FA3047-10-R-0012 Atch 2R-Division 2
84 KB Posted
- Attached to
- Roofing Indefinite Delivery Indefinite Quantity (IDIQ) Federal contract opportunity
- Solicitation number
- FA3047-10-R-0012-ROOFING
About this file
FA3047-10-R-0012 Atch 2R-Division 2 (Specs - 02 84 33) 8 Feb 10 Removal and Disposal of PCBs
Text of this file
802 CONS/LGCA-3 FA3047-10-R-0012
Lackland AFB TX Roofing IDIQ
02 84 33
Section J – Attachment 2R Page 1 of 11 8 Feb 2010
SECTION 02 84 33
REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced.
The publications are referred to within the text by the basic designation only.
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.1000Air Contaminants
29 CFR 1910.145Accident Prevention Signs and Tags
40 CFR 761Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions
49 CFR 171General Information, Regulations, and Definitions
49 CFR 172Hazardous Materials Table, Special Provisions, Hazardous Materials
Communications, Emergency Response Information, and Training Requirements
49 CFR 173Shippers - General Requirements for Shipments and Packagings
49 CFR 174Carriage by Rail
49 CFR 175Carriage by Aircraft
49 CFR 176Carriage by Vessel
49 CFR 177Carriage by Public Highway
49 CFR 178Specifications for Packagings
49 CFR 179Specifications for Tank Cars
1.2 REQUIREMENTS
The work includes the removal and disposal of light fixture ballasts or other PCB containing equipment. Perform work in accordance with 40 CFR 761 and the requirements specified herein.
Section J – Attachment 2R Page 2 of 11 8 Feb 2010
1.3 DEFINITIONS
1.3.1 Leak
Leak or leaking means any instance in which a PCB Article, PCB Container, or PCB
Equipment has any PCBs on any portion of its external surface.
1.3.2 PCBs
PCBs as used in this specification shall mean the same as PCBs, PCB Article, PCB
Article Container, PCB Container, PCB Equipment, PCB Item, PCB Transformer, PCB-
Contaminated Electrical Equipment, as defined in 40 CFR 761, Section 3, Definitions.
1.3.3 Spill
Spill means both intentional and unintentional spills, leaks, and other uncontrolled discharges when the release results in any quantity of PCBs running off or about to run off the external surface of the equipment or other PCB source, as well as the contamination resulting from those releases.
1.4 QUALITY ASSURANCE
1.4.1 Training
Instruct employees on the dangers of PCB exposure, on respirator use, decontamination, and applicable OSHA and EPA regulations.
1.4.2 Certified Industrial Hygienist (CIH)
Obtain the services of an industrial hygienist certified by the American Board of
Industrial Hygiene to certify training, review and approve the PCB removal plan, including determination of the need for personnel protective equipment (PPE) in performing PCB removal work.
1.4.3 Regulation Documents
Maintain at all times one copy each at the office and one copy each in view at the job site
29 CFR 1910.1000, 40 CFR 761, and Contractor work practices for removal, storage and disposal of PCBs.
1.4.4 Surveillance Personnel
Surveillance personnel may enter PCB control areas for brief periods of time provided they wear disposable polyethylene gloves and disposal polyethylene foot covers, as a
02 84 33
Section J – Attachment 2R Page 3 of 11 8 Feb 2010 minimum. Additional protective equipment may be required if respiratory hazard is involved or if skin contact with PCB is involved.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-07 Certificates
Training certification
Qualifications of CIH
PCB removal work plan
PCB disposal plan
Notification
Transporter certification of notification to EPA of their PCB waste activities and EPA ID numbers
Certification of Decontamination for PCB Spill
Post cleanup sampling data
Certificate of disposal
1.6 EQUIPMENT
1.6.1 Special Clothing
Work clothes shall consist of PPE as required by OSHA regulations, including, but not limited to the following:
a. Disposable coveralls
b. Gloves (Disposable rubber gloves may be worn under these)
c. Disposable foot covers (polyethylene)
d. Chemical safety goggles
e. Half mask cartridge respirator.
Section J – Attachment 2R Page 4 of 11 8 Feb 2010
1.6.2 Special Clothing for Government Personnel
Provide PPE specified in paragraph entitled "Special Clothing" to the Contracting Officer as required for inspection of the work.
1.6.3 PCB Spill Kit
Assemble a spill kit to include the following items:
MINIMUM
ITEM QUANTITY
1. Disposable gloves (polyethylene) 6 prs
2. Gloves with a high degree of impermeability to PCB 6 prs
3. Disposable coveralls with permeation resistance to PCB 4 ea
4. Chemical safety goggles 2 ea
5. Disposable foot covers (polyethylene) 6 prs
6. PCB Caution Sign: "PCB Spill--Authorized
Personnel Only" 2 ea
7. Banner guard or equivalent banner material 100 feet
8. Absorbent material
9. Blue polyethylene waste bags 5 bags
10. Cloth backed tape 5 ea
11. Area access logs, blank 1 roll
12. Brattice cloth, 6' x 6' 10 ea
13. Rags 1 piece
14. Ball point pens 20 ea
15. Herculite, 4' x 4' and 2 ea
8' x 8' 1 ea
16. Blank metal signs and grease pencils
17. Waste containers 55 gallon 2 ea drum, may be used as container for kit) 1 ea
1.7 QUALITY ASSURANCE
1.7.1 Training Certification
Submit certificates, prior to the start of work but after the main abatement submittals, signed and dated by the CIH and by each employee stating that the employee has received training. Certificates shall be organized by individual worker, not grouped by type of certificates.
1.7.2 Qualifications of CIH
Section J – Attachment 2R Page 5 of 11 8 Feb 2010
Submit the name, address, and telephone number of the Industrial Hygienist selected to perform the duties in paragraph entitled "Certified Industrial Hygienist." Submit proper documentation that the Industrial Hygienist is certified, including certification number and date of certification/recertification.
1.7.3 PCB Removal Work Plan
Submit a detailed job-specific plan of the work procedures to be used in the removal of
PCB-containing materials, not to be combined with other hazardous abatement plans.
Provide a Table of Contents for each abatement submittal which shall follow the sequence of requirements in the contract. The plan shall include a sketch showing the location, size, and details of PCB control areas. Include in the plan, eating, drinking, smoking and restroom procedures, interface of trades, sequencing of PCB related work, PCB disposal plan, respirators, protective equipment, and a detailed description of the method of containment of the operation to ensure that PCB contamination is not spread or carried outside of the control area. Obtain approval of the plan prior to the start of PCB removal work.
1.7.4 PCB Disposal Plan
Submit a PCB Disposal Plan within 45 calendar days after award of contract for
Contracting Officer's approval. The PCB Disposal Plan shall comply with applicable requirements of Federal, State, and local PCB waste regulations and address:
a. Identification of PCB wastes associated with the work.
b. Estimated quantities of wastes to be generated and disposed of.
c. Names and qualifications of each contractor that will be transporting, storing, treating, and disposing of the wastes. Include the facility location and a 24-hour point of contact.
Furnish two copies of EPA and State PCB waste permits.
d. Names and qualifications (experience and training) of personnel who will be working on-site with PCB wastes.
e. List of waste handling equipment to be used in performing the work, to include cleaning, volume reduction, and transport equipment.
f. Spill prevention, containment, and cleanup contingency measures to be implemented.
g. Work plan and schedule for PCB waste containment, removal and disposal. Wastes shall be cleaned up and containerized daily.
1.7.5 Notification
02 84 33
Section J – Attachment 2R Page 6 of 11 8 Feb 2010
Notify the Contracting Officer 20 days prior to the start of PCB removal work.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 PCB Control Area
Isolate PCB control area by physical boundaries to prevent unauthorized entry of personnel. Food, drink and smoking materials shall not be permitted in areas where
PCBs are handled or PCB items are stored.
3.1.2 Personnel Protection
Workers shall wear and use PPE, as recommended by the Industrial Hygienist, upon entering a PCB control area. If PPE is not required per the CIH, specify in the PCB removal work plan.
3.1.3 Footwear
Work footwear shall remain inside work area until completion of the job.
3.1.4 Permissible Exposure Limits (PEL)
PEL for PCBs is 3.1 E-08 lb/cubic foot on an 8-hour time weighted average basis.
3.1.5 Special Hazards
a. PCBs shall not be exposed to open flames or other high temperature sources since toxic decomposition by-products may be produced.
b. PCBs shall not be heated to temperatures of 135 degrees F or higher without
Contracting Officer's concurrence.
3.1.6 PCB Caution Label
40 CFR 761, Subpart C. Affix labels to PCB waste containers and other PCB-contaminated items. Provide label with sufficient print size to be clearly legible, with bold print on a contrasting background, displaying the following: CAUTION: Contains
PCBs (Polychlorinated Biphenyls).
3.1.7 PCB Caution Sign
Section J – Attachment 2R Page 7 of 11 8 Feb 2010
29 CFR 1910.145. Provide signs at approaches to PCB control areas. Locate signs at such a distance that personnel may read the sign and take the necessary precautions before entering the area.
3.2 WORK PROCEDURE
Furnish labor, materials, services, and equipment necessary for the complete removal of
PCBs located at the site as indicated or specified in accordance with local, State, or
Federal regulations. Package and mark PCB as required by EPA and DOT regulations and dispose of off Government property in accordance with EPA, DOT, and local regulations at a permitted site.
3.2.1 No Smoking
Smoking is not permitted within 50 feet of the PCB control area. Provide "No Smoking" signs as directed by the Contracting Officer.
3.2.2 Work Operations
Ensure that work operations or processes involving PCB or PCB-contaminated materials are conducted in accordance with 40 CFR 761 and the applicable requirements of this section, including but not limited to:
a. Obtaining advance approval of PCB storage sites.
b. Notifying Contracting Officer prior to commencing the operation.
c. Reporting leaks and spills to the Contracting Officer.
d. Cleaning up spills.
e. Maintaining an access log of employees working in a PCB control area and providing a copy to the Contracting Officer upon completion of the operation.
f. Inspecting PCB and PCB-contaminated items and waste containers for leaks and forwarding copies of inspection reports to the Contracting Officer.
g. Maintaining a spill kit as specified in paragraph entitled "PCB Spill Kit."
h. Maintaining inspection, inventory and spill records.
3.3 PCB TRANSFORMERS
3.3.1 Draining of Transformer Liquid
02 84 33
Section J – Attachment 2R Page 8 of 11 8 Feb 2010
Perform work in accordance with 49 CFR 171, 49 CFR 172, 49 CFR 173, 49 CFR 174, 49 CFR 175, 49 CFR 176, 49 CFR 177, 49 CFR 178, and 49 CFR 179, Subchapter C and as specified herein. Drain the transformer, switches, and regulators of free flowing liquid prior to transportation. Place the drained liquids in DOT Spec 17E drums. The drums shall not contain more than 50 gallons of oil. If the equipment cannot be drained, then place it in DOT Spec 17C drums.
3.3.2 Markings
Provide drums and drained PCB-contaminated electrical equipment with caution label markings as specified in paragraph entitled "PCB Caution Label."
3.4 PCB REMOVAL
Select PCB removal procedure to minimize contamination of work areas with PCB or other PCB-contaminated debris/waste. Handle PCBs such that no skin contact occurs.
PCB removal process should be described in the work plan.
3.4.1 Confined Spaces
As feasible, do not carry out PCB handling operations in confined spaces. A confined space shall mean a space having limited means of egress and inadequate cross ventilation.
3.4.2 Control Area
Establish a PCB control area around the PCB item as specified in paragraph entitled
"PCB Control Area." Only personnel briefed on the elements in the paragraph entitled
"Training" and on the handling precautions shall be allowed into the area.
3.4.3 Temperatures
As feasible, handle PCBs at ambient temperatures and not at elevated temperatures.
3.4.4 Solvent Cleaning
Clean contaminated tools, containers, etc., after use by rinsing three times with an appropriate solvent or by wiping down three times with a solvent wetted rag. Suggested solvents are stoddard solvent or hexane.
3.4.5 Drip Pans
Drip pans are required under portable PCB transformers and rectifiers in use or stored for use. The pans shall have a containment volume of at least one and one-half times the internal volume of PCBs in the item.
3.4.6 Evacuation Procedures
Section J – Attachment 2R Page 9 of 11 8 Feb 2010
Procedures shall be written for evacuation of injured workers. Aid for a seriously injured worker shall not be delayed for reasons of decontamination.
3.5 PCB SPILL CLEANUP REQUIREMENTS
3.5.1 PCB Spills
Immediately report to the Contracting Officer any PCB spills on the ground or in the water, PCB spills in drip pans, or PCB leaks.
3.5.2 PCB Spill Control Area
Rope off an area around the edges of a PCB leak or spill and post a "PCB Spill
Authorized Personnel Only" caution sign. Immediately transfer leaking items to a drip pan or other container.
3.5.3 PCB Spill Cleanup
40 CFR 761, Subpart G. Initiate cleanup of spills as soon as possible, but no later than 48 hours of its discovery. To clean up spills, personnel shall wear the PPE prescribed in paragraph entitled "Special Clothing" of this section. If misting, elevated temperatures or open flames are present, or if the spill is situated in a confined space, notify the
Contracting Officer. Mop up the liquid with rags or other conventional absorbent. The spent absorbent shall be properly contained and disposed of as solid PCB waste.
3.5.4 Records and Certification
Document the cleanup with records of decontamination in accordance with 40 CFR 761, Section 125, Requirements for PCB Spill Cleanup. Provide certification of decontamination.
3.5.5 Sampling Requirements
Perform post cleanup sampling as required by 40 CFR 761, Section 130, Sampling
Requirements. Do not remove boundaries of the PCB control area until site is determined satisfactorily clean by the Contracting Officer.
3.6 STORAGE FOR DISPOSAL
3.6.1 Storage Containers for PCBs
49 CFR 178. Store liquid PCBs in Department of Transportation (DOT) Specification
17E containers. Store nonliquid PCB mixtures, articles, or equipment in DOT
Specification 5, 5B, or 17C containers with removable heads.
02 84 33
Section J – Attachment 2R Page 10 of 11 8 Feb 2010
3.6.2 Waste Containers
Label with the following:
a. "Solid (or Liquid) Waste Polychlorinated Biphenyls"
b. The PCB Caution Label, paragraph entitled "PCB Caution Label"
c. The date the item was placed in storage and the name of the cognizant activity/building.
3.6.3 PCB Articles and PCB-Contaminated Items
Label with items b. and c. above.
3.6.4 Approval of Storage Site
Obtain in advance Contracting Officer approval using the following criteria without exception.
a. Adequate roof and walls to prevent rainwater from reaching the stored PCBs.
b. An adequate floor which has continuous curbing with a minimum 6 inch high curb.
Such floor and curbing shall provide a containment volume equal to at least two times the internal volume of the largest PCB article or PCB container stored therein or 25 percent of the total internal volume of all PCB equipment or containers stored therein, whichever is greater.
c. No drain valves, floor drains, expansion joints, sewer lines, or other openings that would permit liquids to flow from the curbed area.
d. Floors and curbing constructed of continuous smooth and impervious materials such as Portland cement, concrete or steel to prevent or minimize penetrations of PCBs.
e. Not located at a site which is below the 100-year flood water elevation.
f. Each storage site shall be posted with the PCB Caution Sign, paragraph entitled "PCB
Caution Sign."
3.7 CLEANUP
Maintain surfaces of the PCB control area free of accumulations of PCBs. Restrict the spread of dust and debris; keep waste from being distributed over work area.
a. Do not remove the PCB control area and warning signs prior to the Contracting
Officer's approval. Reclean areas showing residual PCBs.
Section J – Attachment 2R Page 11 of 11 8 Feb 2010
3.8 DISPOSAL
Comply with disposal requirements and procedures outlined in 40 CFR 761. Do not accept PCB waste unless it is accompanied by a manifest signed by the Government.
Before transporting the PCB waste, sign and date the manifest acknowledging acceptance of the PCB waste from the Government. Return a signed copy to the Government before leaving the job site. Ensure that the manifest accompanies the PCB waste at all times.
Submit transporter certification of notification to EPA of their PCB waste activities.
3.8.1 Certificate of Disposal
40 CFR 761. Submit to the Government within 30 days of the date that the disposal of the PCB waste identified on the manifest was completed. Certificate for the PCBs and
PCB items disposed shall include:
a. The identity of the disposal facility, by name, address, and EPA identification number.
b. The identity of the PCB waste affected by the Certificate of Disposal including reference to the manifest number for the shipment.
c. A statement certifying the fact of disposal of the identified PCB waste, including the date(s) of disposal, and identifying the disposal process used.
d. A certification as defined in 40 CFR 761, Section 3.
3.8.1.1 Payment Upon Furnishing Certificate of Disposal of PCBs
Payment will not be made until the certificate of disposal has been furnished to the
Contracting Officer.
--End of Section--
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .