Kautz road substation construcion, UIP subproject 2- KRS
Open Solicitation Posted
- Solicitation number
- RFP-383167-CD
- Agency
-
Fermi National Accelerator Laboratory
Office of Science, Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237130 Power and Communication Line and Related Structures Construction
- Place of performance
- Batavia, Illinois 60510, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
Fermi Forward Discovery Group, LLC (FFDG), which manages Fermi National Accelerator Laboratory for the Department of Energy, seeks firm-fixed-price subcontract proposals under RFP 383167-CD to rebuild and renovate the Kautz Road Substation in Batavia, Illinois, with proposals due December 18, 2026 at 4:00 p.m. Central Time. The procurement is not a set-aside, though non-small business offerors must submit a Small Business Subcontracting Plan. Questions are due December 4, 2026 at 5:00 p.m. Central Time to cdaley@fnal.gov. Amendment 1, issued November 5, 2026, schedules a Pre-Proposal Meeting and Site Visit for November 18, 2026 at 1:00 p.m. Central Time in the One West Conference Room (WH1W), Wilson Hall, and requires attendee Access Request forms at least seven days in advance.
Work is performed at Fermilab in Batavia, Illinois, and must fall within the accelerator shutdown window, anticipated January 1, 2028 to January 1, 2030, with dates that "may change depending on the needs of the Lab." Milestones include site access on January 4, 2028, foundation completion by March 31, 2028, Authorization for Use and Possession by July 2, 2029, and completion by September 30, 2029. Scope includes demolition of the existing control building and 15KV substation equipment, installation of 345kV substation yard equipment, harmonic filters, medium-voltage feeders, and foundations. FermiForward furnishes the prefabricated control building and the 345kV transformer and breaker. NAICS is 237130 with a $45 million size standard, and PSC is Z2MZ. Work is subject to Davis-Bacon wage requirements with weekly certified payroll through LCPTracker.
Offerors must demonstrate three reference projects completed within ten years, each valued at a minimum of $10 million. At least one must include 345kV substation yard equipment installation, and all must include 138kV or higher equipment plus at least three listed components. Pass/fail gates include three-year safety rates at or below 85 percent of Bureau of Labor Statistics benchmarks for both Total Recordable Case Rate and Days Away, Restricted, or Transferred Rate, an NCCI Experience Modification Rating review, OSHA 300A logs, a corporate safety plan demonstrating 10 CFR Part 851 compliance, and a quality plan aligned with DOE Order 414.1E or equivalent. Financial gates require a current ratio of 1.10 or greater, single-project bonding capacity at or above the proposed total price, and aggregate bonding of at least $30 million. Failure to meet these thresholds results in automatic disqualification as non-responsible.
Bid guarantee is 20 percent of the bid price, not exceeding $3 million. Performance and payment bonds are required at 100 percent of contract price if exceeding $150,000 and $35,000 respectively. Pricing uses nine lump-sum bid items, with mobilization not to exceed 5 percent of total contract cost unless justified, plus one bid alternate replacing CCVTs 119-1 and 119-2 designated ADD or DEDUCT. Evaluation is tradeoff: technical factors total 70 points (organizational structure and key personnel 20, approach, safety compliance, and work plan 25, past performance 25), and cost totals 30 points.
Notice text
2 versions
Update #2 · Latest ·
November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting.
This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads.
The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.
The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.
This project includes the following milestones:
Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.
Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin.
Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward).
Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed..
Milestone 5 – 30th September 2029; This milestone marks the completion of the project.
Update #1 ·
This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads.
The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.
The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.
This project includes the following milestones:
Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.
Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin.
Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward).
Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed..
Milestone 5 – 30th September 2029; This milestone marks the completion of the project.
Files
Show all 19
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB | Fermi National Accelerator Laboratory | No set-aside | |
| Utility excavation and repair services IDIQ | Fermi National Accelerator Laboratory | Total Small Business | |
| Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade | Fermi National Accelerator Laboratory | Total Small Business | |
| PIP-II F-37 building LWC pump room piping system installation | Fermi National Accelerator Laboratory | No set-aside | |
| WFE Solenoid/Corrector Magnet Spares | Fermi National Accelerator Laboratory | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity