60040447.pdf
PDF 336 KB Posted
- Attached to
- Repair BEQ HP505
- Solicitation number
- N4008525R2549
About this file
This is a mechanical building floor plan drawing labeled M-401 for a Marine Corps Base BEQ HP505 repair project. The drawing shows a detailed 1/2"=1'-0" scale enlarged plan view of mechanical equipment and piping layouts.
The plan depicts various HVAC and mechanical systems including chillers (CH-1), pumps (CHWP-1, CHWP-2, SHWP-1, SHWP-2, PHWP-1, PHWP-2, PHWP-3), air separators (AS-1, AS-2), expansion tanks (ET-1, ET-2), unit heaters (UH-1), exhaust fans (EF-1), and associated piping systems. The piping systems shown include 6" chilled water supply and return lines (CHWS/CHWR), 4" heating water supply and return lines (HWS/HWR), and natural gas lines ranging from 2" to 1" in diameter. VFD control panels and other mechanical equipment like buffer tanks (BT-1) are also indicated. The drawing includes general notes and key numbers referencing additional specifications or requirements for the mechanical installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0016.pdf | ||
| Amend 0015.pdf | ||
| Amend 0014.pdf | ||
| Amend 0013.pdf | ||
| 60040360.pdf | ||
| 60040406.pdf | ||
| 60040345.pdf | ||
| 60040454.pdf | ||
| 60040373.pdf | ||
| 60040328.pdf | ||
| 60040433.pdf | ||
| 60040414.pdf | ||
| N4008523B0034 SpecsAsOne Addendum 01.pdf | ||
| 60040411.pdf | ||
| 60040407.pdf | ||
| 60040434.pdf | ||
| 60040420.pdf | ||
| 60040412.pdf | ||
| 60040343.pdf | ||
| Amend 0012.pdf | ||
| 60040362.pdf | ||
| 60040342.pdf | ||
| 60040408.pdf | ||
| 60040436.pdf | ||
| 60040424.pdf | ||
| 60040329.pdf | ||
| 60040422.pdf | ||
| 60040366.pdf | ||
| 60040376.pdf | ||
| 60040359.pdf | ||
| Amend 0011.pdf | ||
| Amend 0010.pdf | ||
| Amend 0009.pdf | ||
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| Amend 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| 23-0034 Asbestos and Lead Assessment.pdf | ||
| 23-0034 Appendix D.pdf | ||
| N4008523B0034 DWGs.pdf | ||
| RFP 230034.pdf | ||
| N4008523B0034 SPECS.pdf |
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V F
D
HVAC
CONTROL
PANEL
SHWP-2
ET-1
ET-2
CHWP-2
AS-2
CH-1
PHWP-1
PHWP-2
PHWP-3
UH-1
EF-1
6" ø
C H
W R
6" ø
C H
W S
B-3
B-2
B-1
4" ø
H W
R
4" ø
H W
S
HWR
CHWP-1
SHWP-1
V F
D
AS-1
UH-1
L-1
BT-1
6" ø
C H
W S
6"ø CHWR
6"ø CHWR
6"ø CHWR
4"ø HWR
4"ø HWR
4"ø HWS
TEF-1
6"ø
6"ø
6"ø
2"ø NG
2" ø
N G
1 1/4"ø NG 1"ø NG
1"ø NG
1"ø NG
2"ø NG
GAS
METER
1 1/2"ø NG
1 1/2"ø NG
DECOUPLING
PIPE
D-WH-2
D-WH-1
T
M
E
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
CAMP LEJEUNE, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091
CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M B
F A
N O
SPEC.
M-401
MAS
JDL
MORGAN HUNTER
MAS
REPAIR BEQ HP505
MECHANICAL BUILDING ENLARGED
60040447 N40085-23-B-0034
123 176
# PLAN NOTES
1 PROVIDE NEW AIR-COOLED CHILLER MOUNTED ON CONCRETE
PAD. EXPOSED CHILLED WATER PIPING MUST BE HEAT
TRACED AND WRAPPED IN INSULATION.
2 PROVIDE NEW BAFFLED THERMAL BUFFER TANK ON
CONCRETE PAD.
3 PROVIDE NEW CHILLED WATER AIR SEPARATOR.
4 PROVIDE NEW CHILLED WATER EXPANSION TANK
5 PROVIDE NEW INLINE CHILLED WATER PUMP MOUNTED ON
CONCRETE PAD ON FLOOR.
6 PROVIDE NEW BOILER MOUNTED ON CONCRETE PAD.
PROVIDE WITH INLINE BOILER FEED PUMP ON INLET OF
BOILER. ROUTE CONDENSATE TO NEAREST FLOOR DRAIN.
ROUTE FLUE TO EXTERIOR WALL AS SHOWN.
7 PROVIDE NEW HOT WATER AIR SEPARATOR.
8 PROVIDE NEW HOT WATER EXPANSION TANK
9 PROVIDE NEW INLINE HOT WATER PUMP MOUNTED ON
CONCRETE PAD ON FLOOR.
10 PROVIDE NEW HOT WATER UNIT HEATER (AND CONTROLS)
MOUNTED UP HIGH IN SPACE. COORDINATE EXACT LOCATION
WITH ALL OTHER EQUIPMENT AND PIPING TO PROVIDE
PROPER CLEARANCES.
11 PROVIDE NEW WALL MOUNTED, DIRECT DRIVE EXHAUST FAN
AND CONTROLS.
12 PROVIDE NEW OUTSIDE AIR LOUVER ON EXTERIOR WALL WITH
CLASS 1A MOTORIZED DAMPER TO BE TIED TO THE EXHAUST
FAN OPERATION.
13 HOT WATER PIPING TO TURN DOWN INSIDE MECHANICAL
BUILDING WALL AND ROUTED UNDERGROUND TO BUILDING
HP505 AS SHOWN.
14 CHILLED WATER PIPING TO TURN DOWN INSIDE CHILLER YARD
AND ROUTED UNDERGROUND TO BUILDING HP505 AS SHOWN.
15 UTILITY COMPANY TO PROVIDE UNDERGROUND GAS PIPING
FROM EXISTING MAIN TO MECHANICAL BUILDING AND GAS
METER WITH 2 PSI OUTLET PRESSURE. CONTRACTOR TO
INSTALL PIPING BETWEEN GAS METER AND EQUIPMENT USING
GAS AND PROVIDE UNION AND LOCKABLE BALL VALVE WHEN
CONNECTING TO THE METER.
16 2 PSI GAS PIPING ROUTED FROM METER TO NEW BOILERS,
NEW WATER HEATER AND EXISTING WATER HEATER. REFER
TO GAS RISER DETAIL ON M-501.
17 PROVIDE NEW WALL-MOUNTED, PUSHBUTTON-TYPE
EMERGENCY GAS SHUTOFF SWITCH. MOUNT AT 54" A.F.F.
GENERAL NOTES:
1. SEE SHEET M-001 FOR GENERAL NOTES, LEGEND &
ABBREVIATIONS
2. PLAN DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NO
ILLUSTRATE ALL SPECIFIC DUCT TAKE-OFF CONFIGURATIONS,
TAPS, ETC. PROVIDE FLEXIBLE DUCTWORK RUNOUTS TO ALL
SUPPLY AND RETURN GRILLES WITH A MAXIMUM LENGTH OF 5
FEET AND SINGLE BENDS NO GREATER THAN 45 DEGREES.
REFER TO PROJECT SPECIFICATIONS AND DUCTWORK
DETAILS FOR SPECIFIC REQUIREMENTS.
3. PIPING IS TO BE INSTALLED SO THAT ALL VALVES, STRAINERS,
UNIONS, TRAPS AND FLANGES REQUIRING ACCESS ARE
EASILY ACCESSIBLE. ALL VALVES MUST BE INSTALLED SO
THAT THE SYSTEM REMAINS IN SERVICE WHEN EQUIPMENT
OR PIPING (ON EQUIPMENT SIDE OF VALVE) IS REMOVED. ALL
BALANCING VALVES AND BUTTERFLY VALVES MUST BE
PROVIDED WITH POSITION INDICATORS AND MAXIMUM
ADJUSTABLE STOPS. ALL VALVES (EXCEPT CONTROL VALVES)
AND STRAINERS MUST BE FULL SIZE OF PIPE BEFORE
REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT OR
CONTROLS.
N
1/2" = 1'-0" A1
MECHANICAL BUILDING ENLARGED
GRAPHIC SCALE: 1/2"=1'-0"
2' 0 1' 2' 4'
1 PPI Responses 01.17.25
| Sheets |
| M-401 - MECHANICAL BUILDING ENLARGED |
File details come from the government source that posted it. Updated .