FA3047-10-R-0012 Atch 2M-Division 2 (Specs - 02 41 00) 8 Feb 10 Demolition
Text of this file
802 CONS/LGCA-3 FA3047-10-R-0012
Lackland AFB TX Roofing IDIQ
02 41 00
Section J – Attachment 2M Page 1 of 20 8 Feb 2010
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
1.1 GENERAL
1.1.1 Partial Demolition
This section includes partial demolition as applicable and as indicated. Partial demolition is defined as existing construction required to be removed to facilitate the new work.
1.1.2 Cutting and Patching
This section includes requirements for cutting and patching as required to facilitate the new work indicated.
1.1.3 Products and Installation
Products and installation for patching and extending work shall be included to facilitate the new work. See applicable Specification Sections to match adjacent construction, materials, finishes, etc.
1.1.4 Transitions and Adjustments.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced.
The publications are referred to within the text by the basic designation only.
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI Guideline K(2005) Guideline for Containers for Recovered Non-Flammable
Fluorocarbon Refrigerants
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION
OFFICIALS (AASHTO)
AASHTO M 145(1991; R 2004) Classification of Soils and Soil-Aggregate Mixtures for
Highway Construction Purposes
AASHTO T 180(2001; R 2004) Moisture-Density Relations of Soils Using a 4.54-kg
(10-lb) Rammer and an 457-mm (18-in) Drop
Section J – Attachment 2M Page 2 of 20 8 Feb 2010
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.6(2006) Safety Requirements for Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1(2008) Safety and Health Requirements Manual
U.S. DEFENSE LOGISTICS AGENCY (DLA)
DLA 4145.25(June 2000) Storage and Handling of Liquefied and Gaseous Compressed
Gases and Their Full and Empty Cylinders
U.S. DEPARTMENT OF DEFENSE (DOD)
DOD 4000.25-1-M(2006; Notice 1) Requisitioning and Issue Procedures
MIL-STD-129(Rev P; Notice 3; Change 4) Military Marking for Shipment and Storage
U.S. FEDERAL AVIATION ADMINISTRATION (FAA)
FAA AC 70/7460-1(Rev K) Obstruction Marking and Lighting
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 61National Emission Standards for Hazardous Air Pollutants
40 CFR 82Protection of Stratospheric Ozone
49 CFR 173.301Shipment of Compressed Gases in Cylinders and Spherical Pressure
Vessels
1.3 GENERAL REQUIREMENTS
Do not begin demolition until authorization is received from the Contracting Officer.
Remove rubbish and debris from the project site daily; do not allow accumulations inside or outside the building(s). The work includes demolition, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from
Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.
1.4 SUBMITTALS
Section J – Attachment 2M Page 3 of 20 8 Feb 2010
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Existing Conditions; G
SD-02 Shop Drawings
Details and Engineering Calculations; G
Submit details and engineering calculations by a structural engineer licensed in the state of the project, as required in paragraph 1.14.1.1.
SD-07 Certificates
Demolition Plan; G
Notifications; G
Proposed salvage, demolition, and removal procedures for approval before work is started.
SD-11 Closeout Submittals
Receipts
Receipts or bills of lading, as specified.
1.5 REGULATORY AND SAFETY REQUIREMENTS
Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in
ASSE/SAFE A10.6.
1.5.1 Notifications
1.5.1.1 General Requirements
Furnish timely notification of demolition and renovation projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61, Subpart M. Notify the
Regional Office of the United States Environmental Protection Agency (USEPA), State's environmental protection agency, local air pollution control district/agency and the
Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61, Subpart M.
Section J – Attachment 2M Page 4 of 20 8 Feb 2010
1.5.2 Receipts
Submit a shipping receipt or bill of lading for all containers of ozone depleting substance
(ODS) shipped to the Defense Depot, Richmond, Virginia.
1.6 DUST AND DEBRIS CONTROL
Prevent the spread of dust and debris to occupied portions of the building and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Vacuum and dust the work area daily. Sweep pavements as often as necessary to control the spread of debris that may result in foreign object damage potential to aircraft.
1.7 PROTECTION
1.7.1 Traffic Control Signs
Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind, jet or prop blast. Notify the Contracting Officer prior to beginning such work.
Contractor must provide a minimum of 2 aviation red or high intensity white obstruction lights on temporary structures (including cranes) over 100 feet 30 meter above ground level. Light construction and installation must comply with FAA AC 70/7460-1. Lights must be operational during periods of reduced visibility, darkness, and as directed by the
Contracting Officer. Maintain the temporary services during the period of construction and remove only after permanent services have been installed and tested and are in operation.
1.7.2 Existing Conditions Documentation
Before beginning any demolition work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. Include in the record the elevation of the top of parapet walls, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document.
1.7.3 Items to Remain in Place
Section J – Attachment 2M Page 5 of 20 8 Feb 2010
Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer. Coordinate the work of this section with all other work indicated. Construct and maintain shoring, bracing, and supports as required.
Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload structural elements or pavements to remain. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.
1.7.4 Existing Construction Limits and Protection
Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas.
Remove dust, dirt, and debris from work areas daily. Replace and restore at completion.
1.7.5 Weather Protection
For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Insulate ductwork and piping to prevent condensation in exposed areas. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.
1.7.6 Building Enclosure
Maintain the security system and secure openings nightly.
1.7.7 Trees
Protect trees within the project site which might be damaged during demolition or deconstruction, and which are indicated to be left in place, by a 6 foot high fence. Erect and secure fence a minimum of 5 feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees, whichever is greater. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting Officer.
1.7.8 Utility Service
Maintain existing utilities indicated to stay in service and protect against damage during demolition operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the Government and disconnected and sealed by the
Contractor.
Section J – Attachment 2M Page 6 of 20 8 Feb 2010
1.7.9 Facilities
Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished, unless directed otherwise by the
Contracting Officer. Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.
1.7.10 Protection of Personnel
Before, during and after the demolition work the Contractor shall continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.
1.8 BURNING
The use of burning at the project site for the disposal of refuse and debris will not be permitted.
1.9 FOREIGN OBJECT DAMAGE (FOD)
Aircraft and aircraft engines are subject to FOD from debris and waste material lying on airfield pavements. Remove all such materials that may appear on operational aircraft pavements due to the Contractor's operations. If necessary, the Contracting Officer may require the Contractor to install a temporary barricade at the Contractor's expense to control the spread of FOD potential debris. The barricade must include a fence covered with a fabric designed to stop the spread of debris. Anchor the fence and fabric to prevent displacement by winds or jet/prop blasts. Remove barricade when no longer required.
1.10 RELOCATIONS
Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Items to be relocated which are damaged by the Contractor shall be repaired or replaced with new undamaged items as approved by the Contracting
Officer.
Section J – Attachment 2M Page 7 of 20 8 Feb 2010
1.11 REQUIRED DATA
Prepare a Demolition Plan. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Coordinate with Waste Management Plan. Include statements affirming Contractor inspection of the existing roof deck and its suitability to perform as a safe working platform or if inspection reveals a safety hazard to workers, state provisions for securing the safety of the workers throughout the performance of the work. Provide procedures for safe conduct of the work in accordance with EM 385-1-1.
1.12 ENVIRONMENTAL PROTECTION
Comply with the Environmental Protection Agency requirements specified.
1.13 USE OF EXPLOSIVES
Use of explosives will not be permitted.
1.14 AVAILABILITY OF WORK AREAS
Areas in which the work is to be accomplished will be available in accordance with the schedule provided by the Contracting Officer
1.15 Cutting and Patching
1.15.1 Requirements for Structural Work
Do not cut and patch structural elements in a manner that would change their load-carrying capacity or load-deflection ratio.
1.15.1.1 Details and Engineering Calculations
Where cutting and patching involves welding or adding reinforcement to existing structural elements, submit details and engineering calculations (by a structural engineer licensed in the state of the project location) showing integration of reinforcement with original structure. Obtain approval to proceed from the Contracting Officer.
1.15.2 Operational Limitations
Do not cut and patch operating elements or related components in a manner that would result in reducing their capacity to perform as intended. Do not cut and patch operating elements or related components in a manner that would result in increased maintenance or decrease operational life or safety. Maintain fire resistance ratings of members and systems.
Section J – Attachment 2M Page 8 of 20 8 Feb 2010
1.15.3 Existing Services
Where existing services are required to be removed, relocated, or abandoned, bypass such services before cutting to eliminate interruption of services to occupied areas.
1.15.4 Cutting and Patching Roofs
1.15.4.1 Guarantee
Determine from the government which roofing manufacturer is responsible for the roof bond or guarantee. Provide the government with a letter confirming authority to perform roof cutting and patching prior to commencing the work.
1.15.4.2 Maintenance Agreement
Coordinate roofing work with manufacturer's "Maintenance Agreement".
1.15.5 Visual Requirements
Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in the Contracting Officer's opinion, reduce the buildings aesthetic qualities. Do not cut and patch construction in a manner that would result in visual evidence of cutting and patching. Remove and replace construction cut and patched in a visually satisfactory manner.
1.15.6 Warranties
Replace, patch, and repair material and surfaces cut or damaged by methods and with materials in such a manner as not to void warranties required or existing.
1.15.7 Materials
1.15.7.1 Existing Materials
Use materials identical to existing materials. For exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible. If identical materials are unavailable, use materials whose installed performance will equal or surpass that of existing materials. Before patching, verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.
1.15.7.2 New Materials
As specified on product Sections; match existing products for patching and extending work. Install work according to manufacturer and special standards.
Section J – Attachment 2M Page 9 of 20 8 Feb 2010
1.15.8 Inspection
1.15.8.1 Surfaces and Conditions
Examine surfaces Contractor will cut and patch and conditions under which Contractor will cut and patch before cutting. If unsafe or unsatisfactory conditions exist, take corrective action before proceeding.
1.15.8.2 Verify Completion
Verify demolition is complete and areas are ready for installation of new work.
1.15.9 Preparation
Arrange work for a minimum of cutting.
1.15.9.1 Temporary Support
Provide temporary support of work to be cut.
1.15.9.2 Services
a. Verify and identify the existence of underground or hidden conduits, plumbing, or voice/data circuits.
b. Do not cut active pipe, conduit, or ductwork scheduled for removal or relocation and serving an occupied building until Contractor either bypasses them or provides alternate services to the affected areas of the building.
1.15.9.3 Conditions
Proceed with installation only after unsafe or unsatisfactory conditions have been corrected.
1.15.10 Unsuitable Material
Remove unsuitable material not marked for salvage, such as rotted wood, corroded metals, and deteriorated masonry and concrete. Replace materials as specified for finished work.
1.15.11 Prepare Surfaces
Prepare surface and remove surface finishes to provide for proper installation of new work and finishes.
1.15.12 Cutting
Section J – Attachment 2M Page 10 of 20 8 Feb 2010
Cut existing construction to provide for installation of other components or performance of other construction activities and the subsequent fitting and patching required to restore surfaces to their original condition.
1.15.12.1 Minimize Damage
a. Cut existing construction using methods least likely to damage elements retained or adjoining construction. Where possible, review proposed procedures with the original installer; comply with the original installer's recommendations.
b. When cutting, use hand or small power tools designed for sawing or grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
c. To avoid marring existing finished surfaces, cut or drill from exposed or finished side into concealed surfaces.
1.15.12.2 Masonry and Concrete
a. Cut through concrete and masonry using a cutting machine, such as a carborundum saw or a diamond-core drill.
b. Core drill all required small masonry openings.
1.15.13 Patching
Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other Work. Provide materials and comply with installation requirements specified in other Sections of these Specifications.
1.15.13.1 Seams
Patch with durable seams that are as invisible as possible. Comply with specific tolerances.
1.15.13.2 Testing
Where feasible, inspect and test patched areas to demonstrate integrity of the installation.
1.15.13.3 Transition to Existing
a. Where new work abuts or aligns with existing, perform a smooth and even transition.
Patch work to match existing adjacent work in texture and appearance.
Section J – Attachment 2M Page 11 of 20 8 Feb 2010
b. When finished surfaces are cut so that a smooth transition with new work is not possible, terminate existing surface along a straight line at a natural line of division.
Make corrective action recommendations to the Contracting Officer.
1.15.13.4 Existing Surfaces
Patch or replace damaged, lifted, discolored, or imperfect portions of existing surfaces.
1.15.13.5 Substrate
Repair substrate prior to patching finish.
1.15.13.6 Gypsum Board
Comply with United States Gypsum Company's "Gypsum Construction Handbook," 5th
Edition, recommendations or corrective remedies for damaged gypsum board.
1.15.14 Finishes
Finish surfaces as specified in individual Specification Sections.
1.15.14.1 Transition to Existing
a. Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.
b. Finish patches to uniform finish and texture over entire area. When Contractor cannot match finish, refinish entire surface to nearest intersections.
c. Where patching occurs in a smooth painted surface, extend final paint coat over entire unbroken surface containing the patch after the area has received primer and second coat.
1.15.15 Cleaning
a. Remove debris and abandoned items from the area and from concealed spaces.
b. Clean areas and spaces where cutting and patching are performed. Completely remove paint, oils, putty, and similar items. Thoroughly clean piping, conduit, and similar features before applying paint or other finishing materials. Restore damaged pipe covering to its original condition.
PART 2 PRODUCTS
2.1 FILL MATERIAL
Section J – Attachment 2M Page 12 of 20 8 Feb 2010
Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition or deconstruction of structures.
Fill material must conform to the definition of satisfactory soil material as defined in
AASHTO M 145, Soil Classification Groups A-1, A-2-4, A-2-5 and A-3. In addition, fill material must be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 2 inches in any dimension.
Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:
Soil classification AASHTO M 145
Moisture-density relations AASHTO T 180, Method B or D
2.2 PATCH AND REPAIR MATERIALS
Comply with individual Specifications Sections for patching and repair to existing materials to remain. Where patching and repair work is indicated, match existing construction and materials unless otherwise indicated.
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
Inspect and evaluate existing structures on site for reuse. Existing construction scheduled to be removed for reuse shall be disassembled. Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified. Materials shall be designated for reuse on site whenever possible.
3.1.1 Structures
a. Demolish structures in a systematic manner from the top of the structure to the ground.
Complete demolition work above each tier or floor before the supporting members on the lower level are disturbed. Demolish concrete and masonry walls in small sections.
Remove structural framing members and lower to ground by means of derricks, platforms hoists, or other suitable methods as approved by the Contracting Officer.
b. Locate demolition and deconstruction equipment throughout the structure and remove materials so as to not impose excessive loads to supporting walls, floors, or framing.
c. Building, or the remaining portions thereof, not exceeding 80 feet in height may be demolished by the mechanical method of demolition.
Section J – Attachment 2M Page 13 of 20 8 Feb 2010
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition or deconstruction work until all utility disconnections have been made.
Shut off and cap utilities for future use, as indicated.
3.1.2.2 Disconnecting Existing Utilities
Remove existing utilities as indicated and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting
Officer. When utility lines are encountered that are not indicated on the drawings, the
Contracting Officer shall be notified prior to further work in that area. Remove meters and related equipment and deliver to a location in accordance with instructions of the
Contracting Officer.
3.1.3 Chain Link Fencing
Remove chain link fencing, gates and other related salvaged items scheduled for removal and transport to designated areas. Remove gates as whole units. Cut chain link fabric to
25 foot lengths and store in rolls off the ground.
3.1.4 Paving and Slabs
Remove concrete and asphaltic concrete paving and slabs as indicated to a depth of 1 1/2 inches below grade. Provide neat sawcuts at limits of pavement removal as indicated.
Pavement and slabs designated to be recycled and utilized in this project shall be moved, ground and stored as directed by the Contracting Officer. Pavement and slabs not to be used in this project shall be removed from the Installation at Contractor's expense.
3.1.5 Roofing
Remove existing roof system and associated components in their entirety down to existing roof deck. Remove roofing system to effect the connections with new flashing or roofing. Remove gravel surfacing from existing roofing felts for a minimum distance of 18 inches back from the cut. Remove gravel without damaging felts. Cut existing felts, membrane and insulation along straight lines. Remove roofing system and insulation without damaging the roof deck. Sequence work to minimize building exposure between demolition and new roof materials installation.
3.1.5.1 Temporary Roofing
Section J – Attachment 2M Page 14 of 20 8 Feb 2010
Install temporary roofing and flashing as necessary to maintain a watertight condition throughout the course of the work. Remove temporary work prior to installation of permanent roof system materials unless approved otherwise by the Contracting Officer.
Make provisions for worker safety during demolition and installation of new materials as described in paragraphs entitled "Statements" and "Regulatory and Safety Requirements."
3.1.5.2 Reroofing
When removing the existing roofing system from the roof deck, remove only as much roofing as can be recovered by the end of the work day, unless approved otherwise by the
Contracting Officer. Do not attempt to open the roof covering system in threatening weather. Reseal all openings prior to suspension of work the same day.
3.1.6 Masonry
Sawcut and remove masonry so as to prevent damage to surfaces to remain and to facilitate the installation of new work. Where new masonry adjoins existing, the new work shall abut or tie into the existing construction as indicated. Provide square, straight edges and corners where existing masonry adjoins new work and other locations..
3.1.7 Concrete
Saw concrete along straight lines to a depth of a minimum 2 inch. Make each cut in walls perpendicular to the face and in alignment with the cut in the opposite face. Break out the remainder of the concrete provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or saw cut entirely through the concrete.
3.1.8 Structural Steel
Dismantle structural steel at field connections and in a manner that will prevent bending or damage. Salvage for recycle structural steel, steel joists, girders, angles, plates, columns and shapes. Flame-cutting torches are permitted when other methods of dismantling are not practical. Transport steel joists and girders as whole units and not dismantled. Transport structural steel shapes to a designated storage area, stacked according to size, type of member and length, and stored off the ground, protected from the weather.
3.1.9 Miscellaneous Metal
Salvage shop-fabricated items such as access doors and frames, steel gratings, metal ladders, wire mesh partitions, metal railings, metal windows and similar items as whole units. Salvage light-gage and cold-formed metal framing, such as steel studs, steel trusses, metal gutters, roofing and siding, metal toilet partitions, toilet accessories and similar items. Scrap metal shall become the Contractor's property. Recycle scrap metal as part of demolition operations. Provide separate containers to collect scrap metal and
Section J – Attachment 2M Page 15 of 20 8 Feb 2010 transport to a scrap metal collection or recycling facility, in accordance with the Waste
Management Plan.
3.1.10 Carpentry
Salvage for recycle lumber, millwork items, and finished boards, and sort by type and size. Chip or shred and recycle salvaged wood unfit for reuse, except stained, painted, or treated wood. Remove windows, doors, frames, and cabinets, and similar items as whole units, complete with trim and accessories. Do not remove hardware attached to units, except for door closers. Brace the open end of door frames to prevent damage.
3.1.11 Patching
Where removals leave holes and damaged surfaces exposed in the finished work, patch and repair these holes and damaged surfaces to match adjacent finished surfaces. Where new work is to be applied to existing surfaces, perform removals and patching in a manner to produce surfaces suitable for receiving new work. Finished surfaces of patched area shall be flush with the adjacent existing surface and shall match the existing adjacent surface as closely as possible as to texture and finish. Patching shall be as specified and indicated, and shall include:
a. Concrete and Masonry: Completely fill holes and depressions, caused by previous physical damage or left as a result of removals in existing masonry walls to remain, with an approved masonry patching material, applied in accordance with the manufacturer's printed instructions.
3.1.12 Air Conditioning Equipment
Remove air conditioning, refrigeration, and other equipment containing refrigerants without releasing chlorofluorocarbon refrigerants to the atmosphere in accordance with the Clean Air Act Amendment of 1990. Recover all refrigerants prior to removing air conditioning, refrigeration, and other equipment containing refrigerants and dispose of in accordance with the paragraph entitled "Disposal of Ozone Depleting Substance (ODS)."
Turn in salvaged Class I ODS refrigerants as specified in paragraph, "Salvaged Materials and Equipment."
3.1.13 Cylinders and Canisters
Remove all fire suppression system cylinders and canisters and dispose of in accordance with the paragraph entitled "Disposal of Ozone Depleting Substance (ODS)."
3.1.14 Locksets on Swinging Doors
The Contractor shall remove all locksets from all swinging doors indicated to be removed and disposed of. Deliver the locksets and related items to a designated location for receipt by the Contracting Officer after removal.
Section J – Attachment 2M Page 16 of 20 8 Feb 2010
3.1.15 Mechanical Equipment and Fixtures
Disconnect mechanical hardware at the nearest connection to existing services to remain, unless otherwise noted. Mechanical equipment and fixtures must be disconnected at fittings. Remove service valves attached to the unit. Salvage each item of equipment and fixtures as a whole unit; listed, indexed, tagged, and stored. Salvage each unit with its normal operating auxiliary equipment. Transport salvaged equipment and fixtures, including motors and machines, to a designated storage area as directed by the
Contracting Officer. Do not remove equipment until approved. Do not offer low-efficiency equipment for reuse; provide to recycling service for disassembly and recycling of parts.
3.1.15.1 Preparation for Storage
Remove water, dirt, dust, and foreign matter from units; tanks, piping and fixtures shall be drained; interiors, if previously used to store flammable, explosive, or other dangerous liquids, must be steam cleaned. Seal openings with caps, plates, or plugs. Secure motors attached by flexible connections to the unit. Change lubricating systems with the proper oil or grease.
3.1.15.2 Piping
Disconnect piping at unions, flanges and valves, and fittings as required to reduce the pipe into straight lengths for practical storage. Store salvaged piping according to size and type. If the piping that remains can become pressurized due to upstream valve failure, end caps, blind flanges, or other types of plugs or fittings with a pressure gage and bleed valve shall be attached to the open end of the pipe to ensure positive leak control. Carefully dismantle piping that previously contained gas, gasoline, oil, or other dangerous fluids, with precautions taken to prevent injury to persons and property. Store piping outdoors until all fumes and residues are removed. Box prefabricated supports, hangers, plates, valves, and specialty items according to size and type. Wrap sprinkler heads individually in plastic bags before boxing. Classify piping not designated for salvage, or not reusable, as scrap metal.
3.1.15.3 Ducts
Classify removed duct work as scrap metal.
3.1.15.4 Fixtures, Motors and Machines
Remove and salvage fixtures, motors and machines associated with plumbing, heating, air conditioning, refrigeration, and other mechanical system installations. Salvage, box and store auxiliary units and accessories with the main motor and machines. Tag salvaged items for identification, storage, and protection from damage. Classify broken, damaged, or otherwise unserviceable units and not caused to be broken, damaged, or
Section J – Attachment 2M Page 17 of 20 8 Feb 2010 otherwise unserviceable as debris to be disposed of by the Contractor. Salvage and crush porcelain plumbing fixtures unsuitable for reuse.
3.1.16 Electrical Equipment and Fixtures
Salvage motors, motor controllers, and operating and control equipment that are attached to the driven equipment. Salvage wiring systems and components. Box loose items and tag for identification. Disconnect primary, secondary, control, communication, and signal circuits at the point of attachment to their distribution system.
3.1.16.1 Fixtures
Remove and salvage electrical fixtures. Salvage unprotected glassware from the fixture and salvage separately. Salvage incandescent, mercury-vapor, and fluorescent lamps and fluorescent ballasts, boxed and tagged for identification, and protected from breakage.
3.1.16.2 Electrical Devices
Remove and salvage switches, switchgear, transformers, conductors including wire and nonmetallic sheathed and flexible armored cable, regulators, meters, instruments, plates, circuit breakers, panelboards, outlet boxes, and similar items. Box and tag these items for identification according to type and size.
3.1.16.3 Wiring Ducts or Troughs
Remove and salvage wiring ducts or troughs. Dismantle plug-in ducts and wiring troughs into unit lengths. Remove plug-in or disconnecting devices from the busway and store separately.
3.1.16.4 Conduit and Miscellaneous Items
Salvage conduit except where embedded in concrete or masonry. Consider corroded, bent, or damaged conduit as scrap metal. Sort straight and undamaged lengths of conduit according to size and type. Classify supports, knobs, tubes, cleats, and straps as debris to be removed and disposed.
3.1.17 Elevators and Hoists
Remove elevators, hoists, and similar conveying equipment and salvage as whole units, to the most practical extent. Remove and prepare items for salvage without damage to any of the various parts. Salvage and store rails for structural steel with the equipment as an integral part of the unit.
3.2 DISPOSITION OF MATERIAL
3.2.1 Title to Materials
Section J – Attachment 2M Page 18 of 20 8 Feb 2010
Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the
Contractor's demolition, and removal procedures, and authorization by the Contracting
Officer to begin demolition. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.
3.2.2 Reuse of Materials and Equipment
Remove and store materials and equipment listed in the Demolition Plan indicated to be reused or relocated to prevent damage, and reinstall as the work progresses.
3.2.3 Salvaged Materials and Equipment
Remove materials and equipment that are listed in the Demolition Plan indicated and specified to be removed by the Contractor and that are to remain the property of the
Government, and deliver to a storage site, as directed within 40 miles of the work site.
a. Salvage items and material to the maximum extent possible.
b. Store all materials salvaged for the Contractor as approved by the Contracting Officer and remove from Government property before completion of the contract. Material salvaged for the Contractor shall not be sold on the site.
c. Remove salvaged items to remain the property of the Government in a manner to prevent damage, and packed or crated to protect the items from damage while in storage or during shipment. Items damaged during removal or storage must be repaired or replaced to match existing items. Properly identify the contents of containers.
d. Remove historical items in a manner to prevent damage. Deliver the following historical items to the Government for disposition: Corner stones, contents of corner stones, and document boxes wherever located on the site.
3.2.4 Disposal of Ozone Depleting Substance (ODS)
Class I and Class II ODS are defined in Section, 602(a) and (b), of The Clean Air Act.
Prevent discharge of Class I and Class II ODS to the atmosphere. Place recovered ODS in cylinders meeting AHRI Guideline K suitable for the type ODS (filled to no more than
80 percent capacity) and provide appropriate labeling. Recovered ODS shall be removed from Government property and disposed of in accordance with 40 CFR 82. Products, equipment and appliances containing ODS in a sealed, self-contained system (e.g.
Section J – Attachment 2M Page 19 of 20 8 Feb 2010 residential refrigerators and window air conditioners) shall be disposed of in accordance with 40 CFR 82.
3.2.4.1 Special Instructions
No more than one type of ODS is permitted in each container. A warning/hazardous label shall be applied to the containers in accordance with Department of Transportation regulations. All cylinders including but not limited to fire extinguishers, spheres, or canisters containing an ODS shall have a tag with the following information:
a. Activity name and unit identification code
b. Activity point of contact and phone number
c. Type of ODS and pounds of ODS contained
d. Date of shipment
e. Naval stock number (for information, call (804) 279-4525).
3.2.4.2 Fire Suppression Containers
Deactivate fire suppression system cylinders and canisters with electrical charges or initiators prior to shipment. Also, safety caps must be used to cover exposed actuation mechanisms and discharge ports on these special cylinders.
3.2.5 Transportation Guidance
Ship all ODS containers in accordance with MIL-STD-129, DLA 4145.25 (also referenced one of the following: Army Regulation 700-68, Naval Supply Instruction
4440.128C, Marine Corps Order 10330.2C, and Air Force Regulation 67-12), 49 CFR
173.301, and DOD 4000.25-1-M.
3.2.6 Unsalvageable and Non-Recyclable Material
Dispose of unsalvageable and non-recyclable combustible material off the site.
3.3 CLEANUP
Remove debris and rubbish from basement and similar excavations. Remove and transport the in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.
3.4 DISPOSAL OF REMOVED MATERIALS
3.4.1 Regulation of Removed Materials
Section J – Attachment 2M Page 20 of 20 8 Feb 2010
Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified in the Waste Management Plan.
3.4.2 Burning on Government Property
Burning of materials removed from demolished structures will not be permitted on
Government property.
3.4.3 Removal to Spoil Areas on Government Property
Transport noncombustible materials removed from demolition structures to designated spoil areas on Government property.
3.4.4 Removal from Government Property
Transport waste materials removed from demolished structures, except waste soil, from
Government property for legal disposal. Dispose of waste soil as directed.
3.5 REUSE OF SALVAGED ITEMS
Recondition salvaged materials and equipment designated for reuse before installation.
Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.
--End of Section--
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .