Attachment 7

View the file

Other files

File Type Posted
Revised_EVKP14-4269_Blank_AF_Form_3052_23Feb2015.xlsx XLSX spreadsheet
RFI.pdf PDF
Amendment_1.doc DOC document
Attachment_4.pdf PDF
Attachment_5.pdf PDF
Attachment_6.pdf PDF
Attachment_2.pdf PDF
Attachment_3.pdf PDF
Solicitation.pdf PDF
Attachment_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 7

Schedule of Material Submittals

AF FORM 66, Sep 86

8 Jan 15

PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

APPROVED DIS-

APPROVED

Progress Schedules and Reports SOW Para 2.2

4 Five (5) days after

NTP

Certificte of Training, Sampling Plan, Protective Equipment Plan SOW Para 4.1.b

4 Prior to field sampling

Asbestos and Lead-Based Paint Clearance Sampling Results

Immediately after finding (if applicable)

4 Lead WasteTLCP Sampling 4

Fourteen (14) days after receipt of sampling result (if applicable)

5 As-Built Drawings SOW Para 3.7 1

Seven (7) calendar days after final inspection

6 DD Form 1354 SOW Para 3.18 4

Seven (7) calendar days after final inspection

Concrete Masonry Units

(CMU)

04 20 00 - 1.02.A & C

4 4 Twenty (20) calendar days after

NTP

RPR AND IMPROVE KIT, LAUNDRY RM

& SECONDARY DINING AREA

DATE

CONTRACTOR

NOTIFIED CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

L I N E

N U M B E R

EVKP14-4269

M A

N U

F' R

'S

IN

ST

R

U C

TI

O

N S

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

RETURN

SUS-

PENSE

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

FOLLOW-

UP

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

REQUIRED

SUB-

MISSION

DATE

After NTP or as

IndicatedM A

N U

F' R

R

EC

O M

M

EN

D A

TI

O

N

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

REMARKS

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

St at em en ts

Te st

R ep or ts

/S ee

R eq

'ts

FINAL

APPROVAL

8 Jan 15

PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

APPROVED DIS-

APPROVED

RPR AND IMPROVE KIT, LAUNDRY RM

& SECONDARY DINING AREA

DATE

CONTRACTOR

NOTIFIED CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

L I N E

N U M B E R

EVKP14-4269

M A

N U

F' R

'S

IN

ST

R

U C

TI

O

N S

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

RETURN

SUS-

PENSE

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

FOLLOW-

UP

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

REQUIRED

SUB-

MISSION

DATE

After NTP or as

IndicatedM A

N U

F' R

R

EC

O M

M

EN

D A

TI

O

N

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

REMARKS

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

St at em en ts

Te st

R ep or ts

/S ee

R eq

'ts

FINAL

APPROVAL

Manufacturer's Descriptive Data 04 20 00 - 1.02.A

Twenty (20) calendar days after

NTP

9 Pre-Mixed Mortar 04 20 00 - 1.02.B 4

Twenty (20) calendar days after

NTP

10 Unit Strength Method 04 20 00 - 1.02.B 4

Twenty (20) calendar days after

NTP

Reinforcing Steel Bars and Rods 04 20 00 - 1.02.C

Twenty (20) calendar days after

NTP

12 Masonry Cement 04 20 00 - 1.02.C & D 4 4

Twenty (20) calendar days after

NTP

13 Prefabricated Millwork 06 20 00 - 1.2 4

Twenty (20) calendar days after

NTP

14 Door and Opening Trim 06 02 00 - 1.2 4

Twenty (20) calendar days after

NTP

8 Jan 15

PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

APPROVED DIS-

APPROVED

RPR AND IMPROVE KIT, LAUNDRY RM

& SECONDARY DINING AREA

DATE

CONTRACTOR

NOTIFIED CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

L I N E

N U M B E R

EVKP14-4269

M A

N U

F' R

'S

IN

ST

R

U C

TI

O

N S

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

RETURN

SUS-

PENSE

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

FOLLOW-

UP

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

REQUIRED

SUB-

MISSION

DATE

After NTP or as

IndicatedM A

N U

F' R

R

EC

O M

M

EN

D A

TI

O

N

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

REMARKS

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

St at em en ts

Te st

R ep or ts

/S ee

R eq

'ts

FINAL

APPROVAL

15 Cabinets 06 20 00 - 1.2 1 4

Twenty (20) calendar days after

NTP

16 Wood Items, Base, and Trim 06 20 00 - 1.2 4

Twenty (20) calendar days after

NTP

17 Trim 06 20 00 - 1.2 1

Twenty (20) calendar days after

NTP

18 Certificates of Grade 06 20 00 - 1.2 4

Twenty (20) calendar days after

NTP

19 Certificates of Compliance 06 20 00 - 1.2 4

Twenty (20) calendar days after

NTP

20 Detail Drawings 06 61 16 - 1.3 4

Twenty (20) calendar days after

NTP

21 Installation 06 61 16 - 1.3 4

Twenty (20)

8 Jan 15

PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

APPROVED DIS-

APPROVED

RPR AND IMPROVE KIT, LAUNDRY RM

& SECONDARY DINING AREA

DATE

CONTRACTOR

NOTIFIED CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

L I N E

N U M B E R

EVKP14-4269

M A

N U

F' R

'S

IN

ST

R

U C

TI

O

N S

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

RETURN

SUS-

PENSE

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

FOLLOW-

UP

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

REQUIRED

SUB-

MISSION

DATE

After NTP or as

IndicatedM A

N U

F' R

R

EC

O M

M

EN

D A

TI

O

N

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

REMARKS

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

St at em en ts

Te st

R ep or ts

/S ee

R eq

'ts

FINAL

APPROVAL

22 Solid Polymer Material 06 61 16 - 1.3 4 4

Twenty (20) calendar days after

NTP

23 Qualifications 06 61 16 - 1.3 4 4

Twenty (20) calendar days after

NTP

24 Fabrications 06 61 16 - 1.3 4 4

Twenty (20) calendar days after

NTP

25 Countertops 06 61 16 - 1.3 1

Twenty (20) calendar days after

NTP

26 Clean-up 06 61 16 - 1.3 4

Twenty (20) calendar days after

NTP

27 Blanket Insulation 07 21 16 - 1.02.A & B 4 4

Twenty (20) calendar days after

NTP

28 Pressure Sensitive Tape 07 21 16 - 1.02.A 4

Twenty (20)

8 Jan 15

PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

APPROVED DIS-

APPROVED

RPR AND IMPROVE KIT, LAUNDRY RM

& SECONDARY DINING AREA

DATE

CONTRACTOR

NOTIFIED CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

L I N E

N U M B E R

EVKP14-4269

M A

N U

F' R

'S

IN

ST

R

U C

TI

O

N S

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

RETURN

SUS-

PENSE

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

FOLLOW-

UP

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

REQUIRED

SUB-

MISSION

DATE

After NTP or as

IndicatedM A

N U

F' R

R

EC

O M

M

EN

D A

TI

O

N

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

REMARKS

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

St at em en ts

Te st

R ep or ts

/S ee

R eq

'ts

FINAL

APPROVAL

29 Accessories 07 21 16 - 1.02.A 4

Twenty (20) calendar days after

NTP

30 Sealants 07 92 00 - 1.02.A & B 4 4

Twenty (20) calendar days after

NTP

31 Primers 07 92 00 - 1.02.A 4

Twenty (20) calendar days after

NTP

32 Bond Breakers 07 92 00 - 1.02.A 4

Twenty (20) calendar days after

NTP

33 Backstop 07 92 00 - 1.02.A 4

Twenty (20) calendar days after

NTP

34 Doors 08 14 00 - 1.02.A & B 4 4

Twenty (20) calendar days after

NTP

35 Accessories 08 14 00 - 1.02.B 4

Twenty (20)

8 Jan 15

PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

APPROVED DIS-

APPROVED

RPR AND IMPROVE KIT, LAUNDRY RM

& SECONDARY DINING AREA

DATE

CONTRACTOR

NOTIFIED CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

L I N E

N U M B E R

EVKP14-4269

M A

N U

F' R

'S

IN

ST

R

U C

TI

O

N S

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

RETURN

SUS-

PENSE

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

FOLLOW-

UP

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

REQUIRED

SUB-

MISSION

DATE

After NTP or as

IndicatedM A

N U

F' R

R

EC

O M

M

EN

D A

TI

O

N

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

REMARKS

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

St at em en ts

Te st

R ep or ts

/S ee

R eq

'ts

FINAL

APPROVAL

36 Gypsum Board 09 29 00 - 1.02.A 4

Twenty (20) calendar days after

NTP

37 Accessories 09 29 00 - 1.02.A 4

Twenty (20) calendar days after

NTP

38 Asbestos Free Materials 09 29 00 - 1.02.B 4

Twenty (20) calendar days after

NTP

39 Detail Drawings 09 30 00 - 1.2 4

Twenty (20) calendar days after

NTP

40 Tile 09 30 00 - 1.2 4 1 4 4

Twenty (20) calendar days after

NTP

41 Setting-bed 09 30 00 - 1.2 4

Twenty (20) calendar days after

NTP

42 Mortar and Grout 09 30 00 - 1.2 4 1 4

Twenty (20)

8 Jan 15

PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

APPROVED DIS-

APPROVED

RPR AND IMPROVE KIT, LAUNDRY RM

& SECONDARY DINING AREA

DATE

CONTRACTOR

NOTIFIED CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

L I N E

N U M B E R

EVKP14-4269

M A

N U

F' R

'S

IN

ST

R

U C

TI

O

N S

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

RETURN

SUS-

PENSE

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

FOLLOW-

UP

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

REQUIRED

SUB-

MISSION

DATE

After NTP or as

IndicatedM A

N U

F' R

R

EC

O M

M

EN

D A

TI

O

N

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

REMARKS

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

St at em en ts

Te st

R ep or ts

/S ee

R eq

'ts

FINAL

APPROVAL

43 Accessories 09 30 00 - 1.2 1

Twenty (20) calendar days after

NTP

44 Coatings 09 90 00 - 1.02.A 4 4

Twenty (20) calendar days after

NTP

Manufacturer's Technical Data Sheets 09 90 00 - 1.02.A

Twenty (20) calendar days after

NTP

46 Color 09 90 00 - 1.02.B 1

Twenty (20) calendar days after

NTP

47 Applicator's Qualifications 09 90 00 - 1.02.C 4

Twenty (20) calendar days after

NTP

48 Application Instruction 09 90 00 -1.02.D 4

Twenty (20) calendar days after

NTP

49 Mixing 09 90 00 - 1.02.D 4

Twenty (20)

8 Jan 15

PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

APPROVED DIS-

APPROVED

RPR AND IMPROVE KIT, LAUNDRY RM

& SECONDARY DINING AREA

DATE

CONTRACTOR

NOTIFIED CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

L I N E

N U M B E R

EVKP14-4269

M A

N U

F' R

'S

IN

ST

R

U C

TI

O

N S

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

RETURN

SUS-

PENSE

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

FOLLOW-

UP

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

REQUIRED

SUB-

MISSION

DATE

After NTP or as

IndicatedM A

N U

F' R

R

EC

O M

M

EN

D A

TI

O

N

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

REMARKS

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

St at em en ts

Te st

R ep or ts

/S ee

R eq

'ts

FINAL

APPROVAL

Manufacturer's Material Safety Data Sheets 09 90 00 - 1.02.D

Twenty (20) calendar days after

NTP

51 Panelboard 26 20 00 - 1.4 4

Twenty (20) calendar days after

NTP

Conduit and Fittings (each type) 26 20 00 - 1.4

Twenty (20) calendar days after

NTP

Wires and Cables (each type) 26 20 00 - 1.4

Twenty (20) calendar days after

NTP

54 Receptacles (each type) 26 20 00 -1.4 4

Twenty (20) calendar days after

NTP

55 Circuit Breaker 26 20 00 - 1.4 4

Twenty (20) calendar days after

NTP

56 600-volt Wiring Test 26 20 00 - 1.4 4

Twenty (20)

8 Jan 15

PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

APPROVED DIS-

APPROVED

RPR AND IMPROVE KIT, LAUNDRY RM

& SECONDARY DINING AREA

DATE

CONTRACTOR

NOTIFIED CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

L I N E

N U M B E R

EVKP14-4269

M A

N U

F' R

'S

IN

ST

R

U C

TI

O

N S

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

RETURN

SUS-

PENSE

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

FOLLOW-

UP

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

REQUIRED

SUB-

MISSION

DATE

After NTP or as

IndicatedM A

N U

F' R

R

EC

O M

M

EN

D A

TI

O

N

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

REMARKS

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

St at em en ts

Te st

R ep or ts

/S ee

R eq

'ts

FINAL

APPROVAL

57 Withstand Voltage Test 26 20 00 - 1.4 4

Twenty (20) calendar days after

NTP

Ground-Fault Receptacle Test 26 20 00 -1.4

Twenty (20) calendar days after

NTP

59 Grounding System Test 26 20 00 -1.4 4

Twenty (20)

Attachment 7 Cover Sheet
EVKP144269 AF Form66
Sheet1