FA3047-10-R-0012 Atch 2AC-Division 7
145 KB Posted
- Attached to
- Roofing Indefinite Delivery Indefinite Quantity (IDIQ) Federal contract opportunity
- Solicitation number
- FA3047-10-R-0012-ROOFING
About this file
FA3047-10-R-0012 Atch 2AC-Division 7 (Specs - 07 51 13) 8 Feb 10 Built-Up Asphalt Roofing
Text of this file
802 CONS/LGCA-3 FA3047-10-R-0012
Lackland AFB TX Roofing IDIQ
07 51 13
Section J – Attachment 2AC Page 1 of 25 8 Feb 2010
SECTION 07 51 13
BUILT-UP ASPHALT ROOFING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced.
The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI/SPRI RD-1(2004) Standard for Retrofit Roof Drains
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-05(2006; Errata 2007) Minimum Design Loads for Buildings and Other
Structures
ASTM INTERNATIONAL (ASTM)
ASTM C 1153(1997; R 2003e1) Standard Practice for Location of Wet Insulation in
Roofing Systems Using Infrared Imaging
ASTM C 208(2008a) Cellulosic Fiber Insulating Board
ASTM D 1863(2005) Mineral Aggregate Used on Built-Up Roofs
ASTM D 1864(1989; R 2002) Moisture in Mineral Aggregate Used on Built-Up Roofs
ASTM D 1970(2009) Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection
ASTM D 2170(2007) Kinematic Viscosity of Asphalts (Bitumens)
ASTM D 2178(2004) Asphalt Glass Felt Used in Roofing and Waterproofing
ASTM D 312(2000; R 2006) Standard Specification for Asphalt Used in Roofing
ASTM D 3617(2007) Sampling and Analysis of New Built-Up Roof Membranes
ASTM D 41(2005) Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing
07 51 13
Section J – Attachment 2AC Page 2 of 25 8 Feb 2010
ASTM D 4402(2006) Viscosity Determination of Asphalt at Elevated Temperatures
Using a Rotational Viscometer
ASTM D 448(2008) Sizes of Aggregate for Road and Bridge Construction
ASTM D 4586(2007) Asphalt Roof Cement, Asbestos-Free
ASTM D 4601(2004) Asphalt-Coated Glass Fiber Base Sheet Used in Roofing
ASTM D 4869(2005; R 2006) Asphalt-Saturated Organic Felt Underlayment Used in
Steep Slope Roofing
ASTM D 517(1998; R 2008) Asphalt Plank
ASTM D 6162(2000a; R 2008) Styrene Butadiene Styrene (SBS) Modified Bituminous
Sheet Materials Using a Combination of Polyester and Glass Fiber Reinforcements
ASTM D 6163(2000; R 2008) Styrene Butadiene Styrene (SBS) Modified Bituminous
Sheet Materials Using Glass Fiber Reinforcements
ASTM D 6164(2005e1) Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet
Materials Using Polyester Reinforcements
ASTM D 6757(2007) Standard Specification for Underlayment Felt Containing Inorganic
Fibers Used in Steep-Slope Roofing
ASTM E 108(2007a) Fire Tests of Roof Coverings
FM GLOBAL (FM)
FM 4470(1986; R 1992) Class I Roof Covers
FM DS 1-29(2009) Design Wind Loads
FM P7825c(2005) Approval Guide Building Materials
NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA)
NRCA 0405(2001; R 2003, 5th Ed) Roofing and Waterproofing Manual
UNDERWRITERS LABORATORIES (UL)
UL 790(2004; Rev thru Oct 2008) Test Methods for Fire Tests of Roof Coverings
UL RMSD(2009) Roofing Materials and Systems Directory
07 51 13
Section J – Attachment 2AC Page 3 of 25 8 Feb 2010
1.2 DESCRIPTION OF ROOF MEMBRANE SYSTEMS
Asphalt applied, four-ply felt, aggregate surfaced and three-ply felt with granule-surfaced modified bitumen cap sheet built-up roof membrane system.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data wind uplift calculations; G
Asphalt
Felts, including ply felt and base sheet as applicable; G
Granule Surface Modified Bitumen Cap Sheet; G
FLASHING MEMBRANE; G
Fasteners; G
Primer; G
Asphalt Roof Cement; G
Walkpad Materials; G
Cant Strips; G
Certificate attesting that the fiberboard furnished for the project contains a minimum of
85% recovered material.
Pre-Manufactured Accessories to be incorporated in the system installation; G
Roof Walkways
Sample warranties; G
Submit all data required by Section 07 22 00 ROOF AND DECK INSULATION with requirements of this section. Include in Data written acceptance by the roof membrane manufacturer of the products and accessories provided. List products in the applicable wind uplift and fire rating classification listings.
Section J – Attachment 2AC Page 4 of 25 8 Feb 2010
SD-06 Test Reports
Samples of Built-Up Roofing
Submit test results on roofing field samples as required, verifying composition of sample.
Submit six copies of laboratory analysis within 30 calendar days after samples are taken.
Submit reports in accordance with ASTM D 3617.
SD-07 Certificates bill of lading
Submit when labels of asphalt containers do not indicate the finished blowing temperature, flash point and equiviscous temperature.
Qualifications of Applicator
Submit evidence of the roofing system manufacturer's approval.
SD-08 Manufacturer's Instructions felts flashings modified bitumen cap sheet
Base Sheet attachment, including pattern and frequency of mechanical attachments required in field of roof, corners, and perimeters to provide for the calculated wind resistance.
Asphalt
Primer asphalt roof cement
Fasteners cold weather conditions installation
Include detailed application instructions and standard manufacturer drawings altered as required by these specifications. Explicitly identify in writing, differences between manufacturer's instructions and the specified requirements.
07 51 13
Section J – Attachment 2AC Page 5 of 25 8 Feb 2010
SD-11 Closeout Submittals
WARRANTY; G
INFORMATION CARD; G
1.4 QUALITY ASSURANCE
1.4.1 Qualifications of Applicator
The roofing system applicator must be approved, authorized, or licensed in writing by the roofing system manufacturer and must have a minimum of 3 years experience as an approved, authorized, or licensed applicator with the manufacturer and be approved at a level capable of providing the specified warranty.
1.4.2 Fire Resistance
Complete roof covering assembly must:
a. Be Class A rated in accordance with ASTM E 108 , FM 4470, or UL 790; and
b. Be listed as part of Fire-Classified roof deck construction in UL RMSD, or Class I roof deck construction in FM P7825c.
1.4.3 Wind Uplift Resistance
Rate complete roof covering assembly, including insulation, as Class 1 A with a wind uplift pressure rating in accordance with FM P7825c. Do not install non-rated systems.
Submit licensed engineer's wind uplift calculations and substantiating data. Base wind uplift measurements on a design wind speed of 90 mph in accordance with ASCE 7-05 and applicable building code requirements. Space fasteners to withstand uplift pressure for field, perimeter and corner zones as outlined in FM DS 1-29 revised 2009. Wind uplift calculator is available at: https://roofnav.fmglobal.com.
1.4.4 Preroofing Conference
After approval of submittals and before performing roofing and insulation system installation work, hold a preroofing conference to review the following:
a. Drawings and specifications and submittals related to the roof work;
b. Roof system components installation;
c. Procedure for the roof manufacturer's technical representative's onsite inspection and acceptance of the roofing substrate, the name of the manufacturer's technical
07 51 13
Section J – Attachment 2AC Page 6 of 25 8 Feb 2010 representatives, the frequency of the onsite visits, distribution of copies of the inspection reports from the manufacturer's technical representatives to roof manufacturer;
d. Contractor's plan for coordination of the work of the various trades involved in providing the roofing system and other components secured to the roofing; and
e. Quality control plan for the roof system installation;
f. Safety requirements.
Coordinate preroofing conference scheduling with the Contracting Officer. The conference must be attended by the Contractor, the Contracting Officer's designated personnel, and personnel directly responsible for the installation of roofing and insulation, flashing and sheet metal work, other trades interfacing with the roof work, and representative of the roofing materials manufacturer. Before beginning roofing work, provide a copy of meeting notes and action items to all attending parties. Note action items requiring resolution prior to start of roof work.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver materials in manufacturers' original unopened containers and rolls with manufacturer's labels intact and legible. Mark and remove wet or damaged materials from site. Where materials are covered by a referenced specification, container must bear specification number, type, and class, as applicable. Indicate on labels or bill of lading for roofing asphalt the asphalt type, finished blowing temperature (FBT), flash point
(FP), and equiviscous temperature (EVT), that is, the temperature at which the viscosity is either 125 centistokes when tested in accordance with ASTM D 2170 or 75 centipoise when tested in accordance with ASTM D 4402. Deliver materials in sufficient quantity to allow work to proceed without interruption.
1.5.2 Storage
Protect materials against moisture absorption, contamination, or other damage. Avoid crushing or crinkling of roll materials. Store roll materials on end on clean raised platforms in dry locations in enclosed buildings or trailers with adequate ventilation. Do not store roll materials in buildings under construction until concrete, mortar, and plaster work are finished and dry. Do not store materials outdoors unless approved by the
Contracting Officer. Completely cover felts stored outdoors, on and off roof, with waterproof canvas protective covering. Do not use polyethylene sheet as a covering. Tie covering securely to pallets to make completely weatherproof and yet provide sufficient ventilation to prevent condensation. Maintain roll materials at temperature above 50 degrees F for a 24-hour period immediately prior to application. Keep aggregate dry as defined by ASTM D 1863. Place only those materials to be used during one day's work on the roof at one time. Remove unused materials from the roof at the end of each day's
07 51 13
Section J – Attachment 2AC Page 7 of 25 8 Feb 2010 work. Immediately remove wet, contaminated or otherwise damaged or unsuitable materials from the site. Damaged materials may be marked by the Contracting Officer.
1.5.3 Handling
Prevent damage to edges and ends of roll materials. Do not install damaged materials in the work. Select and operate material handling equipment so as not to damage materials or applied roofing.
1.6 ENVIRONMENTAL CONDITIONS
Do not install roofing during precipitation, or fog, or when air temperature is below 40 degrees F, or when there is ice, frost, moisture or visible dampness on roof deck.
1.7 SEQUENCING
Coordinate the work with other trades to ensure that components which are to be secured to or stripped into the roofing system are available and that permanent flashing and counterflashing are installed as the work progresses. Ensure temporary protection measures are in place to preclude moisture intrusion or damage to installed materials.
Application of roofing must immediately follow application of insulation as a continuous operation. Coordinate roofing operations with insulation work so that all roof insulation applied each day is covered with complete felt ply installation the same day.
1.8 WARRANTY
Provide roof system material and workmanship warranties meeting specified requirements. Provide revision or amendment to standard membrane manufacturer warranty to comply with the specified requirements.
1.8.1 Roof Membrane Manufacturer Warranty
Furnish the roof membrane manufacturer's 20-year no dollar limit roof system materials and installation workmanship warranty, including flashing, insulation, and accessories necessary for a watertight roof system construction. Write the warranty directly to the
Government commencing at the time of Government's acceptance of the roof work.
Provide the following statement for such warranty:
a. If within the warranty period the roof system, as installed for its intended use in the normal climatic and environmental conditions of the facility, becomes non-watertight, shows evidence of moisture intrusion within the assembly, blisters, splits, tears, delaminates, separates at the seams, or shows evidence of excessive weathering due to defective materials or installation workmanship, the repair or replacement of the defective and damaged materials of the roof system assembly and correction of defective workmanship are the responsibility of the roof membrane manufacturer. All costs
07 51 13
Section J – Attachment 2AC Page 8 of 25 8 Feb 2010 associated with the repair or replacement work are the responsibility of the roof membrane manufacturer.
b.The warranty must remain in full force and effect, including emergency temporary repairs performed by others, when the manufacturer or his approved applicator fail to perform the repairs within 72 hours of notification.
1.8.2 Roofing System Installer Warranty
The roof system installer must warrant for a minimum period of two years that the roof system, as installed, is free from defects in installation workmanship, to include the roof membrane, flashing, insulation, accessories, attachments, and sheet metal installation integral to a complete watertight roof system assembly. Write the warranty directly to the Government. The roof system installer is responsible for correction of defective workmanship and replacement of damaged or affected materials. The roof system installer is responsible for all costs associated with the repair or replacement work.
1.8.3 Continuance of Warranty
Repair or replacement work that becomes necessary within the warranty period must be accomplished in a manner so as to restore and maintain the integrity of the roof system assembly and validity of the roof membrane manufacturer warranty for the remainder of the manufacturer warranty period.
1.9 CONFORMANCE AND COMPATIBILITY
The entire roofing and flashing system must be in accordance with specified and indicated requirements, including fire and wind resistance requirements. Work not specifically addressed and any deviation from specified requirements must be in general accordance with recommendations of the NRCA 0405, membrane manufacturer published recommendations and details, and compatible with surrounding components and construction. Submit any deviation from specified or indicated requirements to the
Contracting Officer for approval prior to installation.
PART 2 PRODUCTS
2.1 GENERAL
Furnish a combination of specified materials that comprise the membrane manufacturer's standard system of the number and type of plies specified. Materials provided must be approved by the roof membrane manufacturer and suitable for the service and climatic conditions of the installation.
2.2 FIBERGLASS FELT MATERIALS
07 51 13
Section J – Attachment 2AC Page 9 of 25 8 Feb 2010
a. Fiberglass Felt Base Sheet: ASTM D 4601, Type II, with perforations and as approved by the roof membrane manufacturer.
b. Ply Felt: ASTM D 2178, Type VI.
2.3 BASE FLASHING MEMBRANE
ASTM D 6163. Membrane manufacturer's standard, minimum two-ply modified bitumen membrane flashing system compatible with the built-up roof membrane and as recommended in membrane manufacturer's published literature. Provide a minimum base ply of flashing membrane of 70 mils thick. Provide a minimum granule surface modified bitumen flashing cap sheet of 120 mils thick on the selvage edge.
2.4 ASPHALT
ASTM D 312, Type III where slope is less than 1/2 inch per foot and Type IV where slope is 1/2 per foot or greater, in accordance with membrane manufacturer requirements.
2.5 SURFACING MATERIAL
2.5.1 Aggregate for Surfacing Built-up Roofing
Water-worn gravel or crushed stone, conforming to ASTM D 1863. Aggregate conforming to gradation sizes No. 6, No. 7, and No. 67 in conformance with ASTM D
448 is acceptable provided other requirements of ASTM D 1863 are met. Provide 2 percent maximum moisture content as determined by ASTM D 1864. Provide light colored and opaque aggregate. Limestone, volcanic rock, crushed shells, and cinders are prohibited.
2.5.2 Granule Surface Modified Bitumen Cap Sheet
ASTM D 6163 or ASTM D 6162; Type II, Grade G, minimum 120 mils thick at selvage edge, and as required to provide specified fire safety rating. Provide ASTM D 6164 for high traffic roofs only.
2.6 PRIMER
ASTM D 41 for asphalt roofing systems and as approved by the membrane manufacturer.
2.7 ASPHALT ROOF CEMENT
ASTM D 4586 for use with asphalt roofing systems, Type II for vertical surfaces and built-up bituminous flashings; Type I for horizontal surfaces and as recommended by the membrane manufacturer.
2.8 CANT STRIPS
Section J – Attachment 2AC Page 10 of 25 8 Feb 2010
Standard cant strips must be of woodfiber conforming to ASTM C 208 treated with bituminous impregnation, sizing, or waxing and fabricated to provide maximum 45 degree change in direction of membrane. Provide minimum 1-1/2 inch thick cant strips and provide for minimum 5 inch face and 3-1/2 inch vertical height when installed at 45 degree face angle, except where clearance restricts height to lesser dimension. Provide kiln-dried preservative-treated wood cants, conforming to ASTM C 208, treated with bituminous impregnation, sizing or waxing and in compliance with requirements of
Section 06 10 00 ROUGH CARPENTRY, at base of wood nailers set on edge and wood curbing where indicated.
2.9 UNSATURATED FELT OR ROSIN-SIZED BUILDING PAPER
Provide rosin-sized sheathing paper weighing minimum 5 pounds per 100 square feet or unsaturated felt weighing approximately 7-1/2 pounds per 100 square feet.
2.10 FASTENERS AND PLATES
Coated, corrosion resistant fasteners compatible with components being attached and contact surfaces. Conform to FM 4470 for fasteners for attachment to deck substrate of
Class I roof deck construction and FM P7825cfor the wind resistance as described in paragraph f1.4.3 Wind Uplift Resistance. Use hard copper fasteners in contact with copper; aluminum or stainless steel fasteners in contact with aluminum; and stainless steel fasteners in contact with stainless steel. For fastening only roofing felts, use fasteners driven through metal discs, or one-piece composite fasteners with heads not less than 1 inch in diameter or 1 inch square with rounded or 45-degree tapered corners.
2.10.1 Wood Substrates and Nailers
Provide 11 gauge annular threaded shank nails with 7/16 to 5/8 inch diameter heads; or one-piece composite nails with annular threaded shanks not less than 11 gauge for securing felts and metal items. Provide fasteners long enough to penetrate minimum 1 inch into or minimum 1/4 inch through wood substrate materials. Do not penetrate wood decking exposed to view on the underside.
2.10.2 Masonry or Concrete Walls and Vertical Surfaces
Provide hardened steel nails or screws with flat heads, diamond shaped points, and mechanically deformed shanks not less than 1 inch long for securing felts, metal items, and accessories. Use power-driven fasteners only when approved in writing by
Contracting Officer.
2.10.3 Metal Plates
07 51 13
Section J – Attachment 2AC Page 11 of 25 8 Feb 2010
Flat corrosion-resistant round stress plates as recommended by the modified bitumen sheet manufacturer's printed instructions and meeting the requirements of FM 4470;
minimum 2 inch in diameter. Form discs to prevent dishing or cupping.
2.11 PRE-MANUFACTURED ACCESSORIES
Pre-manufactured accessories must be manufacturer's standard for intended purpose, compatible with the membrane roof system and approved for use by the roof membrane manufacturer.
2.11.1 Pre-fabricated Curbs
Provide G90 galvanized curbs with minimum 4 inch flange for attachment to roof nailers.
Provide minimum height of 10 inch) above the finished roof membrane surface.
2.11.2 Elevated Metal Walkways and Platforms
As specified in Section 05 50 13 MISCELLANEOUS METAL FABRICATIONS.
2.12 WALKPADS
Provide polyester reinforced roof walkpads, granule-surfaced modified bitumen membrane material, ASTM D 6162 or ASTM D 6164, minimum 1/4 inch thick, compatible with the roof membrane and as recommended by the roof membrane manufacturer. Do not exceed 4 feet in length for each panel. Other walkpad materials require approval of the Contracting Officer prior to installation.
2.12.1 ROOF WALKWAYS
Provide 36 by 72 inch by 1/2 inch thick asphalt planks, consisting of a homogeneous core of asphalt, plasticizers, and fillers bonded between two saturated and coated facing sheets. Top side must be surfaced with ceramic granules. Conform to ASTM D 517, mineral-surfaced asphalt.
2.13 PAVER BLOCKS
Precast concrete, minimum 1-1/2 inch thick, minimum 18 inch square for walkways and minimum 150 mm by 6-inch by 12-inch for use in supporting surface bearing components but extending not less than 2 inch beyond all sides of surface bearing bases.
Install walkpad material under all paver blocks. Provide paver blocks on aggregate surface roofs.
2.14 ROOF INSULATION BELOW MODIFIED BITUMEN MEMBRANE SYSTEM
Insulation must be compatible with the roof membrane, approved by the membrane manufacturer and as specified in Section 07 22 00 ROOF AND DECK INSULATION.
Section J – Attachment 2AC Page 12 of 25 8 Feb 2010
2.15 MEMBRANE LINER
Self-adhering modified bitumen underlayment conforming to ASTM D 1970, EPDM membrane liner conforming to ASTM D 4637, or other waterproof membrane liner material conforming to ASTM D 4869, or ASTM D 6757, and as approved by the
Contracting Officer.
PART 3 EXECUTION
3.1 VERIFICATION OF CONDITIONS
Before applying roofing materials, ensure that the following exist:
a. Drains, curbs, cants, control joints, expansion joints, perimeter walls, roof penetrating components and equipment supports are in place.
b. Surfaces are rigid, clean, dry, smooth, and free of cracks, holes, and sharp changes in elevation. Joints in substrate are sealed to prevent drippage of bitumen into building or down exterior walls. Inspect surfaces and approve immediately before application of roofing and flashings. Apply the roofing and flashings to a smooth and firm surface free from ice, frost, visible moisture, dirt, projections and foreign materials.
c. The plane of the substrate does not vary more than 1/4 inch within an area 10 by 10 feet when checked with a 10 foot straight edge placed anywhere on the substrate.
d. Substrate is sloped as indicated to provide drainage.
e. Walls and vertical surfaces are constructed to receive counterflashing and will permit mechanical fastening of the base flashing materials.
f. Treated wood nailers are in place on non-nailable surfaces, to permit nailing of base flashing at minimum height of 8 inch above finished roofing surface.
g. Treated wood nailers are fastened in place at eaves, gable ends, openings, and intersections with vertical surfaces for securing of felts, edging strips, attachment flanges of sheet metal, and roof fixtures. Surface-applied nailers are same thickness as roof insulation.
h. Cants are securely fastened in place in the angles formed by walls and other vertical surfaces. The angle of the cant is approximately 45 degrees and the height of the vertical leg is not less than nominal 3-1/2 inch. Lay cants in a solid asphalt mopping or coat of asphalt cement just prior to laying the roofing plies.
j. Exposed nail heads in wood substrates are properly set. Warped and split boards or sheets have been replaced. There are no cracks or end joints 1/4 inch in width or greater.
07 51 13
Section J – Attachment 2AC Page 13 of 25 8 Feb 2010
Knot holes are covered with sheet metal and nailed in place. Wood and plywood decks are covered with rosin paper or unsaturated felt prior to base sheet or roof membrane application. Joints in plywood substrates are taped with 2 inch wide masking tape to prevent air leakage from the underside.
k. Insulation boards are installed smoothly and evenly, and are not broken, cracked, or curled. There are no gaps in insulation board joints exceeding 1/4 inch in width.
Insulation is being roofed over on the same day the insulation is installed.
l. Cast-in-place concrete substrates have been allowed to cure and the surface dryness requirements specified under paragraph entitled "Field Quality Control" have been met.
m. Joints between precast concrete deck units, including weld plates, are grouted, leveled, and covered with 4 inch wide ply felt or other bituminous stripping membrane set in bituminous cement prior to applying other roofing materials over the area. Prior to application of primer on precast concrete decks, cover joints with a minimum 4 inch strip of felt or bituminous stripping membrane set in bituminous cement.
3.2 PREPARATION
Verify that work of other trades that penetrates the roof deck or requires men and equipment to traverse the roof deck is complete.
Examine deck surfaces for inadequate anchorage, foreign material, moisture, and unevenness which would prevent the execution and quality of application.
Proceed with the roofing application only after defects have been corrected.
Starting work designates acceptance of the surfaces by the Contractor.
3.2.1 Protection of Property
3.2.1.1 Protective Coverings
Install protective coverings at paving and building walls adjacent to hoists and kettles prior to starting the work. Lap protective coverings not less than six inch, secure against wind, and vent to prevent collection of moisture on covered surfaces. Keep protective coverings in place for the duration of the roofing work.
3.2.1.2 Bitumen Stops
Provide felt bitumen stops or other means to prevent bitumen drippage at roof edges, openings, and vertical projections before hot mopped application of the roofing membrane. Form felt bitumen stops with two 12 inch wide strips of organic ply felt.
Laminate with and set strips into a coating of asphalt roof cement with one-half of the width overhanging the edge of the roof or opening. Where nailers are provided, nail the
07 51 13
Section J – Attachment 2AC Page 14 of 25 8 Feb 2010 strips with roofing nails spaced 12 inch on center in addition to embedding in asphalt roof cement. Protect the free portion of each strip from damage throughout the roofing period.
After the plies of felt are in place, fold free portion of the strips back over the roofing membrane and embed in a continuous coating of asphalt roof cement. Secure with roofing nails spaced 3 inch on center.
3.2.2 Equipment
3.2.2.1 Mechanical Application Devices
Provide and maintain mechanical application devices with pneumatic tires that operate without damaging the insulation, roofing membrane, or structural components.
3.2.2.2 Flame-Heated Equipment
Do not place flame-heated equipment on roof. Provide and maintain a fire extinguisher adjacent to flame-heated equipment and on the roof. Contractor shall provide
Contracting Officer a drawing identifying the location of the kettle prior to commencement of any roof work. Roof work may proceed upon Government approval of contractor's kettle location drawing.
3.2.2.3 Open Flame Application Equipment
Use only open flame equipment recommended by the roofing materials manufacturer.
Do not ignite open flame equipment when left unattended. Provide and maintain a fire extinguisher adjacent to open flame equipment on the roof.
3.2.3 Priming of Surfaces
Prime all surfaces to be in contact with adhered membrane materials. Apply primer at the rate of 3 liters per 0.75 gallon per 100 sq. ft.or as recommended by roof membrane manufacturer's printed instructions to promote adhesion of membrane materials. Allow primer to dry prior to application of membrane materials to primed surface. Avoid flammable primer material conditions in torch applied membrane base flashing applications.
3.2.3.1 Priming of Concrete and Masonry Surfaces
After surface dryness requirements have been met, coat concrete and masonry surfaces which are to receive roofing and base flashing uniformly with primer. Allow primer to dry before application of roofing and flashing materials.
3.2.3.2 Priming of Metal Surfaces
Prime flanges of metal components to be embedded into the roofing system prior to setting in bituminous materials or stripping into roofing system.
Section J – Attachment 2AC Page 15 of 25 8 Feb 2010
3.2.4 Covering of Wood Substrate
Cover wood substrate with a layer of unsaturated felt or rosin-sized building paper lapped
2 inch at sides and 4 inch at ends. Nail to hold in place prior to application of roofing system.
3.2.5 Heating of Asphalt
Break up solid asphalt on a surface free of dirt and debris. Heat asphalt in kettle designed to prevent contact of flame with surfaces in contact with the asphalt. Provide visible working thermometer and thermostatic controls set to the temperature limits. Keep controls in working order and calibrated. Use immersion thermometer, accurate within a tolerance of plus or minus 2 degrees F, to check temperatures of the asphalt frequently.
When temperatures exceed maximum specified, remove asphalt from the site. Do not permit cutting back, adulterating, or fluxing of asphalt.
3.2.5.1 Temperature Limitations for Asphalt
Heat and apply asphalt at the temperatures specified below unless specified otherwise by manufacturer's printed application instructions. Use thermometer to check temperature during heating and application. Have kettle attended constantly during heating process to ensure specified temperatures are maintained. Do not heat asphalt above its finished blowing temperature (FBT). Do not heat asphalt between 500 and 525 degrees F for longer than four consecutive hours. Do not heat asphalt to the flash point (FP). Apply asphalt and embed membrane sheets when temperature of asphalt is within plus or minus
25 degrees F of the equiviscous temperature (EVT). Before heating and application of asphalt refer to the asphalt manufacturer's label or bill of lading for FP, FBT, and EVT of the asphalt used.
3.3 APPLICATION
Apply roofing materials as specified unless approved otherwise by the Contracting
Officer. Keep roofing materials dry before and during application. Except for aggregate surfacing, complete application of roofing in a continuous operation. Begin and apply only as much roofing in one day as can be completed that same day. Maintain specified temperature for asphalt. Provide temporary roofing and flashing as specified herein prior to application of permanent roofing system. Do not apply aggregate surfacing until the other roofing application procedures specified herein are completed.
3.3.1 Phased Membrane Construction
Phased application of membrane plies is prohibited. Any delay in modified bitumen cap sheet installation will result in thorough cleaning of the applied membrane material surface and drying immediately prior to cap sheet installation. Priming of the applied
07 51 13
Section J – Attachment 2AC Page 16 of 25 8 Feb 2010 membrane surface may be required at the discretion of the Contracting Officer prior to cap sheet installation.
3.3.2 Temporary Roofing and Flashing
Provide watertight temporary roofing and flashing where considerable work by other trades, such as installing cooling towers, antennas, pipes, ducts, is to be performed on the roof or where construction scheduling or weather conditions require protection of building interior before permanent roofing system can be installed. Do not install temporary roofing over permanently installed insulation. Provide rigid pads for traffic over temporary roofing.
3.3.2.1 Removal
Completely remove temporary roofing and flashing before continuing with application of permanent roofing system.
3.3.3 Base Sheet Application - General
Fully adhere base sheets in accordance with membrane manufacturer's printed instructions. Roll and broom in the base sheet to ensure full contract with the hot asphalt application. On uninsulated, nailable substrates, mechanically fasten base sheet in conformance with specified wind resistance requirements and membrane manufacturer's printed instructions, and to include increased fastening frequency in corner and perimeter areas as described in 1.4.3 Wind Uplift Resistance. Drive fasteners flush with no dishing or cupping of fastener plate. Where applicable, base sheet may be mechanically fastened in conjunction with insulation to the substrate, in accordance with membrane manufacturers printed instructions. Apply sheets in a continuous operation. Apply sheets with side laps at a minimum of 2 inch unless greater side lap is recommended by the manufacturer's standard written application instructions. Provide end laps of not less than
6 inch and staggered a minimum of 36 inch. Apply sheets at right angles to the roof slope so that the direction of water flow is over and not against the laps. Where nailers have been applied at right angles to roof slope or slope is 1:12 or greater, apply ply felts parallel to the roof slope or so that plies of sheets extend from eave line on one side of the barrel-type roof and 18 inch over the center line of the crown of the roof. Apply sheets on the other side in the same manner, resulting in twice the normal amount of roofing sheets and asphalt at the crown. Extend base sheets approximately 2 inch above the top of cant strips at vertical surfaces and to the top of cant strips elsewhere. Trim base sheet to a neat fit around vent pipes, roof drains, and other projections through the roof.
Retrofit roof drains must conform to ANSI/SPRI RD-1. Application must be free of ridges, wrinkles, and buckles.
3.3.4 Ply Felts
Ensure proper alignment of felts prior to installation. Apply ply felts shingle fashion perpendicular to slope of roof, including application on areas of tapered insulation that
07 51 13
Section J – Attachment 2AC Page 17 of 25 8 Feb 2010 change slope direction. Where nailers are at right angles to roof slope and on decks sloped 1:6 or greater, apply ply felts parallel to slope of roof, or so that plies of felt extend from eave line on one side of barrel-type roof and 18 inch over center line of the crown of roof. Apply felts on other side in same manner, resulting in twice normal amount of roofing felts and asphalt at crown. Bucking or backwater laps are prohibited.
Apply felts in a continuous operation. Provide starter sheets of felt to maintain the specified number of plies throughout the roofing. Apply felts with side laps in accordance with the material manufacturer's printed instructions for the number of plies to be installed and in uniform alignment. Lap ends not less than 6 inch and stagger 36 inch minimum. Place the full width of each ply in hot bitumen immediately behind the bitumen applicator. Plies must be laid free of wrinkles, creases, ridges, or fishmouths.
Extend felts approximately 2 inch above top of cant strips at vertical surfaces and to top of cant strips elsewhere. Trim felts to a neat fit around vent pipes, roof drains, and other projections. Avoid traffic on mopped surfaces when the bitumen is fluid and for a minimum of one hour after ply application.
3.3.4.1 Hot-Mopping of Ply Felts
Bond plies to each other and to the base sheets with hot asphalt. Apply felts immediately following application of asphalt. Do not work ahead with asphalt. At the instant felts come into contact with asphalt, asphalt must be completely fluid, with asphalt temperatures within specified EVT range. Apply asphalt uniformly in a full, continuous mopping and firmly bonding film. Apply asphalt at the rate of approximately 25 pounds per 100 square feet plus or minus 25 percent. Require application rate on the high end of the application range when mopping directly to absorptive insulation substrates of perlite and woodfiber. As felts are rolled into the hot asphalt, immediately squeegee, roll or broom down to eliminate trapped air and to provide tight, smooth laminations without wrinkles, buckles, kinks, or fish mouths. Bitumen must be visible beyond all edges of each ply as it is being installed. Individual ply installation and the completed roof membrane system must be free of air pockets, felt delaminations, ridges, creases, fishmouths, dry laps, or blisters. Do not lay felts dry or turn back laps for mopping between plies.
3.3.4.2 Backnailing of Ply Felts
Unless otherwise recommended by the roof membrane manufacturer and approved by the
Contracting Officer, provide minimum 3-1/2 inch wide nailing strips matching insulation thickness and applied perpendicular to roof slope for backnailing of roof membrane.
Space nailing strips as recommended by the membrane manufacturer, but not exceeding
16 feet on center unless approved otherwise by the Contracting Officer. Coordinate the nailer installation with insulation requirements. As the felt plies are installed, nail each ply 1 inch from the leading edge at each nailer line. Provide maximum backnail spacing of 12 inches on center for roofs with slope of 1:12 or greater. Provide fasteners with a 1 inch diameter metal cap or fasten through 1 inch diameter caps. Set fasteners firm and flush without puncturing felt ply. Conceal fasteners with succeeding plies of felt.
07 51 13
Section J – Attachment 2AC Page 18 of 25 8 Feb 2010
3.3.4.3 Valleys and Ridges
Valleys: Apply roofing at valleys and waterways in the following manner:
Continue base sheets across valleys and terminate 18 inches from the valley.
Continue felt plies across valleys and terminate 12 inch from the valley. Terminate exposed laps on a line 12 inch from, and parallel to, the gutter valley. Provide two plies of felt, 9 inch wide bottom ply, and 12 inch wide top ply, successively mop in over each felt line of the termination.
If the application can be completed without wrinkles, buckles, or fishmouths and if side laps do not face the direction of drainage, roofing felts and base sheets may be laid continuously across or parallel to shallow valleys such as those formed by reverse-slope roofs. For this application, reinforce valleys with one ply of felt, wide, center on the valley gutter and lay in a solid mopping of asphalt over the top ply of roofing.
3.3.5 Membrane Flashing
Provide two plies of modified bitumen membrane strip flashing and sheet flashing in the angles formed where the roof deck abuts walls, curbs, ventilators, pipes, and other vertical surfaces, and where necessary to make the work watertight. Top ply of flashing must be granule-surfaced modified bitumen membrane. Install flashing after plies of roof membrane felt have been applied but before aggregate surfacing is applied. Cut at a 45 degree angle across terminating end lap area of cap membrane prior to applying adjacent overlapping cap membrane. Press flashing into place to ensure full adhesion and avoid bridging. Ensure full lap seal in all lap areas. Mechanically fasten top edge of base flashing 6 inch on center through minimum 1 inch diameter tin caps with fasteners of sufficient length to embed minimum one inch into attachment substrate. Apply matching granules in any areas of asphalt bleed out while the asphalt is still hot. Apply membrane liner over top of exposed nailers and blocking and to overlap top edge of base flashing installation at curbs, parapet walls, expansion joints and as otherwise indicated to serve as waterproof lining under sheet metal flashing components. Metal flashing is specified under Section 07 60 00 FLASHING AND SHEET METAL.
3.3.5.1 Strip Flashing
Set primed flanges of sheet metal flashings to be incorporated into roofing system in a uniform coating of asphalt roof cement not less than 1/16 inch thick applied over the ply felts. Strip-in with one layer of smooth surface modified bitumen membrane and cap with granule-surfaced modified bitumen membrane. Set strip flashing in hot asphalt or cement to the tops of the flanges, roofing membrane, and to each other. Use coatings of asphalt roof cement not less than 1/16 inch thick for ply felt. Use hot asphalt or modified bitumen cement for modified bitumen sheets. Extend first stripping ply not less than 4 inch beyond outer edge of flange onto roof membrane. Extend each additional ply 4 inch beyond the edge of the previous ply.
Section J – Attachment 2AC Page 19 of 25 8 Feb 2010
3.3.5.2 Membrane Flashing at Roof Drain
Flashings for roof drains are specified in Section 07 60 00 FLASHING AND SHEET
METAL. Extend roofing plies to edge of drain bowl opening at roof drain deck flange.
Neatly fit and press primed roof drain flashing into heavy coat of asphalt roof cement applied to top of roofing plies. Strip in and completely cover flashing with two layers of modified bitumen sheet, extending the first sheet 6 inch on the roofing beyond the edge of flashing. Extend the cap sheet 6 inch beyond the previous flashing ply. Bond the two layers to the metal flashing and to each other with hot asphalt. Securely clamp membrane, metal flashing, and strip flashing in the flashing clamping ring. Secure clamps so that strip flashing and metal flashing are free from wrinkles and folds. Trim membrane, flashing, and stripping flush with inside of clamping ring.
3.3.5.3 Pre-fabricated Curbs
Anchor prefabricated curbs securely to nailer or other base substrate as indicated and flash with modified bitumen flashing membrane.
3.3.5.4 Set-On Accessories
Where pipe or conduit blocking, supports and similar roof accessories are set on the membrane, adhere walkpad material to bottom of accessories prior to setting on roofing membrane. Specific method of installing set-on accessories must permit normal movement due to expansion, contraction, vibration, and similar occurrences without damaging roofing membrane. Do not mechanically secure set-on accessories through roofing membrane into roof deck substrate.
3.3.5.5 Lightning Protection
Flash or attach lightning protection system components to the roof membrane in a manner acceptable to the roof membrane manufacturer.
Installation
The installation shall be accomplished by an experienced installation company that is UL listed, a member of the Lightning Protection Institute and an employer of Certified
Master Installers of lightning protection systems. A Certified Master Installer shall directly supervise the work. All equipment shall be reinstalled in a neat, workmanlike manner. The contractor will be responsible for sealing and flashing all lightning protection roof penetrations as per the roof manufacturer's recommendations.
3.3.6 Roof Walkpads
Install walkpads at roof access points and where otherwise indicated for traffic areas and for access to mechanical equipment, in accordance with the modified bitumen sheet
07 51 13
Section J – Attachment 2AC Page 20 of 25 8 Feb 2010 roofing manufacturer's printed instructions. Provide minimum 6 inch separation between adjacent walkpads to accommodate drainage. Provide walkpad under precast concrete paver blocks to protect the roofing.
3.3.7 Elevated Metal Walkways and Platforms
install over completed roof system in accordance with Section 05 50 13
MISCELLANEOUS METAL FABRICATIONS. Provide protection mat of walkpad material, or other material approved by the Contracting Officer, at all surface bearing support locations.
3.3.8 Paver Blocks
Install paver blocks where indicated and as necessary to support surface bearing items traversing the roof area. Set paver block on a layer of walkpad applied over the completed roof membrane.
3.3.9 Aggregate Surfacing
After completion of roof membrane ply and flashing installation, and correction of tears, gouges or other deficiencies in the installed work, apply aggregate surfacing. Uniformly flood coat the surface with hot asphalt at a rate of approximate 2.9 kg 60 pounds per square. While asphalt is still hot, apply gravel aggregate surfacing material at a rate of
400 pounds per square or 300 pounds per square for slag or other approved aggregate surfacing. Provide for full and uniform coverage of the roof surface. Approximately 50 percent of the aggregate must be solidly adhered in the asphalt.
