Asbestos Report for Bldg 4856

View the file

Other files for this federal contract opportunity

Other files attached to Demolition Project, newest first.
File Type Posted
New_Construction.pdf PDF
Bldg 601 natural gas.JPG JPG image
Bldg 4856 natural gas.JPG JPG image
Bldg 601 natural gas.JPG JPG image
DSCN0072.JPG JPG image
Area II gas lines.JPG JPG image
haul route part 2 - Main Base demo.JPG JPG image
haul route - Area II demo.JPG JPG image
haul route part 1 - Main Base demo.JPG JPG image
Attachment 4 - AF Form 103 Dig Outage Location Request.xfdl XFDL file
Attachment 2 - NC Addendum 27 10 00 Building Telecommunications Cabling System - June 2012.pdf PDF
Attachment 1 - Nellis-Creech ID2 Handbook 2011.pdf PDF
Attachment 3 - AF Form 3052 —
Attachment 6 - AF Form 3064 Progress Schedule.xfdl XFDL file
Attachment 5 - AF Form 3000 —
DSCN0081.JPG JPG image
DSCN0077.JPG JPG image
DSCN0076.JPG JPG image
DSCN0073.JPG JPG image
DSCN0080.JPG JPG image
DSCN0075.JPG JPG image
DSCN0070.JPG JPG image
DSCN0072.JPG JPG image
DSCN0074.JPG JPG image
DSCN0071.JPG JPG image
DSCN0078.JPG JPG image
DSCN0065.JPG JPG image
DSCN0066.JPG JPG image
DSCN0069.JPG JPG image
DSCN0079.JPG JPG image
DSCN0082.JPG JPG image
DSCN0068.JPG JPG image
New_Location_of_sheds.pdf PDF
601 fl plan.tif TIF image
Relocationing_Feezer.pdf PDF
601 fl plan.tif TIF image
DEMOLITION_PLAN.pdf PDF
2012-2-3 _ Demo Bldg 601.pdf PDF
Bldg601 - —
Attachment 8 - WD NV120022 —
New_Construction.pdf PDF
Bldg601 - —
Bid Schedule.pdf PDF
FA4861-12-B-0002.pdf PDF
FA4861-12-B-0002.doc DOC document
SOW.docx DOCX document
Attachment 001 - Design Compatibility Standard.pdf PDF
Attachment 02 - Building Tele Cabling System.pdf PDF
Base Pass Information.docx DOCX document
Base Pass Information.docx DOCX document
Show all 50

Demolition Project has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Macrotec Consulting, LLC.

9724 Mild Weather Ct. · Las Vegas, NV 89148 Phone: (702) 338-8213 · Fax: (702) 629-5677

Renovation Investigation Report Asbestos and Lead Based Paint Survey

Project Information:

Nellis Air Force Base 56 Kinley

Report Info:

Macrotec Project # 12590 May 16, 2012

Prepared For:

Vince Bowers 99th Civil Engineering Squadron – CES/CEV Nellis AFB, NV 89191

Prepared By:

Dustin McAllister - Macrotec Consulting, LLC.

Table of Contents:

Introduction Scope of Services Site Description Sample Collection Methodology Sample Analysis Methodology Sample Assessment Recommendations Inspection Limitations

Appendix A Asbestos Assessment Appendix B Lead Assessment Appendix C Sample Location Diagram Appendix D Asbestos Laboratory Report Appendix D.1 Lead XRF Results Appendix E Certifications

Asbestos / Lead Survey Macrotec Project # 12590 Nellis Air Force Base – 56 Kinley Page 2

INTRODUCTION

Macrotec Consulting performed an inspection for Asbestos-Containing Building Materials and Lead Based Paint on May 9, 2012. The inspection was conducted for the project defined as: Demolition of the one story house located at 56 Kinley at Nellis Air Force Base in Las Vegas, NV.

The intent of this inspection was to identify materials containing asbestos and lead based paint, within the subject site, that may be impacted during planned demolition activities. Macrotec’s inspection services were conducted at the request of Vince Bowers of the 99th Civil Engineering Squadron.

Dustin McAllister, a certified lead inspector, License No. NV-I-16781-1, and a Nevada Asbestos Abatement Consultant, License No.IM0961, conducted these services for Macrotec Consulting.

SCOPE OF SERVICES

Asbestos

Macrotec’s inspection services were conducted to identify the presence of any materials containing asbestos pursuant to the requirements of NAC 618.960 and in accordance with the inspection requirements of the EPA’s: 40 CFR Part 61 National Emission Standard for Hazardous Air Pollutants (NESHAP).

These regulations outline inspection and abatement requirements for materials containing asbestos, prior to renovation and/or demolition activities.

Lead

Macrotec collected X-Ray Fluorescence (XRF) readings to identify the presence and content level of lead above the action level (1.0 mg/cm2). The sampling for this project was collected in compliance with the U.S. Department of Housing and Urban Development (HUD) and the Environmental Protection Agencies (EPA) regulatory requirements.

SITE DESCRIPTION

The subject site was the interior and exterior of a one-story residential home.

Macrotec’s inspection was limited to the location within the site planned for demolition as described above.

At the time of this inspection the interior and exterior paint in the house were found to be intact and in good condition.

Nellis Air Force Base – 56 Kinley Page 3

SAMPLE COLLECTION METHODOLOGY

An initial walk through of the subject site was conducted to identify homogeneous suspect materials containing asbestos and lead based paint, and their respective locations. This information was then used to develop a sample collection strategy.

Samples were collected by pre-wetting sample areas with water, then cutting or scraping the sample from the substrate with an appropriate sampling tool.

Whenever possible, samples were collected from areas previously damaged or deteriorating. To avoid potential contamination due to unknown asbestos and no building systems, components, or structures were demolished to obtain samples of potentially hidden materials containing asbestos.

Each suspect bulk sample was sealed in its own zip lock plastic container and labeled with a unique identification number. Sampling tools were individually cleaned before and after each sample was collected to avoid sample cross contamination. Decontamination was accomplished using single use, pre-moistened cloths.

Asbestos samples were recorded on Macrotec’s chain-of-custody form. This form accompanied the samples to Triangle Enivronmental Service Center, Inc. (TESC), located in Moseley, Virginia. The National Voluntary Laboratory Accreditation Program (NVLAP) accredits TESC for analysis of bulk building material samples for asbestos.

Painted surfaces were then tested using an X-Ray Fluorescence (XRF) analyzer.

The XRF was a Niton XLp 300A paint analyzer serial #26948. The instrument was calibrated to the manufactures specifications before the inspection, every four hours, and after the inspection was finished, verified against the National Institute of Standards and Testing (NIST) Standard Reference Material (SRM) 2573 lead. The analyzer was in control at all times of the NIST SRM lead standard.

Interior and exterior XRF readings were taken on determined surfaces on each building component in each room equivalent. The HUD definition of lead based paint is lead equal to or greater than 1.0 mg/cm2. All results above this level are considered positive and all results found below this level are considered negative.

Nellis Air Force Base – 56 Kinley Page 4

SAMPLE ANALYSIS METHODOLOGY

Asbestos

Suspect asbestos samples were subjected to analysis by polarized light microscopy (PLM). Bulk sample analysis was conducted in accordance with the EPA’s “Test Method for the Determination of Asbestos in Bulk Building Materials, EPA/600/R-93/116, 1993.

Lead

To determine lead content, the painted surfaces were tested using an X-Ray Fluorescence (XRF) analyzer. The XRF was used in accordance with chapter seven of the Guidelines of the Evaluation and Control of Lead Based Paint Hazards in Housing published by HUD

SAMPLE ASSESSMENT

Asbestos

Macrotec’s inspection of the subject site found Twenty (20) separate suspect asbestos building materials, of which a total of Thirty One (31) samples were collected and submitted for analysis.

The following table summarizes the materials that were found to be asbestos containing, the locations where the material is located, the material’s friability and its NESHAP classification.

Material Number

Material Description

Material Locations

Material Friability

NESHAP

7 Black Floor Mastic This material is located on the floors throughout the house

Non- Friable

Category I

17 Black Roof Mastic on Pipe Penetration

This material is on the pipe penetration on the west side of the roof.

Non- Friable

Category I

See Appendix A for a listing of the materials, material locations, samples, sample locations and results for this project.

Lead

Macrotec collected One Hundred Thirty Six (136) XRF paint readings within the subject site.

Some painted surfaces were found to be leaded (painted materials and/or surfaces above the HUD action level of 1.0 mg/cm2).

Category I nonfriable asbestos-containing material means asbestos containing packings, gaskets, resilient floor covering, and asphalt roofing products containing more than 1% asbestos as determined by Polarized Light Microscopy (PLM)

Nellis Air Force Base – 56 Kinley Page 5

OSHA regulations require the implementation of worker protection if there is a potential that paint with any amount of lead in it will be disturbed during demolition or renovation activities. See Appendix B for a listing of materials that contain both lead above the HUD action level and above the “Limit of Detection” (LOD), sample locations and results

See Appendix D.1 for a listing of the painted surfaces, XRF readings, and XRF reading locations and results for this project.

RECOMMENDATIONS

Asbestos

US EPA and Nevada Department of Industrial Relations regulations require the removal of all regulated asbestos-containing materials (RACM) prior to any renovation or demolition that could impact or disturb RACM. In accordance with these regulations Macrotec recommends:

Hiring a Certified Asbestos Consultant to develop a project specification based on this investigation and any other additional findings.

Hiring a Nevada licensed Asbestos Abatement Contractor to remove all asbestos materials, which are either regulated or may become regulated during the course of renovation and/or demolition activities.

Hiring a Certified Asbestos Consultant to monitor the removal activities and to provide final clearance inspection reports.

Although the materials found to contain asbestos in this investigation are not RACM, Macrotec recommends the removal of all ACM (in the manner described above) whenever feasible.

Lead

Lead based paint is a common cause of lead poisoning in children and represents a threat to the health and welfare of occupants. If economically feasible, Macrotec recommends that all positive readings be considered to be a potential lead hazard and procedures be incorporated into the overall renovation and maintenance strategy. OSHA regulations require the implementation of worker protection if there is a potential that paint with any amount of lead in it will be disturbed during demolition or renovation activities.

Nellis Air Force Base – 56 Kinley Page 6

INSPECTION LIMITATIONS

The information contained in this report is limited to those areas and suspect materials found to be visually accessible through reasonable means.

Macrotec conducted a non-destructive survey. No demolition of building materials was conducted to determine the presence of asbestos in wall cavities, chases or other inaccessible areas. Macrotec cannot warrant that these areas do not contain asbestos in locations other than those noted in this report, however, a good faith effort was made to conduct a comprehensive survey.

• Macrotec accepts no liability for additional materials or under reporting of asbestos materials that exist below other floor coverings.

• This report is not represented as, nor is it intended to be, an asbestos abatement scope of work or project specification.

• If suspect materials are discovered during future demolition operations, cease all general work activities which could impact the discovered suspect materials, until confirmation sampling can be conducted.

Thank you for allowing Macrotec Consulting to assist you with your environmental consulting needs. Please contact me with any questions regarding this report at (702) 338-8213.

Appendix A

Appendix A - Asbestos Assessment

Macrotec Job #12590 - WO #19476 - 56 Kinley Dr.

The following table lists each of the materials suspected to contain asbestos at the subject site. For each material the sample number, location and laboratory result are listed. If the material was found to contain asbestos, the friablity and NESHAP classification is identified.

1 Plaster No Asbestos Detected

AB1 Living Room - S Wall None Detected

AB2 Living Room - S Wall None Detected

AB3 Bathroom - Adj. Shower None Detected

2 Sheet Rock Mud & Tape No Asbestos Detected

AB4 Kitchen - N Wall None Detected

AB5 Living Room - NE Corner None Detected

AB6 W Bedroom - SW Corner None Detected

3 Troweled Texture on Walls & Ceilings No Asbestos Detected

AB7 Kitchen - W Wall None Detected

AB8 Hallway - N Wall None Detected

AB9 Bathroom - E Wall None Detected

AB10 E Bedroom - W Wall None Detected

AB11 SE Bedroom - S Wall None Detected

4 Block No Asbestos Detected

AB12 Living Room - Adj. Exterior Door None Detected

5 Mortar on Block No Asbestos Detected

AB13 Living Room - Adj. Exterior Door None Detected

Asbestos Survey

56 Kinley Dr.

Macrotec Job #12590

Macrotec Job #12590 - WO #19476 - 56 Kinley Dr.

6 12X12 Gray Floor Tile No Asbestos Detected

AB14 Bathroom - Center None Detected

7 Black Mastic Beneath Floor Tile Non-Friable, Category I

AB15 W Bedroom - Center 2% Chrysotile

AB16 Kitchen - Center 5% Chrysotile

8 Yellow Mastic Behind Base Cove No Asbestos Detected

AB17 Living Room - S End None Detected

9 Mortar Behind Ceramic Tile No Asbestos Detected

AB18 Bathroom - N End None Detected

10 Brick No Asbestos Detected

AB19 Exterior - NW Corner None Detected

11 Mortar on Brick No Asbestos Detected

AB20 Exterior - NW Corner None Detected

12 Stucco No Asbestos Detected

AB21 Exterior - SW Corner None Detected

AB22 Exterior - SW Corner None Detected

AB23 Exterior - S End None Detected

13 Tar Paper Behind Stucco No Asbestos Detected

AB24 Exterior - S End None Detected

Asbestos Survey

56 Kinley Dr.

Macrotec Job #12590 - WO #19476 - 56 Kinley Dr.

14 Concrete Base No Asbestos Detected

AB25 Exterior - SE Corner None Detected

15 Ceramic Roof Tile No Asbestos Detected

AB26 Exterior - Roof - Center None Detected

16 Tar Paper Beneath Roof Tile No Asbestos Detected

AB27 Exterior - Roof - Center None Detected

17 Black Roof Mastic on Pipe Penetration Non-Friable, Category I

AB28 Exterior - Roof - W Side 5% Chrysotile

18 Insulation No Asbestos Detected

AB29 SE Bedroom - Center None Detected

19 Roll Roofing No Asbestos Detected

AB30 Overhang - On Carport Floor None Detected

20 Tar Paper - Beneath Roll Roof No Asbestos Detected

AB31 Overhang - On Carport Floor None Detected

Asbestos Survey

56 Kinley Dr.

Appendix B

Appendix B - Lead Assessment

Macrotec Job #12590 - WO #19476 - 56 Kinley Dr.

The following table lists each of the painted surfaces found to contain lead at the subject site, Materials with a result greater than 1.0 mg/cm2 are considered leaded by the EPA and HUD. Note: OSHA requires PPE for materials containing any amount of lead. For each painted surface, the description, material location and result are listed.

Painted Surface Description

Painted Surface Location

XRF Result (mg/cm2)

This material is located on the walls in the kitchen. 1 - 1.2White Brick Wall

This material is located on the shower walls in the bathrhoom.

4.1 - 6.1White Ceramic Shower Wall

This material is located on the wood poles of the carport

3.8Brown Wood Overhang

This material is located on the roof of house 1.4 - 1.6Orange Ceramic Roof Tile

This material is located on the baseboard throughout the house.

0.11 - 0.4White Vynal Baseboard

This material is located on the windows of the exterior

0.6Black Metal Window Frame

Lead Paint Survey

56 Kinley Dr.

Appendix C

Asbestos & Lead Based Paint Survey

Nellis AFB, 56 Kinley Dr.

Macrotec Project # 12590

Appendix C

* Diagram Not Drawn To Scale

Sample Location Diagram

N

AB3

AB1

AB2

AB4

AB5AB6

AB7

AB8

Living Room

Dining Area

Kitchen

SE

Bedroom

West Bedroom

East Bedroom

Bathroom

Laundry

Storage Car Port

Hall

AB9

AB10

AB11

AB12

AB13

AB14

AB15

AB16

AB17

AB18

AB19

AB20

AB21

AB22

AB23

AB24

AB25

AB26

AB27

AB28 AB29

AB30

AB31

Appendix D

Appendix D.1

Time Duration Component Substrate Side Color Site Building Room Results Depth PbC PbC Err PbL PbL Err PbK PbK Err

5/9/12 8:51 8.72 Calibration Red POS 1.1 1.1 0.1 1.1 0.1 < LOD 0.81

5/9/12 8:52 19.82 Calibration Red POS 1.04 1 0.1 1 0.1 < LOD 0.6

5/9/12 8:52 8.15 Calibration Red POS 1.08 1.1 0.1 1.1 0.1 < LOD 0.9

5/9/12 8:54 20 Wall Brick A White NAFB 56 KLINLEY Kitchen POS 10 1.2 0.4 0.11 0.07 1.2 0.4

5/9/12 8:55 20 Wall Brick B White NAFB 56 KLINLEY Kitchen POS 10 1 0.4 0.14 0.08 1 0.4

5/9/12 8:55 2.34 Wall Drywall C White NAFB 56 KLINLEY Kitchen NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.97

5/9/12 8:55 3.51 Wall Drywall D White NAFB 56 KLINLEY Kitchen NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.2

5/9/12 8:56 3.5 Ceiling Drywall D White NAFB 56 KLINLEY Kitchen NEG 1.32 < LOD 0.03 < LOD 0.03 < LOD 1.05

5/9/12 8:57 1.17 Cabinet Wood D Brown NAFB 56 KLINLEY Kitchen NEG 1 < LOD 0.05 < LOD 0.05 < LOD 4.47

5/9/12 8:57 1.17 Cabinet Wood B Brown NAFB 56 KLINLEY Kitchen NEG 1 < LOD 0.05 < LOD 0.05 < LOD 4.32

5/9/12 8:58 1.16 Cabinet Wood B Brown NAFB 56 KLINLEY Kitchen NEG 1 < LOD 0.05 < LOD 0.05 < LOD 4.23

5/9/12 8:58 1.16 Counter Wood B Beige NAFB 56 KLINLEY Kitchen NEG 1 < LOD 0.13 < LOD 0.13 < LOD 4.65

5/9/12 9:00 1.15 Counter Wood D Beige NAFB 56 KLINLEY Kitchen NEG 1 < LOD 0.14 < LOD 0.14 < LOD 4.85

5/9/12 9:01 1.15 Hood Metal B Beige NAFB 56 KLINLEY Kitchen NEG 1 < LOD 0.03 < LOD 0.03 < LOD 3.04

5/9/12 9:01 3.5 Window Frame Metal B Black NAFB 56 KLINLEY Kitchen NEG 1.36 < LOD 0.03 < LOD 0.03 < LOD 1.26

5/9/12 9:02 3.48 Window Frame Metal A Black NAFB 56 KLINLEY Kitchen NEG 1.05 < LOD 0.03 < LOD 0.03 < LOD 0.96

5/9/12 9:02 1.17 Door Wood B White NAFB 56 KLINLEY Kitchen NEG 1 < LOD 0.03 < LOD 0.03 < LOD 3.45

5/9/12 9:03 1.17 Doorframe Wood B White NAFB 56 KLINLEY Kitchen NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.67

5/9/12 9:03 5.83 Baseboard Vinyl B White NAFB 56 KLINLEY Kitchen NEG 1.68 0.11 0.04 0.11 0.04 < LOD 1.2

5/9/12 9:03 0.58 Baseboard Vinyl C White NAFB 56 KLINLEY Kitchen Null 2.63 < LOD 0.64 < LOD 0.64 < LOD 7.5

5/9/12 9:03 2.91 Baseboard Vinyl C White NAFB 56 KLINLEY Kitchen Null 2.72 < LOD 0.2 < LOD 0.2 < LOD 2.25

5/9/12 9:04 20 Floor VCT C White NAFB 56 KLINLEY Kitchen NEG 3.24 < LOD 0.03 < LOD 0.03 < LOD 0.75

5/9/12 9:05 2.32 Baseboard Vinyl B Brown NAFB 56 KLINLEY Kitchen NEG 1 < LOD 0.1 < LOD 0.1 < LOD 2.35

5/9/12 9:05 1.16 Pipe Metal B Black NAFB 56 KLINLEY Kitchen NEG 1 < LOD 0.03 < LOD 0.03 < LOD 4.8

5/9/12 9:06 1.15 Vent Metal Ceil White NAFB 56 KLINLEY Kitchen NEG 1.43 < LOD 0.06 < LOD 0.06 < LOD 3.79

5/9/12 9:07 6.4 Wall Brick A White NAFB 56 KLINLEY Living NEG 5.7 < LOD 0.06 < LOD 0.06 < LOD 1.05

5/9/12 9:07 4.07 Wall Drywall B White NAFB 56 KLINLEY Living NEG 7.59 < LOD 0.11 < LOD 0.11 < LOD 1.2

5/9/12 9:08 3.52 Wall Brick C White NAFB 56 KLINLEY Living NEG 1.62 < LOD 0.03 < LOD 0.03 < LOD 1.5

5/9/12 9:08 3.48 Wall Drywall D White NAFB 56 KLINLEY Living NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.22

5/9/12 9:08 3.51 Ceiling Drywall White NAFB 56 KLINLEY Living NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.05

5/9/12 9:09 1.15 Vent Metal Ceil White NAFB 56 KLINLEY Living NEG 1 < LOD 0.03 < LOD 0.03 < LOD 3.45

5/9/12 9:09 1.16 Door Wood A White NAFB 56 KLINLEY Living NEG 1 < LOD 0.03 < LOD 0.03 < LOD 3.3

5/9/12 9:09 1.16 Doorframe Wood A White NAFB 56 KLINLEY Living NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.85

5/9/12 9:10 1.16 Closet Door Wood D White NAFB 56 KLINLEY Living NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.16

5/9/12 9:10 1.16 Closet Doorframe Wood D White NAFB 56 KLINLEY Living NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.7

5/9/12 9:10 1.17 Vent Metal D White NAFB 56 KLINLEY Living NEG 1 < LOD 0.03 < LOD 0.03 < LOD 3.6

5/9/12 9:11 5.82 Baseboard Vinyl B White NAFB 56 KLINLEY Living NEG 3.78 0.4 0.1 0.4 0.1 < LOD 1.2

5/9/12 9:11 8.72 Floor VCT White NAFB 56 KLINLEY Living NEG 1.7 < LOD 0.03 < LOD 0.03 < LOD 1.05

5/9/12 9:11 3.5 Floor VCT White NAFB 56 KLINLEY Living NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.8

5/9/12 9:12 1.16 Door Wood C White NAFB 56 KLINLEY Living NEG 1.1 < LOD 0.05 < LOD 0.05 < LOD 3.24

5/9/12 9:12 1.16 Doorframe Wood C White NAFB 56 KLINLEY Living NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.7

5/9/12 9:12 3.47 Window Frame Metal C Black NAFB 56 KLINLEY Living NEG 1 < LOD 0.03 < LOD 0.03 < LOD 0.93

5/9/12 9:13 3.5 Wall Drywall A White NAFB 56 KLINLEY Hall NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.08

5/9/12 9:13 2.91 Wall Drywall B White NAFB 56 KLINLEY Hall NEG 2.18 < LOD 0.04 < LOD 0.04 < LOD 1.65

5/9/12 9:14 2.92 Wall Drywall C White NAFB 56 KLINLEY Hall NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.65

5/9/12 9:14 3.51 Wall Drywall D White NAFB 56 KLINLEY Hall NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.05

5/9/12 9:14 2.32 Ceiling Drywall White NAFB 56 KLINLEY Hall NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.87

5/9/12 9:15 1.17 Closet Door Wood D White NAFB 56 KLINLEY Hall NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.54

5/9/12 9:15 1.17 Closet Door Wood D White NAFB 56 KLINLEY Hall NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.15

5/9/12 9:15 1.17 Closet Shelf Wood D White NAFB 56 KLINLEY Hall NEG 5.3 < LOD 0.53 < LOD 0.53 < LOD 3

5/9/12 9:16 4.09 Baseboard Vinyl B White NAFB 56 KLINLEY Hall NEG 2.62 0.27 0.1 0.27 0.1 < LOD 1.35

5/9/12 9:17 1.75 Wall Drywall A White NAFB 56 KLINLEY W Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.31

5/9/12 9:17 3.5 Wall Drywall B White NAFB 56 KLINLEY W Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.2

5/9/12 9:18 6.98 Wall Brick C White NAFB 56 KLINLEY W Bed NEG 4.7 < LOD 0.05 < LOD 0.05 < LOD 1.05

5/9/12 9:18 4.65 Wall Brick D White NAFB 56 KLINLEY W Bed NEG 3.41 < LOD 0.04 < LOD 0.04 < LOD 1.35

5/9/12 9:18 2.91 Ceiling Drywall White NAFB 56 KLINLEY W Bed NEG 1.08 < LOD 0.03 < LOD 0.03 < LOD 2.1

5/9/12 9:19 1.17 Doorframe Wood A White NAFB 56 KLINLEY W Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.34

5/9/12 9:20 1.74 Window Frame Metal D Black NAFB 56 KLINLEY W Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.9

5/9/12 9:20 1.17 Closet Door Wood A White NAFB 56 KLINLEY W Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.26

5/9/12 9:21 1.15 Closet Shelf Wood A White NAFB 56 KLINLEY W Bed NEG 1 < LOD 0.04 < LOD 0.04 < LOD 2.17

5/9/12 9:21 4.08 Baseboard Vinyl A White NAFB 56 KLINLEY W Bed NEG 2.96 < LOD 1.19 0.28 0.11 < LOD 1.19

5/9/12 9:21 5.26 Floor VCT White NAFB 56 KLINLEY W Bed NEG 3.24 < LOD 0.03 < LOD 0.03 < LOD 1.35

5/9/12 9:22 2.91 Wall Drywall A White NAFB 56 KLINLEY Bathroom NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.96

5/9/12 9:22 1.74 Wall Drywall B White NAFB 56 KLINLEY Bathroom NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.3

5/9/12 9:22 3.48 Wall Drywall C White NAFB 56 KLINLEY Bathroom NEG 2.7 < LOD 0.03 < LOD 0.03 < LOD 1.28

5/9/12 9:23 4.65 Wall Drywall D White NAFB 56 KLINLEY Bathroom NEG 1.76 < LOD 0.03 < LOD 0.03 < LOD 1.2

5/9/12 9:23 3.48 Ceiling Drywall White NAFB 56 KLINLEY Bathroom NEG 3.42 < LOD 0.06 < LOD 0.06 < LOD 1.2

5/9/12 9:24 1.16 Vent Metal B White NAFB 56 KLINLEY Bathroom NEG 1 < LOD 0.03 < LOD 0.03 < LOD 3.68

5/9/12 9:24 1.16 Door Wood B White NAFB 56 KLINLEY Bathroom NEG 1.27 < LOD 0.07 < LOD 0.07 < LOD 3.08

5/9/12 9:24 1.16 Doorframe Wood B White NAFB 56 KLINLEY Bathroom NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.28

5/9/12 9:25 0.58 Shower Wall Ceramic Tile C White NAFB 56 KLINLEY Bathroom POS 2.22 6.1 7.2 < LOD 7.2 < LOD 19.5

5/9/12 9:25 0.59 Shower Wall Ceramic Tile B White NAFB 56 KLINLEY Bathroom POS 1.78 4.1 4.35 < LOD 4.35 < LOD 18.45

5/9/12 9:25 3.51 Tub Porcelain C White NAFB 56 KLINLEY Bathroom NEG 2.44 < LOD 0.09 < LOD 0.09 < LOD 1.66

5/9/12 9:26 1.17 Toilet Porcelain A White NAFB 56 KLINLEY Bathroom NEG 2.94 < LOD 0.36 < LOD 0.36 < LOD 4.95

5/9/12 9:26 1.15 Sink Porcelain A White NAFB 56 KLINLEY Bathroom NEG 1 < LOD 0.06 < LOD 0.06 < LOD 4.64

5/9/12 9:27 1.16 Counter Wood A Beige NAFB 56 KLINLEY Bathroom NEG 1 < LOD 0.05 < LOD 0.05 < LOD 5.04

5/9/12 9:27 1.16 Cabinet Wood A Brown NAFB 56 KLINLEY Bathroom NEG 1 < LOD 0.04 < LOD 0.04 < LOD 3.92

5/9/12 9:27 7.55 Baseboard Vinyl C White NAFB 56 KLINLEY Bathroom Null 2.86 0.22 0.07 0.22 0.07 1.2 0.6

5/9/12 9:28 6.38 Floor VCT White NAFB 56 KLINLEY Bathroom NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.2

5/9/12 9:28 5.23 Wall Brick A White NAFB 56 KLINLEY E Bed NEG 4.23 < LOD 0.04 < LOD 0.04 < LOD 1.2

5/9/12 9:29 2.33 Wall Drywall B White NAFB 56 KLINLEY E Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.8

5/9/12 9:29 3.49 Wall Drywall C White NAFB 56 KLINLEY E Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.22

5/9/12 9:29 7.55 Wall Brick D White NAFB 56 KLINLEY E Bed NEG 4.35 < LOD 0.05 < LOD 0.05 < LOD 1.05

5/9/12 9:29 4.07 Ceiling Drywall White NAFB 56 KLINLEY E Bed NEG 1.62 < LOD 0.03 < LOD 0.03 < LOD 1.2

5/9/12 9:30 2.34 Door Wood C White NAFB 56 KLINLEY E Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.08

5/9/12 9:30 1.16 Doorframe Wood C White NAFB 56 KLINLEY E Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.27

5/9/12 9:30 1.16 Vent Metal C White NAFB 56 KLINLEY E Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 3.53

5/9/12 9:31 3.5 Closet Shelf Wood C White NAFB 56 KLINLEY E Bed NEG 7.92 < LOD 0.37 < LOD 0.37 < LOD 0.9

5/9/12 9:31 3.48 Window Frame Metal D Black NAFB 56 KLINLEY E Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 0.99

5/9/12 9:32 2.91 Window Frame Metal A Black NAFB 56 KLINLEY E Bed NEG 3.48 < LOD 1.67 < LOD 0.07 < LOD 1.67

5/9/12 9:32 1.16 Closet Door Wood C White NAFB 56 KLINLEY E Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.44

5/9/12 9:32 3.49 Closet Doorframe Metal C White NAFB 56 KLINLEY E Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.24

5/9/12 9:33 3.51 Baseboard Vinyl B White NAFB 56 KLINLEY E Bed NEG 1.79 0.16 0.07 0.16 0.07 < LOD 1.35

5/9/12 9:33 7.56 Floor VCT B White NAFB 56 KLINLEY E Bed NEG 1.31 < LOD 0.03 < LOD 0.03 < LOD 1.05

5/9/12 9:34 7.01 Wall Brick A White NAFB 56 KLINLEY SE Bed NEG 2.45 < LOD 0.03 < LOD 0.03 < LOD 1.05

5/9/12 9:34 13.41 Wall Brick B White NAFB 56 KLINLEY SE Bed NEG 6.98 < LOD 0.05 < LOD 0.05 0.8 0.5

5/9/12 9:35 1.17 Wall Drywall C White NAFB 56 KLINLEY SE Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.63

5/9/12 9:35 9.89 Wall Drywall D White NAFB 56 KLINLEY SE Bed NEG 10 < LOD 0.75 < LOD 0.13 < LOD 0.75

5/9/12 9:35 1.75 Ceiling Drywall White NAFB 56 KLINLEY SE Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.23

5/9/12 9:36 1.17 Door Wood D White NAFB 56 KLINLEY SE Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.25

5/9/12 9:36 1.16 Doorframe Wood D White NAFB 56 KLINLEY SE Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.42

5/9/12 9:36 1.16 Closet Door Wood C White NAFB 56 KLINLEY SE Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.39

5/9/12 9:36 2.33 Closet Doorframe Wood C White NAFB 56 KLINLEY SE Bed NEG 7.87 < LOD 2.21 < LOD 0.14 < LOD 2.21

5/9/12 9:37 1.16 Closet Shelf Wood C White NAFB 56 KLINLEY SE Bed NEG 1 < LOD 0.04 < LOD 0.04 < LOD 3.91

5/9/12 9:37 3.51 Window Frame Metal C Black NAFB 56 KLINLEY SE Bed NEG 1.42 < LOD 0.03 < LOD 0.03 < LOD 1.07

5/9/12 9:38 5.82 Baseboard Vinyl C White NAFB 56 KLINLEY SE Bed NEG 2.23 0.29 0.08 0.29 0.08 < LOD 1.05

5/9/12 9:38 9.9 Floor VCT White NAFB 56 KLINLEY SE Bed NEG 1.07 < LOD 0.03 < LOD 0.03 < LOD 1.05

5/9/12 9:38 1.16 Vent Metal C White NAFB 56 KLINLEY SE Bed NEG 1 < LOD 0.03 < LOD 0.03 < LOD 3.41

5/9/12 9:41 5.23 Wall Brick A Beige NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.2

5/9/12 9:41 4.07 Wall Brick B Beige NAFB 56 KLINLEY Exterior NEG 3.8 < LOD 0.06 < LOD 0.06 < LOD 1.35

5/9/12 9:42 4.65 Wall Stucco C Beige NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.2

5/9/12 9:43 3.5 Wall Stucco D Beige NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.52

5/9/12 9:43 4.08 Window Sill Brick D Brown NAFB 56 KLINLEY Exterior NEG 4 < LOD 0.07 < LOD 0.07 < LOD 1.5

5/9/12 9:43 5.81 Window Sill Brick D Brown NAFB 56 KLINLEY Exterior NEG 1.18 < LOD 0.03 < LOD 0.03 < LOD 1.2

5/9/12 9:44 4.11 Window Frame Metal D Black NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 0.85

5/9/12 9:44 6.99 Window Frame Metal D Black NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 0.9

5/9/12 9:44 8.15 Window Frame Metal C Black NAFB 56 KLINLEY Exterior NEG 1 0.6 0.3 < LOD 0.03 0.6 0.3

5/9/12 9:45 3.51 Window Sill Brick C Brown NAFB 56 KLINLEY Exterior NEG 1.55 < LOD 0.05 < LOD 0.05 < LOD 1.47

5/9/12 9:45 1.16 Door Wood C Brown NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 3.13

5/9/12 9:45 1.17 Doorframe Wood C Brown NAFB 56 KLINLEY Exterior NEG 1.39 < LOD 0.05 < LOD 0.05 < LOD 1.99

5/9/12 9:46 1.16 Doorframe Metal B Brown NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.04 < LOD 0.04 < LOD 2.22

5/9/12 9:46 1.16 Door Metal B Brown NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 3.24

5/9/12 9:47 1.16 Door Metal A Brown NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.04 < LOD 0.04 < LOD 3.25

5/9/12 9:47 1.16 Doorframe Metal A Brown NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.04 < LOD 0.04 < LOD 2.1

5/9/12 9:48 1.16 Overhang Wood B Brown NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.04 < LOD 0.04 < LOD 2.25

5/9/12 9:48 1.74 Overhang Wood B Brown NAFB 56 KLINLEY Exterior POS 10 3.8 2.5 < LOD 1.65 3.8 2.5

5/9/12 9:48 1.16 Overhang Wood B Beige NAFB 56 KLINLEY Exterior NEG 5.05 < LOD 0.34 < LOD 0.34 < LOD 2.78

5/9/12 9:48 3.49 Overhang Wood B Beige NAFB 56 KLINLEY Exterior NEG 4.11 < LOD 0.91 < LOD 0.11 < LOD 0.91

5/9/12 9:49 9.36 Floor Concrete Blue NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.05

5/9/12 9:51 1.16 Fascia Wood A Beige NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.34

5/9/12 9:51 1.16 Soffit Wood A Beige NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.4

5/9/12 9:52 1.18 Fascia Metal A Orange NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.32 < LOD 0.32 < LOD 3.58

5/9/12 9:52 3.5 Roof Ceramic Tile A Orange NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.56

5/9/12 9:54 9.3 Roof Ceramic Tile A Orange NAFB 56 KLINLEY Exterior POS 1 1.6 0.5 < LOD 0.03 1.6 0.5

5/9/12 9:57 20 Roof Ceramic Tile A Orange NAFB 56 KLINLEY Exterior Null 2.54 < LOD 0.03 < LOD 0.03 1.3 0.4

5/9/12 9:57 13.37 Roof Ceramic Tile A Orange NAFB 56 KLINLEY Exterior POS 1 1.4 0.4 < LOD 0.03 1.4 0.4

5/9/12 9:58 1.16 Roof Pipe Metal A Brown NAFB 56 KLINLEY Exterior NEG 1.32 < LOD 0.08 < LOD 0.08 < LOD 2.51

5/9/12 9:58 1.75 Roof Vent Metal A Brown NAFB 56 KLINLEY Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.42

5/9/12 10:03 1.16 Wall Wood B Beige NAFB 56 KLINLEY STORAGE NEG 1 < LOD 0.09 < LOD 0.09 < LOD 2.47

5/9/12 10:04 0.59 Calibration Yellow POS 1.07 2.8 1.5 2.8 1.5 < LOD 9.75

5/9/12 10:04 0.59 Calibration Yellow POS 1.16 3.4 1.8 3.4 1.8 < LOD 9.75

5/9/12 10:04 0.59 Calibration Yellow POS 1.46 4.4 2.5 4.4 2.5 < LOD 8.85

Appendix E

CCF03192012_00017
CCF03192012_00018