This is a Standard Form 1413 (Statement and Acknowledgment), which documents a subcontract award under a federal prime contract. The prime contract number is 89243024CSC000002, issued to Fermi Forward Discovery Group, LLC, located at Kirk Road and Wilson Street, Batavia, Illinois 60510. The subcontract pertains to the MINOS High Bay Roof Replacement and Masonry Wall Repair project at Fermilab Site, located 3 miles east of Batavia, Illinois.
The subcontractor shall furnish all labor, materials, transportation, overhead, insurance, bonding costs, safety oversight, quality control oversight, supervision, and equipment necessary to perform roof replacement and masonry wall repair work. The scope of work is defined by the Statement of Work dated August 6, 2026, the Project Manual dated August 3, 2026, and associated drawing sets. The form confirms that the prime contract contains the Contract Work Hours and Safety Standards Act – Overtime Compensation clause, and the subcontract acknowledges inclusion of all applicable labor standards clauses, including requirements for payrolls and basic records, withholding of funds, disputes concerning labor standards, construction wage rate requirements, apprentices and trainees, Copeland Act compliance, subcontract labor standards, contract termination-debarment, and certification of eligibility. The form was signed by Danielle Amico, Procurement Specialist IV, representing Fermi Forward Discovery Group, LLC as the awarding firm.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement And Acknowledgment OMB Control Number: 9000-0066 Expiration Date: 5/31/2027
Part I - Statement Of Prime Contractor
1. Prime Contract Number 2. Date Subcontract
Awarded
3. Subcontract Number
Authorized For Local Reproduction Previous Edition Is Not Usable
STANDARD FORM 1413 (REV. 10/2023)
Prescribed by GSA/FAR (48 CFR) 53.222(e)
4. Prime Contractor 5. Subcontractor
a. Name a. Name
b. Street Address b. Street Address
c. City d. State e. ZIP Code c. City d. State e. ZIP Code
6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."
7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in Item 5 by the following firm:
a. Name Of Awarding Firm
9. Location
10a. Name Of Person Signing 11. By (Signature) 12. Date Signed
10b. Title Of Person Signing
Part II - Acknowledgment Of Subcontractor
13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:
Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Payrolls and Basic Records Withholding of Funds Disputes Concerning Labor Standards Compliance with Construction Wage Rate Requirements and Related Regulations
Construction Wage Rate Requirements Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility
89243024CSC000002
Fermi Forward Discovery Group, LLC
Kirk Road and Wilson Street
Batavia
Fermi Forward Discovery Group, LLC
Danielle Amico
Procurement Specialist IV
8. Project MINOS High Bay Roof Replacement and Masonry Wall Repair
Fermilab Site, 3 miles east of the City of Batavia, Illinois
b. Description Of Work By Subcontractor The Subcontractor shall furnish all labor, materials, transportation, overhead, insurance, bonding costs, safety oversight, quality control oversight, supervision, and equipment necessary to perform the work described in the Statement of Work entitled, “MINOS High Bay Roof Replacement and Masonry Wall Repair” dated August 6, 2026, Project Manual - Minos High Bay Roof Replacement and Masonry Wall Repair dated 8/3/26, and Minos High Bay Roof and Masonry Wall Repair Drawing Set mentioned therein, which the Statement of Work, amendments, and all other exhibits and documents are attached to and hereby made a part of this Subcontract.
60510IL
Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. §
3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number.
The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800
F Street, NW, Washington, DC 20405.
15b. Title Of Person Signing
15a. Name Of Person Signing 16. By (Signature) 17. Date Signed
14. Name(s) Of Any Intermediate Subcontractors, If Any
A C
DB
STANDARD FORM 1413 (REV. 10/2023) BACK
| 2 Date Subcontract Awarded: |
| 3 Subcontract Number: |
| a Name: |
| b Street Address: |
| c City: |
| d State: |
| e ZIP Code: |
| 14 Names Of Any Intermediate Subcontractors If Any: |
| C: |
| B: |
| D: |
| Text1: |
| Text2: |
| Text3: |
File details come from the government source that posted it. Updated .