802 CONS/LGCA-3 FA3047-10-R-0012
Lackland AFB TX Roofing IDIQ
Section J – Attachment 2A Page 1 of 3 8 Feb 2010
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 802nd TRAINING WING (AETC)
LACKLAND AIR FORCE BASE, TX 78236-5000
MISCELLANEOUS ROOF IDIQ
MPLS 09-1011D
TABLE OF CONTENTS
SECTION TITLE PAGES
DIVISION 0 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 30 00 – PROJECT INFORMATION ……………………..00 30 00-1 thru 00 30 00-11
DIVISION 1 - GENERAL REQUIREMENTS
01 22 00.00 10 – MEASUREMENT AND PAYMENT……...
……….……………………...…...01 22 00.00 10-1 thru 01 22 00.00 10-8
01 30 00 – SUBMITTAL DESCRIPTIONS……………... 01 30 00-1 thru 01 30 00-3
01 33 00 – SUBMITTAL PROCEDURES…………………... 01 33 00-1 thru 01 33 00-9
01 35 26 – GOVERNMENTAL SAFETY…………………
REQUIREMENTS…………………………..01 35 26-1 thru 01 35 26-17
01 42 00 – SOURCES FOR REFERENCE…………………..
PUBLICATIONS……………………………01 42 00-1 thru 01 42 00-14
01 45 01 – CONTRACTOR QUALITY CONTROL……....... 01 45 00-1 thru 01 45 00-8
01 50 00 – TEMPORARY CONSTURCTION FACILITIES……
AND CONTROLS…………………………..01 50 00-1 thru 01 50 00-11
01 57 20.00 10 – ENVIRONMENTAL PROTECTION……
……….……………………...….01 57 20.00 10-1 thru 01 57 20.00 10-16
01 70 00 – CONTRACT CLOSEOUT………………………. 01 70 00-1 thru 01 70 00-6
01 73 00 – EXECUTION……………………………………. 01 73 00-1 thru 01 73 00-5
DIVISION 2 - EXISTING CONDITIONS
02 41 00 – DEMOLITION…………………………………...02 41 00-1 thru 02 41 00-18
02 81 00 – TRANSPORTATION AND DISPOSAL OF…….
HAZARDOUS MATERIALS………………..02 81 00-1 thru 02 81 00-13
02 82 14.00 10 – ASBESTOS HAZARD CONTROL……….
ACTIVITIES…………………....02 82 14.00 10-1 thru 02 82 14.00 10-41
02 82 16.00 20 – ENGINEERING CONTROL OF ASBESTOS
CONTAINING MATERIALS….02 82 16.00 20-1 thru 02 82 16.00 20-21
02 83 13.00 20 – LEAD IN CONSTRUCTION..02 83 13.00 20-1 thru 02 83 13.00 20-14
02 84 33 – REMOVAL AND DISPOSAL OF POLYCHLORINATED
BIPHENYLS (PCBs)………………………...02 84 33-1 thru 02 84 33-10
Section J – Attachment 2A Page 2 of 3 8 Feb 2010
DIVISION 3 - CONCRETE - CIVIL/ARCH
(NOT USED)
DIVISION 4 - MASONRY - CIVIL/ARCH
DIVISION 5 - METALS - CIVIL/ARCH
05 30 00 – STEEL DECKS…………………………………..05 30 00-1 thru 05 30 00-13
05 50 13 – MISCELLANEOUS METAL FABRICATIONS..05 50 13-1 thru 05 50 13-10
05 51 33 – METAL LADDERS……………………………….05 51 33-1 thru 05 51 33-6
05 52 05 – METAL RAILINGS AND STAIRS……………..05 52 05-1 thru 05 52 05-10
DIVISION 6 - WOOD AND PLASTICS - SERVICE/ARCH
06 10 00 – ROUGH CARPENTRY………………………….06 10 00-1 thru 06 10 00-20
DIVISION 7 - THERMAL AND MOISTURE PROTECTION - ARCH
07 21 13 – BOARD AND BLOCK INSULATION…………..07 21 13-1 thru 07 21 13-8
07 22 00 – ROOF AND DECK INSULATION……………..07 22 00-1 thru 07 22 00-13
07 31 13 – ASPHALT SHINGLES…………………….......... 07 31 13-1 thru 07 31 13-8
07 32 14 – CLAY TILE ROOFING REPLACEMENT………
OR REPAIR……………………………….....07 32 14-1 thru 07 32 14-11
07 41 13 – METAL ROOF PANELS……………………......07 41 13-1 thru 07 41 13-29
07 51 13 – BUILT-UP ASPHALT ROOFING……………....07 51 13-1 thru 07 51 13-22
07 54 19 – POLYVINYL-CHLORIDE (PVC) ROOFING….07 54 19-1 thru 07 54 19-17
07 60 00 – FLASHING AND SHEET METAL………….... ..07 60 00-1 thru 07 60 00-18
07 61 15 – STANDING SEAM METAL…………………..
ROOFING SYSTEM………………………...07 61 15-1 thru 07 61 15-20
07 92 00 – JOINT SEALANTS……………………………….07 92 00-1 thru 07 92 00-7
DIVISION 8 – OPENINGS
08 62 00 – SKYLIGHTS…………………………………….. 08 62 00-1 thru 08 62 00-9
DIVISION 9 - FINISHES – ARCH
09 90 00 – PAINTS AND COATINGS………………………09 90 00-1 thru 09 90 00-46
DIVISION 10 – SPECIALTIES
Section J – Attachment 2A Page 3 of 3 8 Feb 2010
DIVISION 11 – EQUIPMENT
DIVISION 13 – SPECIAL CONSTRUCTION
DIVISION 26 – ELECTRICAL
26 41 01.00 10 – LIGHTNING PROTECTION ………………
SYSTEM…………………………26 41 01.00 10-1 thru 26 41 01.00 10-7
SCHEDULES
SUBMITTAL SCHEDULE………………………….SCHEDULE-1 thru SCHEDULE-6
-- End of Project Table of Contents --