Amend 0003.pdf
PDF 156 KB Posted
- Attached to
- Repair BEQ HP505
- Solicitation number
- N4008525R2549
About this file
This is Amendment 0003 to solicitation N40085-25-R-2549 for Repair BEQ HP505 at Camp Lejeune, issued by NAVFAC Mid-Atlantic on December 6, 2024.
The amendment provides answers to contractor questions regarding DDC controls and FF&E requirements. Key clarifications include: controls conduit may be exposed in barracks sleeping quarters and does not need to be blue; DDC Controls Contractor will provide BACnet Control Thermostats for PTAC units; and FF&E is not a requirement for this project - contractors can ignore all FF&E-related specifications mentioned in the RFP issued on 11/21/2024, including the previously stated $111,223.80 FF&E budget and requirements for interior designers, audio-visual scope, and furniture documentation. The amendment states that the receipt deadline for offers is not extended.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0016.pdf | ||
| Amend 0015.pdf | ||
| Amend 0014.pdf | ||
| Amend 0013.pdf | ||
| 60040360.pdf | ||
| 60040406.pdf | ||
| 60040345.pdf | ||
| 60040454.pdf | ||
| 60040373.pdf | ||
| 60040328.pdf | ||
| 60040433.pdf | ||
| 60040414.pdf | ||
| N4008523B0034 SpecsAsOne Addendum 01.pdf | ||
| 60040411.pdf | ||
| 60040407.pdf | ||
| 60040434.pdf | ||
| 60040420.pdf | ||
| 60040412.pdf | ||
| 60040343.pdf | ||
| Amend 0012.pdf | ||
| 60040362.pdf | ||
| 60040342.pdf | ||
| 60040447.pdf | ||
| 60040408.pdf | ||
| 60040436.pdf | ||
| 60040424.pdf | ||
| 60040329.pdf | ||
| 60040422.pdf | ||
| 60040366.pdf | ||
| 60040376.pdf | ||
| 60040359.pdf | ||
| Amend 0011.pdf | ||
| Amend 0010.pdf | ||
| Amend 0009.pdf | ||
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| Amend 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| 23-0034 Asbestos and Lead Assessment.pdf | ||
| 23-0034 Appendix D.pdf | ||
| N4008523B0034 DWGs.pdf | ||
| RFP 230034.pdf | ||
| N4008523B0034 SPECS.pdf |
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 4
AMENDMENT NO. 0003 12/06/24 23-0034
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107 A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-25-R-2549
11/18/24
23-0034, Repair BEQ HP505: RFI answers.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
N40085-25-R-2549 Amendment 0003
CONTINUATION SHEET
1. Answers to RFI’s:
QUESTION: Scope of work: Div 23.09 (DDC) - Barracks sleeping quarters are hard lid ceiling.
1) Are contractors supposed to run controls conduit wiring to PTAC units exposed along ceiling?
ANSWER: Controls conduit may be exposed. Exposed conduit within occupied spaces does not need to be blue.
2) Can government clarify their intent?
ANSWER: Please provide additional context for the question.
QUESTION: Plans detail PTAC Unit with integral BACnet controls. Are Div. 23.09 DDC Contactors to assume BACnet Controls by others? Are we to connect communications and install unit mfg. wall sensor?
ANSWER: DDC Controls Contractor to provide BACnet Control Thermostats
QUESTION: Plans detail PTAC Unit with integral BACnet controls. If PTAC Unit MFG provides those controls, does they comply with CL specifications with PICC Statements and
BTL?
ANSWER: DDC Controls Contractor to provide BACnet Control Thermostats
QUESTION: Plans detail PTAC Unit with integral BACnet controls. Will they be pre-addressed per base standards? Pre-Programmed? Will Unit MFG be performing Cx, PVT and BOD acceptance on those controls?
ANSWER: DDC Controls Contractor to provide BACnet Control Thermostats
QUESTION: On page 830/831 of the entire spec pdf, there is a line in section 3.1.1 that says in bold “The Contractor is not required to hire an Interior Designer to develop or validate the Final FF&E Package.” The spec then goes on to be the typical FF&E standard spec, as if that sentence was not supposed to be there at all, as it continues to state in Section 3.1.1.1 that this project needs an NCIDQ/CID certified designer to finalize the FF&E package, etc. This may be a case where the FF&E spec section isn’t correct, because on page 823, Section 1.2 General Requirements lists that the expected government FF&E total is $111,223.80 for this project.
After looking at the Furniture Floor Plans in the drawing package, I can safely say that that number is not possible with the amount of new furniture listed on the schedules to outfit the BEQ spaces. Could the government verify the interior design requirements please?
ANSWER: FF&E is not a requirement of this project. Contractors can ignore any mention of FF&E for this project as stated in the RFP issued on 11/21/2024.
QUESTION: After reviewing this opportunity and section 12 (FF&E) I only see three (3) instances that audio-visual (AV) is mentioned. There is no documentation for the AV needs of this project. Would the Government be able to supply a project work statement to the needs for the BEQ?
ANSWER: FF&E is not a requirement of this project. Contractors can ignore any mention of FF&E for this project as stated in the RFP issued on 11/21/2024.
QUESTION: 12 00 01.00 20, FF&E Package, 1.4.9.3 Bonds Required by the Contractor.
States FF&E budget can’t include furniture sub-contractor bonds, due to the limited scope of this FF&E package could this be reconsidered to include bonds by paid out of the FFE budget and not from the offeror’s HAR?
ANSWER: FF&E is not a requirement of this project. Contractors can ignore any mention of FF&E for this project as stated in the RFP issued on 11/21/2024.
QUESTION: 12 00 01.00 20, FF&E Package, 1.4.9.3 1.2 GENERAL REQUIREMENTS States a budget of $111,223.80, can this budget breakdown by item along with preliminary order data sheets be provided prior to bid?
ANSWER: FF&E is not a requirement of this project. Contractors can ignore any mention of FF&E for this project as stated in the RFP issued on 11/21/2024.
QUESTION: 12 00 01.00 20, FF&E Package, Mentions Audio-Visual (A//V) scope to be included. Is there any A/V design required?
ANSWER: FF&E is not a requirement of this project. Contractors can ignore any mention of FF&E for this project as stated in the RFP issued on 11/21/2024.
QUESTION: 12 00 01.00 20 ,FF&E Package, 3.1.1.4.4 Inventory of Existing FF&E or CEQ states that some furniture will be reused. Please give an indication by percentage of how much furniture will be new vs reused so offeror can determine the amount of documentation effort required for each type of furniture (new vs used).
ANSWER: FF&E is not a requirement of this project. Contractors can ignore any mention of FF&E for this project as stated in the RFP issued on 11/21/2024.
QUESTION: 12 00 01.00 20, FF&E Package, 3.1.1.4.4 3.1.2 FF&E MEETINGS, PRESENTATIONS AND SUBMITTALS FOR THE INTERIOR DESIGN SERVICES States “The Contractor's Interior Designer must attend all design meetings, site visits, walk-throughs, coordinate required mock-ups with the NAVFAC Interior Designer, obtain Activity and NAVFAC approvals and provide a complete and functional FF&E Package.” Please define how many meetings are required for interior design to be physically present to accurately determine the scope of interior designer’s travel to the project site?
ANSWER: FF&E is not a requirement of this project. Contractors can ignore any mention of FF&E for this project as stated in the RFP issued on 11/21/2024.
QUESTION: 12 00 01.00 20, FF&E Package, 3.5.2 Interior Photography Submittal Requires before and after photographs. Is it necessary for the professional photographer to photograph both the before and after photos or can they be used for the after photos only?
ANSWER: FF&E is not a requirement of this project. Contractors can ignore any mention of FF&E for this project as stated in the RFP issued on 11/21/2024.
2. All other terms and conditions remain unchanged.
File details come from the government source that posted it. Updated .