802 CONS/LGCA-3 FA3047-10-R-0012

Lackland AFB TX Roofing IDIQ

Section J – Attachment 3 1

General Decision Number: TX100003 03/12/2010 TX3

Superseded General Decision Number: TX20080003

State: Texas

Construction Type: Building

County: Bexar County in Texas.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories). (Use current heavy & highway general wage determination for Paving &

Utilities Incidental to Building Construction).

Modification Number Publication Date

0 03/12/2010

ASBE0087-001 01/01/2009

Rates Fringes

Asbestos/Insulator Worker

(Includes application of all insulating materials, protective coverings, coatings, and finishings to all types of mechanical systems.)........................$ 21.17 7.40

BRTX0001-004 05/01/2009

BRICKLAYER.......................$ 24.50 1.73

ELEC0060-001 06/01/2009

CABLE SPLICER....................$ 24.20 3.75+12%

ELECTRICIAN......................$ 23.95 3.75+12%

ELEC0060-002 06/01/2009

ELECTRICIAN (Low Voltage including pulling & installing cable through conduit).........................$ 19.51 8%+4.92

* ELEV0081-001 01/01/2010

Section J – Attachment 3 2

Elevator Constructor

MECHANIC....................$ 33.35 20.235+A

FOOTNOTE; A = UNDER 5 YEARS EMPLOYMENT, 6% BHR; OVER 5 YEARS

EMPLOYMENT, 8% BHR. PAID HOLIDAYS : New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving

Day, Friday after Thanksgiving Day and Christmas Day.

* ENGI0450-001 07/01/2009

Power equipment operators:

Cranes......................$ 29.75 8.75

IRON0066-001 06/01/2009

IRONWORKER (Excluding metal building erectors)

Structural..................$ 18.50 5.15

MARB0002-001 07/01/2005

TILE SETTER......................$ 18.50 6.10

PLUM0142-001 07/01/2009

Plumbers and Pipefitters

(Including HVAC WORK)............$ 28.48 8.67

SFTX0669-001 01/01/2010

SPRINKLER FITTER (Fire

Sprinklers)......................$ 25.90 15.35

SHEE0067-001 04/01/2009

Sheet metal worker (Including

HVAC Duct Work)..................$ 25.18 10.75

SUTX1988-002 11/01/1988

Acoustical Ceiling Installer.....$ 12.26

CARPENTER (Excluding

Section J – Attachment 3 3

Acoustical Ceiling Installer

& Drywall Hanger)................$ 10.64

CEMENT MASON/CONCRETE FINISHER...$ 11.46

DRYWALL HANGER...................$ 11.88

GLAZIER..........................$ 10.78 1.40

IRONWORKER (Excluding Metal

Building Assemblers)

Reinforcing.................$ 10.19 3.57

Laborers:

Mason Tenders...............$ 8.36 1.78

Mortar Mixers...............$ 8.99

PLASTERER'S TENDERS.........$ 8.68

Unskilled...................$ 7.25

LATHER...........................$ 15.25

PAINTER (Excluding

Tapers/Finishers)................$ 8.01

PLASTERER........................$ 15.25

Power equipment operators:

Front End Loader............$ 7.36

Roofers:

Kettlemen...................$ 8.85

Roofers.....................$ 8.14

Waterproofers...............$ 7.25

Sheet Metal Worker

Other Work..................$ 11.62

Taper/Finisher...................$ 7.99

TRUCK DRIVER.....................$ 7.25

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be

Section J – Attachment 3 4 prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

Section J – Attachment 3 5

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Other files for this federal contract opportunity

Other files attached to Roofing Indefinite Delivery Indefinite Quantity (IDIQ), newest first.
File Type Posted
FA3047-10-R-0012-0004 Amendment to RFP —
FA3047-10-R-0012-0003 Amendment to RFP Roofing IDIQ.pdf PDF
FA3047-10-R-0012-0002 Amendment to RFP Roofing IDIQ —
FA3047-10-R-0012 Attendance Record —
FA3047-10-R-0012 Atch 1 —
FA3047-10-R-0012 Atch 2V-Division 5 —
FA3047-10-R-0012 Atch 2Z-Division 7 —
FA3047-10-R-0012 Atch 2AB-Division 7 —
FA3047-10-R-0012 Atch 2AG-Division 7 —
FA3047-10-R-0012 Atch 2AI-Division 9 —
FA3047-10-R-0012 Atch 2U-Division 5 —
FA3047-10-R-0012 Atch 2AE-Division 7 —
FA3047-10-R-0012 Atch 1 —
FA3047-10-R-0012 Atch 2T-Division 5 —
FA3047-10-R-0012 Atch 2C-Division 1 —
FA3047-10-R-0012 Atch 2N-Division 2 —
FA3047-10-R-0012 Atch 2AA-Division 7 —
FA3047-10-R-0012 Atch 2P-Division 2 —
FA3047-10-R-0012 Atch 2R-Division 2 —
FA3047-10-R-0012 Atch 2AD-Division 7 —
FA3047-10-R-0012 Atch 2Y-Division 7 —
FA3047-10-R-0012 RFP for Roofing IDIQ —
FA3047-10-R-0012 Atch 2AK —
FA3047-10-R-0012 Atch 2J-Division 1 —
FA3047-10-R-0012 Atch 2A - 8 Feb 10 Table of Contents.pdf PDF
FA3047-10-R-0012 Atch 2Q-Division 2 —
FA3047-10-R-0012 Atch 2AH-Division 8 —
FA3047-10-R-0012 Atch 2X-Division 7 —
FA3047-10-R-0012 Atch 2F-Division 1 —
FA3047-10-R-0012 Atch 2O-Division 2 —
FA3047-10-R-0012 Atch 2K-Division 1 —
FA3047-10-R-0012 Atch 2M-Division 2 —
FA3047-10-R-0012 Atch 2L-Division 1 —
FA3047-10-R-0012 Atch 2D-Division 1 —
FA3047-10-R-0012 Atch 2AJ-Division 26 —
FA3047-10-R-0012 Atch 2B-Division 0 —
FA3047-10-R-0012 Atch 2AC-Division 7 —
FA3047-10-R-0012 Atch 2I-Division 1 —
FA3047-10-R-0012 Atch 2G-Division 1 —
FA3047-10-R-0012 Atch 2W-Division 6 —
FA3047-10-R-0012 Atch 2E-Division 1 —
FA3047-10-R-0012 Atch 2S-Division 5 —
FA3047-10-R-0012 Atch 4 —
FA3047-10-R-0012_SBDC_Informational_Map.pdf PDF
FA3047-10-R-0012 Atch 2AF-Division 7 —
FA3047-10-R-0012 Atch 2H-Division 1 —
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .