The document is a blank Independent Government Cost Estimate (IGE) template for the Maxwell Air Force Base Airfield Improvements project (Project Number PNQS 24-4829). The cost estimate breakdown template includes divisions for General Requirements and Site Work, with line items for specific airfield improvement activities such as pavement pressure washing, marking replacement, sinkhole repair, concrete pavement repair, and thermoplastic replacement. The template is structured to calculate total direct costs by breaking down material costs, labor costs, taxes, insurance, overhead, profit, and bonding, with spaces for a contractor to input specific quantities, unit costs, and total project pricing. All monetary fields are currently blank, indicating this is a template for cost estimation purposes rather than a completed document.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193
| CONTRACTOR | DATE | ADDRESS | 400 Cannon Street | |||||||
| Maxwell Air Force Base Alabama | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| Airfield Improvements | $0.00 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||||
| PNQS 24-4829 Airfield Improvements | Maxwell AFB | |||||||||
| UNIT | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||||||
| LINE | ITEM | OF | QUANTITY | AVERAGE | DIRECT | LINE | ||||
| NO. | MEASURE | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| DIVISION 1 (General Requirements) | ||||||||||
| Mobilization | ||||||||||
| Superintendent | ||||||||||
| DIVISION 2 (Site Work) | ||||||||||
| 1.0 | Pavement Pressure Washing | |||||||||
| 2.0 | Replace Markings (Paint) | |||||||||
| 3.0 | Sinkhole Repair | |||||||||
| 4.0 | Concrete Pavement Repair | |||||||||
| 5.0 | Thermoplastic Replacement |
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||
| Material Costs | $0.00 | $0.00 | |||
| Tax on Materials | $0.00 | $0.00 | |||
| TOTAL MATERIAL COST | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| Labor Cost | $0.00 | $0.00 | |||
| Insurance & Tax on Labor | $0.00 | $0.00 | |||
| TOTAL LABOR COST | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| Total Other Direct Costs | $0.00 | $0.00 | $0.00 | ||
| Total Material, Labor, Tax & Insurance | $0.00 | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |||
| Overhead | $0.00 | $0.00 | $0.00 | ||
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |
| Profit | $0.00 | $0.00 | $0.00 | ||
| Sub Total | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| Bonds | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||
| I acknowledge the above cost estimate has been estimated to the best of my ability and means. | |||||
| Signature: ______________________________________ | Gov't Coord___________________________________ |
File details come from the government source that posted it. Updated .