3.3.10 Granule-Surfaced Modified Bitumen Cap Sheet
Inspect underlying applied membrane and repair free of damage, holes, puncture, gouges, abrasions, and any other defects, and free of moisture, loose materials, debris, sediments, dust, and any other conditions required by the membrane manufacturer prior to cap sheet installation. Provide cleaning and artificial drying with heated blowers or torches to ensure clean, dry surface prior to cap sheet application. When delays in cap sheet installation may have occurred, do not apply cap sheet if underlying materials have been exposed to rain or frozen precipitation within the previous 24 hours. Unroll cap sheet membrane and allow to relax a minimum of 1 hour prior to installation and as otherwise recommended by the membrane manufacturer. Apply cap sheet in same direction as the underlying felt plies. Align cap membrane and apply with minimum 3 inch side laps and minimum 6 inch end laps and as otherwise required by membrane manufacturer. Set cap sheet in hot asphalt. Cap sheet may be torch applied with approval of the Contracting
Officer and written approval of the felt membrane manufacturer, and as recommended by the modified bitumen membrane manufacturer. Cut at a 45 degree angle across selvage edge of cap membrane to be overlapped in end lap areas prior to applying overlapping cap membrane. Apply matching granules in any areas of bitumen bleed out while the bitumen is still hot. Minimize traffic on newly installed cap sheet membrane.
Section J – Attachment 2AC Page 21 of 25 8 Feb 2010
3.3.10.1 Backnailing of Cap Sheet Membrane
Unless otherwise recommended by the roof membrane manufacturer and approved by the
Contracting Officer, install the modified bitumen cap sheet on roofs of slope 1:6 or greater, to provide for end laps at nailer locations. Nail the modified bitumen cap sheet at the end lap area across the width of the sheet. Nail within 1 inch of each edge of the sheet and at 8 to 8-1/2 inch on center across the width of the sheet in a staggered fashion.
Provide nails with a 1 inch diameter metal cap or nail through 1 inch diameter caps.
Cover nails by overlapping adjacent upslope sheet at the end lap area.
3.3.11 Correction of Deficiencies
Where any form of deficiency is found, take additional measures to determine the extent of the deficiency and corrective actions must be as directed by the Contracting Officer.
Where interply moppings are too light, apply additional two plies of felt in full moppings of asphalt. Apply with4 inch side and end laps. Where free water, skips, excessive voids, dry laps, desponding or any form of delamination are discovered between the plies, remove and rebuild affected area. Correction of inadequate number of plies, improper lap widths, or non-uniform or excessive asphalt mopping must be as directed by the
Contracting Officer. Where insulation is found to be wet, remove insulation and provide new built-up roofing and insulation.
3.3.12 Clean Up
Remove debris, scraps, containers and other rubbish and trash resulting from installation of the roofing system from job site each day.
3.4 PROTECTION OF APPLIED ROOFING
3.4.1 Protection Against Moisture Absorption
When precipitation is imminent and at the end of each day's work, protect applied roofing as follows:
3.4.2 Water Cutoffs
Straighten insulation line using loose-laid cut insulation sheets and seal the terminated edge of modified bitumen roofing system in an effective manner. Seal off flutes in metal decking along the cutoff edge. Remove the water cutoffs to expose the insulation when resuming work, and remove the insulation sheets used for fill-in.
3.4.3 Temporary Flashing for Permanent Roofing
07 51 13
Section J – Attachment 2AC Page 22 of 25 8 Feb 2010
Provide temporary flashing at drains, curbs, walls and other penetrations and terminations of roofing sheets until permanent flashings can be applied. Remove temporary flashing before applying permanent flashing.
3.4.4 Temporary Walkways, Runways, and Platforms
Do not permit storing, walking, wheeling, and trucking directly on applied roofing materials. Provide temporary walkways, runways, and platforms of smooth clean boards, mats or planks as necessary to avoid damage to applied roofing materials, and to distribute weight to conform to live load limits of roof construction. Use rubber-tired equipment for roofing work.
3.4.5 Glaze Coat
Use light glaze coating of bitumen to waterproof roof areas requiring extended time to complete. Glaze coating must be at the discretion of the Contracting Officer. Apply bitumen glaze coat on exposed felts at a rate of 5 to 10 pounds per square. Lower application rates, in accordance with membrane manufacturer's recommendations, may be required when modified bitumen cap sheet surfacing is specified. Provide valleys and low areas that may pond water with glaze coating.
3.5 FIELD QUALITY CONTROL
Perform field tests in the presence of the Contracting Officer. Notify the Contracting
Officer one day before performing tests.
3.5.1 Test for Surface Dryness
Before application of insulation or membrane materials and starting work on the area to be roofed, perform test for surface dryness in accordance with the following:
a. Foaming: When poured on the surface to which materials are to be applied, one pint of asphalt when heated in the range of 350 to 400 degrees F, must not foam upon contact.
b. Strippability: After asphalt used in the foaming test application has cooled to ambient temperatures, test coating for adherence. Should a portion of the sample be readily stripped clean from the surface, do not consider the surface to be dry and do not start application. Should rain occur during application, stop work and do not resume until surface has been tested by the method above and found dry.
3.5.2 Construction Monitoring
During progress of the roof work, Contractor is responsible for making visual inspections to ensure compliance with specified parameters. Additionally, verify the following:
07 51 13
Section J – Attachment 2AC Page 23 of 25 8 Feb 2010
a. Equipment is in working order. Metering devices are accurate.
b. Materials are not installed in adverse weather conditions.
c. Substrates are in acceptable condition, in compliance with specification, prior to application of subsequent materials.
Nailers and blocking are provided where and as needed.
Insulatio…
This is the start of the file's text. The full file is on GovTribe.
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .