Attachment_7.pdf
PDF 86 KB Posted
- Attached to
- Repair/Upgrade Kitchen, GOH 4200, Plaza Housing
- Solicitation number
- FA5270-15-T-0045
About this file
Attachment 7
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised_EVKP14-4269_Blank_AF_Form_3052_23Feb2015.xlsx | XLSX spreadsheet | |
| RFI.pdf | ||
| Amendment_1.doc | DOC document | |
| Attachment_4.pdf | ||
| Attachment_5.pdf | ||
| Attachment_6.pdf | ||
| Attachment_2.pdf | ||
| Attachment_3.pdf | ||
| Solicitation.pdf | ||
| Attachment_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 7
Schedule of Material Submittals
AF FORM 66, Sep 86
8 Jan 15
PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
APPROVED DIS-
APPROVED
Progress Schedules and Reports SOW Para 2.2
4 Five (5) days after
NTP
Certificte of Training, Sampling Plan, Protective Equipment Plan SOW Para 4.1.b
4 Prior to field sampling
Asbestos and Lead-Based Paint Clearance Sampling Results
Immediately after finding (if applicable)
4 Lead WasteTLCP Sampling 4
Fourteen (14) days after receipt of sampling result (if applicable)
5 As-Built Drawings SOW Para 3.7 1
Seven (7) calendar days after final inspection
6 DD Form 1354 SOW Para 3.18 4
Seven (7) calendar days after final inspection
Concrete Masonry Units
(CMU)
04 20 00 - 1.02.A & C
4 4 Twenty (20) calendar days after
NTP
RPR AND IMPROVE KIT, LAUNDRY RM
& SECONDARY DINING AREA
DATE
CONTRACTOR
NOTIFIED CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
L I N E
N U M B E R
EVKP14-4269
M A
N U
F' R
'S
IN
ST
R
U C
TI
O
N S
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
RETURN
SUS-
PENSE
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
FOLLOW-
UP
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
REQUIRED
SUB-
MISSION
DATE
After NTP or as
IndicatedM A
N U
F' R
R
EC
O M
M
EN
D A
TI
O
N
C
ER
TI
FI
C A
TE
O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
REMARKS
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
St at em en ts
Te st
R ep or ts
/S ee
R eq
'ts
FINAL
APPROVAL
8 Jan 15
PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
APPROVED DIS-
APPROVED
RPR AND IMPROVE KIT, LAUNDRY RM
& SECONDARY DINING AREA
DATE
CONTRACTOR
NOTIFIED CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
L I N E
N U M B E R
EVKP14-4269
M A
N U
F' R
'S
IN
ST
R
U C
TI
O
N S
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
RETURN
SUS-
PENSE
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
FOLLOW-
UP
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
REQUIRED
SUB-
MISSION
DATE
After NTP or as
IndicatedM A
N U
F' R
R
EC
O M
M
EN
D A
TI
O
N
C
ER
TI
FI
C A
TE
O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
REMARKS
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
St at em en ts
Te st
R ep or ts
/S ee
R eq
'ts
FINAL
APPROVAL
Manufacturer's Descriptive Data 04 20 00 - 1.02.A
Twenty (20) calendar days after
NTP
9 Pre-Mixed Mortar 04 20 00 - 1.02.B 4
Twenty (20) calendar days after
NTP
10 Unit Strength Method 04 20 00 - 1.02.B 4
Twenty (20) calendar days after
NTP
Reinforcing Steel Bars and Rods 04 20 00 - 1.02.C
Twenty (20) calendar days after
NTP
12 Masonry Cement 04 20 00 - 1.02.C & D 4 4
Twenty (20) calendar days after
NTP
13 Prefabricated Millwork 06 20 00 - 1.2 4
Twenty (20) calendar days after
NTP
14 Door and Opening Trim 06 02 00 - 1.2 4
Twenty (20) calendar days after
NTP
8 Jan 15
PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
APPROVED DIS-
APPROVED
RPR AND IMPROVE KIT, LAUNDRY RM
& SECONDARY DINING AREA
DATE
CONTRACTOR
NOTIFIED CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
L I N E
N U M B E R
EVKP14-4269
M A
N U
F' R
'S
IN
ST
R
U C
TI
O
N S
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
RETURN
SUS-
PENSE
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
FOLLOW-
UP
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
REQUIRED
SUB-
MISSION
DATE
After NTP or as
IndicatedM A
N U
F' R
R
EC
O M
M
EN
D A
TI
O
N
C
ER
TI
FI
C A
TE
O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
REMARKS
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
St at em en ts
Te st
R ep or ts
/S ee
R eq
'ts
FINAL
APPROVAL
15 Cabinets 06 20 00 - 1.2 1 4
Twenty (20) calendar days after
NTP
16 Wood Items, Base, and Trim 06 20 00 - 1.2 4
Twenty (20) calendar days after
NTP
17 Trim 06 20 00 - 1.2 1
Twenty (20) calendar days after
NTP
18 Certificates of Grade 06 20 00 - 1.2 4
Twenty (20) calendar days after
NTP
19 Certificates of Compliance 06 20 00 - 1.2 4
Twenty (20) calendar days after
NTP
20 Detail Drawings 06 61 16 - 1.3 4
Twenty (20) calendar days after
NTP
21 Installation 06 61 16 - 1.3 4
Twenty (20)
8 Jan 15
PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
APPROVED DIS-
APPROVED
RPR AND IMPROVE KIT, LAUNDRY RM
& SECONDARY DINING AREA
DATE
CONTRACTOR
NOTIFIED CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
L I N E
N U M B E R
EVKP14-4269
M A
N U
F' R
'S
IN
ST
R
U C
TI
O
N S
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
RETURN
SUS-
PENSE
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
FOLLOW-
UP
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
REQUIRED
SUB-
MISSION
DATE
After NTP or as
IndicatedM A
N U
F' R
R
EC
O M
M
EN
D A
TI
O
N
C
ER
TI
FI
C A
TE
O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
REMARKS
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
St at em en ts
Te st
R ep or ts
/S ee
R eq
'ts
FINAL
APPROVAL
22 Solid Polymer Material 06 61 16 - 1.3 4 4
Twenty (20) calendar days after
NTP
23 Qualifications 06 61 16 - 1.3 4 4
Twenty (20) calendar days after
NTP
24 Fabrications 06 61 16 - 1.3 4 4
Twenty (20) calendar days after
NTP
25 Countertops 06 61 16 - 1.3 1
Twenty (20) calendar days after
NTP
26 Clean-up 06 61 16 - 1.3 4
Twenty (20) calendar days after
NTP
27 Blanket Insulation 07 21 16 - 1.02.A & B 4 4
Twenty (20) calendar days after
NTP
28 Pressure Sensitive Tape 07 21 16 - 1.02.A 4
Twenty (20)
8 Jan 15
PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
APPROVED DIS-
APPROVED
RPR AND IMPROVE KIT, LAUNDRY RM
& SECONDARY DINING AREA
DATE
CONTRACTOR
NOTIFIED CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
L I N E
N U M B E R
EVKP14-4269
M A
N U
F' R
'S
IN
ST
R
U C
TI
O
N S
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
RETURN
SUS-
PENSE
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
FOLLOW-
UP
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
REQUIRED
SUB-
MISSION
DATE
After NTP or as
IndicatedM A
N U
F' R
R
EC
O M
M
EN
D A
TI
O
N
C
ER
TI
FI
C A
TE
O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
REMARKS
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
St at em en ts
Te st
R ep or ts
/S ee
R eq
'ts
FINAL
APPROVAL
29 Accessories 07 21 16 - 1.02.A 4
Twenty (20) calendar days after
NTP
30 Sealants 07 92 00 - 1.02.A & B 4 4
Twenty (20) calendar days after
NTP
31 Primers 07 92 00 - 1.02.A 4
Twenty (20) calendar days after
NTP
32 Bond Breakers 07 92 00 - 1.02.A 4
Twenty (20) calendar days after
NTP
33 Backstop 07 92 00 - 1.02.A 4
Twenty (20) calendar days after
NTP
34 Doors 08 14 00 - 1.02.A & B 4 4
Twenty (20) calendar days after
NTP
35 Accessories 08 14 00 - 1.02.B 4
Twenty (20)
8 Jan 15
PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
APPROVED DIS-
APPROVED
RPR AND IMPROVE KIT, LAUNDRY RM
& SECONDARY DINING AREA
DATE
CONTRACTOR
NOTIFIED CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
L I N E
N U M B E R
EVKP14-4269
M A
N U
F' R
'S
IN
ST
R
U C
TI
O
N S
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
RETURN
SUS-
PENSE
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
FOLLOW-
UP
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
REQUIRED
SUB-
MISSION
DATE
After NTP or as
IndicatedM A
N U
F' R
R
EC
O M
M
EN
D A
TI
O
N
C
ER
TI
FI
C A
TE
O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
REMARKS
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
St at em en ts
Te st
R ep or ts
/S ee
R eq
'ts
FINAL
APPROVAL
36 Gypsum Board 09 29 00 - 1.02.A 4
Twenty (20) calendar days after
NTP
37 Accessories 09 29 00 - 1.02.A 4
Twenty (20) calendar days after
NTP
38 Asbestos Free Materials 09 29 00 - 1.02.B 4
Twenty (20) calendar days after
NTP
39 Detail Drawings 09 30 00 - 1.2 4
Twenty (20) calendar days after
NTP
40 Tile 09 30 00 - 1.2 4 1 4 4
Twenty (20) calendar days after
NTP
41 Setting-bed 09 30 00 - 1.2 4
Twenty (20) calendar days after
NTP
42 Mortar and Grout 09 30 00 - 1.2 4 1 4
Twenty (20)
8 Jan 15
PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
APPROVED DIS-
APPROVED
RPR AND IMPROVE KIT, LAUNDRY RM
& SECONDARY DINING AREA
DATE
CONTRACTOR
NOTIFIED CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
L I N E
N U M B E R
EVKP14-4269
M A
N U
F' R
'S
IN
ST
R
U C
TI
O
N S
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
RETURN
SUS-
PENSE
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
FOLLOW-
UP
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
REQUIRED
SUB-
MISSION
DATE
After NTP or as
IndicatedM A
N U
F' R
R
EC
O M
M
EN
D A
TI
O
N
C
ER
TI
FI
C A
TE
O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
REMARKS
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
St at em en ts
Te st
R ep or ts
/S ee
R eq
'ts
FINAL
APPROVAL
43 Accessories 09 30 00 - 1.2 1
Twenty (20) calendar days after
NTP
44 Coatings 09 90 00 - 1.02.A 4 4
Twenty (20) calendar days after
NTP
Manufacturer's Technical Data Sheets 09 90 00 - 1.02.A
Twenty (20) calendar days after
NTP
46 Color 09 90 00 - 1.02.B 1
Twenty (20) calendar days after
NTP
47 Applicator's Qualifications 09 90 00 - 1.02.C 4
Twenty (20) calendar days after
NTP
48 Application Instruction 09 90 00 -1.02.D 4
Twenty (20) calendar days after
NTP
49 Mixing 09 90 00 - 1.02.D 4
Twenty (20)
8 Jan 15
PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
APPROVED DIS-
APPROVED
RPR AND IMPROVE KIT, LAUNDRY RM
& SECONDARY DINING AREA
DATE
CONTRACTOR
NOTIFIED CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
L I N E
N U M B E R
EVKP14-4269
M A
N U
F' R
'S
IN
ST
R
U C
TI
O
N S
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
RETURN
SUS-
PENSE
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
FOLLOW-
UP
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
REQUIRED
SUB-
MISSION
DATE
After NTP or as
IndicatedM A
N U
F' R
R
EC
O M
M
EN
D A
TI
O
N
C
ER
TI
FI
C A
TE
O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
REMARKS
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
St at em en ts
Te st
R ep or ts
/S ee
R eq
'ts
FINAL
APPROVAL
Manufacturer's Material Safety Data Sheets 09 90 00 - 1.02.D
Twenty (20) calendar days after
NTP
51 Panelboard 26 20 00 - 1.4 4
Twenty (20) calendar days after
NTP
Conduit and Fittings (each type) 26 20 00 - 1.4
Twenty (20) calendar days after
NTP
Wires and Cables (each type) 26 20 00 - 1.4
Twenty (20) calendar days after
NTP
54 Receptacles (each type) 26 20 00 -1.4 4
Twenty (20) calendar days after
NTP
55 Circuit Breaker 26 20 00 - 1.4 4
Twenty (20) calendar days after
NTP
56 600-volt Wiring Test 26 20 00 - 1.4 4
Twenty (20)
8 Jan 15
PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
APPROVED DIS-
APPROVED
RPR AND IMPROVE KIT, LAUNDRY RM
& SECONDARY DINING AREA
DATE
CONTRACTOR
NOTIFIED CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
L I N E
N U M B E R
EVKP14-4269
M A
N U
F' R
'S
IN
ST
R
U C
TI
O
N S
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
RETURN
SUS-
PENSE
DATE
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
FOLLOW-
UP
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
REQUIRED
SUB-
MISSION
DATE
After NTP or as
IndicatedM A
N U
F' R
R
EC
O M
M
EN
D A
TI
O
N
C
ER
TI
FI
C A
TE
O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
REMARKS
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
St at em en ts
Te st
R ep or ts
/S ee
R eq
'ts
FINAL
APPROVAL
57 Withstand Voltage Test 26 20 00 - 1.4 4
Twenty (20) calendar days after
NTP
Ground-Fault Receptacle Test 26 20 00 -1.4
Twenty (20) calendar days after
NTP
59 Grounding System Test 26 20 00 -1.4 4
Twenty (20)
| Attachment 7 Cover Sheet |
| EVKP144269 AF Form66 |
| Sheet1 |
File details come from the government source that posted it. Updated .