FA3047-10-R-0012 Atch 2N-Division 2
96 KB Posted
- Attached to
- Roofing Indefinite Delivery Indefinite Quantity (IDIQ) Federal contract opportunity
- Solicitation number
- FA3047-10-R-0012-ROOFING
About this file
FA3047-10-R-0012 Atch 2N-Division 2 (Specs - 02 81 00) 8 Feb 10 Transportation and Disposal of Hazardous Materials
Text of this file
802 CONS/LGCA-3 FA3047-10-R-0012
Lackland AFB TX Roofing IDIQ
02 81 00
Section J – Attachment 2N Page 1 of 14 8 Feb 2010
SECTION 02 81 00
TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced.
The publications are referred to within the text by the basic designation only.
INTERNATIONAL AIR TRANSPORT ASSOCIATION (IATA)
IATA DGR(2004) Dangerous Goods Regulations
U.S. DEPARTMENT OF TRANSPORTATION (DOT)
DOT 4500.9RDefense Transportation Regulation, Part 2, Cargo Movement, Chapter 204, Hazardous Material
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 261Identification and Listing of Hazardous Waste
40 CFR 262Standards Applicable to Generators of Hazardous Waste
40 CFR 263Standards Applicable to Transporters of Hazardous Waste
40 CFR 264Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities
40 CFR 265Interim Status Standards for Owners and Operators of Hazardous Waste
Treatment, Storage, and Disposal Facilities
40 CFR 266Standards for the Management of Specific Hazardous Wastes and Specific
Types of Hazardous Waste Management Facilities
40 CFR 268Land Disposal Restrictions
40 CFR 270EPA Administered Permit Programs: The Hazardous Waste Permit Program
40 CFR 279Standards for the Management of Used Oil
40 CFR 300National Oil and Hazardous Substances Pollution Contingency Plan
Section J – Attachment 2N Page 2 of 14 8 Feb 2010
40 CFR 302Designation, Reportable Quantities, and Notification
40 CFR 61National Emission Standards for Hazardous Air Pollutants
40 CFR 761Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions
49 CFR 107Hazardous Materials Program Procedures
49 CFR 172Hazardous Materials Table, Special Provisions, Hazardous Materials
Communications, Emergency Response Information, and Training Requirements
49 CFR 173Shippers - General Requirements for Shipments and Packagings
49 CFR 178Specifications for Packagings
1.2 DEFINITIONS
1.2.1 Hazardous Material
A substance or material which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce, and which has been so designated pursuant to the Hazardous
Materials Transportation Act, 49 U.S.C. Appendix Section 1801 et seq. The term includes materials designated as hazardous materials under the provisions of 49 CFR 172, Sections .101 and .102 and materials which meet the defining criteria for hazard classes and divisions in 49 CFR 173. EPA designated hazardous wastes are also hazardous materials.
1.2.2 Hazardous Waste
A waste which meets criteria established in RCRA or specified by the EPA in 40 CFR
261 or which has been designated as hazardous by a RCRA authorized state program.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
On-site Hazardous Waste Management; G
02 81 00
Section J – Attachment 2N Page 3 of 14 8 Feb 2010
Prior to start of work, a plan detailing the manner in which hazardous wastes shall be managed. Written documentation of weekly hazardous waste inspections shall be submitted on a monthly basis.
Notices of Non-Compliance and Notices of Violation
Notices of non-compliance or notices of violation, as specified.
SD-06 Test Reports
Recordkeeping; G
Information necessary to file state annual or EPA biennial reports for all hazardous waste transported, treated, stored, or disposed of under this contract. The Contractor shall not forward these data directly to the regulatory agency but to the Contracting
Officer at the specified time. The submittal shall contain all the information necessary for filing of the formal reports in the form and format required by the governing Federal or state regulatory agency. A cover letter shall accompany the data to include the contract number, Contractor name, and project location.
Spill Response
In the event of a spill or release of a hazardous substance (as designated in 40 CFR 302), or pollutant or contaminant, or oil (as governed by the Oil Pollution Act (OPA), 33
U.S.C. 2701 et seq.), the Contractor shall notify the Contracting Officer immediately. If the spill exceeds a reporting threshold, the Contractor shall follow the pre-established procedures for immediate reporting to the Contracting Officer.
Exception Reports; G
In the event that a manifest copy documenting receipt of hazardous waste at the treatment, storage, and disposal facility is not received within 35 days of shipment initiation, the Contractor shall prepare and submit an exception report to the Contracting
Officer within 37 days of shipment initiation. In the event that a manifest copy documenting receipt of PCB waste at the designated facility is not received within 35 days of shipment initiation, the Contractor shall prepare and submit an exception report to the Contracting Officer within 37 days of shipment initiation.
Packaging Notifications
In accordance with 49 CFR 178.2(c), the Contractor shall acquire the appropriate notifications from the package manufacturers or any other persons certifying compliance with the packaging provisions and provide these to the Government.
SD-07 Certificates
02 81 00
Section J – Attachment 2N Page 4 of 14 8 Feb 2010
Certification
Copies of the current certificates of registration required by 49 CFR 107, Subpart G issued to the Contractor and/or Subcontractors or written statements certifying exemption from these requirements.
Security Plan
Pre-transportation security plan, as specified.
Transportation and Disposal Coordinator
Transportation and Disposal Coordinator qualifications including proof of at least one year specialized experience in management and transportation of hazardous wastes; proof of current Department of Transportation Hazardous Materials Training Certification; and, where applicable, proof of IATA DGR.
Training
Documentation that employees preparing or transporting hazardous materials have been trained, tested, and certified in accordance with 49 CFR 172, Subpart H, including general security awareness requirements and where applicable, site-specific security plan requirements.
EPA Off-Site Policy
A letter certifying that EPA considers the facilities to be used for all off-site disposal to be acceptable in accordance with the Off-Site policy in 40 CFR 300, Section .440. This certification shall be provided for wastes from Resource Conservation and Recovery Act
(RCRA), 42 U.S.C. 6901 et seq., sites as well as from Comprehensive Environmental
Response Compensation and Liability Act (CERCLA), 42 U.S.C. 9601 et seq., responses.
See Attachment A, sample certification, at the end of this section.
Certificates of Disposal
Certificates documenting the ultimate disposal, destruction or placement of hazardous wastes, polychlorinated biphenyls (PCBs), and/or asbestos within 180 days of initial shipment. Receipt of these certificates will be required for final payment.
Shipping Documents and Packagings Certification
All transportation related shipping documents to the Contracting Officer, including draft hazardous waste manifests, draft land disposal restriction notifications, draft asbestos waste shipment records, draft manifests for PCBs, draft bill of ladings for hazardous materials, lists of corresponding proposed labels, packages, marks, and placards to be used for shipment, waste profiles and supporting waste analysis documents, for review a
02 81 00
Section J – Attachment 2N Page 5 of 14 8 Feb 2010 minimum of 14 days prior to anticipated pickup. Packaging assurances shall be furnished prior to transporting hazardous material; "generator copies" of hazardous waste manifests, land disposal restriction notifications, asbestos waste shipment records, "generator copies" of manifests used for initiating shipments of PCBs, bill of ladings and supporting waste analysis documents shall be furnished when shipments are originated;
and "receipt copies" of hazardous waste manifests, PCB manifests and asbestos waste shipment records at the designated disposal facility shall be furnished not later than 35 days after acceptance of the shipment.
Waste Minimization
Written certification that waste minimization efforts have been undertaken to reduce the volume and toxicity of waste to the degree economically practicable and that the method of treatment, storage, or disposal selected minimizes threats to human health and the environment.
1.4 QUALIFICATIONS
1.4.1 Transportation and Disposal Coordinator
The Contractor shall designate, by position and title, one person to act as the
Transportation and Disposal Coordinator (TDC) for this contract. The TDC shall serve as the single point of contact for all environmental regulatory matters and shall have overall responsibility for total environmental compliance at the site including, but not limited to, accurate identification and classification of hazardous waste and hazardous materials; determination of proper shipping names; identification of marking, labeling, packaging and placarding requirements; completion of waste profiles, hazardous waste manifests, asbestos waste shipment records, PCB manifests, bill of ladings, exception and discrepancy reports; and all other environmental documentation. The TDC shall have, at a minimum, one year of specialized experience in the management and transportation of hazardous waste and have been Department of Transportation certified under 49 CFR
172, Subpart H.
1.4.2 Training
The Contractor's employees transporting hazardous materials or preparing hazardous materials for transportation, including samples, shall be trained, tested, and certified in accordance with 49 CFR 172, Subpart H, including security awareness and any applicable security plans. Where shipment of hazardous materials by air may be occurring, such as for sample shipments, the Contractor's hazardous material employees shall also be trained on IATA DGR. Contractor employees making determinations that shipments do not constitute DOT regulated hazardous materials shall also be trained, tested, and certified in accordance with 49 CFR 172, Subpart H.
1.4.3 Certification
02 81 00
Section J – Attachment 2N Page 6 of 14 8 Feb 2010
The Contractor and/or Subcontractors transporting hazardous materials shall possess a current certificate of registration issued by the Research and Special Programs
Administration (RSPA), U.S. Department of Transportation, when required by 49 CFR
107, Subpart G.
1.5 LAWS AND REGULATIONS REQUIREMENTS
Work shall meet or exceed the minimum requirements established by Federal, state, and local laws and regulations which are applicable. These requirements are amended frequently and the Contractor shall be responsible for complying with amendments as they become effective. In the event that compliance exceeds the scope of work or conflicts with specific requirements of the contract, the Contractor shall notify the
Contracting Officer immediately.
PART 2 PRODUCTS
2.1 MATERIALS
The Contractor shall provide all of the materials required for the packaging, labeling, marking, placarding and transportation of hazardous wastes and hazardous materials in conformance with Department of Transportation standards and IATA DGR. Details in this specification shall not be construed as establishing the limits of the Contractor's responsibility.
2.1.1 Packagings
The Contractor shall provide bulk and non-bulk containers for packaging hazardous materials/wastes consistent with the authorizations referenced in the Hazardous Materials
Table in 49 CFR 172, Section .101, Column 8. Bulk and non-bulk packaging shall meet the corresponding specifications in 49 CFR 173 referenced in the Hazardous Materials
Table, 49 CFR 172, Section .101. Each packaging shall conform to the general packaging requirements of Subpart B of 49 CFR 173, to the requirements of 49 CFR 178 at the specified packing group performance level, to the requirements of special provisions of column 7 of the Hazardous Materials Table in 49 CFR 172, Section .101, and shall be compatible with the material to be packaged as required by 40 CFR 262.
The Contractor shall also provide other packaging related materials such as materials used to cushion or fill voids in overpacked containers, etc. Sorbent materials shall not be capable of reacting dangerously with, being decomposed by, or being ignited by the hazardous materials being packaged. Additionally, sorbents used to treat free liquids to be disposed of in landfills shall be non-biodegradable as specified in 40 CFR 264, Section
.314. In addition, packaging notifications will be provided to the Government in accordance with 49 CFR 172, Section .178.2(c) regarding type and dimensions of closures, including gaskets, needed to satisfy performance test requirements.
2.1.2 Markings
02 81 00
Section J – Attachment 2N Page 7 of 14 8 Feb 2010
The Contractor shall provide markings for each hazardous material/waste package, freight container, and transport vehicle consistent with the requirements of 49 CFR 172, Subpart D and 40 CFR 262, Section .32 (for hazardous waste) 40 CFR 761, Section .45
(for PCBs) and 40 CFR 61, Section .149(d) (for asbestos). Markings shall be capable of withstanding, without deterioration or substantial color change, a 180 day exposure to conditions reasonably expected to be encountered during container storage and transportation.
2.1.3 Labeling
The Contractor shall provide primary and subsidiary labels for hazardous materials/wastes consistent with the requirements in the Hazardous Materials Table in 49
CFR 172, Section .101, Column 6. Labels shall meet design specifications required by
49 CFR 172, Subpart E including size, shape, color, printing, and symbol requirements.
Labels shall be durable and weather resistant and capable of withstanding, without deterioration or substantial color change, a 180 day exposure to conditions reasonably expected to be encountered during container storage and transportation.
2.1.4 Placards
For each off-site shipment of hazardous material/waste, the Contractor shall provide primary and subsidiary placards consistent with the requirements of 49 CFR 172, Subpart
F. Placards shall be provided for each side and each end of bulk packaging, freight containers, transport vehicles, and rail cars requiring such placarding. Placards may be plastic, metal, or other material capable of withstanding, without deterioration, a 30 day exposure to open weather conditions and shall meet design requirements specified in 49
CFR 172, Subpart F.
2.1.5 Spill Response Materials
The Contractor shall provide spill response materials including, but not limited to, containers, adsorbent, shovels, and personal protective equipment. Spill response materials shall be available at all times in which hazardous materials/wastes are being handled or transported. Spill response materials shall be compatible with the type of material being handled.
2.2 EQUIPMENT AND TOOLS
The Contractor shall provide miscellaneous equipment and tools necessary to handle hazardous materials and hazardous wastes in a safe and environmentally sound manner.
PART 3 EXECUTION
3.1 ON-SITE HAZARDOUS WASTE MANAGEMENT
02 81 00
Section J – Attachment 2N Page 8 of 14 8 Feb 2010
These paragraphs apply to Government owned waste only. Contractors are prohibited by
10 U.S.C. 2692 from storing Contractor owned waste on site for any length of time. The
Contractor shall be responsible for ensuring compliance with all Federal, state, and local hazardous waste laws and regulations and shall verify those requirements when preparing reports, waste shipment records, hazardous waste manifests, or other documents. The
Contractor shall identify hazardous wastes using criteria set forth in 40 CFR 261 or all applicable state and local laws, regulations, and ordinances. When accumulating hazardous waste on-site, the Contractor shall comply with generator requirements in 40
CFR 262 and any applicable state or local law or regulations. On-site accumulation times shall be restricted to applicable time frames referenced in 40 CFR 262, Section .34 and any applicable state or local law or regulation. Accumulation start dates shall commence when waste is first generated (i.e. containerized or otherwise collected for discard). The
Contractor shall only use containers in good condition and compatible with the waste to be stored. The Contractor shall be responsible for ensuring containers are closed except when adding or removing waste. The Contractor shall be responsible for immediately marking all hazardous waste containers with the words "hazardous waste" and other information required by 40 CFR 262, Section .32 and any applicable state or local law or regulation as soon as the waste is containerized. An additional marking shall be placed on containers of "unknowns" designating the date sampled, and the suspected hazard.
The Contractor shall be responsible for inspecting containers for signs of deterioration and shall be responsible for responding to any spills or leaks. The Contractor shall inspect all hazardous waste areas weekly and shall provide written documentation of the inspection. Inspection logs shall contain date and time of inspection, name of individual conducting the inspection, problems noted, and corrective actions taken.
3.1.1 Hazardous Waste Classification
The Contractor, in consultation with the Contracting Officer, shall identify all waste codes applicable to each hazardous waste stream based on requirements in 40 CFR 261 or any applicable state or local law or regulation. The Contractor shall also identify all applicable treatment standards in 40 CFR 268 and state land disposal restrictions and shall make a determination as to whether or not the waste meets or exceeds the standards.
Waste profiles, analyses, classification and treatment standards information shall be submitted to Contracting Officer for review and approval.
3.1.2 Management Plan
The Contractor shall prepare a plan detailing the manner in which hazardous wastes will be managed and describing the types and volumes of hazardous wastes anticipated to be managed as well as the management practices to be utilized. The plan shall identify the method to be used to ensure accurate piece counts and/or weights of shipments; shall identify waste minimization methods; shall propose facilities to be utilized for treatment, storage, and/or disposal; shall identify areas on-site where hazardous wastes are to be handled; shall identify whether transfer facilities are to be utilized; and if so, how the wastes will be tracked to ultimate disposal.
02 81 00
Section J – Attachment 2N Page 9 of 14 8 Feb 2010
3.2 OFF-SITE HAZARDOUS WASTE MANAGEMENT
The Contractor shall use RCRA Subtitle C permitted facilities which meet the requirements of 40 CFR 264 or facilities operating under interim status which meet the requirements of 40 CFR 265. Off-site treatment, storage, and/or disposal facilities with significant RCRA violations or compliance problems (such as facilities known to be releasing hazardous constituents into ground water, surface water, soil, or air) shall not be used. The Contractor shall submit Notices of Non-Compliance and Notices of Violation by a Federal, state, or local regulatory agency issued to the Contractor in relation to any work performed under this contract. The Contractor shall immediately provide copies of such notices to the Contracting Officer. The Contractor shall also furnish all relevant documents regarding the incident and any information requested by the Contracting
Officer, and shall coordinate its response to the notice with the Contracting Officer or his designated representative prior to submission to the notifying authority. The Contractor shall also furnish a copy to the Contracting Officer of all documents submitted to the regulatory authority, including the final reply to the notice, and all other materials, until the matter is resolved.
3.2.1 Treatment, Storage, and/or Disposal Facility and Transporter
The Contractor shall provide the Contracting Officer with EPA ID numbers, names, locations, and telephone numbers of TSD facilities and transporters. This information shall be contained in the Hazardous Waste Management Plan and shall be approved by the Contracting Officer prior to waste disposal.
3.2.2 Status of the Facility
Facilities receiving hazardous waste must be permitted in accordance with 40 CFR 270 or operating under interim status in accordance with 40 CFR 265 requirements, or must be permitted by a state authorized by the Environmental Protection Agency to administer the
RCRA permit program. Additionally, prior to using a TSD Facility, the Contractor shall contact the EPA Regional Off-site Coordinator specified in 40 CFR 300, Section .440, to determine the facility's status, and document all information necessary to satisfy the requirements of the EPA Off-Site policy and furnish this information to the Contracting
Officer.
3.2.3 Shipping Documents and Packagings Certification
Prior to shipment of any hazardous material off-site, the Contractor's TDC shall provide written certification to the Contracting Officer that hazardous materials have been properly packaged, labeled, and marked in accordance with Department of Transportation and EPA requirements. The Contractor's TDC shall also provide written certification regarding waste minimization efforts documenting that efforts have been taken to reduce the volume and toxicity of waste to the degree economically practicable and that the method of treatment, storage, or disposal selected minimizes threats to human health and the environment.
Section J – Attachment 2N Page 10 of 14 8 Feb 2010
3.2.4 Transportation
Prior to conducting hazardous materials activities, the Contractor responsible for pre-transportation activities shall either certify to the Government that a Security Plan is in place which meets the requirements of 49 CFR 172, Subpart I or in the event that the types or amounts of hazardous materials are excluded from the security planning requirements, a written statement to that effect detailing the basis for the exception. The
Contractor shall use manifests for transporting hazardous wastes as required by 40 CFR
263 or any applicable state or local law or regulation. Transportation shall comply with all requirements in the Department of Transportation referenced regulations in the 49
CFR series. The Contractor shall prepare hazardous waste manifests for each shipment of hazardous waste shipped off-site. Manifests shall be completed using instructions in
40 CFR 262, Subpart B and any applicable state or local law or regulation. Manifests and waste profiles shall be submitted to Contracting Officer for review and approval. The
Contractor shall prepare land disposal restriction notifications as required by 40 CFR 268 or any applicable state or local law or regulation for each shipment of hazardous waste.
Notifications shall be submitted with the manifest to the Contracting Officer for review and approval. In accordance with DOT 4500.9R, the Contractor shall inspect motor vehicles used to transport hazardous materials in accordance the 49 CFR and DOT safety regulations and shall complete DDForm 626, Motor Vehicle Inspection.
3.2.5 Treatment and Disposal of Hazardous Wastes
The hazardous waste shall be transported to an approved hazardous waste treatment, storage, or disposal facility within 45 days of the accumulation start date on each container. The Contractor shall ship hazardous wastes only to facilities which are properly permitted to accept the hazardous waste or operating under interim status. The
Contractor shall ensure wastes are treated to meet land disposal treatment standards in 40
CFR 268 prior to land disposal. The Contractor shall propose TSD facilities via submission of the Hazardous Waste Management Plan, subject to the approval of the
Contracting Officer. The Contractor shall submit Certificates of Disposal as specified in the Submittals paragraph.
3.3 HAZARDOUS MATERIALS MANAGEMENT
The Contractor, in consultation with the Contracting Officer, shall evaluate, prior to shipment of any material off-site, whether the material is regulated as a hazardous waste in addition to being regulated as a hazardous material; this shall be done for the purpose of determining proper shipping descriptions, marking requirements, etc., as described below.
3.3.1 Identification of Proper Shipping Names
The Contractor shall use 49 CFR 172, Section .101 to identify proper shipping names for each hazardous material (including hazardous wastes) to be shipped off-site. Proper
02 81 00
Section J – Attachment 2N Page 11 of 14 8 Feb 2010 shipping names shall be submitted to the Contracting Officer in the form of draft shipping documents for review and approval.
3.3.2 Packaging, Labeling, and Marking
The Contractor shall package, label, and mark hazardous materials/wastes using the specified materials and in accordance with the referenced authorizations. The Contractor shall mark each container of hazardous waste of 110 gallons or less with the following:
"HAZARDOUS WASTE - Federal Law Prohibits Improper Disposal.
If found, contact the nearest police or public safety authority or the U.S. Environmental
Protection Agency.
Generator's name _____________________________________
Manifest Document Number ___________________________".
3.3.3 Shipping Documents
The Contractor shall ensure that each shipment of hazardous material sent off-site is accompanied by properly completed shipping documents. This includes shipments of samples that may potentially meet the definition of a Department of Transportation regulated hazardous material.
3.3.3.1 PCB Waste Shipment Documents
The Contractor shall prepare hazardous waste manifests for each shipment of PCB waste shipped off-site. Manifests shall be completed using instructions in 40 CFR 761, Sections .207 and .208 and all other applicable requirements. Documents shall be submitted to Contracting Officer for review and approval.
3.3.3.2 Asbestos Waste Shipment Documents
The Contractor shall prepare waste shipment records as required by 40 CFR 61 for shipments of asbestos. Waste shipment records shall be submitted to the Contracting
Officer for review and approval. Waste shipment records shall be signed by the
Contractor.
3.3.3.3 Other Hazardous Material Shipment Documents
The Contractor shall prepare a bill of lading for each shipment of hazardous material which is not accompanied by a hazardous waste manifest or asbestos waste shipment record which fulfills the shipping paper requirements. The bill of lading shall satisfy the requirements of 49 CFR 172, Subpart C, and 40 CFR 279 if shipping used oil and any applicable state or local law or regulation, and shall be submitted to the Contracting
Officer for review and approval. For laboratory samples and treatability study samples, the Contractor shall prepare bills of lading and other documentation as necessary to satisfy conditions of the sample exclusions in 40 CFR 261, Section .4(d) and (e) and any
02 81 00
Section J – Attachment 2N Page 12 of 14 8 Feb 2010 applicable state or local law or regulation. Bill of ladings requiring shipper's certifications shall be signed by the Contractor.
3.4 OBTAINING EPA ID NUMBERS
The Contractor shall complete EPA Form 8700-12, Notification of Hazardous Waste
Activity, and submit to the Contracting Officer for review and approval. The Contractor shall allow a minimum of 30 days for processing the application and assigning the EPA
ID number. Shipment shall be made not earlier than one week after receipt of the EPA
ID number.
3.5 SPECIAL REQUIREMENTS FOR ASBESTOS WASTES
If work involves asbestos containing wastes, the Contractor shall manage these wastes in accordance with specification Section 02 82 14.00 10 ASBESTOS HAZARD
CONTROL ACTIVITIES and Section 02 82 16.00 20 ENGINEERING CONTROL OF
ASBESTOS CONTAINING MATERIALS.
3.6 WASTE MINIMIZATION
The Contractor shall minimize the generation of hazardous waste to the maximum extent practicable. The Contractor shall take all necessary precautions to avoid mixing clean and contaminated wastes. The Contractor shall identify and evaluate recycling and reclamation options as alternatives to landfill disposal. Requirements of 40 CFR 266 shall apply to: hazardous wastes recycled in a manner constituting disposal; hazardous waste burned for energy recovery; lead-acid battery recycling; and hazardous wastes with economically recoverable precious metals.
3.7 RECORDKEEPING
The Contractor shall be responsible for maintaining adequate records to support information provided to the Contracting Officer regarding exception reports, annual reports, and biennial reports. The Contractor shall be responsible for maintaining asbestos waste shipment records for a minimum of 3 years from the date of shipment or any longer period required by any applicable law or regulation or any other provision of this contract. The Contractor shall be responsible for maintaining bill of ladings for a minimum of 375 days from the date of shipment or any longer period required by any applicable law or regulation or any other provision of this contract.
3.8 SPILL RESPONSE
The Contractor shall respond to any spills of hazardous material or hazardous waste which are in the custody or care of the Contractor, pursuant to this contract. Any direction from the Contracting Officer concerning a spill or release shall not be considered a change under the contract. The Contractor shall comply with all applicable requirements of Federal, state, or local laws or regulations regarding any spill incident.
Section J – Attachment 2N Page 13 of 14 8 Feb 2010
3.9 EMERGENCY CONTACTS
The Contractor shall be responsible for complying with the emergency contact provisions in 49 CFR 172, Section .604. Whenever the Contractor ships hazardous materials, the
Contractor shall provide a 24 hr emergency response contact and phone number of a person knowledgeable about the hazardous materials being shipped and who has comprehensive emergency response and incident mitigation information for that material, or has immediate access to a person who possesses such knowledge and information.
The phone must be monitored on a 24 hour basis at all times when the hazardous materials are in transportation, including during storage incidental to transportation. The
Contractor shall ensure that information regarding this emergency contact and phone number are placed on all hazardous material shipping documents. The Contractor shall designate an emergency coordinator and post the following information at areas in which hazardous wastes are managed:
a. The name of the emergency coordinator.
b. Phone number through which the emergency coordinator can be contacted on a 24 hour basis.
c. The telephone number of the local fire department.
d. The location of fire extinguishers and spill control materials.
Attachment A
SAMPLE OFF-SITE POLICY CERTIFICATION MEMO
Project/Contract #:__________________________________________________
Waste
Stream:______________________________________________________________
Primary TSD Facility, EPA ID # and Location: ______________________________
Alter. TSD Facility, EPA ID # and Location:________________________________
EPA Region Contact
I (617) 918-1752
II (212) 637-4130
III (214) 814-5267
IV (404) 562-8591
V (312) 353-8207
02 81 00
Section J – Attachment 2N Page 14 of 14 8 Feb 2010
VI (214) 665-2282
VII (913) 551-7154
VIII (303) 312-6419
IX (415) 972-3304
X (206) 553-2859
EPA representative contacted: _____________________________________________
EPA representative phone number: __________________________________________
Date contacted:
Comment:
The above EPA representative was contacted on __________. As of that date the above sites were considered acceptable in accordance with the Off-Site
Policy in 40 CFR 300.440.
Signature: _________________________________ Date:
Phone number:
--End of Section--
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .