Revised_EVKP14-4269_Blank_AF_Form_3052_23Feb2015.xlsx

Air Force Form Feb 23, 2015 XLSX spreadsheet 32 KB Posted

Attached to
Repair/Upgrade Kitchen, GOH 4200, Plaza Housing
Solicitation number
FA5270-15-T-0045
Issued by

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
Show all 20

Who attaches AF Form 3052

Other files

File Type Posted
RFI.pdf PDF
Amendment_1.doc DOC document
Attachment_4.pdf PDF
Attachment_7.pdf PDF
Attachment_5.pdf PDF
Attachment_6.pdf PDF
Attachment_2.pdf PDF
Attachment_3.pdf PDF
Solicitation.pdf PDF
Attachment_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 (3)

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN(GOVERNMENT)Expires 31 October 1989
CONTRACTORADDRESS
CONTRACT FOR(Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR/UPGRADE KITCHEN, GOH 4200 PL
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
EVKP14-4269Kadena Air Base, Okinawa, Japan
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYMANHOURSAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALMANDAYSRATETOTALCOSTSTOTAL
(1)(2)(3)(4) ¥(5) ¥(6)(7) ¥(8) ¥(9) ¥(10) ¥
SUMMARY (OPTIONAL)

A APPLIANCES (Optional) LOT 1 945,000 945,000

TOTAL DIRECT COST945,000
OVERHEAD15%141,750
SUBTOTAL1,086,750
PROFIT10%108,675
TOTAL COST1,195,425

$1.00 = ¥ 103.9439 $11,500.67

AKITCHEN APPLIANCES (Optional)
a36" BUILT IN COOKTOPEA1170,000170,000.00
b30" BUILT IN DOUBLE WALL OVEN CONVECTIONEA1300,000300,000.00
c28.6 CF FRENCH DOOR REFRIGERATOREA1250,000250,000.00
dOVER THE RANGE MICROWAVE OVENEA1200,000200,000.00
EINSTALLATIONLOT125,00025,000.00
SUB-TOTAL945,000.00

7 May 13

&"Courier New,Regular"&8AF FORM 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE. &"Times New Roman,Bold"&12FOR OFFICIAL USE ONLY Page &P of &N

Final

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN(CONTRACTOR)Expires 31 October 1989
CONTRACTORADDRESS
CONTRACT FOR(Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR AND IMPROVE KITCHEN, LAUNDRY AND SECONDARY DINING AREA
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
EVKP14-4269Plaza Housing, Camp Foster, Okinawa, Japan
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYMANHOURSAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALMANDAYSRATETOTALCOSTSTOTAL
(1)(2)(3)(4) ¥(5) ¥(6)(7) ¥(8) ¥(9) ¥(10) ¥
SUMMARY
AARCHITECTURAL
BAPPLIANCES (Install GFE)a
CMECHANICAL
DELECTRICAL
ESAMPLING AND ABATEMENT OF ACM/LBP
TOTAL DIRECT COST
OVERHEAD
SUBTOTAL
PROFIT
TOTAL COST

$1.00 = ¥ 103.9439 $0

AARCHITECTURAL
1REMOVAL WORKS
a. Floor Tile
b. Cove Base
c. Wall Tile
d. Ceiling
e. CMU Wall
f. Dry Wall
g. Kitchen Base Cabinets and Countertops
h. Windows
j. Door and Frames
k. Cabinet Door and Frames
l. Mobilization
m.Disposal
SUB-TOTAL
2NEW WORKS
a. Ceramic Floor Tile
b. Wall Base
c. Dry Wall Partition and stud
d. Door and Frame
e. Kitchen base/wall, pantry cabinets & Countertop
f. Ceiling
g. Surface Preparation
h. Painting
i. Wall Tile
j. Gypsum Board and Metal Furring
k. Wall Insulation
l. WR Gypsum wallboard
m. Cement plaster
n. Miscellaneous
o. Built-in Pull out Garbage Bin
SUB-TOTAL
ARCHITECTURAL TOTAL
BKITCHEN APPLIANCES INSTALL
aCOOKTOP
bDOUBLE WALL OVEN CONVECTION
cDISHWASHER
dOVER THE RANGE MICROWAVE OVEN
eREFRIGERATOR
SUB-TOTAL
CMECHANICAL
1REMOVAL WORKS
a. Kitchen Sink with faucet, disposer, stop
valves, p-trap, water and waste tubes
b. Ref & Laundry Room Equipment
c. Range Hood with ductwork and wall cap
d. Disposal
2NEW WORKS
a. Kitchen Sink with stop valves, p-trap,
water and waste tubes
b. Kitchen Faucet
c. Food Waste Disposer
d. Install Dishwasher and Ref
e. Ductwork and Wall Cap
f . Reinstall Ref & Laundry Eqpt
g. Misc. Work
MECHANICAL TOTAL COST
DELECTRICAL
1REMOVAL WORKS

SUB-TOTAL

2NEW WORKS
a. Panelboard
b. Outlet
c.Telephone Outlet
d. Switch
e. Juntion Box
d. Cover Plate
d. AWG #12
e. AWG #10
f. AWG #6
g. AWG #1
h. AWG #2/0
i. Telephone Cable
i. RSC Conduit 1/2"
j. RSC Conduit 2"
k. Mobilization
l. Disposal

ELECTRICAL SUB-TOTAL

EACM/LBP SAMPLING/TESTING
1ACM/LBP TESTING

SUB-TOTAL

2ACM/LBP ABATEMENT
ACM/LBP including Disposal
SUB-TOTAL
TOTAL

26 November 14

&"Courier New,Regular"&8AF FORM 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE. &"Times New Roman,Bold"&12FOR OFFICIAL USE ONLY Page &P of &N

File details come from the government source that posted it. Updated .