N4008523B0034 SPECS.pdf
PDF 22 MB Posted
- Attached to
- Repair BEQ HP505
- Solicitation number
- N4008525R2549
About this file
The provided file appears to be a set of specifications (N4008523B0034 SPECS.pdf) related to a federal contract opportunity with Solicitation Number N4008525R2549 for the "Repair BEQ HP505" project.
The key details are:
- The opportunity is a solicitation issued by the Department of the Navy Naval Facilities Engineering Command (NAVFAC) for a repair project at Camp Lejeuen.
- Only General MACC Contractors listed on the General Requirements cover page are eligible to submit proposals for this project.
- The file contains the scope of work and any applicable drawings for the project, but does not include a detailed Performance Work Statement or Statement of Objectives.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0016.pdf | ||
| Amend 0015.pdf | ||
| Amend 0014.pdf | ||
| Amend 0013.pdf | ||
| 60040360.pdf | ||
| 60040406.pdf | ||
| 60040345.pdf | ||
| 60040454.pdf | ||
| 60040373.pdf | ||
| 60040328.pdf | ||
| 60040433.pdf | ||
| 60040414.pdf | ||
| N4008523B0034 SpecsAsOne Addendum 01.pdf | ||
| 60040411.pdf | ||
| 60040407.pdf | ||
| 60040434.pdf | ||
| 60040420.pdf | ||
| 60040412.pdf | ||
| 60040343.pdf | ||
| Amend 0012.pdf | ||
| 60040362.pdf | ||
| 60040342.pdf | ||
| 60040447.pdf | ||
| 60040408.pdf | ||
| 60040436.pdf | ||
| 60040424.pdf | ||
| 60040329.pdf | ||
| 60040422.pdf | ||
| 60040366.pdf | ||
| 60040376.pdf | ||
| 60040359.pdf | ||
| Amend 0011.pdf | ||
| Amend 0010.pdf | ||
| Amend 0009.pdf | ||
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| Amend 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| 23-0034 Asbestos and Lead Assessment.pdf | ||
| 23-0034 Appendix D.pdf | ||
| N4008523B0034 DWGs.pdf | ||
| RFP 230034.pdf |
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This page is intentionally left blank.
Repai r s BEQ HP505 Pr oj ect No. 23- 0034 MCB Camp Lej eune, NC 29 May 2024
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 04/ 22 SUMMARY OF WORK
01 14 00 04/ 22 WORK RESTRI CTI ONS ( MCBL)
01 20 00 04/ 22 PRI CE AND PAYMENT PROCEDURES ( MCBCL)
01 30 00 01/ 23 ADMI NI STRATI VE REQUI REMENTS
01 31 23. 13 20 05/ 17, CHG 7: 11/ 21 ELECTRONI C CONSTRUCTI ON AND FACI LI TY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 31 50 04/ 22 TRANSFER AND ACCEPTANCE OF MI LI TARY
REAL PROPERTY
01 32 16 04/ 12 CONSTRUCTI ON PROGRESS DOCUMENTATI ON
01 32 17 07/ 21 NETWORK ANALYSI S SCHEDULES ( NAS)
01 33 00 04/ 22 SUBMI TTAL PROCEDURES
01 33 29 02/ 21 SUSTAI NABI LI TY REQUI REMENTS AND
REPORTI NG
01 35 26 11/ 20, CHG 3: 02/ 22 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 02/ 19 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00 08/ 23 QUALI TY CONTROL
01 50 00 12/ 21 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND
CONTROLS
01 57 19 05/ 12 TEMPORARY ENVI RONMENTAL CONTROLS
01 74 19 02/ 19, CHG 3: 11/ 21 CONSTRUCTI ON WASTE MANAGEMENT AND
DI SPOSAL
01 78 00 04/ 22 CLOSEOUT SUBMI TTALS
01 78 23 04/ 22 OPERATI ON AND MAI NTENANCE DATA
01 78 24. 00 20 03/ 23 FACI LI TY ELECTRONI C OPERATI ON AND
MAI NTENANCE SUPPORT I NFORMATI ON ( eOMSI )
01 78 30. 00 22 5/ 22 GI S DATA DELI VERABLES
01 91 00. 15 20 02/ 21, CHG 1: 05/ 21 TOTAL BUI LDI NG COMMI SSI ONI NG
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 08/ 22 DEMOLI TI ON
02 41 01 08/ 22 BUI LDI NG DECONSTRUCTI ON
02 83 00 11/ 18 LEAD REMEDI ATI ON
DI VI SI ON 03 - CONCRETE
03 30 00 02/ 19, CHG 4: 08/ 22 CAST- I N- PLACE CONCRETE
03 30 53 05/ 14 MI SCELLANEOUS CAST- I N- PLACE CONCRETE
( SI DEWALKS)
03 45 33 05/ 16, CHG 1: 11/ 21 PRECAST STRUCTURAL CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 11/ 15, CHG 2: 05/ 19 UNI T MASONRY
DI VI SI ON 05 - METALS
05 30 00 05/ 15, CHG 2: 08/ 18 STEEL DECKS
05 40 00 05/ 15, CHG 1: 08/ 18 COLD- FORMED METAL FRAMI NG
05 50 13 05/ 17, CHG 1: 08/ 18 MI SCELLANEOUS METAL FABRI CATI ONS
05 51 33 02/ 16, CHG 2: 02/ 18 METAL LADDERS
05 52 00 02/ 18, CHG 1: 02/ 20 METAL RAI LI NGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
PROJECT TABLE OF CONTENTS Page 1
06 10 00 08/ 16, CHG 2: 11/ 18 ROUGH CARPENTRY
06 41 16. 00 10 08/ 10, CHG 1: 11/ 18 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL
CABI NETS
06 61 16 08/ 20 SOLI D SURFACI NG FABRI CATI ONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 19 00 05/ 11, CHG 1: 08/ 17 WATER REPELLENTS
07 27 26 05/ 17, CHG 2: 08/ 20 FLUI D- APPLI ED MEMBRANE AI R BARRI ERS
07 61 15. 00 20 08 Mar ch 2021 CL ALUMI NUM STANDI NG SEAM ROOFI NG
07 84 00. 00 22 09/ 23 FI RESTOPPI NG
07 92 00 08/ 16, CHG 3: 11/ 18 JOI NT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 08/ 20 STEEL DOORS AND FRAMES
08 31 00 05/ 17, CHG 1: 08/ 18 ACCESS DOORS AND PANELS
08 33 23 08/ 20, CHG 1: 02/ 22 OVERHEAD COI LI NG DOORS
08 51 13 05/ 19 ALUMI NUM WI NDOWS
08 71 00 02/ 16, CHG 4: 02/ 22 DOOR HARDWARE
08 81 00 05/ 19 GLAZI NG
08 91 00 08/ 20 METAL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 03 00 03/ 22 LOW PRESSUE BUI LDI NG CLEANI NG
09 22 00 02/ 10, CHG 2: 08/ 18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/ 16, CHG 4: 02/ 20 GYPSUM BOARD
09 30 10 08/ 20 CERAMI C TI LI NG
09 51 00 08/ 20 ACOUSTI CAL CEI LI NGS
09 65 00 08/ 10, CHG 3: 08/ 18, RESI LI ENT FLOORI NG
09 67 23. 13 27SEP2018 STANDARD RESI NOUS FLOORI NG
09 72 00 08/ 17, CHG 1: 08/ 18 WALLCOVERI NGS
09 90 00 02/ 21 PAI NTS AND COATI NGS
09 96 60 LOW- PROFI LE TEXTURED ACRYLI C WALL
COATI NG
09 97 11 05/ 24 EPOXY COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00. 20 08/ 20 I NTERI OR SI GNAGE
10 26 00 08/ 20 WALL AND DOOR PROTECTI ON
10 28 13 08/ 20 TOI LET ACCESSORI ES
10 44 16 11/ 19 FI RE EXTI NGUI SHERS
DI VI SI ON 12 - FURNI SHI NGS
12 00 01. 00 20 02/ 23 FURNI TURE, FI XTURES AND EQUI PMENT
( FF&E) PACKAGE
12 24 13 08/ 20 ROLLER WI NDOW SHADES
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13 08/ 20 WET PI PE SPRI NKLER SYSTEMS, FI RE
PROTECTI ON
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/ 15, CHG 4: 05/ 21 PLUMBI NG, GENERAL PURPOSE
PROJECT TABLE OF CONTENTS Page 2
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00. 00 20 08/ 10, CHG 3: 08/ 18 BASI C MECHANI CAL MATERI ALS AND METHODS
23 05 48. 19 05/ 18 SEI SMI C BRACI NG FOR HVAC
23 05 93 11/ 15 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR
HVAC
23 07 00 02/ 13, CHG 7: 05/ 20 THERMAL I NSULATI ON FOR MECHANI CAL
SYSTEMS
23 09 23. 13 09/ 22 BACnet DI RECT DI GI TAL CONTROL SYSTEMS
FOR HVAC
23 11 20 05/ 20 FACI LI TY GAS PI PI NG
23 21 13. 00 20 04/ 06, CHG 2: 11/ 19 LOW TEMPERATURE WATER ( LTW) HEATI NG
SYSTEM
23 23 00 08/ 21 REFRI GERANT PI PI NG
23 25 00 05/ 21 CHEMI CAL TREATMENT OF WATER FOR
MECHANI CAL SYSTEMS
23 30 00 05/ 20, CHG 1: 02/ 22 HVAC AI R DI STRI BUTI ON
23 52 43. 00 20 05/ 15 LOW PRESSURE WATER HEATI NG BOI LERS
( UNDER 800, 000 BTU/ HR OUTPUT)
23 64 10 11/ 16 WATER CHI LLERS, VAPOR COMPRESSI ON TYPE
23 64 26 08/ 09, CHG 5: 11/ 19 CHI LLED WATER PI PI NG SYSTEMS
23 81 00 05/ 18 DECENTRALI ZED UNI TARY HVAC EQUI PMENT
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11. 00 09/ 22 CYBERSECURI TY FOR FACI LI TY- RELATED
CONTROL SYSTEMS - I SOLATED SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 08 00 11/ 21 APPARATUS I NSPECTI ON AND TESTI NG
26 12 19. 10 05/ 19, CHG 1: 11/ 19 THREE- PHASE, LI QUI D- FI LLED PAD- MOUNTED
TRANSFORMERS
26 20 00 08/ 19, CHG 3: 11/ 21 I NTERI OR DI STRI BUTI ON SYSTEM
26 24 13 08/ 21 SWI TCHBOARDS
26 27 14. 00 20 02/ 21, CHG 1: 05/ 21 ELECTRI CI TY METERI NG
26 28 01. 00 10 08/ 21 COORDI NATED POWER SYSTEM PROTECTI ON
26 41 00 11/ 13 LI GHTNI NG PROTECTI ON SYSTEM
26 51 00 05/ 20, CHG 2: 11/ 21 I NTERI OR LI GHTI NG
26 56 00 08/ 21 EXTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 04/ 22 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG
SYSTEM ( MCBCL)
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 08/ 20 I NTERI OR FI RE ALARM AND MASS
NOTI FI CATI ON SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 00 00 08/ 23 EARTHWORK
31 11 00 11/ 18 CLEARI NG AND GRUBBI NG
31 23 00. 00 20 02/ 11, CHG 2: 08/ 15 EXCAVATI ON AND FI LL
31 31 16. 13 08/ 22 CHEMI CAL TERMI TE CONTROL
PROJECT TABLE OF CONTENTS Page 3
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 11 23 05/ 22 AGGREGATE BASE COURSE
32 11 26 05/ 20 HOT- MI X BI TUMI NOUS BASE COURSE FOR
ROADS AND STREETS
32 31 13. 53 11/ 21 HI GH- SECURI TY FENCES ( ORNAMENTAL) AND
GATES
32 92 23 04/ 06, CHG 1: 08/ 21 SODDI NG
DI VI SI ON 33 - UTI LI TI ES
33 11 00 02/ 18, CHG 2: 11/ 23 WATER UTI LI TY DI STRI BUTI ON PI PI NG
33 30 00 05/ 18 SANI TARY SEWERAGE
33 32 16 11/ 19, CHG 1: 11/ 23 PACKAGED UTI LI TY WASTEWATER PUMPI NG
STATI ONS
33 40 00 11/ 21 STORMWATER UTI LI TI ES
33 71 02 08/ 21 UNDERGROUND ELECTRI CAL DI STRI BUTI ON
33 82 00 08/ 22 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 4
LI ST OF DRAWI NGS
Cont r act dr awi ngs ar e as f ol l ows:
NAVFAC SHEET
DWG NO. NO. TI TLE
G GENERAL
60040325 G- 001 TI TLE SHEET AND I NDEX OF DRAWI NGS
GI LI FE SAFETY
60040326 GI 001 LI FE SAFETY GENERAL NOTES AND LEGEND
60040327 GI 002 CODE COMPLI ANCE SI TE PLAN
60040328 GI 101 LI FE SAFETY FI RST FLOOR PLAN - CONSTRUCTI ON
60040329 GI 102 LI FE SAFETY SECOND AND THI RD FLOOR PLAN - CONSTRUCTI ON
C CI VI L
60040330 C- 001 CI VI L NOTES, LEGEND AND ABBREVI ATI ONS
60040331 CD101 SI TE PLAN- EXI STI NG CONDI TI ONS AND DEMOLI TI ON
60040332 CS101 SI TE PLAN- NEW WORK
60040333 CG101 SI TE GRADI NG PLAN
60040334 CU101 SI TE UTI LI TY PLAN
60040335 CS501 DETAI LS
60040336 CS502 DETAI LS
60040337 CG501 DETAI LS
60040338 CG502 DETAI LS
60040339 CU501 DETAI LS
60040340 CD701 SI TE PLAN- EXI STI NG CONDI TI ONS AND DEMOLI TI ON- HP135
60040341 CG701 SI TE GRADI NG PLAN - HP135
S STRUCTURAL
60040342 S- 101 STRUCTURAL PLAN AND GENERAL NOTES
60040343 S- 102 CONCRETE REPAI R PLAN
60040344 S- 103 MECH EQUI PMENT BUI LDI NG - CONSTRUCTI ON
60040345 S- 201 SECTI ONS
60040346 S- 202 SECTI ONS
60040347 S- 203 MECHANI CAL EQUI PMENT BUI LDI NG SECTI ONS
60040348 S- 501 TYPI CAL CONSTRUCTI ON DETAI LS
A ARCHI TECTURAL
60040349 A- 001 SYMBOL LEGEND
60040350 AD101 FI RST AND SECOND FLOOR - EXI STI NG/ DEMOLI TI ON
60040351 AD102 THI RD FLOOR AND ROOF PLAN - EXI STI NG/ DEMOLI TI ON
60040352 AD103 FI RST AND SECOND FLOOR REFLECTED CEI LI NG PLAN -
EXI STI NG/ DEMOLI TI ON
60040353 AD104 THI RD FLOOR REFLECTED CEI LI NG PLAN - EXI STI NG/ DEMOLI TI ON
60040354 AD201 EXTERI OR ELEVATI ONS - EXI STI NG/ DEMOLI TI ON
60040355 AD401 ENLARGED PLANS - EXI STI NG/ DEMOLI TI ON
60040356 AD402 ENLARGED PLANS - EXI STI NG/ DEMOLI TI ON
60040357 A- 101 FI RST AND SECOND FLOOR PLAN - CONSTRUCTI ON
60040358 A- 102 THI RD FLOOR PLAN - CONSTRUCTI ON
60040359 A- 103 ROOF AND CATWALK PLAN- CONSTRUCTI ONN
60040360 A- 104 FI RST AND SECOND FLOOR REFLECTED CEI LI NG PLAN
60040361 A- 105 THI RD FLOOR REFLECTED CEI LI NG PLAN
60040362 A- 106 ENLARGED REFLECTED CEI LI NG PLANS
60040363 A- 110 MECHANI CAL EQUI PMENT BUI LDI NG - CONSTRUCTI ON
60040364 A- 111 MECHANI CAL EQUI PMENT BUI LDI NG - EXTERI OR
ELEVATI ONS/ BUI LDI NG SECTI ON
60040365 A- 201 EXTERI OR ELEVATI ONS - CONSTRUCTI ON
NAVFAC SHEET
DWG NO. NO. TI TLE
60040366 A- 301 BUI LDI NG SECTI ONS
60040367 A- 310 WALL SECTI ONS
60040368 A- 401 ENLARGED FLOOR PLANS
60040369 A- 402 ENLARGED FLOOR PLANS
60040370 A- 403 ENLARGED FLOOR PLANS
60040371 A- 404 ENLARGED SLEEPI NG ROOM BATH
60040372 A- 405 I NTERI OR ELEVATI ONS
60040373 A- 501 ASSEMBLI ES
60040374 A- 502 DETAI LS
60040375 A- 503 DETAI LS
60040376 A- 504 DETAI LS
60040377 A- 601 DOOR AND FRAME SCHEDULE
60040378 A- 602 DOOR AND FRAME DETAI LS
60040379 A- 603 DOOR AND FRAME DETAI LS
60040380 A- 604 DOOR AND FRAME DETAI LS
60040381 A- 605 WI NDOW TYPES AND DETAI LS
I I NTERI OR DESI GN
60040382 I - 101 1ST FLOOR FURNI TURE PLAN
60040383 I - 102 2ND FLOOR FURNI TURE PLAN
60040384 I - 103 3RD FLOOR FURNI TURE PLAN
60040385 I - 111 1ST FLOOR FI NI SH PLAN
60040386 I - 112 2ND FLOOR FI NI SH PLAN
60040387 I - 113 3RD FLOOR FI NI SH PLAN
60040388 I - 121 1ST FLOOR SI GNAGE PLAN
60040389 I - 122 2ND FLOOR SI GNAGE PLAN
60040390 I - 123 3RD FLOOR SI GNAGE PLAN
60040391 I - 201 I NTERI OR ELEVATI ONS
60040392 I - 301 CASEWORK SECTI ONS
60040393 I - 401 ENLARGED FURNI TURE PLANS
60040394 I - 402 ENLARGED FI NI SH PLANS
60040395 I - 403 ENLARGED SI GNAGE PLANS
60040396 I - 501 SI GNAGE DETAI LS
60040397 I - 502 I NTERI OR DETAI LS
60040398 I - 601 SCHEDULES & LEGENDS
F FI RE PROTECTI ON
60040399 FA001 FI RE ALARM GENERAL NOTES AND LEGEND
60040400 FA101 FI RE ALARM FI RST FLOOR PLAN - CONSTRUCTI ON
60040401 FA102 FI RE ALARM SECOND FLOOR PLAN - CONSTRUCTI ON
60040402 FA103 FI RE ALARM THI RD FLOOR PLAN - CONSTRUCTI ON
60040403 FA501 FI RE ALARM DETAI LS
60040404 FA502 FI RE ALARM DETAI LS
60040405 FX001 FI RE SUPPRESSTI ON GENERAL NOTES AND LEGEND
60040406 FX101 FI RE SUPPRESSI ON FI RST FLOOR PLAN - CONSTRUCTI ON
60040407 FX102 FI RE SUPPRESSI ON SECOND FLOOR PLAN - CONSTRUCTI ON
60040408 FX103 FI RE SUPPRESSI ON THI RD FLOOR PLAN - CONSTRUCTI ON
60040409 FX501 FI RE SUPPRESSI ON DETAI LS
P PLUMBI NG
60040410 P- 001 PLUMBI NG COVER SHEET
60040411 PD101 DEMOLI TI ON PLANS - PLUMBI NG
60040412 P- 101 FLOOR PLANS - WASTE AND VENT
60040413 P- 102 PARTI AL ENLARGED FLOOR PLANS - FI RST AND SECOND FLOOR -
WASTE AND VENT
60040414 P- 103 PARTI AL ENLARGED FLOOR PLANS - FI RST AND SECOND FLOOR -
WASTE AND VENT
60040415 P- 104 PARTI AL ENLARGED FLOOR PLANS - SECOND AND THI RD FLOOR -
WASTE AND VENT
60040416 P- 105 FLOOR PLANS - WATER
60040417 P- 106 PARTI AL ENLARGED FLOOR PLANS - FI RST AND SECOND FLOOR -
WATER
60040418 P- 107 PARTI AL ENLARGED FLOOR PLANS - FI RST AND SECOND FLOOR -
WATER
60040419 P- 108 PARTI AL ENLARGED FLOOR PLANS - SECOND AND THI RD FLOOR -
WATER
60040420 P- 501 PLUMBI NG DETAI LS
60040421 P- 601 PLUMBI NG SCHEDULES
60040422 P- 701 3D RI SER DI AGRAMS - WASTE AND VENT
60040423 P- 702 3D RI SER DI AGRAMS - WATER
M MECHANI CAL
60040424 M- 001 MECHANI CAL NOTES, LEGEND & ABBREVI ATI ONS
60040425 MD101 FI RST AND SECOND FLOOR PLANS - MECHANI CAL DEMOLI TI ON
60040426 MD102 THI RD FLOOR AND ATTI C PLANS - MECHANI CAL DEMOLI TI ON
60040427 MD103 COMPREHENSI VE FLOOR PLANS - MECHANI CAL PI PI NG DEMOLI TI ON
60040428 MD104 TYPI CAL SLEEPI NG ROOMS - MECHANI CAL DEMOLI TI ON
60040429 MD105 PARTI AL FI RST FLOOR PLANS - MECHANI CAL DEMOLI TI ON
60040430 MD106 PARTI AL SECOND FLOOR PLANS - MECHANI CAL DEMOLI TI ON
60040431 MD107 PARTI AL THI RD FLOOR PLANS - MECHANI CAL DEMOLI TI ON
60040432 MD108 SI TE PLAN MECHANI CAL DEMOLI TI ON
60040433 M- 101 FI RST AND SECOND FLOOR PLANS - MECHANI CAL
60040434 M- 102 THI RD FLOOR AND ATTI C PLANS - MECHANI CAL
60040435 M- 103 COMPREHENSI VE FLOOR PLANS - MECHANI CAL PI PI NG
60040436 M- 104 TYPI CAL FOOR PLAN - SLEEPI NG ROOM - MECHANI CAL
60040437 M- 105 FI RST FLOOR PLAN - MECHANI CAL ROOMS - MECHANI CAL
60040438 M- 106 FI RST FLOOR PLAN - CENTRAL CORE - MECHANI CAL
60040439 M- 107 SECOND FLOOR PLAN - MECHANI CAL ROOMS - MECHANI CAL
60040440 M- 108 SECOND FLOOR PLAN - CENTRAL CORE - MECHANI CAL
60040441 M- 109 THI RD FLOOR PLAN - MECHANI CAL ROOMS - MECHANI CAL
60040442 M- 110 THI RD FLOOR PLAN - CENTRAL CORE - MECHANI CAL
60040443 M- 111 SI TE PLAN - MECHANI CAL
60040444 M- 301 MECHANI CAL SECTI ON VI EWS
60040445 M- 302 MECHANI CAL SECTI ON VI EWS
60040446 M- 303 MECHANI CAL SECTI ON VI EWS
60040447 M- 401 MECHANI CAL BUI LDI NG ENLARGED
60040448 M- 501 MECHANI CAL DETAI LS
60040449 M- 502 MECHANI CAL DETAI LS
60040450 M- 503 MECHANI CAL DETAI LS
60040451 M- 504 MECHANI CAL DETAI LS
60040452 M- 505 MECHANI CAL DETAI LS
60040453 M- 506 MECHANI CAL DETAI LS
60040454 M- 601 MECHANI CAL SCHEDULES
60040455 M- 602 MECHANI CAL SCHEDULES
60040456 M- 701 CHI LLED WATER SYSTEM DI AGRAM
60040457 M- 702 HOT WATER SYSTEM DI AGRAM
60040458 M- 703 MECHANI CAL CONTROLS
60040459 M- 704 MECHANI CAL CONTROLS
60040460 M- 705 MECHANI CAL CONTROLS
60040461 M- 706 MECHANI CAL CONTROLS
60040462 M- 707 MECHANI CAL CONTROLS
60040463 M- 708 MECHANI CAL CONTROLS
60040464 M- 709 MECHANI CAL CONTROLS
E ELECTRI CAL
60040465 E- 001 ELECTRI CAL NOTES AND LEGENDS
60040466 ES101 SI TE PLAN - ELECTRI CAL
60040467 ES501 SI TE ELETRI CAL DETAI LS
60040468 ED101 OVERALL FLOOR PLANS - ELECTRI CAL DEMOLI TI ON
60040469 ED102 TYPI CAL SLEEPI NG ROOMS PLAN - ELECTRI CAL DEMOLI TI ON
60040470 ED103 FI RST FLOOR PLANS - ELECTRI CAL DEMOLI TI ON
60040471 ED104 SECOND FLOOR PLANS - ELECTRI CAL DEMOLI TI ON
60040472 ED105 THI RD FLOOR PLANS - ELECTRI CAL DEMOLI TI ON
60040473 E- 101 OVERALL FLOOR PLANS - ELECTRI CAL
60040474 E- 102 TYPI CAL SLEEPI NG ROOM PLAN - ELECTRI CAL
60040475 E- 103 FI RST FLOOR PLANS - ELECTRI CAL
60040476 E- 104 FI RST FLOOR PLANS - ELECTRI CAL
60040477 E- 105 SECOND FLOOR PLANS - ELECTRI CAL
60040478 E- 106 SECOND FLOOR PLANS - ELECTRI CAL
60040479 E- 107 THI RD FLOOR PLANS - ELECTRI CAL
60040480 E- 108 THI RD FLOOR PLANS - ELECTRI CAL
60040481 E- 109 MECHANI CAL BUI LDI NG PLANS - ELECTRI CAL
60040482 E- 110 ROOF PLAN - LI GHTNI NG PROTECTI ON
60040483 E- 111 OVERALL FLOOR PLANS - CABLE TRAY
60040484 E- 501 ELECTRI CAL DETAI LS
60040485 E- 502 ELECTRI CAL DETAI LS
60040486 E- 503 ELECTRI CAL DETAI LS
60040487 E- 504 ELECTRI CAL DETAI LS
60040488 E- 505 ELECTRI CAL DETAI LS
60040489 E- 601 ELECTRI CAL SCHEDULES
60040490 E- 602 ELECTRI CAL SCHEDULES
60040491 E- 603 ELECTRI CAL SCHEDULES
60040492 E- 604 ELECTRI CAL SCHEDULES
60040493 E- 605 ELECTRI CAL SCHEDULES
60040494 E- 606 ELECTRI CAL SCHEDULES
60040495 E- 607 ELECTRI CAL SCHEDULES
60040496 E- 608 ELECTRI CAL SCHEDULES
60040497 E- 609 ELECTRI CAL SCHEDULES
60040498 E- 610 ELECTRI CAL SCHEDULES
60040499 E- 611 ELECTRI CAL SCHEDULES
60040500 E- 701 ELECTRI CAL RI SER DI AGRAM
SECTI ON 01 11 00
SUMMARY OF WORK
04/ 22
PART 1 GENERAL
1. 1 WORK COVERED BY CONTRACT DOCUMENTS
1. 1. 1 Pr oj ect Descr i pt i on
The wor k i ncl udes al l i t ems of wor k as descr i bed i n t he at t ached pr oj ect descr i pt i on.
1. 1. 2 Locat i on
The wor k shal l be l ocat ed at t he Mar i ne Cor ps Base Camp Lej eune, Nor t h Car ol i na, at t he bui l di ng and/ or ar ea as descr i bed i n t he at t ached pr oj ect descr i pt i on. The exact l ocat i on wi l l be i ndi cat ed by t he Cont r act i ng Of f i cer .
1. 2 PHASED CONSTRUCTI ON SCHEDULE
Wi t hi n t he over al l pr oj ect schedul e, commence and compl et e t he wor k i n phases as descr i bed i n t he at t ached pr oj ect descr i pt i on.
1. 3 EXI STI NG WORK
I n addi t i on t o " FAR 52. 236- 9, Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s" :
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k shal l be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
1. 4 LOCATI ON OF UNDERGROUND FACI LI TI ES
The Cont r act or wi l l be r esponsi bl e f or obt ai ni ng t he ser vi ces of a pr of essi onal ut i l i t y l ocat or t o scan t he const r uct i on s i t e wi t h el ect r omagnet i c or soni c equi pment , and mar k t he sur f ace of t he gr ound wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound obst r uct i on not i ndi cat ed or speci f i ed t o be r emoved but i ndi cat ed or di scover ed dur i ng scanni ng i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.
SECTI ON 01 11 00 Page 1
1. 4. 1 Not i f i cat i on Pr i or t o Excavat i on
Not i f y t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) 48 hour s pr i or t o st ar t i ng excavat i on wor k.
1. 5 GOVERNMENT- FURNI SHED MATERI AL AND EQUI PMENT
Gover nment f ur ni shed mat er i al and equi pment wi l l be i ndi cat ed on dr awi ngs and i n scope of wor k i f appl i cabl e.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 2
SECTI ON 01 14 00
WORK RESTRI CTI ONS ( MCBL)
04/ 22
PART 1 GENERAL
1. 1 SUBMI TTALS
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Li st of Cont act Per sonnel
1. 2 SPECI AL SCHEDULI NG REQUI REMENTS
a. The Cont r act or shal l compl y wi t h al l speci al schedul i ng r equi r ement s as descr i bed i n t he at t ached pr oj ect descr i pt i on.
d. Per mi ssi on t o i nt er r r upt any St at i on r oads, r ai l r oads, and/ or ut i l i t y ser vi ce shal l be r equest ed i n wr i t i ng a mi ni mum of 15 cal endar days pr i or t o t he desi r ed dat e of i nt er r upt i on.
1. 3 CONTRACTOR ACCESS AND USE OF PREMI SES
1. 3. 1 Act i v i t y Regul at i ons
Ensur e t hat Cont r act or per sonnel empl oyed on t he Act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear appr opr i at e per sonal pr ot ect i ve equi pment ( PPE) i n desi gnat ed ar eas. Do not ent er any r est r i ct ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Ensur e al l Cont r act or equi pment , i ncl ude del i ver y vehi c l es, ar e c l ear l y i dent i f i ed wi t h t hei r company name.
1. 3. 1. 1 Subcont r act or s and Per sonnel Cont act s
Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.
1. 3. 1. 2 I nst al l at i on Access
Obt ai n access t o Navy i nst al l at i ons t hr ough par t i c i pat i on i n t he Def ense Bi omet r i cs I dent i f i cat i on Syst em ( DBI DS) . Requi r ement s f or Cont r act or empl oyee r egi st r at i on, and t r ansi t i on f or empl oyees cur r ent l y under Navy Commer ci al Access Cont r ol Syst em ( NCACS) , ar e avai l abl e at ht t ps: / / www. cni c. navy. mi l / om/ dbi ds. ht ml . No f ees ar e associ at ed wi t h obt ai ni ng a DBI DS cr edent i al .
Par t i c i pat i on i n t he DBI DS i s not mandat or y, and Cont r act or per sonnel may appl y f or One- Day Passes at t he Base Vi s i t or Cont r ol Of f i ce t o access an i nst al l at i on.
The f ol l owi ng ar e speci f i c det ai l s r egar di ng cont r act or per sonnel
SECTI ON 01 14 00 Page 1 r equi r ement s. For t he most up- t o- dat e i nf or mat i on r egar di ng Base Access pl ease vi s i t ht t ps: / / www. l ej eune. mar i nes. mi l / Base- Access/ .
1. 3. 1. 2. 1 Regi st r at i on f or DBI DS
Regi st r at i on f or DBI DS i s avai l abl e at ht t ps: / / www. cni c. navy. mi l / om/ dbi ds. ht ml . Pr ocedur e i ncl udes:
a. Pr esent a l et t er or of f i c i al awar d document ( i . e. DD For m 1155 or SF 1442) f r om t he Cont r act i ng Of f i cer , t hat pr ovi des t he pur pose f or access, t o t he base Vi s i t or Cont r ol Cent er r epr esent at i ve.
b. Pr esent val i d i dent i f i cat i on, such as a passpor t or Real I D Act - compl i ant st at e dr i ver ' s l i cense.
c. Pr ovi de compl et ed SECNAV FORM 5512/ 1 t o t he base Vi s i t or Cont r ol Cent er r epr esent at i ve t o obt ai n a backgr ound check. Thi s f or m i s avai l abl e f or downl oad at ht t ps: / / www. cni c. navy. mi l / om/ dbi ds. ht ml .
d. Upon successf ul compl et i on of t he backgr ound check, t he Gover nment wi l l compl et e t he DBI DS enr ol l ment pr ocess, whi ch i ncl udes Cont r act or empl oyee phot o, f i nger pr i nt s, base r est r i ct i on and sever al ot her assessment s.
e. Upon successf ul compl et i on of t he enr ol l ment pr ocess, t he Cont r act or empl oyee wi l l be i ssued a DBI DS cr edent i al , and wi l l be al l owed t o pr oceed t o wor ksi t e.
1. 3. 1. 2. 2 DBI DS El i gi bi l i t y Requi r ement s
Thr oughout t he l engt h of t he cont r act , t he Cont r act or empl oyee must cont i nue t o meet backgr ound scr een st andar ds. Per i odi c backgr ound scr eeni ngs ar e conduct ed t o ver i f y cont i nued DBI DS par t i c i pat i on and i nst al l at i on access pr i v i l eges. DBI DS access pr i v i l eges wi l l be i mmedi at el y suspended or r evoked i f at any t i me a Cont r act or empl oyee becomes i nel i gi bl e.
An adj udi cat i on pr ocess may be i ni t i at ed when a backgr ound scr een f ai l ur e r esul t s i n di squal i f i cat i on f r om par t i c i pat i on i n t he DBI DS, and Cont r act or empl oyee does not agr ee wi t h t he r eason f or di squal i f i cat i on.
The Gover nment i s t he f i nal aut hor i t y.
1. 3. 1. 2. 3 DBI DS Not i f i cat i on Requi r ement s
a. I mmedi at el y r epor t i nst ances of l ost or st ol en badges t o t he Cont r act i ng Of f i cer .
b. I mmedi at el y col l ect DBI DS cr edent i al s and not i f y t he Cont r act i ng Of f i cer i n wr i t i ng under t he f ol l owi ng ci r cumst ances:
( 1) An empl oyee has depar t ed t he company wi t hout havi ng pr oper l y r et ur ned or sur r ender ed t hei r DBI DS cr edent i al s.
( 2) Ther e i s a r easonabl e basi s t o concl ude t hat an empl oyee, or f or mer empl oyee, mi ght pose a r i sk, compr omi se, or t hr eat t o t he saf et y or secur i t y of t he I nst al l at i on or anyone t her ei n.
SECTI ON 01 14 00 Page 2
1. 3. 1. 2. 4 One- Day Passes
Per sonnel appl y i ng f or One- Day passes at t he Base Vi s i t or Cont r ol Of f i ce ar e subj ect t o dai l y mandat or y vehi c l e i nspect i on, and wi l l have l i mi t ed access t o t he i nst al l at i on. The Gover nment i s not r esponsi bl e f or any cost or l ost t i me associ at ed wi t h obt ai ni ng dai l y passes or added vehi c l e i nspect i ons i ncur r ed by non- par t i c i pant s i n t he DBI DS.
1. 3. 2 No Smoki ng Pol i cy
Smoki ng i s pr ohi bi t ed wi t hi n and out si de of al l bui l di ngs on i nst al l at i on, except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.
1. 3. 3 Wor ki ng Hour s
Regul ar wor ki ng hour s shal l be 0730- 1600, Monday t hr ough Fr i day, excl udi ng Gover nment hol i days.
1. 3. 4 Wor k Out si de Regul ar Hour s
Wor k out si de r egul ar wor ki ng hour s r equi r es COR appr oval . Pr ovi de wr i t t en r equest at l east 15 cal endar days pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k shal l be l i ght ed i n a manner appr oved by t he COR.
1. 3. 5 Occupi ed Bui l di ng and Exi st i ng Bui l di ngs
The Cont r act or shal l be wor ki ng i n a a por t i on of an exi st i ng bui l di ng whi ch i s not occupi ed. The exi st i ng bui l di ng and i t s cont ent s shal l be kept secur e at al l t i mes.
1. 3. 6 Ut i l i t y Cut over s and I nt er r upt i ons
a. The Cont r act or shal l coor di nat e a mi ni mum of 14 cal endar days pr i or t o any pl anned ut i l i t y cut over / i nt er r upt i on. Make ut i l i t y cut over s and i nt er r upt i ons dur i ng nor mal wor ki ng hour s.
b. Ensur e t hat new ut i l i t y l i nes ar e compl et e, except f or t he connect i on, bef or e i nt er r upt i ng exi st i ng ser vi ce.
c. I nt er r upt i on t o wat er , sani t ar y sewer , st or m sewer , t el ephone ser vi ce, el ect r i c ser vi ce, ai r condi t i oni ng, heat i ng, f i r e al ar m, and compr essed ai r shal l be consi der ed ut i l i t y cut over s. Thi s t i me l i mi t i ncl udes t i me f or deact i vat i on and r eact i vat i on.
d. Oper at i on of St at i on Ut i l i t i es: The Cont r act or shal l not oper at e nor di st ur b t he set t i ng of cont r ol devi ces i n t he st at i on ut i l i t i es syst em, i ncl udi ng wat er , sewer , el ect r i cal , and st eam ser vi ces. The Gover nment wi l l oper at e t he cont r ol devi ces as r equi r ed f or nor mal conduct of t he wor k. The Cont r act or shal l not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o such oper at i on.
SECTI ON 01 14 00 Page 3
1. 4 SECURI TY REQUI REMENTS
Cont r act Cl ause " FAR 52. 204- 2, Secur i t y Requi r ement s and Al t er nat e I I , " " FAC 5252. 236- 9301, Speci al Wor ki ng Condi t i ons and Ent r y t o Wor k Ar ea, " appl y.
1. 5 EMERGENCY UNEXPLODED ORDNANCE ( UXO) RESPONSE
I n t he event t hat UXO, as def i ned i n 40 CFR 260 i s encount er ed dur i ng t he const r uct i on act i v i t i es t hat ar e deemed t o be a t hr eat t o human heal t h or t he envi r onment , Camp Lej eune Mi l i t ar y Pol i ce and EOD pr of essi onal s shal l be i mmedi at el y cont act ed t o conduct an emer gency r esponse. Addi t i onal l y, i mmedi at el y cont act t he Cont r act i ng Of f i cer i f UXO i s encount er ed. An eval uat i on of t hi s scenar i o and pr ocedur es, wi t h cont r act number s, shal l be i ncl uded i n t he Heal t h and Saf et y Pl an ( HASP) f or t he f i el dwor k.
1. 5. 1 3R TRAI NI NG
Al l Cont r act or per sonnel per f or mi ng gr ound di st ur bi ng act i v i t i es must compl et e cont r act or awar eness t r ai ni ng r el at ed t o r ecogni z i ng UXO. Thi s t r ai ni ng ( 3R TRAI NI NG) i s avai l abl e onl i ne at :
ht t p: / / www. l ej eune. mar i nes. mi l / Of f i cesSt af f / Envi r onment al Mgmt / Tr ai ni ngVi deo. aspx
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 14 00 Page 4
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES ( MCBCL)
04/ 22
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EP 1110- 1- 8 ( 2021) Engi neer i ng and Desi gn - - Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e
1. 2 SUBMI TTALS
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Schedul e of Pr i ces
1. 3 SCHEDULE OF PRI CES
1. 3. 1 Dat a Requi r ed
Wi t hi n 15 cal endar days of not i ce of awar d, pr epar e and del i ver t o COR a schedul e of pr i ces ( const r uct i on cont r act ) . Pr ovi de a det ai l ed br eakdown of t he cont r act pr i ce, gi v i ng quant i t i es f or each of t he var i ous k i nds of wor k, uni t pr i ces, and ext ended pr i ces t her ef or . Schedul e of pr i ces shal l be separ at ed by i ndi v i dual bui l di ng number s wi t h subt ot al s f or each bui l di ng.
1. 3. 2 Payment Schedul e I nst r uct i ons
Payment s wi l l not be made unt i l t he Schedul e of Pr i ces has been submi t t ed t o and accept ed by t he Cont r act i ng Of f i cer .
Addi t i onal l y, t he Schedul e of Pr i ces must be separ at ed as f ol l ows:
a. Pr i mar y Faci l i t i es Cost Br eakdown:
Def i ned as wor k on t he pr i mar y f aci l i t i es out t o t he 5 f oot l i ne.
Wor k out t o t he 5 f oot l i ne i ncl udes const r uct i on encompassed wi t hi n a t heor et i cal l i ne 5 f oot f r om t he f ace of ext er i or wal l s and i ncl udes at t endant const r uct i on, such as pad mount ed HVAC cool i ng equi pment , cool i ng t ower s, and t r ansf or mer s pl aced beyond t he 5 f oot l i ne.
b. Suppor t i ng Faci l i t i es Cost Br eakdown:
Def i ned as s i t e wor k, i ncl udi ng i nci dent al wor k, out s i de t he 5 f oot l i ne.
SECTI ON 01 20 00 Page 1
1. 4 CONTRACT MODI FI CATI ONS
I n conj unct i on wi t h t he Cont r act Cl ause DFARS 252. 236- 7000 Modi f i cat i on Pr oposal s- Pr i ce Br eakdown, and wher e act ual owner shi p and oper at i ng cost s of const r uct i on equi pment cannot be det er mi ned f r om Cont r act or account i ng r ecor ds, base equi pment use r at es upon t he appl i cabl e pr ovi s i ons of t he
EP 1110- 1- 8.
1. 5 CONTRACTOR' S I NVOI CE AND CONTRACT PERFORMANCE STATEMENT
1. 5. 1 Cont ent of I nvoi ce
Request s f or payment wi l l be pr ocessed i n accor dance wi t h t he Cont r act Cl ause FAR 52. 232- 27 Pr ompt Payment f or Const r uct i on Cont r act s and FAR
52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s. I nvoi ces not compl et ed i n accor dance wi t h cont r act r equi r ement s wi l l be r et ur ned t o t he Cont r act or f or cor r ect i on of t he def i c i enci es. The r equest s f or payment shal l i ncl ude t he document s l i s t ed bel ow.
a. The Cont r act or ' s i nvoi ce, on NAVFAC For m 7300/ 30 f ur ni shed by t he Gover nment , showi ng i n summar y f or m, t he basi s f or ar r i v i ng at t he amount of t he i nvoi ce. For m 7300/ 30 must i ncl ude cer t i f i cat i on by Qual i t y Cont r ol ( QC) Manager as r equi r ed by t he Cont r act .
b. The Est i mat e f or Voucher / Cont r act Per f or mance St at ement on NAVFAC For m 4330/ 54 f ur ni shed by t he Gover nment . Use NAVFAC For m 4330, unl ess ot her wi se di r ect ed by t he Cont r act i ng Of f i cer , on NAVFAC Cont r act s when a Mont hl y Est i mat e f or Voucher i s r equi r ed.
c. Cont r act or ' s Mont hl y Est i mat e f or Voucher and Cont r act or s Cer t i f i cat i on ( NAVFAC For m 4330) wi t h Subcont r act or and suppl i er payment cer t i f i cat i on. Ot her document s, i ncl udi ng but not l i mi t ed t o, t hat need t o be r ecei ved pr i or t o pr ocessi ng payment i ncl ude t he f ol l owi ng submi t t al s as r equi r ed. These i t ems ar e st i l l r equi r ed mont hl y even when a pay voucher i s not submi t t ed.
d. Mont hl y Wor k- hour r epor t .
e. Updat ed Const r uct i on Pr ogr ess Schedul e and t abul ar r epor t s r equi r ed by t he cont r act .
f . Cont r act or Saf et y Sel f Eval uat i on Checkl i st .
g. Updat ed submi t t al r egi st er .
h. Sol i d Wast e Di sposal Repor t .
i . Cer t i f i ed payr ol l s.
j . Updat ed t est i ng l ogs.
k. Ot her suppor t i ng document s as r equest ed.
1. 5. 2 Submi ssi on of I nvoi ces
I f DFARS Cl ause 252. 232- 7006 Wi de Ar ea Wor kFl ow Payment I nst r uct i ons i s i ncl uded i n t he Cont r act , pr ovi de t he document s l i s t ed i n above par agr aph CONTENT OF I NVOI CE i n t hei r ent i r et y as at t achment s i n Wi de Ar ea Wor k Fl ow
SECTI ON 01 20 00 Page 2
( WAWF) f or each i nvoi ce submi t t ed. The maxi mum si ze of each WAWF at t achment i s t wo megabyt es, but t her e ar e no l i mi t s on t he number of at t achment s. I f a document cannot be at t ached i n WAWF due t o syst em or s i ze r est r i ct i on, pr ovi de i t as i nst r uct ed by t he Cont r act i ng Of f i cer .
Mont hl y i nvoi ces and suppor t i ng f or ms f or wor k per f or med t hr ough t he anni ver sar y awar d dat e of t he Cont r act must be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n 5 cal endar days of t he dat e of i nvoi ce. For exampl e, i f Cont r act awar d dat e i s t he 7t h of t he mont h, t he dat e of each mont hl y i nvoi ce must be t he 7t h and t he i nvoi ce must be submi t t ed by t he 12t h of t he mont h.
1. 5. 3 Fi nal I nvoi ce
a. A f i nal i nvoi ce must be accompani ed by t he cer t i f i cat i on r equi r ed by DFARS 252. 247. 7023 Tr anspor t at i on of Suppl i es by Sea, and t he Cont r act or ' s Fi nal Rel ease. I f t he Cont r act or i s i ncor por at ed, t he Fi nal Rel ease must cont ai n t he cor por at e seal . An of f i cer of t he cor por at i on must s i gn and t he cor por at e secr et ar y must cer t i f y t he Fi nal Rel ease.
b. For f i nal i nvoi ces bei ng submi t t ed v i a WAWF, t he or i gi nal Cont r act or ' s Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea must be pr ovi ded di r ect l y t o t he r espect i ve Cont r act i ng Of f i cer pr i or t o submi ssi on of t he f i nal i nvoi ce. Once r ecei pt of t he or i gi nal Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea has been conf i r med by t he Cont r act i ng Of f i cer , t he Cont r act or must t hen submi t f i nal i nvoi ce and at t ach a copy of t he Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea i n WAWF.
c. Fi nal i nvoi ces not accompani ed by t he Cont r act or ' s Fi nal Rel ease and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea wi l l be consi der ed i ncompl et e and wi l l be r et ur ned t o t he Cont r act or .
1. 6 PAYMENTS TO THE CONTRACTOR
Payment s wi l l be made on submi ssi on of i t emi zed r equest s by t he Cont r act or whi ch compl y wi t h t he r equi r ement s of t hi s sect i on, and wi l l be subj ect t o r educt i on f or over payment s or i ncr ease f or under payment s made on pr evi ous payment s t o t he Cont r act or .
1. 6. 1 Obl i gat i on of Gover nment Payment s
The obl i gat i on of t he Gover nment t o make payment s r equi r ed under t he pr ovi s i ons of t hi s Cont r act wi l l , at t he di scr et i on of t he Cont r act i ng Of f i cer , be subj ect t o r educt i ons and suspensi ons per mi t t ed under t he FAR and agency r egul at i ons i ncl udi ng t he f ol l owi ng i n accor dance wi t h FAR
32. 103 Pr ogr ess Payment s Under Const r uct i on Cont r act s:
a. Reasonabl e deduct i ons due t o def ect s i n mat er i al or wor kmanshi p;
b. Cl ai ms whi ch t he Gover nment may have agai nst t he Cont r act or under or i n connect i on wi t h t hi s Cont r act ;
c. Unl ess ot her wi se adj ust ed, r epayment t o t he Gover nment upon demand f or over payment s made t o t he Cont r act or ; and
d. Fai l ur e t o mai nt ai n accur at e " as- bui l t " or r ecor d dr awi ngs i n
SECTI ON 01 20 00 Page 3 accor dance wi t h FAR 52. 236. 21.
1. 6. 2 Payment f or Onsi t e and Of f s i t e Mat er i al s
Pr ogr ess payment s may be made t o t he Cont r act or f or mat er i al s del i ver ed on t he si t e, f or mat er i al s st or ed of f const r uct i on s i t es, or mat er i al s t hat ar e i n t r ansi t t o t he const r uct i on s i t es under t he f ol l owi ng condi t i ons:
a. FAR 52. 232- 5( b) Payment s Under Fi xed Pr i ce Const r uct i on Cont r act s.
b. Mat er i al s del i ver ed on t he si t e but not i nst al l ed, i ncl udi ng compl et ed pr epar at or y wor k, and of f - s i t e mat er i al s t o be consi der ed f or pr ogr ess payment must be maj or hi gh cost , l ong l ead, speci al or der , or speci al t y i t ems, not suscept i bl e t o det er i or at i on or physi cal damage i n st or age or i n t r ansi t t o t he const r uct i on s i t e. Exampl es of mat er i al s accept abl e f or payment consi der at i on i ncl ude, but ar e not l i mi t ed t o, st r uct ur al st eel , non- magnet i c st eel , non- magnet i c aggr egat e, equi pment , machi ner y, l ar ge pi pe and f i t t i ngs, pr ecast / pr est r essed concr et e pr oduct s, pl ast i c l umber ( e. g. , f ender pi l es/ cur bs) , and hi gh- vol t age el ect r i cal cabl e. Mat er i al s not accept abl e f or payment i ncl ude consumabl e mat er i al s such as nai l s, f ast ener s, condui t s, gypsum boar d, gl ass, i nsul at i on, and wal l cover i ngs.
c. Mat er i al s t o be consi der ed f or pr ogr ess payment pr i or t o i nst al l at i on must be speci f i cal l y and separ at el y i dent i f i ed i n t he Cont r act or ' s est i mat es of wor k submi t t ed f or t he Cont r act i ng Of f i cer ' s appr oval i n accor dance wi t h Schedul e of Pr i ces r equi r ement of t hi s Cont r act .
Request s f or pr ogr ess payment consi der at i on f or such i t ems must be suppor t ed by document s est abl i shi ng t hei r val ue and t hat t he t i t l e r equi r ement s of t he c l ause at FAR 52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s have been met .
d. Mat er i al s ar e adequat el y i nsur ed and pr ot ect ed f r om t hef t and exposur e.
e. Pr ovi de a wr i t t en consent f r om t he sur et y company wi t h each payment r equest f or of f s i t e mat er i al s.
f . Mat er i al s t o be consi der ed f or pr ogr ess payment s pr i or t o i nst al l at i on must be st or ed ei t her i n Hawai i , Guam, Puer t o Ri co, or t he Cont i nent al Uni t ed St at es. Ot her l ocat i ons ar e subj ect t o wr i t t en appr oval by t he Cont r act i ng Of f i cer .
g. Mat er i al s i n t r ansi t t o t he j ob s i t e or st or age si t e ar e not accept abl e f or payment .
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 20 00 Page 4
SECTI ON 01 30 00
ADMI NI STRATI VE REQUI REMENTS
01/ 23
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y - - Saf et y and Heal t h Requi r ement s Manual
1. 2 SUBMI TTALS
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Vi ew Locat i on Map
Pr ogr ess and Compl et i on Pi ct ur es
1. 3 VI EW LOCATI ON MAP
Submi t , pr i or t o or wi t h t he f i r st di gi t al phot ogr aph submi t t al s, a sket ch or dr awi ng i ndi cat i ng t he r equi r ed phot ogr aphi c l ocat i ons. Updat e as r equi r ed i f t he l ocat i ons ar e moved.
1. 4 PROGRESS AND COMPLETI ON PI CTURES
Phot ogr aphi cal l y document s i t e condi t i ons pr i or t o st ar t of const r uct i on oper at i ons. Pr ovi de mont hl y, and wi t hi n one mont h of t he compl et i on of wor k, di gi t al phot ogr aphs, 1600x1200x24 bi t t r ue col or mi ni mum r esol ut i on i n JPEG f i l e f or mat showi ng t he sequence and pr ogr ess of wor k. Take a mi ni mum of 20 di gi t al phot ogr aphs each week t hr oughout t he ent i r e pr oj ect f r om a mi ni mum of t en di f f er ent v i ewpoi nt s sel ect ed by t he Cont r act or unl ess ot her wi se di r ect ed by t he Cont r act i ng Of f i cer . Submi t wi t h t he mont hl y i nvoi ce t wo set s of di gi t al phot ogr aphs, each set on a separ at e compact di sc ( CD) or dat a ver sat i l e di sc ( DVD) , cumul at i ve of al l phot os t o dat e. I ndi cat e phot ogr aphs demonst r at i ng envi r onment al pr ocedur es.
Pr ovi de phot ogr aphs f or each mont h i n a separ at e mont hl y di r ect or y and name each f i l e t o i ndi cat e i t s l ocat i on on t he vi ew l ocat i on sket ch. Al so pr ovi de t he vi ew l ocat i on sket ch on t he CD or DVD as a di gi t al f i l e.
I ncl ude a dat e desi gnat or i n f i l e names. Phot ogr aphs pr ovi ded ar e f or unr est r i ct ed use by t he Gover nment .
1. 5 MI NI MUM I NSURANCE REQUI REMENTS
Pr ovi de t he mi ni mum i nsur ance cover age r equi r ed by FAR 28. 307- 2 Li abi l i t y , dur i ng t he ent i r e per i od of per f or mance under t hi s cont r act . Pr ovi de ot her i nsur ance cover age as r equi r ed by St at e l aw.
SECTI ON 01 30 00 Page 1
1. 6 ELECTRONI C MAI L ( EMAI L)
a. The Cont r act or i s r equi r ed t o est abl i sh and mai nt ai n el ect r oni c mai l ( emai l ) capabi l i t y al ong wi t h t he capabi l i t y t o open var i ous el ect r oni c at t achment s i n Mi cr osof t , Adobe Acr obat , and ot her s i mi l ar f or mat s.
b. Wi t hi n 10 days af t er cont r act awar d; t he Cont r act or shal l pr ovi de t he Cont r act i ng Of f i cer a s i ngl e ( onl y one) emai l addr ess f or t he ROI CC of f i ce t o send communi cat i ons r el at ed t o t hi s cont r act cor r espondence. The ROI CC of f i ce may al so use emai l t o not i f y t he Cont r act or of base access condi t i ons when emer gency condi t i ons war r ant , such as hur r i canes, t er r or i st t hr eat s, et c.
c. Mul t i pl e emai l addr esses ar e not aut hor i zed.
d. I t i s t he Cont r act or ' s r esponsi bi l i t y t o make t i mel y di st r i but i on of al l ROI CC emai l wi t hi n i t s own or gani zat i on, i ncl udi ng f i el d of f i ce( s) .
e. The Cont r act or shal l pr ompt l y not i f y t he Cont r act i ng Of f i cer , i n wr i t i ng, of any changes t o t hei r emai l addr ess.
1. 7 SUPERVI SI ON
1. 7. 1 Super i nt endent Qual i f i cat i ons
Pr ovi de pr oj ect super i nt endent wi t h a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a super i nt endent on pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he al t er nat e super i nt endent ar e t he same as f or t he pr oj ect super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he super i nt endent ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he super i nt endent i s i n quest i on.
For pr oj ect s wher e t he super i nt endent i s per mi t t ed t o al so ser ve as t he Qual i t y Cont r ol ( QC) Manager as est abl i shed i n Sect i on 01 45 00 QUALI TY CONTROL, t he super i nt endent must have qual i f i cat i ons i n accor dance wi t h t hat sect i on.
1. 7. 2 Mi ni mum Communi cat i on Requi r ement s
Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of Cont r act wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he Cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on ski l l s .
1. 7. 3 Dut i es
The pr oj ect super i nt endent i s pr i mar i l y r esponsi bl e f or managi ng subcont r act or s and coor di nat i ng day- t o- day pr oduct i on and schedul e adher ence on t he pr oj ect . The super i nt endent i s r equi r ed t o at t end Red
SECTI ON 01 30 00 Page 2
Zone meet i ngs, par t ner i ng meet i ngs, and qual i t y cont r ol meet i ngs. The super i nt endent or qual i f i ed al t er nat i ve must be on- si t e at al l t i mes dur i ng t he per f or mance of t hi s cont r act unt i l t he wor k i s compl et ed and accept ed.
1. 7. 4 Non- Compl i ance Act i ons
The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and f or f ai l ur e t o manage t he pr oj ect t o ensur e t i mel y compl et i on.
Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me f or excess cost s or damages by t he Cont r act or .
1. 8 PRECONSTRUCTI ON MEETI NG
I mmedi at el y af t er awar d, pr i or t o commenci ng any wor k at t he s i t e, coor di nat e wi t h t he Cont r act i ng Of f i cer a t i me and pl ace t o meet f or t he Pr econst r uct i on Meet i ng. The meet i ng must t ake pl ace wi t hi n 35 cal endar days af t er awar d of t he cont r act , but pr i or t o commencement of any wor k at t he s i t e. The pur pose of t hi s meet i ng i s t o di scuss and devel op a mut ual under st andi ng of t he admi ni st r at i ve r equi r ement s of t he Cont r act i ncl udi ng but not l i mi t ed t o: dai l y r epor t i ng, i nvoi c i ng, val ue engi neer i ng, saf et y, base- access, out age r equest s, hot wor k per mi t s, schedul e r equi r ement s, qual i t y cont r ol , schedul e of pr i ces or ear ned val ue r epor t , shop dr awi ngs, submi t t al s, cyber secur i t y, pr osecut i on of t he wor k, gover nment accept ance, f i nal i nspect i ons and cont r act c l ose- out . Cont r act or must pr esent and di scuss t hei r basi c appr oach t o schedul i ng t he const r uct i on wor k and any r equi r ed phasi ng.
1. 8. 1 At t endees
Cont r act or at t endees must i ncl ude t he Pr oj ect Manager , Super i nt endent , Si t e Saf et y and Heal t h Of f i cer ( SSHO) , Qual i t y Cont r ol Manager and maj or subcont r act or s.
1. 9 FACI LI TY TURNOVER PLANNI NG MEETI NGS ( Red Zone Meet i ngs)
Meet wi t h t he Gover nment t o i dent i f y st r at egi es t o ensur e t he pr oj ect i s car r i ed t o expedi t i ous c l osur e and t ur nover t o t he Cl i ent . St ar t pl anni ng t he t ur nover pr ocess at t he Pr e- Const r uct i on Conf er ence meet i ng wi t h a di scussi on of t he Red Zone pr ocess and convene at r egul ar l y schedul ed NRZ Meet i ngs begi nni ng at appr oxi mat el y 75 per cent of pr oj ect compl et i on.
I ncl ude t he f ol l owi ng i n t he f aci l i t y Tur nover ef f or t :
1. 9. 1 Red Zone Checkl i st
a. Cont r act i ng Of f i cer ' s Techni cal Repr esent at i ve ( COTR) wi l l pr ovi de t he Cont r act or a copy of t he Red Zone Checkl i st t empl at e.
b. Pr i or t o 75 per cent compl et i on, modi f y t he Red Zone Checkl i st t empl at e by addi ng or del et i ng cr i t i cal act i v i t i es appl i cabl e t o t he pr oj ect and assi gn pl anned compl et i on dat es f or each act i v i t y. Submi t t he modi f i ed Red Zone Checkl i st t o t he Cont r act i ng Of f i cer . The Cont r act i ng Of f i cer may r equest addi t i onal act i v i t i es be added t o t he Red Zone Checkl i st at any t i me as necessar y.
SECTI ON 01 30 00 Page 3
1. 9. 2 Meet i ngs
a. Conduct r egul ar Red Zone Meet i ngs begi nni ng at appr oxi mat el y 75 per cent pr oj ect compl et i on, or t hr ee t o s i x mont hs pr i or t o Benef i c i al Occupancy Dat e ( BOD) , whi chever comes f i r st .
b. The Cont r act i ng Of f i cer wi l l est abl i sh t he f r equency of t he meet i ngs, whi ch i s expect ed t o i ncr ease as t he pr oj ect compl et i on dr aws near er .
At t he begi nni ng, Red Zone meet i ngs may be ever y t wo weeks t hen i ncr ease t o weekl y t owar ds t he f i nal mont h of t he pr oj ect .
c. Usi ng t he Red Zone Checkl i st as a Pl an of Act i on and Mi l est ones ( POAM) and basi s f or di scussi on, r evi ew upcomi ng cr i t i cal act i v i t i es and st r at egi es t o ensur e wor k i s compl et ed on t i me.
d. Dur i ng t he Red Zone Meet i ngs di scuss wi t h t he COTR any upcomi ng act i v i t i es t hat r equi r e Gover nment i nvol vement .
e. Mai nt ai n t he Red Zone Checkl i st by document i ng t he act ual compl et i on dat es as wor k i s compl et ed and updat e t he Red Zone Checkl i st wi t h r evi sed pl anned compl et i on dat es as necessar y t o mat ch pr ogr ess.
Di st r i but e copi es of t he cur r ent Red Zone Checkl i st t o at t endees at each Red Zone Meet i ng.
<TAI OPT=PARTNERI NG>1. 10 PARTNERI NG
Cont r act or shal l host t he par t ner i ng sessi on wi t hi n 45 cal endar days of cont r act awar d. To most ef f ect i vel y accompl i sh t hi s Cont r act , t he Cont r act or and Gover nment must f or m a cohesi ve par t ner shi p wi t h t he common goal of dr awi ng on t he st r engt h of each or gani zat i on i n an ef f or t t o achi eve a successf ul pr oj ect wi t hout saf et y mi shaps, conf or mi ng t o t he Cont r act , wi t hi n budget and on schedul…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .