Exhibit O 6-7-126 MINOS HIGH BAY ROOF_MASONRY WALL REPAIR_drawing set.pdf
PDF 9 MB Posted
- Solicitation number
- ISD_384202_DA
About this file
Project Summary: MINOS (785) High Bay Roof Replacement and Masonry Wall Repair
This document is a set of design drawings and specifications for a federal construction project at Fermilab (Project No. 6-7-126) involving high bay roof replacement and masonry wall repair for the NUMSB MINOS Service Building (FIMS No. 785). The roof replacement addresses a 4,444 square foot area and requires installation of a new PVC roofing system (Sarnafil G49 80 MIL) with a 20-year total system labor and material warranty. The new roof assembly specifications include a vapor retarder, 1/2" DensDeck Prime board, tapered insulation for positive drainage at 1/4" per foot slope, and liquid-applied membrane flashing (Sikalastic RoofPro 30) at masonry wall intersections with coverage rates of approximately 32, 69, and 42 square feet per gallon across three application layers totaling 111 mils thickness.
The masonry wall repair scope involves comprehensive investigation and remediation of the parapet wall, including removal and replacement of deteriorated limestone coping stones with minimum 2" overhang and drip kerfs, installation of stainless steel through-wall flashings with end dams, restoration of drainage cavities with weep holes at 24" on-center, peel-and-stick membrane installation, tuckpointing, and correction of water intrusion pathways. Approximately 4,650 square feet of exterior brick facing and 1,330 square feet of interior (roof-side) brick require repair or replacement using "Medium Ironspot 46 Velour" ASTM C216 Grade SW Type FBS triple-size brick from Endicott Clay Products. The subcontractor must submit a manufacturer's notice of approval prior to work commencement, participate in a preconstruction meeting with the manufacturer's representative, and provide one electronic PDF warranty copy to Jacquelyn Dragovich (jdragovi@fnal.gov, 630-840-5440) without monetary limitations on defects in material and workmanship coverage.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
AREA
P-112
WILSON ST.
RING RD.
HWY. 56 BUTTERFIELD RD.
TO
IN
TE
RS
TA
TE
I-
FA
RN
SW
O
RT
H
CONSTRUCTION
KAUTZ RD.
ENTRANCE
ROAD B
KI
RK
R D.
(NO TRUCKS)
PINE ST.
ENTRANCE
AREA
MAIN
INJECTOR
MAIN
KA
UT
Z
RD
PINE ST. (OUT)
PINE ST. (IN) LABORATORY
AREA
HOLTER RD
CENTRAL
WILSON ST.
ENTRANCE
BURLINGTON NORTHERN R.R.
BATAVIA RD.
RECEIVING
(NO ACCESS)
SITE BOUNDARY LINES
ON SITE CONST. ROUTES
HOURS
LEGEND
ENTRANCE
BATAVIA RD.
(LOAD LIMIT-6 TONS)
EL
G
IN
J
O
LI
ET
E
AS
TE
RN
R .R
CO
M
M O
NW
EA
LT
H
ED
IS
O N
PO
W
ER
L
IN
ES
ROAD
C
BATAVIA RD.
EOLA RD.
ENTRANCE
SWENSON
D-0 FA
RM
R D
FE
LD
O
TT
R D
INDUSTRIAL
AREA
CDF
ROAD D
EO
LA
R D.
TO RT. 59
FERMILAB
VILLAGE
TO HWY 59
T
LOCKED
GATE
RAILYARD
STORAGE
WILSON ST.
HWY 38 ROOSEVELT RD.
TRAFFIC
CONSTRUCTION
MUON
CAMPUS
DISC
OVE
RY R
D.
PI
P
II
FE
YN
MAN
C.C
WILSON ST………….6 AM- 4:30 PM M-F NO TRUCKS ALLOWED
PINE ST………………..6 AM TO 6 PM NO TRUCKS ALLOWED
BATAVIA RD………...6 AM to 6 PM
FIXED TARGET AREA
NEUTRINO AREA
PROTON AREA
PROJECT AREA
MINOS SERVICE BUILDING
NUMSB 785
HIGH BAY ROOF
SITE PLAN - NUMSB 785
NTS
VICINITY PLAN
NTS
PROJECT
NORTH
E S
W
NUMSB MINOS SERVICE BUILDING
HIGH BAY ROOF
(785)
MINOS (785) - HIGH BAY ROOF REPLACEMENT and
MASONRY WALL REPAIR
Project No. 6-7-126
N.T.S.
AERIAL PHOTO
N.T.S.
SCHWAHN ROAD
NOVA NEAR DETECTOR
(786)
SBN FOR DETECTOR BUILDING
(788)
MINI BOONE DETECTOR BUILDING
(780)
VIEW OF ELEVATION LOOKING SOUTH WEST
N.T.S.
PINE STREET
A ug
2,
- 1
0:
pm M
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \6
\7 N uM I\1
M in os
R oo f R ep la ce m en t H ig h Ba y\
- F in al D es ig n\
D ra w in gs
\6 -7
-1
_M
IN
O S_
G
-G
.d w g
6-7-126
MINOS HIGH BAY ROOF REPLACEMENT
and MASONRY WALL REPAIR
G-01
/0
3/
IS
SU
E
FO
R B
ID
COVER SHEET
ISSUE FOR CCR 05/29/26
ISSUE FOR BIDDING 08/03/26
7856-7-9
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES
DIRECTORATE
DESIGN REQUIREMENTS FOR NEW ROOF:
1. EXTERNAL FIRE: CLASS A ROOF
2. HAIL: SH
3. ROOFNAV ASSEMBLY NO.: 213439-0-0
4. FM ASSEMBLY NO: 461650-0-0
STRUCTURAL DESIGN REQUIREMENTS FOR ROOFING
1. REFERENCE STRUCTURAL DESIGN CODES AND STANDARDS:
· ASCE 7-22 MINIMUM DESIGN LOADS FOR BUILDING AND OTHER STRUCTURES
· IBC 2024
2. OCCUPANCY RISK CATEGORY = II
3. BASIC WIND SPEED (3 SECOND GUST) = 107 MPH
4. EXPOSURE CATEGORY = C
5. COMPONENT AND CLADDING WIND PRESSURES: REFER TO SPECIFICATION
SECTION 075419
PROJECT
NORTH
E
S
W
Sheet List Table Sheet Number Sheet Title
GENERAL
G-01 COVER SHEET
G-02 GENERAL NOTES
G-03 PHOTOS OF EXISTING CONDITIONS
G-04 GROUND FLOOR PLAN - FOR REFERENCE ONLY
G-05 MASONRY WALL DETAILS - FOR REFERENCE ONLY
G-06 MASONRY WALL SECTION DETAILS - FOR REFERENCE ONLY
G-07 STRUCTURAL FRAMING PLAN - FOR REFERENCE ONLY
ARCHITECTURAL
A-01 ROOFING PLAN
A-02 ROOFING DETAILS
A-03 ROOFING DETAILS
A-04 ROOFING DETAILS
AutoCAD SHX Text
INDIAN CREEK ROAD
GENERAL NOTES
PART 1 - SCOPE
A. SEE EXHIBIT "A" AND SUPPLEMENTAL TERMS AND CONDITIONS AND PROJECT MANUAL FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
B. FURNISH ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO COMPLETE THE SCOPE OF WORK BELOW AND AS NOTED ON THE DRAWING.
C. INSTALLATION OF ALL MATERIALS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S PUBLISHED INSTRUCTIONS AND ALL WORK
PERFORMED IN ACCORDANCE WITH OSHA REGULATIONS.
D. PROVIDE FULL TEAR-OFF DOWN TO METAL DECK INCLUDING ACCESSORIES. PROVIDE NEW PVC ADHERED ROOFING SYSTEM AS PER ASSEMBLY DETAILS ON DRAWINGS AND SPECIFICATIONS TO PROVIDE A COMPLETE WATER-TIGHT RE-ROOFING APPLICATION.
E. PROVIDE ALL MATERIALS AND DETAILS REQUIRED BY THE ROOFING MANUFACTURER'S PUBLISHED INSTRUCTIONS WHETHER SPECIFICALLY
IDENTIFIED HEREIN OR ON THE DRAWINGS.
F. SEE PROTECTION NOTES FOR REQUIRED PROTECTION OF EXISTING.
G. FIELD VERIFY ALL DIMENSIONS PRIOR TO STARTING ANY WORK.
H. CAREFULLY INSPECT AND SURVEY CONDITIONS IMMEDIATELY BENEATH THE ROOF DECK. COORDINATE ELECTRICAL CONDUIT LOCATIONS
WITHIN DECK FLUTES.
I. SUBCONTRACTOR IS RESPONSIBLE FOR LOCATING ANY EXISTING CONDUIT LOCATIONS IN FLUTES OF METAL DECKING. CONDUITS MUST BE LOCATED, COORDINATED, AND MARKED ON ROOFING MATERIALS PRIOR TO INSTALLATION OF ANY MECHANICAL FASTENERS. CONFIRMATION WITH FERMILAB CONSTRUCTION COORDINATOR IS REQUIRED PRIOR TO INSTALLATION OF ANY MECHANICAL FASTENERS.
J. SUBCONTRACTOR IS RESPONSIBLE FOR LOCATING AND MARKING ALL EXISTING UTILITIES BEFORE COMMENCING ANY WORK. IF THE SUBCONTRACTOR FAILS TO LOCATE OR MARK SUCH UTILITIES, AND SUCH FAILURE RESULTS IN DAMAGE TO ANY UTILITY, THE SUBCONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL COSTS, INCLUDING BUT NOT LIMITED TO REPAIR, REPLACEMENT, RELOCATION , AND CONSEQUENTIAL DAMAGES, AS WELL AS DELAY AND DISRUPTION COSTS.
K. PROVIDE SAFETY BARRICADES AND WARNING SIGNS TO PREVENT ENTRANCE TO WORK ZONE, STAGING AREAS AND SURROUNDING AREAS.
L. SUBCONTRACTOR SHALL INSTALL ALL NECESSARY PROTECTION FOR EXISTING IMPROVEMENTS, PROJECT SITE, PROPERTY AND NEW WORK AGAINST, DUST, DIRT, WEATHER, DAMAGE, VANDALISM AND MAINTAIN AND RELOCATE ALL PROTECTION TO ACCOMMODATE PROGRESSION OF
THE WORK.
M. ALL COMPONENTS TO BE INSTALLED IN DRY WEATHER AND SEALED OFF FROM POSSIBLE INCLEMENT WEATHER AT THE END OF EACH DAY WORKED. TEMPORARY CLOSURES WILL BE REQUIRED AT THE END OF EACH WORKING DAY TO PREVENT THE FLOW OF WATER BENEATH THE
ROOF SYSTEM DURING INCLEMENT WEATHER.
N. DAILY ROOFING TEAR OFF WILL BE LIMITED TO THE AMOUNT THAT CAN BE REPLACED IN A DAY'S WORK. SUBCONTRACTOR WILL BE LIABLE FOR
ALL DAMAGES RESULTING FROM AN IMPROPERLY INSTALLED NIGHTLY TIE-IN.
O. DAILY CLEAN-UP OF WORK AREA IS REQUIRED. ALL MATERIALS FROM DEMOLITION, EXCEPT METAL, SCRAPS AND PACKING MATERIALS SHALL BE DISPOSED OF IN SUBCONTRACTOR PROVIDED CONTAINERS. ALL MATERIALS SHALL BE REMOVED FROM THE SITE AT THE END OF THE
PROJECT.
P. SUBCONTRACTOR SHALL COORDINATE WORK AND COOPERATE WITH SUBCONTRACTORS ON ADJACENT AND CONCURRENT WORK.
Q. AFTER REMOVAL OF ALL ROOFING MATERIAL VERIFY METAL DECKING IS SOUND, DRY, AND FREE OF OIL, RUST AND DEBRIS. NOTIFY FERMILAB CONSTRUCTION COORDINATOR OF ANY AREAS THAT ARE NOT IN ACCORDANCE WITH ROOFING MANUFACTURER'S REQUIREMENTS.
R. REFER TO GENERAL NOTES ON ARCHITECTURAL DRAWINGS FOR MORE REQUIREMENTS REGARDING TO EXISTING SURFACE CONDITIONS, AND
REMOVAL REQUIREMENTS.
S. DEBRIS SHALL BE REMOVED FROM THE FERMILAB SITE. CONSTRUCTION/DEMOLITION WASTE MATERIALS SHALL BE DISPOSED OF TO A RECYCLING VENDOR TO THE EXTENT PRACTICABLE. SUBCONTRACTOR SHALL SUBMIT A REPORT AT THE CONCLUSION OF THE JOB OF THE
AMOUNT OF WASTE RECYCLED.
GENERAL NOTES (CONTINUED)
PART 5 - MASONRY WALL REPAIR (CONTINUED)
Official Name of Building: NUMSB MINOS
FIMS Number: 785
New Roof ID(s) R785R01
Roof Area (Square Feet) 4444
Roofing Contractor Name:
Address:
Phone Number:
Date of New Roofing:
Roofing System Used:
Cool Roof (Y/N):
A ug
6,
- 3
:5 9p m M
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \6
\7 N uM I\1
M in os
R oo f R ep la ce m en t H ig h Ba y\
- F in al D es ig n\
D ra w in gs
\6 -7
-1
_M
IN
O S_
G
-G
.d w g
07/13/26JAD
JAD
07/13/26
6-7-126
MINOS HIGH BAY ROOF REPLACEMENT
and MASONRY WALL REPAIR
G-02
/0
3/
IS
SU
E
FO
R B
ID
GENERAL NOTES
ISSUE FOR CCR 05/29/26
ISSUE FOR BIDDING 08/03/26
7856-7-9
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES
DIRECTORATE
PART 2 - SITE INVESTIGATION AND WORK CONDITIONS AFFECTING WORK; CONTRACT DOCUMENTS A. THE SUBCONTRACTOR ACKNOWLEDGES THAT IT HAS TAKEN STEPS REASONABLY NECESSARY TO ASCERTAIN THE NATURE AND LOCATION OF
THE WORK AND THAT IT HAS INVESTIGATED AND SATISFIED ITSELF AS TO THE GENERAL AND LOCAL CONDITIONS WHICH CAN AFFECT THE
WORK OR ITS COST, INCLUDING BUT NOT LIMITED TO:
1. CONDITIONS BEARING UPON TRANSPORTATION, DISPOSAL, HANDLING, AND STORAGE OF MATERIALS;
2. THE AVAILABILITY OF LABOR, WATER ELECTRIC POWER, AND ROADS;
3. UNCERTAINTIES OF WEATHER OR SIMILAR PHYSICAL CONDITIONS AT THE SITE;
4. THE CONFORMATION AND CONDITIONS OF THE GROUND; AND
5. THE CHARACTER OF EQUIPMENT AND FACILITIES NEEDED PRELIMINARY TO AND DURING WORKED PERFORMANCE.
6. THE SUBCONTRACTOR ALSO ACKNOWLEDGES THAT IT HAS SATISFIED ITSELF AS TO THE CHARACTER, QUALITY, AND QUANTITY OF
SURFACE AND SUBSURFACE MATERIALS OR OBSTACLES TO BE ENCOUNTERED INSOFAR AS THIS INFORMATION IS REASONABLY ASCERTAINABLE OR INFERABLE FROM AN INSPECTION OR EXPLORATION OF THE SITE, FROM EXPLORATORY WORK DONE AND DISCLOSED BY FERMILAB OR ANY OTHER PERSON, FROM THE DRAWINGS AND SPECIFICATIONS MADE A PART OF THE SUBCONTRACT OR FROM ANY COMBINATION THEREOF. ANY FAILURE BY THE SUBCONTRACTOR TO TAKE THE ACTIONS DESCRIBED AND ACKNOWLEDGED IN THIS PARAGRAPH WILL NOT RELIEVE THE SUBCONTRACTOR FROM RESPONSIBILITY FOR ESTIMATING PROPERLY THE DIFFICULTY AND COST OF SUCCESSFULLY PERFORMING THE WORK OR FOR PROCEEDING TO SUCCESSFULLY PERFORM THE WORK WITHOUT ADDITIONAL EXPENSE
TO FERMILAB.
PART 3 - PROTECTION
A. PRIOR TO STARTING ANY WORK, CAREFULLY INSPECT THE UNDERSIDE OF THE DECK TO INSURE NO INTERFERENCE FROM EXISTING PIPING, CONDUIT, DUCT WORK, OR EQUIPMENT. NOTIFY THE FERMILAB CONSTRUCTION COORDINATOR IMMEDIATELY OF ANY CONDITIONS THAT MAY
INTERFERE WITH ROOFING FASTENERS.
B. EXISTING FACILITIES: PROTECT ADJACENT WALKWAYS, ENTRIES, LANDSCAPING AND OTHER BUILDING FACILITIES DURING DEMOLITION
OPERATIONS. MAINTAIN EXITS FROM EXISTING STRUCTURES.
C. EXISTING UTILITIES: MAINTAIN UTILITY SERVICES AND PROTECT FROM DAMAGE DURING DEMOLITION OPERATIONS.
D. TEMPORARY PROTECTION: ERECT TEMPORARY PROTECTION, SUCH AS WALKS, FENCES, RAILINGS, CANOPIES, AND COVERED PASSAGEWAYS.
1. PROTECT STRUCTURES AND FACILITIES FROM DAMAGE DUE TO DEMOLITION ACTIVITIES.
2. PROTECT EXISTING SITE IMPROVEMENTS, APPURTENANCES, AND LANDSCAPING TO REMAIN.
3. PROVIDE TEMPORARY BARRICADES AND OTHER PROTECTION REQUIRED TO PREVENT PUBLIC ACCESS INTO WORK AREA AND INJURY TO
PEOPLE AND DAMAGE TO ADJACENT STRUCTURES AND FACILITIES.
4. PROVIDE PROTECTION TO ENSURE SAFE PASSAGE OF PEOPLE AROUND DEMOLITION AREA AND TO AND FROM OCCUPIED PORTIONS OF
ADJACENT STRUCTURES. PROTECT EXITS WITH COVERED WALKWAY TO PUBLIC WAY.
5. PROTECT WALLS, WINDOWS, ROOFS, AND OTHER ADJACENT EXTERIOR CONSTRUCTION THAT ARE TO REMAIN AND THAT ARE EXPOSED TO
DEMOLITION OPERATIONS.
6. ERECT AND MAINTAIN TEMPORARY ENCLOSURES TO PREVENT FUMES, DUST, NOISE, AND DIRT MIGRATION INTO BUILDINGS.
D. RESTORE ALL PLANTING AREAS UPON COMPLETION OF WORK AND REMOVAL OF EQUIPMENT.
GENERAL NOTES (CONTINUED)
PART 4 - WARRANTY REQUIREMENTS:
NOTE: FINAL PAYMENT WILL NOT BE ISSUED WITHOUT RECEIPT OF WARRANTY
A. THE SUBCONTRACTOR SHALL BE AN “APPROVED APPLICATOR” AS RECOGNIZED BY THE ROOFING MANUFACTURER.
B. SUBCONTRACTOR SHALL INSTALL THE ROOFING SYSTEM IN STRICT ACCORDANCE WITH THE MANUFACTURERS PUBLISHED DETAILS, SPECIFICATIONS, AND RECOMMENDATIONS TO COMPLY WITH THE WARRANTY REQUIREMENTS.
C. MANUFACTURER'S NOTICE OF APPROVAL: CONTRACTOR TO PROVIDE A NOTICE OF APPROVAL SIGNED BY THE ROOFING MANUFACTURER STATING THAT THE PROPOSED ROOFING SYSTEM HAS BEEN REVIEWED AND COMPLIES WITH SPECIFIED WARRANTY REQUIREMENTS. DOCUMENT MUST BE SUBMITTED TO OWNER PRIOR TO BEGINNING WORK.
D. A PRECONSTRUCTION MEETING PRIOR TO THE START OF CONSTRUCTION IS REQUIRED AND SHALL INCLUDE THE
MANUFACTURER'S REPRESENTATIVE.
E. UPON COMPLETION AND INSPECTION BY THE ROOFING MANUFACTURER'S REPRESENTATIVE, SUBCONTRACTOR SHALL ISSUE A TWENTY (20) YEAR TOTAL SYSTEM LABOR AND MATERIAL WARRANTY WITHOUT MONETARY LIMITATION COVERING ALL DEFECTS
IN MATERIAL AND WORKMANSHIP FOR THE TERM OF THE WARRANTY.
THE FOLLOWING INFORMATION SHALL BE PROVIDED BY THE SUBCONTRACTOR AND INCLUDED ON EACH ROOFING WARRANTY:
PROVIDE ONE (1) ELECTRONIC VERSION (PDF) OF EACH WARRANTY. DO NOT GROUP WARRANTIES.
SUBMIT EXECUTED WARRANTY TO JACQUELYN DRAGOVICH , JDRAGOVI@FNAL.GOV, 630-840-5440
PART 5 - MASONRY WALL REPAIR (CONTINUED)
1. COORDINATION AND PROJECT INTEGRATION
1.A. MASONRY WALL REPAIR WORK MUST BE COORDINATED WITH THE MINOS HIGH BAY ROOF REPLACEMENT.
1.B. SUBCONTRACTOR SHALL REVIEW EXISTING CONDITIONS AND SUBMIT COMPREHENSIVE REPAIR APPROACH
SUMMARY. EXAMINE SUBSTRATE AND CONDITIONS OF WORK AND NOTIFY FFDG CONSTRUCTION COORDINATOR AND FFDG PROJECT MANAGER IN WRITING OF DETRIMENTAL CONDITIONS. DO NOT PROCEED UNTIL UNSATISFACTORY
CONDITIONS HAVE BEEN CORRECTED
1.C. FFDG MUST APPROVE OF SUBCONTRACTOR'S REPAIR APPROACH SUMMARY BEFORE SUBCONTRACTOR MOVES
FORWARD WITH REPAIRS.
1.D. SUBCONTRACTOR TO REFER TO SPECIFICATIONS SECTION 040120.63 BRICK MASONRY REPAIR AND SECTION
040120.64 - BRICK MASONRY REPOINTING FOR MORE INFORMATION.
1.E. REFER TO SECTION 040120.63 PARAGRAPH 1.8 FOR PREPARATION REQUIREMENTS OF BRICK MASONRY REPAIR MOCKUPS TO DEMONSTRATE AESTHETIC EFFECTS AND SET QUALITY STANDARDS FOR MATERIAL INSTALLATION.
2. SCOPE INVESTIGATION:
2.A. SUBCONTRACTOR IN COORDINATION WITH FFDG CONSTRUCTION COORDINATOR AND FFDG ARCHITECT/PROJECT MANAGER WILL CONDUCT A SCOPE INVESTIGATION TO REVIEW EXISTING CONDITION OF MASONRY WALL.
INVESTIGATION WILL IDENTIFY POTENTIAL SOURCES OF WATER INTRUSION, INCLUDING COPING STONE CONDITIONS, MEMBRANE FAILURES, FLASHING ISSUES, POROUS LIMESTONE AND INADEQUATE DRAINAGE.
2.B. INVESTIGATION OF EXISTING LIMESTONE COPING, FLASHING, AND MEMBRANE CONDITIONS SHALL OCCUR AT THE SAME TIME AS TUCKPOINTING TO ENSURE COMPLETE UNDERSTANDING OF WATER_INTRUSION PATHWAYS.
2.C. TUCKPOINTING MAY BE PERFORMED ONLY AFTER COPING, FLASHING, MEMBRANE, AND DRAINAGE REPAIRS ARE
COMPLETE.
3. SUBCONTRACTOR WILL PREPARE TO DECONSTRUCT THE WALL AT HIGHEST POINT ON MINOS HIGH BAY ROOF FOR INVESTIGATION
BY FFDG ARCHITECT AND FFDG A/E CONSULTANT.
3.A. THE WALL PORTION THAT IS OPENED MUST BE WEATHER TIGHT AT CONCLUSION OF THE INVESTIGATION.
4. SUBCONTRACTOR MUST BE PREPARED TO CORRECT, INCLUDING BUT NOT LIMITED TO, THE FOLLOWING:
4.A.A. MISSING OR FAILED COPING FLASHING/MEMBRANE
4.A.B. POROUS/CRACKED LIMESTONE COPING
4.A.C. OPEN JOINTS UNDER COPING
4.A.D. MISSING KERFS/DRIP EDGES
4.A.E. FAILED/CLOGGED/ MISSING WEEP HOLES
4.A.F. DETERIORATED THROUGH_WALL FLASHINGS
4.A.G. THERMAL_MOVEMENT RELATED TO COPING JOINT CRACKS
4.A.H. UNSEALED DOWEL/PIN PENETRATIONS
4.A.I. TUCKPOINTING ALONE IS NOT CONSIDERED AN ACCEPTABLE SOLUTION.
4.A.J. WEEP HOLE CLEANING/ REPAIR OR INSTALLATION OF WEEP HOLES AS REQUIRED.
5. IN THE ABSENCE OF A FINALIZED STRATEGY BY FFDG ARCHITECT AND FFDG A/E CONSULTANT, SUBCONTRACTOR SHALL PROPOSE A COMPREHENSIVE STRATEGY TO INCLUDE BUT NOT LIMITED TO THE FOLLOWING REQUIREMENTS. NOTE THAT THIS IS SUBJECT TO CHANGE BASED ON INVESTIGATION RESULTS AND ANALYSIS FROM FFDG A/E CONSULTANT. UNLESS INVESTIGATION PROVES OTHERWISE, THE SUBCONTRACTOR SHOULD FOLLOW THE GENERAL WORK SEQUENCE OUTLINED BELOW.
5.A. REMOVE COPING STONES AND DETERIORATED COMPONENTS AS NEEDED. SUBCONTRACTOR TO BEGIN AT HIGHEST
POINT OF MASONRY WALL ABOVE HIGH BAY ROOF.
5.B. CLEAN AND INSPECT PARAPET TOP.
5.C. EXAMINE SUBSTRATE AND CONDITIONS OF WORK AND NOTIFY FFDG CONSTRUCTION COORDINATOR AND FFDG
PROJECT MANAGER IN WRITING OF DETRIMENTAL CONDITIONS. DO NOT PROCEED UNTIL UNSATISFACTORY
CONDITIONS HAVE BEEN CORRECTED
5.D. INSTALL PEEL_AND_STICK MEMBRANE OVER PARAPET TOP.
5.E. INSTALL STAINLESS STEEL THROUGH_WALL FLASHING WITH END DARESET OR REPLACE COPING STONES WITH
CORRECT SLOPE AND DRIP KERFS
5.F. SEAL COPING JOINTS WITH APPROPRIATE SEALANT.
5.G. RESTORE DRAINAGE CAVITY AND WEEPS.
5.H. PERFORM FINAL TUCKPOINTING OF MASONRY JOINTS.
5.I. ROOFER WILL BE RESPONSIBLE FOR TYING IN THE NEW MEMBRANE WITH COUNTERFLASHING AND/OR FLUID APPLIED
MEMBRANE AS PER MANUFACTURER'S GUIDELINES AND WARRANTIES.
5.J. IF ANY REMOVAL/REPLACEMENT OF COUNTER FLASHING ON LOWER ROOFS REQUIRED, SUBCONTRACTOR SHOULD
REFER TO JOHNS MANVILLE WARRANTY INFORMATION ON SHEET A-01 FOR LOWER ROOFS THAT ARE NOT PART OF
SCOPE.
5.K. SUBCONTRACTOR SHALL ENSURE THAT MASONRY WALL IS WEATHERTIGHT AT CONCLUSION OF SCOPE
INVESTIGATION, AT END OF EACH WORKDAY, AND AT ANY MILESTONE.
5.L. LIMESTONE COPING STONE REQUIREMENTS
5.L.1. INSPECT AND REPLACE COPING STONES AS REQUIRED; MAINTAIN MINIMUM 2" OVERHANG WITH DRIP KERF CUT ½"
BACK FROM EDGE.
5.L.2. PROVIDE/REPLACE STAINLESS STEEL DOWELS OR PINS ONLY WHERE STRUCTURALLY REQUIRED; MAINTAIN
EXPANSION JOINTS AT 4-6 FT INTERVALS UNLESS STONE LENGTH DICTATES OTHERWISE.
5.L.3. INSTALL CONTINUOUS PEEL_AND_STICK MEMBRANE FULLY ADHERED TO THE PARAPET TOP BEFORE COPING IS
PLACED.
5.L.4. AT DOWEL/PIN PENETRATIONS, MEMBRANE SHALL BE CUT TIGHT AND PATCHED TO CREATE A SEALED “BOOT.”
5.L.5. PROVIDE ½" PER FOOT SLOPE TOWARD THE ROOF SIDE.
5.M. ROOF MEMBRANE AND WATERPROOFING INTEGRATION
5.M.1. PVC ROOF MEMBRANE SHALL TURN UP THE PARAPET AS PER MANUFACTURER'S GUIDELINES FOR 30 YEAR
GUARANTEE. REFER TO DRAWING DETAILS AND SPECIFICATIONS. FOR LOWER ROOFS NOT IN SCOPE, REFER TO JOHNS MANVILLE WARRANTY FOR GUIDELINES. REFER TO NOTE ON A-01 ROOF PLAN FOR MORE INFORMATION ON
JOHNS MANVILLE WARRANTY INFORMATION.
5.M.2. REFER TO SPECIFICATIONS AND DRAWINGS FOR MORE INFORMATION ON LIQUID (FLUID) APPLIED MEMBRANE
FLASHING WHICH WILL BE APPLIED ON MASONRY AS PER SPECIFICATIONS AND DRAWINGS.
5.M.3. IF AFTER INVESTIGATION, THE EXISTING COMPONENTS DO NOT PROVIDE SUFFICIENT PROTECTION, INSTALL A FLUID-APPLIED AIR BARRIER BEHIND THE VENEER, ENSURING IT TIES INTO THE ROOF MEMBRANE, SO THE AIR AND
WATER BARRIER REMAIN CONTINUOUS. MASONRY BACKUP AND CAVITY DRAINAGE
5.M.4. CONFIRM AND MAINTAIN MINIMUM 2" DRAINAGE CAVITY BEHIND VENEER AS SHOWN IN REFERENCE DRAWINGS.
5.M.5. INSTALL OR REPLACE STAINLESS STEEL THROUGH WALL FLASHING WITH END DAMS AT COPING LEVEL.
5.N. PARAPET WALL CONSTRUCTION REQUIREMENTS
5.N.1. TOP COURSE OF CMU BACKUP SHALL BE FULLY GROUTED AND PROTECTED WITH PEEL_AND_STICK MEMBRANE.
5.N.2. PROVIDE CONTINUOUS STAINLESS STEEL PARAPET ANCHORS WHERE REQUIRED.
5.N.3. PROVIDE WEEP HOLES AT 24" O.C. MAX ABOVE ROOF THROUGH WALL FLASHING AND AT BASE OF MASONRY WALL.
5.N.4. RESTORE OR CLEAR BLOCKED DRAINAGE CAVITIES AS REQUIRED.
5.N.5. E CONTINUITY BETWEEN ROOF INSULATION AND WALL INSULATION TO MINIMIZE THERMAL BRIDGING.
5.O. INSULATION REQUIREMENTS
5.O.1. WHERE FEASIBLE, PROVIDE CONTINUOUS EXTERIOR INSULATION (RIGID MINERAL WOOL OR POLYISOCYANURATE
BOARD INSULATION) AS SHOWN ON REFERENCE DRAWINGS.
5.O.2. ENSURE CONTINUITY BETWEEN ROOF INSULATION AND WALL INSULATION TO MINIMIZE THERMAL BRIDGING.
5.P. CONTROL AND EXPANSION JOINTS
5.P.1. PROVIDE VERTICAL EXPANSION JOINTS IN VENEER EVERY 20-25 FT OR AS DIRECTED.
5.P.2. RESTORE SOFT JOINTS BELOW COPING TO ACCOMMODATE DIFFERENTIAL MOVEMENT.
5.Q. TUCKPOINTING GUIDANCE
5.Q.1. TUCKPOINTING MAY BE PERFORMED ONLY AFTER COPING, FLASHING, MEMBRANE, AND DRAINAGE REPAIRS ARE
COMPLETE.
5.Q.2. MORTAR JOINT TUCKPOINTING IS A FINAL STEP, NOT A PRIMARY WATER_INTRUSION FIX.
6. FFDG HAS LIMITED QUANTITY OF FACE BRICK TO MATCH EXISTING. SUBCONTRACTOR TO FIND BEST MATCH AND PROVIDE A
SAMPLE AS PER SPECIFICATION 040120.63 BRICK MASONRY REPAIR.
6.A. SF TAKE OFFS NEED TO BE VERIFIED IN FIELD. THE NUMBERS BELOW ARE APPROXIMATE.
6.B. SF OF BRICK ON OUTSIDE FACE IS APPROX. 4650 SF.
6.C. SF OF BRICK ON INSIDE FACE (ROOF SIDE) IS APPROX. 1330 SF.
6.D. TOTAL SF OF BRICK IS APPROX. 5980 SF.
6.E. LENGTH OF LIMESTONE COPING(STOCK UNITS, 12" WALL, 6" THICK0 IS APPROXIMATELY 200 LINEAR FOOT.
6.F. FACE BRICK INFORMATION FROM EXISTING BUILDING (PROJECT 6-7-5).
6.G. CONFORM TO REQUIREMENTS OF ASTM SPECIFICATION C216, GRADE SW, TYPE FBS, TRIPLE SIZE (3-5/8” X 7-5/8” X
7-5/8”) AND CLOSURE BRICK. BRICK SHALL BE “MEDIUM IRONSPOT 46 VELOUR” AS MANUFACTURED BY ENDICOTT CLAY
PRODUCTS CO., FAIRBURY, NE.
6.H. BRICK HAVING CORES IN EXCESS OF 25% SHALL NOT BE USED. NO PART OF ANY HOLE SHALL BE LESS THAN 3/4 INCH FROM ANY EDGE OF BRICK. BRICKS MAY HAVE A RECESS (FROG) IN ANY ONE BEARING FACE NOT EXCEEDING 3/8 INCH
IN DEPTH. NO PART OF FROG SHALL BE LESS THAN 3/4 INCH FROM EDGE OF BRICK.
6.I. FACES AND ENDS THAT WILL BE EXPOSED IN THE COMPLETED WORK SHALL BE UNIFORMLY STRAIGHT, TRUE, AND
FREE FROM CHIPS AND SPALLS.
EXISTING LADDER ANCHOR REFER TO
SPECIFICATIONS AND ROOF DETAIL
DRAWINGS FOR FLASHING AND SEALING
REQUIREMENTS
EXISTING ROOF
DRAIN
EXISTING TIE
ANCHOR
EXISTING SECURITY
CAMERAEXISTING ROOF
DRAIN
EXISTING ROOF
DRAIN
EXISTING SECURITY
CAMERA
EXISTING ANTENNA
STAND
EXISTING ROOF
DRAIN
EXISTING ROOF
WALKING PADS
EXISTING ROOF
HATCH
EXISTING ROOF
WALKING PADS
EXISTING
TRIPOD.
NOT IN
SCOPE
EXISTING TIE
ANCHOR
EXISTING ROOF
DRAIN
EXISTING ROOF
HATCH
EXISTING TIE
ANCHOR
EXISTING VENT
STACK
EXISTING VENT
STACK
712.4772
EXISTING
ANTENNAE
NOT IN
SCOPE
1 2 3 4 5
EXIST.
FAN
AT AT ATAT 3
G-05
G-05
G-05
G-05
G-05
G-059
G-05
G-05
G-05
G-05
G-05
KEY PLAN LAB B
N.T.S.
N.T.S.
N.T.S. G-03
1PHOTO OF HIGH BAY
LOOKING NORTH
N.T.S. G-03
2PHOTO OF HIGH BAY
LOOKING SOUTH
N.T.S. G-03
3PHOTO OF HIGH BAY
LOOKING WEST
N.T.S. G-03
4ROOF DRAIN FLOODING
PHOTO OF HIGH BAY
N.T.S. G-03
5PHOTO OF EXISTING TIE ANCHOR
N.T.S. G-03
PHOTO OF LADDER ANCHOR
N.T.S. G-03
7PHOTO OF HIGH BAY
LOOKING NORTH
N.T.S. G-03
8ROOF DRAIN FLOODING
PHOTO OF HIGH BAY
N.T.S. G-03
10SECURITY CAMERA
LOOKING EAST
N.T.S. G-03
11HIGH BAY ANTENNA STAND
LOOKING SOUTH
N.T.S. G-03
9ANCHOR TIE
PHOTO OF EXISTING
A ug
2,
- 1
0:
pm M
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \6
\7 N uM I\1
M in os
R oo f R ep la ce m en t H ig h Ba y\
- F in al D es ig n\
D ra w in gs
\6 -7
-1
_M
IN
O S_
G
-G
.d w g
07/15/26JAD
JAD
07/15/26
6-7-126
MINOS HIGH BAY ROOF REPLACEMENT
and MASONRY WALL REPAIR
G-03
/0
3/
IS
SU
E
FO
R B
ID
PHOTOS OF EXISTING
CONDITIONS
ISSUE FOR CCR 05/29/26
ISSUE FOR BIDDING 08/03/26
7856-7-9
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES
DIRECTORATEPROJECT
NORTH
E
S
W
A ug
2,
- 1
0:
pm M
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \6
\7 N uM I\1
M in os
R oo f R ep la ce m en t H ig h Ba y\
- F in al D es ig n\
D ra w in gs
\6 -7
-1
_M
IN
O S_
G
-G
.d w g
07/15/26JAD
JAD
07/15/26
6-7-126
MINOS HIGH BAY ROOF REPLACEMENT
and MASONRY WALL REPAIR
G-04
/0
3/
IS
SU
E
FO
R B
ID
GROUND FLOOR PLAN - FOR
REFERENCE ONLY
ISSUE FOR CCR 05/29/26
ISSUE FOR BIIDDING 08/03/26
7856-7-9
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES
DIRECTORATE
N.T.S.
PROJECT
NORTH
E
S
W
FOR REFERENCE ONLY - GROUND FLOOR PLAN
NTS
A ug
2,
- 1
0:
pm M
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \6
\7 N uM I\1
M in os
R oo f R ep la ce m en t H ig h Ba y\
- F in al D es ig n\
D ra w in gs
\6 -7
-1
_M
IN
O S_
G
-G
.d w g
07/15/26JAD
JAD
07/15/26
6-7-126
MINOS HIGH BAY ROOF REPLACEMENT
and MASONRY WALL REPAIR
G-05
/0
3/
IS
SU
E
FO
R B
ID
MASONRY WALL DETAILS - FOR
REFERENCE ONLY
ISSUE FOR CCR 05/29/26
ISSUE FOR BIDDING 08/03/26
7856-7-9
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES
DIRECTORATE
N.T.S.
PROJECT
NORTH
E
S
W
FOR REFERENCE ONLY
CONT. 16 GA. GALV. CLEAT PAINTED
TO MATCH EXT. WALL PANELS
PRE-FINISHED 18 GA. GALV. FASCIA
COPING. COLOR TO MATCH WALL
PANELS
CONT. 3/16"x12"x4 1/2" BENT PLATE
CLOSURE. TYP. AT PERIMETER OF BUILDING
AT COLUMN LINES 1, 5, A AND B. WELD TO
TOP OF BEAM FLANGE. PAINT.
2x6 TREATED WOOD NAILERS & BLOCKING, FASTEN TO BENT PLATE
20 GA. CAP
FLASHING. WRAP
OVER TOP OF
PARAPET WALL
20 GA. CAP FLASHING. WRAP OVER
EL. 784'-6"
TOP / FASCIA COPING
TOP / FASCIA COPING
EL. 784'-6"
TOP / STEEL
EL. 782'-6"
4-PLY BUILT-UP ROOFING SYSTEM OVER
1/2" FIBERBOARD OVER TAPERED ROOF
INSULATION AND 1-1/2" METAL ROOF
DECK
TOP OF PARAPET WALL
4" NOM. CANT
WALL GIRT
METAL PANEL
1-1/2" FLUSH EXTERIOR INSULATED
GALV. 1/2" SUBGIRT
METAL LINER PANEL
2" INTERIOR INSULATED
1/
4"
6"
1" 1" 4"
10"
7"
1/
2"
4 PLY BUILT-UP ROOFING SYSTEM OVER
1/2" FIBERBOARD OVER TAPERED
ROOF INSULATION AND 1-1/2" METAL
ROOF DECK
3-1/2"x3-1/2"x3/8"x4" CLIP
ANGLE CONNECTOR - ANCHOR
TO EACH VERTICAL MULLION
CLEAR ANODIZED ALUM.
FACIA, GRAVEL STOP
TO MATCH CURTAIN WALL
WOOD BLOCKING
ANCHOR SECURELY
8"x5"x3/8" CONT.
WELD TO BEAM
SEALANT
ALUM. CURTAIN
WALL FRAMING
SYSTEM w/ 1" INSUL.
SPANDREL GLASS
VERTICAL MULLION
TOP / STEEL
EL. 766'-6"
ALUMINUM CURTAIN WALL 1-1/2"=1'-0"
HEAD/ROOF FASCIA
A-20
A 1 B 5
1'-0" 4" 2"
1' -0
4" 2"
3"
2' -0
DETAIL-COPING
COPING 3"=1'-0" -
GALVANIZED 18 GA.
GRAVEL STOP 3" HIGH
4-PLY BUILT-UP ROOFING
SYSTEM OVER 1/2"
FIBERBOARD OVER
TAPERED INSULATION AND
1-1/2" METAL ROOF DECK
'-0
CANT
GRAVEL
3"
TRIM FASTEN TO WALL
18 GA. GALV. & PAINTED STL.
STL. PLATE
SEALANT
3"x12" WIDE
PRE-FINISHED 18 GA.
GALV. FASCIA COPING.
COLOR TO MATCH WALL
PANELS
4" 2"1'-0"
WALL GIRT
EL. 782'-6"
TOP / STEEL
EL. 784'-6"
TOP / FASCIA COPING
EL. 783'-6"
BOT / FASCIA COPING
20 GA. CAP FLASHING B
OVERFLOW OPENING
3" 3"
CONT. 3/16"x12"x4 1/2" BENT
PLATE CLOSURE. TYP. AT
PERIMETER OF BUILDING AT
COLUMN LINES 1, 5, A AND B.
WELD TO TOP OF BEAM FLANGE.
PAINT.
2x6 TREATED WOOD NAILERS &
BLOCKING, FASTEN TO BENT PLATE
STEEL FRAMING -
SEE STRUCT.
STEEL BEAMS -
SEE STRUCTURAL
'-0
SECTION
PARAPET 1-1/2"=1'-0" A-19
A
SECTION
OVERFLOW OPENING 1-1/2"=1'-0" A-14
C
G06
FOR REFERENCE ONLY
FOR REFERENCE ONLY
FOR REFERENCE ONLY
FOR REFERENCE ONLY
A ug
2,
- 1
0:
pm M
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \6
\7 N uM I\1
M in os
R oo f R ep la ce m en t H ig h Ba y\
- F in al D es ig n\
D ra w in gs
\6 -7
-1
_M
IN
O S_
G
-G
.d w g
07/15/26JAD
JAD
07/15/26
6-7-126
MINOS HIGH BAY ROOF REPLACEMENT
and MASONRY WALL REPAIR
G-06
/0
3/
IS
SU
E
FO
R B
ID
WALL SECTION DETAILS -
FOR REFERENCE ONLYISSUE FOR CCR 05/29/26
ISSUE FOR BIDDING 08/03/26
7856-7-9
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES
DIRECTORATE
N.T.S.
PROJECT
NORTH
E
S
W
A ug
2,
- 1
0:
pm M
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \6
\7 N uM I\1
M in os
R oo f R ep la ce m en t H ig h Ba y\
- F in al D es ig n\
D ra w in gs
\6 -7
-1
_M
IN
O S_
G
-G
.d w g
07/15/26JAD
JAD
07/15/26
6-7-126
MINOS HIGH BAY ROOF REPLACEMENT
and MASONRY WALL REPAIR
G-07
/0
3/
IS
SU
E
FO
R B
ID
STRUCTURAL FRAMING PLAN -
FOR REFERENCE ONLY
ISSUE FOR CCR 05/29/26
ISSUE FOR BIDDING 08/03/26
7856-7-9
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES
DIRECTORATE
N.T.S.
PROJECT
NORTH
E
S
W
FOR REFERENCE ONLY -ROOF FRAMING PLAN
A
B
±1 2'
-1
1/ 2"
V.
I.F
A-03
EXIST.
FAN
106'-8"
'-8
'-1
/4
NOT IN SCOPE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
AT AT ATAT
A-02
±24'-8 3/4" V.I.F.
26'-0"
EXTERIOR FACE
OF CURTAIN
WALL
±30'-11 1/4" V.I.F.
±3 8'
-9
/2
V.
I.F
±4
2' -3
/4
V
.I.
F.
EXIST. FALL ARREST
SYSTEM ANCHOR
TIE
EXIST. FALL ARREST
SYSTEM ANCHOR
TIE
A-03
EQUIMPMENT NUMBER
R785R02.1
(UPPER)
EQUIMPMENT
NUMBER
R785R02-(MIDDLE)
EQUIMPMENT
NUMBER
R785R02-(LOWER)
SLOPE
SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE
SL
O
PE
SLOPE
SLOPE
SL
O
PE
A-03
A-03
A-03
COLUMNS BELOW
APPROX. LOCATION
OF VENT STACK
26'-0"26'-0"26'-0" 1'-4"
EQUIMPMENT NUMBER R785R01
(HIGH BAY)
4300 SF ±
EXIST. ROOF HATCH
SLOPE SLOPESLOPE SLOPESLOPE SLOPE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
EXIST.
