SINKHOLE REPAIR.pdf

PDF 2 MB Posted

Attached to
Maxwell AFB - Airfield Repairs - Amendment 0006
Solicitation number
FA330026R0003
Issued by

About this file

These Standard Specifications outline requirements for sinkhole repair at Maxwell Air Force Base (AFB) in Alabama. The contractor is responsible for identifying the source of sinkholes adjacent to the airfield and repairing them according to details specified in sheet D1. Key requirements include obtaining an airfield waiver through the base planning office prior to work commencement, using approved materials through the submittal process, and potentially reusing excavated materials for structural backfill. The contractor may use any available equipment to execute the work, with measurement and payment to be determined in accordance with the contract documents.

View the file

Other files

File Type Posted
Solicitation Amendment - FA330026R00030004.pdf PDF
Attachment 8 - PNQS 24-4829 Airfield Improvements - AF3052 - Blank IGE - Rev 2.xlsx XLSX spreadsheet
Attachment 9 - Question and Answers.pdf PDF
Solicitation Amendment FA330026R00030004 SF 30.pdf PDF
PNQS 24-4829 Airfield Improvements Specs V2.pdf PDF
Solicitation Amendment FA330026R00030003 SF 30.pdf PDF
PNQS 24-4829 Drawings V2.pdf PDF
Standard Specifications For Pressure Cleaning Concrete Pavement.pdf PDF
Solicitation Amendment - FA330026R00030003.pdf PDF
UFC 3-260-04 Airfield and Heliport Marking.pdf PDF
Solicitation Amendment FA330026R00030002 SF 30.pdf PDF
Site Visit - Sign in Sheet - Master - Airfield Improvements.xlsx XLSX spreadsheet
Attachment 2 - PNQS 24-4829 Airfield Improvements - Drawings - Original.pdf PDF
Attachment 4 - Site Visit Location - Maxwell AFB Airfield Improvements Original.pdf PDF
Attachment 6 - Site Visit Reservation - Amendment 0002.xlsx XLSX spreadsheet
Attachment 7 - PNQS 24-4829 Airfield Improvements Drawings - Amendment 0002.pdf PDF
Attachment 1 - PNQS 24-4829 Airfield Improvements - Specifications - Original.pdf PDF
Solicitation Amendment - FA330026R00030001.pdf PDF
Attachment 3 - Davis-Bacon Act WD AL20250115.pdf PDF
Attachment 8 - Question and Answers.pdf PDF
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx XLSX spreadsheet
Site Visit Location - Maxwell AFB Airfield Imrovements.pdf PDF
Solicitation - FA330026R0003.pdf PDF
Attachment 3 - PNQS 24-4829 Airfield Improvements - Drawings.pdf PDF
Attachment 2 - PNQS 24-4829 Airfield Improvements - Specifications.pdf PDF
Davis-Bacon Act WD AL20250115.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD SPECIFICATIONS

FOR

SINKHOLE REPAIR

MAXWELL AFB, AL

1.General

The work shall include the repair of sinkholes adjacent to the airfield at Maxwell AFB, AL. The contractor is to identify the source of the sinkhole and repair according to the details in sheet

D1.

2.Materials

All materials utilized for sinkhole repair will be approved through the submittal process. The

Contractor may reuse excavated materials for structural backfill.

3.Equipment

The contractor is to use any equipment at his disposal for execution of this work. An airfield waiver is required prior to commencement of the work. The waiver is executed through the base planning office and is at no charge.

4.Construction Requirements

The contractor is to identify the source of the sinkhole and repair it in accordance with the details in sheet D1.

5.Method of Measurement

The measurement will be in accordance with the contract documents.

File details come from the government source that posted it. Updated .