This is an architectural roofing plan and specification document for the Fermilab MINOS (785) High Bay Roof Replacement and Masonry Wall Repair project. The scope of work includes removal and replacement of the existing roof assembly with a new PVC membrane system (Sarnafil S327 80 mil) installed over tapered insulation, vector mapping grid, and DensDeck Prime roof board mechanically attached to existing metal decking. The new roof assembly requires positive drainage sloped at 1/4" per foot to existing roof drains, with installation of new strainer domes and prefabricated tapered sumps at all drain locations to achieve IECC R30 insulation compliance.

The project specifies removal of existing antennas (designated as existing antenna "A" by Fermilab and existing antenna "B" by subcontractor), an existing roof hatch, and an existing ladder. The subcontractor must preserve and reinstall the existing lightning protection system through a qualified Lightning Protection Institute (LPI) certified subcontractor in accordance with NFPA 780 and UL 96A standards. Additional work includes installation of new roof curbs with exterior insulation for camera mounting, new Sika Crossgrip Xtra walkway systems, and removal of all asphaltic residue from penetrations, vertical surfaces, pitch pockets, roof drains, and vents due to PVC and asphalt incompatibility. The project completion date was February 11, 2025, and the three lower bay roofs (equipment R785R02.1, R785R02-Middle, and R785R02-Lower) remain under a 20-year Johns Manville warranty through February 11, 2045 (guarantee number ANM128161397) and are excluded from this scope pending warranty coordination.

View the file

Other files

File Type Posted
Pre-Proposal Sign In Sheet_Minos roof-wall_2nd Site Visit.pdf PDF
QandA-Minos Roof and Masonry Wall1_Response_Final.pdf PDF
Response8-PLM Results Report - Lab F - MINOS - F38FC - NWA.pdf PDF
6-7-126_MINOS_G-01 COVER SHEET_REV01.pdf PDF
SECTION 075419 - POLYVINYL-CHLORIDE (PVC) ROOFING_Amendment2.pdf PDF
6-7-126_MINOS_G-02 GENERAL NOTES_REV01.pdf PDF
Amend 02 to RFP ISD_384202_DA.pdf PDF
2.0 Price Proposal Form_Final_R1_fill-ins.pdf PDF
Second Site Visit-Business Visitor Registration Instructions and Directions.pdf PDF
Amend 01 to RFP ISD_384202_DA.pdf PDF
Pre-Proposal Meeting-Sign in Sheet.pdf PDF
1.0 Request for Proposal_ISD_384202_DA.pdf PDF
Exhibit E Bid Bond FL-41.pdf PDF
Exhibit H Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit K SARC_Subcontractor Annual RepsCerts Rev 8.pdf PDF
Exhibit L General Decision No IL20260008 Mod2_2026_0518.pdf PDF
Exhibit N FL-61 (Rev. 1-07).pdf PDF
Attach B 6-7-126_MINOS HB ROOF REPLACEMENT_PROJECT MANUAL_260803.pdf PDF
Exhibit C FFDG General Terms and Conditions for Construction (08.2025).pdf PDF
Exhibit D 2025 Construction Insurance Requirements.pdf PDF
Exhibit I SF1413_fill-ins.pdf PDF
Exhibit M Sample FFP Subcontract.pdf PDF
Exhibit P Summary of Required Solicitation Documents.pdf PDF
2.0 Price Proposal Form_Final_fill-ins.pdf PDF
Attach A 6-7-126_SOW_Minos Roof_High Bay_wall repair_v5.pdf PDF
Exhibit F Payment Bond FL-42_FFDG.pdf PDF
Exhibit G Performance Bond FL-40_FFDG.pdf PDF
Exhibit J PUR-466_Proposal Certifications_r5_10.14.25.pdf PDF
Exhibit O 6-7-126 MINOS HIGH BAY ROOF_MASONRY WALL REPAIR_drawing set.pdf PDF
Exhibit Q Business Visitor Registration Instructions and Directions-MinosRoof_MasonryWall.pdf PDF
Exhibit R Fermilab Site Map-MINOS.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

±1 2'

-1

1/ 2"

V.

I.F

A-03

EXIST.

FAN

106'-8"

'-8

'-1

/4

NOT IN SCOPE

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

AT AT ATAT

A-02

±24'-8 3/4" V.I.F.

26'-0"

EXTERIOR FACE

OF CURTAIN

WALL

±30'-11 1/4" V.I.F.

±3 8'

-9

/2

V.

I.F

±4

2' -3

/4

V.

I.F

EXIST. FALL ARREST

SYSTEM ANCHOR

TIE

EXIST. FALL ARREST

SYSTEM ANCHOR

TIE

A-03

EQUIMPMENT NUMBER

R785R02.1

(UPPER)

EQUIMPMENT

NUMBER

R785R02-(MIDDLE)

EQUIMPMENT

NUMBER

R785R02-(LOWER)

SLOPE

SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE

SL

O

PE

SLOPE

SLOPE

SL

O

PE

A-03

A-03

A-03

COLUMNS BELOW

APPROX. LOCATION

OF VENT STACK

26'-0"26'-0"26'-0" 1'-4"

EQUIMPMENT NUMBER R785R01

(HIGH BAY)

4300 SF ±

EXIST. ROOF HATCH

SLOPE SLOPESLOPE SLOPESLOPE SLOPE

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

EXIST.

LADDER

TO

REMAIN

A11

A2

A1

A12

A3

A4 A5 A6A8

A12

A12

A12

A12

A7

A10A10

TYP. AT ALL

ROOF DRAINS

X A01

A01

A91

A9

A9

A9

X

X-XX

X

X-XX

SYMBOL LEGEND

PHOTO DETAIL LOCATION

SECTION DETAIL

LINE INDICATES ITEM TO BE

REMOVED

ROOF DRAIN WITH SUMP

NEW WALKWAY REFER TO KEYNOTES AND SPECIFICATIONS FOR MORE

INFORMATION

EXIST. FALL PROTECTION TIE ANCHORS

SLOPE

SLOPE FOR POSITIVE DRAINAGE

1/4" PER FOOT TYP. AT ALL ROOF LOCATIONS

AREA NOT IN SCOPE - REFER TO KEYNOTES AND GENERAL NOTES FOR MORE

INFORMATION.

SARNASTOP OVER THE COMPLETED SARNAFIL MEMBRANE.

3'-0" FROM ALL PERIMETER EDGES REFER TO SPECIFICATIONS AND

MANUFACTURER GUIDELINES. REFER TO KEYNOTE A8.

KEYNOTE LEGEND

EXISTING ANTENNA "A" TO BE REMOVED BY FERMILAB AND REPLACED BY FERMILAB. SUBCONTRACTOR TO COORDINATE WITH CONSTRUCTION COORDINATOR AND FFDG PROJECT MANAGER FOR SCHEDULE REQUIREMENTS FOR REMOVAL.

EXISTING CAMERA TO BE REMOVED BY FERMILAB. SUBCONTRACTOR TO PROVIDE NEW ROOF CURBS WITH EXTERIOR INSULATION .

REFER TO SIKA DETAIL ON SHEET A-04.

CURB HEIGHT TO BE MIN.18" ABOVE MEMBRANE AND TIED TO EXISTING METAL DECKING. SIZE OF CURBS TO ACCOMMODATE CAMERA

MOUNT SHOWN IN DETAIL FOR REFERENCE ONLY CAMERA MOUNT BASE ON SHEET A-04.

PROVIDE PREFABRICATED TAPERED SUMP AT DRAINS TO PROVIDE POSITIVE DRAINAGE AND IECC COMPLIANCE OF R30 FOR INSULATION. IF COMPLIANCE IS NOT ACHIEVED THROUGH TAPERED SUMP AN ADJUSTABLE COLLAR MUST BE PROVIDED.

TO PREVENT SPLITTING OF NEW PVC MEMBRANE- SARNAFIL S327 80 MIL MEMBRANE AT DRAINS, REFER TO MANUFACTURER

GUIDELINES.

EXISTING LEADER PIPES SHALL BE CLEANED OF EXCESS BITUMEN BUILD-UP, DIRT AND DEBRIS.

SUBCONTRACTOR TO INSTALL NEW STRAINER DOMES AT DRAINS. SUBCONTRACTOR TO INSPECT EXISTING ROOF DRAINS AND INFORM FERMILAB CONSTRUCTION COORDINATOR OF ANY ISSUES THAT MAY NEED TO BE ADDRESSED TO BE SURE POSITIVE DRAINAGE IS

ACHIEVABLE.

X

GENERAL NOTES:

1. SUBCONTRACTOR IS TO VERIFY ALL INFORMATION AND DIMENSIONS IN FIELD. ANY VARIANCE IN EXISTING CONDITIONS MUST BE COMMUNICATED TO FERMILAB

CONSTRUCTION COORDINATOR.

2. REFER TO REFERENCE DRAWINGS IN SHEET LIST TABLE IN GENERAL SUBSECTION FOR EXISTING STRUCTURAL FRAMING PLAN AND DRAWINGS, EXISTING

MASONRY WALL DETAILS, AND EXISTING COPING INFORMATION.

3. SUBCONTRACTOR IS RESPONSIBLE FOR LOCATING ANY EXISTING CONDUIT LOCATIONS IN FLUTES OF METAL DECKING. CONDUITS MUST BE LOCATED , COORDINATED, AND MARKED ON ROOFING MATERIALS PRIOR TO INSTALLATION OF ANY MECHANICAL FASTENERS. CONFIRMATION WITH FERMILAB CONSTRUCTION COORDINATOR IS REQUIRED PRIOR TO INSTALLATION OF MECHANICAL FASTENERS.

4. SUBCONTRACTOR IS RESPONSIBLE FOR LOCATING AND MARKING ALL EXISTING UTILITIES BEFORE COMMENCING ANY WORK. IF THE SUBCONTRACTOR FAILS TO LOCATE OR MARK SUCH UTILITIES, AND SUCH FAILURE RESULTS IN DAMAGE TO ANY UTILITY, THE SUBCONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL COSTS, INCLUDING BUT NOT LIMITED TO REPAIR, REPLACEMENT, RELOCATION , AND CONSEQUENTIAL DAMAGES, AS WELL AS DELAY AND DISRUPTION COSTS.

5. TAPERED INSULATION SLOPE TO BE 1/4" PER FOOT AND SLOPED TO PROVIDE POSITIVE DRAINAGE.

6. INSULATION THICKNESS AT PARAPET WALLS VARIES-VERIFY BLOCKING FOR FASCIA, GRAVEL STOP AND RELATED REQUIREMENTS. ALL WOOD BLOCKING IS TO

BE FIRE RATED EXTERIOR GRADE.

7. ANY NEW METAL DECKING TO BE INSTALLED MUST BE MECHANICALLY SECURED TO STRUCTURE, TYPICAL AT ALL CLOSED ROOF OPENINGS. REFER TO

SPECIFICATIONS FOR MORE INFORMATION.

8. ALL NEW ROOFING MATERIALS MUST BE INSTALLED TO PROVIDE POSITIVE DRAINAGE TO EXISTING ROOF DRAINS.

9. REFER TO SHEET G-02 FOR SCOPE OF WORK FOR REPAIR OF MASONRY WALL.

A. IN ADDITION TO WHAT IS OUTLINED IN SPECIFICATIONS, PVC AND ASPHALT ARE NOT COMPATIBLE. SUBCONTRACTOR TO REMOVE ALL EXISTING ASPHALTIC

RESIDUE FROM INCLUDING BUT NOT LIMITED TO THE FOLLOWING:

A.1. PENETRATIONS,

A.2. VERTICAL SURFACES (CURBS, PARAPETS, MASONRY WALLS)

A.3. PITCH POCKETS,

A.4. ROOF DRAINS AND

A.5. VENTS

11. NEW ROOF ASSEMBLY:

B. REFER TO SPECIFICATIONS FOR BASIS OF DESIGN AND MANUFACTURER GUIDELINES INCLUDING BUT NOT LIMITED TO THE FOLLOWING:

B.1. POLYVINYL-CHLORIDE (PVC) MEMBRANE ADHERED ON

B.2. 1/2" DENSDECK PRIME ROOF BOARD ADHERED ON

B.3. VECTOR MAPPING GRID ON TOP

B.4. TAPERED INSULATION ADHERED ON

B.5. VAPOR RETARDER ADHERED ON

B.6. 1/2" DENSDECK PRIME ROOF BOARD TO BE MECHANICALLY ATTACHED TO EXISTING METAL DECKING.

EXISTING ANTENNA "B" TO BE REMOVED BY SUBCONTRACTOR IN FULL.

EXISTING HATCH TO BE REMOVED IN FULL. REFER TO SECTION DETAILS FOR MORE INFORMATION.

SUBCONTRACTOR TO INSTALL NEW WALKWAY BY SIKA CROSSGRIP XTRA REFER TO SPECIFICATIONS.

PROVIDE SARNASTOP OVER THE COMPLETED PVC MEMBRANE. INSTALL 3'-0" FROM PERIMETER EDGES AS PER MANUFACTURER

GUIDELINES. TYPICAL AT PERIMETER

ROOF COPING TO REMAIN AND TO BE PROTECTED. ANY DETERIORATION OR DEFORMITIES MUST BE COMMUNICATED TO CONSTRUCTION

COORDINATOR AND PROJECT MANAGER BEFORE PROCEEDING.

EXISTING OVERFLOW SCUPPER TO REMAIN.

A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

EXISTING LOWER BAY ROOFS ARE NOT IN SCOPE. THESE ROOFS ( EQUIPMENT NUMBERS - R785R02.1, R78R02(MIDDLE), AND R78R02(LOWER) ARE UNDER 20 YEAR WARRANTY WITH JOHNS MANVILLE. ANY WORK REQUIRED FOR MASONRY WALL REPAIR THAT MAY IMPACT ROOF MUST MEET WARRANTY REQUIREMENTS. SUBCONTRACTOR IS TO CONTACT JOHNS MANVILLE PRIOR TO MOVING FORWARD

WITH ANY REPAIR OR ALTERATION.

JOHNS MANVILLE CONTACT: AMY GARDNER, MIDWEST OWNER SERVICES SPECIALIST 800-922-5922, OPTION #1 X 6472

GUARANTEE NUMBER: ANM128161397

EXPIRATION DATE: FEBRUARY 11, 2045

JOB NAME : FERMILAB - MINOS (785)

DATE OF COMPLETION: FEBRUARY 11, 2025

A12

EXISTING LIGHTNING ROD TO REMAIN. PRIOR TO REMOVAL, THE SUBCONTRACTOR SHALL DOCUMENT EXISTING CONDITIONS. PROVIDE REMOVAL, TEMPORARY PROTECTION, REINSTALLATION, ADJUSTMENT, AND CERTIFICATION OF THE EXISTING LIGHTNING PROTECTION SYSTEM BY A QUALIFIED LIGHTNING PROTECTION SUBCONTRACTOR. THE LIGHTNING PROTECTION SUBCONTRACTOR SHALL EMPLOY PERSONNEL CERTIFIED BY THE THE LIGHTNING PROTECTION INSTITUTE (LPI) AS A MASTER INSTALLER OR MASTER INSTALLER/DESIGNER, OR BE A UL LISTED LIGHTNING PROTECTION SYSTEM INSTALLER. REINSTALLATION OF LIGHTNING ROD SHALL BE IN ACCORDANCE WITH NFPA 780 AND UL 96A. PROVIDE FINAL INSPECTION AND CERTIFICATION DOCUMENTATION AT PROJECT COMPLETION.

A5 A6

A2

A1

A1

A11

A2

A11

S ep

3,

- 5

:0 2p m M

:\F

ES

S_

EN

G \A ct iv e Pr oj ec ts \6

\7 N uM I\1

M in os

R oo f R ep la ce m en t H ig h Ba y\ C

AD

B

IM

\6

-7 -1

_M

IN

O

S_ A0

1- A0

5.

dw g

07/15/26JAD

JAD

07/15/26

6-7-126

MINOS HIGH BAY ROOF REPLACEMENT

and MASONRY WALL REPAIR

A-01

/2

5/

AD

D

EN

D

U M

ROOFING PLAN

ISSUED FOR CCR 05/29/26

1/8"=1'-0" 8 0 8 16

SCALE FEET

ISSUED FOR BIDDING 08/03/26

ADDENDUM 02 09/25/26

7856-7-9

SCALE:

PROJECT NO.

SHEET NO.

DESIGNED

DRAWN

CHECKED

APPROVED

ISD ENGINEERING DATE

PROJECT NAME.

SHEET NAME:

REVISIONS

REV. DESCRIPTION DATE

REVISION NO.FIMS. NO.

ISD

INFRASTRUCTURE

SERVICES

DIRECTORATE

1/8" = 1'-0" A-01

1ROOF PLAN

PROJECT

NORTH

E

S

W

N.T.S. A-01

5PHOTO OF MASONRY WALL AT HIGH BAY

N.T.S. A-01

4ANTENNA A

PHOTO OF EXIST.

N.T.S. A-01

2TYP. ROOF DRAIN

PHOTO OF

N.T.S. A-01

3EXIST. LIGHTNING ROD

PHOTO OF ANTENNAE AND

File details come from the government source that posted it. Updated .