LADDER
TO
REMAIN
A11
A2
A1
A12
A3
A4 A5 A6A8
A12
A12
A12
A12
A7
A10A10
TYP. AT ALL
ROOF DRAINS
X A01
A01
X
X-XX
X
X-XX
SYMBOL LEGEND
PHOTO DETAIL LOCATION
SECTION DETAIL
LINE INDICATES ITEM TO BE
REMOVED
ROOF DRAIN WITH SUMP
NEW WALKWAY REFER TO KEYNOTES AND SPECIFICATIONS FOR MORE
INFORMATION
EXIST. FALL PROTECTION TIE ANCHORS
SLOPE
SLOPE FOR POSITIVE DRAINAGE
1/4" PER FOOT TYP. AT ALL ROOF LOCATIONS
AREA NOT IN SCOPE - REFER TO KEYNOTES AND GENERAL NOTES FOR MORE
INFORMATION.
SARNASTOP OVER THE COMPLETED SARNAFIL MEMBRANE.
3'-0" FROM ALL PERIMETER EDGES REFER TO SPECIFICATIONS AND
MANUFACTURER GUIDELINES. REFER TO KEYNOTE A8.
KEYNOTE LEGEND
EXISTING ANTENNA "A" TO BE REMOVED BY FERMILAB AND REPLACED BY FERMILAB. SUBCONTRACTOR TO COORDINATE WITH CONSTRUCTION COORDINATOR AND FFDG PROJECT MANAGER FOR SCHEDULE REQUIREMENTS FOR REMOVAL.
EXISTING CAMERA TO BE REMOVED BY FERMILAB. SUBCONTRACTOR TO PROVIDE NEW ROOF CURBS WITH EXTERIOR INSULATION .
REFER TO SIKA DETAIL ON SHEET A-04.
CURB HEIGHT TO BE MIN.18" ABOVE MEMBRANE AND TIED TO EXISTING METAL DECKING. SIZE OF CURBS TO ACCOMMODATE CAMERA
MOUNT SHOWN IN DETAIL FOR REFERENCE ONLY CAMERA MOUNT BASE ON SHEET A-04.
PROVIDE PREFABRICATED TAPERED SUMP AT DRAINS TO PROVIDE POSITIVE DRAINAGE AND IECC COMPLIANCE OF R30 FOR INSULATION. IF COMPLIANCE IS NOT ACHIEVED THROUGH TAPERED SUMP AN ADJUSTABLE COLLAR MUST BE PROVIDED.
TO PREVENT SPLITTING OF NEW PVC MEMBRANE- SARNAFIL S327 80 MIL MEMBRANE AT DRAINS, REFER TO MANUFACTURER
GUIDELINES.
EXISTING LEADER PIPES SHALL BE CLEANED OF EXCESS BITUMEN BUILD-UP, DIRT AND DEBRIS.
SUBCONTRACTOR TO INSTALL NEW STRAINER DOMES AT DRAINS. SUBCONTRACTOR TO INSPECT EXISTING ROOF DRAINS AND INFORM FERMILAB CONSTRUCTION COORDINATOR OF ANY ISSUES THAT MAY NEED TO BE ADDRESSED TO BE SURE POSITIVE DRAINAGE IS
ACHIEVABLE.
X
GENERAL NOTES:
1. SUBCONTRACTOR IS TO VERIFY ALL INFORMATION AND DIMENSIONS IN FIELD. ANY VARIANCE IN EXISTING CONDITIONS MUST BE COMMUNICATED TO
FERMILAB CONSTRUCTION COORDINATOR.
2. REFER TO REFERENCE DRAWINGS IN SHEET LIST TABLE IN GENERAL SUBSECTION FOR EXISTING STRUCTURAL FRAMING PLAN AND DRAWINGS, EXISTING
MASONRY WALL DETAILS, AND EXISTING COPING INFORMATION.
3. SUBCONTRACTOR IS RESPONSIBLE FOR LOCATING ANY EXISTING CONDUIT LOCATIONS IN FLUTES OF METAL DECKING. CONDUITS MUST BE LOCATED , COORDINATED, AND MARKED ON ROOFING MATERIALS PRIOR TO INSTALLATION OF ANY MECHANICAL FASTENERS. CONFIRMATION WITH FERMILAB CONSTRUCTION COORDINATOR IS REQUIRED PRIOR TO INSTALLATION OF MECHANICAL FASTENERS.
4. SUBCONTRACTOR IS RESPONSIBLE FOR LOCATING AND MARKING ALL EXISTING UTILITIES BEFORE COMMENCING ANY WORK. IF THE SUBCONTRACTOR FAILS TO LOCATE OR MARK SUCH UTILITIES, AND SUCH FAILURE RESULTS IN DAMAGE TO ANY UTILITY, THE SUBCONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL COSTS, INCLUDING BUT NOT LIMITED TO REPAIR, REPLACEMENT, RELOCATION , AND CONSEQUENTIAL DAMAGES, AS WELL AS
DELAY AND DISRUPTION COSTS.
5. TAPERED INSULATION SLOPE TO BE 1/4" PER FOOT AND SLOPED TO PROVIDE POSITIVE DRAINAGE.
6. INSULATION THICKNESS AT PARAPET WALLS VARIES-VERIFY BLOCKING FOR FASCIA, GRAVEL STOP AND RELATED REQUIREMENTS. ALL WOOD BLOCKING
IS TO BE FIRE RATED EXTERIOR GRADE.
7. ANY NEW METAL DECKING TO BE INSTALLED MUST BE MECHANICALLY SECURED TO STRUCTURE, TYPICAL AT ALL CLOSED ROOF OPENINGS. REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
8. ALL NEW ROOFING MATERIALS MUST BE INSTALLED TO PROVIDE POSITIVE DRAINAGE TO EXISTING ROOF DRAINS.
9. REFER TO SHEET G-02 FOR SCOPE OF WORK FOR REPAIR OF MASONRY WALL.
A. IN ADDITION TO WHAT IS OUTLINED IN SPECIFICATIONS, PVC AND ASPHALT ARE NOT COMPATIBLE. SUBCONTRACTOR TO REMOVE ALL EXISTING
ASPHALTIC RESIDUE FROM INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
A.1. PENETRATIONS,
A.2. VERTICAL SURFACES (CURBS, PARAPETS, MASONRY WALLS)
A.3. PITCH POCKETS,
A.4. ROOF DRAINS AND
A.5. VENTS
11. NEW ROOF ASSEMBLY:
B. REFER TO SPECIFICATIONS FOR BASIS OF DESIGN AND MANUFACTURER GUIDELINES INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
B.1. POLYVINYL-CHLORIDE (PVC) MEMBRANE ADHERED ON
B.2. 1/2" DENSDECK PRIME ROOF BOARD ADHERED ON
B.3. VECTOR MAPPING GRID ON TOP
B.4. TAPERED INSULATION ADHERED ON
B.5. VAPOR RETARDER ADHERED ON
B.6. 1/2" DENSDECK PRIME ROOF BOARD TO BE MECHANICALLY ATTACHED TO EXISTING METAL DECKING.
EXISTING ANTENNA "B" TO BE REMOVED BY SUBCONTRACTOR IN FULL.
EXISTING HATCH TO BE REMOVED IN FULL. REFER TO SECTION DETAILS FOR MORE INFORMATION.
SUBCONTRACTOR TO INSTALL NEW WALKWAY BY SIKA CROSSGRIP XTRA REFER TO SPECIFICATIONS.
PROVIDE SARNASTOP OVER THE COMPLETED PVC MEMBRANE. INSTALL 3'-0" FROM PERIMETER EDGES AS PER MANUFACTURER
GUIDELINES. TYPICAL AT PERIMETER
NOT USED
EXISTING OVERFLOW SCUPPER TO REMAIN.
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
EXISTING LIGHTNING ROD TO REMAIN. SUBCONTRATOR SHALL PROTECT, TEMPORARILY REMOVE AND REINSTALL EXISTING LIGTN ING PROTECTION COMPONENTS AS REQUIRED FOR NEW WORK OR REPAIRS, WITHOUT COMPRIMISING SYSTEM PERFORMANCE. PRIOR
TOREMOVAL, THE SUBCONTRACTOR SHALL DOUMENT EXISTING CONDITIONS.
A11
EXISTING LOWER BAY ROOFS ARE NOT IN SCOPE. THESE ROOFS ( EQUIPMENT NUMBERS - R785R02.1, R78R02(MIDDLE), AND R78R02(LOWER) ARE UNDER 20 YEAR WARRANTY WITH JOHNS MANVILLE. ANY WORK REQUIRED FOR MASONRY WALL REPAIR THAT MAY IMPACT ROOF MUST MEET WARRANTY REQUIREMENTS. SUBCONTRACTOR IS TO CONTACT JOHNS MANVILLE PRIOR TO MOVING FORWARD
WITH ANY REPAIR OR ALTERATION.
JOHNS MANVILLE CONTACT: AMY GARDNER, MIDWEST OWNER SERVICES SPECIALIST 800-922-5922, OPTION #1 X 6472
GUARANTEE NUMBER: ANM128161397
EXPIRATION DATE: FEBRUARY 11, 2045
JOB NAME : FERMILAB - MINOS (785)
DATE OF COMPLETION: FEBRUARY 11, 2025
A12
A5 A6
A2
A1
A1
A11
A2
A11 A2
A ug
2,
- 1
0:
pm M
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \6
\7 N uM I\1
M in os
R oo f R ep la ce m en t H ig h Ba y\
- F in al D es ig n\
D ra w in gs
\6 -7
-1
_M
IN
O S_
A0 1-
A0 5.
dw g
07/15/26JAD
JAD
07/15/26
6-7-126
MINOS HIGH BAY ROOF REPLACEMENT
and MASONRY WALL REPAIR
A-01
/0
3/
IS
SU
E
FO
R B
ID
ROOFING PLAN
ISSUED FOR CCR 05/29/26
1/8"=1'-0" 8 0 8 16
SCALE FEET
ISSUED FOR BIDDING 08/03/26
7856-7-9
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES
DIRECTORATE
1/8" = 1'-0" A-01
1ROOF PLAN
PROJECT
NORTH
E
S
W
N.T.S. A-01
5PHOTO OF MASONRY WALL AT HIGH BAY
N.T.S. A-01
4ANTENNA A
PHOTO OF EXIST.
N.T.S. A-01
2TYP. ROOF DRAIN
PHOTO OF
N.T.S. A-01
3EXIST. LIGHTNING ROD
PHOTO OF ANTENNAE AND
NOM.NOM. NOM.
FACE BRICK
EL. VARIES
TOP OF MASONRY
SLOPE
SLOPE
EXIST. LIMESTONE COPING
EL. VARIES
TOP / STEEL
4"4" 10"
A-02
EXTERIOR GRADE FIRE TREATED
WOOD BLOCKING
SPECIFIED
SARNIFIL
SECUREMENT
1'
-2 pe r m fg . s ta nd ar ds
STEEL ANGLE SEE ROOF FRAMING
PLAN
EXIST. METAL DECKING
ROOF ASSEMBLY - SEE DETAIL
PROVIDE VAPOR RETARDER SA106- SELF ADHERED
PROVIDE TAPERED INSULATION
ADHERED PER SPECIFICATIONS
PROVIDE 1/2" DENSDECK
PRIME COVERBOARD-
ADHERED
EXISTING METAL DECKING
PVC MEMBRANE - SARNAFIL PVC G410 80 MIL.
ADHERED
SUBCONTRACTOR MUST LOCATE EXISTING UTILITIES AND ELECTRICAL CONDUITS BELOW
EXISTING ROOF DECKING AND WITHIN FLUTES OF DECKING. SUBCONTRACTOR MUST
REFER TO GENERAL NOTES ON SHEET G-02, SPECIFICATIONS, AND PROVIDE A SAFETY PLAN
FOR ROOF WORK RELATING TO CONDUITS/UTILITIES UNDER EXISTING ROOF DECKING.
PVC MEMBRANE
HEAT- WELDED LAP
PER MANUFACTURERS
GUIDELINES AND
SPECIFICATIONS
VECTOR
MAPPING
GRID ON
TAPERED
INSULATION
NOTES:
1. SUBCONTRACTOR MUST WALK THROUGH BUILDING PRIOR TO WORK COMMENCING TO LOCATE
AND MARK WHERE ANY UTILITIES, AND ELECTRICAL CONDUITS ARE LOCATED UNDER THE
EXISTING ROOF DECKING AND WITHIN FLUTES OF DECKING.
2. SUBCONTRACTOR MUST REFER TO GENERAL NOTES ON SHEET G-02 AND SPECIFICATIONS
REGARDING PROCEDURES FOR MECHANICAL FASTENING TO EXISTING ROOF DECKING.
SUBCONTRACTOR MUST PROVIDE A SAFETY PLAN TO ENSURE NO MECHANICAL FASTENERS
WILL NOT PENETRATE EXISTING CONDUITS UNDER ROOF DECKING.
3. AS PER SPECIFICATIONS, PROVIDE ENHANCED SECUREMENT AT PERIMETER AND CORNER
ZONES OF ROOF.
4. HEAT WELD ALL SEAMS TO FORM CONTINUOUS WATERTIGHT SYSTEM.
5. ALL PRODUCTS TO BE ADHERED PER SPECIFICATIONS AND MANUFACTURER GUIDELINES.
5.1. INCREASE ADHESIVE DENSITY AND MECHANICAL FASTENERS AT PERIMETER AND CORNER
ZONES PER WIND UPLIFT REQUIREMENTS.
5.2. REFER TO SPECIFICATIONS FOR MORE INFORMATION.
MECHANICAL FASTENERS
PER MANUFACTURER
GUIDELINES
1/2" DENSDECK PRIME THERMAL BARRIER -
MECHANICALLY ATTACHED TO METAL DECKING
PER MANUFACTURER GUIDELINES. REFER TO
GENERAL NOTES AND SPECIFICATIONS.
NOTE: THIS DETAIL TO BE USED AS REFERENCE FOR OVERFLOW SCUPPERS. NO METAL BOX SCUPPER IS EXISTING.
PROVIDE OVERFLOW SCUPPER WITH SARNACLAD METAL IF REQUIRED.
PROVIDE VECTOR MAPPING
GRID PER SPECIFICATIONS
NOTES:
Fluid-Applied Membrane System, 30-Year Warranty:
Sikalastic RoofPro 30, Sika Reemat Premium:
1. Base Layer: Sikalastic 641 Lo-VOC, 50 mils wet-film thickness; approximately 32 sq. ft. per gallon coverage rate.
2. Top Layer No. 1: Sikalastic 641 Lo-VOC, 23 mils wet-film thickness; approximately 69 sq. ft. per gallon coverage rate.
3. Top Layer No. 2: Sikalastic 641 Lo-VOC, 38 mils wet-film thickness; approximately 42 sq. ft. per gallon coverage rate.
Total System Thickness: 111 mils wet-film thickness.
A ug
2,
- 1
0:
pm M
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \6
\7 N uM I\1
M in os
R oo f R ep la ce m en t H ig h Ba y\
- F in al D es ig n\
D ra w in gs
\6 -7
-1
_M
IN
O S_
A0 1-
A0 5.
dw g
07/15/26JAD
JAD
07/15/26
6-7-126
MINOS HIGH BAY ROOF REPLACEMENT
and MASONRY WALL REPAIR
A-02
/0
3/
IS
SU
E
FO
R B
ID
ROOFING DETAILS
ISSUED FOR CCR 05/29/26
3/4"=1'-0" 1 0 2 31
SCALE FEET
ISSUED FOR BIDDING 08/03/26
7856-7-9
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES
DIRECTORATE
NTS A-02
1MEMBRANE AT MASONRY WALL
SECTION DETAIL AT LIQUID APPPLIED
3/4"= 1'-0" A-02
2 WALL AND ROOF MEMBRANE
SECTION DETAIL AT MASONRY
NTS A-02
3DETAILS FOR PROPOSED ROOF ASSEMBLY
NTS A-02
5TYP. COVER STRIP AT SEAM DETAIL NTS A-02
4AND SARNAFASTENER DETAIL
FOUR FOOT PERIMETER SARNABAR
NTS A-02
3TYP. SCUPPER BOX DETAIL
TOP / STEEL
EL. 782'-6" @ 2'x8' HATCH
REMOVE EXISTING ROOF ASSEMBLY AS PER
SPECIFICATIONS
REMOVE EXISTING 2'-0" x 8'-0" TOPSIDE ACCESS
HATCH IN FULL.
REMOVE EXISTING HATCH CURB WITH INTERNAL CAP FLASHING
REMOVE EXISTING ROOF ASSEMBLY AS
PER SPECIFICATIONS
REMOVE EXISTING ROOF COUNTER
FLASHING AS PER SPECIFICATIONS
EXISTING STRUCTURE -REFER TO STRUCTURAL FRAMING PLAN
REMOVE EXIST. L 5 X 3 X 1/4" FRAME FIELD WELDED TO
STRUCTURE THAT PROTRUDES ABOVE METAL DECKING.
TOP / STEEL
EL. 782'-3 1/2"
NOTE:
REFER TO STRUCTURAL FRAMING PLAN FOR OPENING LOCATION
AND STRUCTURAL MEMBER INFORMATION
TOP / STEEL
EL. 782'-6" @ 2'x8' HATCH
PROVIDE NEW METAL DECKING TO COVER HATCH
OPENING. NEW DECKING TO MATCH EXISTING PROFILE
AND GAUGE. PROVIDE SUPPLEMENTAL STEEL
SUPPORTS AS REQUIRED. SECURE IN ACCORDANCE
WITH SDI STANDARDS.
LIQUID APPLIED MEMBRANE (FLUID
APPLIED MEMBRANE) AS PER
SPECIFICATIONS AND MANUFACTURER'S
RECOMMENDATIONS
EXISTING STRUCTURE -REFER TO STRUCTURAL FRAMING PLAN
TOP / STEEL
EL. 782'-3 1/2"
NOTE:
REFER TO STRUCTURAL FRAMING PLAN FOR OPENING LOCATION
AND STRUCTURAL MEMBER INFORMATION
PROVIDE NEW ROOF ASSEMBLY AS PER SHEET A-01 AND
SPECIFICATIONS
A-02
SIM.
A-02
SIM.
EXISTING MASONRY WALL SEE SHEET A-02
AND GENERAL NOTES FOR MASONRY
WALL REPAIR FOR MORE INFORMATION
EXISTING MASONRY WALL SEE DETAIL
4/A-04 FOR MORE INFORMATION
TOP / FASCIA COPING
EL. 784'-6"
TOP / STEEL
EL. 782'-6"
A 1 B 5
A-03
EXIST. CONT. BENT PLATE CLOSURE.
TYPICAT AT PERIMETER OF BUILDING
LINES AT COLUMN LINES 1, 5, A AND B.
1 1/2" FLUSH EXTERIOR INSULATED
METAL PANEL
2" INTERIOR INSULATED METAL
LINER PANEL
EXIST. GALV. 1/2" SUBGIRT
PROVIDE NEW ROOF ASSEMBLY
AS PER SHEET A-01 AND
SPECIFICATIONS
EL. 782'-6"
TOP / STEEL
EL. 784'-6"
TOP / FASCIA COPING
EL. 783'-6"
BOT / FASCIA COPING
B
6"
3" 3"
EXIST. CONT. 3/16" X 12" X 4 1/2"
BENT PLATE AT PERIMITER OF
BUILDING. REMOVE EXISTING
WOOD BLOCKING ATTACHED TO
BENT PLATE FOR NEW ROOF
ASSEMBLY
REFER TO STRUCTURAL
FRAMING PLAN
EXIST. STEEL PLATE
PROVIDE SEALANT
3,5 A-04
A-03
PROVIDE 20 GA. CAP FLASHING. WRAP
OVER TOP OF PARAPET WALL.
COORDINATE WITH ROOF FLASHING
AS PER MANUFACTURER GUIDELINES
WRAP VAPOR RETARDER UP TO
TOP OF WOOD NAILER
EXIST. 3" X 12" WIDE OVERFLOW
OPENING REFER TO 3/A-03
PROVIDE NEW ROOF ASSEMBLY
AS PER SHEET A-01 AND
SPECIFICATIONS
EL. 784'-6"
TOP / FASCIA COPING
4" 2"
3"
1' -0
EXISTING COPING TO
REMAIN
EXISTING CONT. 16 GA.
GALVANIZED CLEAT TO
REMAIN
SARNAFIL G49 60 MIL. FLASHING
AS PER MANUFACTURER
GUIDELINES
EXISTING FLASHING TO
REMAIN AND OVERLAP
ONTO THE METAL
EXTENDER PIECE
TYPICAL
NOTE:
PROVIDE FASTENERS THAT WILL PREVENT GALVANIC CORROSION WITH EXISTING SIDING AND
ADJACENT MATERIALS. PROVIDE FASTENERS OF STAINLESS STEEL OR HOT-DIP GALVANIZED STEEL
CORROSION RESISTANT, COMPATIBLE WITH ADJOINING MATERIALS.
PRIOR TO INSTALLATION OF PVC MEMBRANE AND FLASHING, ALL EXISTING ASPHALT-BASED
(BITUMINOUS) COATINGS, MASTIC AND RESIDUE ON PARAPETS SHALL BE COMPLETELY REMOVED TO
REVEAL CLEAN SOUND, AND DRY SUBSTRATE TYPICAL.
ALUMINUM TAPE
GROMMETED FASTENER
FASTENED AT 12" O.C.
CORROSION RESISTANT,
GASKETED, AND MANUFACTURER
APPROVED TYPICAL
SARNASTOP AT BASE OF WALL
OR CURB FASTENED AT 12" O.CO.
A ug
2,
- 1
0:
pm M
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \6
\7 N uM I\1
M in os
R oo f R ep la ce m en t H ig h Ba y\
- F in al D es ig n\
D ra w in gs
\6 -7
-1
_M
IN
O S_
A0 1-
A0 5.
dw g
07/15/26JAD
JAD
07/15/26
6-7-126
MINOS HIGH BAY ROOF REPLACEMENT
and MASONRY WALL REPAIR
A-03
/0
3/
IS
SU
E
FO
R B
ID
ROOFING DETAILS
ISSUED FOR CCR 05/29/26
1"=1'-0"
SCALE FEET
ISSUED FOR BIDDING 08/03/26
7856-7-9
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES
DIRECTORATE
1"= 1'-0" A-03
1AT EXISTING HATCH
DEMOLITION SECTION DETAIL
1"= 1'-0" A-03
2AT EXISTING HATCH
PROPOSED SECTION DETAIL
NTS A-03
3WALL WITH METAL COPING CAP
SIKA DETAIL AT PARAPET
NTS A-03
4DETAIL AT EXISTING HATCH
EXISTING STRUCTURAL SECTION
3"= 1'-0" A-03
5SECTION DETAIL AT COPING
1"= 1'-0" A-03
6SECTION DETAIL AT PARAPET WALL
3"=1'-0"
SCALE FEET
'-0
'-0
3 1/2" X 3 1/2" X 1/2" X 2
1/2" WIDE
STEEL ANGLE
(TYP.)
3/4" DIA. STEEL RUNGS
WELDED (TYP.)
1/4" DIA.
FLATHEAD
EXP. BOLT
2 1/2" MIN.
EMBEDMENT
CMU WALL
2 1/2" X 1/2" STEEL
SIDE RAILS (TYP.)
CONC. FLOOR
(T
YP
2'-0"
1/2" STEEL BENT PLATE
8" X 3" X 2" WIDE
CONTINUOUS WELD
TO LADDER
6'-0" O.C. (TYP.)
2 1/2" X 1/2" STEEL
SIDE RAILS (TYP.)
1/4" MIN CLEARANCE TO
SHEET METAL ROOF JACKET
PRIME FLANGE BEFORE STRIPPING.
SET IN MASTIC OVER ROOFING.
3" MIN TO 4" MAX FLANGE
STRIP IN W/ 2 LAYERS
ROOF FLASHING.
RECOMMENDATION
DECK MFR'S
ATTACH PER STEEL
STL CLOSURE PLATE
14 GA. MIN GALV
PL 1/2"X1'-0"X1'-0"
PIPE
UMBRELLA AND TO PIPE.
MIN 8" ABOVE ROOFING
NOTE:
4" SQUARE SCH. 80
PL 1/2"X5 1/2"X5 1/2"
5/8" DIA STL ROD
REFER TO NOTE
METAL WATERTIGHT
METAL DRAW BAND
3/16
3/16
TYP
SEALANT
UMBRELLA
1/4
3/16
6 SIDES
1' -8
FIELD PAINT ALL EXPOSED STEEL
NOTE:
HOT PITCH POCKET
4"
2"
4"
WOOD NAILER
SEAL TIGHT w/
BATT INSULATION
4"
APPROX 2" TO 4"
ACCOMMODATE INSUL.
BLOCKING, ETC. TO
HT. OF PIPE, FLASHING,
INSUL. - INCREASE
THICKNESS
NOTE FOR NEW ROOF:
SUBCONTRACTOR TO REMOVE ALL EXISTING ASPHALTIC RESIDUE FROM THE PENETRATION, AS PVC AND ASPHALT ARE NOT COMPATIBLE.
NOTE:
REFER TO NOTE ON SHEET A-01 AND SPECIFICATIONS FOR MORE INFORMATION ON CAMERA CURBS.
A ug
2,
- 1
0:
pm M
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \6
\7 N uM I\1
M in os
R oo f R ep la ce m en t H ig h Ba y\
- F in al D es ig n\
D ra w in gs
\6 -7
-1
_M
IN
O S_
A0 1-
A0 5.
dw g
07/15/26JAD
JAD
07/15/26
6-7-126
MINOS HIGH BAY ROOF REPLACEMENT
and MASONRY WALL REPAIR
A-04
/0
3/
IS
SU
E
FO
R B
ID
ROOFING DETAILS
ISSUED FOR CCR 05/29/26
ISSUED FOR BIDDING 08/03/26
7856-7-9
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES
DIRECTORATE
N.T.S. A-04
4EXISTING LADDER DETAILS
FRONT ELEVATION
SIDE ELEVATION
N.T.S. A-04
1EXISTING ANCHOR TIE SECTION DETAIL
FOR REFERENCE ONLY
N.T.S. A-04
2TYP. PIPE PENETRATION FLASHING
NTS A-04
6 FOR REFERENCE ONLY CAMERA MOUNT BASE
NTS A-04
3TYP. FLASHING AT EQUIP. CURB
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
STEEL LADDER
AutoCAD SHX Text 1/2"=1'-0"
AutoCAD SHX Text I
AutoCAD SHX Text
| Sheets and Views |
| G-01 COVER SHEET |
| G-02 GENERAL NOTES |
| G-03 PHOTOS OF EXISTING CONDITIONS |
| G-04 GROUND FLOOR PLAN - FOR REFERENCE ONLY |
| G-05 MASONRY WALL DETAILS - FOR REFERENCE ONLY |
| G-06 WALL SECTION DETAILS - FOR REFERENCE ONLY |
| G-07 STRUCTURAL FRAMING PLAN - FOR REFERENCE ONLY |
| A-01 ROOFING PLAN |
| A-02 ROOFING DETAILS |
| A-03 ROOFING DETAILS |
| A-04 ROOFING DETAILS |
File details come from the government source that posted it. Updated .