802 CONS/LGCA-3 FA3047-10-R-0012
Lackland AFB TX Roofing IDIQ
07 31 13
Section J – Attachment 2Z Page 1 of 9 8 Feb 2010
SECTION 07 31 13
ASPHALT SHINGLES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced.
The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D 1970(2009) Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection
ASTM D 226(2006) Standard Specification for Asphalt-Saturated Organic Felt Used in
Roofing and Waterproofing
ASTM D 3462(2009) Asphalt Shingles Made From Glass Felt and Surfaced with Mineral
Granules
ASTM D 41(2005) Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing
ASTM D 4586(2007) Asphalt Roof Cement, Asbestos-Free
ASTM D 4869(2005; R 2006) Asphalt-Saturated Organic Felt Underlayment Used in
Steep Slope Roofing
ASTM D 6380(2003; R 2009) Standard Specification for Asphalt Roll Roofing (Organic
Felt)
NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA)
NRCA 0408(Fifth Edition) Steep-slope Roofing Manual
UNDERWRITERS LABORATORIES (UL)
UL 790(2004; Rev thru Oct 2008) Test Methods for Fire Tests of Roof Coverings
UL 997(1995; Rev Jul 1998) Wind Resistance of Prepared Roof Covering Materials
1.2 DEFINITIONS
07 31 13
Section J – Attachment 2Z Page 2 of 9 8 Feb 2010
1.2.1 Top Lap
That portion of shingle overlapping shingle in course below.
1.2.2 Head Lap
The triple coverage portion of top lap which is the shortest distance from the butt edge of an overlapping shingle to the upper edge of a shingle in the second course below.
1.2.3 Exposure
That portion of a shingle exposed to the weather after installation.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Shingles; G
Submit data including type, weight, class, UL labels, and special types of underlayment and eave flashing.
SD-04 Samples
Shingles; G
Full shingle sample and manufacturer's standard size samples of materials and products requiring color or finish selection.
Color charts; G
SD-08 Manufacturer's Instructions
Application
1.4 DELIVERY AND STORAGE
Deliver materials in the manufacturer's unopened bundles and containers bearing the manufacturer's brand name. Keep materials dry, completely covered, and protected from the weather. Store according to manufacturer's written instructions. Roll goods shall be stored on end in an upright position or in accordance with manufacturer's
07 31 13
Section J – Attachment 2Z Page 3 of 9 8 Feb 2010 recommendations. Immediately before laying, roofing felt shall be stored for 24 hours in an area maintained at a temperature not lower than 50 degrees F.
1.5 WARRANTIES
Warranties shall begin on the date of Government acceptance of the work.
1.5.1 Manufacturer's Warranty
Furnish the asphalt shingle manufacturer's standard 25 year warranty for the asphalt shingles. The warranty shall run directly to the Government.
1.5.2 Contractor's Warranty
The Contractor shall warrant for 5 years that the asphalt shingle roofing system, as installed, is free from defects in workmanship. When repairs due to defective workmanship are required during the Contractor's warranty period, the Contractor shall make such repairs within 72 hours of notification. When repairs are not performed within the specified time, emergency repairs performed by others will not void the warranty.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Shingles
Mineral granule-surfaced asphalt shingles, self-sealing, square tab, strip, fungus-resistant.
ASTM D 3462, architectural shingles weighing not less than 290 pounds per 100 square feet. Shingles shall meet the fire resistance requirements of UL 790 for Class A and the wind resistance requirements of UL 997. Color shall be as selected from the manufacturer's standard color charts. Shingle color shall be as indicated. Do not use high light reflectance colors where resultant glare would be objectionable to pilots.
2.1.2 Mineral-Surfaced Asphalt Roll Roofing
ASTM D 6380.
2.1.3 Smooth-Surfaced Asphalt Roll Roofing
ASTM D 6380, Type II.
2.1.4 Underlayment
07 31 13
Section J – Attachment 2Z Page 4 of 9 8 Feb 2010
Asphalt-saturated felt conforming to ASTM D 4869 or ASTM D 226, Type I, number 15, without perforations or other material specified by the shingle manufacturer for use as underlayment.
2.1.4.1 Leak Barrier Underlayment
Self-adhering leak barrier or ice dam underlayment shall comply with ASTM D 1970 for sealability around nails, minimum thickness of 40 mils.
2.1.5 Nails for Applying Shingles and Asphalt-Saturated Felt
Aluminum or hot-dipped galvanized steel or equivalent corrosion resistant with sharp points and flat heads 3/8 to 7/16 inch in diameter. Shank diameter of nails shall be a minimum of 0.105 inch and a maximum of 0.135 inch with garb or otherwise deformed for added pull-out resistance. Nails shall be long enough to penetrate completely through or extend a minimum of 3/4 inch into roof deck, whichever is less, when driven through materials to be fastened.
2.1.6 Asphalt Roof Cement
ASTM D 4586, Type II.
2.1.7 Asphalt Primer
ASTM D 41.
2.1.8 Ventilators
Ventilation is required with a total net free ventilating area of not less than 1 to 150 of the area of the space ventilated.
2.1.8.1 Nailable Plastic Shingle Over Type Ridge Vents
Ridge vents shall be constructed of UV stabilized nailable rigid polypropylene material, approximately 1 foot wide and 1 inch thick, and shall be in 4 foot long interlocking sections with self-aligning ends or corrugated polyethylene rigid roll or rigid strip ridge vent with aluminum wind deflectors on each side. Vents shall be designed to prevent infiltration of insects, rain, and snow.
2.1.8.2 Nailable Mesh Shingle Over Type Ridge Vents
Ridge vents shall be constructed of UV stabilized nailable polyester mesh material, approximately one foot wide. Vents shall be designed to prevent infiltration of insects, rain, and snow.
PART 3 EXECUTION
Section J – Attachment 2Z Page 5 of 9 8 Feb 2010
3.1 VERIFICATION OF CONDITIONS
Ensure that roof deck is smooth, clean, dry, and without loose knots. Roof surfaces shall be firm and free from loose boards, large cracks, and projecting ends that might damage the roofing. Vents and other projections through roofs shall be properly flashed and secured in position, and projecting nails shall be driven flush with the deck.
3.2 SURFACE PREPARATION
Cover knotholes and cracks with sheet metal nailed securely to sheathing. Flash and secure vents and other roof projections, and drive projecting nails firmly home.
3.3 APPLICATION
Apply roofing materials as specified herein unless specified or recommended otherwise by shingle manufacturer's written instructions or by NRCA 0408.
3.3.1 Underlayment
Provide for roof slopes 4 inches per foot and greater. Apply one layer of shingle underlayment to roof deck. Lay underlayment parallel to roof eaves, starting at eaves.
Provide minimum 2 inch head laps, 4 inch end laps, and 6 inch laps from both sides over hips and ridges. Nail sufficiently to hold until shingles are applied. Turn up vertical surfaces a minimum of 4 inches.
3.3.2 Drip Edges and Eave Flashing
Provide metal drip edges and eave flashing as specified in Section 07 60 00 FLASHING
AND SHEET METAL applied directly on the wood deck at eaves and over the underlayment at rakes. Extend back from edge of deck a minimum of 3 inches, and secure with nails spaced a maximum of 4 inches o.c. along inner edge.
3.3.3 Starter Strip
Apply starter strip at eaves, using 9 inch wide strip of mineral-surfaced roll roofing of a color to match shingles. Optionally, use a row of shingles with tabs removed and trimmed to ensure that joints are not exposed at shingle cutouts. Apply starter strip along eaves, overlaying and overhanging the metal drip edge at eaves and rake edges 1/4 inch to 3/8 inch; fasten in a line parallel to and 3 to 4 inches above eave edge. Cement starter strip/shingles to metal drip edges with asphalt roof cement. Place nails so top of nail is not exposed in cutouts of first course of shingles. When roll roofing is provided, seal tabs of first course of shingles with asphalt roof cement.
3.3.4 Shingle Courses
Section J – Attachment 2Z Page 6 of 9 8 Feb 2010
Start first course with full shingle, and apply succeeding courses with joints staggered at thirds or halves. Butt-end joints of shingles shall not align vertically more often than every fourth course. Apply shingle courses as follows:
a. Fastening: Do not drive fasteners into or above the factory-applied adhesive unless adhesive is located 5/8 inch or closer to top of cutouts. Place fasteners so they are concealed by shingle top lap and penetrate the head lap.
b. Where eave is less than 20 feet above grade: Shingles applied with nails: Nominal 5 inch exposure. Apply each shingle with minimum of four nails. Place one nail one inch from each end, and evenly space nails on a horizontal line a minimum of 5/8 inch above top of cutouts.
c. Where eave is greater than 20 feet above grade: Nailing: Apply shingles with nominal 5 inch exposure. Apply each shingle with minimum of six nails. Place one nail one inch from each end and one nail on each side of each cutout, on a horizontal line 5/8 inch above cutouts.
d. Where eave is greater than 20 feet above grade and/or roof slope is steeper than 21 inches per foot: Sealing: Seal each tab with continuous, 9 inch long, 1/4 inch diameter bead of asphalt roof cement, applied to the surface of course below. Place bead on horizontal line 5/8 inch above cutouts so bead will be one inch from bottom edge of tab to be sealed and so bead will not show through cutouts. After nailing each shingle, press tabs down to ensure spreading and bonding of asphalt roof cement.
3.3.5 Hips and Ridges
Form with 9 by 12 inch individual shingles or with 12 by 12 inch shingles cut from 12 by
36 inch strip shingles. Bend shingles lengthwise down center with equal exposure on each side of hip or ridge. Lap shingles to provide a maximum 5 inch exposure, and nail each side in unexposed area 5 1/2 inches from butt and one inch in from edge.
3.3.6 Valleys
Provide either closed cut or woven valleys. Open roll roofing or open sheet metal valleys may be substituted when approved by Contracting Officer.
3.3.6.1 Closed Cut Valleys
Provide 36 inch wide valley lining of leak barrier underlayment for full length of valley as follows:
a. Center lining in valley under underlayment. Provide continuous leak barrier without end laps. Fasten lining and underlayment per manufacturer's instructions to hold it in place until shingles are applied.
Section J – Attachment 2Z Page 7 of 9 8 Feb 2010
b. Apply first regular course of shingles along eaves of one of the intersecting roof planes and across valley. Extend course at least 12 inches onto adjoining roof.
c. Apply succeeding courses in same manner as first course, extending across valley and onto adjoining roof.
d. Press shingles tightly into valley and nail in normal manner, except apply nails not closer than 6 inches to valley centerline, and apply additional nail in top corner of each shingle crossing valley.
e. Apply shingles on the adjoining roof plane, starting along eaves and across valley onto previously applied shingles. Trim overlapping courses back to a line parallel to and a minimum of 2 inches back from valley centerline.
f. Trim one inch on a 45 degree angle from upper corner of each end shingle. Embed end shingles in a 3 inch wide band of asphalt roof cement.
3.3.6.2 Woven Valleys
Provide valley lining as specified for closed cut valley. Lay valley shingles over lining by either of the following methods:
a. Method I: Apply regular shingles on both roofs simultaneously. Weave each course in turn over the valley. Lay the first regular course of shingles along eaves of roof up to and over valley. Extend course along adjoining roof deck at least 12 inches. Carry first regular course of shingles of adjoining roof over valley on top of previously applied shingles. Lay succeeding courses alternately, weaving valley shingles over each other for full length of valley.
b. Method II: Apply regular shingles on each roof surface separately to a line about 3 feet from center of valley, and weave valley shingles in place later, as specified for
Method I.
In following either method, press shingles tightly into valley, and fasten in normal manner; except apply nails not closer than 6 inches to valley centerline, and apply additional nail in top corner of terminal shingle on both sides of valley.
3.3.6.3 Open Roll Roofing Valleys
Provide 18 inch wide strip of mineral-surfaced asphalt roll roofing, of a color to blend with asphalt shingles, and with granular surface facing down, for the full length of valley as follows:
a. Center roll roofing strip in valley over underlayment. Lay centered in valley over felt underlayment and with granular face down. Nail strip only enough to hold in place.
07 31 13
Section J – Attachment 2Z Page 8 of 9 8 Feb 2010
Apply nails in rows one inch from each edge. As fastening along second side proceeds, press strip firmly into valley.
b. Center second strip 36 inches wide in valley and lay it over first strip with granular face exposed and nail as specified for 18 inch strip.
c. Before applying roofing shingles, snap two chalk lines for full length of valley.
Locate each line 3 inches from centerline of valley at top, and increase width between lines by one inch for each 8 feet of valley length, continuing to eaves.
d. Apply a 2 inch band of asphalt roof cement along each edge of 36 inch strip from edge to chalk line. Cut regular shingle courses true along valley chalk lines, and nail in normal manner.
3.3.6.4 Open Sheet Metal Valleys
Sheet metal flashing for valleys is specified in Section 07 60 00 FLASHING AND
SHEET METAL. Before installing and fastening flashing in place with metal cleats:
a. Install single layer of 36 inch wide, asphalt-saturated felt, centered on valley and extending entire length of valley over felt underlayment.
b. Cut regular shingle courses on each roof on true line 2 inches from valley centerline at top of valley, and increase width between lines by one inch for each 8 feet of valley length, continuing to eaves.
c. Apply 2 inch band of asphalt roof cement over flashing, along and under side of shingles adjoining valley.
d. Press shingles tightly into cement, and nail in normal manner, except apply nails not closer than 5 inches to valley centerline. Do not drive nails through valley flashing.
e. Provide a 4 inch band of asphalt roof cement for fastening shingle tabs down along open metal gutters.
3.3.7 Flashing
3.3.7.1 Stepped Flashing
For sloping roofs which abut vertical surfaces, provide stepped metal flashing as specified in Section 07 60 00 FLASHING AND SHEET METAL.
3.3.7.2 Vent and Stack Flashing
Apply shingles up to point where vent or stack pipe projects through roof, and cut nearest shingle to fit around pipe. Before applying shingles beyond pipe, prepare flange of metal
07 31 13
Section J – Attachment 2Z Page 9 of 9 8 Feb 2010 pipe vent flashing as specified in Section 07 60 00 FLASHING AND SHEET METAL, by applying a 1/8 inch thick coating of asphalt roof cement on bottom side of flashing flange. Slip flashing collar and flange over pipe, and set coated flange in 1/16 inch coating of asphalt roof cement. After applying flashing flange, continue shingling up roof. Lap lower part of flange over shingles. Overlap flange with side and upper shingles. Fit shingles around pipe, and embed in 1/16 inch thick coating of asphalt roof cement where shingles overlay flange.
3.3.7.3 Chimney Flashing
Provide treated wood crickets as specified in Section 06 10 00 ROUGH CARPENTRY.
Provide metal base and counterflashing as specified in Section 07 60 00 FLASHING
AND SHEET METAL. Uniformly coat masonry surfaces which are to receive flashing with asphalt primer applied at rate of one gallon per 100 square feet. Apply shingles over underlayment up to front face of chimney. Apply metal front base flashing with lower section extending at least 4 inches over shingles. Set base flashing in a 1/16 inch coating of asphalt roof cement on shingles and chimney face. Apply metal step flashing at sides in a coating of asphalt roof cement. Embed end shingles in each course that overlaps step flashing with asphalt roof cement. Apply metal rear base flashing over cricket and back of chimney in coating of asphalt roof cement. Apply end shingles in each course up to cricket, and cement in place. Lap base flashing minimum of 3 inches with metal counterflashing.
--End of Section--
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .