Attachment 3 - AF Form 3052/Cost Estimate

Text of this file

AF3052

CONSTRUCTION COST ESTIMATE BREAKDOWNOMB No. 0704-0193 Expires 31 October 1989
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Nellis SABER
PURCHASE REQUEST NUMBERPROJECT NUMBERN/A$
WORK LOCATION
MATERIAL COSTCreech AFB NV
LINE NO.ITEM (1)UNIT OF MEASURE (2)QUANTITY (3)UNIT (4)TOTAL (5)LABOR COSTS
1MANHOURS MANDAYS (6)AVERAGE RATE (7)TOTAL (8)OTHER DIRECT COSTS (9)LINE TOTAL (10)
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

&R&"Arial,Bold"&7 Page A4- 1 &CPage &P

AF3052R

INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples -- square yards -- SY, cubic yards -- CY, square
feet -- SF, linear feet -- LF, board feet -- BF, each -- EA, pound -- LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be fur--
nished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will
be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6. 7, and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Enter in Col 7 the average rate per mahour (manday) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in Col 1) which are special to the contract
and of significant dollar value. Identify Subcontractor costs here and include back-up documentation on how these costs were derived.
Col 10 Line Total. Self-explanatory.
NOTE:In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows:
1TOTAL MATERIAL COSTS:$ _________________________(Column 5 Total)
2TOTAL LABOR COSTS:$ _________________________(Column 8 Total)
3TOTAL OTHER DIRECT COSTS:$ _________________________(Column 9 Total)
4TOTAL DIRECT COSTS:$ _________________________(Column 10 Total, = Items 1 + 2 + 3)
5OVERHEAD @ ____________%$ _________________________(Item 4 x Item 5 %)
6PROFIT @ ____________%$ _________________________(Item 4 x Item 6 %)
7SUBTOTAL:$ _________________________(Item 4 + 5 + 6)
8BOND @ ____________%$ _________________________(Item 7 x Item 8 %)
9TOTAL PRICE:$ _________________________(Item 7 + 8))
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror shall, under the conditions stated in FAR 15.804-2, be required to submit a certificate of current cost or pricing data
(see FAR 15.804).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit and submit with this
form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in their proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer or his authorized representative upon request.
4. Submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such negotiations prior to contract award.
(Reverse of Construction Cost Estimate Breakdown)

&CPage &P

Sheet 3

&A Page &P

Sheet 4

Sheet 5

Sheet 6

Sheet 7

Sheet9

Sheet10

Sheet11

Sheet12

Sheet13

Sheet14

Sheet15

Sheet16

Other files for this federal contract opportunity

Other files attached to Demolition Project, newest first.
File Type Posted
New_Construction.pdf PDF
Bldg 601 natural gas.JPG JPG image
Bldg 4856 natural gas.JPG JPG image
Bldg 601 natural gas.JPG JPG image
DSCN0072.JPG JPG image
Area II gas lines.JPG JPG image
haul route part 2 - Main Base demo.JPG JPG image
haul route part 1 - Main Base demo.JPG JPG image
haul route - Area II demo.JPG JPG image
Attachment 4 - AF Form 103 Dig Outage Location Request.xfdl XFDL file
Attachment 5 - AF Form 3000 —
Attachment 7 - AF Form 3065 Progress Report.xls XLS spreadsheet
Attachment 2 - NC Addendum 27 10 00 Building Telecommunications Cabling System - June 2012.pdf PDF
Attachment 1 - Nellis-Creech ID2 Handbook 2011.pdf PDF
Attachment 6 - AF Form 3064 Progress Schedule.xfdl XFDL file
DSCN0075.JPG JPG image
DSCN0070.JPG JPG image
DSCN0072.JPG JPG image
DSCN0081.JPG JPG image
DSCN0077.JPG JPG image
DSCN0076.JPG JPG image
DSCN0073.JPG JPG image
DSCN0080.JPG JPG image
DSCN0079.JPG JPG image
DSCN0082.JPG JPG image
DSCN0068.JPG JPG image
DSCN0067.JPG JPG image
DSCN0064.JPG JPG image
DSCN0074.JPG JPG image
DSCN0071.JPG JPG image
DSCN0078.JPG JPG image
DSCN0065.JPG JPG image
Relocationing_Feezer.pdf PDF
New_Location_of_sheds.pdf PDF
601 fl plan.tif TIF image
Attachment 8 - WD NV120022 —
2012-5-9 . Demolition of Building.pdf PDF
New_Construction.pdf PDF
Bldg601 - —
Bid Schedule.pdf PDF
601 fl plan.tif TIF image
DEMOLITION_PLAN.pdf PDF
2012-2-3 _ Demo Bldg 601.pdf PDF
Bldg601 - —
FA4861-12-B-0002.pdf PDF
FA4861-12-B-0002.doc DOC document
SOW.docx DOCX document
Attachment 001 - Design Compatibility Standard.pdf PDF
Base Pass Information.docx DOCX document
Base Pass Information.docx DOCX document
Show all 50

Demolition Project has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .