Amend 0008.pdf
PDF 12 MB Posted
- Attached to
- Repair BEQ HP505
- Solicitation number
- N4008525R2549
About this file
I am unable to see the actual contents of "Amend 0008.pdf" in the provided information. While I can see this is Amendment 8 related to solicitation N4008525R2549 for a BEQ HP505 repair project under Naval Facilities Engineering Command, I cannot provide specific details about what changes or updates this amendment contains without access to the actual amendment content. The base solicitation appears to be a General MACC (Multiple Award Construction Contract) opportunity limited to pre-qualified contractors in the Camp Lejeune area of responsibility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0016.pdf | ||
| Amend 0015.pdf | ||
| Amend 0014.pdf | ||
| Amend 0013.pdf | ||
| 60040360.pdf | ||
| 60040406.pdf | ||
| 60040345.pdf | ||
| 60040454.pdf | ||
| 60040373.pdf | ||
| 60040328.pdf | ||
| 60040433.pdf | ||
| 60040414.pdf | ||
| N4008523B0034 SpecsAsOne Addendum 01.pdf | ||
| 60040411.pdf | ||
| 60040407.pdf | ||
| 60040434.pdf | ||
| 60040420.pdf | ||
| 60040412.pdf | ||
| 60040343.pdf | ||
| Amend 0012.pdf | ||
| 60040362.pdf | ||
| 60040342.pdf | ||
| 60040447.pdf | ||
| 60040408.pdf | ||
| 60040436.pdf | ||
| 60040424.pdf | ||
| 60040329.pdf | ||
| 60040422.pdf | ||
| 60040366.pdf | ||
| 60040376.pdf | ||
| 60040359.pdf | ||
| Amend 0011.pdf | ||
| Amend 0010.pdf | ||
| Amend 0009.pdf | ||
| Amend 0007.pdf | ||
| Amend 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| 23-0034 Asbestos and Lead Assessment.pdf | ||
| 23-0034 Appendix D.pdf | ||
| N4008523B0034 DWGs.pdf | ||
| RFP 230034.pdf | ||
| N4008523B0034 SPECS.pdf |
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 24
AMENDMENT NO. 0008 12/20/24 23-0034
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107 A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-25-R-2549
11/18/24
23-0034, Repair BEQ HP505: Answers to RFI's.
The time and date for receipt of proposals remains 1500, on 8 January 2025.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
N40085-25-R-2549 Amendment 0008
CONTINUATION SHEET
1. Answers to RFI’s:
1. QUESTION: Should the 8" CMU attic access wall on A4/A502 be fire rated?
ANSWER: No rating is required.
2. QUESTION: Amendment 0004 question 1 tells us to remove Piles 60’ below grade. We need to know how many and where they are, can as-builts be provided??
ANSWER: See Attached “as-built” drawings.
2. All other terms and conditions remain unchanged.