoff dampers and access doors. Plans will be revised to reflect this.
63. QUESTION: Drawing I-101 Existing FF&E Removal: Existing serviceable chairs, comforters, refrigerators, and microwaves turned over to government to building 1212 and/or 1301. Does this apply to both building HP505 and HP135?
ANSWER: Yes
64. QUESTION: A 103, construction keynote 7 states to provide an OSHA compliant fall protection system. Will the Camp Lejeune Fall Protection System Standard be provided for guidance on engineering and installation requirements?
ANSWER: See enclosed 11 24 24 MCBCL Fall Protection Dated November 2018
65. QUESTION: There do not appear to be any Draftstop Walls in the Attic. Please provide materials and dimensional layout.
ANSWER: Since the roof is noncombustible construction, draftstopping and fireblocking in accordance with IBC 718 is not required.
66. QUESTION: Spec Section 064116 2.1.1 b states maple hardwood species for casework trim
(Shelves). 2.7.5.1 states shelves to have pvc edge banding. Is a plastic laminate apron of the same color acceptable in lieu of the maple for the closet shelving?
ANSWER: No. Maple hardwood should be used for the closet shelving. Plastic laminate is acceptable for the vanity per the drawings.
67. QUESTION: Per the deferred submittal notes on sheet S-101, which MEP support anchorage should be sealed by a registered engineer?
ANSWER: A deferred submittal is not required on this project for support anchorage beyond what is already indicated on the PME drawings, so that requirement may be omitted.
68. QUESTION: Per note 24/AD102 to infill all existing unused roof penetrations, please provide details to infill unused roof penetrations through hollow plank and/or cast in place concrete on metal deck.
ANSWER: The small unused existing roof penetrations (less that 12" in either direction) may be infilled by attaching a 16 gauge metal plate to the bottom of the roof slab with concrete screws or powder actuated fasteners at 4" off center, and the opening infilled with 3,000 psi concrete or grout. Roughen edges of existing opening before placing infill.
69. QUESTION: Per note 17/AD401, the chase floor will be removed for shower drain installation, please provide further structural details to infill the concrete slab on deck.
ANSWER: A section of the chase floor up to 18"x18" may be removed for replacement of the shower drains and then infilled by drilling (2) #4 dowels into each side of the opening with structural epoxy and 4" embedment and infilling with 3,000 psi concrete or grout. Roughen edges of existing opening before placing infill.
2. All other terms and conditions remain unchanged.
UNITED STATES MARINE CORPS
MARINE CORPS INSTALLATIONS EAST-MARINE CORPS BASE
PSC BOX 20005
CAMP LEJEUNE NC 28542-0005
From: Director, Environmental Management Division/G-F To: Action Proponent
Subj: DECISION MEMORANDUM, CATEGORICAL EXCLUSION; REPAIR BEQ
HP505, LE2312M, (NEPA LE24083)
Ref: (a) MCO 5090.2 - V12
(b) 32 C.F.R. 775.6(e)
(c) 32 C.F.R. 775.6(f)
Encl: (1) PUBLIC WORKS DIVISION REIR of 4 Sep 24
(2) Supporting Documents
(3) Applicable Conditions
1. In response to enclosure (1), this Decision Memorandum satisfies reference (a) National Environmental Policy Act (NEPA) requirements applicable to the proposed action.
Pursuant to reference (b) planning considerations, this Decision Memorandum (DM) also documents the decision to categorically exclude (CATEX) the proposed action from the requirements of preparing an Environmental Assessment (EA) or an Environmental Impact Statement (EIS).
2. As outlined in enclosures (1) and (2), the proposed scope of the project is:
Repair the Bachelor Enlisted Quarters Building HP505.
Building HP505 is a 120-sleeping room 48,930 square footage Bachelor Enlisted Quarters facility that was built in 1989. The FCI of this facility is 70. The building is projected to remain in use for an additional 30 years.
This project will replace the individual room floor tile, and cove base. The metal wall lockers will be replaced with CMU closet partitions. Partitions will be constructed with steel door jambs, steel doors, and security locks. The rusted and damaged wall framing, entry doors and window units in the facility will be replaced with doors and windows that meet the current Marine Corps requirements. The existing roof will be replaced with a pitched standing seam metal roof system. All interior personnel doors and hardware will be replaced throughout the building. All wet insulation will be replaced throughout the building. All previously painted interior and exterior surfaces will be repaired as needed and repainted. All spalling concrete balconies on the building shall be replaced due to the severity of the damage. The vanities will be replaced to include pre-formed sink bowl tops, and single level faucets.
All plumbing fixtures and sanitary accessories will be replaced throughout the building.
This shall include replacing all plumbing piping throughout the building. The HVAC system throughout the building will be replaced to insure non-problematic and durable system. This will include the replacement of all required duct work and the installation
29 Oct 2024 of DDC controls. All electrical lighting, panels, outlets, and switches will be replaced. Replace all flooring in the sleeping rooms throughout the building with LVP type flooring. The common area spaces throughout the building will have epoxy type flooring replaced. Replace all drop ceiling throughout the building with a plastic style grid ceiling. The COMM system throughout the building shall be upgraded to meet the current codes of the Marine Corps. Repair all damaged exterior siding/brick surfaces.
This will include exterior wall framing redesign and replacement as required to insure a watertight surface. The fire protection will be upgraded to meet the current code of the Marine Corps.
Areas affected by repair/construction will be in compliance with applicable ATFP, Fire Suppression, Seismic, Accessibility, ASHRAE, and LEEDS codes and standards (as required) upon completion of the project.
3. Pursuant to subparagraph (34) of reference (c), the proposed action qualifies for the following categorical exclusion: " (34) Demolition, disposal, or improvements involving buildings or structures when done in accordance with applicable regulations including those regulations applying to removal of asbestos, PCBs, and other hazardous materials."
The proposed action will not result in any extraordinary circumstances.
4. In accordance with NEPA, this Decision Memorandum (DM)documents the proper level of environmental review for the proposed action to date but may not constitute authority to proceed with the implementation of the project. Please see the enclosures for more information. If the proposed action changes or does not begin within one calendar year after the date of this DM, please coordinate with the Environmental Planning Program Manager at (910-451-4542) to determine whether this DM continues to apply to the proposed action or whether an updated environmental impact review will be required to find that a CATEX still applies to the proposed action.
Accepted /s/ Robert A. Lowder, P.E.
Receipt Acknowledged Parker CIV Chelsea 29 Oct 24
Enclosure 1: REIR
REQUEST FOR ENVIRONMENTAL IMPACT REVIEW
SECTION I - ACTION SPONSOR INFORMATION
Project Title: REPAIR BEQ HP505
Short Plain English Description of Action: Repair the Bachelor Enlisted Quarters Building HP505. Building HP505 is a 120 sleeping room 48,930 square footage Bachelor Enlisted Quarters facility that was built in 1989.
Project ID: LE2312M
Start By Date: 1-Mar-25
End By Date: 1-Jun-26
Action Sponsor (Unit/Command): PUBLIC WORKS DIVISION
Action Sponsor Name: CHELSEA PARKER
Phone Number: 9103814343
Action Sponsor Name (Alternate): N/A
Phone Number: N/A
Base Location: Mainside
Project will result in permanent site improvement?: No
New or Modified Real Estate License Will Be Issued By Base?: N/A
Descriptive Information
Purpose and Need of Action: This is needed to ensure that troops have a safe environment to live, rest and relax. This BEQ is old and has been identified as needing to be completely overhauled to get it to an acceptable level of livability to enhance the quality of life.
Enclosure (1)
Scope of Project (Project Narrative): Repair the Bachelor Enlisted Quarters Building HP505. Building HP505 is a 120-sleeping room 48,930 square footage Bachelor Enlisted Quarters facility that was built in 1989. The FCI of this facility is 70. The building is projected to remain in use for an additional 30 years. This project will replace the individual room floor tile, and cove base. The metal wall lockers will be replaced with CMU closet partitions. Partitions will be constructed with steel door jambs, steel doors, and security locks. The rusted and damaged wall framing, entry doors and window units in the facility will be replaced with doors and windows that meet the current Marine Corps requirements. The existing roof will be replaced with a pitched standing seam metal roof system. All interior personnel doors and hardware will be replaced throughout the building. All wet insulation will be replaced throughout the building. All previously painted interior and exterior surfaces will be repaired as needed and repainted. All spalling concrete balconies on the building shall be replaced due to the severity of the damage. The vanities will be replaced to include pre-formed sink bowl tops, and single level faucets. All plumbing fixtures and sanitary accessories will be replaced throughout the building. This shall include replacing all plumbing piping throughout the building. The HVAC system throughout the building will be replaced to insure non-problematic and durable system. This will include the replacement of all required duct work and the installation of DDC controls. All electrical lighting, panels, outlets, and switches will be replaced. Replace all flooring in the sleeping rooms throughout the building with LVP type flooring. The common area spaces throughout the building will have epoxy type flooring replaced. Replace all drop ceiling throughout the building with a plastic style grid ceiling. The COMM system throughout the building shall be upgraded to meet the current codes of the Marine Corps. Repair all damaged exterior siding/brick surfaces.
This will include exterior wall framing redesign and replacement as required to insure a watertight surface. The fire protection will be upgraded to meet the current code of the Marine Corps. Areas affected by repair/construction will be in compliance with applicable ATFP, Fire Suppression, Seismic, Accessibility, ASHRAE, and LEEDS codes and standards (as required) upon completion of the project.
Identify Other Alternatives Considered: N/A
Information concerning avoidance, specific best management practices, or mitigation necessary to complete the project: N/A
Preferred and Alternative Sites
Preferred Site Description: N/A
End of Form
SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY
a. AIR QUALITY
1. Will the project involve new/modification equipment associated with the following?: Yes (Select all that apply): j. Boilers k. Combustion Sources (engine/jet engine test stands, boilers, generators, etc.)
Provide proposed construction dates, equipment size, specification, and estimated types.: N/A
2. Will pollution control equipment be involved (e.g. filter or incinerators)?: No
3. Was this building constructed before 1978?: No
4. Are there going to be any renovations, demolitions and/or building improvements?: Yes
b. LAND QUALITY
1. Number of acres involved? Indicate total project area and total disturbed area.:
less than 5 acres
2. Does the proposed action involve digging and/or grading?: No
3. Will the action require use of earthen fill material?: No
4. Will the project increase impervious surfaces by 10,000 sqft or more?: No
5. Are there wetlands within the project area?: No
c. GROUNDWATER QUALITY
1. Does the project involve use of herbicides, insecticides, or pesticides?: No
2. Does the project involve installation/use of septic tanks, leach beds, or other on-site disposal of sanitary waste?: No
3. Will there be any wells dug or any excavation deeper than 20 feet?: No
4. Will the project generate or use any toxic or hazardous/waste materials?: Yes
5. Will there be an increase of solid waste (temporarily or permanently) caused by implementing the project/action?: Yes
6. Will the project or action be carried out within 100 to 500 feet of a drinking water supply well? If yes, provide distance to nearest drinking water well.: No
7. Does the project require the installation or removal of any petroleum or non-petroleum underground storage tank (UST)?: No
8. Are there any known Installation Restoration Program (Comprehensive Environmental Response, Compensation, and Liability Act - CERCLA or Resource Conservation Recovery Act - RCRA) sites or hazardous waste treatment, storage, and disposal (RCRA) facilities within the proposed project area: Yes
d. SURFACE WATER QUALITY
1. Is the project located on or in a water body or adjacent to or in the 100-year flood plain?: No
2. After construction is complete, will petroleum products including fuel, oil and lubricants be routinely stored or used (temporarily or permanently) at the site? : No
3. Does the project require the installation of any petroleum or non-petroleum above ground storage tank (AST)?: No
e. NATURAL RESOURCES
1. Will trees be removed?: No
Amount to be removed:: N/A
2. Will grass, shrubs, or other low-growing vegetation be cut and/or removed?: No
3. Will public access for hunting, boating, fishing etc, be restricted?: No
4. Does the project involve the transfer (purchase, sale, lease, easement or otherwise) of any real estate interest?: No
5. Are there potential effects on any threatened or endangered species?: No
f. CULTURAL RESOURCES
1. Are there any known archaeological sites in the area of your project/action?: No
2. Are there any known historic buildings or districts affected by the project/action?:
No
3. If known, please contact the Base Archaeologist/Cultural Resources Program Manager for assistance at (910) 451-7230.:
g. UTILITIES AND SERVICES
1. Will new/modified utilities be required? Select all that apply.: Electric Natural Gas Water Wastewater Communication/Fiber If other is selected, please describe below.: N/A
h. SOCIAL ECONOMIC CONSIDERATIONS
1. Will the project cause an increase/decrease in on-base or off-base military population?: No
2. Will there be any changes to traffic flow and patterns on or off base?: No
3. Will the project cause noise or safety issues that could potentially impact off-base persons or property either during construction or from the project itself?: No
4. Will there be any increased demand on a local or state government to provide services?: No
i. GENERAL CONSIDERATIONS
1. Are alternative procedures, practices, or technologies available to minimize environmental impact or utility use?: No
2. Are there likely effects on the human environment that:: d. N/A
Explain YES answers here:: N/A
Enclosure 2: Site Map
Figure 1: General Location
Figure 2: Specific Location
Enclosure (2)
Figure 3: IR Program Map
Enclosure (2)
Enclosure 3: Applicable Conditions
AST/UST/IR/MRP (Soil):
1. If contaminants are suspected through odors or visual observation during construction activities, immediately stop work, call 911, and contact EQB at 910-451-9641 for further instructions.
2. There are no known monitoring wells in the project areas but if an unmarked well is discovered and inadvertently damaged, immediately contact EQB at 910-451-9641 for further instructions.
3. The proposed project area is near previously investigated historic surface danger zones (UXO Site 07) that warranted no further action, see attached map. Soil taken off base from this site may need to be screened for UXO, please coordinate with the IR PM.
3R UXO Safety Awareness Training is required for all construction personnel. Training is available at http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Video/. Should a munitions-related item be found during construction, follow appropriate notifications as detailed in the 3R training. Any munitions related item found during project construction should additionally be reported to EMD within 10 days (T.Richard, 910-451-9641) to determine if additional evaluation and precautions are necessary (Explosives Safety Submission, UXO Tech Support, etc). Additional UXO safety resources available at: Construction - DENIX (osd.mil) https://www.denix.osd.mil/uxo/for-work-crews/construction/index.html
4. This project is within the Aquifer Use Control Boundary associated with IR Site 96, Operable Unit (OU) 22. All work conducted in an identified EPA NPL OU or RCRA SWMU must adhere to the provisions detailed in 29 CFR 1910.120 Occupational Safety and Health Standards, Hazardous Materials, Hazardous waste operations and emergency response.
5. If drilling fluids or other substances/compounds/products are injected into the ground surface, Safety Data Sheets must be sent to EQB for review and screening of potential contaminants.
Contact:
IR Program, 910-451-9641/9610 AST/UST Program,910-451-5878
Water Quality Program/ECB:
1. Reduction of Lead in Drinking Water Act:
Installation or repair of any piping, fittings, fixtures, solder or flux providing water for possible human consumption must be “lead-free” as defined by the Reduction of Lead in Drinking Water Act (RLDWA). The RLDWA revised the definition of lead free to a weighted average of 0.25% of the wetted surfaces of plumbing products and 0.2% lead for solder and flux. A methodology for calculating the weighted average of wetted surfaces can be found at www.epa.gov.
2. Material types, diameters, and lengths of new (and replaced/demolished) potable
Enclosure (3) water lines and wastewater lines should be provided to PWD GIS.
Contact:
Water Quality Manager, 910-451-9518 Public Works Design Branch, 910-451-2212 Public Works Utilities Director, 910-451-5024
Air Quality:
1. Ensure that subject buildings are evaluated for asbestos/asbestos containing materials by a certified professional prior to the demolition/renovation.
2. Ensure that any fugitive dust emissions generated by construction/renovation/demolition are appropriately controlled.
3. If the project includes installation of new activities/equipment which generate air emissions, must been evaluated for air permitting, contact AQ program at phone numbers below. Please note that air emission sources are required to be permitted prior to their installation/operation. Examples of such sources include, but are not limited to:
boilers, water heaters, generators, fuel storage tanks, painting/coating operations, woodworking, welding, abrasive blasting, engine testing, and parts ovens.
4. Ensure that appropriate Ozone Depleting Substance (ODS) servicing procedures are followed. Units with a charge capacity of greater than 50 pounds are required to be registered, contact AQ program at phone number below.
5. If the project includes removal of any currently permitted air emission sources, contact AQ program at phone numbers below.
Contact:
Air Quality Program, 910-451-9421/5836
ECB (Asbestos):
1. The proposed course of action may disturb asbestos. Contact the Asbestos Program Manager, ECB at 910-451-7018 to determine precautions and possible testing/removal requirements.
2. Asbestos Containing Material (ACM) can be accepted at the Camp Lejeune Sanitary Landfill. Coordinate with the ROICC or Contract Representative for disposal.
Contact:
Asbestos Program Manager, 910-451-7018
Land and Wildlife Resources Section (Demolition/Renovation):
1. To reduce the incidental take of migratory birds and their nests, any activity of demolition or renovation of structures where an active bird nest is encountered should be put on hold and the Lejeune Wildlife Resources Services (LWRS)Biologist shall be contacted for additional guidance.
Contact:
Wildlife Resources Manager, 910-451-7235
Note 1: In accordance with MCIEAST-MCB CAMLEJO 11013.4, projects that include construction, intrusive work, or real estate actions will require site approval from G-F. Please contact Asset Management Branch (AMB) at 910-451-0982.
Note 2: The following sections reviewed the REIR, replied to it and have no concerns:
Range Training and Management, Above-ground Storage Tanks (AST), Underground Storage Tanks (UST), Explosive Safety Office (ESO), Environmental Compliance Branch (ECB), Cultural Resources, Threatened and Endangered Species (T&E), Wetlands, Base Safety/Lead Management and Floodplains.